Agenda

▪ Introduction

▪ Goals & Performance

▪ Marketing

▪ Single Family

▪ Multi Family

▪ Suppliers

HES-IE Team

▪ Ron Araujo

– Art St Armand

– Carl Watts

– Cumal Gray

– Damaris Velez

– Dana Forrester

– Marge Kelly

– Serina Segura

– Tasha Perreault

HES-IE Goals & Performance

HES-IE Year-End Forecast

CL&P

Yankee Gas

Forecast as of August 2014 results

Goal

Goal

Program Policy

▪ Any vendor found to engage in activity or practice

that constitutes a serious violation of program

policy during the course of implementing HES-IE

is subject to immediate removal, de-listing, or

suspension from the Program including

termination of contract.

– Vendors are required to report all incidents such as

theft, property damage, complaints, etc. to HES-IE.

Marketing Update

HES-IE Vendor Marketing Guidelines

HES-IE Vendor Marketing

▪ Direct Marketing

– Mailers

– Inserts

– Postcards

– Coupons

HES-IE Vendor Marketing

▪ Print

– Newspaper

– Magazines

– Free-standing inserts

HES-IE Vendor Marketing

▪ Internet

– Websites

– Social media posts

HES-IE Vendor Marketing

▪ Tradeshows &

Event Participation

HES-IE Vendor Marketing

▪ Naming Conventions

– Energize Connecticut vs. Energize CT

– EnergizeCT.com vs. www.energizect.com

– When and when not to use acronyms

(e.g., CEFIA vs. Clean Energy Finance and Investment Authority)

▪ Legal Disclosure Statements

– Short

– Long

HES-IE Vendor Marketing

HES-IE Vendor Marketing

Please contact me at:

[email protected]

860-665-3572

THANK YOU!!!

Single Family Units (1-4)

HES-IE Processes

Excellence in Customer Service

▪ Customer Excellence

– All Vendors are required to be Customer Centric.

– All Employees are expected to create a positive

experience for each customer.

This begins with scheduling the customer for an appointment,

following through on commitment, and working with the

customer to gain approval and understanding.

– It’s exceeding customer expectations!

Applications

▪ Vendors are required to submit completed

applications as they receive them.

– Applications are not to be held

▪ Applications received by HES-IE will be

processed within 5 business days

Enrollment Process For Single Family (1-4

units)

– Individually Metered, each tenant must apply for HES-IE services

Only tenants who apply will receive full services.

– If master metered (Electric) or Central Heating System, the landlord may apply for HES-IE and provide proof of income for all tenants and must include rental income .

As long as 50% of the tenants qualify for HES-IE services for a 2 unit building, or 66% of the tenants qualify for HES-IE services for 3-4 unit building, work orders will be created for all units and measures may be provided.

If renter, the Landlord must provide approval through the permission statement.

Aging Report

▪ Aging Report – Core Services

– The Aging Report reflects the amount of time the work

order has been active. It also reflects the various

stages of the assigned work order.

– The Aging Report lists all work orders assigned to each

vendor. Vendors receive the Aging report monthly. All

outstanding work orders are to be addressed

immediately.

Completion of all work orders within the 45 day window is the

responsibility of each Vendor

Cancellation of Work Orders

– All Vendor requested cancellation of work orders may

be re-routed to another Vendor.

The Vendor the work order is re-routed to will receive a notice

that the work order was cancelled and the reason will be noted

Components of HES-IE – Single Family

▪ Blower Door Testing – Window Glaze, if used, is part of air sealing

Not to be invoiced separately

– Fire-stop under attic insulation is part of air sealing

▪ Duct Sealing

▪ Replacement of Incandescent bulbs – Incandescent to CFL

– Incandescent to LED

▪ Water Saving Measures – Showerheads cannot exceed 2.0 GPM

– Faucet Aerators cannot exceed 1.5 GPM

▪ Refrigerator/Freezer LOA form

▪ HVAC system information – Reset Control

– ECM Pump Motors

▪ Window Review

▪ Insulation Calculation

▪ Client Education

▪ Heat Pump Water Heaters

▪ Clean Tune Test

▪ Health & Safety Screening

Comprehensive

“one home at a time”,

with a focus on all energy use.

