V:\1117\active\111720046\8_tender\contract_1\contract_1_addendum_3_201710__\TENDER 1220-20-518-2017 Addendum_3.docx ADDENDUM NO. 3 Contract 1 BID DOCUMENTS FOR 10/27/2017 WATERMAIN REPLACEMENT, NEW FORT RUPERT RESERVOIR AND REPLACEMENT WATER TREATMENT RESERVOIR – CONTRACT 1 FILE: 111720046 TENDER #: 1220-20-518-2017 ISSUED BY: Jon Bell, P.Eng. Stantec Consulting Ltd. Tel: (250) 388-9161 Fax: (250) 382-0514 [email protected] Addendum issued to active tenderers with documents on record (12 pages including attachments) 1. The final addendum 4, if required, will be issued Tuesday October 31 st , 2017. 2. The bid form has been reissued under Addendum 3 (4 pages). Bidders to submit utilizing the attached “Addendum 3” form of tender. The adjustments are follows: I. The four quantities of “Provisional Hot-Mix Asphalt Concrete Paving” have been revised. II. Fort Rupert Reservoir Site – Sitework, Site Preparation: Quantity has been revised to include necessary MOT permit adjustments and quantity verification. III. 15% contingency was deleted under addendum 2. IV. Line for GST added. V. Total Tendered Amount Line Added. 3. Section 11 70 00 One Way Flow Altitude Control Valve – 2.1 Main Valve Approved product: Singer S106-PG & X107 Position Transmitter Proposed product: Cla-Val Model 210-01 Altitude Valve for One-Way Flow & X101 Position Indicator. Response: Approved 4. Drawing Revision: Ministry of Transportation and Infrastructure permits were recently received. The following drawings have been updated to match the requirements within and Bidder to include the scope of work of each drawings in its entirety inclusive of the highlighted addendum #3 modifications: I. C107 II. C108 III. C201 IV. C301 V. C303 5. Drawing C302 Note 1, 2, 8 is revised to refer to drawing C201. 6. Drawing C305 Item 22 revised the detail sheet reference to C202.

Upload: others

Post on 02-Apr-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

V:\1117\active\111720046\8_tender\contract_1\contract_1_addendum_3_201710__\TENDER 1220-20-518-2017 Addendum_3.docx

ADDENDUM NO. 3 – Contract 1

BID DOCUMENTS FOR 10/27/2017 WATERMAIN REPLACEMENT, NEW FORT RUPERT RESERVOIR AND REPLACEMENT WATER TREATMENT RESERVOIR – CONTRACT 1

FILE: 111720046

TENDER #: 1220-20-518-2017

ISSUED BY:

Jon Bell, P.Eng. Stantec Consulting Ltd. Tel: (250) 388-9161 Fax: (250) 382-0514 [email protected]

Addendum issued to active tenderers with documents on record (12 pages including attachments)

1. The final addendum 4, if required, will be issued Tuesday October 31st, 2017.

2. The bid form has been reissued under Addendum 3 (4 pages). Bidders to submit utilizing the attached “Addendum 3” form of tender. The adjustments are follows:

I. The four quantities of “Provisional Hot-Mix Asphalt Concrete Paving” have been

revised. II. Fort Rupert Reservoir Site – Sitework, Site Preparation: Quantity has been revised to

include necessary MOT permit adjustments and quantity verification. III. 15% contingency was deleted under addendum 2. IV. Line for GST added. V. Total Tendered Amount Line Added.

3. Section 11 70 00 One Way Flow Altitude Control Valve – 2.1 Main Valve

Approved product: Singer S106-PG & X107 Position Transmitter Proposed product: Cla-Val Model 210-01 Altitude Valve for One-Way Flow & X101 Position Indicator. Response: Approved

4. Drawing Revision: Ministry of Transportation and Infrastructure permits were recently received. The following drawings have been updated to match the requirements within and Bidder to include the scope of work of each drawings in its entirety inclusive of the highlighted addendum #3 modifications:

I. C107 II. C108 III. C201 IV. C301 V. C303

5. Drawing C302 Note 1, 2, 8 is revised to refer to drawing C201.

6. Drawing C305 Item 22 revised the detail sheet reference to C202.

V:\1117\active\111720046\8_tender\contract_1\contract_1_addendum_3_201710__\TENDER 1220-20-518-2017 Addendum_3.docx

7. Added Scope: Altitude valve sensing line to be connected to the drain line with an additional 25mm thredolet and ball valve assembly accessible by a traffic rated brooks box complete with R20 rigid insulation fastened to the underside of the traffic rated lid. The pressure sensing line will be stainless steel with the diameter per the valve manufactures requirement installed in ground between the building and drain port connection. Cost for this addition to be added to Fort Rupert Reservoir Site – Metals, Stainless Steel Piping Outside Reservoir Footprint.

8. For Tender Item Mobilization and Demobilization shall the lump sum not exceed 10% or 5%? - refer to Section 01 01 01, Clause 1.1.4.

Response: Mobilization and Demobilization shall not exceed 5%.

9. On the Schedule of Quantities it states "GST shall be shown separately". Where do you want it shown? Response: Refer to item 2 above

10. Can HDPE be used in lieu of C900 for the watermain?

Response: No C900 only.

11. Can you please quantify or identify All Other Work under MASONRY? Response: Refer to Section 01 10 00 Measurement and Payment Article 1.5.

12. Is it possible to get pictures of the existing tank that needs to be removed along with pictures of the existing building that needs to be relocated? Response: Pictures are available upon email request to [email protected].

13. Drawing C305 Item 4A do the hand wheels need to be stainless steel? Response: No can be epoxy coated steel.

14. Drawing C305 Item 4C product alternative request Singer? Response: Yes pending approved shop drawings for equivalency.

15. On the schedule of quantities it calls for a 40mm of asphalt but when you look at the trench

details on the drawings it calls for 80mm of asphalt. Please clarify. Moti spec calls for the matching of the existing asphalt or is the asphalt going to be a standard depth of 80mm regardless of the existing depth? Also please confirm the depth of asphalt on non MOTI roads is 40mm and not the standard 50mm.

Response: Details 1 and 2 on C201 are shown incorrectly and are revised as follows:

The provisional pavement restoration shall be:

• 80mm thick (two lifts – 40mm upper course and 40mm lower course to Moti standards or MMCD depending on location) to the saw cut line shown in trenching details 10 and 11 on C201.

