Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 1 of 15
Agenda for Connectivity/Long term Access to Generation projects in Northern Region
POWERGRID has received Connectivity and Long term Access (LTA) applications for
new generation projects in NR. In addition, there are certain modifications of already
granted Long term Access. The list of the projects to be discussed is given below:
1.0 Connectivity and LTA to Faridabad Solar PV (5 MWp) Plant of M/s NTPC Limited
in Haryana.
2.0 Connectivity and LTA to Unchahar Solar PV Plant (10 MWp) of M/s NTPC
Limited in Uttar Pradesh.
3.0 Connectivity to Singrauli Small Hydro (2X4MW) Plant of M/s NTPC Limited in
Uttar Pradesh (Long term Access discussed in last meeting).
4.0 Timely development of Evacuation system for Tapovan Vishnugadh / Lata
Tapovan Hydro-electric project of NTPC
5.0 Connectivity and LTA for Sainj HEP
6.0 Long Term Access for 240 MW from Essar Power (1200 MW) in Jharkhand to
Noida Power Company Limited (NPCL) and 300 MW from GMR Kamalanga
(1050MW) in Odisha to Haryana
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 2 of 15
1.0 Connectivity and Long term Access to Faridabad Solar PV Plant (5 MWp) of
M/s NTPC Limited in Haryana.
i) Connectivity
M/s NTPC Ltd. has applied for Connectivity for 5 MWp to Faridabad Solar PV Plant (5
MWp) located at Faridabad in Haryana. As per the connectivity application,
commissioning schedule of the plant is Dec.’2013. Accordingly, connectivity has been
applied from Dec.’13 (Copy of the Connectivity application attached at Annexure 1).
As per the application, the Solar power is pooled at 33kV & further connected through
the existing electrical system of 220 kV Faridabad generating station. Accordingly, no
transmission system is being proposed for connectivity to 5MWp solar power of the
plant.
ii) Long Term Access
M/s NTPC Ltd. has also applied for Long term Access (on behalf of GRIDCO) for
transfer of 5MWp power from Faridabad Solar PV Plant (5 MWp) to GRIDCO Limited,
Odisha in Eastern Region. LTA has been sought w.e.f. 1/12/2013 upto 1/12/2038 (Copy
of the LTA application is attached at Annexure 2).
No transmission system requirement has been envisaged for Long term access as the
LTA has been sought for 5 MW in the direction from Northern Region to Eastern Region
which would be opposite to the normal power flow direction and would be transferred
via existing inter-state transmission system through displacement.
iv) Proposal:
Connectivity & Long term Access for 5 MWp solar power from Faridabad Solar PV Plant
of M/s NTPC Ltd. is proposed subject to:
Connectivity
� All applicable conditions as listed in Annexure-A.
� As per CERC order dated 2/5/2013, following has been mentioned:
‘Provided further that the application by the applicant defined under Regulation
2(1) (b)(i) (e) shall be considered by CTU only if the existing generating station
agrees to act as the ‘’Principal Generator” on behalf of the renewable energy
generating station(s) seeking connectivity through the electrical system of the
generating station and formalizes a written agreement/arrangement among them
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 3 of 15
to undertake all operational and commercial responsibilities for the renewable
energy generating station(s) in following the provisions of the Indian Electricity
Grid Code and all other regulations of the commission, such as grid security,
scheduling and dispatch, collection and payment/adjustment of Transmission
charges, UI charges, congestion and other charges etc. and submit a copy of the
agreement to the CTU, alongwith the application for connectivity, with copy to the
respective RLDC in whose control area it is located’’
� In line with the above para NTPC vide letter dated 10/07/2013 was requested for
submission of suitable declaration that the Principal Generator shall undertake
the provisions of the above Regulations. In response we have received a letter
dated 01/08/2013 from NTPC Ltd. stating that
“since ‘Faridabad Solar Plant’ is under the ownership of NTPC, Shift Charge
Engineer of ‘Faridabad Gas Power Station’ will be responsible for all day to day
coordination with RLDC in regard to declaration of schedules, submission of
metered data etc in regard to ‘Faridabad Solar Plant’. Further ‘Faridabad Gas
Power Station’ agrees to act as principal Generator on behalf of Faridabad Solar
Plant and agrees to undertake all operational & commercial responsibilities for
‘Faridabad Solar Plant’ in following the provisions of IEGC & all other regulations
of CERC. However, ‘Faridabad Solar Plant’ will be considered as a separate
‘User’ for which energy accounts to be issued separately.”
A copy of the letter dated 01/08/2013 from NTPC is enclosed at Annexure-
Members may deliberate and connectivity may be granted to Faridabad Solar PV Plant
(5 MWp) of M/s NTPC Limited in Haryana.
Long Term Access
� LTA is proposed to be granted subject to
o Grant of Connectivity
o NTPC to submit the copy of the PPA
o Signing of requisite Long Term Access Agreement and TSA for payment
of the transmission system charges, as applicable, from Dec.’ 2013 for 25
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 4 of 15
years by GRIDCO Limited in case of firm PPA with GRIDCO is available
or by NTPC Ltd in case PPA is not available.
o All applicable conditions as listed in Annexure-A.
2.0 Connectivity and LTA to Unchahar Solar PV Plant (10 MWp) of M/s. NTPC
Limited in Uttar Pradesh.
i) Connectivity
In line with the CERC regulations, M/s NTPC Ltd. has applied for Connectivity for 10
MWp to Unchahar Solar PV Plant (10 MWp) located at Raebareli in Uttar Pradesh. As
per the connectivity application, commissioning schedule of the plant is Sep.’ 2013.
Accordingly, connectivity has been applied from Sep.’13 (Copy of the Connectivity
application attached at Annexure-3). NTPC may confirm the date for connectivity.
As per the application, the Solar power is pooled at 33kV & further connected through
the existing electrical system of 220 kV Unchahar Switchyard. Accordingly, no
transmission system is being proposed for connectivity to 10MWp solar power plant.
ii) Long Term Access
M/s NTPC Ltd. has also applied for Long term Access (on behalf of Damodar Valley
Corporation) for transfer of 10MWp power from Unchahar Solar PV Plant (10 MWp) to
DVC, West Bengal in Eastern Region. LTA has been sought w.e.f. 01/08/.2013 upto
01/08/2038 (Copy of the LTA application is attached at Annexure 4). NTPC may
confirm the date for LTA.
No transmission system requirement has been envisaged for long term access as the
LTA has been sought for 10 MW in the direction from Northern Region to Eastern
Region which would be opposite to the normal power flow direction and would be
transferred via existing inter-state transmission system through displacement.
iv) Proposal:
Connectivity & Long term Access for 10 MWp solar power from Unchahar Solar PV
Plant of M/s NTPC Ltd. is proposed subject to:
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 5 of 15
Connectivity
� All applicable conditions as listed in Annexure-A.
� As per CERC order dated 2/5/2013, following has been mentioned:
‘Provided further that the application by the applicant defined under Regulation
2(1) (b)(i) (e) shall be considered by CTU only if the existing generating station
agrees to act as the ‘’Principal Generator” on behalf of the renewable energy
generating station(s) seeking connectivity through the electrical system of the
generating station and formalizes a written agreement/arrangement among them
to undertake all operational and commercial responsibilities for the renewable
energy generating station(s) in following the provisions of the Indian Electricity
Grid Code and all other regulations of the commission, such as grid security,
scheduling and dispatch, collection and payment/adjustment of Transmission
charges, UI charges, congestion and other charges etc. and submit a copy of the
agreement to the CTU, alongwith the application for connectivity, with copy to the
respective RLDC in whose control area it is located’’
� In line with the above para, NTPC vide letter dated 10/07/2013 was requested for
submission of suitable declaration that the Principal Generator shall undertake
the provisions of the above Regulations. In response we have received a letter
dated 31/07/2013 from NTPC Ltd. stating that
“since ‘Unchahar Solar Plant’ is under the ownership of NTPC, Shift Charge
Engineer of ‘Feroze Gandhi Unchahar Thermal Power Plant’ will be responsible
for all day to day coordination with RLDC in regard to declaration of schedules,
submission of metered data etc in regard to ‘Unchahar Solar Plant’. Further
Feroze Gandhi Unchahar Thermal Power Plant’ agrees to act as principal
Generator on behalf of ‘Unchahar Solar Plant’ and agrees to undertake all
operational & commercial responsibilities for ‘Unchahar Solar Plant’ in following
the provisions of IEGC & all other regulations of CERC. However, ‘Unchahar
Solar Plant’ will be considered as a separate ‘User’ for which energy accounts to
be issued separately.”
A copy of the letter dated 31/07/2013 from NTPC is enclosed at Annexure-
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 6 of 15
Members may deliberate and connectivity may be granted to Unchahar Plant (10
MWp) of M/s NTPC Limited in Uttar Pradesh.
Long Term Access
� LTA is proposed to be granted subject to
o Grant of connectivity
o NTPC to submit the copy of the PPA
o Signing of requisite Long Term Access Agreement and TSA for payment
of the transmission system charges, as applicable, from 01/09/2013 (to be
confirmed by NTPC) for 25 years by DVC in case of firm PPA with DVC is
available or by NTPC Ltd in case PPA is not available.
o All applicable conditions as listed in Annexure-A.
� The connectivity has been applied from Sept 2013, whereas LTA is from 01/08/2013.
NTPC Ltd may clarify the date.
3.0 Connectivity and LTA to Singrauli Small Hydro (2X4MW) Plant of M/s NTPC
Limited in Uttar Pradesh (Long term Access discussed in last meeting).
i) Connectivity
In line with the CERC regulations, M/s NTPC Ltd. has applied for Connectivity for 8
MWp of Singrauli Small Hydro Plant (SHP) located at Singrauli, in Uttar Pradesh. As per
the connectivity application, commissioning schedule of the plant is Feb’ 2014.
Accordingly, connectivity has been applied from Feb.’14 (Copy of the Connectivity
application attached at Annexure 5).
As per the application, the 8 MW small hydro units are stepped up to 33kV and
integrated through the electrical system of Singrauli generating station. Accordingly, no
transmission system is being proposed for connectivity to 8MWp power of the Singrauli
SHP.
ii) Long Term Access
NTPC Limited had also applied for LTA for 8 MW from their Singrauli small hydro
project, in Uttar Pradesh. LTA had not been granted due to the need to regularize its
connectivity. As per the LTA application, LTA is required from 01.07.2013 for 25
Years. NTPC may confirm the schedule. Also, the beneficiaries along with quantum
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 7 of 15
mentioned were: UPPCL (4.1MW), Delhi Discoms (2.1MW), Rajasthan Discoms
(1.8MW). NTPC may indicate the Discom wise allocation for signing of the Long term
Access Agreement and the Transmission Service Agreement with the beneficiaries
(Copy of the LTA application is enclosed at Annexure-6).
iv) Proposal:
Connectivity & Long term Access for 8 MWp small Hydro Plant from Singrauli SHP of
M/s NTPC Ltd. is proposed subject to:
Connectivity
� All applicable conditions as listed in Annexure-A.