When a Blower Door cannot be performed

▪ If due to failing Combustion Air Zone (CAZ) – Clean, Tune, and Test should be performed

Vendor should return to perform Blower Door Testing if CCT corrects situation.

– If not, Vendor should receive quotes for replacement.

▪ Of 45 submitted CAZ no blower door testing, 26 were listed as CAZ – None were re-invoiced for CTT and rescheduled BD

▪ ALM Vendor must be specific on the Health and Safety issue found in

the home.

– Documentation is needed to allow for remediation.

Insulation

Reviewing the Basics

Building Analyst

Technical Standards Building Analyst Professional

Heat Loss and Savings Calculations

▪ For heat loss and savings calculations, building components must be measured and area and volume calculations must be accurate +/- 10%. For use in heat loss and savings calculations use the following criteria for building component evaluations:

▪ R-values of installed insulation shall be determined based on an actual measurement of the insulation depth and the R-value per inch for that product.

▪ Voids in insulation must be accounted for by determining the net square footage of uninsulated area and recording it as a separate component of the building.

▪ Gaps between batt insulation and framing must be accounted for by determining the effective R-value for the insulation using the Effective R-value for Batt

▪ A blower door test must be completed before and after installation of any of type of insulation

Check of Insulation Levels

▪ Measuring Insulation Levels, Use a measuring

tape to measure the depth of the insulation

(inches).

Looking across your attic, if the insulation

is level with or below the attic floor joists,

you probably need to add more

insulation.

It is important that the insulation be evenly

distributed with no low spots; sometimes

there is enough insulation in the middle of

the attic and very little along the eaves.

Identify all materials needed to complete the

insulation work.

Insulation Markers

RAFTER VENTS

Check the attic venting

▪ Attic Air Flow

– Soffit Vent

– Rafter Vent

– Ridge Vent

Attic Hatch Covers are a must The good

Fire rated High R value

The bad Not fire rated low R value

The ugly Custom made not fire rated and who knows what R value?

Hatch Cover Requirements

Attic hatch covers that meet’s the ASTM E84 tests, the material has a Flame Spread Rating of less than

25 and Smoke Developed Rating of less than 450. The product meets the 2009 IECC and IRC Code

requirements for attic access openings. It can also be used to meet the requirements laid out for attic

entrances in the ENERGY STAR® Thermal Bypass Checklist.

Specifically, Item 5.1 (for Access panels) and Item 5.2 (for Drop-down Stairs) are addressed by meeting

the requirements of having movable insulation and having all air gaps sealed. Attic hatch covers that

comes with a 10 year warranty

Fire Rated R - Value Air - Sealing Hand - Hold

Some of Different Hatch Covers

The Energy Guardian

Battic Door kits

Therma-Dome Attic Stair Cover

Kamco Supply - Attic Hatch Cover

These Items are NOT Insulation

▪ This is part of the normal air sealing measure (Fill wiring and plumbing holes

with expanding foam. – Caulk around electrical junction boxes, and fill holes in box with caulk. Plumbing by passes and

chimney by passes)

Add On Measures

Add on Measures - Insulation

▪ Available Insulation Incentives – Attic

– Wall

– Basement

– Crawlspace

*including Attic Hatches, Vents, etc.

All homes meeting the criteria for insulation must be reviewed to

determine incentive.

Additional Verification may be required (photos)

Add on Measure - HVAC

▪ Heating System Replacement and Conversions

– The heating system should be viewed upon visit to

determine efficiency

Vendors are required to work with customers to provide

incentive for replacement.

– Remember to review all options:

Is Natural Gas available?