• All other extents of paving shown in the contract drawings shall be ground down 40mm and repaved with the upper course of the trenchline.

This applies to both MoTI and non-MoTI roads.

V:\1117\active\111720046\8_tender\contract_1\contract_1_addendum_3_201710__\TENDER 1220-20-518-2017 Addendum_3.docx

16. In the schedule of quantities there is a note that list what is to be included in the Watermain. In this note it does not list any surface restoration. This seems to be accurate as pavement restoration is to be included under “Hot Mix Asphalt”. But in your supplementary Specs “SS 33 11 01” 1.8.2 which describes payment for watermain to include all surface restoration. Please confirm Pavement restoration is to be paid as Item and not to be included in Watermain item.

Response: Pavement restoration shall be per the four quantities of “Provisional Hot-Mix Asphalt Concrete Paving” as revised in 2. I. above.

Distribution: District of Port Hardy to Post on BC Bid.

DESCRIPTION

Clearing and Grubbing

DESCRIPTION Units Qty. Rate ($) Amount ($)

CONTRACT SPECIFIC INSTRUCTIONS

Mobilization & Demobilization L.S. 1

TRAFFIC CONTROL

Traffic Control L.S. 1

ENVIRONMENTAL PROTECTION

Environmental Management Plan, Erosion and Sediment Control L.S. 1

CONCRETE WALKS, CURBS, AND GUTTERS

Extruded concrete median curb (MMCD SD # C6) m 110

CAST IN PLACE CONCRETE

Concrete for Culvert Crossing at Station 50 + 602minimum 28 day strength required: 25 Mpa L.S. 1

WATERWORKS

Payment for watermain includes: Excavation, disposal of surplus excavated materials, bedding, compaction, supply and installation of all pipe, bolts, gaskets, restraints, couplers, tie-rods, imported

backfill, pressure and leak testing, flushing and disinfection, and all required water sampling and testing (by a qualified independent consultant).

NOTE

350mm PVC C900 Class 235 m 420

combined trench of 300mm & 350mm C900 PVC Class 235 m 605

300mm PVC C900 Class 235 m 2,330

250mm PVC C900 Class 235 m 25

150mm PVC C900 Class 235 m 65

350mm 45° DI Bend c/w Thrust block Ea. 6

300mm 11.25° DI Bend c/w Thrust block Ea. 2

300mm 22.5° DI Bend c/w Thrust block Ea. 3

300mm 45° DI Bend c/w Thrust block Ea. 11

250mm 45° DI Bend c/w Thrust block Ea. 4

150m 45° DI Bend c/w Thrust block Ea. 16

350 x 300 x 300 DI Tee c/w Thrust block Ea. 1

300 x 300 x 300 DI Tee c/w Thrust block Ea. 1

300 x 300 x 250 DI Tee c/w Thrust block Ea. 1

300 x 300 x 150 DI Tee c/w Thrust block Ea. 4

300mm Cross c/w Thrust block Ea. 1

350mm DI Gate Valve Ea. 4

300mm DI Gate Valve Ea. 27

250mm DI Gate Valve Ea. 1

150mm DI Gate Valve Ea. 4

Tie-in to existing main: west of Fort Rupert RoadRefer to Detail 1 on Sheet C107 L.S. 1

Tie-in to existing main: Byng Road at Peel St branch*two connection points. 250mm Byng & 150mm Peel

Refer to Detail 1 on Sheet C110L.S. 1

Master Municipal Specifications Contract 1 - General Requirements

Incidental to Contract

Master Municipal Specifications Contract 1- Waterworks and Site Work

District of Port Hardy APPENDIX 1 - Addendum 3 FT 4TENDER #:1220-20-518-2017 FORM OF TENDER MMCD 2009

Watermain Replacement, Fort Rupert Reservoir and Water Treatment Reservoir Site Development - Contract 1

SCHEDULE OF QUANTITIES AND PRICES(see paragraph 5.3.1 of the Instructions to Tenderers - Part II)

(All Prices and Quotations shall include all taxes, but shall not include GST. GST shall be shown separately and summarized as requested)

DESCRIPTION Units Qty. Rate ($) Amount ($)

Tie-in to existing main: Byng Road at Beaver Harbour RoadRefer to Detail 2 on Sheet C105 L.S. 1

Tie-in to existing main: Byng Road at Avalon SchoolRefer to Detail 1 on Sheet C106 L.S. 1

Tie-in to existing main: Beaver Harbour Road at Fort Rupert SchoolRefer to Detail 1 on Sheet C101 L.S. 1

Tie-in to existing 150mm line: Beaver Harbour ParkRefer to Sheet C101 at Station 49+850 L.S. 1

Tie-in to exist. 150mm line: 5250 Beaver Harbour RD Mobile ParkRefer to Sheet C102 at Station 50+224 L.S. 1

Tie-in to exist. 250mm line: Wagalus SchoolRefer to Detail 1 on Sheet C105 L.S. 1

Tie-in to exist. 150mm line: Weynton StRefer to Detail 1 on Sheet C104 L.S. 1

Tie-in to exist. 150mm line: Fire Dept. Fire Hydrant - 1935 Beaver Harbour RdRefer to Sheet C105 at Station 51+182 L.S. 1

Tie-in to exist. 150mm line Peel Street at Beaver Harbour RoadRefer to Detail 1 on Sheet C103 L.S. 1

Reducer 250 x 300mm DI Ea. 3

Reducer 150 x 300mm DI Ea. 5

Fire Hydrant Assemblies c/w Thrust blocks & Restraints. Incl mainline Tee. Ea. 21

Fire Hydrant Assemblies w/ korflow culvert 600mm c/w Thrust blocks & Restraintsto include complete hydrant assembly with mainline tee, all joint restraints, thrust blocks, valves, as

well as culvert and headwall installation. Denso-tape all joints including the mainline tee.Ea. 7

Water Service Connections 50mm dia.Includes import backfill, service saddles, connection (drawing W2b) to end at curb located into new meter box (H20 rated per standard drawing W2c), and permanent asphalt & concrete reinstatement.

Ea. 6

Water Service Connections 25mm dia.Includes import backfill, service saddles, connection (drawing W2b) to end at curb located into new meter box (H20 rated per standard drawing W2c), and permanent asphalt & concrete reinstatement.

