DGS C-0251-0045PHASE 001 PAGE 1 ADDENDUM NO. 3 DATE: June 19, 2019 DEPARTMENT OF GENERAL SERVICES BUREAU OF PRE-CONSTRUCTION 1800 HERR STREETS HARRISBURG, PENNSYLVANIA ADDENDUM NO. 3 on PROJECT NO. DGS C-0251-0045 PHASE 001 PROJECT TITLE - Safety Rest Area Site 47 I-81 NB - Demolition & New Construction PROFESSIONAL: LSC Design 320 George Street York, PA, 17401 If you submitted a bid through e-Builder prior to this Addendum being issued, your bid has been discarded and you must re-submit your bid(s) through e-Builder prior to the bid opening date and time. Please see Section 4.C. of the Instruction to Bidder GENERAL CHANGES – ALL CONTRACTS Item 1 - Refer to attached file SPECIFICATION CHANGES – ALL CONTRACTS Item 1 - Refer to attached file DRAWING CHANGES – ALL CONTRACTS Item 1 - None

Upload: others

Post on 24-Oct-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM NO. 3 on PROJECT NO. DGS C-0251-0045 PHASE …

DGS C-0251-0045PHASE 001 PAGE 1 ADDENDUM NO. 3

DATE: June 19, 2019

DEPARTMENT OF GENERAL SERVICESBUREAU OF PRE-CONSTRUCTION

1800 HERR STREETSHARRISBURG, PENNSYLVANIA

ADDENDUM NO. 3

on

PROJECT NO. DGS C-0251-0045 PHASE 001PROJECT TITLE - Safety Rest Area Site 47 I-81 NB - Demolition & New ConstructionPROFESSIONAL:LSC Design320 George StreetYork, PA, 17401

If you submitted a bid through e-Builder prior to this Addendum being issued, your bid has been discarded and you must re-submit your bid(s) through e-Builder prior to the bid opening date and

time. Please see Section 4.C. of the Instruction to Bidder

GENERAL CHANGES – ALL CONTRACTS Item 1 - Refer to attached file

SPECIFICATION CHANGES – ALL CONTRACTS Item 1 - Refer to attached file

DRAWING CHANGES – ALL CONTRACTS Item 1 - None

Page 2: ADDENDUM NO. 3 on PROJECT NO. DGS C-0251-0045 PHASE …

1 Addendum No. 3

DEPARTMENT OF GENERAL SERVICES BUREAU PRE-

CONSTRUCTION 1800 HERR STREET

HARRISBURG, PENNSYLVANIA

ADDENDUM NO. 3

on PROJECT NO. and TITLE: DGS 251-45-01 PHASE 1 - Safety Rest Area Site 47 I-81 NB PROJECT NO. and TITLE: DGS 251-46-01 PHASE 1 - Safety Rest Area Site 48 I-81 SB LSC Design, Inc 320 N. George Street, Suite 100 York, PA 17401

DATE: June 19, 2019

GENERAL CLARIFICATIONS – ALL CONTRACTS

Item 1 - Question: Please confirm that the water treatment building is by GC; addendum 1 isn't clear.

Response: The water treatment building is part of the .1 General Construction Contract, plumbing piping, site water piping and water treatment equipment is by the .3 Plumbing Contractor.

Item 2 - Question: Please confirm whether or not SWH1&2 is part of Base Bid No. 1 or 3? It says on the drawings the collector and plumbing is part of Base Bid No. 3 but want to confirm where we should be figuring SWH-1&2.

Response: Base Bid No. 1 shall include the BWH-1 and BWH-2; SWH-1 and SWH-2 are part of Base Bid No. 3. Refer to Drawing P-1, Plumbing General Notes; Note 28. Base Bids.

SPECIFICATION CHANGES – CONTRACT NO. DGS 251-45-01 Phase 1.1 and DGS 251-46-01

Phase 1.1

Item 3 - Page 010100-2, Article 1.5, Paragraph B. Item 9. add the following: g. Cap the connection to the Township Sanitary Sewer as soon as possible after the start of the

Project.

SPECIFICATION CHANGES – CONTRACT NO. DGS 251-45-01 Phase 1.3 and DGS 251-46-01 Phase 1.3

Item 4 - Page TC-4, Division 33 – Utilities, add the following section to the Table of Contents and the .3 Contract:

Section 331300 Disinfecting Water Distribution System

Item 5 - Page 010100-3, Article 1.5, Paragraph D., Revise Item 6. to read as follows:

6. Sanitary Piping system within the building and site sanitary piping and final connection to the Township Sanitary Sewer system.