Good candidate for Ductless Heat Pump?

Dig deeper:

• Components Evaluation

• ECM Pump Motors

• Boiler Water Reset

Add on Measure – Window Replacement

▪ Single Pane Windows

– If single pane windows are found in the home, the

customer should be made aware of the possible

incentive for replacing their windows with Certified

Energy Star Double Pane. The Certified Product

Directory (CPD) number must be listed on quote.

All invoicing cannot exceed quote and must be documented with

quote information (Certified Energy Star, CPD)

Incentive Qualification Tool

▪ The calculation sheet is used to determine the possible incentive for Insulation. During the initial visit, the tool must be utilized to determine configured incentive amount and provide a timeline for approval. – For Window and Heating System Replacements, the

calculation would be performed after the quotes are received.

▪ All proposed incentives are to be submitted to the email address: [email protected] – The approval or denial will be sent back to the vendor

through this email address. Vendors are required to document all information and upload the

information in CLMTRS under the Docs tab.

Incentive Qualification Tool

Attic and Sidewall Insulation Calculation

Below Grade Insulation

(Basement/Crawlspace) Calculation

Window Replacement Calculation

HVAC Calculation

Calculated Incentive

Approvals/Denials

▪ Vendor will calculate the incentive and email

HES-IE through the email address:

[email protected]

Reminder: The Incentive Excel Sheet must be sent saved as:

Vendor Name, Work order #, Customer Name.

The applicable quotes must also be submitted.

For Windows, the photos of the single pane windows must

accompany the request.

▪ HES-IE will review the calculation and provide

vendor with approval or denial within 48 hours.

Field Service Tool

▪ This document must be used for each work

order. The Technician is responsible to complete

it entirely. The document must be uploaded onto

the Docs tab in CLMTRS upon invoicing

– This is important to document what was done during

the visit as well as recommendations.

Sample of FST

Invoicing for Single Family

▪ Reminders

▪ All invoices must be itemized

– Documentation (including FST), copy of contractor

invoice

▪ Other

– Basement Insulation

– ECM Pumps

– HPWH

All must be entered as a “Custom Measure”

Client Education

▪ Customer-Centric!

– Client Education/Kitchen table wrap up is an

opportunity to leave a positive impression on the

customer.

Review the HES-IE booklet with the customer to demonstrate

the measures performed, possible add on measures and what

they can do to reduce their energy costs.

Customer Surveys

▪ All HES-IE customers receive surveys upon completion of work through U.S. Mail and or email by the HES-IE Team. – Customers submit completed Surveys through email or U.S.

Mail

▪ Vendor may survey customers, however, no survey should be filled out by the technician or in front of the technician. The survey must be left with the customer to complete. – All surveys returned to the Vendor via email or U.S. Mail.

Great Opportunity to collect customer email address and add to work order in CLMTRS.

Core Service Evaluations

▪ Core Service Evaluations – Email sent weekly to [email protected] for

following weeks work schedule

– An Excel spread sheet must contain the following information that must be included in your submitted spread sheet. CLP Job ID - (CT14-000000) Customer Name – (John Doe),

Vendor – (ABCDEFG) , Technicians Name, - ( Job Tech), Appointment Date – (September 12th 2014), Appointment Time – (10:00AM), City – (Stamford), Address(123 Bethere St), Customer Contact phone #(203-987-6543), and Project Current Status – (Scheduled).

▪ Cancellation of scheduled jobs – All cancellations must be documented and sent to the

Inspector via the email address

Coming Soon….

