PAGE 1 Krebs Engineering, Inc. 2100 Riverhaven Drive, Suite 100 Birmingham, AL 35244 205-987-7411 March 30, 2018 ADDENDUM NO. 2 CONTRACT NO.: 17045 OWNER: Anniston Water Works and Sewer Board PROJECT: Fort McClellan WWTP Improvements BID DATE: April 5, 2018 TO: ALL PROSPECTIVE CONTRACTORS AND SUPPLIERS The changes, modifications, and/or additions covered by and set forth in this Addendum No. 2 shall become part of and be incorporated in the Contract Documents for the above referenced project: BIDDING CLARIFICATIONS: AD2.1 References to the Trickling Filters are the current day structures called Peak Flow
Basin No. 1 and No. 2. The two concrete structures were previously used as Trickling Filters, but are currently used as Peak Flow Basins. The Contractor is responsible for removal of all media, pipe, and debris from the Trickling Filters (Peak Flow Basin No. 1 and No. 2) and legally disposing of it off-site or at locations identified on the drawings. In addition, the media may be used as fill material at areas approved by the engineer if Alternate No. 1 is selected. In all cases the media must be chocked-off with fine material and topsoil added if located in grass areas.
AD2.2 Crack repair and concrete coatings for the Peak Flow Basin Nos. 1 and 2 are just for
the Alternate Bid Item No. 2 and No. 3. No crack repair or concrete coatings for Peak Flow Basin Nos. 1 and 2 are included in the Base Bid.
AD2.3 Structures identified as being demolished will be drained by the Owner to the
greatest extent possible using existing plant pumping systems and pipelines. Any remaining solids inside structures identified as being demolished shall be removed from the site and disposed of legally by the Contractor.
SPECIFICATIONS TO BE REVISED BY ADDENDUM: AD2.4 Specification Section 01 10 00, Summary, Section 1.6 Work Sequence, A.1.
Milestone Dates, change paragraph b to: The improvements to the Aeration Basin shall be complete no later than January 1,
2019. This shall include all equipment improvements, instrumentation, and electrical work.
KREBS 17045 ADDENDUM NO. 2
PAGE 2 AD2.5 Specification Section 33 11 16.10, Metal Pipe and Fittings for Water Utilities, add the
following section:
2.7 STAINLESS STEEL PIPE
A. Stainless steel pipe and fittings shall conform to the requirements of ANSI/ASTM A778, latest revision, Grade TP 304.
B. Stainless steel pipe shall be furnished in accordance with nominal pipe sizes and nominal wall thicknesses given in Table 1 of the American National Standard for Stainless Steel Pipe (ANSI B36.19, latest revision).
C. Pipe sizes and Schedules (nominal wall thicknesses) shall be Schedule 10. Flanges, nuts and bolts shall also be made of stainless steel unless otherwise specifically shown on Drawings.
D. All fittings shall be forged fittings unless otherwise specifically shown
on the Drawings.
E. Flanged pipe ends shall be made of type 304L stainless steel slip-on type rolled angel face rings and stainless steel back-up flanges drilled to ANSI 16.1 class 125 standard. The angle face ring thickness shall be continuously welded on both sides to the pipe or fitting. The angle leg shall not interfere with the flange bolt holes.
AD2.6 Specification Section 44 42 13, Aeration Equipment, Section 2.1 Manufacturers, C. Floating Aerator, Add the following Manufacturer:
3. Aerator Solutions AD2.7 Specification Section 44 46 26, Clarifier, Section 2.3 Effluent Weirs and Baffles,
Paragraph H., Replace in its entirety with the following: H. Scum baffle panels and splice plates shall be ¼” thick plastic laminate.
Dimensions of the scum baffle and brackets shall be as shown on the drawings. The scum baffle panels shall be 12’ in length unless otherwise noted. The scum baffle brackets shall be FRP angle with slotted holes to provide horizontal, vertical, and radial adjustment of the baffle. Fastening holes in the scum baffle panel shall be countersunk to accommodate flat head fasteners. Cuts ends of non-standard lengths shall be sealed with resin.
DRAWINGS TO BE REVISED BY ADDENDUM: AD2.8 Replace Sheet C3-02A, Overall Site Grading Plan (Alternate), in its entirety with the
attached Sheet C3-02A.
