• Building reports

• Smoke and mirrors quotes

• Floor plan challenge

Adding Value

Building Reports

Gardens / Fill against house

Building Reports

Gutters rusting

Building Reports

Downpipes rusting

Building Reports

No circuit breakers installed

Building Reports

Downpipes discharging next to stump

Building Reports

External coatings showing signs of wear and possible breakdown of waterproofing

Building Reports

Possible asbestos if built before 1986

Building Reports

Damaged decking

Building Reports

No hand rail

Building Reports

Debris under house

Building Reports

Missing stump

Building Reports

Tree on gutter

Building Reports

Rotted out stumps

Building Reports

Steps propped

Building Reports

Unsafe steps

Building Reports

Damaged kitchen flooring

Building Reports

Jockeys only bathroom

Smoke and Mirrors Quotes

DESCRIPTION QTY RATEEXC GST

DISCOUNT AMOUNT EXC GST

POST CCA TREATED WET 100x75MM 2.4 1

PINE PALINGS CCA TREATED 75x16x1.5M 40

PINE PALINGS CCA TREA75x16x1.8M 20

TREATED PINE F5 70x35MM 5.4M H3 1

CONCRETE MIX RAPID SET CONCRETE 20KG

3

GATE END FRAME 3

HORIZONTAL D-RAIL HD1.6 1

HORIZONTAL D-RAIL HD1.3 1

HORIZONTAL RAIL H900 1

TRANSPORT CHARGE SINGLE DEL 50

TOTAL EX GST 527.38

GST 52.73

TOTAL 580.11

QUOTE 1

Rule #1: Always get itemised quotes

DESCRIPTION QTY RATEEXC GST

DISCOUNT AMOUNT EXC GST

POST CCA TREATED WET 100x75MM 2.4 1 10.50 10.50

PINE PALINGS CCA TREATED 75x16x1.5M 40 1.35 54.00

PINE PALINGS CCA TREA75x16x1.8M 20 1.45 29

TREATED PINE F5 70x35MM 5.4M H3 1 13.10 13.10

CONCRETE MIX RAPID SET CONCRETE 20KG

3 8.10 24.3

GATE END FRAME 3 92.30 276.90

HORIZONTAL D-RAIL HD1.6 1 53.00 53.00

HORIZONTAL D-RAIL HD1.3 1 51.00 51.00

HORIZONTAL RAIL H900 1 21.50 21.50

TRANSPORT CHARGE SINGLE DEL 50 0.91 45.50

TOTAL EX GST 578.80

GST 57.88

TOTAL 636.68

QUOTE 2

Rule #2: Don’t pay retail

DESCRIPTION QTY RATEEXC GST

DISCOUNT AMOUNT EXC GST

POST CCA TREATED WET 100x75MM 2.4 1 9.28 TD020 9.28

PINE PALINGS CCA TREATED 75x16x1.5M 20 1.16 TD020 23.20

PINE PALINGS CCA TREA75x16x1.8M 20 1.32 TD020 26.40

TREATED PINE F5 70x35MM 5.4M H3 1 12.69 TD020 12.69

CONCRETE MIX RAPID SET CONCRETE 20KG

3 7.10 TD010 21.30

GATE END FRAME 3 88.18 TD005 251.31

HORIZONTAL D-RAIL HD1.6 1 50.36 TD005 47.84

HORIZONTAL D-RAIL HD1.3 1 49.73 TD005 47.24

HORIZONTAL RAIL H900 1 20.55 TD005 19.52

TRANSPORT CHARGE SINGLE DEL 50 0.91 45.40

TOTAL EX GST 504.18

GST 50.41

TOTAL 554.59

QUOTE 3

Rule #3: Check Quantities

DESCRIPTION QTY RATEEXC GST

DISCOUNT AMOUNT EXC GST

POST CCA TREATED WET 100x75MM 2.4 1 9.28 TD020 9.28

PINE PALINGS CCA TREATED 75x16x1.5M 40 1.16 TD020 46.40

PINE PALINGS CCA TREA75x16x1.8M 20 1.32 TD020 26.40

TREATED PINE F5 70x35MM 5.4M H3 1 12.69 TD020 12.69

CONCRETE MIX RAPID SET CONCRETE 20KG

3 7.10 TD010 21.30

GATE END FRAME 3 88.18 TD005 251.31

HORIZONTAL D-RAIL HD1.6 1 50.36 TD005 47.84

HORIZONTAL D-RAIL HD1.3 1 49.73 TD005 47.24

HORIZONTAL RAIL H900 1 20.55 TD005 19.52

TOTAL EX GST 481.98

GST 48.19

TOTAL 530.17

QUOTE 4

Rule #4: Check for each item

Where is the delivery charge?

Floor Plan Challenge

Floor Plan Challenge

Floor Plan Solution

Summary

• Building reports can be misleading• Always attend the building inspection• Obtain written quotes for required works

where possible• Check quotes thoroughly• Get more than one quote• Ask for a trade discount• Check off all deliveries before signing off

Summary

• More bedrooms = more money• Create rooms under existing roof line• Label floor plans for the highest value