Ea. 6

Water Service Connections 19mm dia.Includes import backfill, service saddles, connection (drawing W2b) to end at curb located into new meter box (H20 rated per standard drawing W2c), and permanent asphalt & concrete reinstatement.

Ea. 28

Trench Dams Ea. 5

50mm Saddle and Corp. Stop at 50+290 Ea. 1

25mm Air Release Valve and Chamber Ea. 2

AC PIPE DISPOSAL

Removal and Disposal of AC Pipe m 55

PAINTED PAVEMENT MARKINGS

Permanent Pavement Markings (to MoTI standards and Permit Requirements) L.S. 1

PIPE CULVERTS

600 mm Korflow Culvert at Rupert Access Road including Mortared Rock Headwalls Ea. 1

Permanent pavement restoration - non MoTI roadways (all other works) one lift of Upper Course #2, placed in 40mm lift to extents shown on drawings. m2 5500

Permanent pavement restoration - non MoTI roadways (all other works) One lift of Lower Course #2, placed in 40mm lift to max saw cut width shown in drawing details. m2 2640

Permanent pavement restoration Fort Rupert Road and Byng Road east of intersection and extending 20m East down Byng Road

(to meet MoTI standards and permit requirements) - Upper Lift to extents shown in drawingsm2 1100

Permanent pavement restoration Fort Rupert Road and Byng Road east of intersection and extending 20m East down Byng Road

(to meet MoTI standards and permit requirements) - Lower lift to saw cut line shown in drawing details.

m2 500

Bulk Rock Excavation m3 50

Saw Cutting m 300

Trench Rock Excavation m3 50

Common Excavation Outside of Design Lines m3 100

Unsuitable foundation Replacement Design Lines m3 100

Dechlorination Manhole Ea. 2

Waterworks and Site Work Subtotal (1)

CONTRACT 1 - PROVISIONAL UNIT ITEMS

PROVISIONAL HOT-MIX ASPHALT CONCRETE PAVING

REMAINING PROVISIONAL ITEMS

Provisional Items Subtotal (2)

Description Units Qty Rate ($) Amount ($)

General

Commissioning, Start-up and Training L.S. 1

Sitework

Site Preparation (includes clearing/grubbing, excavation, backfills as stated in Section 01 10 00 Part 1.3.1) m2 2100

PVC Storm Drains, Injection Manhole L.S. 1

Site valves, fittings, appurtenances, trenching, backfill L.S. 1

Meter Chamber Structure Including Lid L.S. 1

Chain Link Fence / Barrier Gate L.S. 1

All other work L.S. 1

Concrete

Control room floor including foundation walls and footings L.S. 1

Generator pad, foundation walls, thrust blocks, pipe saddles and reinforcement L.S. 1

All other work L.S. 1

Masonry

Control Room Walls and Reinforcement L.S. 1

All other work L.S. 1

Metals

Stainless Steel Piping Within Reservoir Footprint L.S. 1

Stainless Steel Piping Outside Reservoir Footprint L.S. 1

Wood

Roof structure and roofing L.S. 1

All other work L.S. 1

Thermal and Moisture Protection L.S. 1

Door L.S. 1

Finishes L.S. 1

Process Mechanical Inside Building

Stainless steel piping, fittings and welding L.S. 1

PRV, Altitude Valve, valves, strainer, couplings, restraints, joints and appurtenances (excluding mag flow meters) L.S. 1

Building Mechanical

Fans, Heaters, Louvers, and Controls L.S. 1

Floor drains and Piping L.S. 1

Electrical and Controls

Buried conduits incl. trench, bed, compact,L.S. 1

Wire and above ground conduitL.S. 1

Main BreakerL.S. 1

Mag flow Meter, Pressure Transducer, Chlorine Analyzer, Chlorine Injection L.S. 1

Control SystemL.S. 1

Utility coord and installL.S. 1

Ground loop and grounding rodsL.S. 1

Generator and ATS L.S. 1

CONTRACT 1 - FORT RUPERT RESERVOIR SITE

Fort Rupert Reservoir Site Subtotal (3)

Description Units Qty Rate ($) Amount ($)

Water Treatment Reservoir Site Development

Relocations - Building and Phone (Electrical & Civil) L.S. 1

Decommissioning and Removals - Tank & Foundation L.S. 1

Stainless Steel Piping Within 1.0m of Reservoir Footprint L.S. 1

Exterior Pipeworks and Valving L.S. 1

Site preparation (includes clearing/grubbing, excavation, backfills as stated in Section 01 10 00 Part 1.3.1) L.S. 1

Reinstatement and Level Sensing Installations L.S. 1

Water Treatment Reservoir Site Subtotal (4)

CONTRACT 1 - UTILITY COORDINATION COST

CONTRACT 1 - TOTALS

CONTRACT 1 - WATER TREATMENT RESERVOIR SITE

GOODS AND SERVICES TAX Registration No.: (GST)

TOTAL TENDERED AMOUNT [TOTAL CONSTRUCTION COST + GST]

TOTAL CONSTRUCTION COST INCLUDES 1+2+3+4+5+6 (Excluding Applicable Tax)

BC Hydro Coordination Cost Lump Sum (5)

Telus Coordination Cost Lump Sum (6)

10+000

10+100

10+200

|

|| |

|

|

|

|

|

|

|

|

ASPHALT REINSTATEMENT(TYP)

|

|| |

|

|

|

|

|

|

|

|

CONSTRUCTION NOTES

INSTALL HYDRANT AS PER MMCD STANDARD DRAWING W4.

INSTALL HYDRANT ASSEMBLY PER DETAIL ON SHEET C203.

EXISTING GROUND PRV TO BE DECOMMISSIONED BY THECONTRACTOR POST COMMISSIONING OF THE NEW WATERMAIN.DECOMMISSIONING WILL INCLUDE REMOVAL OF ALL INTERNALPIPING AND BACKFILLING CHAMBER WITH SAND.