� As per CERC order dated 2/5/2013, following has been mentioned:
‘Provided further that the application by the applicant defined under Regulation
2(1) (b)(i) (e) shall be considered by CTU only if the existing generating station
agrees to act as the ‘’Principal Generator” on behalf of the renewable energy
generating station(s) seeking connectivity through the electrical system of the
generating station and formalizes a written agreement/arrangement among them
to undertake all operational and commercial responsibilities for the renewable
energy generating station(s) in following the provisions of the Indian Electricity
Grid Code and all other regulations of the commission, such as grid security,
scheduling and dispatch, collection and payment/adjustment of Transmission
charges, UI charges, congestion and other charges etc. and submit a copy of the
agreement to the CTU, alongwith the application for connectivity, with copy to the
respective RLDC in whose control area it is located’’
� In line with the above para, NTPC vide letter dated 10/07/2013 was requested for
submission of suitable declaration that the Principal Generator shall undertake
the provisions of the above Regulations. In response we have received a letter
dated 31/08/2013 (received on 02/08/2013, some typographical error in date)
from NTPC Ltd. stating that
“since ‘Singrauli Small Hydro Plant’ is also under the ownership of NTPC, Shift
Charge Engineer of Singrauli Super Thermal Power station will be responsible for
all day to day coordination with RLDC in regard to declaration of schedules,
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 8 of 15
submission of metered data etc in regard to ‘Singrauli Small Hydro Plant’. Further
Singrauli Super Thermal Power Station agrees to act as principal Generator on
behalf of ‘Singrauli Small Hydro Plant’ and agrees to undertake all operational &
commercial responsibilities for ‘Singrauli Small Hydro Plant’ in following the
provisions of IEGC & all other regulations of CERC. However, ‘Singrauli Small
Hydro Plant’ will be considered as a separate ‘User’ for which energy accounts to
be issued separately.”
A copy of the letter dated 31/08/2013 from NTPC is enclosed at Annexure-7.
Members may deliberate and connectivity may be granted to Singrauli Small
Hydro Plant (8 MW) of M/s NTPC Limited in Uttar Pradesh.
Long Term Access
� LTA is proposed to be granted subject to
o Grant of connectivity
o Signing of requisite Long Term Access Agreement and TSA for payment
of the transmission system charges, as applicable, from July’ 2013 (to be
confirmed by NTPC) for 25 years by beneficiaries in case of PPA with
beneficiaries or allocation from Govt of India is available or by NTPC Ltd in
case PPA or allocation from Govt of India is not available.
o NTPC to submit the copy of the PPA
o All applicable conditions as listed in Annexure-A.
Members may discuss and concur.
4.0 Timely development of Evacuation system for Tapovan Vishnugadh / Lata
Tapovan Hydro-electric project of NTPC
The issue of implementation of integrated transmission system for evacuation of
power from various hydro projects (including Central Sector, State Sector & IPPs) in
Uttarakhand was discussed in various Standing Committee meetings as well as in
TCC & NRPC meetings. The issue was discussed in the 2nd TCC and 3rd NRPC
meeting held on 10/11/2006 wherein Chairman / Members observed that PTCUL
could take up the “intra-state transmission system” up to the pooling point on their
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 9 of 15
own, for which there was no requirement of any commitment of payment of
transmission charges by other constituents and arrangement of recovery of
transmission charges will be only between PTCUL and the generators. While taking
up the implementation of transmission system, the agreement for payment of
transmission charges could not be signed with some of the Inter-state generators.
Subsequently, PTCUL took up the matter in NRPC meetings for declaring the system
for granting the system as deemed ISTS, however no consensus could be reached.
PTCUL took up the matter with CERC for declaring the integrated scheme as deemed
ISTS scheme. CERC has issued order dated 31/01/2013 regarding declaration of
UITP as deemed ISTS. As per the order, CERC had accorded the status of deemed
ISTS and directed PTCUL to segregate the transmission lines carrying inter-state
power and approach the CTU which is the nodal agency for vetting of the
comprehensive scheme in accordance with the connectivity regulations. Further, CTU
has been directed by CERC to study the transmission system and in case any
modifications are suggested by CTU, the same shall be incorporated and
implemented by the PTCUL. CTU has also been directed to monitor the ISTS portion
of the UITP scheme.
CERC has further stated that :
“only the long term access granted to NTPC by CTU is on record and the status of
long term access to other Central Sector generators and IPPs in the region is not
known. It is therefore possible that these generators might have planned to sell their
entire power or part of it on merchant basis through medium term open access and
short term open access. Since transmission lines are built only for long term access,
the transmission charges for the transmission lines built to cater to the requirement of
sale of power through medium term and short term access cannot be saddled on the
beneficiaries of the inter-State transmission system and must be borne by the
concerned generating companies. We direct the petitioner to ensure that these
generators enter into appropriate agreements with the petitioner and CTU for bearing
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 10 of 15
the transmission charges till they identify and enter into PPAs with the beneficiaries
outside the State.
It is essential that the transmission lines which have been accorded deemed ISTS
status are segregated from the dedicated transmission lines and intra-State
transmission lines to obviate any confusion about the liability for payment of
transmission charges. The dedicated transmission lines from intra-state generators,
i.e. those generators selling power only within the State of Uttarakhand, from the
generation bus bar up to the main transmission line/pooling point of Uttarakhand
would be considered as dedicated transmission lines/intra-state transmission system
and the transmission system beyond the main transmission line/pooling point of
Uttarakhand would be considered as a combination of intra-State transmission system
and inter-State transmission system and paid for accordingly. That is, the Yearly
transmission charges of the various elements of such system would be divided into
intra-State portion and inter-State portion, based on installed capacity of the
generating stations using the common system. Charges for the ISTS would be shared
by beneficiaries of ISTS. For the intra-state transmission system, the charges would
be shared as directed by UERC.”
In regard to above, a preliminary meeting with PTCUL was held on 28/05/2013,
wherein PTCUL explained the status of the various transmission elements of the UITP
scheme. During the meeting it was explained by the CTU that the transmission system
needs to be prioritized & phased in such a manner that power does not get bottled up
from any generator. It was also informed by the PTCUL that at present their 1st priority
is for Alaknanda Basin as the generation projects in other basins may take some time.
The detail of the generation projects in Alaknanda basin along with Associated
Transmission Lines and LTA application status is enclosed at Annexure-8 and the
detail of the Common Transmission scheme in Alaknanda basin is enclosed at
Annexure-9.
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 11 of 15
From the generation list it may be observed that Tapovan Vishnugadh (520 MW)
project of NTPC, a major project in the basin, may come up first. NTPC need to inform
the firm schedule of the generation project. The transmission scheme required for
evacuation of power from this project needs to be taken up on urgent basis so as
power from the generation project does not get bottled up. The issue of evacuation of
power from Tapovan Vishnugadh was discussed during the 28th NRPC meeting of
NRPC held on 26/04/2013, it was deliberated that the transmission scheme had
already been granted the deemed ISTS status and as per the BPTA already signed
beneficiaries had agreed to pay transmission charge for all central sector projects,
existing and future as per applicable CERC regulation. During the meeting
beneficiaries agreed for the payment of transmission charges corresponding to MW
allocation of Tapovan Vishnugad by Govt of India in line with CERC Regulations.
However, as per CERC order it has been directed to PTCUL to ensure that other
generators enter into appropriate agreements with PTCUL and CTU for bearing the
transmission charges till they identify and enter into PPAs with the beneficiaries
outside the state. It is therefore necessary PTCUL has to ensure that all the identified
generators apply for LTA and sign the required agreement for payment of
transmission charges. Accordingly PTCUL need to take necessary action in this
regard.
Keeping above in view the transmission system proposed by PTCUL needs to be
discussed and concurred by the Standing Committee on Power System Planning.
5.0 Connectivity and LTA for Sainj HEP
The issue of evacuation of power from Sainj HEP was discussed in 30th and 31st
Standing Committee Meeting of NR, wherein it was proposed that injection of Sainj
HEP of HPPCL could be through LILO of Parbati-II – Parbati-III 400 kV line. However
in case of outage of one circuit, 10% overload generation, 0.9 pu voltage and 0.9
power factor there may be certain constraints and generation would have to be
backed down. During the meeting, NHPC informed that enhancement of current
carrying capacity of 400 kV XLPE cable is not possible and hence evacuation of
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 12 of 15
power of Sainj through XLPE cable provide at Parbati-III HEP is not feasible. It was
further deliberated that cable limitation may come in case of outage of one circuit, 10%
over generation, 0.9 pu voltage and 0.9 power factor and possibility of occurrence of
above contingency was very remote and HPPCL had agreed to back down the
generation at Sainj, if required with a view to prevent the overloading of the XLPE
cable of Parbati-III switchyard. Subsequently, NHPC informed that backing down of
generation at Sainj HEP does not safeguard the overheating of XLPE cable provided
at Parbati-III switchyard and as such the arrangement is not acceptable to NHPC.
After deliberations it was decided to form a committee consisting of representatives
from CTU, CEA, HPPTCL, HPPCL & NHPC to solve the issue and if required joint site
visit may be undertaken.
In line with above a joint visit was undertaken on 6th and 7th May 2013. During the
visit it was observed that it would be feasible to LILO 400 kV direct ckt from Parbatri-II
to Parbati Pooling station (Banala) for evacuation of power from Sainj HEP. HPPTCL
has agreed to construct additional towers for LILO arrangement. The above proposal
was discussed in detail during a meeting held in CEA on 14/05/2013. During the
meeting NHPC raised its concern that with the implementation of the LILO
arrangement, evacuation of power from Parbati-II (800 MW) would be dependent on
Parbati-III & Sainj and there would not be any direct link to Parbati Pooling station.
CEA & CTU stressed that keeping in view that long term planning, the most optimum
solution is through the proposed LILO of Parbati-II to Parbati Pooling station 400 kV
line at Sainj.
After detailed deliberations following decisions were taken:
• For evacuation of Sainj HEP power, LILO of 2nd 400 kV direct circuit from Parbati-II
HEP to Parbati Pooling station (Banala) shall be implemented by HPPTCL.
• HPPCL shall install suitable scheme at Sainj HEP generation station to ensure that
current flowing through the cable at Parbati-III does not exceed 2400 Amps. This
SPS scheme will back down the Sainj generation accordingly.
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 13 of 15
• In case of permanent outage of Sainj switchyard 400 kV bus, bypass of LILO
arrangement will be carried out by HPPTCL for evacuation of power from Parbati-II
generation.
• The above proposed arrangement should be implemented expeditiously by
HPPTCL as the generation of Sainj is expected to be commissioned by December
2014.
6.0 Long Term Access for 240 MW from Essar Power (1200 MW) in Jharkhand to
Noida Power Company Limited (NPCL) and 300 MW from GMR Kamalanga
(1050MW) in Odisha to Haryana
• Essar Power (Jharkhand) Ltd. has informed that Noida Power Company Ltd.
(NPCL) has signed Power Purchase Agreement with them for supplying 240 MW
from their generation project in Latehar district of Jharkhand.
NPCL may kindly confirm for signing the requisite commercial agreements with
POWERGRID for payment of transmission charges for the above mentioned quantum
of power.
• Similarly, GMR Kamalanga Energy Ltd. has informed that Haryana has signed
Power Purchase Agreement with them for supplying 300 MW from their generation
project in Angul district of Odisha.
Haryana may kindly confirm for signing the requisite commercial agreements with
POWERGRID for payment of transmission charges for the above mentioned quantum
of power.
Members may note.
