Creating a high performing QA function… SimplesBy Carl Bruiners
![Page 2: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/2.jpg)
Presumptions
• Continuous Integration (CI) environmental at an embryotic stage
• No Continuous Delivery (CD) model
• No or limited reporting around QA
• Certain aspects around Development / Agile has been omitted to keep the focus on QA
![Page 3: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/3.jpg)
Note: This should form part of the teams definition of done
Team QA Vision
![Page 4: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/4.jpg)
What is high performing QA• Testing an integral part of the team
• Automated testing
• Continuous integration / delivery
• Reducing escaping defects
• Eliminating debt
• Reduce uncertainty
• Compliance – Accessibility, W3C, etc…
• Coding standards, practices and patterns
• Improving code base through refactoring
• Features / functions delivered are aligned to commercial requirements
• Hi-visibility of failing tests – i.e. CI / defect information radiators
• Team take shared responsibility for failed tests
• Guaranteed environment up time – Managed through SLA’s
![Page 5: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/5.jpg)
Commercial Benefits
![Page 6: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/6.jpg)
Customer
• Increased frequency of new feature deliveries
• Improved customer experience by reducing likelihood of encountering a defect
• Improved ability to test granular level functions without impacting on the product (in combination with A/B or multi-variant testing).
• Improved flexibility to react to competitors
![Page 7: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/7.jpg)
Product
• Reduced time spent on fixing defects = More time spent working on product features
• Teams work on small incremental feature / function deliveries so that new features ready for production are not held back by other unfinished features
• Base product improvement will help extensibility and scalability
• Feature areas are modular, encapsulated independent features which lessens any escaping defects impacting on other features / areas of the product
• A/B / Multi-variant testing feedback helps commercial make customer driven decisions
![Page 8: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/8.jpg)
Financials
• Average daily cost of £58 p/p
• Average effort time per defect 2 days
• Average weekly incoming defect rate 10
Weekly Monthly Annual Target Cost in days
Base £1,160 £4,640 £55,680 n/a 960
1st Year £696 £2,784 £33,408 40% 576
2nd Year £11.60 £46.40 £556.80 99% 9.5
![Page 9: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/9.jpg)
Agile Development
![Page 10: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/10.jpg)
Agile Application Lifecycle Management
![Page 11: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/11.jpg)
Agile Delivery Process
![Page 12: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/12.jpg)
• QA integrated within the team
• Refactoring as the team goes along
• Test Driven Development (TDD)
• Pair Programming – to reduce SPOF’s
• GUI / Functional automated testing
• Set a sensible BAU percentage – 20%-30%
• Development practices / patterns – i.e. OO, MVC, patterns, etc..
• Defects reviewed on a daily basis by the PO and team
• Testers validate defects – ensure reproducible steps
• Defining a commercial focused MMFS (Minimal Marketable Feature Set)
• Quality gates in swim lane – Peer review and ready for acceptance (on stage)
Development
![Page 13: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/13.jpg)
Defects
•Testers review incoming defects
•Ensuring defects have enough information supplied
•Identifying priority / severity of defect/s based on commercial value
•Frequently review defects
•Minimise escalations
•PM / PO's to be inclusive of prioritisation of defects
Testing
•Define smoke testing areas on the product
•Adopt Test Driven Development (TDD)
•Introducing Quality Control Gates (QC) into Sprints
Managing Risk
![Page 14: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/14.jpg)
Continuous Integration
Automated testing
•Automated unit testing
•Automated smoke testing
Environment
•Integration server
•SCM – All project deliverables stored under source control i.e. images, SQL scripts, documentation, etc…
•Builds should happen as frequently as possible
•Continuous visible feedback on testing
•Configuration management
![Page 15: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/15.jpg)
Continuous Delivery – Post CI buildAutomated testing
•GUI testing
•Functional testing
•Security testing
•Performance testing
•Regression testing
•Smoke testing
Automated deployment
•Stage
•Production
![Page 16: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/16.jpg)
Continuous delivery workflow
Dev test suite Test suite
Build Performance
Unit test Security
Code scan (U)AT
Compliancy
Regression
GUI
Functional
![Page 17: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/17.jpg)
The Plan
![Page 18: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/18.jpg)
Deliverable goals – Year 1
• Reduce escaping defects through implementing QC gates
• Reduce incoming defects
• Implement / improve CI environment
• Implement CD (inc. fully automated testing)
• Ensure features / functions delivered are aligned to commercial drivers
• Introduce Quality Controls into Agile process
• Work with teams to ensure correct defects are targeted
• Work with teams on correct best practice development practices
• Measure success rates of defects and improve when needed
• Promote X-team development through sharing each others journeys
• Measure escaping defects
![Page 19: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/19.jpg)
Short Term (Q1 / Q2 2012)
*Note: Subject to change
![Page 20: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/20.jpg)
Medium Term (Q3 / Q4 2012)
![Page 21: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/21.jpg)
Long Term 2013+
![Page 22: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/22.jpg)
My role• Reshape teams to be more test driven / orientated – Testers embedded in the teams• Ensure features being delivered on are returning health ROI• Ensuring commercial alignment;
• Create Scrum of Scrums not only amongst the teams – I attend• Daily Scrum of Scrums between myself and other Senior Management – Prioritised defect list shared
• Protect the teams from external influences• Reviewing defect backlogs to ensure that defects being worked on are aligned to commercial alignment• Stopping enhancements by reviewing the defect backlogs• Spot review stories to ensure stories are using I.N.V.E.S.T• Measure escaping defects• Mitigation of SPOFs• Ensuring Operations / IT have environments up against a ILSA• Bring in ISLA’s• Manage ISLA’s• Define, manage and negotiate rollback plans• Define, manage and negotiate dependency reductions – self sufficient teams / department• Managing other senior managers expectations – transparency / honesty• Protect teams from external factors that are out of scope• Manage scope creep• Resource management – Alignment of staff to peek periods or demands required to meet commercial
goals.• Building strongest equal teams• Carry out an annual Agile assessment (incorporates QA)• Organising the introduction of hi-visibility information radiators• Reduce aged defects over x days old • CI our QA strategy• Reduce cost of QA through improved process and productivity improvements
![Page 23: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/23.jpg)
Questions
![Page 24: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/24.jpg)
Handouts
![Page 25: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/25.jpg)
Fig. 1 – Cone of uncertainty
![Page 26: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/26.jpg)
Fig. 2 – Agile test curve
![Page 27: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/27.jpg)
Fig. 3 – CI dashboard
![Page 28: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/28.jpg)
Fig. 4 – Prototyping
![Page 29: Agile QA presentation](https://reader035.vdocuments.site/reader035/viewer/2022081413/548cac54b4795936648b460a/html5/thumbnails/29.jpg)
Fig. 5 – Scrum Ceremonies