REFER TO DETAIL ON SHEET C201 FOR COMBINED WATER TRENCHDETAIL

2

1

ALL JOINTS ON 300Ø SUPPLY MAINTO HAVE JOINT RESTRAINTS (TYP)

ALL JOINTS ON 350 Ø MAIN TOHAVE JOINT RESTRAINTS

BY

NG

RO

AD

FORT RUPERT ROAD

PO

LE S

UP

PO

RT

RE

QU

IRE

D IF

EX

CA

VA

TIO

N IS

WIT

HIN

TH

E S

OIL

FO

UN

DA

TIO

N IN

TE

RA

CT

ION

ZO

NE

. R

EF

ER

TO

DE

TA

IL O

N S

HE

ET

C20

3

PROPERTY LINE

1

2

3

W

W WW

W

W

W

W

W

W

W

W WW W

W

W

W

W

W

W

W

W

W

300Ø PVC

350Ø PVC

300Ø PVC

15+000

15+100

15+200

15+300

4

4

4

NOTES

1. FOR ALL BENDS, TEES, VALVES AND END CAPS, REFER TO TABLES ONSHEET C202 FOR RESTRAINT REQUIREMENTS AND THRUST BLOCKDETAILS.

0.53%

6.48%

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

GR

OU

ND

INV

ER

T

EXISTING GROUND

50.7

8

49.1

5

51.3

3

49.2

5

52.1

3

49.6

4

53.1

9

50.6

0

54.1

9

51.8

9

55.3

2

53.1

8

56.7

9

54.4

8

58.0

4

55.7

7

59.2

3

57.0

7

60.5

2

58.3

6

61.8

0

59.6

6

62.9

5

60.8

5

63.8

9

61.8

7

64.7

5

62.7

3

10+000 10+020 10+040 10+060 10+080 10+100 10+120 10+140 10+160 10+180 10+200 10+220 10+240 10+260

152.7m CURVEMAX. 2° DEFLECTION

PER BELL

41.5m CURVEMAX. 2° DEFLECTION

PER BELL

350mm ∅ PVC C900 CL235 WATERMAIN

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60G

RO

UN

D

INV

ER

T

2.17%

21.3m CURVEMAX. 2° DEFLECTION

PER BELL

2.17%

21.3m CURVEMAX. 2° DEFLECTION

PER BELL

51.1

4

48.6

4

51.0

9

49.0

7

51.7

6

49.5

1

52.8

4

50.1

0

54.0

8

51.3

0

14+980 15+000 15+020 15+040 15+060 15+080

300mm ∅ PVC C900 CL235 WATERMAIN

EXISTING GROUND

MIN

. 1.2

mC

LEA

R C

OV

ER

HY

DR

AN

T T

EE

HY

DR

AN

T T

EE

250Ø

PE

RM

AS

TR

AN

D

D45

0∅

45° HORIZ. BENDINV=49.232

OBVERT OF 300mm ∅ SUPPLY MAIN

300 FxH GATE VALVE

EXISTING UNDERGROUNDPRESSURE REDUCINGVALVE STATION

350Ø PVC

350Ø PVC

250 HxH 45° BEND

300F x 250H REDUCER

350 HxF 45° BEND

350 HxF GATE VALVE

300 HxH 45° BEND

350 HxH 45° BEND

250 HYMAX COUPLER

W

W

W

W

W

300Ø PVC

RESTRAIN PIPE SPOOL BETWEENBEND AND REDUCER

CAP EXISTING POSTCONNECTION

SPOOL PIECE ASREQUIRED

3

N

ORIGINAL SHEET - ISO A1

Consultants

File Name:

www.stantec.com

400 - 655 Tyee RoadVictoria BC

Dwn.Issued Appd. YY.MM.DD

ByRevision Appd. YY.MM.DD

Client/ProjectPermit-Seal

Drawing No.

Scale

Revision

Title

Project No.Copyright Reserved

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to

The Copyrights to all designs and drawings are the property of

authorized by Stantec is forbidden.

Stantec without delay.

Stantec. Reproduction or use for any purpose other than that

\\C

D12

08-F

04\w

orkg

roup

\111

7\ac

tive\

1117

2004

6\4_

draw

ings

\_cu

rren

t\Civ

il\11

1720

046_

cont

ract

1_w

ater

mai

n.dw

g 1

0/27

/201

7 1:

09 P

M O

FIT

ZG

ER

ALD

DISTRICT OF PORT HARDY

Port Hardy, BC Canada 111720046

WATERMAIN REPLACEMENT, FORT RUPERTRESERVOIR AND WATER TREATMENT SITEDEVELOPMENT - CONTRACT 1

111720046_contract1_watermain.dwg

FOR CO

NTINUATION SEE SHEET C108

FOR CONTINUATION SEE SHEET C109

PLAN1:500

PROFILEHORIZ 1:500 VERT 1:100

SUPPLY LINE PROFILEHORIZ 1:500 VERT 1:100

SCALE:CONNECTION DETAIL

1:2501- FOR CONNECTION

DETAILS REFER TO1-

FORT RUPERT ROADWATERMAIN PLAN / PROFILESTATION 10+000 TO STATION 10+260

C107

AS SHOWN

90% SUBMISSION AF/HL DP 2017.08.21100% SUBMISSION 2017.09.11FOR WATER PERMIT TO CONSTRUCT 2017.09.21ISSUED FOR TENDER 2017.10.10

AF/HL DPAF/HL DPAF/HL DP

3

ISSUED FOR ADDENDUM 3 2017.10.27AF/HL DP

AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
PLAN 433 RW
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W 250 PERMASTRAND
AutoCAD SHX Text
250 PERMASTRAND
AutoCAD SHX Text
500 CSP
AutoCAD SHX Text
300 PVC
AutoCAD SHX Text
300 PVC
AutoCAD SHX Text
450 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
250 PERMASTRAND
AutoCAD SHX Text
0
AutoCAD SHX Text
1:500
AutoCAD SHX Text
5
AutoCAD SHX Text
15
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
0
AutoCAD SHX Text
1:250
AutoCAD SHX Text
2.5
AutoCAD SHX Text
7.5
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
0
AutoCAD SHX Text
1:100
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m

W

W

10+300 10+400 10+500| | | | | | | | | | |

|

| | | | | | | | | | |

|

CONSTRUCTION NOTES

INSTALL HYDRANT ASSEMBLY PER DETAIL ON SHEET C203.