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 14 of 15
Annexure- A
Connectivity:
� The applicant shall abide by all provisions of the Electricity Act, 2003, CERC
(Grant of Connectivity, Long-term Access and Medium-term Open Access in
inter-State transmission and related matters) Regulations, 2009, Central
Electricity Authority (Technical Standards for connectivity to the Grid) and Indian
Electricity Grid Code as amended from time to time.
� The connectivity shall be as per the Detailed Procedures of Central Transmission
Utility (POWERGRID) for Grant of Connectivity, Long-term Access and Medium-
term Open Access to Inter-State Transmission and all provisions regarding
connectivity would have to be met.
� The applicant shall furnish additional details for signing Connection Agreement
for the same and would sign the Connection Agreement as per the provisions of
Connectivity.
� As agreed in 30th Standing committee meeting 50 MVAR bus reactor would be
provided by all the generators having capacity of more than 100 MW and 80
MVAR bus reactor would be provided by all the generators having capacity of
more than 300 MW.
Long Term Access:
� Long Term Access is being processed subject to the condition that the
applicant/beneficiaries, bears all applicable transmission charges as per CERC
norms for transfer of power.
� In all cases wherein PPA agreement has not been signed, all beneficiaries
indicated shall be assumed as target beneficiaries.
� Signing the requisite LTAA / TSA for Transmission system charges.
� The applicant shall abide by all provisions of the Electricity Act, 2003, CERC
(Grant of Connectivity, Long-term Access and Medium-term Open Access in
inter-State transmission and related matters) Regulations, 2009, Approved
Detailed procedure of CTU, CEA (Technical Standards for connectivity to the
Grid) and Indian Electricity Grid Code as amended from time to time.
� The Long term Access shall be as per the Detailed Procedures of Central
Connectivity & LTA agenda for meeting to be held with 32nd
NR SCM
Page 15 of 15
Transmission Utility (POWERGRID) for Grant of Connectivity, Long-term Access
and Medium-term Open Access to Inter-State Transmission and all provisions
regarding LTA would have to be met
� As agreed in 30th Standing committee meeting 50 MVAR bus reactor would be
provided by all the generators having capacity of more than 100 MW and 80
MVAR bus reactor would be provided by all the generators having capacity of
more than 300 MW.
Ref. 0 : CC:PEE: TPC/FARIDABAO/L; N 1
Chief Operating Offic .(CTUPower Grid Corporation of India Limited,"Saudamini", Plot No.2, Sector-29,Near IFFCO Chowk ,Gurgaon-122001Fax: 0124-2571809
NTPC Li ited(AGoV!. of India Enterprise)(Formerly National Thermal Power Corporation lid.)
~ CWlf<'fll/ Corporate Centre
Date: 05-06-2013
Sub: Application for Grant of Connectivity to ISTS for Faridabad Solar PV Plant
Dear Sir,
With reference to the above subject, please find enclosed herewith our application for Grantof Connectivity for following NTPC Project :
I) Faridabad Solar PV Plant (5 Mwp)
In line with the CERC connectivity regulation published for renewable plant of capacity lessthan 50 MW, and detailed procedure of Central Transmission Utility Under Regulation 27(1)of the CERC (Grant of Connectivity, Long term Access and Medium - term Open Access inInter State Transmission System and related matters) Regulations, 2009,application for thegrant of Connectivity to ISTS consisting of following documents(as per regulation) for aboveproject dully filled in is submitted ;
1. Format - CON-1 (Affidavit)2. Format - CON-2 (Application)3. Details of EFT transaction I.e payment Unique Ref no. 201344032 ,paid on
31/05/2013 Rs. 2,00,000/-
The basic scheme indicating Faridabad Solar PV plant connecting to the existing connectionpoint with ISTS through electrical system of generatin g station is also enclosed(Flag A).
As you are kindly aware that above Solar PV project have short commissioningschedule(Dec 2013),the connect ivity of above project may please be granted at the earliest.The LTA app licat ion for Faridabad Solar PV plant is being submitted shortly.
Thanking You,
Yours faithfully,
. ,~ ~ / \ b(Dinkar Devate) )
GM (pE-Electrica l)
3rl1I i!liP-l<ti1 <tl1i!l f(i1i!l ~, tffiC «. n- su. ~-24 , lfficiffCfi!'l"rf. 13,~ (3Jr.) flr.r-201301
ENGINEERING OFFICE COMPLEX, Plot No. A-8A, Sector-24. Post Box No. 13, NOIDA (U.P.) Pin-201301~~.. : 0120-2410333 (10~) 0 120-2410116 (5~) tt<Rl : 0 120- 24 10 136 , 0 120- 2410137Telephone : 0120-2410333 (10 Lines) 0120·2410116 (5Lines) Fax : 0120-2410136, 0120-2410137q'~tf q;mf~ : 'l!'l. tt, tft,~. 11cf'l,~ <tl1 1tl~Cft1, 7, ~·&1~~I.,(i1 vnm.Mtdtm, rrt~ -110003
Regd. Office : NTPC Bhawan, SCOPE Complex , 7. Institut ional Area . Lodhi Road, New Delhi-110003
•
E
79AB 584441FrID VIT
In the matter of tilling application to Power Grid orporation f India Limited. torgrant of onnectivity under ERC Regulations. 2009 for Fa rida bud Sola r 5 MWp
I. .. i hra /0 Late hri hyarn under i hra, working a dditi nal eneralManager in Project .nginet:ring D epartment Electrical) of I 'PC Ltd., ha ing itregi tered office at TP Bhav an. ' cope ornplex, 7 In titutional area. Lodi Road.New Delhi-II 0 003 do so lemnly affirm and say as follows:
I. I am the dditional General anager of TP Ltd.. the repre: entative in theab e matter and am du ly authorized to tile the above appli ration and to make thiaffidavit.
I ubrnit that TP ' Ltd.. i a Go ernment ompany registered under CompaniesAct. 19 -6 a public limited mpany. nder the rticle of .iati n of theC mpany and in accordance with the provi ion of : Iectricit) Act. _003/ relevant
egulation s) of ERCC. the company run file the enclo .ed appl ication.
I ibmit that all the detail give n in the enclosed application for grant ofCon iect ivity al ng with ne cssary documents are true and correct and n thingmat rial ha been can ealed there [
( 1"0 be duly atte ted b) otar: )
t: 3JU N2013
Format.cON-2
S.:-io. Descsrlntlon DetailsI. Name the Annlicant :-iTPC Limited, Address for correspondence AGM(PE-EI«tJ,:lITPC LTD.. .
Engineering Office Complex.A-SA. Sector-24.NOIDA-20130Il U.I' )
3. Contact DetailsPrime: Contact Person Shri S.S.l\IishraDesiunation AG l\IfI'E-E I«t\
Phone No. (Lan dline) 0120-H I0729Phone No. (Mobile} 09650991145Fax 0120-H 10102EMail ssmis hra~n tllceoc.co. i n
Alternate Contact Person :\ts. S.~J ohant'"
Desienation DGMIPE·EI«tlPhone No. (Landli ne) 0120-3318421Phone No. (Mobile) 965099 1556Fax 0120-2410102EMail sagarika(QIntpceoc.co.in
4. Nature of AnulicationGenerator (other than captive] GeneratorCaptive GeneratorBulkConsumer
5. Details of Connectivity5 a. Capacity lMW) for which 5 MWp
connectivity is required5 b Date from which connectivity is 0<c '2013
required6. Location of the Generating (i.) Place : Faridabad
Station/Bulk consumerNearest Villaee/Town TownDistrictState Haryana
Latitude North :28 DeQ 17 MinLongitude East :77 Dec 19 Min13 Sec
7. Installed Capacity of theGenerating StationExisting - 430 MW(Combin<d cvclej
8. Commissioning Schedule- of the Ocr '~O 13
Generating Station
9. Detai ls of the Generation StationName of the Power Plant Faridabad Solar PV plant
Promoter NTPC Ltd.Fuel Renewable
Source of Fuel SolarGeneration Voltage 300 V AC(eonverted through
inverter from DC)Step-up voltage Solar power is pooled at 33 kV
level and further connected throughti,e ex isting electrical sys tem ofgenerating station (220 kVswitchyard-Single Line Diagramanaehedl
Is it an identified project bv CEA NoBase Load/Peak load Intinn Power
10. Details of Neares t 400i220/132kV 220 kV Faridabad Switcltyard
Substations0 \ \ 11er NTPC
II. Details ofe-transaction(Application Fee)
Amount (in Rs.) 2.00.000/-(two lakh onlyfffbroughRTGS)
Transaction Ref. No ::!01 3044032(Paymcnt unique refno.)
Date 31/05/20 13Bank NameBranch Name
FARIDABAD 220KV SWITCHYARDBAY O. 2
--~--- - TR. BUS-I-- -F-- BUS- II
-- ~-~~g~
J..EllWtl
@ CHECK lotmR
@ IolAIN mR
@ STANOOY ET'ER
PV CELLS PV CELLSlYPICAL
PV CELLS PV CELLS
lYPICAL
33/220 TRANSF.7.5MVA
::
TARIfF ERGY WmR
~ t ~ 33 KV POOLING SWGR
~ 6I!
i ~ CORE-l
j CORE- I Cl..: 5P20f! Cl:5P20.. JI
~ I ~2CORE-2ceuz
l• 2
~
i ~ g gI t ~GEN V/33 KV ~GEN V/33 KV
I I; I 9 9l it £
t ~
["" it .nm)NTPC
FARIDABAD-SOLAR PROJECT5
SINGLE LINE DIAGRAM
-.L IG. 1ltY. NO.
5704-999-POE-J-OOl a
}
INFORMATION REQUIR ED TO BE SUBM ITrED WITH T HEAPPLICATION FOR CO ECTIYITY BY GE ERATI G STArIO
PROJ ECT NAME: Faridab ad Solar PY PlantlS MWD):>.No. Descrt ntion Informa tion Dera il1.0 Site identification and land Existing project, ava ila ble a nd belongs to
acquisition NTsc.
2.0 Environme ntal clearance for -NA-the power station
3.0 Forest C learance (if -NA-applicable) for the land forthe Dower station
4.0 Fuel Arrangements -NA-
5.0 Water linkage -NA-
rr:!!!i5Trfl}~ff~
tl!:e~risl-;mited
~~/Corporale Centre
R '1': 0 I :CD: 706
,lncl: :.
10C< U (('"I llPower Grid orporution or India Ltd... ' audamini" Plot . o. _.\: ,tor-29, iurgaon-I ~2021I Ian anaFax l o . : 0 1 24-:~ 5 71 X09
Sub: Long Icrrn Access (L'I;\ I app lication for Faridabad Solar PV(:, i\1\\')
Pica. c lin I enclose d the LTA application ItH' Fa ridah ad Solar (- l\ IW) inc ludi nu Format I.TI\- Iand LT I\ -_ along with the proof o f applcatiun Il:cs ·o l" Rs. 2,OO.OO() ( Rupees '1'\\'0 lacs onl y )already pa id by RT( is vide Reference No 0000 12()25XXC 1'3 2]2 1'1- :) on 2 () , () 6 .~ O 13 as perCERC Rcuulations on "G ram of Connectivity. l.ong l'cnu Access and Medium-term Open\ c C' • in inte r-S ta te '1ransmission and re lat e I matter: Regu lations" 20n9 and s ubse q uent
pro .ed urcs dale 1 .... 1.1 2.2009 . Application for Gram of Connc , t i \ ' i t~ !l;: already he zn ma de \ ideurr I zucr date I 0 5,()6 ._0 L'" ( 'op~ of le tter '11 los 'd) . TPC IS mak lJlII this a l pii 'a iOI1 on h 'hal I'
o r the benefic iary i.c iRID '0 (GRI/) (,O kiter autho riving '"11'(' to app ly in its beha lf 1:
enclosed ). ( iRID ) shall be signing any necessary uurccmcnt s includinu HP I'. etc. withPo wcrgrid / other transmission licensee and shall he respo nsib le till' payme nt or applicablecharges . It is requ est ed thai the enc losed appl icat ion may he processed at your end. We wou ldfurther like 10 indicate that since j rTP , is maki ng this application on hchalf nf (i RII)CO. 1 11'\may be uram 'd in the name of GRIDC'O .