KREBS 17045 ADDENDUM NO. 2
PAGE 3 AD2.9 Replace Sheet C4-02, Headworks Modification Mechanical Sections, in its entirety
with the attached Sheet C4-02. AD2.10 Replace Sheet C6-01, Final Clarifiers No. 1 and No. 2 Modification Plan and Section,
in its entirety with the attached Sheet C6-01. AD2.11 Replace Sheet S8-02, Post Aeration Structural Sections, in its entirety with the
attached Sheet S8-02. AD2.12 Replace Sheet S9-01, Parshall Flume Structural Plan and Sections, in its entirety
with the attached Sheet S9-01. AD2.13 Replace Sheet C10-01, UV Basin Modification Mechanical Plan and Sections, in its
entirety with the attached Sheet C10-01. AD2.14 Sheet DT-04, Miscellaneous Details, Block A1, Change the following: “Coat Interior Walls of Manhole with Coal Tar Epoxy, Min. 30 MILS DFT” to “Coat
Interior Walls of Manhole with Permite PCS-9043 Type II or Equivalent” This Addendum No. 2 shall be attached to the front of your set of specifications and made a part
of the Contract Documents. Receipt of this Addendum No. 2 shall be acknowledged on Page 4
of the Proposal Form.
Krebs Engineering, Inc. By____________________________
BASIN
POST AERATION
FLUME
PARSHALL
STATION
RETURN PUMP
(EXTENDED)
HEADWORKS
FENCE
CHAIN LINK
FENCE
CHAIN LINK
ENTRANCE GATE
CANTILEVER A7
DT-02
A7
DT-02
A7
DT-02
METER VAULT
RAS FLOW
METER VAULT
WAS FLOW
G1
C3-09
JUNCTION BOX
PEAK FLOW BASIN
HANDRAIL
ALUMINUM D7
DT-03
G7
C3-09
G1
C3-10
LEVEL INDICATOR
ULTRASONIC
MODIFICATIONS
JUNCTION BOX No. 2
G10
C3-10
LEVEL INDICATORS
WEIR & ULTRASONIC
V
8"
DI
701
702
704
703
702
699
699
697
697
696
697
698
699
694
693
694
694
693
692
694
694
693
692
691
691 6
91 6
93
692
692
692
693
694 69
6
699
698
698
711
712
713
699
696
698
698
697
708
709
706
707
706
707
706
703
709
720
725
730
715710
705
700
700
695
710
700
695
700
705
730
725
720
715
710
705
710
715
700
705
710
710
715
720
725
705
710
700
695
690
690
P
P
P
P
P
CRANE
V
V
V
V
V
V
V
V
V
V
V
VV
V
F
AERATION BASIN
RIP-RAP
720
715
705
700
705
710
V
V
V
698
697
694
V
AC
ET
ET
ET
697
695
Sheet Title
Sequence
Sheet No.
Revisions
No. Date
Designed
Drawn
Project No.
Checked
of
Issue Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
92
Description
3/2
9/2
018
4:5
6:3
0 P
M
P:\bha
m\A
NNIS
TO
N\1
7045_FtM
cClellan_
WW
TP_
Desig
n\Dra
win
gs\1
7045
C3-0
2A.d
gn
BH
M-E
NG
L-0
5
17045
© 2018 KREBS ENGINEERING, INC.
CLO
STL/NDW
CLM/TTM
SE
WE
R B
OA
RD
AN
NIS
TO
N W
AT
ER W
OR
KS A
ND
FO
RT M
cC
LE
LL
AN W
WTP I
MP
RO
VE
ME
NTS
AN
NIS
TO
N,
AL
AB
AM
A
FEB., 2018
K
L
M
693
692
694
695
696
695
696
694
694
696
695
693
699
700.25
699.50
700
699.75
4020
1 INCH = 40 FT.
040
C3-02A 1" = 40'PLANA1
WT-1-92
WT-2-92
WT-14-92
WT-12-92
WT-3-92WT-13-92
WT-4-92
WT-6-92
WT-5-92
WT-9-92
WT-8-92
WT-11-92
GEOTECHNICAL LEGEND
WT-X-92OF SOIL BORINGAPPROXIMATE LOCATION
(ALTERNATE)
GRADING PLAN
OVERALL SITE
EL. 698.53
EL. 689.60±
WSE 696.53
HANDRAIL
ALUMINUM
2'-5"±
EL. 696.13
8'-0" WEIR 5'-1"±
D7
DT-03
K12
--
1/4" = 1'-0"
SECTION - WEIR @ PEAK FLOW BASIN No. 1 & 2 (ALT. No. 2)K12
D7
DT-03HANDRAIL
ALUMINUM
No. 1
ALTERNATE
No. 1
ALTERNATE
25
ALABAMA WASTEWATER TREATMENT MODERNIZATION.
OF ENGINEERS AS PART OF THE 1992 FORT McCLELLAN,
NOTE: GEOTECHNICAL DATA PROVIDED BY U.S. ARMY CORPS
NOTE: CUT EXISTING CONCRETE WALL TO DIMENSIONS SHOWN.
COATINGS.
ALTERNATE No. 3: PEAK FLOW BASIN No. 1 AND No. 2 SOUTHWEST WALL INTERIOR SURFACE PROTECTIVE
WALL.
ALTERNATE No. 2: PEAK FLOW BASIN No. 1 AND No. 2 CONCRETE CRACK REPAIR ALONG SOUTHWEST
BETWEEN PEAK FLOW BASIN No. 1 AND No. 2.
