‘Electrical Systems’
Time to Focus
8/21/2018 1
Introduction
8/21/2018 2
• Introduction
• Electricity
• Electrical Safety
• Electrical Stats - Mick McKenzie
• Electrical Related Events
• Electrical Systems Overview
• Electrical Management and Controls – Kevin Barton NGB
Testing Manager
• Temporary Electrics – Chris Sweet
• Electrical Compliance – Nick Martin
Electricity
“Electricity is invisible and a constant danger, it is never to be
underestimated or ignored”
8/21/2018 3
Electrical Safety
8/21/2018 4
The danger of working with and around electricity is well
Publicized.
It has the potential to kill or cause severe injury.
Hazards include:
Electric Shock and burns from contact with live parts
Exposure to arching or fire from electrical install
Other types of injury related to the above occurrences
such as falling from height.
So vigilance and robust control processes for working with
and around electricity is critical and required at all times.
These controls are particularly important on large multi
phased projects such as LBSR were construction teams are
working in and around live electrical assets with varying sizes
of plant and tools frequently.
Electrical Stats – Mick McKenzie Time to talks
1st Nov 2015 to 31st Dec 2016 = 43 (14 Months) 3 per month
1st Jan 2017 to 31th Oct 2017 = 57 (10 Months) 5.7 per month
1st Nov 2017 – 3rd Aug 2018 = 55 (9 Months) 6.1 per month
Since the Time to focus session on electricity last November we have
seen an increase in the number of time to talks carried out around
electricity
Close calls
Total close calls raised 2012 to 2017 = 1967 (59 Months) = 33 per
month
1st Nov 2017 – 3rd Aug = 745 (9 Months) = 83
Since the time to focus session we have again seen a significant rise in
the number raised
N420 Sponsor Review
8/21/2018 5
Electrical Related - Events
8/21/2018 6
Date
Time
Description
Contractor
11/11/2017 17:50
LV cable was damaged by the action of the bucket of a 3t 360 excavator. A flash resulted.
There were no injuries and there was no one in the immediate vicinity at risk of injury.
The activity was in the area immediately adjacent the Shipwright Arms and involved the
installation of drainage as part of the Tooley Street urban realm works.
The drainage had been installed and the excavation was being backfilled with local and
imported material. It is reported that it was during the movement of the spoil that the bucket
came into contact with a previously identified and exposed cable. The machine was not
digging but dragging back the material - CCTV footage made available by the Shipwright
Arms substantiates this.
The immediate cause of the incident is the contact of excavator bucket with the cable
causing a short circuit. The underlying causes include the failure to follow process and
supervisory deficits.
BCL / Costain
13/11/2017 08:00
Damage to Cable No 97 above ER-E20 feeding MCC-EO-23 block A mezz
Kilnbridge fire sealer was filling the hole above ER-E20 on the mezz on the North side with
compound when all of a sudden the compound was blown everywhere.
With better lighting we found a small nic on cable No 97 which is feeding MCC-EO-23 on
block A mezz, we confirmed this was the cable by hand tracing it back to SWBD D1-1 in ER-
E20. Contacted the permit office so they could inform the station that we need to isolate the
MCC.
Isolated Cable No 97 MCC-EO-23 and fitted safety locks and issued a permit to work No
06473. Then insulation resistance tested the cable and it was clear.
Once the cable was removed the damage was clear and the only way to restore power was
to cut the cable and insert a torpedo with a new temporary section of cable.
We installed the torpedo and new section of cable, retested it and re-energised it at 1330.
NGB
Electrical Related - Events
8/21/2018 7
Date
Time
Description
Contractor
21/01/2018 09:00 Live Conduit cut in SU 54 BOH Interim C – Façade Lighting conduit cut
Costain / NGB
10/03/2018 14:30
Details of event: An incident occurred on Saturday 10th March with a BROKK damaging
what is now known to be a redundant station communication cable during the task of
exposing existing drainage between 2 no. Drainage pits {7 & 8} in the Western Passage. no
injury
BCL / Costain
14/03/2018 10:45
This investigation relates to the discovery of a failure to adequately secure access to a
permit controlled LV room and the modification of the limitation of access permit issued for
the planned works being carried out in this room.
