Metro Central Joint Development Assessment Panel
Agenda
Meeting Date and Time: 22 July 2016; 9:30am Meeting Number: MCJDAP/184 Meeting Venue: Department of Planning 140 William Street, Perth Attendance
DAP Members Mr Charles Johnson (Presiding Member) Mr Chris Antill (Deputy Presiding Member) Mr John Ellis (A/Specialist Member) Cr Pauline Tarrant (Local Government Member, City of Canning) Cr Christine Cunningham (Local Government Member, City of Canning) Cr Robert Rossi (Local Government Member, City of Belmont) Cr Janet Powell (Local Government Member, City of Belmont) Cr Glenn Cridland (Local Government Member, City of South Perth) Cr Sharon Hawkins-Zeeb (Local Government Member, City of South Perth) Officers in attendance Ms Zoe Lavranos (City of Canning) Mr Simon Peters (City of Belmont) Ms Melissa Thompson (City of Belmont) Mr Cameron Howell (City of South Perth) Department of Planning Minute Secretary Ms Natalie Garland Ms Georgia Young Applicants and Submitters Mr Kris Nolan (Urbis Pty Ltd) Mr Andrew Campion (Campion Design Group) Mr George Watts (Herring Storer Acoustics) Mr Brian Adcroft (ADC Projects Pty Ltd) Mr Edwin Bollig (Bollig Design Group) Mr Peter Simpson (PTS Town Planning) Mr Paul Ruthven Cr Fiona Reid Members of the Public Nil
Version: 2 Page 1
-
1. Declaration of Opening
The Presiding Member declares the meeting open and acknowledges the past and present traditional owners and custodians of the land on which the meeting is being held.
2. Apologies
Mr Lou DAlessandro (Specialist Member) Mayor Phil Marks (Local Government Member, City of Belmont) Cr Colin Cala (Local Government Member, City of South Perth)
3. Members on Leave of Absence
Nil
4. Noting of Minutes
Note the Minutes of meeting No. 179 held on 5 July 2016, No. 180 held on 6 July 2016, No. 181 held on 8 July 2016 and No. 182 held on 12 July 2016 and No.183 held on the 13 July 2016.
5. Declarations of Due Consideration
Any member who is not familiar with the substance of any report or other information provided for consideration at the DAP meeting must declare that fact before the meeting considers the matter.
6. Disclosure of Interests
Nil
7. Deputations and Presentations 7.1 Mr George Watts (Herring Storer Acoustics) presenting for the
application at Item 8.2. The presentation will provide a brief justification for acoustic compliance with codes.
7.2 Mr Andrew Campion (Campion Design Group) presenting for the application at Item 8.2. The presentation will address the reasons for rejection provided in the City of Belmonts RAR.
7.3 Mr Paul Ruthven presenting against the application at Item 9.2. The
presentation will address the potential impacts of the development on amenity and safety, and the relevance of Amendment 46.
7.4 Cr Fiona Reid presenting against the application at Item 9.2. The presentation will discuss the proposed length of time of the application extension.
7.5
Mr Peter Simpson (PTS Town Planning Pty Ltd) presenting for the application at Item 9.2. The presentation will discuss the proposed length of time of the application extension.
Version: 2 Page 2
-
8. Form 1 - Responsible Authority Reports DAP Applications
8.1 Property Location: 25 Brewer Road, Canning Vale Application Details: Warehouse and Incidental Office Applicant: Urbis Pty Ltd Owner: Swan Brewery Company Ltd Responsible authority: City of Canning DoP File No: DAP/16/01025
8.2 Property Location: Lot 500 (No. 95), portion Lot 604 (Nos. 85-91)
Great Eastern Highway and Lot 170 (No. 5) Toorak Road, Rivervale
Application Details: Hotel comprising of 160 guest rooms along with car parking, bar and restaurant
Applicant: Campion Design Group Owner: Swantop Pty Ltd Responsible authority: City of Belmont DoP File No: DAP/16/01005
9. Form 2 Responsible Authority Reports - Amending or cancelling DAP development approval
9.1 Property Location: Lot 23 (No. 5) Cowcher Place, Belmont Application Details: Minor Amendment to St John Ambulance Multi-
Use Hub Facilities Applicant: ADC Projects Pty Ltd Owner: St John Ambulance Western Australia Ltd Responsible authority: City of Belmont DoP File No: DAP/15/00838 9.2 Property Location: Lot 1001 (No. 12) Charles Street, South Perth
[previously Lots 151-153 Nos. 12-16] Application Details: Proposed Amendment (Validity of Approval) to
Approved Non-Residential Development Comprising Office and Caf/Restaurant in a Nine Storey Building
Applicant: PTS Town Planning Pty Ltd Owner: Broadway Pty Ltd Responsible authority: City of South Perth DoP File No: DAP/13/00447
10. Appeals to the State Administrative Tribunal
Nil
11. General Business / Meeting Closure In accordance with Standing Order 7.3 only the Presiding Member may publicly comment on the operations or determinations of a DAP and other DAP members should not be approached to make comment.
Version: 2 Page 3
-
Page 1
Form 1 - Responsible Authority Report (Regulation 12)
Property Location: 25 Brewer RD Canning Vale (LOT: 1003
P/D: 407783) Application Details: Warehouse and Incidental Office DAP Name: Metro Central JDAP Applicant: Urbis Pty Ltd Owner: Swan Brewery Company Ltd LG Reference: 15/17466.1 Responsible Authority: City of Canning Authorising Officer: Kelly Vilkson, Manager Statutory Planning Department of Planning File No: DAP/16/01025 Report Date: 8 July 2016 Application Receipt Date: 12 April 2016 Application Process Days: 90 Days Attachment(s): 1. Location Plan.
2. Development Plans. 3. Stormwater Report by DWA 30 March
2016. 4. Planning Report by URBIS 12 April
2016. 5. Transport Assessment by Cardno 7 April
2016. 6. External Agency Comments.
Officer Recommendation: That the Metro Central Joint Development Assessment Panel resolves to: Approve DAP Application reference DAP/16/01025 and accompanying plans, including Site Layout Plan (15187 TP01), Office Layout Plan and South / West Elevation Plan (15187 TP02), North / South / East Elevation Plan (ref: 15187 TP03), West Elevation and Section A Plan (ref: 15187 TP04), Section B and Section C Plan (15187 TP05), Substation Plan and South / East Elevation Plan (15187 TP06), Landscape Plan (DWG1 revC), Landscape Plans (DWG2 revB and DWG3 revB) and Stormwater Design Plans (DWG No. C01, C02, C03 and C04), in accordance with clause 68 of the Deemed Provisions of the Planning and Development (Local Planning Schemes) Regulations 2015 and of the City of Canning Town Planning Scheme No. 40, subject to the following conditions: Conditions 1. Prior to the occupation or use of the development, all car parking spaces and
loading areas together with their aisles are to be constructed, drained and line marked. All loading areas, parking bays and access aisles are to be thereafter maintained and remain clear of any storage and/or obstacles to the satisfaction of the City.
2. Prior to occupation or use of the development, a Parking Management Strategy
shall be submitted to and approved by the City. The approved Strategy is to be implemented thereafter to the satisfaction of the City.
-
Page 2
3. Prior to the occupation or use of the development, a Waste Management Plan
is to be provided detailing the location of bins; cleaning and maintenance of bins and bin enclosure/s; frequency of collection; specify private contractor removal service, City of Canning provided service and/or combination of both; and procedure and associated timeframes to remove accumulated disused/ discarded items from the site (items left behind by tenants).
4. Prior to occupation or use of the development, landscaping is to be provided in
accordance with the Landscape Plans (DWG2 revB and DWG3 revB). The landscaping is to be maintained thereafter to the satisfaction of the City.
5. Stormwater from all roofed and paved areas must be collected and discharged
to the Water Corporation drain, with prior written permission of the Water Corporation of Western Australia and to the satisfaction of the City. Storm water must not affect or be allowed to flow onto or into any other property. Drainage systems must be in accordance with the Building Code of Australia.
Advice Notes a. If the development the subject of this approval is not substantially commenced
within a period of 2 years, or another period specified in the approval after the date of the determination, the approval will lapse and be of no further effect.
b. Where an approval has so lapsed, no development must be carried out without the further approval of the local government having first being sought and obtained.
c. The proposed development is to comply with the provisions of the Building Act
2011, the Building Code of Australia and any other requirements of the Citys Building Department.
d. This approval does not authorise the commencement of any building works.
The applicant is advised that a building permit must be obtained prior to the commencement of any works. To obtain a building permit it will be necessary to submit documentation in compliance with the Building Regulations, including plans incorporating all conditions of this approval, specifications and structural drawings.
e. In relation to waste management; a suitable enclosure for the storage and
cleaning of receptacles on the premises is required, as follows: i. Install in the enclosure a tap connected to an adequate supply of water; ii. Be of sufficient size to accommodate all receptacles used on the
premises but in any event having a floor area not less than a size approved by the Manager of Waste Services or an Environmental Health Officer;
iii. Constructed of brick, concrete, corrugated compressed fibre cement sheet or other material of suitable thickness approved by the Manager of Waste Services or an Environmental Health Officer;
iv. Having walls not less than 1.5 metres in height and having an access way of not less than 1 metre in width and fitted with a self-closing gate;
-
Page 3
v. Containing a smooth and impervious floor of not less than 75 millimetres in thickness; and which is evenly graded and connected to an approved liquid refuse disposal system in an approved manner; and
vi. Which is easily accessible to allow for the removal of the receptacles.
f. In relation to stormwater disposal, the Water Corporation advises that drainage is to be constructed in accordance with the plan approved by the Water Corporation in their email dated 1st April 2016 and as specified in Drawing SK01 C contained in the report by DWA dated 30th March 2016.
g. Industrial/Commercial crossovers must be constructed in accordance with the Citys Industrial/Commercial Crossover Standard Details refer to Plan No. STD 02. The Citys Engineering Services advise that the minimum and maximum width of industrial/commercial crossovers is four point five (4.5) and eleven (11) metres respectively. The City advises that: i. Prior to construction of all crossovers and internal driveways, levels at the
property boundary must be obtained from the Citys Customer Services Officer - Construction on 9231 0654. The City sets a +2% grade from the top of the fully mountable kerb to the property boundary and any variation must be approved by the Citys Engineering Services in writing prior to the commencement of any construction. Concrete crossovers must be inspected prior to pouring concrete and asphalt crossovers must be inspected after laying and compaction of crushed limestone/road base. All crossovers must be inspected on completion of construction. Contact the Customer Services Officer - Construction on the above number to arrange for an inspection;
ii. Industrial/Commercial crossover construction material must be concrete or asphalt; and
iii. Industrial crossover splays as shown on the plan are acceptable.
h. The site is located in close proximity to the Parmelia high pressure natural gas transmission pipeline. The applicant/landowner is to contact the APA group prior to storing highly flammable, explosive, acid or corrosive material. In this regard; it may be necessary to undertake an AS 2885 risk assessment to determine appropriate safety and mitigation measures to contain ground contamination, fire or explosion are adequate and will not have any adverse effects on the natural gas pipeline.
i. If an applicant or owner is aggrieved by this determination there is a right of review by the State Administrative Tribunal in accordance with the Planning and Development Act 2005. An application must be made within 28 days of the determination.