AND No. 2, ALUMINUM HANDRAIL ALONG THE SAME WALL, AND NEW WEIR CUT
ALTERNATE No. 1: INCLUDE GRADING (FILL) ALONG SOUTHWEST WALL OF PEAK FLOW BASIN No. 1
2 03/29/2018 ADD. NO. 2
5/8 CAP REBAR
IPF
ALABAMA STATE ROUTE #2
1
SOUTH BOUND McCLELLAN BLVD
EL:700.42
E:664343.58
N:1174361.38
PK NAIL #1
EL:696.82
E:663955.96
N:1174669.18
PK NAIL #2212
EL: 705.982
BM 32101-LA1
RR SPIKE
BUILDING
CONTROL
ST
OR
AGE B
UIL
DIN
G
STATION
GREASE PUMP
PS
RAS/WAS
STATION
PUMPING
PEAK FLOW
JB3
JB4
JB2
JB1
STATION
PUMPING
FILTRATE
HEADWORKS
DRYING BEDS
SLUDGE
No. 1
CLARIFIER No. 2
PEAK FLOW BASIN
No. 3
PEAK FLOW BASIN
No. 1
PEAK FLOW BASIN
No. 2
CLARIFIER
SHOP
GENERATOR/
UV BASIN
BLDG.
PUMP
SLUDGE
CO
BOX No. 2
JUNCTION
BOX No. 1
JUNCTION
FENCE (TYP.)
EX. CHAIN LINK
FENCE (TYP.)
EX. CHAIN LINK
BOX No. 3
JUNCTION
DIGESTER
AEROBIC
Sheet Title
Sequence
Sheet No.
Revisions
No. Date
Designed
Drawn
Project No.
Checked
of
Issue Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
92
Description
3/3
0/2
018
3:4
8:2
0 P
M
P:\bha
m\A
NNIS
TO
N\1
7045_FtM
cClellan_
WW
TP_
Desig
n\Dra
win
gs\1
7045
C4-0
2.d
gn
BH
M-E
NG
L-0
5
17045
© 2018 KREBS ENGINEERING, INC.
CLO
STL/NDW
CLM/TTM
SE
WE
R B
OA
RD
AN
NIS
TO
N W
AT
ER W
OR
KS A
ND
FO
RT M
cC
LE
LL
AN W
WTP I
MP
RO
VE
ME
NTS
AN
NIS
TO
N,
AL
AB
AM
A
FEB., 2018
K
L
M
33'-8"1'-0"
EL. 716.50
EL. 711.50
EL. 709.50
RECONDITION EX.
SELF CLEANING
SCREEN
1'-0"
4'-0"1'-0"1'-0"
1/2" EXPANSION
MATERIAL (TYP.)
EL. 706.07
EL. 704.82
ALUMINUM
HANDRAIL
(TYP.)
ALUMINUM
GRATING (TYP.)
D7
DT-03
K1
DT-03
1'-0"8"
3'-0"
3'-0"
EL. 716.50
EL. 711.50
EL. 709.50
4'-0"2'-5"
1/2" EXPANSION
MATERIAL
8"8" 4'-0"
RECONDITIONED
SELF CLEANING
SCREEN
SELF CLEANING
SCREEN
GRIT AUGER
EL. 706.07
EL. 704.82
1'-0"1'-0"
GRAVITY SLUICE FROM
RECONDITIONED SCREEN
TO NEW COMPACTOR.
EQUIP SLUICE WITH
FLUSHING CONNECTION
4" AIR PIPING
SUBMERGED
AIR DIFFUSERS
BLOWER
ELECTRICAL
CONTROLS
EL. 713.17
NOTESH13
1
2
3
4
5
6
7
8
9
FITTINGS LISTD13
C4-02
MECHANICAL SECTIONS
MODIFICATION
HEADWORKS
1/4" = 1'-0"SECTIONA9 1/4" = 1'-0"SECTIONA1
SUPPORT COLUMN
STRETCH CABLE
3'-6"
LOOP DEPTH
TOWING TROLLEY
CABLE TROLLEYWIRE ROPE
PLASTIC COATED
END CLAMP
FLAT CABLE
FLAT CABLE
F9 NO SCALEFESTOON SYSTEM DETAIL
4" D.I. PIPE
(TYP. FOR 4)
SLIDE GATE
48" SQ. ST. STL.
INDICATOR
FLOAT LEVEL
1'-0" 9'-4"2'-5"15'-6"2'-5"4'-0"
4'-0"
2'-5"
45° 4
5°
7'-1"
C LC L
8"
4'-0"
2'-6"
PIPE TRENCH
1'-0"
14'-6"±
GRIT AUGER
AUGER TO
CONNECT SCREEN
GRIT CLASSIFIER
3'-0"
43'-4"
11'-5"
SCREEN
SELF CLEANING
RECONDITIONED
4" D.I. WATER
(PROVIDED BY OWNER)
RECEPTACLE
SCREENING AND GRIT
DRAIN
CLASSIFIER
6" D.I. GRIT
D13
DT-04
1/4" = 1'-0"ENLARGED PLANF1
EX. FLEXIBLE HOSING
DISCHARGE PIPE TO
CONNECT NEW 4" D.I.
