Page 1: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

The reality of measuring 21st Century

leadership and team performance risk V3.0

Ian Sharpe MAIPM CPPD PMP 0403 113 035

Page 2: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Source: Gartner IT Services SurveyMarket Share, March 2013

IT Consulting Services

Company Market Share %

CY-2012

1 IBM 9.2%

2 UXC 7.1%

3 Accenture 6.7%

4 KPMG 6.7%

5 Ernst & Young 5.5%

6 PwC 4.7%

7 CSC 3.5%

8 Deloitte 3.4%

9 SMS 2.7%

10 Computershare 1.6%

The largest Australian-owned provider of ICT consulting services,

based on market share

Gartner ranking of #2 in the Australia

Top 300 ASX ranking and debt free

With 2,750 employees and revenues of over $600

million for FY13 - Growth 6%

2

Who is UXC?

Page 3: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

3

CONSULTING AND PROFESSIONAL SOLUTIONS

ENTERPRISE APPLICATIONS

> Who we are

> What we do

> How we do it

> Customers

Design Implement & Enhance Operate & Manage

Health > Utilities > Government > Financial Services > Manufacturing > Resources > Telco

UXC ConsultingUXC Professional Solutions

UXC Engineering Solutions

UXC Eclipse (Microsoft Dynamics) UXC Red Rock (Oracle)UXC Oxygen (SAP)

UXC Cloud Solutions (NetSuite)

UXC Connect

- ERP, CRM- Analytics & Business Intelligence

- HCM- Supply Chain Management - Corporate Performance

- Enterprise Content Management

- Financials

- Advisory and Delivery- Strategy & Architecture- Business Transformation

- Project, Program & PortfolioManagement

- Business Analysis- IT Service Management

- Communications- Education & Training

- Network Infrastructure- Unified Communications

- Data Centre Optimisation- Workspace Virtualisation

- Managed Services & Support

- Enterprise Mobility- Contact Centre- Entertainment & Content

- IP Video Surveillance- Outsourcing & Cloud

ICT INFRASTRUCTURE

UXC is an integrated service provider

Page 4: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting

Advisory

Best-of-breed ICT Advisory Services

with deep domain expertise and

thought-leadership

Who is UXC Consulting?4 Service streams harnessing the power of 7 expert practices

Education

Highly experienced Project Delivery

professionals to help you drive the

very real outcomes you need

Delivery

Servicing specific client needs, drawing threads of capability

from across our existing practices and Advisory, Delivery,

Training Service Streams

Integrated solutions

Strategy and Architecture

Business Transformation

Portfolio, Program and

Project Services

IT Service Management

Business Analysis

Communications

Technology

Leading professional Education and Accreditation in IT

Management, Project Management, Change Management

and Business Analysis

4

Page 5: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Where we’re going today

• The awful truth about failure• How do you find out what level of

risk your team performance is creating?

• What does ‘good’ look like?• Do you know where your team

performance risk is right now?• Questions

©4-D Systems and UXC Consulting

Page 6: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Something, somewhere has gone

horribly wrong in the team…

Page 7: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

This would all be much easier if people and

teams were like this…

©4-D Systems and UXC Consulting

Page 8: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

… the truth is we behave very differently…

Page 9: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

…and it is often unclear whether success is at

risk, from day to day team interactions

Page 10: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Can personality tests help?

Page 11: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Imagine if they did and we worked this way …

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting. Image is copyright Scott Adams

Do you work this way?

… no personality test proves how effective

a team you really have

Page 12: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Social context

What can we measure to meaningfully

profile team performance risk?

Page 13: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

In the same way that iron filings are driven by magnetic force ...

Page 14: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

...your behaviour would clearly be differentin these social contexts

Page 15: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

... leaders use this to drive high performance

behaviours and reduce associated risk

©4-D Systems and UXC Consulting

Page 16: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

... because ignoring context trumps skills

75% of the time (Gilbert)

Page 17: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

What kind of skills and intelligence are needed to...

• Fly the space shuttle?

• Build and launch a deep space telescope?

• Send a lander to Mars?

• Build a satellite?

Page 18: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Challenger

7 Astronaut Fatalities

What happened?• NASA launched Challenger, 18

degrees F, crusted with ice• It exploded 73 seconds later,

killing the seven crew

Technical cause identified• O-ring failure on booster

Real cause - Hurry up get it done• “The real question was why the

team proceeded to launch when all the evidence indicated otherwise.”

• Political pressure to launch, launch, launch

• President Reagan’s “State of the Union” speech that night

• Relationships with the “booster” contractor were “broken”

Page 19: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Hubble Space Telescope (HST)

Useless $2B telescope

What happened?• The 2.4M primary mirror was

manufactured incorrectly• Hubble Space Telescope, NASA’s

Crown Jewel, was useless

Technical cause identified• A spacing error in a critical

measuring device caused the flaw

Real cause - Hostile relationship• Fuelled by massive ($400M)

recurrent overruns on HST project• Repeatedly punished contractor for

their overruns and delays• Contractor did not communicate

problems they could rationalize away

Page 20: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Mars Climate Orbiter (MCO)

Navigation error, crashed into Mars

What happened?• Satellite was tested, delivered,

and launched• Then, instead of orbiting the

planet, it crashed into Mars

Technical cause identified• JPL software using imperial units

and Lockheed Martin (LM) executing in metric (as agreed under contract), causing orbital error

Real cause - Better, cheaper, faster• Scare profit towards the end for LM• NASA management ignored experts

reports of orbit discrepancies• Recommended corrective actions

never implemented

Page 21: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Mars Polar Lander (MPL)