INSTALL HxH 45° BEND

REFER TO DETAIL ON SHEET C201 FOR COMBINED WATER TRENCH DETAIL

1

2

11 2

2

ALL JOINTS ON 300Ø SUPPLY MAINTO HAVE JOINT RESTRAINTS

ALL JOINTS ON 350 Ø MAIN TO HAVE JOINT RESTRAINTS

FORT RUPERT ROAD

ASPHALT REINSTATEMENT(TYP)

PROPERTY LINE

W W W W W W W W W W W

W

W W W W W W W W W W W

W

300Ø PVC

350Ø PVC

15+300 15+400 15+500

3

33

INSTALL 600Ø KORFLOW CULVERTOR APPROVED EQUIVALENT

FOR SITE WORKS REFER TOSHEET C301

NOTES

1. FOR ALL BENDS, TEES, VALVES AND END CAPS, REFER TO TABLES ONSHEET C202 FOR RESTRAINT REQUIREMENTS AND THRUST BLOCKDETAILS.

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

GR

OU

ND

INV

ER

T

64.7

5

62.7

3

65.5

0

63.4

1

66.0

1

63.9

2

66.2

6

64.2

7

66.4

7

64.4

4

66.7

0

64.4

7

66.7

6

64.4

7

66.7

3

64.4

7

66.6

9

64.4

7

66.7

3

64.5

4

66.8

3

65.0

0

66.9

0

65.0

4

66.8

7

65.0

7

66.8

5

65.1

1

66.7

9

65.1

4

10+260 10+280 10+300 10+320 10+340 10+360 10+380 10+400 10+420 10+440 10+460 10+480 10+500 10+520 10+540 10+560 10+580 10+595

EXISTING GROUND

3.14%0.00%

0.17%

23.3

8%

13.09%

152.7m CURVEMAX. 2° DEFLECTION

PER BELL5.9m CURVE

MAX. 2° DEFLECTIONPER BELL

3.0m CURVEMAX. 2° DEFLECTION

PER BELL

6.3m CURVEMAX. 2° DEFLECTION

PER BELL

350mm ∅ PVC C900 CL235 WATERMAIN

HY

DR

AN

T T

EE

HY

DR

AN

T T

EE

D60

0∅

300Ø SUPPLY LINE NOT SHOWN FOR CLARITY

600Ø

CU

LVE

RT

45° HORIZ. BENDINV=65.122

45° HORIZ. BENDINV=65.137

PR

OP

ER

TY

LIN

ES

TA

10+

557.

634

= S

TA

2+

000

(350

Ø P

VC

)S

TA

15+

568.

628

= S

TA

1+

000

(300

Ø P

VC

)

INSTALL PIPE ANCHOR BLOCKSPER MMCD DETAIL G8 FOR

SLOPE GREATER THAN 10%

11.25° VERT. BEND(ACTUAL BEND 12.27°)

INV=65.157

MIN

. 0.9

mC

LEA

R C

OV

ER

MIN

. 1.2

mC

LEA

R C

OV

ER

MIN

. 1.2

mC

LEA

R C

OV

ER

N

ORIGINAL SHEET - ISO A1

Consultants

File Name:

www.stantec.com

400 - 655 Tyee RoadVictoria BC

Dwn.Issued Appd. YY.MM.DD

ByRevision Appd. YY.MM.DD

Client/ProjectPermit-Seal

Drawing No.

Scale

Revision

Title

Project No.Copyright Reserved

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to

The Copyrights to all designs and drawings are the property of

authorized by Stantec is forbidden.

Stantec without delay.

Stantec. Reproduction or use for any purpose other than that

\\C

D12

08-F

04\w

orkg

roup

\111

7\ac

tive\

1117

2004

6\4_

draw

ings

\_cu

rren

t\Civ

il\11

1720

046_

cont

ract

1_w

ater

mai

n.dw

g 1

0/27

/201

7 1:

09 P

M O

FIT

ZG

ER

ALD

DISTRICT OF PORT HARDY

Port Hardy, BC Canada 111720046

WATERMAIN REPLACEMENT, FORT RUPERTRESERVOIR AND WATER TREATMENT SITEDEVELOPMENT - CONTRACT 1

111720046_contract1_watermain.dwg

FO

R C

ON

TIN

UA

TIO

N S

EE

SH

EE

T C

107

PLAN1:500

DISTRIBUTION LINE PROFILEHORIZ 1:500 VERT 1:100

C108

FORT RUPERT ROADWATERMAIN PLAN / PROFILESTATION 10+260 TO STATION 10+580

AS SHOWN

90% SUBMISSION AF/HL DP 2017.08.21100% SUBMISSION 2017.09.11FOR WATER PERMIT TO CONSTRUCT 2017.09.21ISSUED FOR TENDER 2017.10.10

AF/HL DPAF/HL DPAF/HL DP

ISSUED FOR ADDENDUM 3 2017.10.27AF/HL DP

3

3

AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
P L A N 1 8 4 3 R / W
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
600 CSP
AutoCAD SHX Text
0
AutoCAD SHX Text
1:500
AutoCAD SHX Text
5
AutoCAD SHX Text
15
AutoCAD SHX Text
25m
AutoCAD SHX Text
0
AutoCAD SHX Text
1:100
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m
AutoCAD SHX Text
5m

D + 600mm MAX

SCALE:

UTILITY TRENCH DETAIL

NTS10-

300m

m10

0mm

MIN

D

900m

m M

IN

D + 450mm MIN

APPROVEDUNDISTURBEDNATIVE SOIL

SCALE:

REDUCED COVERAGE DETAIL

NTS12-

PIPE

1.0m1.0m

SECTION

PLAN

EXTENT OF CONCRETE

LIM

IT O

F C

ON

CR

ET

E T

O E

XT

EN

D U

NT

IL A

MIN

.C

OV

ER

OF

700

mm

OV

ER

PIP

E IS

AC

HIE

VE

D

EXISTING GROUND

MAX D + 1000mm

SCALE:

COMBINED WATER TRENCH DETAIL

NTS11-

300

100m

m M

IND

1

900m

m M

IN

FOR PAVEMENTRESTORATION REFER TODETAIL THIS SHEET

TIE TO EXISTINGADJACENT GRADE

APPROVEDUNDISTURBEDNATIVE SOIL

EXISTING GROUND

MAX D1+D2 + 1300mm

350Ø 300ØD2

300

D1 + D2 + 900 MAX

80mm ASPHALT TO MOTI 2012 STANDARDSPECIFICATIONS FOR HIGHWAY CONSTRUCTION150mm OF GRANULAR BASE TO MOTI 2012STANDARD SPECIFICATIONS FOR HIGHWAYCONSTRUCTION300mm OF GRANULAR SUBBASE TO MOTI 2012STANDARD SPECIFICATIONS FOR HIGHWAYCONSTRUCTIONIMPORTED GRANULAR BACKFILL TO MOTI 2012STANDARD SPECIFICATIONS FOR HIGHWAYCONSTRUCTION