During a routine inspection on the BOH area by Gary Smith NR interface manager the door
to room ER-E05 was found open and paperwork for the planned work activity was found on
the floor.
Subsequent investigation identified that the limitation of access permit for the room had been
modified to include the name of the engineer who had arranged for it and also that
scaffolding was being carried out as part of the works.
Works were suspended and the room was shut.
The principal causes of the failures are the modification of a limitation of access permit after
it was issued by the permit issuer. And the permit controlled room being left open and
accessible to anyone who wanted to gain unauthorised access to the room.
Costain
30/04/2018 N/S Fire Panel struck by MEWP caused Network Fault Costain
Electrical Systems
HV -20kv/11kv - Overview of Systems
LV Distribution Normal (20kv) - overview of systems and any
outstanding works
LV Distribution Essential (11kv)
Retail LV Distribution - all sub mains installed and tested - status of any
outstanding issues
UPS - New and Legacy - battery replacements
Lighting and Small Power - status of where we are still working - Stainer
street / Joiner street / WAV / Western passage / Kent link areas that we
have yet to EIS
Dali Lighting Control - overview of system and planned completion
Disabled Alarm System - overview of system and planned completion
8/21/2018 8
HV -20kv/11kv - Overview of System
8/21/2018 9
8/21/2018 10
HV -20kv/11kv - Overview of System
Following the successful HV Interconnector Testing & Commissioning
of the Black Building Test, all HV works are now complete. The
station is fully operational as per the design intent.
8/21/2018 11
LV Distribution Normal (20kv) & Essential (11kv)
LV Distribution Normal (20kv) & Essential (11kv)
8/21/2018 12
All Main Switchboards and Distribution Boards are now fully tested
and commissioned (excluding a number of work areas identified in the
P6 programme).
Full LV discrimination has been verified with minor modification to
MCC breaker settings.
Retail LV Distribution
8/21/2018 13
Retail Switchboards Tested and Commissioned.
Final distribution to third parties (Retailer, ATM, JCD, Photo Me Booth
etc.) still to be completed or Stainer Street, Joiner Street, Terminating
Concourse.
Reviewing current design to separate Retail and Station Power
Supplies
UPS – New & Legacy Battery Replacement
8/21/2018 14
New
As discussed and agreed with the project and the RAM following UPS
systems will have replacement batteries due to failure to provide 1
hour autonomy as per specification.
UPS1/1-E-EL & UPS1/2-E-EL (Platform 1-15 Emergency Lighting)
UPS4E-CO (Telecom East)
UPS1 Arch 77 (Emergency Lighting Service Yard & Car Park)
Legacy
As discussed and agreed with the project and the RAM following UPS
systems are being retained by the route.
UPS5E-CO, UPS6E-CO & Shard UPS ( TER1, TER2 & Shard
Concourse Terminating)
Lighting and Small Power
8/21/2018 15
Works are still progressing in the following areas, as identified in the
P6 programme and have yet to be EIS;
Joiner Street Bridge Plant rooms
Western Passage
WAV Area
Terminus Concourse – Riser B
Kent Link
Joiner Street
Stainer Street
London Dungeon
SU77 Mezz
Area 51
Dali Lighting Control
8/21/2018 16
There are 29 Dali Control Panels in various stages of completion.
Witness Testing of the 1st Dali Panel planned for 23rd August with
Costain/NR for LCP26 Arch 77 & LCP28 Block C.
All the Testing & Commissioning of the remaining Dali Control Panels
are captured in the P6 programme.
Full System Testing & Commissioning currently planned for
completion 21Dec 18.
Disabled Alarm System
8/21/2018 17
Disabled Alarm System
8/21/2018 18
System 95% Installed.
Standalone testing and commissioning 95%,
Full integration testing to be completed, Date TBC period programme
update Friday 24th Aug.