Item 6 - Page 010100-4, Article 1.5, Paragraph D., Item 15 add the following:

f. The .3 Contractor shall arrange and obtain DEP inspection and approval to use the water system prior to Substantial Completion.

Page 3: ADDENDUM NO. 3 on PROJECT NO. DGS C-0251-0045 PHASE …

PROJECT NO. and TITLE: DGS 251-45-01 PHASE 1 - Safety Rest Area Site 47 I-81 NB PROJECT NO. and TITLE: DGS 251-46-01 PHASE 1 - Safety Rest Area Site 48 I-81 SB

Addendum No. 3, June 19, 2019

2 Addendum No. 3

DRAWING CHANGES – CONTRACT NO. DGS 251-45-01 Phase 1 and DGS 251-46-01 Phase 1:

None

ATTACHMENTS - CONTRACT NO. DGS 251-45-01 Phase 1.3:

Section 331300 Disinfecting Water Distribution System

ATTACHMENTS - CONTRACT NO. DGS 251-46-01 Phase 1.3:

Section 331300 Disinfecting Water Distribution System

END OF ADDENDUM NO. 3

Page 4: ADDENDUM NO. 3 on PROJECT NO. DGS C-0251-0045 PHASE …

331300-1 DISINFECTING OF WATER DISTRIBUTION

SECTION 331300DISINFECTING OF WATER DISTRIBUTION

PART 1 GENERAL1.01 STIPULATIONS

A. The specifications sections “General Conditions of Contract”, “Special Conditions” and “Division1 - General Requirements” form a part of this section by this reference thereto, and shall havethe same force and effect as if printed herewith in full.

1.02 SECTION INCLUDESA. Disinfection of water well.B. Disinfection of water storage tanks.C. Testing and reporting results.D. Department of Enviromental Protection inspection and approval prior to Substantial Completion.

1.03 RELATED REQUIREMENTSA. Section 331116 - Site Water Utility Distribution Piping.B. Section 332100 - Water Supply Well Pump.

1.04 REFERENCE STANDARDSA. AWWA B300 - Hypochlorites; 2011.B. AWWA B301 - Liquid Chlorine; 2010.C. AWWA B302 - Ammonium Sulfate; 2010.D. AWWA B303 - Sodium Chlorite; 2010.E. AWWA C651 - Disinfecting Water Mains; 2005.

1.05 SUBMITTALSA. Test Reports: Indicate results comparative to specified requirements.B. Certificate: From Department of Enviromental Protection indicating approval of water system.C. Disinfection report:

1. Type and form of disinfectant used.2. Date and time of disinfectant injection start and time of completion.3. Test locations.4. Initial and 24 hour disinfectant residuals (quantity in treated water) in ppm for each outlet

tested.5. Date and time of flushing start and completion.6. Disinfectant residual after flushing in ppm for each outlet tested.

D. Bacteriological report:1. Date issued, project name, and testing laboratory name, address, and telephone number.2. Time and date of water sample collection.3. Name of person collecting samples.4. Test locations.5. Initial and 24 hour disinfectant residuals in ppm for each outlet tested.6. Coliform bacteria test results for each outlet tested.7. Certification that water conforms, or fails to conform, to bacterial standards of The

Pennsylvania Code, Chapter 109, Safe Drinking Water.1.06 QUALITY ASSURANCE

A. Water Treatment Firm: Company specializing in disinfecting potable water systems specified inthis Section with minimum three years documented experience.

B. Testing Firm: Company specializing in testing potable water systems, certified by governingauthorities of Commonwealth of Pennsylvania.

DGS 251-45 Phase 1.3

Page 5: ADDENDUM NO. 3 on PROJECT NO. DGS C-0251-0045 PHASE …

331300-2 DISINFECTING OF WATER DISTRIBUTION

C. Submit bacteriologist's signature and authority associated with testing.PART 2 PRODUCTS2.01 DISINFECTION CHEMICALS

A. Chemicals: AWWA B300, Hypochlorite, AWWA B301, Liquid Chlorine, AWWA B302,Ammonium Sulfate, and AWWA B303, Sodium Chlorite.

PART 3 EXECUTION3.01 EXAMINATION

A. Verify that piping system and water well has been cleaned, inspected, and pressure tested.B. Schedule disinfecting activity to coordinate with start-up, testing, adjusting and balancing,

demonstration procedures, including related systems.3.02 DISINFECTION

A. Use method prescribed by the applicable state or local codes, or health authority or waterpurveyor having jurisdiction, or in the absence of any of these follow AWWA C651.

