ADEQ ARK A N S A S Department of Environmental Quality August 17, 2000 Mr. Dale Herendeen Manager, Environmental Health and Safety International Paper Company Pine Bluff Mill 5201 Fairfield Road Pine Bluff, AR 71601 Dear Mr. Herendeen: Please accept this letter as granting your request for interim authority to construct at your facility in Jefferson County, Arkansas. This authority is granted on the basis of the request submitted by the facility on August 14, 2000 to commence construction on a wetlands treatment system. As provided by Act 943 of 1995, this interim authorization cannot exceed ninety (90) days. If the facility's permit is not issued within ninety (90) days of the date of this letter, the facility must request further interim authorization in writing, with a showing that delays resulted from circumstances beyond the facility's control. If you have questions or comments, please feel free to call Marysia Jastrzebski at (501) 682-0629. Sincerely, Randall Mathis Director cc: Legal Division Water Division Chuck C. Bennett Central Files ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY 8001 NATIONAL DRIVE / POST OFFICE BOX 8913 / LITTLE ROCK, ARKANSAS 72219-8913 / TELEPHONE 501-682-0744 / FAX 501-682-0798 www.odeq. slole.or.us

Upload: others

Post on 19-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADEQ€¦ · within ninety (90) days of the date of this letter, the facility must request further interim authorization in writing, with a showing that delays resulted from circumstances

ADEQ ARK A N S A S Department of Environmental Quality

August 17 2000

Mr Dale Herendeen Manager Environmental Health and Safety International Paper Company Pine Bluff Mill 5201 Fairfield Road Pine Bluff AR 71601

Dear Mr Herendeen

Please accept this letter as granting your request for interim authority to construct at your facility in Jefferson County Arkansas This authority is granted on the basis of the request submitted by the facility on August 14 2000 to commence construction on a wetlands treatment system

As provided by Act 943 of 1995 this interim authorization cannot exceed ninety (90) days If the facilitys permit is not issued within ninety (90) days of the date of this letter the facility must request further interim authorization in writing with a showing that delays resulted from circumstances beyond the facilitys control

If you have questions or comments please feel free to call Marysia Jastrzebski at (501) 682-0629

Sincerely

Randall Mathis Director

cc Legal Division Water Division

Chuck C Bennett Central Files

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY 8001 NATIONAL DRIVE POST OFFICE BOX 8913 LITTLE ROCK ARKANSAS 72219-8913 TELEPHONE 501-682-0744 FAX 501-682-0798

wwwodeqslole orus

___ _

VARIANCE AND INTERIM AUTHORITY ROUTING TRACK

PLEASE EXPEDITE

Bernie Finch NPDES Branch 8-14-2000RECEIVED BY _________ DATE _______

Attach copy of request and route as follows

--Wa=te=r=--__ DIVISION DATE REC _____

REVIEWED BY _+rQ_~______ RECOMMENDATION _~-~=J-_~-----~l~~_=~--I_~ DATE 8 ( D 0gt

LEGAL DIVISION DATE REC _____

REVIEWED BY __________

RECOMMENDATION _____________________________

If recommendation is to grant variance or interim authority attach draft letter and public notice

DATE TRANSMITTED TO DIRECTORS OFFICE ________

DIRECTORS OFFICE DATE REC _________

REVIEVED BY __________

DECISION _________________________

DATE ________________

Return to T ega) Division

DATE REC _________PUBLIC AFFAIRS

DATE SENT FOR PUBLICATION _____________

INTERNA1iIONAL~PABER

August 14 2000

Mr Randall Mathis Director Arkansas Department of Environmental Quality Po Box 8913 Little Rock AR 72219-8913

RE International Paper Company - Pine Bluff Mill Request for Authorization to Construct GBMc No 2100-98-033

Dear Mr Mathis

The International Paper Company - Pine Bluff Mill (IP Pine Bluff) has submitted a construction permit application to the NPDES Permit Section of the ADEQ for a proposed new wastewater treatment unit

The proposed wetlands treatment system will be constructed on approximately 150 acres owned by IP Pine Bluff adjacent to existing wastewater treatment basins Wetlands treatment systems offer many advantages over trad itional wastewater treatment processes in that they use naturally occurring systems to reduce organic and suspended matter from process wastewaters as opposed to mechanical treatment processes which require consumption of fossil fuels to generate electricity and chemical processes which allow the possibility of accidental release of materials to the environment Another advantage of constructed wetlands is they provide habitat for myriad wildlife species and replace in small measure an ecosystem that has been threatened with eradication by human encroachment

GBMC amp Associates has coordinated submission of the permit application with the engineers and managers of the NPDES Section to ensure their knowledge of the project and to address preliminary technical issues about the construction Nevertheless the proposed wetlands project must be initiated by September 1 or IP Pine Bluff will miss the window of opportunity to complete construction of the wetlands cells and have them ready to accept cattail plants by April 2001 Any delay beyond this time period greatly increases the risk of plant loss and jeopardizes the economic viability of the wetlands project

Thus IP Pine Bluff respectfully requests authorization to immediately initiate construction of the wetlands treatment units as described in the construction permit application submitted to the ADEQ IP Pine Bluff understands that authorization to construct does not constitute a permit approval from your office and that the ADEQ may have additional concerns that require resolution before issuance of a construction permit

Thank you for your consideration of this request If you have any questions or wish to discuss this matter please do not hesitate to call me at (870) 541-3866 or Vince Blubaugh at (501) 847-7077

