administration and finances under h2020 in msca skopje 21/5/2015 gabriela chira, head of sector...
TRANSCRIPT
![Page 1: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/1.jpg)
Administration and Finances
under H2020 in MSCA
Skopje 21/5/2015
Gabriela CHIRA, Head of Sector
Research Executive Agency
![Page 2: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/2.jpg)
A - Finances
![Page 3: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/3.jpg)
Overview
1. EU contribution
2. Eligible costs
3. Cost categories
4. Parental and maternity leave
5. Subcontracting
6. Partner organizations
7. Non-eligible costs
8. Guarantee Fund
9. Useful documents
![Page 4: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/4.jpg)
A A maximummaximum EU contribution EU contribution
Where is it recorded? Grant Agreement - Article 5.1Annex II
![Page 5: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/5.jpg)
Eligible and Ineligible CostsEligible and Ineligible Costs
Article 6 of the GA
Eligible costs:
Unit costs (defined by the cost categories)Incurred during project durationNecessary for implementing the actionNumber of units must be identifiable and verifiable
Ineligible costs:
Costs which do not comply with the conditions in the GACosts reimbursed under another EU or Euratom grant
![Page 6: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/6.jpg)
Funding mechanism
Fully based on unit costs 1 researcher month = 1 unit Unit cost is a pre-calculated in estimated budget Amounts: in EUR per unit cost Total = unit costs* x number of units
1 unit
=
1 month of
eligible
ESR
![Page 7: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/7.jpg)
Costs categories
A. Recruited Researchers:
A.1 Living allowanceA.2 Mobility allowanceA.3 Family allowance
B. Institutional costs:
B.1 Research, training and networking costsB.2 Management and indirect costs
![Page 8: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/8.jpg)
Costs categories summary
RATES FOR 2014-2015
Researcher Institution
Living allowance*
Mobility allowance
Family allowance
Research, training
and networking costs
Management and indirect
costs
ITN 3110 600 500 1800 1200
IF 4650 600 500 800 650
Staff member unit costs Institution
RISE 2000 1800 700
Researcher Institution
COFUNDESR 3710**
650**ER 500**
* country correction coefficient
** co-funding rate 50%
![Page 9: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/9.jpg)
I. RESEARCHER ALLOWANCES
![Page 10: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/10.jpg)
A1. Living allowance:
Employment Contract or Stipend?Already agreed during GAP, in general:
Fellows should always be paid with employment contract (Type A)
Stipend (Type B) should only be given where national regulation would prohibit the possibility of appointing a researcher under an employment contract and only with the prior consent of the Project Officer.
What does it include?
Monthly salary for the fellow before any deductions: contributions of both employers and employees to social security, pension, taxation, voluntary deductions.
![Page 11: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/11.jpg)
What records do we need to keep for EU audit purposes?
Evidence of the eligibility of the fellow.
Employment contract/agreement with the fellow.
Proof of payment of the salary to the fellow and of the deductions for social security etc.
Evidence that the fellow worked on the project on the beneficiary's premises: this can include lab books, conference abstracts, library records…
Is the fellow obliged to keep timesheets?
No Timesheets are not an obligation for Marie Curie Fellows but can be used if in line with local practices.
Records
![Page 12: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/12.jpg)
A2. Mobility allowance (N/A for RISE and COFUND)
For Whom? All recruited fellows
How much? 600 EUR per month
Purpose Contribution to household, relocation and travel expenses to/from home country.
Is the mobility allowance taxed?
Normally yes - it depends on local taxation rules
Some institutes offer to operate this as a ‘virtual real cost’ category in accordance with their administrative procedures. This means that fellows can submit receipts for rent, household bills etc. which can be used to grant partial exceptions from tax
What records do we need to keep for EU audit purposes?
Same as for living allowance
![Page 13: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/13.jpg)
A.3 Family allowance (N/A for RISE and COFUND)
For Whom?
All recruited fellows who have family at the time of recruitment.
How much?
500 EUR per month – if family obligations
or
0 EUR per month – if no family obligations
What if the family status changes during the project?
The mobility allowance is calculated on the family status at the time of recruitment to the project/call deadline. It does not change during project lifetime,
What records do we need to keep for EU audit purposes?
Same as for living allowance.
![Page 14: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/14.jpg)
Underpayments
•The categories assigned to researcher - full amount must be used for the fellow (including employers social security contributions)
•Underpayments will not be accepted
•Underpayment = breach of the grant agreement.
•The beneficiary will be required to make a corrective payment (confirmation in the Financial statement)
![Page 15: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/15.jpg)
Top-Ups
• The beneficiary can pay the fellow a higher rate than the Marie Curie rate but it must be sourced from other funds.
