adhiraj samyama - kharghar, navi mumbai
DESCRIPTION
Adhiraj Samyama invokes a unique design philosophy – Samyama or balance, to help you attain the perfect work-life equilibrium. It is spread over 40 Acres Township and contain 55-storey towers of 2BHK and 3BHK apartments. Samyama permeates all aspects of the township to achieve the perfect yin-yang between tradition and innovation, nature and culture, light and shade, work and play. Thus, Adhiraj Samyama is your passport to an exclusive world of never-before assembled amenities that make living here, an experience to be savoured for generations.TRANSCRIPT
•An unique design philosophy –to help you attain the perfect work-life equilibrium.
•An exclusive world of never-before assembled amenities that allow you to soak up a multi-dimensional life the way it is meant to be lived, in all its hues.
ADHIRAJ PRESENTS
Project HighlightsSAMYAMA
• 40 Acres Integrated Township at Kharghar.
Recreation • 5 acre central park, • 50,000 sqft club house & Sports Arena
• Swimming Pool – Family Pool , Olympic size pool, Kids pool, Open air Jacuzzi
• Amphitheatre (Social Events)
Commercial Super Market, Retail Plaza, Restaurants, Service Apartments.
Education •World Class School •ICSCE / CBSE School Health•Medical Center– 24/7•Dedicated Ambulance Service•Tele-Medicine
Social•Water front café and restaurant .
Central Park – 5 Acres
Sports Arena
Indoor Activity
Retail and Club Amenities
Peripheral Road, Cycling, Parking
AT THE HEART OF THE THRIVING NETWORK
LOCATION TRAVEL TIME*
PROPOSED AIRPORT 20 Minutes
MAHAPE |DAKC 25 Minutes
AIROLI | MIND SPACE 25 Minutes
THANE 35 Minutes
EASTERN EXP HIGHWAY 45 Minutes
CHEMBUR 45 Minutes
BKC 55 Minutes
ANDHERI KURLA 55 Minutes
FORT 55 Minutes
KALAMBOLI | THANE 10 Minutes
*Estimated Time
Commercial Centers(20 mins)
DAKC – Dhirubhai Ambani Knowledge CentreMIDC, Taloja, Ambernath, MahapeCBDIT & ITES – Mahape, Vashi and CBD BelapurSteel Market (Jai Durga )
Road connectivity
NH4 Sion Panvel Expressway (10 Mins)
Rail Metro station ( 500 m) , Kharghar Railway StationTaloje ,Panvel ,
Airport Santacruz & Sahar – Mumbai (55 min)
Proposed airport – Navi Mumbai (15 min)
Schools (3km)
APJ – KhargharRyan International Bal Bharti DPS
UG & PG Colleges(3km)
MGM Engg & Med collegeD.Y.Patil Engg CollegeYerla Dental collegeNIFT- Fashion TechnologyITM – Management InstituteBharthi Vidyapeeth
Health facilities(3km)
Tata cancer research centerMGM HospitalYerla med hospitalNiramay super speciality hospital
Recreation(3km)
Golf CourseISKON TempleKharghar HillsD.Y. Patil StadiumCentral Park
Location Advantage
Entertainment & Shopping(5 KM)
Little WorldGloMaxPrime Mall
Weekend Destinations (45 Mins)
Adlabs Imagica
LonavalaAlibaugMatheran
Phase I
Phase II
Soft Launch of Phase II
PHASE ITower Launched 2A, 2B, 3B.Launch date: March 2012Launch Units : 864Launch Sqft : 10 Lac Sqft.Units Sold : 772Sqfts Sold : 8 Lac Sqft
Project Status: Construction Work in Progress in full Swing.
Phase II Brief
Soft Launch of Towers 4A, 4B.
•Phase II : 15 Lac Sqft•Soft launch: 6 Lac Sqft•Construction status – Soil testing •Launch - Dec 14.•Commencement of Construction: Feb 15.•Configuration: 1, 2 & 3 BHK.
1 BHK – 690 SQFTDisclaimer: The above plans are for representation Purpose only dimensions represented may vary by2-3% depending on structural inputs to be incorporated.
2 BHK – 842 SQFTDisclaimer: The above plans are for representation Purpose only dimensions represented may vary by2-3% depending on structural inputs to be incorporated.
3 BHK ( Combination 1+1 BHK)3 BHK – 1380 SQFT
Disclaimer: The above plans are for representation Purpose only dimensions represented may vary by2-3% depending on structural inputs to be incorporated.
Phase II Tower : 4A.
Configuration 1, 2 & 3BHK only
• 1 BHK – 690 Sqft *
• 2 BHK – 842 Sqft *
• 3 BHK – 1380 Sqft *
* The Above mentioned area’s are subject to change by passing Authorities estimated at ( + - )3% .
Disclaimer: The above plans are for representation Purpose only dimensions represented may vary by 3% depending on structural inputs to be incorporated.
Phase IIImportant details of Soft Launch :
Soft Launch date: June 2014.
Limited stock: Only ONE lakh sqft.
Work Commences from Feb 2015.
Lock-in Period: 3 years from the date of Allotment.
Note: Adhiraj will have First right of refusal. Allotment letter will be issued by Feb.15.
Thank you