Background: Property Address: 25 Brewer Road Canning Vale
(Lot 1003 Deposited Plan 407783) Zoning MRS: Industrial TPS: General Industry Use Class: Warehouse = P;
Office = IP Strategy Policy: N/A Development Scheme: N/A
-
Page 4
Lot Size: 64,111m Existing Land Use: Vacant (undeveloped) land Value of Development: $18 Million Extract from the Citys Town Planning Scheme No. 40 Map:
Extract from the Citys Aerial Photography (source Landgate February 2016):
With reference to the above two extracts from the Citys Scheme and aerial photography, the context of the site and local area is described below: 1. The subject land is located with the Canning Vale Industrial Estate, which is
characterised by industrial development including distribution warehouses, workshops and showrooms, and situated approximately 13km south-east of the Perth Central Business District and 4km north-east of Jandakot Airport;
-
Page 5
2. The subject Lot 1003 was created in 2015 as part of the subdivision of the former Swan Brewery Estate. Lot 1003 is vacant and was cleared of structures and vegetation as part of subdivision works; and
3. Roe Highway is located to the north and a freight rail line is located to the south, which generally delineates the industrial precinct and provides separation to the adjoining residential areas.
Details: With reference to the attached development plans and Applicants supporting planning report dated 12 April 2016 (refer to Attachments 2 and 3), the key aspects of the proposed development includes the construction of the following buildings and structures: 1. 22,243m warehouse with 7,556m external adjoining breeze ways.
The warehouse will be used for the storage and distribution of alcoholic beverages. The warehouse will consist of loading, unloading, dispatch and storage areas, with the main storage area containing floor to ceiling racking used for the storage of beer, cider and wine. Spirits will have their own isolated racking area. Loading and unloading docks are located on the east and west sides of the buildings. Access to the docks will be provided via the internal vehicular thoroughfare (breezeway) which is for the exclusive use of trucks and service vehicles. The thoroughfare wraps around the warehouse and facilitates one-way vehicle movement, which allows trucks to enter and exit the site in a forward gear. Access to the docks will be provided through a manoeuvring area within the site, which will support all required vehicle movements, as well as provide for vehicle parking. The warehouse will be primarily constructed with Colorbond steel in surfmist and cortex finishes. The applicant has advised that the warehouse will employ approximately 120 staff members and operate on a 24 hours a day, 6 days a week basis. The operational hours will increase to 7 days a week during peak periods. The staff members will work varying shifts with approximately 60 staff members on site at any given time and 110 staff members on site during peak times and changeover periods.
2. 700m Battery Charge building adjoining the front of the warehouse. This building is used to charge batteries for the forklifts used on site. Its been provided as a separate room to comply with the ventilation requirements for battery charging areas.
3. 1,248m office and amenities floor space and a 156m of outdoor area for use by staff. Three separate offices areas totaling 1,248m (including staff amenities) are proposed. The offices will provide for the administration activities associated with the direct operations of the distribution warehouse. The primary office building is located at the south side of the warehouse fronting Brewer Road. This office aims to act as the front door for the development. The other office areas are dock offices which are located slightly north of the main office on the eastern and western edges of the warehouse. The eastern office consists of a two storey building, while the western dock office will be a single storey office
-
Page 6
building. These offices provide an administrative area to facilitate deliveries, dispatch and logistics for the warehouse.
4. 155 line-marked car bays and space for a further 358 reserved car bays. The 155 line-marked car bays for the use of staff and customers will be located within the front setback area. There are also two reserved/deferred parking areas where an further 358 car bays, required under Table 6 of the Citys Scheme, may be provided to accommodate parking needs for future redevelopment or a change of business operations. One of the deferred car parking areas will be paved as part of this application whilst the other will be landscaped. Further commentary on the provision of parking is provided in the Planning Assessment section.
5. Four (4) access points for vehicles.
A Transport Assessment by Cardno dated 7 April 2016 has been submitted by the applicant in support of this application (refer to Attachment 5). This report concludes that the proposed development will have no impact on the existing road network. A single crossover is provided for entry and exit into the staff and customer car park. This crossover aims to facilitate full vehicle movements onto Brewer Road. Separate truck access points have been provided on the east and west sides of the Brewer Road frontage. These crossovers allow for one (1) way vehicle movements entering and exiting the site. The truck sweep path will allow a B-Double 26m truck to enter the site from the western Brewer Road crossover, maneuvering around the warehouse and exiting via the eastern Brewer Road crossover.
An additional access point is provided via Barley Place. This crossover allows for full truck movements entering and exiting the site. However, this access point is intended to only be used for emergencies and not as part of the day to day operations of the warehouse. The applicant has advised that all of the truck access points will be controlled via motorised boom gates and/or motorised sliding gates. The boom gate at the sites Brewer Road entry has been strategically setback a sufficient distance to allow for two trucks to queue within the site area; therefore reducing the likelihood of any traffic building up on Brewer Road.
6. Front fencing.
The Brewer Road frontage includes an 1800m high black vinyl coated chain wire mesh fence with 3 rows of barbed wire across the top. The boundary fence comprised of an 1800mm high black vinyl coated chain wire mesh fence with looped razor across the top. Both fences will be of a height of 2100mm if including the barbed wire and razor wire components.
Legislation & policy: Town Planning Scheme No. 40 The application has been assessed in respect to Part VI Industrial Development of the Citys Town Planning Scheme No. 40 (the Citys Scheme). The subject site is zoned General Industry under the City Scheme. Under Table 3A, the proposed Warehouse is a P use, meaning the use is permitted, and the Office is an IP use, meaning the use is only permitted where it is incidental to the predominant permitted
-
Page 7
use. A copy of the Citys Scheme is available to download from the Citys website via the following link: http://www.canning.wa.gov.au/P/planning-services-2.html State Government Policies The Western Australian Planning Commissions (WAPC) State Planning Policy 4.1: State Industrial Buffer (SPP4.1) outlines the requirement for buffers to reduce impacts on sensitive uses, such as residential dwellings, major recreational areas, hospitals, schools and other institutional uses involving accommodation. The subject proposed is located approximately 800metres from residential properties to the north/north-east and approximately 1kilometre from residential properties to the south. SPP4.1 does not require a buffer for the proposed distribution warehouse. Copies of the WAPC State Planning Policies are available to download from the WAPCs website via the following link: http://www.planning.wa.gov.au/State-planning-policies.asp Local Policies Local Planning Policy SRS223 Assessment of Subdivision and Development in the Canning Vale Industrial Area in Proximity to the Canning Vale Residential Area (Policy SRS223) Policy SRS223 provides guidelines for subdivision and development within the Canning Vale Industrial Estate, which aim to ensure that the scale and nature of industrial development is compatible with and minimises any potential impact on the Canning Vale residential area. Part 2.0 of the policy encourages a number of preferred uses, including distribution warehouses. It is considered that the development complies with the provisions of the policy. Copies of the Citys local planning policies are available to download from the Citys website via the following link: http://www.canning.wa.gov.au/P/planning-services-2.html Consultation: Public Consultation It is acknowledged that the number of marked parking bays does not meet the requirements of Table 3B of the Scheme. However, the applicant has demonstrated the ability to provide more than required number of bays if possible. Based on this, it is considered that adequate parking will be provided to suit the needs of the business, and the development will not have an adverse impact on the surrounding industrial area. As such, the decision was made not the publically advertise this proposal. This variation is further discussed in the Planning Assessment section. Consultation with other Agencies or Consultants The City referred the development proposal to the Water Corporation and the APA Group (due to the sites proximity to the Parmelia Gas Pipeline), as detailed below: 1. Water Corporation (WC):
A new stormwater drain is proposed to assist with the sites internal drainage. The stormwater drain will run north along the eastern edge of the sites boundary, wrapping around the rear of the site to connect to Barley Place. A four stormwater design plans (DWG No. C01, C02, C03 and C04) are contained in Attachment 4, and a Management and Disposal of Site Stormwater report from DWA dated 20 March 2016 is provided in Attachment 3. The additional stormwater drain will allow 865m of underground storage which will contain a 1 in 1-year storm event and 930m of above ground storage to manage peak flows in the 1 in 100 year ARI storm event.
-
Page 8
The underground portion of the stormwater drain runs under the proposed staff car parking area. Clause 7.2.5 of the Water Corporations Guidelines for Designers specifies that building within an easement may be permitted subject to protection of service requirements being met. The proposed stormwater drain has been designed with regard to the sites other services and infrastructure, most specifically Water Corporations existing easement for drainage. Engineering details of the proposed stormwater has been provided along with a correspondence from Water Corporation, which approves the proposed stormwater drainage system. The Officer Recommendation includes a condition and advice note relating to appropriate disposal of stormwater.
2. APA Group (APA):
The APAs closest asset is the Parmelia Gas Pipeline (PGP) which is situated within a 9 metre easement running along the southern side of Bannister Road in Canning Vale inside private property. The proposed development is approximately 430 metres to the north of the PGP. This application is outside the Western Australian Planning Commission, Planning Bulletin 87 notification zone and outside the residential/industrial/commercial setback distances. The APA has requested that they are notified prior to storing highly flammable, explosive, acid or corrosive material. In this respect, an advice note has been included in the Officer Recommendation section.
Planning assessment: The development application has been assessed with regard to relevant provisions contained in the abovementioned legislation and policies. The City is satisfied that the development complies with the relevant planning controls, and subsequently recommends approval subject to conditions. In making a decision on this development application, the local government (or in this instance the Metro Central JDAP) is required to have due regard to the matters listed under clause 67 of the Deemed Provisions. In addition, clause 64 of the Deemed Provisions enables the decision maker to consider variations to requirements and standards of the Citys Scheme. In this instance, the application requires the consideration of a reduced number of line-marked car parking bays. Table 3B of the Citys Scheme requires the provision of 261 car parking bays for the proposed warehouse and office land uses. The application proposes the construction and line marking of 155 car bays within the front setback area between the building and Brewer Road. A Transport Assessment by Cardno dated 7 April 2016 has been submitted by the applicant in support of this application (refer to Attachment 5). This report concludes that notes that during peak operational periods the development is expected to accommodate a maximum of 110 people on site at the peak time of 2pm, generating a maximum demand for 110 car bays to be utilised by employees. This will leave a total of 45 car bays free for the use of customers and visitors to the site, not including the use of reserve bays. The report concludes that the provision of 155 car bays is considered to be sufficient to cater for the projected parking demand. Should an issue arise, however, the use of parking reserve areas is available.
-
Page 9
The provision of 155 car bays in lieu of 261 bays for the proposed land uses is supported by the City on the basis that: 1. The development provides an adequate number of car parking bays to cater for
the projected parking demand of the business; 2. Two parking reserve areas are available for any future changes to car parking
needs. In this respect, the Officer Recommendation includes a condition requiring the provision of a parking management strategy. This strategy will provide flexibility for the business to manage their parking needs without having to seek an amendment to the development approval; and
3. Based on reasons 1 and 2 above, the reduced provision of parking will not negatively impact on surrounding industrial businesses.
Conclusion: It is considered that the development proposal meets the relevant planning requirements. The proposal incorporates a building design and landscaping which will provide attractive and efficient development in the area. It is therefore recommended that the development application be approved subject to conditions, as listed in the Officer Recommendation section.