SCALE:

PAVEMENT RESTORATION DETAIL

TO MOTI STANDARD SPECIFICATIONS

NTS2-

80mm ASPHALT150mm OF GRANULAR BASEMMCD 31 05 17 PART 2.10300mm OF GRANULAR SUBBASEMMCD 31 05 17 PART 2.9IMPORTED GRANULAR BACKFILLMMCD 31 05 17 PART 2.3 OR 2.9

SCALE:

PAVEMENT RESTORATION DETAIL

TO MMCD STANDARD SPECIFICATIONS

NTS1-

GRANULAR PIPE BEDDING TO:· MOTI 2012 STANDARD

SPECIFICATIONS FORHIGHWAY CONSTRUCTION

· MMCD 31 05 17 PART 2.7 TYPE 1OUT OF HWY ROW

IMPORTED GRANULAR BACKFILL TO:· MOTI 2012 STANDARD

SPECIFICATIONS FORHIGHWAY CONSTRUCTION

· MMCD SECTION 31 05 17 PART2.3 (75mm) OR PART 2.9

1.0m GRAVEL SHOULDER. 100mmDEPTH OF GRANULAR BASE TO:· MOTI 2012 STANDARD

SPECIFICATIONS FORHIGHWAY CONSTRUCTION

· MMCD SECTION 31 05 17PART 2.10

300mm

SAW CUT PRIORTO EXCAVATION

PIT RUN SAND TOMMCD 31 05 17PART 2.4

GRANULAR BASETO MMCD 31 05 17PART 2.10

1.0m GRAVEL SHOULDER. 100mmDEPTH OF GRANULAR BASE TO:· MOTI 2012 STANDARD

SPECIFICATIONS FORHIGHWAY CONSTRUCTION

· MMCD SECTION 31 05 17PART 2.10

GRANULAR PIPE BEDDING TO:· MOTI 2012 STANDARD

SPECIFICATIONS FORHIGHWAY CONSTRUCTION

· MMCD 31 05 17 PART 2.7 TYPE 1OUT OF HWY ROW

IMPORTED GRANULAR BACKFILL TO:· MOTI 2012 STANDARD

SPECIFICATIONS FORHIGHWAY CONSTRUCTION

· MMCD SECTION 31 05 17 PART2.3 (75mm) OR PART 2.9

300mm

SAW CUT PRIORTO EXCAVATION

FOR PAVEMENTRESTORATION REFER TODETAIL THIS SHEET

SCALE:BOLLARD DETAIL

NTS4-

900m

m M

IN10

00m

m15

0mm

CONCRETE FILLED 150ØSTEEL PIPE BOLLARD

FINISH GRADE

CONCRETEFOOTING

SCALE:

TYPICAL BOLLARD PLACEMENT

AT HYDRANT DETAIL

NTS5-

1.0m

TY

P

1.0m TYP

BOLLARD (TYP) REFERTO DETAIL THIS SHEET

SCALE:GRAVEL STRUCTURE

NTS3-

10mm HOLE

60° 135°135°

CHECKERBOARD SIGN(W-14)

NOTES:

1. GATE - 50mm SCHED 40 GALVANIZED PIPE2. POSTS - 100mm SCHED 40 GALVANIZED PIPE3. WELDS TO BE TREATED WITH GALVACON OR

EQUIVALENT4. GATE TO SWING 180°MINIMUM

PLATE WELDED TOCOVER POST ENDS

13mmX50mm(NOM) FLAT

BAR

1.00

m80

0mm

100m

m

200mm

600m

m

450m

m

7.00m

300mm50mm

50mm

500mm

1.00m 500mm 2.40mm

150m

m45

0mm

150m

m 150m

m

65mmGALVANIZED

PIPE

BOTTOM OF CHAIN LINK51mm MAXIMUM CLEAR

FROM GROUND

3.0 MAXIMUM

1.80

m

305mm

88.9mmTERMINALPOST

TENSION BARBAND

TOP RAIL

TERMINAL POST CAP

NOTE:1. TERMINAL POSTS ARE LOCATED AT CORNERS, GATES,

CHANGES OF GRADE, AND A MINIMUM OF EVERY 90.000mON STRAIGHT LEVEL SECTIONS.

CONCRETE FOOTING(TYP)

50.3mm PIPELINE POST

GALVANIZED CHAINLINK MESH

TIE BOTTOMWIRE TO EACHLINE POST

3.5mm BOTTOM WIREFASTENED 500mm OC

TURN BUCKLE(TYPICAL)

1.21

9m (

TY

P F

OR

TE

RM

INA

LP

OS

TS

)

1.00

6m (

TY

PF

OR

LIN

EP

OS

TS

)

SCALE:

BARRIER GATE DETAIL

NTS8-

SCALE:

CHAINLINK FENCE

FENCE PANEL DETAIL

NTS7-

STEEL PADLOCKCOVER

CONCRETEFOOTING (TYP)

3.0 MAXIMUM6.0m3.0 MAXIMUM

NOTE:1. ALL GATE FRAMES AND BRACE PIECES TO

BE SCHEDULE 40 GALVANIZED PIPE.2. GATE LOCK TO BE FITTED WITH STEEL

BARREL SHROUD

SCALE:SECURITY GATE DETAIL

NTS6-

CONCRETEFOOTING (TYP)