1'-0" 1'-0"
DIFFUSERS (TYP.)
SUBMERGED AIR
DISCHARGE
GRIT
J9 3/16" = 1'-0"SECTION
EQUIPMENT
ELEVATION FOR NEW
AND TROUGH. ADJUST
EX. GREASE BEACH
A13
C4-01
A1
C4-02
A1
C4-02
A9
C4-02
A9
C4-02
3'-0"
1'-0"
8" 3'-0"
PUMP
GREASE
RETAINING WALL
CONCRETE
36
FITTINGS LISTF13
1
13
2
2
45 5 6
9
7
8
9
8
7
SCREEN
SELF CLEANING
DIRECTLY TO RECEPTACLE
DISCHARGE SCREENINGS
2 03/29/18 ADD. NO. 2
GRIT PUMP
BRIDGE
TRAVELING
HANDRAIL
1 1/2" GALV. STL.
PIPE
GRIT DISCHARGE
FLEXIBLE HOSE
ASSEMBLY
SKIMMER ARM
COLUMN
FESTOON
ADJUSTED TO THE ELEVATIONS SHOWN.
NOTE: EXSTING GREASE BEACH AND TROUGH SHALL BE
INSULATE ALL EXPOSED PIPE.
SCREEN AND COMPACTOR WASH/SPRAY SYSTEM. HEAT TRACE AND
2. BLIND FLANGE TAPPED FOR CONNECTIONS TO THE MECHANICAL
PIPE AT BOTH TAPS.
ON EACH SIDE OF VALVE. INCLUDE 3/4" BALL VALVE & GALVANIZED
1. 6" PLUG VALVE SHALL HAVE 3/4" THREADED HOSE CONNECTIONS
NOTES:
4" D.I. BLIND FLANGE (SEE NOTE 2)
4" D.I. PIPE, FLG-PE
4" D.I. 90° BEND, PE-MJ
4" D.I. PIPE, FLG-FLG
4" D.I. 90° BEND, FLG-FLG
6" D.I. PLUG VALVE, FLG-FLG (SEE NOTE 1)
6" D.I. PIPE, FLG-PE (INV. 707.40)
6" D.I. PIPE, FLG-FLG
6" D.I. 90° BEND, FLG-FLG
Sheet Title
Sequence
Sheet No.
Revisions
No. Date
Designed
Drawn
Project No.
Checked
of
Issue Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
92
Description
3/2
8/2
018
5:1
7:0
5 P
M
P:\bha
m\A
NNIS
TO
N\1
7045_FtM
cClellan_
WW
TP_
Desig
n\Dra
win
gs\1
7045
C6-0
1.d
gn
BH
M-E
NG
L-0
5
17045
© 2018 KREBS ENGINEERING, INC.
CLO
STL/NDW
CLM/TTM
SE
WE
R B
OA
RD
AN
NIS
TO
N W
AT
ER W
OR
KS A
ND
FO
RT M
cC
LE
LL
AN W
WTP I
MP
RO
VE
ME
NTS
AN
NIS
TO
N,
AL
AB
AM
A
FEB., 2018
K
L
M
(CLARIFIER NO. 1)
16" EFFLUENT LINE
LINE
6" SCUM
(CLARIFIER NO. 1)
18" INFLUENT LINE
INFLUENT CHANNEL
EFFLUENT CHANNEL
INSI
DE SCUM
BAFFLE
DIAMETER
= 64'-0"
INSIDE TANK DIAMETER = 70'-0
"
ROTATION
TRUSS
SKIMMER
(CLARIFIER NO.1)
SCUM TROUGH
WEIR GATE
SCUM BOX &
HEADER
TOEPLATE
W/HANDRAIL &
ACCESS BRIDGE
WALKWAY
TOP OF
MANIFOLD
DRIVE CAGE
DEFLECTOR BLADE
12" RETURN SLUDGE LINE
TRUSS
(CLARIFIER NO. 1)
16" EFFLUENT LINE
SID
E
WA
TE
R
DE
PT
H
HEADER
EL. 702.00±
FINISHED GRADE
AT SIDEWALL
TOP OF GROUT
EL. 702.23
TOP OF WALL
CHANNEL BOTTOM
EL. 700.08
BAFFLE
TARGET
SURFACE
MAX. WATER
TOEPLATE
W/HANDRAIL &
ACCESS BRIDGE
ASSEMBLY
SKIMMER
SCUM BLADE
FULL RADIUS
SKIMMER
RACEWAY
SCUM BAFFLE
EFFLUENT WEIR
SCUM BLADE
FULL RADIUS
DRIVE UNIT
(TYP.)