-
LOCATION PLAN 25 Brewer Road CANNING VALE 6155
SCALE 1:5000 DATE: 24/06/2016
-
43 Wantirna Road, Ringwood, Victoria, Australia 3134
A.B.N. 12 130 395595
www.dnmconsulting.com
TelFax
DAVIS, NAISMITH & McGOVERN
EmailWeb
613 9870 3022613 9870 2827
-
43 Wantirna Road, Ringwood, Victoria, Australia 3134
A.B.N. 12 130 395595
www.dnmconsulting.com
TelFax
DAVIS, NAISMITH & McGOVERN
EmailWeb
613 9870 3022613 9870 2827
AutoCAD SHX TextNORTHAutoCAD SHX TextSCALE 1 :AutoCAD SHX Text100AutoCAD SHX TextLUNCH ROOMAutoCAD SHX TextFIRSTAutoCAD SHX TextAIDAutoCAD SHX TextRECEPTIONAutoCAD SHX TextMANAGER OFFICEAutoCAD SHX TextOPEN OFFICEAutoCAD SHX TextDISABLEDAutoCAD SHX TextTOILETAutoCAD SHX TextURINALAutoCAD SHX TextMALEAutoCAD SHX TextTOILETSAutoCAD SHX TextFEMALEAutoCAD SHX TextTOILETAutoCAD SHX TextFRAutoCAD SHX TextOPEN OFFICEAutoCAD SHX TextW A R E H O U S EAutoCAD SHX TextO F F I C EAutoCAD SHX Text%%UO F F I C E L A Y O U T P L A NAutoCAD SHX TextOFFICE 1AutoCAD SHX TextOFFICE 2AutoCAD SHX TextMEETINGAutoCAD SHX TextROOM 1AutoCAD SHX TextMEETINGAutoCAD SHX TextROOM 2AutoCAD SHX TextTRAINING ROOMAutoCAD SHX TextARCHIVEAutoCAD SHX TextCOMMSAutoCAD SHX TextROOMAutoCAD SHX TextCLEANERSAutoCAD SHX TextSTOREAutoCAD SHX TextSTORAGEAutoCAD SHX TextMALEAutoCAD SHX TextLOCKERSAutoCAD SHX TextMALEAutoCAD SHX TextTOILETSAutoCAD SHX TextBOARD ROOMAutoCAD SHX TextDRAWING NUMBERAutoCAD SHX TextREVAutoCAD SHX TextTITLEAutoCAD SHX TextSCALEAutoCAD SHX TextDATEAutoCAD SHX TextDRAWNAutoCAD SHX TextJOB NUMBERAutoCAD SHX TextPROJECTAutoCAD SHX TextDESIGNEDAutoCAD SHX TextCHECKEDAutoCAD SHX TextCOMMENCING ANY WORK OR SHOP DRAWINGSAutoCAD SHX TextALL DIMENSIONS TO BE CHECKED ON THE JOB BEFOREAutoCAD SHX Textother than that stated in the particular enquiry, order or contract with which it is issued.AutoCAD SHX Textit must not be reproduced, copied or communicated to any other party nor be used for any purposeAutoCAD SHX Textand shall be returned on demand. It is issued on the condition that, except with our written permissionAutoCAD SHX TextThis drawing and all information thereon is the property of Davis Naismith and McGovern Pty Ltd,AutoCAD SHX TextConsulting Structural and Civil EngineersAutoCAD SHX TextDESCRIPTIONAutoCAD SHX TextREVISIONSAutoCAD SHX TextNoAutoCAD SHX TextDATEAutoCAD SHX TextBYAutoCAD SHX TextPRELIMINARY ONLYAutoCAD SHX TextNOT FOR CONSTRUCTIONAutoCAD SHX TextSCALE IN METRESAutoCAD SHX Text0AutoCAD SHX Text50AutoCAD SHX Text10AutoCAD SHX Text1:500AutoCAD SHX Text40AutoCAD SHX Text30AutoCAD SHX Text20AutoCAD SHX Text10AutoCAD SHX TextPROPOSED OFFICE & WAREHOUSEAutoCAD SHX TextCANNINGVALE, WAAutoCAD SHX TextPROPOSED OFFICE LAYOUTAutoCAD SHX Text15187 - TP02AutoCAD SHX TextEAutoCAD SHX Text15/187AutoCAD SHX Text1:100 @ B1AutoCAD SHX TextMAR `16AutoCAD SHX TextE.M.AutoCAD SHX TextE.M.AutoCAD SHX Text--AutoCAD SHX TextAAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text18.03.16AutoCAD SHX TextI.N.AutoCAD SHX Text--AutoCAD SHX TextFOR: BEVCHAINAutoCAD SHX TextSCALE 1 :AutoCAD SHX Text100AutoCAD SHX Text%%US O U T H E L E V A T I O NAutoCAD SHX TextSCALE 1 :AutoCAD SHX Text100AutoCAD SHX Text%%UW E S T E L E V A T I O NAutoCAD SHX TextB A T T E R YAutoCAD SHX TextC H A R G EAutoCAD SHX TextO U T D O O RAutoCAD SHX TextA R E AAutoCAD SHX TextPROPOSED OFFICEAutoCAD SHX TextWAREHOUSEAutoCAD SHX Text%%UAREAS SCHEDULEAutoCAD SHX TextBATTERY CHARGEAutoCAD SHX TextOUTDOOR AREAAutoCAD SHX TextSURFMIST COLORBONDAutoCAD SHX TextCORTEX COLORBONDAutoCAD SHX TextALUCOBOND ORANGE COLOURAutoCAD SHX TextSURFMIST PAINT FINISHAutoCAD SHX TextORANGE PAINT FINISHAutoCAD SHX TextALUCOBOND COLOURAutoCAD SHX TextCHAMPAGNE METALLICAutoCAD SHX Text%%UFINISHES SCHEDULEAutoCAD SHX TextZINCALUME ROOF SHEETINGAutoCAD SHX TextWINDOWS/FEATURE FRAMES -AutoCAD SHX TextCLEAR ANODISED ALUMINIUMAutoCAD SHX TextCORTEX PAINT FINISHAutoCAD SHX TextCOLORBOND DOWNPIPES & FLASHINGSAutoCAD SHX TextBAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text22.03.16AutoCAD SHX TextI.N.AutoCAD SHX TextFEMALEAutoCAD SHX TextTOILETSAutoCAD SHX TextFEMALEAutoCAD SHX TextLOCKERSAutoCAD SHX TextA/C UNITAutoCAD SHX TextBBQAutoCAD SHX TextCAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text24.03.16AutoCAD SHX TextI.N.AutoCAD SHX TextDAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text01.04.16AutoCAD SHX TextI.N.AutoCAD SHX TextEAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text06.04.16AutoCAD SHX TextI.N. -
43 Wantirna Road, Ringwood, Victoria, Australia 3134
A.B.N. 12 130 395595
www.dnmconsulting.com
TelFax
DAVIS, NAISMITH & McGOVERN
EmailWeb
613 9870 3022613 9870 2827
AutoCAD SHX TextFAutoCAD SHX TextEAutoCAD SHX TextDAutoCAD SHX TextCAutoCAD SHX TextBAutoCAD SHX TextAAutoCAD SHX TextFAutoCAD SHX TextEAutoCAD SHX TextDAutoCAD SHX TextCAutoCAD SHX TextBAutoCAD SHX TextAAutoCAD SHX Text%%UN O R T H E L E V A T I O NAutoCAD SHX Text%%US O U T H E L E V A T I O NAutoCAD SHX TextSCALE 1 :AutoCAD SHX Text200AutoCAD SHX TextSCALE 1 :AutoCAD SHX Text200AutoCAD SHX TextSCALE 1 :AutoCAD SHX Text200AutoCAD SHX Text%%UE A S T E L E V A T I O NAutoCAD SHX Text22AutoCAD SHX Text21AutoCAD SHX Text20AutoCAD SHX Text19AutoCAD SHX Text18AutoCAD SHX Text17AutoCAD SHX Text16AutoCAD SHX Text15AutoCAD SHX Text14AutoCAD SHX Text13AutoCAD SHX Text12AutoCAD SHX Text11AutoCAD SHX Text10AutoCAD SHX Text9AutoCAD SHX Text8AutoCAD SHX Text8AutoCAD SHX Text7AutoCAD SHX Text6AutoCAD SHX Text5AutoCAD SHX Text4AutoCAD SHX Text3AutoCAD SHX Text2AutoCAD SHX Text1AutoCAD SHX TextPRELIMINARY ONLYAutoCAD SHX TextNOT FOR CONSTRUCTIONAutoCAD SHX TextSCALE IN METRESAutoCAD SHX Text1:200AutoCAD SHX Text2AutoCAD SHX Text20AutoCAD SHX Text10AutoCAD SHX Text8AutoCAD SHX Text6AutoCAD SHX Text4AutoCAD SHX Text2AutoCAD SHX Text0AutoCAD SHX TextPROPOSED OFFICE & WAREHOUSEAutoCAD SHX TextCANNINGVALE, WAAutoCAD SHX TextPROPOSED ELEVATIONS &AutoCAD SHX Text15187 - TP03AutoCAD SHX TextCAutoCAD SHX Text15/187AutoCAD SHX Text1:200 @ B1AutoCAD SHX TextMAR `16AutoCAD SHX TextE.M.AutoCAD SHX Text--AutoCAD SHX TextI.N.AutoCAD SHX TextAAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text18.03.16AutoCAD SHX TextI.N.AutoCAD SHX TextSECTIONS - SHEET 1AutoCAD SHX TextFOR: BEVCHAINAutoCAD SHX TextDRAWING NUMBERAutoCAD SHX TextREVAutoCAD SHX TextTITLEAutoCAD SHX TextSCALEAutoCAD SHX TextDATEAutoCAD SHX TextDRAWNAutoCAD SHX TextJOB NUMBERAutoCAD SHX TextDESIGNEDAutoCAD SHX TextCHECKEDAutoCAD SHX TextCOMMENCING ANY WORK OR SHOP DRAWINGSAutoCAD SHX TextALL DIMENSIONS TO BE CHECKED ON THE JOB BEFOREAutoCAD SHX TextDESCRIPTIONAutoCAD SHX TextREVISIONSAutoCAD SHX TextNoAutoCAD SHX TextDATEAutoCAD SHX TextBYAutoCAD SHX TextPROJECTAutoCAD SHX Textother than that stated in the particular enquiry, order or contract with which it is issued.AutoCAD SHX Textit must not be reproduced, copied or communicated to any other party nor be used for any purposeAutoCAD SHX Textand shall be returned on demand. It is issued on the condition that, except with our written permissionAutoCAD SHX TextThis drawing and all information thereon is the property of Davis Naismith and McGovern Pty Ltd,AutoCAD SHX TextDESCRIPTIONAutoCAD SHX TextREVISIONSAutoCAD SHX TextNoAutoCAD SHX TextDATEAutoCAD SHX TextBYAutoCAD SHX TextConsulting Structural and Civil EngineersAutoCAD SHX Text%%UE A S T E L E V A T I O N C O N TAutoCAD SHX TextSCALE 1 :AutoCAD SHX Text200AutoCAD SHX TextREFER BELOW FOR CONTINUATIONAutoCAD SHX TextREFER ABOVE FOR CONTINUATIONAutoCAD SHX TextALUCOBOND COLOURAutoCAD SHX TextCHAMPAGNE METALLICAutoCAD SHX Text%%UFINISHES SCHEDULEAutoCAD SHX TextWINDOWS/FEATURE FRAMES -AutoCAD SHX TextCLEAR ANODISED ALUMINIUMAutoCAD SHX TextSURFMIST COLORBONDAutoCAD SHX TextCORTEX COLORBONDAutoCAD SHX TextALUCOBOND ORANGE COLOURAutoCAD SHX TextSURFMIST PAINT FINISHAutoCAD SHX TextORANGE PAINT FINISHAutoCAD SHX TextZINCALUME ROOF SHEETINGAutoCAD SHX TextCORTEX PAINT FINISHAutoCAD SHX TextCOLORBOND DOWNPIPES & FLASHINGSAutoCAD SHX TextBAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text22.03.16AutoCAD SHX TextI.N.AutoCAD SHX TextCAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text06.04.16AutoCAD SHX TextI.N. -
