aes huntington beach energy projectrenewaeshuntington.com/hbep-eader-elementary-05_31_176v1.pdf ·...

15
AES HUNTINGTON BEACH ENERGY PROJECT Eader Elementary May 31, 2017

Upload: others

Post on 02-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

AES HUNTINGTON BEACH

ENERGY PROJECT

Eader Elementary May 31, 2017

Page 2: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

AES Serves

9M CUSTOMERS

7 UTILITY COMPANIES

19,000 GLOBAL

WORKFORCE

6 4

17

MARKET-FACING STRATEGIC BUSINESS UNITS

CONTINENTS

COUNTRIES

$36B TOTAL ASSETS

OWNED & MANAGED

$14B TOTAL 2016

REVENUES

36,693 MW GENERATION CAPACITY

Improving lives by delivering safe, reliable and sustainable energy in every market we serve.

The AES Corporation

Page 3: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

AES in California

3 natural gas power plants

• Long Beach (Alamitos)

• Huntington Beach

• Redondo Beach

Approximately 15% of Southern

California Edison’s peak demand

Innovative leader in new energy

solutions – helping California

meet green energy and clean air

goals

Over 280 MW of renewable

energy sources

• Wind

• Battery Storage *

• Solar power developer

*Coming to Long Beach by 2021

Page 4: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

Huntington Beach Energy Project (HBEP)

Modernization Project

844 MW natural gas, combined-cycle, air-cooled plant

644-MW CCGT

200-MW SCGT

Demolish and remove the old steam generators and stacks

Page 5: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

Why Build a New, Modern Plant?

California’s goals for a cleaner, more environmentally sensitive

energy future are fundamentally changing the electrical system.

Renewable Energy: 33% by 2020 – 50% by 2030

Greenhouse Gases: 80% reduction by 2050

Coal: Limits on out-of-state coal contracts

Water: Limits on once-through-cooling (OTC) for power plants

Loss of generation in south-Western Los Angeles reliability area

Page 6: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

50% less fuel to deliver the sam electrical service

Cut emission rates nearly in half

Increase operating flexibility enabling integration of renewable energy

No ocean water and use of fresh water reduced by approximately 70%

Shorter and sleeker and have far superior “curb-appeal” consistent with

Huntington Beach’s “Surf City” theme.

Improvements

Page 7: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)
Page 8: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

Application to modernize (939-MW combined-cycle) submitted to California

Energy Commission (CEC) June 2012

CEC approved Huntington Beach Energy Project license October, 2014

Southern California Edison (SCE) awarded AES a 20 year Power Purchase

Agreement October, 2014 (AES Huntington Beach and AES Alamitos) (844-

MW)

Petition to Amend filed September 2015

Commission approves Amendment April 12, 2017

Current Project Status

Page 9: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

Mobilization – equipment to site underway

Start of main construction – June 5, 2017

Banning Street entrance for Magnolia Tank Farm – mid June

2017

Newland Parking anticipated to begin mid-June 2017

Underground work – Q3 2017 – Q1 2018

Above ground work – Q1 2018 – Q3 2019

Start of commissioning – Q3 2019

Completion March 1, 2020

Next Steps

Page 10: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

Noise

Construction restrictions Heavy equipment and noisy construction work restricted to:

Monday – Saturday 7:00 a.m. – 8:00 p.m.

No Sundays – No Holidays

Exceptions

Noise complaint process HBEP Hotline ((888) 372-5633

Dust

Traffic – Parking

Mitigation Measures

Page 11: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

Approved Construction Parking Areas and Truck Routes

170 Parking Spots

Page 12: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)
Page 13: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)
Page 14: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)
Page 15: AES HUNTINGTON BEACH ENERGY PROJECTrenewaeshuntington.com/HBEP-Eader-Elementary-05_31_176v1.pdf · 2017-06-01 · AES in California 3 natural gas power plants • Long Beach (Alamitos)

www.RenewAESHuntington.com

[email protected]

(888) 372-5633