Ihanking ~ ou'{nu l's 1:lith rulh
jW~(A . K. Bishrii )
:\(;1 1 (C u m mcr c inl)I. ' /' \ - 1- . \l"tid;:l\ it1.1'1\-2
..1 . Pruoror payment vide Reference No DOOO I _G25gX( ' r:' 23_1 ·1:5 on 20.06.20 I :;4. Letter dated 05.06.211 U lor Grunt of C OI \IlCLli \' i [ )
5. G RInco kiter dated 16.05.201_ uuthorisinu N'I PC In applyn il i ts h 'halL
l1;r iT lft ~ WA'm lflIPiACffi, 7, ~4'l~'£iH\1 'Qjtlrr rmftm,~ ~-1 1 0003, hr!Tel.: 24360100, c !Fax : 011.24361018
NTPC Shawan, SCOPE Comple, 7, Institutional Area, Lodhl Road. New Delhl-l 10003,~ebslle : www.nlpc.co.ln
JUDICIAL
e-Stamp
IN-DL19335490044379L
29-M ay-2013 11:45 AM
IMPACC (IV)! d17197031 DELHII DL-DLH
SUBIN·DLDL71970337923579949909L
NTPC LIMITED
Article 4 Affidavit
Not Applicable
o(Zero)
NTPC LIMITED
Not Applicable
NTPC LIMITED
10
(Ten only)
I DIA 0
Government of National Capital Territory of Delh i
I A. K. Hi. hoi Sin Shri S0I1111ath Bishoi workin u as . dditio uul G cncl'al Managcr(C nnuu er ciul) in I IT I'C Ltd. having its r 'l!.i uerc . ice ut I 'T Pe Hhawan. ,' ( '( )PF Complex , 7.Inst itut ional rea. L~ di Roa I. I I '\\ Delhi-I \ () (llt.:l3~vc~od~~·mnl~ aIfirm an d :a~ as fo llows:
Slatuatory Alan:1 The aUlhenl,cil y of lIle Stamp C ruficate con be venfied at Aulhoris d Col ection Cenl IS (ACCs), SHCll Offices and Sub-r g strar Offices (SROs).2. The Cont act Deleils 01ACCs , SHCll Offices and SROs are ll vallablo on the Web silo ·www.shcllostamp .com·
FO R tAT-I.T,-1
:\ FFID:\ V ITIII the matter or filinu application to Power Grid Corporation or India Limited. lor grant of LOIl l-!-
ter m ACl:l:SS under eER Rcuulation s 2009.
First Party
Second Party
Stamp Duty Paid By
Stamp Duty Amount(Rs.)
Certificate No,
Certificate Issued Date
Account Rs'erence
Unique Doc. Reference
Purchased by
Description of Document
Property Description
Consideration Price (Rs.)
•••• •• •• •• •• • •••• • • •••••• • •• ••••••• • • •• •••••• •Please rite or type below this line•• ••• •• •• •••••• •••• •• ••••••• • •••••• ••• • •• .
I. I am the Additiu nul Jt.'IH~nll 'l a nagt.' I' of N'! P . Ltd. the repro .cntative in the abo ve matterand am duly authorized to file the above applicat ion and to make thi. affidavit,
I submit that 1Is I 'T P Ltd. is it reuistc rc I company Public Ltd. Reui: rcrcd till Ier CompaniesAct. ndcr the Article of A.: elation of the Company and in a cor lane' wi th th ' pI' vi i n. fElc nri i t~ A t. _003/1' levant Rcgulationt r ER . th mpany 'an tile the en -I) " -dappli ration.
I submit that all the details given in the cnclo. cd app lication for grant of Long 'Icrm Accessalougw ith nccc: sary d OCUl1lclI !S an: true and correct and nothing materia l has been concealedthere f.
(A. K. Hi. hoi)
FORl\IIAT -LT A-2
Application for Grant of Lon g - rer m Access (LTA)
I _la m e the A pplica n t
2 Ad d ress for' o r re spondence
3 on tact DetailsPrime ~OI1laC l Per. on
DesiunationPh nc lo.Il. andline
Phone No.(Mobi lelFax
I:-Mail
Alternate 'outa t Pcrs nDe iunation
Phone No.t l. andlinc )Phone o.t Mobile)
FaxE- -lail
-I lut u r e of the / pplicantm ial icncrutor other than capt ive)
aptive encratorBulk On 'lII11Cr
Electricity 'I'm IeI'Distribution Licensee
~ D ita ils for Lon g Term A ccess (LTA)
T P Limited (on he ha lf of G R ID 0 )
I TP " Bha vun , ~ o re-7 , . cope om plex7, In uitution a l Area, Lo d hi Road ,i lew Delh i-II 0003
A. K. Bi:ho iAdditio na l ener ul Ma nage r01 1-2-1.6 9 0l)650l)92568011-24360328a kh ishoi(U) ntpceoc.co.in
' . K. . 'ha n n aAddition a l Gene r a l lanager()11-2 • 6552.9650l)l)0535011-2-1 60328slishar·nwcmntllC.co.in
Sa uantum ( 1\\') fo r wh ich I.T irequired
5h Da te from which LTA required(/lO I earlier than 3 yearsfrom the lastday (~{t17(! month in which applicat ion
17m been received)
5c Date upto w hich LTA requi red(1_ years to _ - yearsfront the da le!
PO/11 which L7: I is requ ired)
5 1\\
01.12.20 13
01.12.2038
Sd Injection of Power (more thanone only in case of sing le Drawal )
Entity- IState/Region
Quanturu- Ionnect ivity with the Grid
Se Drnwal of Power (m ore thanone only in case of s ing le Injection )
Entity- I' tatc/RegionQuantum- I
Connectivitv with the Grid
I '1' PC, Fa rida had Sola rHa ryana / RSMW1 '1' 1'(' Fa ridahad Switchy a rd( Power shall be pooled at Faridabad ' o lar plant andgetting connected <II existing Faridabad stationSwi tchyard )
G RI DCOOr -issa /E RS '1\VVa r ious " l' U Substa t ions in Orissa
6 Detail of DD/Cheque e-trunsaction(Application Fee )
Amount (in Rs.)DD/ hcque transaction o.
DateBank 1ame
Branch arne
Two lacs onlyoonoJ 2625R8CT"232 145520 . 06 .~O \ .,Sta te Ba nk of HydcruhadScope Complex. I cw Delhi
7 Details of Bank Guarant eeAmount (in Rs)
Bank I arnePeriod of Validity
/
Pagc 2 0f 2
L 3~:b
T he ED (Commercial),TPC Ltd., SCOPE Complex,
7, Inst itutional Area, ,Lodi Road, New Delhi- 11 1101,F ax: 0 i r- 2436 0358
~
..
,
GRIDCO
GR Dec> -rTli1:ed(A Govt. of O rissa Undertaking)(Form rfy Grid Corporatfon of Orissa LImited)Re d_~ce:Janpa~.Bhubaneswa~7S1022
Phone: 0674-25 41127 Fax: 0674-2543452C2) Date fb i q,d....
-.I
Sir,
Sub:' Arrangement.of'L'I'A on behalfof GRIDCO
With reference to the above cited subject, GRIDCO has executed Power
Purchase Agreements with PC to avail 5 fW power each from Dadri Solar P station
of Uttar Pradesh and Farida bad Solar PV Station of Haryana bundled with equal capacity
of therma~ po er from the nallocated quota of he u. coming coal based s atio .s of
"TPC to be located by toP, GoL For ansrn ission of those power from the above
Solar PV Stations to Odisha system through CTU network, Long Term. ccess from CTU
is required, ,-You are requested to make arran~ement on b~half of GRlDCO [9 apply
. " .LTA for availing Solar power from Dadri & Faridabad projects of NTPC.
I
Thanking' you ,
~ ,-./'~ c,.: ,'IP'
Sr. GM(PP)
Cc: Member Secre tary , ERPC, 14, Golf Club Road, Kolkata- 700033 for favour of
information
G 1, ERLDC, 14, Golf Club Road, Kolka ta- 700033 for favour of information
tr4~-{d2, ~~
d---- r-:::::=.<->:1- ( So-, , .
(~TPC )I \ / U /", rUfIIll ( 0/111'1111)
ttTP
GPS P I O' 3 FII · 0 Date 01 0820 L
ToCOO ( TU)PO ER GRID CORPORAT IO OF INDIA LTD .'SAUDA INI' PLO T O. 2SECTOR- 29GURGAON (HARYANA)PIN 122 021FAX 0 .01 24·2571809
Su : Coordination for 'Faridabad Solar PV Plan t' by 'Faridabad Gas Po er Station '
De r II
T I i1a re erence o our Ie er dated 007 20 3 In regards to app ica Ion or Conn c i i Y or Fandabad
Solar i:)lant In trns regar ould h. e to Indicate at since Fanda ad Solar Plan IS nderhe
ov ersrup of TPC Shif Charge Engineer a Fandabad Gas Power Stat.on Will be responsible for all day
to oay coordmauon with RLDC Ir' regard to decl aration of schedules submisston of me ered data etc i
C :0 Fanda a Solar PI n F er Frida ad a Po er S a Ion ree a ac s nnci pa
er erator on hal" a 'Fandaoad Solar Plan a d agrees a nderta e all opera lanai commercial
res onsrmhnes tor Fancabad Solar Plant In ollowmq t e prov rsrons 0 IEGC & all other Regula tions of
CERe However Fandabad Solar Plant will be co s.dered as a separate 'User' for wh ich energy accounts
flee 0 b ISS d separately
Tag '(auYours Faithfully...
