advances in combustion technology 22/04/2016€¦ · koradi manufacturing facility hazira, surat...

19
SC/EEC Seminar/22 nd April,2016 1 L&T-MHPS BOILERS ADVANCES IN COMBUSTION TECHNOLOGY S.Chandrasekhar 22/04/2016

Upload: others

Post on 15-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 1

L&T-MHPS BOILERS

ADVANCES IN COMBUSTION

TECHNOLOGY

S.Chandrasekhar

22/04/2016

Page 2: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 2

L&T-MHPS BOILERS

1 INTRODUCTION TO LMB

2 KEY FEATURES OF LMB BOILERS

3 NEW ENVIRONMENTAL NORMS

4 HISTORY OF DEVELOPMENT OF COMBUSTION

TECHNOLOGY

5 MECHANISM OF NOx CONTROL

6 OPERATIONAL EXPERIENCE

7 POST COMBUSTION CONTROL

8 CONCLUSION

PRESENTATION FLOW

Page 3: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 3

L&T-MHPS BOILERS

INTRODUCTION TO LMB

Page 4: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 4

L&T-MHPS BOILERS

49% 51%

Larsen & Toubro,

India

Mitsubishi Hitachi Power

System, Japan L&T-MHPS Boilers,

India

L&T

MHPS

LMB

51% 49%

Joint Venture of L&T and MHPS

Incorporation

L&T-MHPS Boilers was incorporated

on

April 18, 2007

(20 Years Term)

Scope

Complete Technology Transfer

of Supercritical Boilers

Product Range

Supercritical Boilers of 500 MW and above including

Pulverizer

Page 5: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 5

L&T-MHPS BOILERS

LMB’s Scope of Business

L&T-MHPS

Boilers

Engineering

&

Designing

Commissioning

Manufacturing

Logistics

Safety and

Quality

Operational

Spares

Procurement Marketing

Installation After Sales

Services

Page 6: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 6

L&T-MHPS BOILERS

2 x 700 MW

NPL Rajpura

2 x 660 MW

Jaypee Nigrie

3 x 660 MW

Mahagenco

Koradi

Manufacturing

Facility

Hazira, Surat

Head Office,

Marketing,

Engineering,

Project

Management,

Supply Chain Groups

Faridabad

Offices & Factory

Projects

Engineering Centre

Chennai

2 x 660 MW

NTPC Tanda

2 x 660 MW

MPPGCL Malwa

2 x 660 MW

NTPC Khargone

2 x 660 MW

RRVUNL Chhabra

Offices, Manufacturing Facility & Project Sites Location

Page 7: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 7

L&T-MHPS BOILERS

Head Office, Marketing, Engineering, Project Management,

Supply Chain Groups, Faridabad

Snapshot of Offices and Manufacturing Facility

Engineering Centre, Chennai

Administration Block, Hazira Manufacturing Facility, Hazira

Page 8: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 8

L&T-MHPS BOILERS

KEY FEATURES OF LMB BOILERS

Page 9: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 9

L&T-MHPS BOILERS

KEY FEATURES OF LMB BOILERS

(Vertical WW Design)

Good Operability

(Advance Combustion System)

-Circular Corner Firing

-Low NOx Burner

-MACT

Low NOx & Unburnt Carbon

(High Performance Vertical Mill)

Low Unburnt Carbon

=High Boiler Efficiency

(Reliable High Temp. Material)

High Reliability

(Split Pass Design)

Good Controllability

Main Topic

Page 10: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 10

L&T-MHPS BOILERS

KEY FEATURES OF LMB BOILERS

Page 11: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 11

L&T-MHPS BOILERS

• Effective Classification

of Coarse Particles

↓ Good Ignition &

Combustion

(Low Unburnt Carbon)