8/21/2018 19
Electrical Safety Management System
Existing Station Supplies
New Station Supplies
Method of Manging Safe System of Works
New process to be implemented Sept 2018 onwards
8/21/2018 20
Electrical – Old DNO
8/21/2018 21
Electrical - New Switchboard
8/21/2018 22
Limitation of Access Permit
Electrical Management & Controls
Safe Isolation Permit
Temporary Electrics
8/21/2018 23
Temporary Electrics
8/21/2018 24
Woodlands Current Temporary Services August 18
MDU 2B -3L2 230V 16A combi
supplying power for portable transformer
MDU 2B - 6L2 - Gas room combi
MDU 2B - 7TP - 3 Phase gas room Combi
MDU 2B - 3L3 - 16A Combi vent room
office
MDU 2B
MDU 2A
MDU 12
MDU 21A
MDU 12 - 8TP - 2 TX block B/block C (5316)
Temp lighting in service trench
MDU 3C
MDU 28 - 2L1 - 2x 16A combi sockets
MDU 28 - 2L2 - 2x 16A combi sockets
(charging area for screens)
MDU 61- 2L1 - WIFI spur SU-33
MDU 61 - 2L2 - WIFI spur SU-36
MDU 27A - 3TP - LTX Stainer street (2930)
MDU 5 - 1TP - LTX no1 (4698)
MDU 30A - 2TP - TX 4167 Adj
MDU 30A
MDU 28
MDU 5
MDU 30
MDU 34
MDU SU- 19
MDU SU- 17
MDU 200A/ 7
MDU 32
MDU 33
MDU SU- 07
MDU SU- 17
MDU 32 - 6TP - Lighting & power TX Cooperidge (2086 &
4150)
MDU 27A
MDU 61
MDU61 - 4L2 - WIFI in airwave
MDU - 4L3 - MET radios airwave
32A SUPPLY FOR STANER
No permanent present
MDU 33 - 2L2 - DSSO Ped
Flow counter
MDU 32 - 2L2 - CCU DNO 11Kv No
permanent power in place NGB?
MDU 32 - 2L3 - CCU DNO 20Kv No
permanent power in place NGB?
630A MDU W52C MCCB1 200A MDU 32
Dungeon/middle MCCB 3 MDU 38A- RATRUN
MCCB 4 MDU 30A DUNGEON
MDU 21A -1TP Costains stores MDU 21A -5TP
New Costain Office
MDU 21A -7TP Toilet DB
MDU 21A -6TP Canteen DB
MDU 21A -2L3 Socket security
hut
MDU 33 - 8TP - TX Chicken shop
Lighting to be left in place until works are
complete
MDU WP3
Consumer unit fed from Distribution board in ER-W39 B.O.H supplying
lighting and power to nurses room and briefing area
MDU Electrical Equipment
MDU WP3 – 3L1 CIS screens Joiner
Street
MDU WP3 -3L1 2X spurs Joiner street
CCTV
All temporary lighting and power within this area is fed from MDU 3C. Awaiting test sheet and results from
Woodlands
Temporary Electrics
8/21/2018 25
Woodlands Current Temporary Services August 18
MDU 38A
MDU 40
MDU 42B
MDU WP4
MDU WP2
MDU WP1
MDU 61
MDU WP2 1TP- LTX adj No2 (5595)
8TP- LTX adj (4785)
MDU WP2 5TP- LTX adj No 1 (5594)
MDU WP4 4L1- CCTV Node
MDU
MDU WP4 4L3- DB lighting tunnel
MDU 42-B 3L2- LTX upstairs on top of
roof
MDU 42-B 1TP- LTX (3619) Red Brick
DB-B1-27ELP 8L1-Temp AC
supply fed from Excess
Fares DB DB-B1-27ELP 12TP-Temp AC supply fed from
Excess Fares DB
MDU 61 3TP- Combi
MDU 61 – 1TP TX Adj 3358
MDU 61- 8TP TX 3450
Temporary lighting and power still in place within
retail units and service spine in TTO
MDU WP2 – 2L1 JC Decaux signs x4
MDU WP2 3L3- EDNE sign Western
Passage
MDU WP4 7TP- Temp 3 phase DB in
SU64
MDU Electrical Equipment
Electrical Systems Compliance
When carrying out your compliance checks please ensure we check
110v Tools and leads are within their 3 month PAT test date
Limitation of access permit to works – ensure
Name/Date/Location/Details of work
From September onwards as mentioned above anyone working in any
Main LV Switchrooms must have VIR/SPR and endorsed by NR –
Richard Burgess.
Note HV Rooms will remain under NGB safe system of work, permit to
work.