TIE RODS
(TYP.)
ASSEMBLY
TIE-ROD
SCUM BLADE
FULL RADIUS
SUPPORT
SKIMMER
SKIMMER
RACEWAY
(EL. 701.20)
FRP EFFLUENT WEIR
FRP SCUM BAFFLE
(CLARIFIER No. 2 ONLY)
REPLACE CENTER PIER
(TYP.)
FRP SKIRT BAFFLEASSEMBLY
TIE-BARASSEMBLY
TIE-ROD
SQUEEGEES
HEADER
F1 1/8" = 1'-0"PLAN
A1 1/8" = 1'-0"SECTION C6-01
90°
ELEVATION WEIR PLATE
STANDARD WEIR PLATE = 11'-11"
1'-11 3/4"STANDARD WEIR 4 SPACES @ 2'-0" O.C. = 8'-0"1'-11 3/4"
9 1/2"
4 1/2"
5 3/4" 5 3/4"11'-0"
A9
1/4" X 9 1/2" FRP WEIR PLATE
5 HOLES 2 5/8" Ø
(2 PLACES)
2 1/2" RAD
TYP.3/16"
1'-3"
1'-6"
4'-0"4'-0"4'-0"
12'-0"
& NUTS IN SCUM BAFFLE
HD. SCREWS, WASHERS
TYPE 316 ST. STL. FLAT
7/16" WIDE FOR 3/8" LG.
3 3/4"
4" 4"
1'- 2 1/4"
3 3/4"
10 1/2"
5"
C SPLICE (12'-0" O.C.)L
HOLE IN BRACKET
9/16" WIDE X 1 1/4" LG. SLOTTED
(BEHIND)
BUTT PLATE
ENDS OF PLATE
1/2" SPACE BETWEEN
WEIR PLATE
1/4" X 9 1/2" FRP
9"
1'- 6"
V-NOTCH WEIR PLATE
1/4" X 9 1 / 2 FRP
1"=1'-0"ELEVATION SCUM BAFFLE PLATED9
K9
--
5 HOLES - 2 5/8" DIA.
12"
5" 8 1/4"
8" 1/4"
1/2"
NUTS & WASHERS
EXP. ANCHORS W/ ST. STL.
5/8" x 6" LG. TYPE 316 ST. STL.
& WASHERS
MACHINE BOLTS, NUTS
1/2" TYPE 316 ST. STL.
SCUM BAFFLE
1/4" X 1'-6" FRPIN WEIR TO MATCH EXISTING
BOTTOM OF V-NOTCH
THE NUT (TYP.)
THAN 1/4" PAST
PROTRUDE MORE
BOLTS MUST NOT
NUTS & WASHERS
EXP. ANCHORS W/ ST. STL.
5/8" x 6" LG. TYPE 316 ST. STL.
SCUM BAFFLE
FLAT HD. SCREWS, WASHERS & NUTS IN
7/16" WIDE FOR 3/8" LG. TYPE 316 ST. STL.
1 1/16" HOLES IN BAFFLE SUPPORT BRACKET
1/4" x FRP PLATE
SCUM BAFFLE
SPACING = 6" V-NOTCH
2 1/2"
2 1/2"
1 1/4"
1 1/2"
1 1/2"
NOTE: ADJUST DIMENSIONS AS RECOMMENDED BY MANUFACTURER (TYP.)
NOTE: ADJUST DIMENSIONS AS RECOMMENDED BY MANUFACTURER (TYP.)
BAFFLE
1/4" x FRP SCUM
AND SECTION
MODIFICATION PLAN
No. 1 AND No. 2
FINAL CLARIFIERS
K9
--
K9
--
K9
--
1" = 1'-0"EFFLUENT WEIR & SCUM BAFFLEK9
1 1/2" = 1'-0"WEIR PLATE SPLICE G13G9 1 1/2" = 1'-0"SCUM BAFFLE SPLICE
1" = 1'-0"
NO SCALESKIRT BAFFLE DETAILK13
K13
--
2'-6"
3'-2 5/8"
3"
3"3"
R = 35'-0"± R = 32'-6"±
PLATE
SLOTTED HOLES IN BUTT
4-7/16" WIDE FOR 3/8" LG.
SKIRT BAFFLE
NUT, AND WASHER (TYP.)
1/2" x 5" EPOXY ANCHOR,
LOCK WASHER
NUT, (2) WASHERS,
1/2" x 1-1/2" HHMB,
BAFFLE
1/4" FRP SKIRT
SIDES OF SKIRT BAFFLE
CONTINUOUS BOTH
ANGLE 3/16" x 3" x 3"
ROLLED ALUMINUM
EL. 696.20±
BOTTOM OF S.B.
CHROMATE PRIMER.
SHOP COAT OF BITUMASTIC PAINT OR ZINC
WITH CONCRETE SHALL RECEIVE A HEAVY
NOTE: ALL ALUMINUM SURFACES TO BE IN CONTACT
DETAILS. CONTRACTOR RESPONSIBLE FOR INSTALLATION.
