aim workshop 30 sep - 02 oct, 2014 1...aim workshop 30 sep - 02 oct, 2014 11 in addition to the...
TRANSCRIPT
![Page 1: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/1.jpg)
30 SEP - 02 OCT, 2014AIM Workshop 1
![Page 2: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/2.jpg)
Presented by Shirley Ford
30 SEP - 02 OCT, 2014AIM Workshop 2
![Page 3: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/3.jpg)
Since 2008, the Barbados Air Traffic Services achieved ISO 9000 certification.
From the beginning, the AIS was part of the process which included audits, management review meetings, as well as, being included in the documentation made up of the Quality Manual and Quality Assurance Manual.
30 SEP - 02 OCT, 2014AIM Workshop 3
![Page 4: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/4.jpg)
QMI-SAI Global was the company selected to evaluate the Barbados Air Traffic Services
Quality Management System against the ISO 9000:2000 requirements.
QMI-SAI Global is a widely recognized as a leading international registrar. It has over twenty-six (26) years of management system auditing experience
and 24000 (24000) registrations worldwide.
30 SEP - 02 OCT, 2014AIM Workshop 4
![Page 5: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/5.jpg)
30 SEP - 02 OCT, 2014AIM Workshop 5
![Page 6: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/6.jpg)
The Barbados Air Traffic Services QMS (ISO9001:2008)
30 SEP - 02 OCT, 2014AIM Workshop 6
•Quality Policy•Quality Objectives•Audit Results•Analysis of Data•Corrective & Preventive action•Management Review
The Quality Management
System is maintained through:
![Page 7: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/7.jpg)
The QMS was introduced to provide a service that meets customer & regulatory requirements;
30 SEP - 02 OCT, 2014AIM Workshop 7
This enables Barbados ATS to address & achieve customer satisfaction through:
• Effective application;
• Processes for continual improvement
• Prevention of non-conformities
![Page 8: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/8.jpg)
•Quality,•Reliability and •Integrity in the services
provided.
The QMS ensures that customers
receive
•Specifications,•Standards, as well as •Legal & quality
requirements.
The QMS calls for precise
adherence to:
30 SEP - 02 OCT, 2014AIM Workshop 8
![Page 9: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/9.jpg)
• Annex 2
• Annex 11
• Annex 15
• Relevant standards & regulations
The policies and
procedures implemented
within the QMS ensure compliance
with:
30 SEP - 02 OCT, 2014AIM Workshop 9
![Page 10: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/10.jpg)
Develops, implements and maintains appropriate Safety and Quality Management Systems;
Supports and coordinates with the Regulatory Section the processing of certification of personnel;
Conducts appropriate Quality Audits and develops any required remedial programs;
Analyses audit findings and ensures corrective follow-up action;
Prepares and submits working procedures and methods for Quality Assurance activity;
30 SEP - 02 OCT, 2014AIM Workshop 10
![Page 11: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/11.jpg)
Participates as required, in Inspections and Investigations;
Provides timely advice and assistance to management and staff on safety matters;
Makes an input into training in Quality Assurance matters;
Maintains an appropriate system to identify potential hazards;
Monitors the progress of Safety Reports and ensures that hazards are addressed;
Identifies Safety Training requirements;
30 SEP - 02 OCT, 2014AIM Workshop 11
![Page 12: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/12.jpg)
In addition to the Quality manuals, the AIS was required to develop:
•An AIS Operations Manual which contains day to day instructions for staff; and
•a number of quality forms.
30 SEP - 02 OCT, 2014AIM Workshop 12
![Page 13: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/13.jpg)
AMENDMENT TRACKING FORM
To ensure amendments are done in a timely manner and provides a measure of accountability.
30 SEP - 02 OCT, 2014AIM Workshop 13
![Page 14: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/14.jpg)
DOCUMENT DISTRIBUTION FORM
To ensure ICAO and other official documents are received by all ATC units management and BCATC.
30 SEP - 02 OCT, 2014AIM Workshop 14
![Page 15: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/15.jpg)
STATISTICAL DATABASE ERROR TRACKING FORM
To track non-conformities in the statistical database in efforts to meet the quality objectives.
30 SEP - 02 OCT, 2014AIM Workshop 15
![Page 16: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/16.jpg)
ATS AND OTHER MESSAGES ERROR TRACKING FORM
To track non-conformities in ATS messages, FPLS and NOTAMs in order to meet the quality objectives.
30 SEP - 02 OCT, 2014AIM Workshop 16
![Page 17: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/17.jpg)
NOTAM DISTRIBUTION FORM
To ensure that NOTAMs pertinent to the operations of ATC units are
received and distributed in a timely manner.
30 SEP - 02 OCT, 2014AIM Workshop 17
![Page 18: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/18.jpg)
30 SEP - 02 OCT, 2014AIM Workshop 18
ERROR ANALYSIS FORM
To analyze data of all non-conformities, determine if the quality objectives have been
met and provide recommendations for future
development.
![Page 19: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/19.jpg)
30 SEP - 02 OCT, 2014AIM Workshop 19
RECORD OF MISSING FLIGHT PLANS IN ATC UNITS FORM
To determine the reasons why FPLs are missing from ATC units.
![Page 20: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/20.jpg)
30 SEP - 02 OCT, 2014AIM Workshop 20
CUSTOMER COMMENTS/COMPLAINTS FORM
To develop a system useful for service improvement and customer satisfaction.
![Page 21: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/21.jpg)
The AIS developed:•A documented on-the-job training program;•A quarterly performance appraisal system.
In development are:•An AIS refresher training program; and•An Advance AIS Course.
30 SEP - 02 OCT, 2014AIM Workshop 21
![Page 22: AIM Workshop 30 SEP - 02 OCT, 2014 1...AIM Workshop 30 SEP - 02 OCT, 2014 11 In addition to the Quality manuals, the AIS was required to develop: •An AIS Operations Manual which](https://reader036.vdocuments.site/reader036/viewer/2022071420/61195d257eac9d04862449da/html5/thumbnails/22.jpg)
30 SEP - 02 OCT, 2014AIM Workshop 22
Thank You!
Any Questions?