TURN BUCKLE

GATE LOCK ANDFROST-FREE LATCH

ROADWAYGATE FRAME BRACE

GATEFRAME

THREE HINGESPER GATE

ORIGINAL GROUND

METALLIC POST

FINISHED GRADE

CONCRETE FOOTING

SCALE:INSULATED FENCE POST

NTS9-

PVC DUCT OR CONDUITSIZE AS REQUIRED

SOLVENT WELD CAP

100m

m M

IN

1.0m

FILL WITH THIN MIX OFNON-SHRINKING GROUTAND THEM PUSH POST IN

1.80

m

NUMBER OF BOLLARDS REQUIREDVARIES. REFER TO PLANS

80mm ASPHALT

100mm CONCRETE MIN25MPa AT 28 DAYS

200mm

150mm OF GRANULAR BASEMMCD 31 05 17 PART 2.10450mm OF GRANULAR SUBBASEMMCD 31 05 17 PART 2.9APPROVED SUBGRADE

127mm (TYP) 305m

m

BARBWIRE HANGER ARM

BARBED WIRE OVERHANG

100m

m2.30

0m

350m

m

450m

m

40mm

50mm

APPLICABLESIGN REFERTO PLAN

SQUARE,PERFORATED,WELDED STEELTUBING

CONCRETE BASE:300mm SQUAREBOTTOM; 200mmSQUARE TOP

SCALE:SIGN POST DETAIL

NTS13-

CIVIL DETAILSSHEET 1 OF 3

NTS

C201ORIGINAL SHEET - ISO A1

Consultants

File Name:

www.stantec.com

400 - 655 Tyee RoadVictoria BC

Dwn.Issued Appd. YY.MM.DD

ByRevision Appd. YY.MM.DD

Client/ProjectPermit-Seal

Drawing No.

Scale

Revision

Title

Project No.Copyright Reserved

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to

The Copyrights to all designs and drawings are the property of

authorized by Stantec is forbidden.

Stantec without delay.

Stantec. Reproduction or use for any purpose other than that

\\C

D12

08-F

04\w

orkg

roup

\111

7\ac

tive\

1117

2004

6\4_

draw

ings

\_cu

rren

t\Civ

il\11

1720

046_

cont

ract

1_de

tails

.dw

g 1

0/27

/201

7 12

:26

PM

OF

ITZ

GE

RA

LD

DISTRICT OF PORT HARDY

Port Hardy, BC Canada 111720046

WATERMAIN REPLACEMENT, FORT RUPERTRESERVOIR AND WATER TREATMENT SITEDEVELOPMENT - CONTRACT 1

111720046_contract1_details.dwg90% SUBMISSION AF/HL DP 2017.08.21100% SUBMISSION 2017.09.11FOR WATER PERMIT TO CONSTRUCT 2017.09.21ISSUED FOR TENDER

AF/HL DPAF/HL DPAF/HL DP 2017.10.10

ISSUED FOR ADDENDUM 3 AF/HL DP 2017.10.27

3

3

FORT RUPERT ROAD

X

X

X

X

X

X

X

X

X

X

1+00

0

1+020

1+040

1+06

0

1+080

1+097

|

|

|

|

|

X

XX

X

X

X

X

GRAVEL ACCESS ROAD

REFER TO C302 FOR DETAILS

PRO

PERTY LIN

E

PROPERTY LINE

GRAVEL

1

2

2

LIMIT OF EXCAVATION ANDCLEARING AND GRUBBING (TYP)

LIMIT OF EXCAVATION ANDCLEARING AND GRUBBING (TYP)

PRO

PERTY LIN

E

16.7%

SWALE (TYP)DIRECT AWAY FROM

GRAVEL ACCESS ROAD

3

3

2

REFER TO C108 FOR CONTINUATION

65.92

65.84

PROPOSEDBUILDING

STORAGE TANK(TANK AND CONCRETEFOUNDATION NOT IN

CONTRACT)

F 70.00E70.00

RA-1

3.50

2.50

2.50 2.50

R15.00

R20.0

0

4

66

67

68

69

70

71

72

73

74

75

76

66

67

68

69

70

71

72

73

74

75

76

0+995 1+000 1+020 1+040 1+060 1+080 1+100 1+105

EXISTING GROUND

FINISHED GROUND

600Ø CULVERT

SCALE:ACCESS ROAD PROFILE

1:250H AND 1:50V

PVI STA=1+079.43PVI ELEV=72.06

K=2.1LVC=15.00

BV

CS

=1+

071.

93B

VC

E=

71.4

4

EV

CS

=1+

086.

93E

VC

E=

72.1

3

PVI STA=1+015.60PVI ELEV=66.77

K=1.5LVC=15.39

BV

CS

=1+

007.

90B

VC

E=

66.9

3

EV

CS

=1+

023.

29E

VC

E=

67.4

1

-2.00%

8.28%

1.00%

N

ORIGINAL SHEET - ISO A1

Consultants

File Name:

www.stantec.com

400 - 655 Tyee RoadVictoria BC

Dwn.Issued Appd. YY.MM.DD

ByRevision Appd. YY.MM.DD

Client/ProjectPermit-Seal

Drawing No.

Scale

Revision

Title

Project No.Copyright Reserved

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to

The Copyrights to all designs and drawings are the property of

authorized by Stantec is forbidden.

Stantec without delay.

Stantec. Reproduction or use for any purpose other than that

\\C

D12

08-F

04\w

orkg

roup

\111

7\ac

tive\

1117

2004

6\4_

draw

ings

\_cu

rren

t\Civ

il\11

1720

046_

cont

ract

1_C

301.

dwg

10/

27/2

017

1:50

PM

OF

ITZ

GE

RA

LD

DISTRICT OF PORT HARDY

Port Hardy, BC Canada 111720046

WATERMAIN REPLACEMENT, FORT RUPERTRESERVOIR AND WATER TREATMENT SITEDEVELOPMENT - CONTRACT 1

111720046_contract1_C301.dwg

SCALE:

PLAN

1:250

FORT RUPERT RESERVOIRACCESS ROAD PLAN AND PROFILE

C301

AS SHOWN

CONSTRUCTION NOTES:INSTALL BARRIER GATE. REFER TO SHEET C201 FOR DETAILS

INSTALL RIP RAP ARMOURING ANGULAR 300mm SINGLE SIZE 20kg

INSTALL LANGLEY 11-13 PRECAST CONCRETE HEADWALL ORAPPROVED EQUIVALENT

INSTALL STOP SIGN (RA-1). REFER TO SHEET C201 FOR DETAILS

1

2

ISSUED FOR 90% SUBMISSION OF JB 2017.09.27

3

ISSUED FOR TENDER OF JB 2017.10.10

4

3

ISSUED FOR ADDENDUM 3 OF JB 2017.10.27

3

3

3

AutoCAD SHX Text
BH 17-04
AutoCAD SHX Text
BH 17-05
AutoCAD SHX Text
BH 17-03
AutoCAD SHX Text
TP 17-02
AutoCAD SHX Text
0
AutoCAD SHX Text
1:250
AutoCAD SHX Text
2.5
AutoCAD SHX Text
7.5
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
12.5m
AutoCAD SHX Text
0
AutoCAD SHX Text
1:50
AutoCAD SHX Text
0.5
AutoCAD SHX Text
1.5
AutoCAD SHX Text
2.5m
AutoCAD SHX Text
2.5m
AutoCAD SHX Text
2.5m