SHALL BE PROVIDED BY KUSTERS. SEE KUSTERS SCOPE OF SUPPLY FOR ADDITIONAL
SQUEEGEES AND BACKING PLATES, AND CENTER PIER (CLARIFIER No. 2 ONLY)
6. SKIMMER ASSEMBLY, TIE ROD ASSEMBLY, MANIFOLD SEALS AND BACKING PLATES, HEADER
5. V-NOTCH WEIR ELEVATION SHALL MATCH THE EXISTING WEIR ELEVATION.
PRIOR TO WEIR & SCUM BAFFLE INSTALLATION.
4. CONTRACTOR SHALL VERIFY ALL DIMENSIONS & ELEVATIONS OF EXISTING CLARIFIERS
3. AS A MINIMUM, ONE CLARIFIER SHALL REMAIN IN OPERATION AT ALL TIMES.
UNLESS SPECIFICALLY STATED OTHERWISE.
2. CLARIFIER No.1 SHOWN ON PLAN. WORK REQUIREMENT IS THE SAME FOR CLARIFIER No.2
EFFLUENT PIPE & APPURTENANCES (ALL FERROUS METAL).
BRIDGE SUPPORT SYSTEM, CENTER PIPE, NEW SKIMMER ARM/ SCUM ARM, SCUM BEACH,
1. APPLY NEW PROTECTIVE COATING SYSTEM ON CLARIFIER COLLECTION MECHANISM,
NOTES:
39
WASHER
4" SQ. FRP
LOCATED @ 4'-0" O.C.
SUPPORT BRACKETS
FRP SCUM BAFFLE
ON CENTERLINE
WITH 1" x 2" LG. SLOT
1/4" FRP BUTT PLATE
W/ BOLT HOLE ON CENTERLINE5" SQ. x 1/4" FRP WASHER
2 3/29/2017 ADD. NO. 2
Sheet Title
Sequence
Sheet No.
Revisions
No. Date
Designed
Drawn
Project No.
Checked
of
Issue Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
92
Description
3/3
0/2
018
8:2
9:2
2 A
M
P:\bha
m\A
NNIS
TO
N\1
7045_FtM
cClellan_
WW
TP_
Desig
n\Dra
win
gs\1
7045S8-0
2.d
gn
BH
M-E
NG
L-0
5
17045
© 2018 KREBS ENGINEERING, INC.
CLO
STL/NDW
CLM/TTM
SE
WE
R B
OA
RD
AN
NIS
TO
N W
AT
ER W
OR
KS A
ND
FO
RT M
cC
LE
LL
AN W
WTP I
MP
RO
VE
ME
NTS
AN
NIS
TO
N,
AL
AB
AM
A
FEB., 2018
K
L
M
S8-02
3/8" = 1'-0"SECTIONG1
3/8" = 1'-0"SECTIONA1
SECTIONS
STRUCTURAL
POST AERATION
1'-0"1'-0"6'-0"1'-0"6'-0"1'-0"1'-0"
1'-6" 3'-0" 3'-0" 1'-6"
10'-0"
1'-6"2'-0"1'-6"2'-0"1'-6"2'-0"1'-6"6" 6"
6"
38'-0"
1'-0"1'-0"4'-0"2'-0"22'-0"2'-0"4'-0"1'-0"1'-0"
VERTICAL, E.F.
#6 BARS @ 8" O.C.
HORIZONTAL, E.F.
#7 BARS @ 7" O.C.
3'-0"
3'-0" @ 8" O.C.
#6 DOWELS
@ 8" O.C.
#6 DOWELS
@ 8" O.C.
#6 DOWELS
12" O.C. T & B
#6 BARS @
8" O.C. T & B
#7 BARS @
17'-0"
6"
HORIZ., E.F.
#7 BARS @ 7" O.C.
VERT., E.F.
#6 BARS @ 8" O.C.
VERT., E.F.
#6 BARS @ 8" O.C.
HORIZ., E.F.
#7 BARS @ 7" O.C.
VERT., E.F.
#6 BARS @ 8" O.C.
HORIZ., E.F.
#7 BARS @ 7" O.C.
8" O.C. E.W.
#5 BARS @
VERT., E.F.
#6 BARS @ 8" O.C.
HORIZ., E.F.
#6 BARS @ 8" O.C.
VERT., E.F.
#6 BARS @ 8" O.C.
HORIZ., E.F.
#6 BARS @ 8" O.C.
8" O.C. T & B
#7 BARS @
@ 8" O.C.
#6 DOWELS@ 8" O.C.
#6 DOWELS
VERT., E.F.
#6 BARS @ 8" O.C.
HORIZ., E.F.
#7 BARS @ 7" O.C.
