agenda
DESCRIPTION
Agenda. Each proposal has a presentation time followed by a dedicated discussion. Introductions. 1 st session: 2 proposals. break. 2 nd session: 2 proposals. Discussion/wrap-up. HiRadMat - Status. Adrian Fabich HiRadMat Technical Board CERN , 15 th July 2014. Overview. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Agenda](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813c3d550346895da5bb2a/html5/thumbnails/1.jpg)
A. Fabich 1
Agenda
15/7/2014
Introductions
1st session: 2 proposals
2nd session: 2 proposals
break
Each proposal has a presentation time followed by a dedicated discussion.
Discussion/wrap-up
![Page 3: Agenda](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813c3d550346895da5bb2a/html5/thumbnails/3.jpg)
A. Fabich 3
Overview
• Report from HiRadMat experiments in 2012
• Shut-down work
• Summary of 2014 proposals
15/7/2014
![Page 4: Agenda](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813c3d550346895da5bb2a/html5/thumbnails/4.jpg)
A. Fabich 4
2012 experiments
• 9 experiments completed• On average 4 weeks between 2 experiment– Partially grouped
15/7/2014
![Page 5: Agenda](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813c3d550346895da5bb2a/html5/thumbnails/5.jpg)
A. Fabich 5
2012 - Protons to HiRadMat
• Total: 1.4*1016 protons• About 48 hours of SPS cycling for HiRadMat
– Preparation, waiting and extractions– Similar time span in 2011 for commissioning
15/7/2014
![Page 6: Agenda](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813c3d550346895da5bb2a/html5/thumbnails/6.jpg)
A. Fabich 6
Experiments in 2012
• RIB target R&D • LHC transfer collimator (2x)• BLM validation• RP benchmarking• Crystal collimation
PhDs completed:Juan Blanco, Nov. 2013
Nikos Charitonidis, March 201415/7/2014
Beam tunneling(HRMT12)
TE/MPER. Schmidt et al.
Powder target(HRMT10)C. Densham et al.
![Page 8: Agenda](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813c3d550346895da5bb2a/html5/thumbnails/8.jpg)
A. Fabich 8
Shut-down work
• Installation of additional cabling– Mainly for vacuum and HQ signal
• Removal of experiments from – Remainders in TNC:
• LPROT (HRMT12): follow-up required• TISD (HRMT01): removal delayed by availability of class-A lab
• Removal of WNAF collimator blocks– Minimum advancement– lengthy preparations for and discussions with authorities
15/7/2014
![Page 9: Agenda](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813c3d550346895da5bb2a/html5/thumbnails/9.jpg)
A. Fabich 9
New Proposals in 2014
• 12 applications– Named 14xx (year 2014 + running number)– Running number in the order of reception
• 9 invited for presentation/discussion
• 3 proposals to be discussed “offline”“placing them on the radar screen”– TPGS4 (1402): repetition with slightly higher intensity– Supra Magnet (1406): later availability– Microphone (1411): purely parasitic
15/7/2014
![Page 11: Agenda](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813c3d550346895da5bb2a/html5/thumbnails/11.jpg)
A. Fabich 11
Time frame
• One experiment interested in ion operation• Half the user groups are interested in TA (Transnational Access)
15/7/2014
![Page 13: Agenda](https://reader035.vdocuments.site/reader035/viewer/2022062314/56813c3d550346895da5bb2a/html5/thumbnails/13.jpg)
A. Fabich 13
Aim of TodayReview the proposals
In view of • Technical feasibility• Operational• Safety• Radiation-protection• Schedule
• Follow-up: Written report on the view by the HRM Technical Board• Schedule future meeting – October 2014
15/7/2014