• In some countries (eg AT, NL, NO) the Marie Curie rates are too low and a top-up is required
• A top-up cannot be charged to the project, costs exceeding the maximum MC rate will be rejected.
![Page 16: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/16.jpg)
In summary
Can we pay the fellow less?
No Breach of the Grant Agreement
Can we pay the fellow more?
Yes But any top-up cannot be charged to the project
Do we always pay the fellow in euro?
No The fellow can be paid in the local currency, but the costs must be reported in euro.
![Page 17: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/17.jpg)
II. INSTITUTIONAL COSTS
![Page 18: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/18.jpg)
How much?
Fixed amount of €1.800 per researcher-month
What is it used for?
To contribute to expenses related to:
Training courses etc.
Research costs
Participation of researchers in training events and conferences
Secondments
Co-ordination between participants
Tuition fees (if applicable)
B.1 Research, training and networking costs
![Page 19: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/19.jpg)
How is it distributed between the partners?
Calculated according to the fellow-months per beneficiary.
The full flat rate must be reported by the beneficiary paying the fellow
The consortium can agree to distribute it differently, in which case it should be addressed in the consortium agreement
What if we don’t use as many fellow months as foreseen?
The fixed rate of €1.800 applies to the implemented fellow months; therefore, the maximum allowable for category B1 by the end of the project is as follows: total fellow months delivered x 1800.
![Page 20: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/20.jpg)
How much?1200 EUR per researcher-month
How much is for management and how much is for overheads? It is a decision of the consortium how best to use this contribution for the proper implementation of the project.
How is it distributed between the partners? It is a decision of the consortium. Usually the coordinator retains the largest share of the management costs.
What if we don’t use as many fellow months as foreseen?
The fixed rate of 1200 EUR applies to the implemented fellow months; therefore, the maximum allowable is: total fellow months delivered x 1200.
• B.2 Management and indirect costs
![Page 21: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/21.jpg)
What is it used for?
Costs associated with the preparation of the reports etc required: Researcher declarations, deliverables, 1st year progress report, periodic reports and final report.
Personnel costs of the Project Manager.
Maintenance of the consortium agreement.
The overall legal, ethical, financial and administrative management for each of the beneficiaries.
Indirect costs of the project beneficiaries.
![Page 22: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/22.jpg)
Can a fellow take maternity or parental leave? Yes, in accordance with national legislation.
Are the costs of the leave eligible?No, the fellow's contract is suspended for the duration of maternity/parental leave.
Parental and maternity leaveParental and maternity leave
![Page 23: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/23.jpg)
How are the costs of Partner Organisations reimbursed?
The costs of Partner Organisations can be reimbursed by one of the beneficiaries.
It is for the beneficiary(ies) and partner organisation(s) concerned to reach a mutual agreement on arrangements for reimbursement.
Partner OrganisationsPartner Organisations
![Page 24: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/24.jpg)
Finances during the project lifecycle
![Page 25: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/25.jpg)
Project duration: 4 years
GA Signature/project starts
1st periodic Report(after the 2 first years) Final Report
PrefinancingPayment of the balance
Interim Payment*
Project life cycleProject life cycle
* Not applicable for actions with 1 reporting period
![Page 26: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/26.jpg)
Final Payment = 10%
Guarantee Fund reimbursement =
5%
TOTAL EU CONTRIBUTON = 100%
Prefinancing = 60% 55% for project
5% for Guarantee fund
Interim Payment = 30%
Project durationAfter final payment
Maximum paymentsMaximum payments – example – example
![Page 27: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/27.jpg)
How Much?
60%-80% of total EU Contribution – according to the GA
Example ITN – 60%:
• 55% of total EU contribution consortium
• 5% of total EU contribution Guarantee Fund
Do we need to submit documents to claim it?
• No payment is made automatically within 30 days of the deadline in the core Grant
Agreement (either start date or date of last signature)
Who owns the prefinancing?
• Pre-financing remains the property of the EU until the final payment
How is it distributed among the partners?
• That is a decision of the consortium and should be addressed in the consortium
agreement
Pre-financingPre-financing
![Page 28: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/28.jpg)
How Much?Up to 90% of total EU Contribution (prefinancing + interim payment)
• Based on costs claimed in the periodic report
• A reimbursement of accepted costs
Do we need to submit documents to claim it?• Yes payment is made based upon the information in the submitted periodic report and
cost claim forms
Who owns the interim payment?• Consortium, this payment is as a payment based on the costs incurred.
Who receives the interim payment?• Coordinator, who distributes it among the consortium members
Interim paymentInterim payment
![Page 29: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/29.jpg)
How Much?
•The balance of the money owed to the consortium based on the final accepted costs
Do we need to submit documents to claim it?