\ \ ' . /, •. e: ....,r,
Co NRLDC
-- - - -• "iF. ~.R =t-¢ . - 121 00 1.-:1f11
I. I t.lh.ll (,.1 Power t: In. Vill: ~' luihe i.!' II . . 'Ill a. l andaha I I~I fill t l l.rry ana}• n'~ Phonc : II I~ q•.2 (J1.'(1) J a: . () I ~\I-] .tllll ' 27. ;-""1 I .mail 11 111111 .hr: (J~ « ntpc .co.in
'iiliJi '~ ~~.17m~. i ~~.WT niT:.:Tf. ;.iJ~ n ~~. 1'!;';:;Jl- 110 003' ;:g(1. ()lI i ,1. \, r Pl B ha\\ ,II1. I:"-P"-' l "Illpi ." In..aiuui mal \1 ;:, . l.odhi Roa l. l'\\ (),,-·Ihi IIlll103
Ref. 0: CC .pcE:i ftJC/Ht= IGO /1
C~-. ~ : ~ C ;: ~ r:: ti ~. ~ C ~f1ce \\- I ~;
Power Grid Corporation of India Limited,"Saudamini" , Plot No. 2, Sector-29 ,Near IFFCO Chowk,Gurgaon-122001Fax: 0124-2571809
(A GoVl. ollnd'a Enterpnse)(Formet!y tional Thermal Power Corpota lid I
~/Corporate CentreDate: 23-04-2013
Sub: Application for Grant of Connectivity to ISTS for Renewable Projects
Dear Sir,
With reference to the above subject, please find enclosed herewith our application for Grantof Connectivity for following NTPC Projects :
I) Singrauli small Hydro Plant (2x 4 MW)II) Unchaha r Solar PV Plant (10 Mwp)
In line with the CERC connectivity regulation published for renewable plant of capacity lessthan 50 MW, and detailed procedure of Central Transmission Utility Under RegUlation 27(1)of the CERC (Grant of Connectivity, Long term Access and Medium - term Open Access inInter State Transmission System and related matters) Regulations, 2009,application for thegrant of Connectivity to ISTS consisting of following documents(as per regulation) for each ofabove project dully filled in is submitted :
1. Format - CON-1 (Affidavit)2. Format - CON-2 (Application)3. DD No. 123426 Dated 22/04/2013 for Rs. 2,00,000/-4. DD No. 123427 Dated- 22/04/2013 for Rs. 2,00,000/-
The basic scheme indicating renewable project connecting to the existing connection pointwith ISTS through electrical system of generating station is also enclosed(Flag A).
As you are kindly aware that these Renewab le project (particularly -Solar PV) have shortcommissioning schedule(Sept 2013),the connectivity of above projects may please begranted at the earliest. The LTA application for Singrauli Hydro Plant has already beenapplied and LTAapplication for Unchhar Solar PV plant is being submitted shortly.
Thanking You,
Yours faithfully,•
31f1l\!l iSl q; 1 q; liQIC'l ll ~, ~ of. tJ-BtJ . ~-24. tffic iITCR1 of . 13 .~ (~3JJ.) ftr-f-201301
ENGINEER ING OF FICE COMPLEX. Plot No. A-SA. Sector-24 . Post Sox No. 13. NOIDA (U.P.) Pin-201301t f(;:rq;t~ : 0120-2410333 (10 ~) 0120- 2410116 (5~) ~iffi : 0120-2410136, 0120-2410137Telephone : 0120-2410333 (10 Lines) 0120-2410116 (5Lines) Fax : 0120-2410 136. 0120-2410137quf) <tl tl~~ :~. <!tolft.~. l1cA".~ q;IJQ~ Q'd . 7 . {te'lt'<.'W"lC'!~ . ffiQt m .Off~ -110003
Regd. Office : NTPC Shawano SCOPE Complex, 7, Institutional Area, Lodhi Road . New Delhi-110003
E
•
I
o•
AFFIDAVIT
In the matter of filling application to Power Grid Corporation of India Limited, for!?grant of Connecti ity under CERC Regulations, 2009 for Unchaha r Solar 10 MWp
, S.S.Mishra Sio Late Shri Shyam Sunder Mishra, working as Additional GeneralManager in Project Engineering Department(Electrical) of NTPC Ltd., having its
f egistered office at NTPC Bhawan, Sco pe Complex, 7 Inst itutional area, Lodi Road,New Delhi-l lO003 do solemnly affirm and say as follows:
6, . I am the Additional General Manager of TPC Ltd. , the repre entative in theabo e matter and am duly authorized to file the abo e application and to make thisaffida it.
ignature ). .Mishra
AGM(PE-Elect)TPC Ltd.
ATT~O_
5.S. GUPTA, ADVOCATENOTARYPUBLIC
Oelhl &NaidaG. . Nagar (U.P.)
25 P 3
that all the details given in the enclosed application for grant of~~I;1ti v i ty along with necessary documents are true and correct and nothing
al has been concealed thereof.
.To be du l atte ted by otary )
TPC Ltd., is a Go ernment Company registered under Companiesct, 56 a public limited ompan . nder the Article of A ociation of the
r A Co P v and in accordance with the pro ision of Electricity Act, 20031 relevantReg lati n( ) of ERCC, the compan can file the enclosed application.
ld0 ' \ l • .\
... \3. ': .' ' 3'" Sj{ ' .•• 0 .
Format·CON-2
S.No. Descsr'int iou Details1. Name the Applicant NTPC Limited2. Address for correspondence AGM(PE-Eleet),NTPC LT D.
Engineer ing Office Complex,A-8A, Sector-24,NOIDA-201301(U.P)
3. Contact DetailsPrime Contact Person Sh ri S.S.MishraDesignation AGM(PE-Elec tl
Phone No. (Landline) 0120-2410729Phone No. (Mobile) 09650991145Fax 0120-2410102EMail ssmishra(Q),ntpceoc.co.inAlternate Contact Person Ms. S.Mo haotvDesiunation DGM(PE-Elecl)Phone No. ILand line) 0120-3318421Phone No. (Mobile) 9650991556Fax 0120-24 10102EMail sai!a rikat'WntDceoc.co.in
4. Nature of AnnlicationGenerator (other than captive) GeneratorCaotive GeneratorBu lk Consumer
5. Details of Connectivity5 a. Capacity (MW) for which l D MWp
connectivity is required5b Date from which connectivity is Sept"2013
required6. Location of the Generating (i.) P lace : Unchahar
Station/Bulk consumerNearest Village/Town Town : RaibereliDistrictState Utta r P radeshLatitude No rth :25 De a 54 MinLongitude East :8 1 Oe D 18 Min
7. Installed Capacity of theGenerating: StationExisting - 1050 MW(2 x 210 thermal stage-
1.2x2 10 MW thermal stage-ll &Ix210 MW Stage-Ill)
8. Commissioning Schedule of the Sept 2013Generating Station
9. Details of the Generation Station
f---- - Name of the Power Plant UnchaharSolar PV plant-- - - _ ._ -Promoter NTPC Ltd.Fuel Renewable
Source of Fuel Sol arGeneration Voltage 265 V AC(conveted through
inverter from DC)Step-up voltage Solar power is pooled at 33 kV
level and further connectedthrough the existing 220 kVswitchyard (S ingle Line Diagramattached)
Is it an identified project by CEA NoBase Load/Peak load Infirm Power
10. Deta ils of Nearest 4001220/1 32kV 220 kV Unchahar Switchyard
SubstationsOwner NTPC
I I. Details of e-transactionI (Application Fee)
Amount (in Rs.} 2,00.000/-rtwo lakh onlv)Transaction Ref. No 0 .0 No : 1 J. ." 4 J. .,
Date 2 2.( O L" I 2-0 \ \
Bank Name I <U>'''- 1>.""",, -c " ,,""'-\ ....Branch Name f- . , -,c . - .,.., 1
V
INFORMATION REQUIRED TO BE SUBMIlT ED WITH THEAPPI. IC ATION I'OR CONNH'TIVITY BY GFNFRAT1NG STATION :
PROJECT NAME: Unchahar Solar PV Plant(IO MWp)S.No. Descrintion Information Detail1.0 Site identification and land Existing project,ava ilable and belongs to
acquisition NTPC.
2.0 Environmental clearance for -NA-the power station
3.0 Forest Clearance (if -NA-applicable) for the land forthe Dower station
4.0 Fuel Arrangements -NA-
5.0 Water linkage -NA-
400KV SIJYDICT- I 'AY ICT- Z .... '1''-T-' --T-- O£oo.<"" (£N(IlATOll
~. .~
<y cr, ,.' .'
ICT- I ~' 4QO/1 3ZI(V 4fXI/ l32KV ~-i ICT-2 X'" X O£.,"< ,""". 10000A ,,. ,., ,
I132KV .... ' ~ ~ 132KV .... , r£N Vt:nJ(V ~ GOl V /33KV
--~ ---- 132KV svYD --- r ~ n-""'. ""'.''''" "...
!, ,, .'
J Ic:n.DiY TIl -I '---i 13Z1111CV 13<'II I1CV ~-i CI:llJn' TIl·Z
i'"f' IZ.5MV 1l \Z.5MV A \ ,
• , ,- II I ~uo·, ,,,,.,jI I .......------T--~....r... _l~Y_!:'E" nseev ""'"
"'"! .! I , , -m T"'IJ"I
, ,~T"'iV f~, ,
~ I .. .. .. . 1\\1:"1:") "''\, ,M,"1:I~ ", , rOto
" " •! I, ,
\'O) ....'t"
I I ~ uo·, uo-, ~
" r l~r T-I IICV S'J(;R
! Ii i , , , ,
I1I33KV ~ I j I j i 11/3J1(V• • 1 a J • 10 MYAt ! 10 MYA Cll.1>fr F'£EDEIlS
dI I
OIH LINE
f II .
• LEGEND
I e GENERATOR
I § CIRCUIT BREAKER ORAWOUT TYPE
[....."'...1 P'! "l'bft~,~
8 H TP C tflI£..1J.m.i,1~TAANSFORMER - S1NGRAtIU '!;;tti.'fYl'KO PROlIC'I'
X '" INTDCOHNRCnOi'l or Illi'IGR.uru SIU.U. BYDRO- - - - - E~ISTING PROJlCT 1m1I m9TIi'1G 9YSTI:II-- PllOPOSEO - --- n- 1-'-• -
SlNG-BYDL-SLDl .D1FG
FGUTPP 220KV SWITCHYARDBAY NO.5
--~---- TR. BUS- I-- - - - BUS- II- - T - - BUS- I
220KV
33 /220 TRANSF.
-H -
33KV CABLE/OVERHEAD
KV
CORE-2CL: 0.2
CORE-lCL:5P20
PV CELLS PV CELLSTYPICAL
KV
33 KV POOLING SWGR
CORE-2CL:0.2
CORE-lCL:5P 20
PV CELLS PV CELLS
TYPICAL
~ "t k
[ i§ "~ •~
! t~.k
r I• 'Ii
~ 1
~~
FGUTPP- SOLAR PROJECT
0000-999- POE- J- 001 a
SIN GLE liNE DIAGRAMo 220 S
NTPC LimitedfA Govt. of India Entorprise)
~ <PI"llf<:;ro/Corporate Centre
Ref: 01:CD: 706 Dated: 14th May 2013
ToCOO (CTU)Power Grid Corporation of India Ltd."Saudamini" Plot No. 2Sector-29, Gurgaon-12202 1HaryanaFax No. : 0124-2571809
Sub: Long Term Access (LTA) application for Unchahaar Solar (l0 MW)
Sir
Yours faithfull y
~y(A. K. Bish oi)
AG M (Commercial)
)•
-Thanking you
Please find enclosed the LTA appli cation for Unchahaar Solar (l0 MW) including Format LTA1 and LTA-2 along with the proof of application fees of Rs. 2,00,000 (Rupees Two lacs only)already paid by RTGS vide CMS No 150804549 on 7.05.2013 as per CERC Regulations on"Grant of Connectivity, Long Term Access and Medium-term Open Access in inter-StateTransmission and related matters Regulations" 2009 and subsequent procedures dated31.12.2009. Application for Grant of Connectivity has already been made vide our letter dated23.04.2013 (copy of letter enclosed). NTPC is making this application on behalf of thebeneficiary i.e DYC . DYC shall be signing any necessary agreements including BPTA etc. withPowergrid / other transmission licensee and shall be responsible for payment of appli cablecharges. It is requested that the enclosed application may be processed at your end. We wouldfurther like to indicate that since NTPC is making this application on behalf of DYC, LTA maybe granted in the name of DYC.