43 Wantirna Road, Ringwood, Victoria, Australia 3134
A.B.N. 12 130 395595
www.dnmconsulting.com
TelFax
DAVIS, NAISMITH & McGOVERN
EmailWeb
613 9870 3022613 9870 2827
AutoCAD SHX TextSCALE 1 :AutoCAD SHX Text200AutoCAD SHX Text%%UW E S T E L E V A T I O NAutoCAD SHX Text16AutoCAD SHX Text15AutoCAD SHX Text14AutoCAD SHX Text13AutoCAD SHX Text12AutoCAD SHX Text11AutoCAD SHX Text10AutoCAD SHX Text9AutoCAD SHX Text8AutoCAD SHX Text7AutoCAD SHX Text6AutoCAD SHX Text5AutoCAD SHX Text4AutoCAD SHX Text3AutoCAD SHX Text2AutoCAD SHX Text1AutoCAD SHX Text22AutoCAD SHX Text21AutoCAD SHX Text20AutoCAD SHX Text19AutoCAD SHX Text18AutoCAD SHX Text17AutoCAD SHX Text16AutoCAD SHX Text22AutoCAD SHX Text21AutoCAD SHX Text20AutoCAD SHX Text19AutoCAD SHX Text18AutoCAD SHX Text17AutoCAD SHX Text16AutoCAD SHX TextSECTIONAutoCAD SHX TextAAutoCAD SHX TextPGA10AutoCAD SHX Text16AutoCAD SHX Text15AutoCAD SHX Text14AutoCAD SHX Text13AutoCAD SHX Text12AutoCAD SHX Text11AutoCAD SHX Text10AutoCAD SHX Text9AutoCAD SHX Text8AutoCAD SHX Text7AutoCAD SHX Text6AutoCAD SHX Text5AutoCAD SHX Text4AutoCAD SHX Text3AutoCAD SHX Text2AutoCAD SHX Text1AutoCAD SHX TextPRELIMINARY ONLYAutoCAD SHX TextNOT FOR CONSTRUCTIONAutoCAD SHX TextSCALE IN METRESAutoCAD SHX Text1:200AutoCAD SHX Text2AutoCAD SHX Text20AutoCAD SHX Text10AutoCAD SHX Text8AutoCAD SHX Text6AutoCAD SHX Text4AutoCAD SHX Text2AutoCAD SHX Text0AutoCAD SHX TextPROPOSED OFFICE & WAREHOUSEAutoCAD SHX TextCANNINGVALE, WAAutoCAD SHX TextPROPOSED ELEVATIONS &AutoCAD SHX Text15187 - TP04AutoCAD SHX TextBAutoCAD SHX Text15/187AutoCAD SHX Text1:200 @ B1AutoCAD SHX TextMAR `16AutoCAD SHX TextE.M.AutoCAD SHX Text--AutoCAD SHX TextI.N.AutoCAD SHX TextAAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text18.03.16AutoCAD SHX TextI.N.AutoCAD SHX TextSECTIONS - SHEET 2AutoCAD SHX TextFOR: BEVCHAINAutoCAD SHX TextDRAWING NUMBERAutoCAD SHX TextREVAutoCAD SHX TextTITLEAutoCAD SHX TextSCALEAutoCAD SHX TextDATEAutoCAD SHX TextDRAWNAutoCAD SHX TextJOB NUMBERAutoCAD SHX TextDESIGNEDAutoCAD SHX TextCHECKEDAutoCAD SHX TextCOMMENCING ANY WORK OR SHOP DRAWINGSAutoCAD SHX TextALL DIMENSIONS TO BE CHECKED ON THE JOB BEFOREAutoCAD SHX TextDESCRIPTIONAutoCAD SHX TextREVISIONSAutoCAD SHX TextNoAutoCAD SHX TextDATEAutoCAD SHX TextBYAutoCAD SHX TextPROJECTAutoCAD SHX Textother than that stated in the particular enquiry, order or contract with which it is issued.AutoCAD SHX Textit must not be reproduced, copied or communicated to any other party nor be used for any purposeAutoCAD SHX Textand shall be returned on demand. It is issued on the condition that, except with our written permissionAutoCAD SHX TextThis drawing and all information thereon is the property of Davis Naismith and McGovern Pty Ltd,AutoCAD SHX TextDESCRIPTIONAutoCAD SHX TextREVISIONSAutoCAD SHX TextNoAutoCAD SHX TextDATEAutoCAD SHX TextBYAutoCAD SHX TextConsulting Structural and Civil EngineersAutoCAD SHX Text%%UW E S T E L E V A T I O N C O N TAutoCAD SHX TextREFER BELOW FOR CONTINUATIONAutoCAD SHX TextREFER ABOVE FOR CONTINUATIONAutoCAD SHX TextREFER BELOW FOR CONTINUATIONAutoCAD SHX TextREFER ABOVE FOR CONTINUATIONAutoCAD SHX TextSECTIONAutoCAD SHX TextCONTAutoCAD SHX TextAAutoCAD SHX TextPGA10AutoCAD SHX TextALUCOBOND COLOURAutoCAD SHX TextCHAMPAGNE METALLICAutoCAD SHX Text%%UFINISHES SCHEDULEAutoCAD SHX TextWINDOWS/FEATURE FRAMES -AutoCAD SHX TextCLEAR ANODISED ALUMINIUMAutoCAD SHX TextSURFMIST COLORBONDAutoCAD SHX TextCORTEX COLORBONDAutoCAD SHX TextALUCOBOND ORANGE COLOURAutoCAD SHX TextSURFMIST PAINT FINISHAutoCAD SHX TextORANGE PAINT FINISHAutoCAD SHX TextZINCALUME ROOF SHEETINGAutoCAD SHX TextCORTEX PAINT FINISHAutoCAD SHX TextCOLORBOND DOWNPIPES & FLASHINGSAutoCAD SHX TextBAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text22.03.16AutoCAD SHX TextI.N. -
43 Wantirna Road, Ringwood, Victoria, Australia 3134
A.B.N. 12 130 395595
www.dnmconsulting.com
TelFax
DAVIS, NAISMITH & McGOVERN
EmailWeb
613 9870 3022613 9870 2827
AutoCAD SHX TextFAutoCAD SHX TextEAutoCAD SHX TextDAutoCAD SHX TextCAutoCAD SHX TextBAutoCAD SHX TextAAutoCAD SHX TextEAutoCAD SHX TextDAutoCAD SHX TextCAutoCAD SHX TextBAutoCAD SHX TextSECTIONAutoCAD SHX TextCAutoCAD SHX TextTP05AutoCAD SHX TextSCALE 1 :AutoCAD SHX Text200AutoCAD SHX TextSECTIONAutoCAD SHX TextDAutoCAD SHX TextTP05AutoCAD SHX TextSCALE 1 :AutoCAD SHX Text200AutoCAD SHX Text8AutoCAD SHX Text7AutoCAD SHX Text6AutoCAD SHX Text5AutoCAD SHX Text4AutoCAD SHX Text3AutoCAD SHX Text2AutoCAD SHX Text1AutoCAD SHX TextSECTIONAutoCAD SHX TextBAutoCAD SHX TextPGA10AutoCAD SHX Text22AutoCAD SHX Text21AutoCAD SHX Text20AutoCAD SHX Text19AutoCAD SHX Text18AutoCAD SHX Text17AutoCAD SHX Text16AutoCAD SHX Text15AutoCAD SHX Text14AutoCAD SHX Text13AutoCAD SHX Text12AutoCAD SHX Text11AutoCAD SHX Text10AutoCAD SHX Text9AutoCAD SHX Text8AutoCAD SHX Text5000 WIDE x AutoCAD SHX Text6000 HIGH TYPAutoCAD SHX TextPRELIMINARY ONLYAutoCAD SHX TextNOT FOR CONSTRUCTIONAutoCAD SHX TextSCALE IN METRESAutoCAD SHX Text1:200AutoCAD SHX Text2AutoCAD SHX Text20AutoCAD SHX Text10AutoCAD SHX Text8AutoCAD SHX Text6AutoCAD SHX Text4AutoCAD SHX Text2AutoCAD SHX Text0AutoCAD SHX TextPROPOSED OFFICE & WAREHOUSEAutoCAD SHX TextCANNINGVALE, WAAutoCAD SHX TextPROPOSED ELEVATIONS &AutoCAD SHX Text15187 - TP05AutoCAD SHX TextDAutoCAD SHX Text15/187AutoCAD SHX Text1:200 @ B1AutoCAD SHX TextMAR `16AutoCAD SHX TextE.M.AutoCAD SHX Text--AutoCAD SHX TextI.N.AutoCAD SHX TextAAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text18.03.16AutoCAD SHX TextI.N.AutoCAD SHX TextSECTIONS - SHEET 3AutoCAD SHX TextFOR: BEVCHAINAutoCAD SHX TextDRAWING NUMBERAutoCAD SHX TextREVAutoCAD SHX TextTITLEAutoCAD SHX TextSCALEAutoCAD SHX TextDATEAutoCAD SHX TextDRAWNAutoCAD SHX TextJOB NUMBERAutoCAD SHX TextDESIGNEDAutoCAD SHX TextCHECKEDAutoCAD SHX TextCOMMENCING ANY WORK OR SHOP DRAWINGSAutoCAD SHX TextALL DIMENSIONS TO BE CHECKED ON THE JOB BEFOREAutoCAD SHX TextDESCRIPTIONAutoCAD SHX TextREVISIONSAutoCAD SHX TextNoAutoCAD SHX TextDATEAutoCAD SHX TextBYAutoCAD SHX TextPROJECTAutoCAD SHX Textother than that stated in the particular enquiry, order or contract with which it is issued.AutoCAD SHX Textit must not be reproduced, copied or communicated to any other party nor be used for any purposeAutoCAD SHX Textand shall be returned on demand. It is issued on the condition that, except with our written permissionAutoCAD SHX TextThis drawing and all information thereon is the property of Davis Naismith and McGovern Pty Ltd,AutoCAD SHX TextDESCRIPTIONAutoCAD SHX TextREVISIONSAutoCAD SHX TextNoAutoCAD SHX TextDATEAutoCAD SHX TextBYAutoCAD SHX TextConsulting Structural and Civil EngineersAutoCAD SHX TextREFER BELOW FOR CONTINUATIONAutoCAD SHX TextREFER ABOVE FOR CONTINUATIONAutoCAD SHX TextSECTIONAutoCAD SHX TextCONTAutoCAD SHX TextBAutoCAD SHX TextPGA10AutoCAD SHX TextALUCOBOND COLOURAutoCAD SHX TextCHAMPAGNE METALLICAutoCAD SHX Text%%UFINISHES SCHEDULEAutoCAD SHX TextWINDOWS/FEATURE FRAMES -AutoCAD SHX TextCLEAR ANODISED ALUMINIUMAutoCAD SHX TextSURFMIST COLORBONDAutoCAD SHX TextCORTEX COLORBONDAutoCAD SHX TextALUCOBOND ORANGE COLOURAutoCAD SHX TextSURFMIST PAINT FINISHAutoCAD SHX TextORANGE PAINT FINISHAutoCAD SHX TextZINCALUME ROOF SHEETINGAutoCAD SHX TextCORTEX PAINT FINISHAutoCAD SHX TextCOLORBOND DOWNPIPES & FLASHINGSAutoCAD SHX TextBAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text22.03.16AutoCAD SHX TextI.N.AutoCAD SHX TextCAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text24.03.16AutoCAD SHX TextI.N.AutoCAD SHX TextDAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text01.04.16AutoCAD SHX TextI.N. -
