adiation safety management practices

in 19th preventative maintenance

of Kori unit 4 and future plans

adiation safety management practices

in 19th preventative maintenance

of Kori unit 4 and future plans

Page 2: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

Table of Contents

1. Improvement practices of Radiation Safety Management - Introduction

1. Improvement practices of Radiation Safety Management - Introduction

2. Improvement practices of Radiation Safety Management - the point

2. Improvement practices of Radiation Safety Management - the point

3. Improvement practices of Radiation Safety Management - conclusion

3. Improvement practices of Radiation Safety Management - conclusion

4. Future plan - automatic decontamination device for contaminated protect wear

4. Future plan - automatic decontamination device for contaminated protect wear

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 3: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 4: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

The role of Safety Manager And Dose reduction techniques

Improvement practices of Radiation Safety Management - Introduction

Practices of process control by each water level control

of S/G secondary side

Automatic decontamination device for contaminated

protect wear

Worker Management Protection Control

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 5: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

RCS water level S/G secondary side water level

Improvement practices of Radiation Safety Management – the point

Reduction radiation dose exposure of workers by process control depend on each water level control of S/G secondary side

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 6: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

Comparison of radiation dose at main point due to water level of S/G secondary side

Improvement practices of Radiation Safety Management – the point

Reduction radiation dose exposure of workers by process control depend on each water level control of S/G secondary side

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 7: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

Perform to the work at inside of S/G secondary side

Man-Way

○ impossible to emplace of shielding

○ hot and humid of workplace → not easy to wear shield garment

Process control for moisture separator work and

Lancing/FOSAR

○ keep the water level more than 70% – space radiation dose rate↓

○ Lancing / FOSAR working with fully drained – space radiation dose

rate ↑

○ process control in order to not perform the working of moisture

separator and Lancing / FOSAR at same time

→ keep the water level more than 70% at working of moisture

separator

Process control by each water level – S/G moisture separator work

Improvement practices of Radiation Safety Management – the point

Reduction radiation dose exposure of workers by process control depend on each water level control of S/G secondary side

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 8: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

Process control for each water level – 126ft

Improvement practices of Radiation Safety Management – the point Reduction radiation dose exposure of workers by process control depend on each water level control of S/G secondary side

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 9: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

complete The

working

complete The

working

Orderly progression other working

Orderly progression other working

Complete Lancing & FOSAR

/ conform fill water

Complete Lancing & FOSAR

/ conform fill water

complete The

working

complete The

working

complete Lancing & FOSAR

/ conform fill water

complete Lancing & FOSAR

/ conform fill water

Process by each water level – 126ft

completeThe

working

completeThe

working

Orderly progression other working(ISI, RCP, snubber, valve)

Orderly progression other working(ISI, RCP, snubber, valve)

Complete Lancing & FOSAR

/ conform fill water

Complete Lancing & FOSAR

/ conform fill water

Lancing & FOSAR working With complete drainage

Lancing & FOSAR working With complete drainage

After drainage S/G Lancing& FOSAR

After drainage S/G Lancing& FOSAR

Orderly progression other working

(ISI, RCP, snubber, valve)

Orderly progression other working

(ISI, RCP, snubber, valve)

After drainageS/G Lancing& FOSAR

After drainageS/G Lancing& FOSAR

Orderly progression other working(ISI, RCP, snubber, valve )

Orderly progression other working(ISI, RCP, snubber, valve )

S/G ‘B’

S/G ‘C’

S/G ‘A’

Improvement practices of Radiation Safety Management – the point Reduction radiation dose exposure of workers by process control depend on each water level control of S/G secondary side

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 10: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

12%

600

target

985

763

993.24

642.76

result target

result

단위 [man-mSv]

단위 [man-mSv]

Improvement practices of Radiation Safety Management – conclusion

Reduction radiation dose exposure of workers by process control depend on each water level control of S/G secondary side

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 11: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 12: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

summary issues

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 13: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

Korea Nuclear Eng,.Korea Nuclear Eng,.

Page 14: adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans

Expected effection

Korea Nuclear Eng,.Korea Nuclear Eng,.