•Yes Payment is made based upon the information in the submitted periodic report and
cost claim forms
What if our final costs are higher than foreseen in the project?
•Payment is capped at the negotiated EU contribution and any amounts exceeding this will
not be reimbursed
Who receives the final payment?
•The payment is made to the coordinator who distributes it among the consortium members
Do we need to submit documents to receive the Guarantee Fund amount?
•No this is done automatically when processing the final payment
Final PaymentFinal Payment
![Page 30: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/30.jpg)
B - Reporting
![Page 31: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/31.jpg)
Principles of submission in H2020:
- Forms and templates provided in the electronic exchange system (PP)
Two-step submission process:
1 - Beneficiary Coordinator
2 - Coordinator REA
- No paper signed document, only electronic submission
- Process more automated
![Page 32: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/32.jpg)
Reporting:
1.Continuous reporting •during whole project life cycle, whenever needed
• Researcher declaration• Deliverables• Publications• Questionnaires• etc.
2.Periodic reporting •Reports from art. 19 and 20 of the GA•Predefined templates in the system
![Page 33: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/33.jpg)
![Page 34: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/34.jpg)
1 - Continuous Reporting:
-Possible to submit whenever during the project life cycle:
![Page 35: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/35.jpg)
2 - Periodic reporting
![Page 36: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/36.jpg)
1. Progress reports (art. 19 of GA)
WHEN
ITN - Within 30 days after year 1
RISE - within 30 days after the end of each year, except when the periodic and final reports are due (year 1 and 3)
NO financial report required
COFUND and IF – not applicable
WHATTemplate defined on the Participant PortalAttachments possible
HOWvia PP MP
![Page 37: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/37.jpg)
2. Periodic Report (art.20 of GA)
WHEN
Within 60 days following the end of each reporting period
WHAT
Periodic report includes: Technical report (attachment) + Continuous reporting, including
questionnaire (H2020 key indicators) Financial report – Individual financial statement from each beneficiary +
Periodic summary financial statement
HOWVia PP MP
![Page 38: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/38.jpg)
3. Final report
WHEN
Within 60 days following the end of the last reporting period (not applicable IF 1 RP)
WHAT• Report covers whole project period• Final technical report• Final financial report (final summary financial statement created automatically by the
electronic exchange system, consolidating the individual financial statements for all reporting periods)
• To be submitted together with Periodic report for last RP
HOWVia PP MP
Applicable for: - IF with more than 1 RP- ITN- RISE- COFUND
![Page 39: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/39.jpg)
No Funding distribution report
No Certificate on Financial Statement
Only specific cases – recovery, termination, audit, etc. defined in the GA
![Page 40: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/40.jpg)
Reporting Summary
Reports ITN RISECOFUN
D
IF
with 1 RP
IF
with more
than 1 RP
Progress report x x
Periodic report (end of each reporting period)
x x x x x
Final Report (end of the project) x x x x
Researcher Declaration (for each researcher)
x x x
![Page 41: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/41.jpg)
Submission of Periodic report – H2020 principle:
• Coordinator prepares Periodic Technical report, based on the input from all beneficiaries
• Beneficiaries (including Coordinator) prepare their individual Financial statements, signed electronically (FSIGN) and submit to Coordinator
• Coordinator "marks for submission" all reports to be submitted to REA
• Coordinator submits all reports in one package Single Submission.
----------------------
NB: In case of need coordinator can decide to submit package without some Form C (beneficiaries didn't submit Form C on time and blocking payment for whole consortium), those beneficiaries will not have any opportunity to
submit their Form C within the same reporting period, only in the next reporting period!
![Page 42: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/42.jpg)
WHAT • Changes in the Grant agreement (e.g. change in consortium,
modification of Annex I, etc.)
• Normally with prior agreement of Project Officer
HOW Via PP MP
Amendments:
![Page 43: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/43.jpg)
After the grant agreement is signed by Coordinator and by REA
![Page 44: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/44.jpg)
![Page 45: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/45.jpg)
It is highly recommended to involve the POduring the amendment request preparation
![Page 46: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/46.jpg)
The Amendment Request can only be•Rejected (the whole) (with comments)•Accepted (the whole) - 45 days•Widthdrawn by the originated partyNo other option; no 'negotiation'
![Page 47: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/47.jpg)
Grant Agreement
Marie Curie website (H2020 info coming soon)
http://ec.europa.eu/research/msca/index_en.htm
Documents
Work programme
Guide for Applicants
Useful documents
![Page 48: Administration and Finances under H2020 in MSCA Skopje 21/5/2015 Gabriela CHIRA, Head of Sector Research Executive Agency](https://reader035.vdocuments.site/reader035/viewer/2022062322/56649d705503460f94a52431/html5/thumbnails/48.jpg)
01/02/2012Helsinki48