Mis-read indicator, Crashed into Mars

What happened?• Computer shut the descent

engine off 40m above ground and crashed onto Mars

Technical cause identified• They found a landing leg switch

wired backward, & fixed it• Test procedure required a retest

confirming, all OK• They violated the procedure, and

resumed next steps• Did not learn that the opening leg

made an extra signal - interpreted by the computer as “on the ground”

Real cause - Better, cheaper, faster• Parallel mission with MCO• Underfunded by at least 30%• Scare profit towards the end for LM

Page 22: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Space Shuttle Columbia

What happened?• During launch, a large piece of

frozen foam hit the left wing• Shuttle disintegrated during re-

entry killing the seven crew

Technical cause identified• Damaged insulation tiles

Real cause - We’ve been safe before• Shuttle delay impeded acquiring

Military satellite diagnostic images• Decided not to tell the crew about

the concerns• Failure Review Board: “A rescue

might have been possible”

Page 23: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

NOAA-N Prime Satellite

Dropped onto the floor, repairs cost $135M

What happened?• Workers tipped a $200M

weather satellite over for access• The satellite smashed into the

floor, causing $135m damage

Technical cause identified• Others had “borrowed” the holding

bolts over the weekend• The rotation procedure required

verifying bolts were in place• Workers violated procedure

Real cause - Culture of inattention• Characterized by poor

communications, failure to correct known problems, and supervisor violations

Page 24: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

The reality of project failure…

• They first appeared to have technical failures as root

causes However, the people/ teams were technically

competent. In many cases, the most technically qualified

people in the world

• These were all detectable and avoidable

The real root causes were man-made due to

a broken context driving broken

behaviours ‘as normal’

• These are only the huge,

publically-visible mishaps/disasters

Page 25: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

How do we break the core of high performance teams and leaders into fundamental manageable

parts?

Measuring team social context

Page 26: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

CULTIVATINGWe all need to feel appreciated

VISIONINGWe all need hopeful, realistic

futures

INCLUDINGWe all need to feel we belong

DIRECTING We all need the ability to meet

expectations

Start with neurology - there are four deep

wired needs (dimensions) crucial to people

Page 27: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

CULTIVATINGMutual respect and enjoyable work

High trustWilling and energised collaboration

VISIONINGGrounded optimism

Sustained, effective creativityPerceiving ‘magical’ solutions

INCLUDINGAligned efficient action

‘We’ not ‘I’High trustworthiness and efficiency

DIRECTING No drama states in team

Everyone knows their partClear and achievable expectations

Expressing

authentic

appreciation

Addressing

shared interests

Expressing

reality-based

optimism

Being

Outcome

Focussed

Appropriately

including

others

Making and

keeping realistic

agreements

Resist blaming

and complaining

Clarifying roles,

accountability

and authority

Two behaviours per need strongly drive a

high performance team social context

©4-D Systems and UXC Consulting

Page 28: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

15 mins to anonymously diagnose your team risk

using a team development assessment (TDA)

Attention

drawn to the ‘why’ for each

behaviour

Attention

drawn to the standard for

excellence

Reflection

and write comments

Evaluation

through grading each

behaviour

Agree

Action items and do them

Discuss

report with team members

90m

What the survey looks like

15m

Page 29: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

TDA results are then compared against a

benchmark to call out performance risk

Distribution of benchmark teams’ first performance assessment scores

Feeling unappreciated

Significant conflict

Blind optimism

Low commitment

Feel excluded

Low trust

Victims and Blamers

High disorganisation

Mutual respect

High collaboration

Grounded optimism

High commitment

Feel included

High trust

No drama

Clear RAAs

Page 30: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

... scoring a team shows clear focus areas for the team to work on…

An overall performancebenchmark

… of the eight behaviours

.. is established from individual participants’ perceptions …

Page 31: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

... and TDAs are an efficient process to raise performance ...

Page 32: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

‘Red’ scores indicate at least one of the 7

deadly sins of teams are in play

• Ineffective team leadership

• Task undoable because of inadequate resources

• Flawed procurement implementation

• Team affected by a larger broken context

• Team engaged in power struggle with other organisation

• Members temperamentally unsuited to required work

• Flawed organisational structure

Page 33: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

You can make raise the performance

of your team, wherever they start

Team average percentile rankings

~22% Team Efficiency Increase

The teams enhanced performance by an average of 5% per reassessment.

53% 66% 70% 75%

66% 71% 76% 80%

72% 75% 79% 83%

77% 81%

84% 90%

1st Assessment

2nd Assessment

3rd Assessment

4th Assessment

Page 34: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

... Some unique advantages 4-D offers

• Stop teams fire-fighting• Prevent distressed teams (rescuing existing ones)• Develop people leadership simultaneously• Help individuals take and sustain accountability, in

context• Clear calls to action, backed by practical

development

Page 35: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Never doubt that a small group of thoughtful, committed project professionals can change the world

Indeed, it’s the only thing that ever has

Margaret Mead, Anthropologist

©4-D Systems and UXC Consulting

Page 36: Aipm conference 2013   the reality of measuring 21st century leadership and team performance risk v3

©4-D Systems and UXC Consulting©4-D Systems and UXC Consulting

Questions

Join me and an international group of peers including NASA (isdsharpe)

Where I share the latest PM, change and leadership insights to ‘pay it forward’ http://iansharpe.blogspot.com.au/

Follow and help me share your voice and leading insights(@Ian_Sharpe)