43 Wantirna Road, Ringwood, Victoria, Australia 3134
A.B.N. 12 130 395595
www.dnmconsulting.com
TelFax
DAVIS, NAISMITH & McGOVERN
EmailWeb
613 9870 3022613 9870 2827
AutoCAD SHX TextTRANSFORMERAutoCAD SHX TextTRANSFORMERAutoCAD SHX TextHV KIOSKAutoCAD SHX TextLV KIOSKAutoCAD SHX TextPROPOSED FENCEAutoCAD SHX TextBOUNDARYAutoCAD SHX Text%%UPROPOSED SUBSTATION PLANAutoCAD SHX Text%%USOUTH ELEVATIONAutoCAD SHX TextSCALE 1 :AutoCAD SHX Text50AutoCAD SHX TextSCALE 1 :AutoCAD SHX Text50AutoCAD SHX Text%%UEAST ELEVATIONAutoCAD SHX TextSCALE 1 :AutoCAD SHX Text50AutoCAD SHX TextHV KIOSKAutoCAD SHX TextLV KIOSKAutoCAD SHX TextTRANSFORMERAutoCAD SHX TextHV KIOSKAutoCAD SHX Text1200 NOMAutoCAD SHX Text1200 NOMAutoCAD SHX Text1200 NOMAutoCAD SHX Text1800 NOMAutoCAD SHX Text1800 NOMAutoCAD SHX Text1800 NOMAutoCAD SHX Text1465 NOMAutoCAD SHX Text1465 NOMAutoCAD SHX Text1465 NOMAutoCAD SHX TextDRAWING NUMBERAutoCAD SHX TextREVAutoCAD SHX TextTITLEAutoCAD SHX TextSCALEAutoCAD SHX TextDATEAutoCAD SHX TextDRAWNAutoCAD SHX TextJOB NUMBERAutoCAD SHX TextPROJECTAutoCAD SHX TextDESIGNEDAutoCAD SHX TextCHECKEDAutoCAD SHX TextCOMMENCING ANY WORK OR SHOP DRAWINGSAutoCAD SHX TextALL DIMENSIONS TO BE CHECKED ON THE JOB BEFOREAutoCAD SHX Textother than that stated in the particular enquiry, order or contract with which it is issued.AutoCAD SHX Textit must not be reproduced, copied or communicated to any other party nor be used for any purposeAutoCAD SHX Textand shall be returned on demand. It is issued on the condition that, except with our written permissionAutoCAD SHX TextThis drawing and all information thereon is the property of Davis Naismith and McGovern Pty Ltd,AutoCAD SHX TextConsulting Structural and Civil EngineersAutoCAD SHX TextDESCRIPTIONAutoCAD SHX TextREVISIONSAutoCAD SHX TextNoAutoCAD SHX TextDATEAutoCAD SHX TextBYAutoCAD SHX TextPRELIMINARY ONLYAutoCAD SHX TextNOT FOR CONSTRUCTIONAutoCAD SHX TextPROPOSED OFFICE & WAREHOUSEAutoCAD SHX TextCANNINGVALE, WAAutoCAD SHX TextPROPOSED TRANSFORMERAutoCAD SHX Text15187 - TP06AutoCAD SHX TextAAutoCAD SHX Text15/187AutoCAD SHX Text1:50 @ B1AutoCAD SHX TextAPR `16AutoCAD SHX TextE.M.AutoCAD SHX TextE.M.AutoCAD SHX Text--AutoCAD SHX TextAAutoCAD SHX TextISSUED FOR INFORMATIONAutoCAD SHX Text06.04.16AutoCAD SHX TextI.N.AutoCAD SHX TextPLAN AND ELEVATIONSAutoCAD SHX TextFOR: BEVCHAINAutoCAD SHX TextNORTHAutoCAD SHX TextSCALE IN MILLIMETRESAutoCAD SHX Text1000AutoCAD SHX Text2000AutoCAD SHX Text3000AutoCAD SHX Text4000AutoCAD SHX Text1:50AutoCAD SHX Text1000AutoCAD SHX Text5000AutoCAD SHX Text0AutoCAD SHX Text1200 NOMAutoCAD SHX Text1200 NOMAutoCAD SHX Text1200 NOMAutoCAD SHX Text1800 NOMAutoCAD SHX Text1800 NOMAutoCAD SHX Text1800 NOM -
REV No:
AUTHORISED
JOB NUMBER:
DRAWN: DATE:DESIGNED:
DWG No:
DATE: DATE:
CHECKED:
DATE:
A1SCALE AT A1:
DRAWING TITLE:
PROJECT:
CLIENT:
GRID: DATUM:
ORIGINAL DRAWING SIZE:
THIS DRAWING IS COPYRIGHT. USE OR COPYING OF THIS DRAWING IN WHOLE OR IN PART
WITHOUT THE WRITTEN PERMISSION OF DAVID WILLS AND ASSOCIATES CONSTITUTES A
COPYRIGHT INFRINGEMENT.
Office:
Unit 1 / 9 Shields Crescent
BOORAGOON WA 6154
Mail:
PO Box 3084
MYAREE LPO WA 6154
Phone (08) 9424 0900
Fax (08) 9330 3133
E-mail [email protected]
ABN 34 900 498 130
David Wills and Associates
C o n s u l t i n g E n g i n e e r s
NOT
FOR
CONS
TRUC
TION
REV DATE DESCRIPTION SIG
LINC PROPERTY PTY LTD
SWAN BREWERY INDUSTRIAL ESTATEBREWER ROAD STORMWATER DESIGN
SITE PLAN
1:2000
LOCAL AHD
BD
28/01/16
MR
27/01/16
DW
29/01/16
16009 C01 C
A 29/01/16 ISSUED FOR APPROVAL BD
B 05/02/16 UPDATE TO INCLUDE STORMWATER AND SEWER EASEMENT BD
C 06/04/16 ARCHITECTURAL PLAN AMENDED BD
David WillsAIT(Civil) GradDipB MIEAust CPEng
D.Wills07/04/2016
PROPOSEDBEVCHAIN
WAREHOUSE
VINNICOM
BE DRIVE
LOT438
metres
0 m
scales quoted apply to
original drawing scale
40 80 120 160
1:2000
A1
THORN WAY
VINNICOMBE DRIVE
PURD
Y PL
ACE
BANNIST
ER ROA
D
BREWER ROAD
BARLEY PLACE
CRAFT STREETENTERPRISE COURT
PRODUCTION ROAD
BAILE ROAD
BARREL WAYERNEST CLARK ROAD
TACOMA CIRCUIT
TACO
MA C
IRCU
IT
BAILE
ROA
D
GAUGE CIRCUIT
GAUGE CIRCUIT
MODAL CRES
LOT437
LOT436
LOT435
LOT434
LOT300
LOT507
LOT100
LOT801
LOT9003
LOT21
LOT22
LOT23
LOT24
LOT25
LOT26
LOT27
LOT28
LOT29
LOT82
LOT83
LOT84
LOT85
LOT86
LOT87
LOT88
LOT89
LOT90
LOT91
LOT92
LOT93
LOT94
LOT95
LOT478
LOT480
LOT479
LOT481
LOT483
LOT482
LOT462
LOT463
LOT464
LOT465
LOT461
LOT460
LOT459
LOT108
LOT73
LOT72
LOT71
LOT506
LOT513
LOT507
LOT508
LOT509
LOT510
LOT511
LOT512
LOT499
LOT500
LOT501
LOT502
LOT503
LOT504
LOT505
LOT492
LOT493
LOT494LOT
495
LOT496
LOT497
LOT498
VINNIECOMBEDRIVECOMPUTATIONBASIN
LOT440
LOT441
LOT442
LOT30
LOT31
LOT107
LOT106
LOT105
LOT104
LOT103
LOT102
LOT445 LOT
447
LOT449
LOT441
LOT453
LOT401
LOT402
LOT403
LOT404
LOT405
LOT406
LOT433
LOT408
LOT413
LOT80
LOT49
LOT50
LOT81
LOT42
LOT45
LOT59
LOT73
LOT501
LOT56LOT
77
LOT54
LOT69
LOT436
LOT432
LOT425
LOT428
LOT420
LOT419
LOT410
LOT414
LOT424
LOT506
LOT401
LOT403
LOT404
LOT405
LOT408
LOT406
LOT20LOT
301
LOT437
LOT101LOT
3
LOT511
LOT1003
SUBJECT SITE
STORM WATER AND SEWER EASEMENT
-
REV No:
AUTHORISED
JOB NUMBER:
DRAWN: DATE:DESIGNED:
DWG No:
DATE: DATE:
CHECKED:
DATE:
A1SCALE AT A1:
DRAWING TITLE:
PROJECT:
CLIENT:
GRID: DATUM:
ORIGINAL DRAWING SIZE:
THIS DRAWING IS COPYRIGHT. USE OR COPYING OF THIS DRAWING IN WHOLE OR IN PART
WITHOUT THE WRITTEN PERMISSION OF DAVID WILLS AND ASSOCIATES CONSTITUTES A
COPYRIGHT INFRINGEMENT.
Office:
Unit 1 / 9 Shields Crescent
BOORAGOON WA 6154
Mail:
PO Box 3084
MYAREE LPO WA 6154
Phone (08) 9424 0900
Fax (08) 9330 3133
E-mail [email protected]
ABN 34 900 498 130
David Wills and Associates
C o n s u l t i n g E n g i n e e r s
NOT
FOR
CONS
TRUC
TION
REV DATE DESCRIPTION SIG
LINC PROPERTY PTY LTD
SWAN BREWERY INDUSTRIAL ESTATEBREWER ROAD STORMWATER DESIGN
ROOF DRAINAGE DESIGN
1:500
LOCAL AHD
BD
28/01/16
MR
27/01/16
DW
29/01/16
16009 C04 C
A 29/01/16 ISSUED FOR APPROVAL BD
B 05/02/16 UPDATE TO INCLUDE STORMWATER AND SEWER EASEMENT BD
C 06/04/16 ARCHITECTURAL PLAN AMENDED BD
metres
0 m
scales quoted apply to
original drawing scale
10 20 30 40
1:500
A1
David WillsAIT(Civil) GradDipB MIEAust CPEng
D.Wills07/04/2016
BEVCHAIN WAREHOUSE
OFFICE
BATTERYCHARGE
KEGSTORAGE
CANOPY
DEFERRED CAR PARK
DEFE
RRED
CAR
PAR
KDEFERRED CAR PARK
TRUCK PARKING AREA
CAR
PARK
ING
LOT102
LOT29
LOT82
LOT81
LOT50
LOT25
LOT1003
LEGEND1800X1200 SOAKWELL WITH 600x600HEAVY DUTY GRATED INLET GULLY
1800X1200 SOAKWELL U.N.O.
300W x 300H EVES GUTTER
300W x 300H EVES GUTTER
200W x 150H EVES GUTTER
200W x 150H EVES GUTTER
1:1000 1:1000
1:1000 1:1000
1:1000 1:1000
1:10001:1000
1:1000 1:1000
1:100
01:1
000
1:1000 1:1000
DP 150
DP 150 DP 150 DP 150 DP 150 DP 150
DP 150 DP 150 DP 150
DP 100
DP 100
DP 100
DP 100
DP 150DP 150
2
2
2
RIDGE LINE
DP 150 WITH SPREADERFROM ROOF ABOVE
DP 150 DP 150
DP 100
DP 100
1:100
01:1
000
STORM WATER AND SEWER EASEMENT
DP 150 DP 150 DP 150
DP 150
1:1000
1:1000
DP 150 DP 150 DP 150 DP 150 DP 150
DP 150 DP 1501:1000 1:1000
1:1000
300W x 300H EVES GUTTER
350W x 400H EVES GUTTER
300W x 300H EVES GUTTER
300W x 300H EVES GUTTER
DISCHARGE FROM ROOF DIRECTLY TO STORMWATER SYSTEM PIPE BELOW GROUND
2
DP 150
DP 150
DP 150
1:1000
NOTES
1. ALL DOWNPIPES TO DISCHARGE TOSURFACE UNLESS OTHERWISE NOTED
1:1000 1:1000
DP 150 WITH SPREADERFROM ROOF ABOVE
-
REV No:
AUTHORISED
JOB NUMBER:
DRAWN: DATE:DESIGNED:
DWG No:
DATE: DATE:
CHECKED:
DATE:
A1SCALE AT A1:
DRAWING TITLE:
PROJECT:
CLIENT:
GRID: DATUM:
ORIGINAL DRAWING SIZE:
THIS DRAWING IS COPYRIGHT. USE OR COPYING OF THIS DRAWING IN WHOLE OR IN PART
WITHOUT THE WRITTEN PERMISSION OF DAVID WILLS AND ASSOCIATES CONSTITUTES A
COPYRIGHT INFRINGEMENT.