B. Provide and attach equipment required to perform the work.C. Inject treatment disinfectant into piping system.D. Maintain disinfectant in system for 24 hours.E. Flush, circulate, and clean until required cleanliness is achieved; use municipal domestic water.F. Replace permanent system devices removed for disinfection.

3.03 FIELD QUALITY CONTROLA. Test samples in accordance with AWWA C651.

END OF SECTION

DGS 251-45 Phase 1.3

Page 6: ADDENDUM NO. 3 on PROJECT NO. DGS C-0251-0045 PHASE …

331300-1 DISINFECTING OF WATER DISTRIBUTION

SECTION 331300DISINFECTING OF WATER DISTRIBUTION

PART 1 GENERAL1.01 STIPULATIONS

A. The specifications sections “General Conditions of Contract”, “Special Conditions” and “Division1 - General Requirements” form a part of this section by this reference thereto, and shall havethe same force and effect as if printed herewith in full.

1.02 SECTION INCLUDESA. Disinfection of water well.B. Disinfection of water storage tanks.C. Testing and reporting results.D. Department of Enviromental Protection inspection and approval prior to Substantial Completion.

1.03 RELATED REQUIREMENTSA. Section 331116 - Site Water Utility Distribution Piping.B. Section 332100 - Water Supply Well Pump.

1.04 REFERENCE STANDARDSA. AWWA B300 - Hypochlorites; 2011.B. AWWA B301 - Liquid Chlorine; 2010.C. AWWA B302 - Ammonium Sulfate; 2010.D. AWWA B303 - Sodium Chlorite; 2010.E. AWWA C651 - Disinfecting Water Mains; 2005.

1.05 SUBMITTALSA. Test Reports: Indicate results comparative to specified requirements.B. Certificate: From Department of Enviromental Protection indicating approval of water system.C. Disinfection report:

1. Type and form of disinfectant used.2. Date and time of disinfectant injection start and time of completion.3. Test locations.4. Initial and 24 hour disinfectant residuals (quantity in treated water) in ppm for each outlet

tested.5. Date and time of flushing start and completion.6. Disinfectant residual after flushing in ppm for each outlet tested.

D. Bacteriological report:1. Date issued, project name, and testing laboratory name, address, and telephone number.2. Time and date of water sample collection.3. Name of person collecting samples.4. Test locations.5. Initial and 24 hour disinfectant residuals in ppm for each outlet tested.6. Coliform bacteria test results for each outlet tested.7. Certification that water conforms, or fails to conform, to bacterial standards of The

Pennsylvania Code, Chapter 109, Safe Drinking Water.1.06 QUALITY ASSURANCE

A. Water Treatment Firm: Company specializing in disinfecting potable water systems specified inthis Section with minimum three years documented experience.

B. Testing Firm: Company specializing in testing potable water systems, certified by governingauthorities of Commonwealth of Pennsylvania.

DGS 251-46 Phase 1.3

Page 7: ADDENDUM NO. 3 on PROJECT NO. DGS C-0251-0045 PHASE …

331300-2 DISINFECTING OF WATER DISTRIBUTION

C. Submit bacteriologist's signature and authority associated with testing.PART 2 PRODUCTS2.01 DISINFECTION CHEMICALS

A. Chemicals: AWWA B300, Hypochlorite, AWWA B301, Liquid Chlorine, AWWA B302,Ammonium Sulfate, and AWWA B303, Sodium Chlorite.

PART 3 EXECUTION3.01 EXAMINATION

A. Verify that piping system and water well has been cleaned, inspected, and pressure tested.B. Schedule disinfecting activity to coordinate with start-up, testing, adjusting and balancing,

demonstration procedures, including related systems.3.02 DISINFECTION

A. Use method prescribed by the applicable state or local codes, or health authority or waterpurveyor having jurisdiction, or in the absence of any of these follow AWWA C651.

B. Provide and attach equipment required to perform the work.C. Inject treatment disinfectant into piping system.D. Maintain disinfectant in system for 24 hours.E. Flush, circulate, and clean until required cleanliness is achieved; use municipal domestic water.F. Replace permanent system devices removed for disinfection.

3.03 FIELD QUALITY CONTROLA. Test samples in accordance with AWWA C651.

END OF SECTION