FORT RUPERT ROAD

W

W

WW

W

W

WW

X

X

X

X

X

X

X

X

X

X

X

X

DD

W

W

W

W

W

W

W

WW

W

X

XX

X

X

X

X

X X

GRAVEL ACCESS ROAD

GRAVEL

STORAGE TANKBOTTOM OF TANK ELEVATION 72.5m(TANK AND CONCRETE FOUNDATION

NOT IN CONTRACT)

PROPOSED BUILDINGMFE = 72.50

GENSET

PROPERTY LINE

GRAVEL ACCESS RO

AD

2+060

2+000

2+02

0

2+04

0

|

|

|

1+000

1+02

0

1+04

0

|

|

|

21

300Ø

PV

C C

900

350Ø

PV

C C

900

300Ø

PVC C

900

350Ø

PVC C

900

REFER TO C304 FOR DETAILS

INSTALL 600Ø KORFLOW CULVERTOR APPROVED EQUIVALENT

REFER TO C108 FOR CONTINUATION

INV 70.00

5

3

100Ø

PV

CUP

UP

UP

4

4

4

INV 65.92INV 65.84

67

68

69

70

71

72

73

67

68

69

70

71

72

73

GR

OU

ND

INV

ER

T

1+990 2+000 2+020 2+040 2+060 2+070

SCALE:WATERMAIN FROM TANK (350Ø)

1:200H AND 1:40V

EXISTING GROUND

350Ø PVC C900

PR

OP

ER

TY

LIN

ES

TA

2+

000

= S

TA

10+

557.

634

1.0

MIN

13.09%

8.61%

0.23%

4.79m CURVEMAX 2° DEFLECTION PER BELL

7.20m CURVEMAX 2° DEFLECTION PER BELL

300Ø PVC C900

300mm MIN

68.6

7

67.0

0

70.9

5

69.5

5

72.5

4

70.5

5

70.6

0

STORAGE TANK

45° HORIZ. BEND

90° VERT. BENDC/W THRUST BLOCK

FINISHED GROUND

45° HORIZ. BEND

TE

E

INSTALL PIPE ANCHOR BLOCKSPER MMCD DETAIL G8 FOR

SLOPES GREATER THAN 10%

CH

LOR

INE

AN

ALY

ZE

R A

ND

ME

TE

R C

HA

MB

ER

MH

1C

HLO

RIN

E IN

JEC

TIO

N M

AN

HO

LE

350Ø PVC C900 REFER TOC108 FOR CONTINUATION

67

68

69

70

71

72

73

67

68

69

70

71

72

73

GR

OU

ND

INV

ER

T

0+990 1+000 1+020 1+040 1+060

SCALE:WATERMAIN TO BUILDING (300Ø)

1:200H AND 1:40V

EXISTING GROUND

300Ø PVC C900

PR

OP

ER

TY

LIN

ES

TA

1+

000

= S

TA

15+

568.

628

1.0

MIN

350Ø PVC C900

300mm MIN

PROPOSEDBUILDING

300Ø PVC C900 REFER TOC108 FOR CONTINUATION

14.45m CURVEMAX 2° DEFLECTION PER BELL

7.50m CURVEMAX 2° DEFLECTION PER BELL

68.6

7

67.0

5

70.9

8

69.5

4

72.5

4

69.9

7

45° HORIZ. BEND45° HORIZ. BEND

2.15%

13.72%

0.21%

90° VERT. BENDC/W THRUST BLOCK

45° HORIZ. BEND

FINISHED GROUND

45° HORIZ. BEND

INSTALL PIPE ANCHOR BLOCKSPER MMCD DETAIL G8 FOR

SLOPES GREATER THAN 10%

N

ORIGINAL SHEET - ISO A1

Consultants

File Name:

www.stantec.com

400 - 655 Tyee RoadVictoria BC

Dwn.Issued Appd. YY.MM.DD

ByRevision Appd. YY.MM.DD

Client/ProjectPermit-Seal

Drawing No.

Scale

Revision

Title

Project No.Copyright Reserved

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to

The Copyrights to all designs and drawings are the property of

authorized by Stantec is forbidden.

Stantec without delay.

Stantec. Reproduction or use for any purpose other than that

\\C

D12

08-F

04\w

orkg

roup

\111

7\ac

tive\

1117

2004

6\4_

draw

ings

\_cu

rren

t\Civ

il\11

1720

046_

cont

ract

1_C

303.

dwg

10/

27/2

017

1:05

PM

OF

ITZ

GE

RA

LD

DISTRICT OF PORT HARDY

Port Hardy, BC Canada 111720046

WATERMAIN REPLACEMENT, FORT RUPERTRESERVOIR AND WATER TREATMENT SITEDEVELOPMENT - CONTRACT 1

111720046_contract1_C303.dwg

CONSTRUCTION NOTES:300Ø PVC 45° HXH BEND C/W THRUST BLOCK

350Ø PVC 45° HXH BEND C/W THRUST BLOCK

INSTALL RIP RAP ARMOURING ANGULAR 300mm SINGLE SIZE 20kg

UTILITY POLE. REFER TO ELECTRICAL FOR DETAILS.

100Ø PVC DRAIN TO DAYLIGHT C/W RODENT FLAPGATE.

1

2

FORT RUPERT RESERVOIRSITE UTILITIES SHEET 1 OF 2

C303

AS SHOWN

ISSUED FOR 90% SUBMISSION OF JB 2017.09.27

SCALE:

PLAN

1:200

3

4

5

ISSUED FOR TENDER OF JB 2017.10.10

3

3

ISSUED FOR ADDENDUM 3 OF JB 2017.10.27

AutoCAD SHX Text
0
AutoCAD SHX Text
1:200
AutoCAD SHX Text
2
AutoCAD SHX Text
6
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
0
AutoCAD SHX Text
1:40
AutoCAD SHX Text
0.4
AutoCAD SHX Text
1.2
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m
AutoCAD SHX Text
2.0m