Sincerely

)pjon~

Dale Herendeen Manager Environmental Health and Safety

Page 2: ADEQ€¦ · within ninety (90) days of the date of this letter, the facility must request further interim authorization in writing, with a showing that delays resulted from circumstances

___ _

VARIANCE AND INTERIM AUTHORITY ROUTING TRACK

PLEASE EXPEDITE

Bernie Finch NPDES Branch 8-14-2000RECEIVED BY _________ DATE _______

Attach copy of request and route as follows

--Wa=te=r=--__ DIVISION DATE REC _____

REVIEWED BY _+rQ_~______ RECOMMENDATION _~-~=J-_~-----~l~~_=~--I_~ DATE 8 ( D 0gt

LEGAL DIVISION DATE REC _____

REVIEWED BY __________

RECOMMENDATION _____________________________

If recommendation is to grant variance or interim authority attach draft letter and public notice

DATE TRANSMITTED TO DIRECTORS OFFICE ________

DIRECTORS OFFICE DATE REC _________

REVIEVED BY __________

DECISION _________________________

DATE ________________

Return to T ega) Division

DATE REC _________PUBLIC AFFAIRS

DATE SENT FOR PUBLICATION _____________

INTERNA1iIONAL~PABER

August 14 2000

Mr Randall Mathis Director Arkansas Department of Environmental Quality Po Box 8913 Little Rock AR 72219-8913

RE International Paper Company - Pine Bluff Mill Request for Authorization to Construct GBMc No 2100-98-033

Dear Mr Mathis

The International Paper Company - Pine Bluff Mill (IP Pine Bluff) has submitted a construction permit application to the NPDES Permit Section of the ADEQ for a proposed new wastewater treatment unit

The proposed wetlands treatment system will be constructed on approximately 150 acres owned by IP Pine Bluff adjacent to existing wastewater treatment basins Wetlands treatment systems offer many advantages over trad itional wastewater treatment processes in that they use naturally occurring systems to reduce organic and suspended matter from process wastewaters as opposed to mechanical treatment processes which require consumption of fossil fuels to generate electricity and chemical processes which allow the possibility of accidental release of materials to the environment Another advantage of constructed wetlands is they provide habitat for myriad wildlife species and replace in small measure an ecosystem that has been threatened with eradication by human encroachment

GBMC amp Associates has coordinated submission of the permit application with the engineers and managers of the NPDES Section to ensure their knowledge of the project and to address preliminary technical issues about the construction Nevertheless the proposed wetlands project must be initiated by September 1 or IP Pine Bluff will miss the window of opportunity to complete construction of the wetlands cells and have them ready to accept cattail plants by April 2001 Any delay beyond this time period greatly increases the risk of plant loss and jeopardizes the economic viability of the wetlands project

Thus IP Pine Bluff respectfully requests authorization to immediately initiate construction of the wetlands treatment units as described in the construction permit application submitted to the ADEQ IP Pine Bluff understands that authorization to construct does not constitute a permit approval from your office and that the ADEQ may have additional concerns that require resolution before issuance of a construction permit

Thank you for your consideration of this request If you have any questions or wish to discuss this matter please do not hesitate to call me at (870) 541-3866 or Vince Blubaugh at (501) 847-7077

Sincerely

)pjon~

Dale Herendeen Manager Environmental Health and Safety

Page 3: ADEQ€¦ · within ninety (90) days of the date of this letter, the facility must request further interim authorization in writing, with a showing that delays resulted from circumstances

INTERNA1iIONAL~PABER

August 14 2000

Mr Randall Mathis Director Arkansas Department of Environmental Quality Po Box 8913 Little Rock AR 72219-8913

RE International Paper Company - Pine Bluff Mill Request for Authorization to Construct GBMc No 2100-98-033

Dear Mr Mathis

The International Paper Company - Pine Bluff Mill (IP Pine Bluff) has submitted a construction permit application to the NPDES Permit Section of the ADEQ for a proposed new wastewater treatment unit

The proposed wetlands treatment system will be constructed on approximately 150 acres owned by IP Pine Bluff adjacent to existing wastewater treatment basins Wetlands treatment systems offer many advantages over trad itional wastewater treatment processes in that they use naturally occurring systems to reduce organic and suspended matter from process wastewaters as opposed to mechanical treatment processes which require consumption of fossil fuels to generate electricity and chemical processes which allow the possibility of accidental release of materials to the environment Another advantage of constructed wetlands is they provide habitat for myriad wildlife species and replace in small measure an ecosystem that has been threatened with eradication by human encroachment

GBMC amp Associates has coordinated submission of the permit application with the engineers and managers of the NPDES Section to ensure their knowledge of the project and to address preliminary technical issues about the construction Nevertheless the proposed wetlands project must be initiated by September 1 or IP Pine Bluff will miss the window of opportunity to complete construction of the wetlands cells and have them ready to accept cattail plants by April 2001 Any delay beyond this time period greatly increases the risk of plant loss and jeopardizes the economic viability of the wetlands project

Thus IP Pine Bluff respectfully requests authorization to immediately initiate construction of the wetlands treatment units as described in the construction permit application submitted to the ADEQ IP Pine Bluff understands that authorization to construct does not constitute a permit approval from your office and that the ADEQ may have additional concerns that require resolution before issuance of a construction permit

Thank you for your consideration of this request If you have any questions or wish to discuss this matter please do not hesitate to call me at (870) 541-3866 or Vince Blubaugh at (501) 847-7077

Sincerely

)pjon~

Dale Herendeen Manager Environmental Health and Safety