CoalPulverized

Coal

Grinding

Table

Roller

Recirculation

of Coarse

Particles

Driving Device

of Separator

Hydraulic

Loading

Device

Hot Air

CoalPulverized

Coal

Grinding

Table

Roller

Recirculation

of Coarse

Particles

Driving Device

of Separator

Hydraulic

Loading

Device

Hot Air

Raw Coal Pulverized

Coal

Hot Air

Rotary Separator

KEY FEATURES OF LMB BOILERS

Page 12: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 12

L&T-MHPS BOILERS

NEW ENVIRONMENTAL NORMS

Page 13: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 13

L&T-MHPS BOILERS

S.N. TPP Installation Period NOx requirement Deadline

1 Before Dec 31, 2003 600 mg/Nm3 Within 2 year from

notification

2 Between Jan 01, 2004 to Dec

31, 2016 300 mg/Nm3

Within 2 year from

notification

3 From Jan 01, 2017 100 mg/Nm3 Must meet upon

completion

As per Ministry of Environment, Forest and Climate Change Notification dated Dec

7, 2015

NEW ENVIRONMENT NORMS

Page 14: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 14

L&T-MHPS BOILERS

HISTORY OF DEVELOPMENT OF

COMBUSTION TECHNOLOGY

Page 15: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 17

L&T-MHPS BOILERS

Low Pollutant

High Efficiency

Coal

Combustion

Technology

Circular Corner Firing

(CCF)

Low NOx Burner

(PM Burner)

In Furnace NOx

Removal System

(MACT)

High Performance

Vertical Mill

(MRS Mill)

NOx Removal

Technology in

Flue Gas

Dry Selective Catalytic

NOx Removal System

(SCR)

Best Mix of Advanced

Combustion Technology

HISTORY OF DEVELOPMENT OF COMBUSTION TECHNOLOGY

Page 16: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 18

L&T-MHPS BOILERS 18

2. Concept

• Advance combustion technologies have been

proved in R & D center before actual PJ.

MHI Nagasaki

R&D Center

Test Mill Test Burner

HISTORY OF DEVELOPMENT OF COMBUSTION TECHNOLOGY

Page 17: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 19

L&T-MHPS BOILERS 19

100kg/h single burner test furnace - Concept verification

500kg/h single burner test furnace - Burner shape design

4t/h single burner test furnace - burner performance confirmation

Large scale Combustion simulation

Process from development to actual boiler application

Gas temperature

NOx

Concept Verification and Feedback

Actual boiler performance evaluation

Feedback of actual boiler operation result

Renewed test furnace

Install to Actual boiler

Advanced Flame Measurement - Matrix measurement of inside of flame - Optical temperature - Infrared camera - Flame - Particle - Unburned carbon - Heat flux - Online monitoring - Laser Doppler velocimeter (LDV:in future) - Laser Induced Fluorescence (LIF:in future)

HISTORY OF DEVELOPMENT OF COMBUSTION TECHNOLOGY

Page 18: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 20

L&T-MHPS BOILERS 20

- Developed burner with almost the same size of actual size was tested

with 4t/h single burner test furnace.

HISTORY OF DEVELOPMENT OF COMBUSTION TECHNOLOGY

Page 19: ADVANCES IN COMBUSTION TECHNOLOGY 22/04/2016€¦ · Koradi Manufacturing Facility Hazira, Surat Head Office, Marketing, Engineering, Project Management, Supply Chain Groups Faridabad

SC/EEC Seminar/22nd April,2016 21

L&T-MHPS BOILERS 21

2. Concept

40

50

60

70

80

90

100

400050006000700080009000

HHV (Air dry, Mineral-Matter-Free base, kcal/kg)

Fix

ed C

arb

on

(D

ry,

Min

era

l-M

att

er-F

ree

ba

se,

%)

Meta-anthracite

Anthracite

Semi-anthracite

Low volatile bituminous

Midium volatile bituminous

High volatile

bituminous A

High volatile

bituminous B

High volataile

bituminous C or

Sub-bituminous A

Sub-

bituminous B

Sub-

bituminous CLignite

● Indian Coal

HISTORY OF DEVELOPMENT OF COMBUSTION TECHNOLOGY