Office:
Unit 1 / 9 Shields Crescent
BOORAGOON WA 6154
Mail:
PO Box 3084
MYAREE LPO WA 6154
Phone (08) 9424 0900
Fax (08) 9330 3133
E-mail [email protected]
ABN 34 900 498 130
David Wills and Associates
C o n s u l t i n g E n g i n e e r s
NOT
FOR
CONS
TRUC
TION
REV DATE DESCRIPTION SIG
LINC PROPERTY PTY LTD
SWAN BREWERY INDUSTRIAL ESTATEBREWER ROAD STORMWATER DESIGN
SITE GRADING
1:500
LOCAL AHD
BD
28/01/16
MR
27/01/16
DW
29/01/16
16009 C02 C
A 29/01/16 ISSUED FOR APPROVAL BD
B 05/02/16 UPDATE TO INCLUDE STORMWATER AND SEWER EASEMENT BD
C 06/04/16 ARCHITECTURAL PLAN AMENDED BD
metres
0 m
scales quoted apply to
original drawing scale
10 20 30 40
1:500
A1
David WillsAIT(Civil) GradDipB MIEAust CPEng
D.Wills07/04/2016
FFL 23.00
23.00
23.00
1.0%
1.0%
BEVCHAIN WAREHOUSE
OFFICE
BATTERYCHARGE
KEGSTORAGE
SPIRITSTORAGE
DEFERRED CAR PARK
DEFE
RRED
CAR
PAR
K
DEFERRED CAR PARK
TRUCKPARKINGAREA
CAR
PARK
ING
22.85
LOT102
LOT29
LOT82
LOT81
LOT50
LOT25
LOT1003
LEGEND
PROPOSED SURFACE LEVEL15.8
0
PROPOSED HEAVY DUTY GRATED INLET GULLY
150mm HIGHBARRIER KERB
150mm HIGHBARRIER KERB
150mm HIGHBARRIER KERB
22.60
STORM WATER AND SEWER EASEMENT
0.2%
22.60 22.60
22.60
22.75
22.70
22.70 23.00
23.00
22.70
22.70
22.85
22.85
22.8522.85
22.85
22.85
22.85
22.85
22.85
22.85
23.00
23.00 22.80
22.80
22.85
22.85
22.85
22.85
22.85
22.85
22.8522.85
22.8522.85
22.70
22.85
22.8522.8522.8522.85
22.80
21.75 21.7521.75
21.70 21.70
23.00
21.75
23.00
21.75
23.00
21.7523.00
22.85
22.75
22.55
22.85
22.80
22.85
23.00
22.8022.75
22.80
22.85
23.0023.00
22.85
22.85
22.85
22.85GAS
SUBS
TATION
0.1%
0.5%
2.5%
0.5%
1.0%
0.1%
0.5%
1.5%
0.3%
1.0%
1.0%
1.0%
1.0%
22.90
22.90
22.30
22.30
0.1%
0.1%
1.0%
2.0%
1.0%
0.5%22.70 22.70
-
D
D
D
D
D
D
DD
DD
DD
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DD
DD
DD
DD
DD
DD
DD
D
D
D
D
D
D
D
D
D
D
D
D
DDDDDDDDDD
D D D D D D D D D D D D
D
DD
DD
DDDDD
D
DDDD D D D
D
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DD
D
DD
DD
DD
DD
DD
DD
DD
DD
DD
D
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
D D D D D D D D D D D D D D D D
DD
DD
DD
DD
DD
DD
D D D D D D D D D D D D D
DD
DD
DD
DD
DD
DD
DD
DD
DD
D
REV No:
AUTHORISED
JOB NUMBER:
DRAWN: DATE:DESIGNED:
DWG No:
DATE: DATE:
CHECKED:
DATE:
A1SCALE AT A1:
DRAWING TITLE:
PROJECT:
CLIENT:
GRID: DATUM:
ORIGINAL DRAWING SIZE:
THIS DRAWING IS COPYRIGHT. USE OR COPYING OF THIS DRAWING IN WHOLE OR IN PART
WITHOUT THE WRITTEN PERMISSION OF DAVID WILLS AND ASSOCIATES CONSTITUTES A
COPYRIGHT INFRINGEMENT.
Office:
Unit 1 / 9 Shields Crescent
BOORAGOON WA 6154
Mail:
PO Box 3084
MYAREE LPO WA 6154
Phone (08) 9424 0900
Fax (08) 9330 3133
E-mail [email protected]
ABN 34 900 498 130
David Wills and Associates
C o n s u l t i n g E n g i n e e r s
NOT
FOR
CONS
TRUC
TION
REV DATE DESCRIPTION SIG
LINC PROPERTY PTY LTD
SWAN BREWERY INDUSTRIAL ESTATEBREWER ROAD STORMWATER DESIGN
BELOWGROUND STORAGE
1:500
LOCAL AHD
BD
28/01/16
MR
27/01/16
DW
29/01/16
16009 C03 C
A 29/01/16 ISSUED FOR APPROVAL BD
B 05/02/16 UPDATE TO INCLUDE STORMWATER AND SEWER EASEMENT BD
C 06/04/16 ARCHITECTURAL PLAN AMENDED BD
metres
0 m
scales quoted apply to
original drawing scale
10 20 30 40
1:500
A1
David WillsAIT(Civil) GradDipB MIEAust CPEng
D.Wills07/04/2016
FFL 23.00
BEVCHAIN WAREHOUSE
OFFICE
BATTERYCHARGE
KEGSTORAGE
SPIRITSTORAGE
DEFERRED CAR PARK
DEFE
RRED
CAR
PAR
K
DEFERRED CAR PARK
TRUCK PARKING AREA
CAR
PARK
ING
LOT102
LOT29
LOT82
LOT81
LOT50
LOT25
LOT1003
LEGEND
INVERT LEVEL DOWN STREAM
INVERT LEVEL UP STREAMPIPE DIAMETER / GRADELENGTH
D D D D PROPOSED DRAINAGE PIPE
GENERAL NOTES
U/S
D/S
21.23200/18416.6m
21.14
1800X1200 SOAKWELL WITH 600x600
1. DRAINAGE PIPES TO BE RCP CLASS 2.
STORMWATER DISPOSAL NOTES
DESIGN TO INFILTRATE A 1:1 ARI STORMEVENT ON SITE AND CONTAIN A 1:10 YRSTORM EVENT IN BELOW GROUNDSTORAGE:- AVAILABLE BELOW GROUND
STORAGE = 865 m
DESIGN TO CONTAIN A 1:100 YR STORMEVENT ON SITE (BELOW GROUND +DEPRESSION):- AVAILABLE DEPRESSION STORAGE =
940m- AVAILABLE TOTAL ON SITE STORAGE
= 1805 m
HEAVY DUTY GRATED INLET GULLY
1800X1200 SOAKWELL U.N.O.
PROPOSED LOCAL AUTHORITY STORMWATER
DISCHARGES INTO EXISTING1500 PIPE (LOCAL AUTHORITY
STORMWATER SYSTEM)
GAS
SUBS
TATION
U/S
D/S
20.00525/19122.9m
19.88U/S
D/S
20.25525/2006.0m
20.22
U/S
D/S
20.19525/1975.9m
20.16
U/S
D/S
20.38450/19236.5m
20.19
U/S
D/S
20.88450/19999.5m
20.38
U/S
D/S
20.5450/20050.0m
20.25 U/S
D/S
20.78450/19554.5m
20.5
U/S
D/S
21.22300/19887.3m
20.78
U/S
D/S
21.33300/19121.0m
21.22
U/S
D/S
21.23300/18416.6m
21.14
U/S
D/S
21.14300/1202.4m
21.12
U/S
D/S
21.36300/1604.8m
21.33
U/S
D/S
21.43300/20040.1m
21.23
U/S
D/S
21.60300/19232.6m
21.43
U/S
D/S
21.18450/19959.8m
20.88
U/S
D/S
21.22450/1787.1m
21.18
U/S
D/S
21.43300/18012.6
21.36U/S
D/S
20.76450/19225.0m
20.63
U/S
D/S
20.90450/19927.8m
20.76
U/S
D/S
21.22450/19662.8m
20.90
U/S
D/S
21.42450/16032.1m
21.22
U/S
D/S
14.90300/2996.6m
14.90
U/S
D/S
XX.XX300/XXX6.6m
XX.XX
U/S
D/S
21.42300/18711.2m
21.36
EXISTING INVERT LEVEL TO BE CONFIRMED ON SITEPRIOR TO COMMENCEMENT OF ANY WORKS
AVERAGE DISCHARGE INTO LOCAL AUTHORITYSTORMWATER SYSTEM OF 975 l/sec
D D D D D
STORM WATER AND SEWER EASEMENT
37.2m (31 x 1.2m LONG CULVERT SECTIONS)
39.6m (33 x 1.2m LONG CULVERT SECTIONS)
20.4m (17 x 1.2m LONGCULVERT SECTIONS)
7.2m (6x1.2m LONGCULVERT SECTIONS)
21.6m
(18x1.2m
LONG
CULV
ERT
SECT
IONS
)
PROPOSED LOCAL AUTHORITY MANHOLE
-
REV No:
AUTHORISED
JOB NUMBER:
DRAWN: DATE:DESIGNED:
DWG No:
DATE: DATE:
CHECKED:
DATE:
A1SCALE AT A1:
DRAWING TITLE:
PROJECT:
CLIENT:
GRID: DATUM:
ORIGINAL DRAWING SIZE:
THIS DRAWING IS COPYRIGHT. USE OR COPYING OF THIS DRAWING IN WHOLE OR IN PART
WITHOUT THE WRITTEN PERMISSION OF DAVID WILLS AND ASSOCIATES CONSTITUTES A
COPYRIGHT INFRINGEMENT.