▪ Android

– Scheduled date will be added to CLMTRS

▪ Scorecard

– Overall MMBTU savings

▪ Single Family Goals per Vendor

– Units, Dollars and Savings

▪ Neighborhood Canvas 2015

– 2015 Program no longer available

Multi-Family

Components of HES-IE Multi Family

▪ Blower Door Testing Sample – Window Glaze, if used, is part of air sealing

Not to be invoiced separately

▪ DUCT Sealing

▪ Replacement of Incandescent bulbs – Incandescent to CFL

– Incandescent to LED

▪ Water Saving Measures – Showerheads cannot exceed 2.0 GPM

– Faucet Aerators cannot exceed 1.5 GPM

▪ Refrigerator/Freezer LOA form

▪ HVAC system information – Reset Control

– ECM Pump Motors

▪ Window Review

▪ Insulation Calculation

▪ Heat Pump Water Heater

Comprehensive

“multiple units at a time”,

with a focus on all energy use.

Excellence in Customer Service

▪ Customer Excellence

– All Vendors are required to be Customer Centric.

– All Employees are expected to create a positive

experience for each customer.

This begins with scheduling the customer for an appointment,

following through on commitment, and working with the

customer to gain approval and understanding.

– It’s exceeding customer expectations!

Potential Projects

▪ Potential multi-family project sites are identified by Vendor/PA or Property Manager/Owner.

▪ Owners or Property Management Companies are informed of the project process and the site is assessed to determine measures needed at the site.

▪ Vendors are required to market to Multi Family sites.

▪ When a vendor brings the lead forward (if not previously taken care of through the program) the Project will be assigned to that vendor.

▪ All leads brought in by other sources will be assigned throughout vendor base. – Assignment will be based on assigned territory, current work load,

timeliness of work, and adherence to program rules. All Housing Authorities currently are served by Community Action Agencies only.

Enrollment Process

▪ For Multi Family Complexes (5 units and above),

the property manager must complete the Income

Verification Form.

– If 66% of the tenants qualify for HES-IE services, the

complex can receive services through the program.

Income Verification Form

Revenue Codes

▪ Energy Efficiency budgets and program funding is

established based upon energy usage by revenue

class. This usage is captured by revenue code.

– Multifamily properties are provided utility services through

two possible options:

Master metered

Common area and Individual tenant metering

▪ To consistently serve multifamily projects, the use of

revenue code has been utilized to determine which

budget provides the funds for the EE measures

recommended.

Site Visit

▪ A site visit is scheduled with the Owner/Property Management Company.

▪ The vendor will determine the measures needed at the site and will complete the approved analysis documentation forms. – Lighting Audit

– Blower Door Sample

– HVAC Documentation and applicable quotes

– Insulation Current R Value, Photos, and applicable quotes

– Window Assessment, Photos, and applicable quotes

▪ Comprehensive Projects may qualify for an additional incentive. All calculations are determined based on cost effectiveness through savings.

Lighting Audit Process: ▪ Conducting a lighting audit consists of inventorying the existing lighting

fixtures in each functional area of the interior unit(s), common area(s), parking lot(s) and the exterior area(s) of a multi-family building and/or complex. – The overall goal of the lighting audit is to gather all data necessary for maximizing

lighting efficiency and reduce energy costs without compromising the safety of the residents of the property.

▪ Prior to the site visit the Program Administrator (PA) and/or the vendor shall fully explain what qualifies a fixture(s) and/or lamp(s) for replacement to the customer. The PA will inform the customer of the lighting incentive(s) for the property after the lighting audit is completed and screened for energy savings. – The lighting auditor should request interior and exterior building plans/drawings if

available.

– The building maintenance staff should accompany the lighting auditor during the audit in order to gain access to all areas that have lighting replacement potential. In addition, maintenance staff must be present in order to answer any questions concerning fixture type and wattage. Incentives are provided for existing fixtures that are currently operational. Lighting not in use or

broken are not incentivized

Lighting Audit Continued

▪ While conducting the audit, the auditor will:

– Fill out the data collection sheet(s)

– Take photos of the existing fixture(s) and the lamp(s)

that exist.

▪ The audit must consist of all lighting in each

room. An excel spreadsheet will be used to

provide documentation for each room. NOTE:

The Audit must be submitted to the PA in the

excel format.