Enc1 : 1. L TA-l- Affidav it2. LTA- 23. Proofofpayment vide CMS No 150804549 on 7.05.20134. Letter dated 23.04.2013 for Grant of Connectivity>. pV(.'!. O\.M~o~c:Uvt'vv Wt-vCJl/4. 7- ~''}{)IY
"
lfT it 1ft~ WA" M CfiIi1j~Cffi , 7, ~~~<J:~ I'1("l ~, m-ar"'Us, ~~-110003 , hrfTel.: 24360100,~/Fax : 011-24361018
NTPC Shawan, SCOPE Comple, 7, Institutional Area, Lodhl Road, New Delhl-110003,~lWebsl le : www.ntpc.cO.ln
. \
' .:
, (I~Q, only)
IN·DL191554581 06902K05~Sep·201 2 }1 :29 AM~
IMPACC (IV)/dI"132103/ DELHI/ Dt-DU~SUBIN-DLDL7321033849531 0877321K"
NTPC LTD
Article 4 Aff idavit
NA
o ,: '(Zer~)
NTPC LTD.) ..
NA
NTPC L:-TD " .':. 1. • - 1 ' '' ' . •
::'10
Slaluatory A lert :
1. The authenticity of the Stamp Certificate can be verified at Authorised Collection Centers (ACCs), SHCll Offices and Sub-ragistrar Offices (SROs) .2. The Contact Details of ACCs, SHCll Offices and SROs are available on the Web site ..www.shcilestamp.com..
I A. K. Bishoi S/o Shr i Somnath-'Blsh . worki ng as Additional General M anager(Commercial) in NTPC Ltd, hav· il~.i!s :reg:i~t~?i lic e at NTPC Bhawan. SCOPE Complex, 7,Institutional Area , l .odi Road, '~ ~~)lje.I~~,~ ~9g.% "" () l em n lY affi rm and say as fo llows:
~. " ~" . • ~\ -a\ .. ',. «:;.- " " •• ~'" J- I," . 0 (. ~il'. -:.. ~ (
~
AFFIDAVITIn the matter of filing app lication to Power Gri d Cor poration of Ind ia Limited , for grant of Langterm Access under CERC Reg ulat ions 2009.
Ii I
II! :i II ,! I
iiIII IIIi II jI I! II I! I
i!i II ,
! . ~ 1 \
:• • • • ••• •• • ••• •_•••• • •• •••• ••• •• • •••••• •• _.- - -.Please write or type below this line•••••• •• • • • • • •• • •_••••• ••• _.- _••• - _•••••••• '1-1
i , I, : I
FORMAT-LT A-l II! I!iIi
III',I
~-=:=U____.__J j
I:IIFirst PartyI 'I;Second Party,I ; Stamp Duty Paid ByI ,i!Stamp Duty Amount(Rs.)
, ' 'Rf'4Aq~I ;
l ie rt'f' t N! : e 11C8 e o.I:Certificate Issued Date
I:Account Reference
I!Unique Doc. Reference '
! ;Purchased by
Description of Document
Property Description
Consideration Price (Rs.) ii
" ..'
1. I am the Additional General Manager of NTPC Ltd . the representative in the above matterand am duly author ized to file the above appli cation and to make thi s affidav it.
I submit that Mis N TPC Ltd. is a registered company Public Ltd. Registered under CompaniesAct. Under the Article of Association of the Company and in acc ordance with the provision s ofElectricity Act, 2003/re levant Regulation(s) of CERC, the company can fi Ie the enclosedapplication.
I submit that all the detail s given in the enclosed application for gra nt of Long Term Accessalongwith necessary documents are true and correct and nothing material has been concealedthereof.
Cti1~(A.K. Bishoi)
ATTta:oNOTA ...
..
FORMAT-LTA-2
Application for Grant of Long -term Access (LTA)
1 Name the Applicant
2 Address for Correspondence
3 Contact DetailsPrim e Contact Person
DesignationPhone No .(Landline)
Phone No.(Mobile)Fax
Alternate Contact PersonDesi gnation
Phone No.(Landline)Phone No.(Mobile)
FaxE-Mail
4 Nature of the ApplicantNormal Gen erator (other than captive)
Captive GeneratorBulk Consumer
Electricity TraderDi stribution Licensee
5 Details for Long Term Access (LTA)
5a Quantum (MW) for which LTArequired
5b Date from wh ich LTA required(not earlier than 3 years from the lastday ofthe month in which application
has been received)
5c Date upto which LTA required(1 2 years to 25 years from the date
from which LTA is required)
NTPC Limited (on behalf of DVe)
NTPC Bhavan, Core-7, Scope Complex,7, Institutional Area, Lodhi Road,New Delhi-ll0003
A. K. BishoiAdditional General [email protected]
S. K . SharmaAddit ional General [email protected]
Yes
10MW
01.08 .2013
1.08.2038
Page 1 of 2
5d Injection of Power (more thanone only in case of single Drawal)
Entity- lState/Region
Quantum- lConnectivity with the Grid
5e Drawal of Power (more thanone only in case of single Injection)
Entity- 1State/Reg ion
Quantum- 1Connectivity with the Grid
NTPC,Unchahaar SolarU.P. /NR10MWNTPC Unchahaar Switchyard
DVCWest Bengal /ER10MWVarious CTU Substations in DVC area
6 Details of DD/Cheque e-transaction(Application Fee)
Amount (in Rs.) Two lacs onlyDD/Ch eque transaction No. 150804549
Date 07.05.2013Bank Name ICICI Bank
Branch Name Connaught Place
7 Details of Bank GuaranteeAmo unt (in Rs) N/A
Bank NamePer iod of Validity
Page 2 of2
/
, ~,
Ref. No: CC:PEE:NTPC/REN/CONN/'I
Cli lef Operating Officer(CTUjPower Grid Corporation of India Limited,"Saudamini", Plot No.2, Sector-29,Near IFFCO Chowk,Gurgaon-12200 1Fax: 0124-2571809
rpr 'i!t r8 i'If JiJrf1It5(ITmf~. 7fi1 ;mrij
---"'--C---r.-' infte--(A Govt. of India·Eni erprise) ,
(Formerly Nalienai Thermal PowerCorporation Ltd.)
m'""{r1l ,,",*,1'1/ Co rporate CentreDate: 23-04-2013
Sub: Application for Grant of Connectiv ity to ISTS for Renewable Projects
Dear Sir,
With reference to the above subject , please find enclosed herewith our application for Grantof Connectivity for following NTPC Projects :.
I) Singrauli small Hydro Plant (2x 4 MW)II) Unchahar Sola r PV Plant (10 Mwp)
In line with the CERC connectivity regulation publishedfor renewable plant of capac ity lessthan 50 MW, and detailed procedure of Central Transmission Utility Under Regulation 27(1)of the CERC (Grant of Connectiv lty, Long term Access and Medium - term Open Access in
.. Inter State Transmission System and related matters) Requlatlons, 2009 ,applicat ion for thegrant of Connectiv ity to ISTS consist ing of following documents(as per regulation) for each ofabove project dully filled in is submitted ;.
1. Format - CON-1 (Affidavit) .2. Format>- CON-2 (Application)3. DO No. 123426 Dated 22/04/20 13 for Rs. 2 ,00,000/-4. DO No. 123427 Dated- 22/04/2013 for Rs. 2 ,00 ,000/-
The basic scheme indicating renewable project connecting to the existing connection pointwith ISTS through electrical system of generating station is also enclosed(Flag A).
As you are kindly aware that these Renewable project (particularly -Solar PV) have shortcommissio ning schedule(Sept 2013),the connectivity of above projects may please begranted at the earliest. ' The LTA application for Singrau li Hydro Plant has already beenapplied and LTAapplication for Unchhar Solar PV plant is being submitted shortly.
Thanking You,
31f4"l if3l <l>I ~ ~, tffiC -.r. IHll! . ~-24 , tl1R:~ -.r.13 ,~T (<J .lT:) fiFf~201301ENGINEERING OFFICE COMPLEX, Pldt No. A·8A. Sector-24, Post Box No. 13, NOIDA (UP.) Pin-201301tfa-q;'-.r: 0 120--24 10333 (10~) 0120- 24 101 16 (5 B~) Tjh f'ff : 0 120·-2 410136 , 01 20 ,....24 10 13 7~e~~~~one : 9 '1 20-24103~3 _ ( 1~ Lines) 0120-2410116 (5Lines) Fax: 0120·2410136. 0120-2410137
~ Limited/) Govl 0/ Ind•• Enlerp " n j
Ji""tffi:R/ Unchahar
Ref. No. : US/GM/400Date: 3 1.07.20 13
ToCOO (CTV)Power Grid Corporation or India Ltd."Saudamini" Plot No.2Sector-29, Gurgaon-122021HaryanaFax No. : 0124-2571809
Sub: Coordination for " nchahar Solar Plant" by."Feroze Gandhi Unchahar Thermal PowerPlant"
Sir,
This has reference to your letter dated 10.07.2013 in regards to application for Connectivity for"Unchahar Solar Plant" . In this regard we would like to indicate that since "Unchahar Solar Plant"is also under ownership of NTPC, Shift Charge Engineer of "Feroze Gandhi Unchahar ThermalPower Plant" will be responsible for all day to day coordination with RLDC in regard to declarationof schedules, submission of metered data etc in regard to "Unchahar Solar Plant". Further "FerozeGandhi Unchahar Thermal Power Plant" agrees to act as principal Generator on behalf of"Unchahar Solar Plant" and agrees to undertake all operational & commercial responsibilities for"Unchahar Solar Plant" in following the provision of IEGC & all other Regulation of CERe.However "U nchahar Solar Plant" will be considered as a separate "User" for which energyaccounts need to be issued separately.
Thanking youYours fa'
( Prakash iwari )General Manager
Copy to: NRLDC
~ 'fitfi~m ~~. ~~~.~ ,(llliij~clt ("G".~.}-229406
Fcroze Gandhi nc ha ha r T hermal Power Sta tion, P.O: Unc ha ha r, Di stt: Raebareli (U P) - 229 406 ~/Fax 05311·278072
Regd. Office: NTPC Bhawan, Scope Complex. 7, Institutional Area, Lodhi Road, New Delhi - 11 0 003
! -r; -c.. ; '; ~ ; • ..;
[;]
' U>coue' , u~
:9l.. . .. , DA!YI()DAR VALLEY C()RP()I{A'I 'I() i'\'
COI\1M [({CIA L DEPARTM EN:rDVC: T()W«~RS ; V.L P. ROA D
KOLKATA: 700 054 .