Office:
Unit 1 / 9 Shields Crescent
BOORAGOON WA 6154
Mail:
PO Box 3084
MYAREE LPO WA 6154
Phone (08) 9424 0900
Fax (08) 9330 3133
E-mail [email protected]
ABN 34 900 498 130
David Wills and Associates
C o n s u l t i n g E n g i n e e r s
NOT
FOR
CONS
TRUC
TION
REV DATE DESCRIPTION SIG
LINC PROPERTY PTY LTD
SWAN BREWERY INDUSTRIAL ESTATEBREWER ROAD STORMWATER DESIGN
BOX CULVERT DETAILS
1:500
LOCAL AHD
BD
07/04/16
MR
27/01/16
DW
16009 C05 A
A 07/04/16 ISSUED FOR APPROVAL BD
metres
0 m
scales quoted apply to
original drawing scale
10 20 30 40
1:500
A1
David WillsAIT(Civil) GradDipB MIEAust CPEng
D.Wills07/04/2016
TRIPLE UNIT CULVERT TYPICAL SECTIONSCALE 1:25
SINGLE UNIT CULVERT TYPICAL SECTIONSCALE 1:25
PAVEMENT (PROPOSED SURFACE)PAVEMENT (PROPOSED SURFACE)
ROCLA 3000x1800 LARGE BOXCULVERT OR SIMILAR APPROVED
ROCLA 3000x1800LARGE BOX CULVERTOR SIMILAR APPROVED
ROCLA 3000x1800 LARGE BOXCULVERT OR SIMILAR APPROVED
ROCLA WBWLS3002 BOX CULVERTLINK SLAB OR SIMILAR APPROVED
GREOFABRIC
GROUNDWATER LEVEL 18.6m AHD
MASS CONCRETE STRIPFOOTING (TYP) MASS CONCRETE STRIPFOOTING (TYP)
GEOFABRIC
GROUNDWATER LEVEL 18.6m AHD
300
MIN
-
Your Ref: Our Ref:
16009-02-C
30 March 2016
Jewda Group Pty Ltd (ABN 34 900 498 130 / ACN 105 005 383) ATF Wills Family Trust T/A David Wills and Associates
Office: Unit 1/9 Shields Crescent, Booragoon Mail: P.O. Box 3084, Myaree LPO WA 6154
Tel: 9424 0900 Email: [email protected] Web: www.dwaconsulting.com.au
DEVELOPMENT OF LOT 1003 BREWER ROAD, CANNING VALE MANAGEMENT AND DISPOSAL OF SITE STORMWATER
At the request of Mr David Paz of Linc Property, David Wills and Associates have been engaged to investigate options available for the discharge of stormwater from the development of the proposed development of Lot 1003 Brewer Road, Canning Vale whilst minimising the volume of site storage to compensate the flows. This report will be used to gain Statutory Authority approval. 1. BACKGROUND
The former Swan Brewery site, located north of Baile Road, Canning Vale was an area of approximately 40 ha in size. Recently, this land has been redeveloped as an Industrial subdivision by Linc Property Pty Ltd comprising 90+ new lots, which included the largest lot 1003 of 6.41 ha. The Water Corporation is responsible for the Vinnicombe Drive Compensating Basin which exists just to the north east of the site refer to Site Plan below. It is understood that the original design of this Compensating Basin of approximately 8500 m2 in size, accounted for runoff from impervious surfaces on the full Swan Brewery 40 ha site as well as the adjacent Industrial land subdivision bound by Tacoma Circuit, Ernst Clarke and Baile Roads.
Site Plan Courtesy of NearMap
Lot 1003 6.411ha
Vinnicombe Drive Compensating Basin
-
Page 2 of 5
Stage 5 of the subdivision development (Lot 1003) was originally proposed to be further split into smaller Industrial lots. The Developer now intends to develop the Lot to establish a single large Industrial site for BevChain Australia Pty Ltd. The stormwater drainage for the overall subdivision development was to collect all of the new Municipal Road reserve impervious surfaces in a series of roadside catchpits and underground drainage pipes. This stormwater has been designed to be conveyed to the Water Corporation Vinnicombe Drive Compensating Basin via a network of underground pipe drains. All lots within the subdivision were required to contain storms of 1 in 100 year events and discharge the storm water generated from the site by infiltration (the subdivision arrangement does not allow for connection of any subdivision lots to the Vinnicombe Drive Compensating Basin) Given the reduction in impervious area from the original Swan Brewery site contributing flows to the Vinnicombe Compensating Basin, Linc Properties wanted to investigate the opportunity for Lot 1003 to discharge an amount of stormwater from impervious surfaces into the Water Corporation system. Any discharge from Lot 1003, will be required to be consistent with Water Sensitive Urban Design (WSUD) principles of the Department of Water and the Water Corporation Main Drain design requirements. 2. MEETING THE DEPARTMENT OF WATER WSUD REQUIREMENTS
In order to meet the Department of Water WSUD requirements, it is understood that the following criteria is applicable for the subject sites to:
Manage stormwater runoff from constructed impervious surfaces generated by the 1 in 1 year ARI storm of 60 minutes duration, at its source consistent with Water Sensitive Urban Design (WSUD) principles.
Contained at Appendix A, is a calculation of the stormwater runoff volume from the subject site to meet the above requirement is 865 m3 of stormwater generated by the 1 in 1 year ARI storm event. It is proposed that this volume of water be stored below ground and infiltrated through native sands to recharge the groundwater table well below the finished ground surface. This underground storage volume is in addition to any storage necessary to avoid impact on the Vinnicombe Drive Compensating Basin and Water Corporation requirements. 3. MEETING THE WATER CORPORATION REQUIREMENTS TO AVOID ANY IMPACT UPON THE
VINNICOMBE DRIVE COMPENSATING BASIN
The Vinnicombe Drive Compensating Basin forms part of the Bannister Creek Main Drain system which was developed from the late 1960s to service an industrial using the Australian Rainfall and Runoff (ARR) 19581. Generally, pipe systems were designed for 1 in 5-year Average Recurrence Interval (ARI) storm event. At that time, the compensating basin was designed for a 1 in 10 year ARI storm of critical duration, with 0.3, freeboard. There was no allowance for onsite infiltration which is significant. The run off coefficient was a blanket value of 0.5 with an expectation that some on site compensation was required, no matter the size of the lot. 1 Australian Rainfall and Runoff, Edition 1 First Report of the Stormwater Standards, The Institution of Engineers Australia, Barton, ACT, 1958
-
Page 3 of 5
While the ARR 1958 rainfall intensities are slightly higher for shorter duration storm events, they are slightly lower for longer duration storm events compared to the ARR 19872 which is the current design criteria to be applied. Given the slightly higher rainfall intensities of the 1958 ARR for the longer duration storm events, an additional factor of safety is provided to the Compensating Basin with lower rainfall intensities now being experienced for corresponding long duration storm events using the current criteria. Referencing the ARR 1958 method for calculation of peak flow, the site discharge would be in the region of be 2745L/sec during the design 1 in 10-year storm event, based on a time of concentration for the overall site of 31 minutes. The time of concentration was estimated consistent with the ARR1958 principles, using the Friend Equation with a Horton value (surface roughness) based on a paved surface (n = 0.011) and catchment length of 900m. Empirically, the time of concentration appears appropriate given the area and imperviousness of the site. NearMap aerial photography dating back to 2008 also provides verification of the site conditions and assumptions, prior to the subdivision development. For further comparison, the volume of runoff from the entire 39.3 ha of the Swan Brewery site for a 1 in 10 year ARR1958 storm event of 12 hours duration was shown to be within 2% of the equivalent volume using the ARR 1987 method for the same duration, based on a coefficient of runoff of 0.50. Calculations to support each of the above hypotheses are provided at Appendix B of this report. With the permissible site discharge rate of 2743L/sec established (see Appendix B), 1476 L/sec of flow from Municipal Road Reserves (see calculations in Appendix C) has been allowed for a 1 in 100 year ARI storm event. The balance of 1267 L/sec can be used to discharge the stormwater runoff from Lot 1003. Lot 1003 has an area of approximately 6.41 hectares. Assuming a run off coefficient of 0.9, the impervious area will be approximately 5.77ha. To meet the Department of Water criteria of a 1 in 1 year ARI storm of 60 minutes duration, which results in an intensity of 16.4 mm per hour, a retained volume of 865 cubic metres is required before any water can discharge from the site. This volume will be provided within the lot and ensure that this water is discharged by infiltration before there is any overflow into the Water Corporations Vinnicombe Drive Compensating Basin. Therefore, to calculate the additional required storage within the lot will require to investigate the series of storm events up to 1 in 100 year ARI of varying durations to determine a;
1) The peak discharge from the site; and 2) The required onsite storage.
2 Australian Rainfall and Runoff, Edition 3 A Guide to Flood Estimation, The Institution of Engineers Australia, Barton, ACT, 1987
-
Page 4 of 5
The maximum discharge from the site has been conservatively set at 1267 Litres per second (original pre-developed site flow rate less flow rate from subdivision Municipal Road reserves). As the calculation of required storage volume has been undertaken graphically rather than numerically using a sophisticated model, an average discharge of 975 L/sec has been assumed from the site. This is approximately 75% of the peak discharge which is in accordance with previous modelling undertaken in such situations. The graphical approach is very conservative as the peak discharge from the site road system will occur at approximately 31 minutes. Based upon the graphical solution using the current 1987 ARR rainfall intensities, it is calculated that the maximum additional volume required to be contained within the site shall be 930 m3. The 1200mm diameter reinforced concrete outfall pipe connecting to the Vinnicombe Drive Compensating Basin to the old Swan Brewery site is also more than capable of discharging the anticipated 2743L/sec total combined flow resulting from rainfall on the Municipal Road Reserve and subject site impervious surfaces during the 1 in 100 year ARI storm event. The capacity of the pipe is in excess of 2648 L/sec at its as constructed grade of 1 in 310. However, as the invent of the pipe is more than 4m below the surface, the hydraulic grade line can easily be increased during peak flow events. At a hydraulic grade of 1 in 270 (2.3m below the surface), the 2743 L/sec total approach flow entering the 1200mm diameter pipe can easily be achieved. Calculations and a graphical solution of this storage volume are provided at Appendix C of this report. It is proposed that the 930 m3 be stored above ground within the car park/access areas at a maximum depth of 200mm according to the provisions contained in AS3500.3 Plumbing and Drainage Part 3: Stormwater drainage. This 930 m3 is additional to the 865 m3 required to retain the 1 in 1 year ARI 60-minute duration storm event on the subject site. The long term duration storm events of between 36 and 72 hours have also been assessed for their effect on total volumetric discharge to the Vinnicombe Drive Compensating Basin. For both long duration storm events, the original design total runoff volume (according to ARR1958) from the 39.3ha Swan Brewery site exceeds that generated by Lot 1003 and the adjacent Municipal Road Reserves for the 1 in 100 year ARI storm event (to ARR 1987). The post developed volumetric totals from Lot 1003 and the adjacent Municipal Road Reserves include allowance for the peak discharge restrictions and infiltration of captured stormwater through native Bassendean Sands to the groundwater table below surface (assuming a conservative long term infiltration rate of 4.3m/day). Calculations are provided at Appendix D of this report indicating the volumetric discharge totals. A concept plan showing the overall proposal to deal with stormwater runoff from associated with the development of Lot 1003 is attached at Appendix E of this report.
-
Page 5 of 5
4. CONCLUSIONS
Lot 1003 will be developed allowing excess flow and storage capacity from the original design of the area to be utilized to reduce the onsite storage volume to contain a 1 in 100-year storm event of critical duration of site. 865 m3 of underground storage to contain a 1 in 1-year storm of 60 minutes duration will be constructed. This will recharge the groundwater table below the finished surface of the subject site, consistent with WSUD principles a large percentage of all rain fall will be discharged using this method. An addition 930 m3 of above ground storage will be created to deal with peak flows up the 1 in 100 year ARI storm event of critical duration. The Water Corporation or City of Canning systems will not be compromised, nor over loaded. with respect to the development of Lot 1003 proceeding. Should you require any further information or assistance, please contact Paul Ivkovic or David Wills on our office phone number of (08) 9424 0900. Prepared by: Checked by: Paul Ivkovic BEng (Civil) (Hons) BBus MIE Aust CPEng Senior Engineer
David Wills AIT(Civil) GradDipB MIE Aust CPEng Principal Engineer/Director
Encl.
1. Appendix A Calculation of Lot 1003 storage volume to meet WSUD principles 2. Appendix B Comparison of ARR1958 & ARR1987 methods and rainfall intensities 3. Appendix C Calculation of storage volumes for Lot 1003 during 1 in 100-year storm
event 4. Appendix D Concept proposal 5. Appendix E Concept proposal
S:\Projects\16009 - Swan Brewery Industrial Estate, Bannister Creek - Stormwater Drainage\Stage 2\16009 Report Final Rev C.docx
-
A
Appendix A Calculation of Lot 1003 storage volume to meet WSUD principles
-
A1
Calculation of storage required to meet Department of Water WSUD principles Using the Rational Method, the volume of stormwater to manage stormwater runoff from constructed impervious surfaces generated by the 1 in 1 year ARI storm of 60 minutes duration, at its source consistent with Water Sensitive Urban Design (WSUD) principles, is calculated as follows:
= 60
360
Where: V is the volume of stormwater in (m3); d is the storm duration (60 min); C is the C10 runoff coefficient based on the impervious surface area and the 1-hour
duration storm intensity according to ARR1987 0.90 for Lot 1003 with a site fraction imperviousness of 1.0;
I is the rainfall intensity in (mm/h) 15mm/h, and A is the catchment area (ha) 6.411 ha for Lot 1003.