FIN. GRADE EL. 696.00
FIN. GRADE EL. 696.00
EL. 683.50
EL. 682.00
EL. 698.83
EL. 693.50
EL. 696.15
EL. 698.83
FIN. GRADE EL. 696.00
1'-6"
1'-6"
EL. 683.50
EL. 682.00
AS SHOWN, E.F.
ADDITIONAL # 5 BARS
2'-6"
12" O.C. T & B
#6 BARS @ 2'-6"
A10
S0-01
AS REQUIRED
INTO EXTERIOR WALLS
OPENING OR HOOK BARS
EXTEND 1'-6" BEYOND
5 - #6 BARS CONT, T & B
12" O.C.
#3 TIES @
44
(TYP.)
SHOWN FOR CLARITY
AT PIPE PENETRATION NOT
ADDITIONAL REINFORCEMENT
STONE (TYP.)
6" CRUSHED
STONE (TYP.)
6" CRUSHED
2 ADD. NO. 203/29/18
Sheet Title
Sequence
Sheet No.
Revisions
No. Date
Designed
Drawn
Project No.
Checked
of
Issue Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
92
Description
3/3
0/2
018
3:2
0:0
7 P
M
P:\bha
m\A
NNIS
TO
N\1
7045_FtM
cClellan_
WW
TP_
Desig
n\Dra
win
gs\1
7045S9-0
1.d
gn
BH
M-E
NG
L-0
5
17045
© 2018 KREBS ENGINEERING, INC.
CLO
STL/NDW
CLM/TTM
SE
WE
R B
OA
RD
AN
NIS
TO
N W
AT
ER W
OR
KS A
ND
FO
RT M
cC
LE
LL
AN W
WTP I
MP
RO
VE
ME
NTS
AN
NIS
TO
N,
AL
AB
AM
A
FEB., 2018
K
L
M
EL. 686.90EL. 686.90
EL. 691.66
AND SECTION
STRUCTURAL PLAN
PARSHALL FLUME
S9-01
3/8" = 1'-0"PLANG1
3/8" = 1'-0"SECTIONA1
A1
--
A1
--
EL. 691.26
STONE (TYP.)
6" CRUSHED
EL. 698.57
FIN. GRADE EL. 695.00± FIN. GRADE EL. 695.00±
1'-0"1'-0"5'-0"1'-0"19'-0"1'-0"5'-0"1'-0"1'-0"
1'-3"
1'-0"
1'-0"
1'-3"
1'-0"
35'-0"
1'-0"5'-0"21'-0"5'-0"1'-0"
33'-0"
1'-0"
6'-0"
1'-0"
8'-0"
(TYP.)
GROUT
3'-0"
3'-0"
8" O.C. E.W./E.F.
#6 BARS @
A10
S0-01
(TYP.)
BARS @ 8" O.C., E.F.
#5 VERTICAL DOWEL
(TYP.)
CORNER REINFORCING
1'-0"
2'-6"
O.C. HORIZ. E.F.
#6 BARS @ 8"
O.C. VERT. E.F.
#5 BARS @ 8"
O.C. TOP E.W.
#5 BARS @ 8"
O.C. BOTTOM E.W.
#6 BARS @ 8"
O.C. BOTTOM E.W.
#6 BARS @ 8"
O.C. TOP E.W.
#5 BARS @ 8"
O.C. HORIZ. E.F.
#6 BARS @ 8"
O.C. VERT. E.F.
#5 BARS @ 8"
WITH CRUSHED STONE
FILL ENTIRE VOID AREA
46 3/8" = 1'-0"SECTIONA11
3/8" = 1'-0"SECTIONG11
EL. 698.57
EL. 698.57
O.C. E.W., E.F.
#6 BARS @ 8"
(TYP.)
BARS @ 8" O.C., E.F.
#6 VERTICAL DOWEL
EL. 691.26
GROUT FILL
O.C. E.W., T.B.
#6 BARS @ 8"
STONE (TYP.)
6" CRUSHED
1'-0" 1'-0"6'-0"1'-0"1'-0"
1'-0"
2'-6"
EL. 691.26
EL. 686.90
O.C. BOTTOM E.W.
#6 BARS @ 8"
O.C. TOP E.W.
#5 BARS @ 8" (TYP.)
BARS @ 8" O.C., E.F.
#6 VERTICAL DOWEL
O.C. E.W., E.F.
#6 BARS @ 8"
OF 2'-6" (TYP.)
UPER SLAB MIN.
WALL BAR INTO
EXTEND HORIZ
1'-3"
2'-6"
1'-0"6'-0"1'-0"1'-0" 1'-0"
G11
--
G11
--
A11
--
A11
--
2 03/29/18 ADD. NO. 2
Sheet Title
Sequence
Sheet No.
Revisions
No. Date
Designed
Drawn
Project No.