Lighting Documentation Date

Site Name

Site Address

Building Number

Auditor

Location Lamp Type Lamp Wattage Lamp Quantity Fixture Type Fixture Quantity Mounting Type Recommendation/Comments:

▪ The auditor should sample a percentage of each

unit type and one hundred percent (100%) of the

common area, parking lot & exterior area(s). 20%

of studio units, 20% of one bedroom units, 20%

of two bedroom units, 20% of three bedroom

units etc.

Blower Door Test Sampling

Additional Measures ▪ HVAC

– Boiler/Furnaces

– ECM Pump motors

– Heat Pumps

– Boiler water temperature reset

▪ Window

▪ Insulation

▪ Domestic Hot Water – ECM Pump motors

– Heat Pump Water Heaters

– Direct Fired/High Efficiency Gas water heaters

▪ Custom Measures – Other measures that may be warranted and have energy savings

All Vendors should determine if there is a need for additional measures. Documentation should accompanying Project Data sheet.

Projects Submitted by Vendors

▪ Vendor are required to provide Multi Family

projects. All Vendors must develop leads and

work with the Owners/Property Managers.

– In doing so, Vendors will determine if the site is in need

of energy efficiency measures. The owner/property

manager will also advise if they are going to proceed.

– Insulation quotes will be accepted “up to $1.45 per SF”

for Vendor Submitted projects.

The Vendor should take note that the higher the insulation price,

the larger the co-payment for the customer. This may prevent

completion of a project.

Customer Submitted Projects

▪ Owners/Property Managers also call directly for site assessments.

▪ All Customer Submitted Projects must have best quote for insulation. The “up to $1.45 per square foot does not apply. – The Vendor will be required to provide best price quotes and

the customer will also be informed they may proceed on their own.

▪ NOTE: For both Vendor Submitted and Customer Submitted Projects the Owner/Property Manager may at any time decide to move forward on their own for Add on Measures (Window, HVAC, and Insulation).

Letter of Agreement

▪ Upon receipt of “complete” proposals, LOAs will be written. – 30 day goal to create LOA for all completed proposals

– Vendors will be advised of all Incomplete proposals

▪ The project group is created in CLMTRS with the applicable work orders.

▪ When the LOA is counter signed, the PA will advise the Vendor of the project group Name and provide the following: – LOA Exhibit(s) applicable to Vendor.

– Field Worksheet with specified measures.

▪ If fixtures are required, the PA will process the request. – All other measures the Vendor may proceed with.

LOA’s not Counter-Signed

▪ All LOA’s not counter signed within the noted

time-frame will be cancelled.

– Vendor & Property Manager/Owner will be notified

Client Education for Multi-Family Customers

▪ All Vendors are required to provide a leave

behind notice to each tenant advising of the work

that was performed.

– This will inform the customer of the work that was

provided through the fund.

Client Education Leave Behind

Invoicing for Multi-Family Projects

▪ Vendors must invoice upon completion of the

project.

– Vendor may invoice when a particular measure is

complete.

▪ Vendors may not invoice for any measure that is

not listed on the LOA

– If not on the LOA, an Addendum must be written and

counter signed.

Until this is done, the measure should not be installed.

Administration Fees

▪ Lighting Audit

– Fee structure under development

▪ Vendors may request an administration fee up to

5% for additional measures such as Window

Replacement, Insulation upgrades and Heating

System Replacements.

– The request must include detailed information (Scope

of work for labor costs, commissioning services costs

etc.) on the activities the vendor will perform for each

fee requested.

Inspections

▪ Invoice Submitted

– PA will inspect work prior to approving invoice

Coming Soon….

▪ Scorecard

▪ Overall MMBTU’s

▪ Multi Family Goals per Vendor

– Units, Dollars and Savings

▪ Fixtures – Vendor Ordering

Fixture Suppliers