Computing the above, the total volume of stormwater in 60-minute duration storm event to be retained on site to meet Department of Water requirements is 865 m3. This volume is proposed to be stored below ground and infiltrated through native sands to recharge the groundwater table well below the finished ground surface.
-
B
Appendix B Comparison of ARR1958 & ARR1987 methods and rainfall intensities
-
C 13.7 Interval Fy
b 3 1 1
n 0.7 2 1.22
Storm Interval 10 5 1.5
Fy 1.7 10 1.7
20 1.9
50 2.17
t (min) I (mm/h) 100 2.35
5 138.00
6 127.10
7 118.10
8 110.50
9 103.90
10 98.30
11 93.30
12 88.90
13 85.00
14 81.50
15 78.30
16 75.40
17 72.70
18 70.30
19 68.00
20 65.90
30 51.20
60 32.60
120 20.40
180 15.50
360 9.60
720 5.90
1440 3.70
2880 2.30
4320 1.70
31 50.2
ARI tc1 (min) tc2 (min) total t (min) C I (mm/h) A (ha) Q (L/sec)
1 23 8 31 0.50 29.5 39.3367 1612
2 23 8 31 0.50 36 39.3367 1967
5 23 8 31 0.50 44.3 39.3367 2420
10 23 8 31 0.50 50.2 39.3367 2743
20 23 8 31 0.50 56.1 39.3367 3065
50 23 8 31 0.50 64 39.3367 3497
100 23 8 31 0.50 69.3 39.3367 3786
tc using Friend Equation
Horton n = 0.011 (paved)
With
L1 (m) 795 L2 (m) 115
S1 1 in 392.5 S2 1 in 57.5
Pre-developed catchment - ARR 1958
Calculation of former Swan Brewery site (39.33ha) according to ARR1958
B1
-
t (min) I (mm/h) C A (ha) Q (L/sec) V (L) t (min) I (mm/h) C A (ha) Fy Q (L/sec) V (L)
5 138 0.5 39.3367 7540 2,261,860 5 123 0.5610 39.3367 1 7540 2,261,860
6 127.1 0.5 39.3367 6944 2,499,847 6 114 0.5575 39.3367 1 6944 2,499,847
10 98.3 0.5 39.3367 5371 3,222,331 10 89.3 0.5504 39.3367 1 5371 3,222,331
20 65.9 0.5 39.3367 3600 4,320,481 20 60.1 0.5483 39.3367 1 3600 4,320,481
30 51.2 0.5 39.3367 2797 5,035,098 30 46.7 0.5482 39.3367 1 2797 5,035,098
60 32.6 0.5 39.3367 1781 6,411,882 60 29.8 0.5470 39.3367 1 1781 6,411,882
120 20.4 0.5 39.3367 1115 8,024,687 120 18.8 0.5426 39.3367 1 1115 8,024,687
180 15.5 0.5 39.3367 847 9,145,783 180 14.3 0.5420 39.3367 1 847 9,145,783
360 9.6 0.5 39.3367 524 11,328,970 360 9.03 0.5316 39.3367 1 524 11,328,970
720 5.9 0.5 39.3367 322 13,925,192 720 5.79 0.5095 39.3367 1 322 13,925,192
1440 3.7 0.5 39.3367 202 17,465,495 1440 3.78 0.4894 39.3367 1 202 17,465,495
2880 2.3 0.5 39.3367 126 21,713,858 2880 2.46 0.4675 39.3367 1 126 21,713,858
4320 1.7 0.5 39.3367 93 24,074,060 4320 1.86 0.4570 39.3367 1 93 24,074,060
129,429,544 0.5271 129,429,544
Methods are within 2% based on volume of stormwater during same length event
10 year Return Period for Storm - ARR 1958 10 year Return Period for Storm - ARR 1987
Comparison of ARR1958 & ARR1987 rainfall intensities for 1 in 10 year event
C adjusted to provide the same
discharge volume
B2
-
C
Appendix C Calculation of storage volumes for Lot 1003 during 1 in 100 year storm event
-
ARI tc (min) C Fy I (mm/h)
A (ha) from
Municipal Road Reserves Q (L/sec) PSD (L/sec)
Net flow
(L/sec)
Tempering
factor
Net allowable PSD from
Lot 1003 (L/sec)
1 13 0.90 0.8 39.8 4.0323 321 2743 2422 1.3 1863
2 13 0.90 0.85 52.1 4.0323 446 2743 2297 1.3 1767
5 13 0.90 0.95 66.9 4.0323 641 2743 2102 1.3 1617
10 13 0.90 1 77.4 4.0323 780 2743 1963 1.3 1510
20 13 0.90 1.05 92 4.0323 974 2743 1769 1.3 1361
50 13 0.90 1.15 113.5 4.0323 1271 2743 1472 1.3 1132
100 13 0.90 1.2 131.8 4.0323 1476 2743 1267 1.3 974
Refer to attached mass storage curves plotting inflows (vol vs. time) for Lot 1003 flows and PSD
Post-developed flows from Swan Brewery subdivision site - based on ARR 1987
C value limited 1.0 max
C1
-
C2
865
0.0
1000.0
2000.0
3000.0
4000.0
5000.0
6000.0
0 10 20 30 40 50 60 70 80
Vo
lum
e (
cu.m
)
Storm duration (min)
1 in 100 year ARI flow from
Lot 1003
Permissible site discharge
(58.4 cu.m/sec or 975 L/sec)
Peak difference 930 m3.
-
C3
865
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
1600.0
1800.0
2000.0
0 10 20 30 40 50 60 70 80 90 100
Vo
lum
e (
cu.m
)
Storm duration (min)
1 in 10 year ARI flow from Lot 1003
Permissible site discharge (58.4
cu.m/sec or 975 L/sec)
-
C4
865
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
0 10 20 30 40 50 60 70 80 90 100
Vo
lum
e (
cu.m
)
Storm duration (min)
1 in 5 year ARI flow from Lot 1003
Permissible site discharge (58.4
cu.m/sec or 975 L/sec)
-
D
Appendix D Consideration of long duration storm events on Vinnicombe Drive Compensating Basin
-
Appendix D
t (h) Fy C10 I100 (mm/h) A (ha) V (m3)
Volume of rainfall runoff - Lot 1003 36 1.2 0.9500 4.60 6.411 10617
Volume of rainfall runoff - Municipal Road Reserves (subdivision) 36 1.2 0.9000 4.60 4.03 6674
17290
t (h) k (m/day) A (ha) V (m3)
Volume of rainfall infiltrated over storm duration 36 4.3 0.032 -2064
Volume stored - below ground on Lot 1003 -865.4
Volume stored - above ground on Lot 1003 -930
-3859
V (m3)
Net outgoing volume from Lot 1003 and Municipal Road Reserves to
Vinnicombe Drive CB 13431
t (h) C I10 (mm/h) A (ha) V (m3)
Original ARR1958 rainfall runoff design volume - Swan Brewery catchment 36 0.5000 2.74 39.3364 19401
19401
t (h) Fy C10 I100 (mm/h) A (ha) V (m3)
Volume of rainfall runoff - Lot 1003 72 1.2 0.9500 3.00 6.411 13848
Volume of rainfall runoff - Municipal Road Reserves (subdivision) 72 1.2 0.9000 3.00 4.03 8705
22553
t (h) k (m/day) A (ha) V (m3)
Volume of rainfall infiltrated over storm duration 72 4.3 0.032 -4128
Volume stored - below ground on Lot 1003 -865.4
Volume stored - above ground on Lot 1003 -930
-5923
V (m3)
Net outgoing volume from Lot 1003 and Municipal Road Reserves to
Vinnicombe Drive CB 16629
t (h) C I10 (mm/h) A (ha) V (m3)
Original ARR1958 rainfall runoff design volume - Swan Brewery catchment 72 0.5000 1.69 39.3364 23932
23932
Long term storm - Volume discharged to Vinnicombe Drive Compensating Basin (36h duration event)
Long term storm - Volume discharged to Vinnicombe Drive Compensating Basin (72h duration event)
16009 - Lot 1003 Brewer Road, Canning Vale
-
E
Appendix E Concept proposal
-
REV No:
AUTHORISED
JOB NUMBER:
DRAWN: DATE:DESIGNED:
DWG No:
DATE: DATE:
CHECKED:
DATE:
A1SCALE AT A1:
DRAWING TITLE:
PROJECT:
CLIENT:
GRID: DATUM:
ORIGINAL DRAWING SIZE:
THIS DRAWING IS COPYRIGHT. USE OR COPYING OF THIS DRAWING IN WHOLE OR IN PARTWITHOUT THE WRITTEN PERMISSION OF DAVID WILLS AND ASSOCIATES CONSTITUTES ACOPYRIGHT INFRINGEMENT.
Office:
Unit 1 / 9 Shields Crescent
BOORAGOON WA 6154
Mail:
PO Box 3084
MYAREE LPO WA 6154
Phone (08) 9424 0900
Fax (08) 9330 3133
E-mail [email protected]
ABN 34 900 498 130C o n s u l t i n g E n g i n e e r s
REV DATE DESCRIPTION SIG
LINC PROPERTY PTY LTD
LOT 1003 BREWER ROAD, CANNING VALE
STORMWATER CONCEPT LAYOUT
1:1000 AT A1 SIZE
LOCAL AHD
PI
12/02/16
PI
12/02/16
DW
29/02/16
SK01 C
A 01/03/16 ISSUED FOR CONCEPT APPROVAL PI
B 22/03/16 CHANGES AS PER WATER CORPORATION COMMENTS PI
C 29/03/16 MINOR AMENDMENTS PI
LEGENDMAIN DRAINAGE (CCL/WC)
EXISTING SEWEREXISTING WATERSITE BOUNDARY
DDSDW
PRELIMINARYSUBJECT
TO CHANGE
David WillsAIT(Civil) GradDipB MIEAust CPEng
D.Wills22/03/16
TYPICAL SECTION - ON SITE DETENTION SYSTEMNOT TO SCALE
SITE PLANSCALE 1:1000 AT A1 SIZE
-
PROPOSED DISTRIBUTION WAREHOUSE Lot 1003 Brewer RdCanning Vale
APRIL2016
-
Urbis Pty Ltd ABN 50 105 256 228 All Rights Reserved. No material may be reproduced without prior permission. You must read the important disclaimer appearing within the body of this report. URBIS Australia Asia Middle East urbis.com.au
URBIS STAFF RESPONSIBLE FOR THIS REPORT WERE:
Director Kris Nolan Associate Director Sally Birkhead Consultant Stephanie Norgaard Job Code PA 1207 Report Number Final Lodgement 12 April 2016
-
URBIS 160204- PA1207 - DEVELOPMENT APPLICATION - FINAL LODGED 7 APRIL EXECUTIVE SUMMARY i
Executive Summary ................................................................................................................................... iii
Introduction .................................................................................................................................................. 1
1 Overview of Site ............................................................................................................................... 2
1.1 Location and Context ......................................................................................................................... 2 1.2 Physical Condition ............................................................................................................................. 3 1.3 Site Access ........................................................................................................................................ 3 1.4 Site Particulars ................................................................................................................................... 3
2 Proposed Development .................................................................................................................. 4
2.1 Warehouse ........................................................................................................................................ 4 2.2 Office ........................................................................