1 \ \ " "
OFFICE COpy
:'-; 11, ( '01111 .'01"1"1'( ','1. 1i \ / ? b.(,
·, ··t r : ~ ~ ..~ : I i\ ., ..~ ., 1( -.·. · , : , ·,I II \.. \ J\"11",. 1 ,-\I . VI ~lIhl:\"'1 \,-,. \Illll l l""'-'''\ J }
, Nali(Jnili Thenn ul Power Corporati on Limited
~l:( ) pe COlllp l e~. , ,
7. ln sritutional Area. l. odhi Road, , N~<\' D~lj' i- 1 1 1 1 OJ
, h~,-.; ;10:0 1L~ 2 4 3 60j 5 H
,Sub: Arrangeme nt of LTi\ on.bchal ror IweDear Sir,
f)a lc : 0" , 7 MA.Yiu12
Thi-, IS ' Ii ' refere nce ttl the discussio n with Mr. P, K. Ghoxa]. l) (j !'vl (Commercia l).Kol k~IItL NT PC. rega rdi ng arrangeme nt of Lon g Te rm i\cqcss 10 avai l sol ar power tro m var ious
~TPC Projects. Dy e ente red into { IV O a~eclllcllis with NTPC Lim ilcll Oil (it h .lanua ry ·]Oi2 I'llI'
p urchase 0" I() f'vl \V solar power each Irom 'Ia lcher Kanihu So lar ilV Power Project and
Unchahar So lar PV Power SImian t)1' NlPC. For transm issiount those powe r lromthc So lar
power stations or NT PC lei DVC system using. ('TU network. l.ong Term Access li'l1111 ell! is ,' . . i . J •
necessary,
Dur in g di scussion. Mr. P.K. d )()sal, D G IVt" (COimnlen.: i,il). NT PC co rn niunicatcd tha: f'
N:''P( i~ agreea b le lO ~i) p'I )' ITA' (>n.ijeh ~ Jro l ' Dye 10 avail so lar power a~ ·. p~ r PPI\ will,Nll'C.Acc ordingly. it is requested to kindly ;,~ a kc ' al~~ !\ i, gen'H::nl i o r bch<ill' lll" DYC to appl y iTA for,\ vailil{g s(; l a r p~.l~\'cr lrom.lJrichahiiii ,lnd Ta lcili.: r i<.al~j ha Project o r NT'PC.
' . . . . ; , ; . . ! .' .
, cc:
i[ '
,-. - ' \ NOO:
1) The Directo rl Co mmcrc ial). DVe. Ko lka ta
1 ) The Chie f" Eng ineer (CI.D) . D Ve. ivl ai l l l(~ 11
,Hoj
.'.., ..~ ~ . '.......
.... ~ _ _-_.-..- ' .'
Ref. i 0: CC:Pc E:i TPCIKE ICOI /1
C-l;:- < C;:.:rc: ti:-.,; Cfficei\ (~T:";~
Power Grid Corporat ion of India Limited,"Saudamini" , Plot No.2, Sector-29,Near IFFCO Chowk,Gurgaon-12200 1Fax: 0124-2571809
(A Gov!. oJIndia Enlerpnse)(Formerly a' Thermal PCMe!Corpotalion Lid I
/ Corporate centre
Date: 23-04-2013
Sub: Application for Grant of Connectivity to ISTS for Renewable Projects
Dear Sir,
With reference to the above subject, please find enclosed herewith our application for Grantof Conn ectivity for following NTPC Projects :
I) Singrauli sma ll Hydro Plant (2x 4 MW)II) Unchahar Solar PV Plant (10 Mwp)
In line with the CERC connectivity regu lation published for renewable plant of capacity lessthan 50 MW, and deta iled procedure of Central Transmission Utility Under Regu lation 27(1)of the CERC (Grant of Connectiv ity, Long term Access and Medium - term Open Access inInter State Transm ission System and related matters) Regulations, 2009 ,application for thegrant of Connectivity to ISTS consisting of following documents(as per regulation) for each ofabove project dully filled in is submitted ;
1. Format - CON -1 (Affidavit)2. Format - CON-2 (Application)3. DO No . 123426 Dated 22/04/2013 for Rs. 2,00,000/-4. DO No . 123427 Dated- 22104/2013 for Rs. 2,00,000/-
The basic scheme indicating renewa ble project connecting to the existing connection pointwith ISTS through electrical system of generating sta tion is also enclosed (Flag A) .
As you are kindly awa re that these Renewable project (particu larly -Solar PV) have shortcommissioning schedule(Sept 2013),the connectivity of above projects may please begranted at the earliest. The LTA applicat ion for Singrauli Hydro Plant has already beenapplied and LTA application for Unchhar Solar PV plant is being submitted shortly.
Thanking You ,
Yours faithfull y,•
31f11 ~ i F-l <t> 1 q) 1~rC1~ lJfn:R . tRTC «. r-ev. ~-24 . ~ 1{1lffi ri . 13 ,~ t-ur. ) flt;r-201301ENGINEERING OFFICE COMPLEX, Plot No. A-8A, Sector-24. Post Box No. 13, NOIDA (U.P.) Pin-201301t~"t : 01 20 -2410333 (10~) 0 120-24 10 1 16 (5 t"rr~ ) Jtcm : 0120-241 0 136. 0 120-2410137Telephone : 0120-2410333 (10 Lines) 0120-2410116 (5Lines) Fax : 0120-2410136, 0120-2410137q~ <t>J1rl~ : lr-f . tt, tft.~. ~,~ CfjI "l~CRt , 7 . ll'i'i!li;,<g l"l('l tTftm. C1tt1t m.~~ -110003Regd. Office : N ;PC 8 hawan, SCOPE Complex. 7, Institutional Area, Lodhi Road , New Delhi-110003
E
•
J 2
AFFIDAVIT
"In the matter of filling application to PO\ er Grid Corporation of India Limited, forgrant of Connecti it under CER Regulations, 2009 for Singrauli small Hydro
~08MW
I, S. .Mishra S/o Late Shr i Shyam Sunder Mishra, working as Additional General~Manager in Project Engineering Department(Electrical) of NTPC Ltd., having itsregiste red office at NtpC Bhawan cope Complex, 7 Institutional area Lodi Road
e Delhi-l l0 003 do solemnl atlirm and say as folio s:
5 APR20J3
T~S.5. GUP.T1\ , OVOCATE
~ ' OT py PUBLICO· I i &Noida G.B. Nagar (U.P.)..(To be dul y attested by otary)
~
t that all the details given in the enclosed application for grant of;-"1'--:-."(_OlrlJ)(~tivi t along \ ith neces ary documents e true and correct and nothing
erial has been concealed thereof. ,
J . I am the Additional General anager of TPC Ltd. the repre entati e in theabove matter and am dul authorized to file the abo e application and to make this
~~--"'~lda it.
Format-CON-2
S.Nu. Desesriptiun DetailsI. Name the Aoo licant NTPC Limited2. Address for correspondence AGM(PE-Elecl),NTPC LTO.
E.ngineering Office Comp lex,A-8A, 8«to r-14,NOIDA·20130HU.Pl
3. Contact DetailsPrime Contact Person Shri S.S.MishraDesiznation AGMIPE-EI«tl
Phone No. (Landline) 0120-2410729Phone No. (Mo bile} 09650991145Fax 0120-1410102E Mail ssmish ral'Qlntpceoc.co.inAlternate Contact Person Ms. 8.MohanlYDesignation OGM(PE·ElectlPhone No. (Landline} 0120-3318421Phone No. (Mobile) 9650991556Fax 0120-2410 102E Mail sagarika(a:ln tnceoc.co.in
4. Nature of ApplicationGenerator (other than caotivel GeneratorCaptive GeneratorBulk Consumer
5. Details ofConnectivitv5 a. Capacity (MW) for which BMW
connectivity is required5h Date from which connectivity is Feh'2 014
reouired6. Location of the Generating (L) Place : Singrauli
Station/Bulk consumerNearest Vil lace/Town Town : Shaktinacar
District SonebhadraState Uttar PradeshLatitude 24 Oeg 11 Min N
Lonuitudc 82 deg 45 min E,
7. Installed Capacity of theGeneratine StationExisting - 2000 MW(5x 200 MW stage -I
and 2x500 MW-stage-II) thermalI nlant
8. Commissioning Schedule of the Feh 2014Generatine Station
9. Details of the Generatio n Sta tionName of the Power Plant Singrauli small Hydro
_.- Promoter NTPC I.td . . -._ - - -- - ---Fuel Renewable
Source of Fuel HydroGenerat ion Voltaue I I kV
Sten-un voltage 33 kVIs it an identified orciect by CEA NoBase Load/Peak load Base Load
10. Details or Nearest 400/2201l32kV Singra uli 400/ 132 kV Switch yard
Substat ions The 8 MW small Hydro units are steppedup to 33 kV and integrated through theelectrical system ""d generatingstarlom l.e. II kV/ 132 kV/400 kV) as perenclosed Sin rle Line Diagram .
Owner NTPCtl. Detail s ofe-transaction
IAnnlication Fee \Amount lin Rs .) 2,OO,OOO/-(lwo lakh onlv\
Transactio n Ref. No D.DNo: \ :< 3 1.; 2.. &Date 2- 2- I" ... /~ o'~
Bank Name ~",'''- Q~ ....... , t: " .1.. l (\..\..C\d..
Branch Name p,~~. "1""0'" 1\,\".-0
INFORMATION REQ UIRED TO BE SUBMITTED WITH THEAPPLI CATION FOR rONNECTIVITY BY GENERATING STATION:
PROJECT NAM E: Singrauli small Hydro Project (2X4MW)
S.No. Descrmtion Information Detail1.0 Site identification and land Existing projectavailab le and belongs
acquisition to NTPC.
2.0 Environmental clearance for -NA-the power station
3.0 Forest Clearance (if -NA-applicab le) for the land forthe Dower station
4.0 Fuel Arrangements -NA-
5.0 Water linkage Existing cooling water return channel ofSingrauli Super Thermal Power Station
P'f i!/ rtflama m?m< llST 3mf)
(AGoo. of IndiaEnterpriSe)
~~ / Corporate Centre
Ref: 01:CD: 706
ToExecutive Director (SEF & CE)Power Grid Corporation oflndia Ltd."Saudamini" Plot No.2Sector-29, Gurgaon-122021HaryanaFax No. : 0124-2571809
Dated: 25th May'2012
Sub: Long Term Access (LTA) application for Singrauli Hydro (2 X 4 MW)
Sir
Please find enclosed the LTA application including Format LTA-1 and LTA-2 along with theapplication fees of Rs. 2,00,000 (Rupees Three lacs only) vide bankers cheque No. 745222 dated24.05.2012 as per CERC Regulations on "Grant of Connectivity, Long Term Access andMedium-term Open Access in inter-State Transmission and related matters Regulations" 2009and subsequent procedures dated 31.12.2009. The drawals of various beneficiaries considered inthe application are considered as per existing Gol guidelines. Final allocation of power shall benotified by Gol at the time of commissioning of station. The power from Singrauli Hydro shallbe transmitted via existing evacuation system through displacement (Single Line diagramattached for reference). NTPC is making this application on behalf of the beneficiaries. Thebeneficiaries have agreed for subsequent signing of all necessary agreements including BPTAetc. with Powergrid / other transmission licensee developing the identified transmission systemand payment of applicable charges, corresponding to their final share of allocated capacity fromthe project. It is requested that the enclosed application may be processed at your end. We wouldfurther like to indicate that since NTPC is making this application on behalf of its beneficiaries,LTA may be granted in the name of beneficiaries.Thanking you
Yours faithfully
(A.B~'5DGM (Commercial)
Encl: 1. L TA-1- Affidavit2. LTA-23. Bankers Cheque No. 7452224. Single Line Diagram for Singrauli Hydro
1!Ol i\ tit <It :mlGI~ 4iioqilllf<i, 7, ~dl¥ld01cl ~, oi\tl\"i\i;,~~-110003. ~ /Tel. : 2436 0100 ililffi IFax: 011-2436 1018
NTPC Bhawan. Scope Compiex, 7, Institutional Area, lodl Road, New DelhI-110003.~ IWebsite: www.ntpc.co.in
47AA 246998
FORMAT-LTA-lAFFIDAVIT
In te matter of filing application to Power Grid Corporation of India Limited, for grant of Long-term Access under CERC Regulations 2009. . .
I 1. Basu Roy Slo Late Shri S. C. Basu Roy working as Deputy General Manager(Commercial) in NTPC Ltd, having its registered office at NTPC Bhawan, SCOPE Complex, 7,In~itutional Area, Lodi Road, New Delhi-I 10003, do solemnly affirm and say as follows:
I. ~ am the Deputy General Manager of NTPC Ltd. the representative in the above matter andarri'dulyauthorized to file the above application and to make this affidavit.
1 ~bmit that MIs NTPC Ltd. is a registered company Public Ltd. Registered under CompaniesAcJ:, Under the Article of Association of the Company and in accordance with the provisions ofEI~tricity Act, 2003/relevant Regulation(s) of CERC, the company can file the enclosedapplication.
I stbmit that all the details given in the enclosed application for grant of Long Term AccessalTgwith necessary documents are true and correct and nothing material has been concealedthereof.
a~~~(A. BasuR.oY) '1-' \V
f~-PUS.. q,.../"" ....;lEv" .
tlO ~
rf;;;q ~. -~il«j•...'V ..~
" ~, jl,(j.~~,\.,* '~",Il%" ,,,,• . .~ ~x
~Z,;:r.~S·~~~~·
FORMAT-LTA-2
Application for Grant of Long -term Access (LTA)
1 Name the Applicant
2 Address for Correspondence
3 Contact DetailsPrime Contact Person
DesignationPhone No.(Landline)
Phone No.(Mobile)·,Fax
Alternate Contact PersonDesignation
Phone No.(Landline)Phone No.(Mobile)
FaxE-Mail
4 Nature of the ApplicantNormal Generator (other than captive)
Captive GeneratorBulk Consumer
Electricity TraderDistribution Licensee
S Details for Long Term Access (LTA)
Sa Quantum (MW) for which LTArequired
Sb Date from which LTA required(not earlier than 3 years from the lastday ofthe month in which application
has been received)
Sc Date upto which LTA required
NTPC Limited (on behalf ofbeneficiaries listed at Se)
NTPC Bhavan, Corc-7,Scope Complex,7, Institutional Area, Lodhi Road,New Delhi-110003
A. Basu RoyDeputy General [email protected]
C.K. MondolAdditional General [email protected]
Yes
8MW
01.07.2013
01.07.2038
Page 1 of2
(12 years to 25 years from the datefrom which ITA is required)
Sd Injection of Power (more thanone only in case of single Drawal)
Entity-IState/Region
Quantum-IConnectivity with the Grid
5e Drawal of Power (more thanone only in case of single Injection)
Entity-IState/Region
Quantum-IConnectivity with the Grid
Entity-ZState/Region
Quantum-2Connectivity with the Grid
Entity-3State/Region
Quantum-3Connectivity with the Grid
NTPC,singrauli HydroUttar Pradesh / NR8MWNTPC Singrauli Switchyard
UPPCLU.PINR4.1MWVarious CTU substations in U.P.
DELHI DISCOMDELHIINR2.1MWVarious CTU substations in Delhi
RAJASTHAN DISCOMSRAJASTHANINR1.8MWVarious CTU substations in Rajasthan
6 Details of DD/Cheque e-transaction(Application Fee)
Amount (in Rs.) Two lacs onlyDD/Cheque transaction No. 745222
Date 24.05.2012Bank Name State Bank of Hyderabad
Branch Name New Delhi, Scope Complex (Code:205ll)
7 Details of Bank GuaranteeAmount (in Rs) N/A
Bank NamePeriod of Validity
Page 2 of2
400KV S\JYD
e1I/33KV ~10 MVA 1
1LEGEND
e GENERATOR
~ CIRCUIT BREAKER DRAWOUT TYPEv8 TRANSFORMER
X GCB
----- EXISTING-- PROPOSED
1tKY S"'GRt_~ 10 MVA
l O/H LINE
O/H LINE
GENERATOR4MI/
YXGCB
GEN Y/33KY ~~5MVA G"'-bYndll =
GENERATOR4MI/
C(XGCB
GEN V/33KV ("~5MVA .;"*Yndll =
33KV
-- SlNGRAUlJ SMALL_~RO PROJECT(2X4Mln
~CONNECTION OF SINGRAUlJ sw.u. HYDROPROJECT.llITH EX1S1'lNG SYSTEM
SING HYDL-SLDl.Dl'lG
Page 1 of 1
V. Thiagarajan
From: [email protected]
Subject: Fw: Connectivity appli cati on of Singrau li Hydro
From: [email protected]: Friday, May 10, 2013 11:47 AMTo: V. ThlagarajanCc: [email protected]: Re: Connectivity app lication of Singrauli Hydro
Dear Sir,
It is confirmed t hat the Singrauli small Hdro {zx 4 MW) is within existing generating st at ion asdefined in CERe and is connected through the electrical system of the generation sta tion.
reg's
Sagarika Mohanty
NTPC
From: V. ThiagarajanSent: Friday, May 10, 2013 11:29 AMTo: [email protected] ; [email protected]: Connectivity app lication of Singrauli Hydro
Sir,Regarding the connecti vity appl ication of Singrauli Hydro please confirm that the proposed Singrauli Hydro(2x4MW) and is with in ex isting Singrauli generation as de fined in the CERC regu lations.
Regards,
V .ThiagarajanChief ManagerPOWERGRID
10-05-2011
[ttOf8"'~ ]NTPC
"""""'"--/coo (CTUj
Power Grid Corporation of In d ia Ltd ." Soudamini " Plot No.2Sector 29 , Gurgaon - 122021HARYANA Fax : 0124 2571809
NTPC Limited(A 1>"", 01 Jh~ ~ntoI~1
~/Singrau l l
03 1/ GM/August 3 1,2013
Sub: Co-ord inatio n for " Singrauli Small Hydro Plant" bySingrauli Super Thermal Power Station
Sir ,
This has reference to your letter dated 10 /07 /201 3 in regard to application forConnectivity for "Sin gra u li Small Hydro Plant" . In this regard , we would like toindicate that since " Singrauli Small Hydro Plant" is also under ownership of NTPC ,Shift Ch arge Engineer of Singrauli Super Thermal Power Station will be responsiblefor all day- to- day co-ordination with RLDC in regard to declaration of schedules,submission of metered data etc in regard to "Singra u li Small Hydro Plant" . FurtherSingrauli Super Thermal Power Station agrees to act as principal Generator onbehalf of "Singrauli Small Hydro Plant" and agrees to undertake al l operational &commercial responsibilities for "Singrauli Small Hydro Plant" in following theprovision of lEG C & a ll other Regulations of CERC. Howerver "Singra u li Small HydroPlant" will be considered as a separate "User" for which energy accou nts need to beissued separately .
Thanking you , ..,......,) You rs faithfully ,
'~lGENERAL MANAGER
Copy : NRLDC
1litTM~ wfH Q1"CR~ . qJ.3l1.- ~lffiAll'< . f3rMr-~ (3.)1".) ·231 222. tc:!h./ Tet. : 05446-232441
Singrauli Super Thermal Power Station, P.O.-Shaktinagar, Distt.-Sonebhadra (U.P.)-231 222, ~lFax : 05446·232405
~~ : e"'ltl4"l'ff'1 \l'CR"~(f)IAl~iffi . 7 $w::&'Icq~1"4C1 mtm. C1Ttft '<'15. ~~-1 10003E-mail : [email protected]
S. No. Name or Generators Capacity (in MW) Associated Transmission lines LTA Status
1 Lata Tapovan(NTPC) 171 220kV D/c Twin Zebra Lata Tapovan-Josimath line Not applied
2 Tamak Lata(UJVNL) 250
LILO of one circuit of 220KV D/c Twin Zebra Lata Tapovan-
Josimath line at 250MW Tamak Lata HEP Not applied
3 Bhunder Ganga(Super Hydro) 24.3 220KV D/c Twin Zebra Bhunder Ganga-Josimath line Not applied
4 Badrinath(GMR) 300
220KV D/c Twin Zebra line from 300MW Badrinath HEP to LILO
point on One circuit of 220 KV Bhunder Ganga-Joshimath line Applied
5 Vishnugad(NTPC) 520
400KV D/c Twin Moose Vishnugad-Pipalkoti line & LILO of
Vishnuprayag Muzaffarnagar line at Pipalkoti Applied
6 Pipalkoti(THDC) 444
LILO of one circuit of 400KV D/c Quad Moose Pipalkoti
Karanprayag line at 444MW Pipalkoti HEP Not applied
7 Devsari(SJVNL) 252 220KV D/c Twin Zebra Devsari-Karanprayag line Not applied
8 Bawala Nandprayag(UJVNL) 300 220KV D/c Twin Zebra Bawala Nandprayag- Karanprayag line Not applied
9 Langrasu(UJVNL) 100
LILO of one circuit of 220KV D/c twin Zebra Bawala Nandprayag-
Karanprayag line at 100MW Langrasu HEP Not applied
10 Phatabyung(Lanco) 76 220KV D/C Single Zebra Phatabyung-Baramwari line Applied
11 Rambara(Lanco) 76
LILO of one circuit of 220KV Phatabyung-Baramwari line at 76MW
Rambara HEP Applied
12 Singoli Bhatwari(L&T) 99
LILO of one circuit of 220KV Baramwari-Srinagar line at 99MW
Singoli-Bhatwari HEP Not applied
13 Srinagar HEP(GVK) 330 400KV D/c Twin Moose Srinagar-Srinagar HEP line Not applied
Total MW 2942.3
Details of the Alaknanda Basin transmission system to be associated with various generation projects
S. No. Name of Transmission line
Line length(ckt kms)
/capacity in MVA
1 400KV S/s GIS Pipalkoti 630MVA
2 400KV D/c Pipalkoti-Karanprayag-Srinagar line(Quad Moose) 184ckm
3 LILO of Vishnuprayag-Muzaffarnagar line at Pipalkoti 1ckm
4 400kV D/c Srinagar-Kashipur line (Quad Bersimis) 304ckm
5 400kV S/s Srinagar 630MVA
6 400kV Bay at 400kV S/s Kashipur 2 Nos.
7 220kV D/c Lata Tapovan-Josimath line (Twin Zebra) 22ckm
8 220kV D/c Josimath-Pipalkoti line (Twin Zebra) 49 ckm
9 220kV S/s Josimath 2X50 MVA
10 220kV S/s Baramwari 2X50 MVA
11 220kV D/c Baramwari-Srinagar line 220ckm
Details of the Common Transmission scheme of Alaknanda Basin