Checked
of
Issue Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
A
B
C
D
E
F
G
H
J
92
Description
3/2
9/2
018
3:1
4:2
7 P
M
P:\bha
m\A
NNIS
TO
N\1
7045_FtM
cClellan_
WW
TP_
Desig
n\Dra
win
gs\1
7045
C10-0
1.d
gn
BH
M-E
NG
L-0
5
17045
© 2018 KREBS ENGINEERING, INC.
CLO
STL/NDW
CLM/TTM
SE
WE
R B
OA
RD
AN
NIS
TO
N W
AT
ER W
OR
KS A
ND
FO
RT M
cC
LE
LL
AN W
WTP I
MP
RO
VE
ME
NTS
AN
NIS
TO
N,
AL
AB
AM
A
FEB., 2018
K
L
M
1
2
3
6
7
8
9
0
1
2
3
6
7
8
9
0
3/8" = 1'-0"SECTIONA1
3/8" = 1'-0"PLANF1
3/8" = 1'-0"SECTIONA11 C10-01
A11
--
A1
--
A1
--
A11
--
AND SECTIONS
MECHANICAL PLAN
UV BASIN MODIFICATION
UV BANK 2A UV BANK 2B
UV BANK 1A UV BANK 1B
EFFLUENT
AERATION BASIN
24" POST
F.F. EL. 688.50
CLEANING AREA
WALKWAY AND
COLUMN (TYP.)
CANOPY SUPPORT
OUTLINE
METAL CANOPY
(TYP.)
LEVEL CONTROL
AUTOMATIC
EFFLUENT
24" PLANT
SLAB
CONCRETE
25'-6"
(TYP.)
HANDRAIL
ALUMINUM
2'-0"34'-0"4'-0"
40'-0"
T.O.W. EL. 693.54
CENTER (TYP.)
DISTRIBUTION
UV POWER
SYSTEMS CENTER
UV HYDRAULICCONTROL CENTER
UV SYSTEM
4'-0"
13'-6"
8'-0"
SLAB
CONCRETE
OF DIRECTION
BE A MAXIMUM 8'-0" AND ALL CHANGE
SPACING ON PIPE SUPPORT SHALL
ST. STL. CUSHIONED PIPE CLAMPS.
MOUNT ON ST. STL. UNISTRUT USING
(2 HOSES TO EACH PDC FROM HSC)
1/2" HYDRAULIC HOSE
UV BANK 1A UV BANK 1BEL. 688.50
EFFLUENT
24" PLANT
INV. EL 682.98±
EFFLUENT
AERATION BASIN
24" POST
INV. EL. 687.11±
EL. 684.98±
(TYP.)
LEVEL CONTROL
AUTOMATIC
3'-0"1'-0"24'-0"1'-0"3'-0"
EX. T.O.W. EL. 692.50±
SLAB
CONCRETE
1'-0"4'-0"
1'-0" 2'-0"
(TYP.)
HANDRAIL
ALUMINUM
MATERIAL (TYP.)
1/2" EXPANSION
EL. 687.69±
WEIR SETPOINT
EL. 693.54
CENTER (TYP.)
DISTRIBUTION
UV POWER
(TYP.)
NOT SHOWN FOR CLARITY
ELECTRICAL CONNECTIONS
CENTER (TYP.)
DISTRIBUTION
UV POWERCOLUMN (TYP.)
CANOPY SUPPORT
EL. 688.50±
SYSTEMS CENTER
UV HYDRAULIC
SLAB
CONCRETE
(TYP.)
HANDRAIL
ALUMINUM
8'-0"
UV BANK 2AUV BANK 1A
EL. 693.54
MATERIAL (TYP.)
1/2" EXPANSION
4'-0"
10 1/2 " 1'-0" 10 1/2 " 1'-0"10 1/2 " 10 1/2 "
2'-9" 2'-9"6'-0"
1'-0"5'-0"1'-0"1'-0" 1'-0"
EL. 686.86
D7
DT-03
D7
DT-03
D7
DT-03
MIN. 688.20
MAX. 688.51
NOTE: CANOPY SUPPORT COLUMNS NOT SHOWN FOR CLARITY.
EL. 692.50±
EX. T.O.W.
RESPONSIBILITY OF THE CONTRACTOR
CANOPY BY CONTRACTOR SHALL BE THE
FIX ANY DAMAGE TO EXISTING METAL
MATERIAL AND LABOR REQUIRED TO
ANCHORED TO NEW CONCRETE SLAB.
EXISTING METAL CANOPY SHALL BE
PDC FROM HSC)
(2 HOSES TO EACH
1/2" HYDRAULIC HOSE
PDC FROM HSC)
(2 HOSES TO EACH
1/2" HYDRAULIC HOSE
PDC FROM HSC)
(2 HOSES TO EACH
1/2" HYDRAULIC HOSE
WIDTH (TYP.)
REDUCE CHANNEL
ST. STL. BAFFLES TO
WIDTH (TYP.)
REDUCE CHANNEL
ST. STL. BAFFLES TO
(TYP. FOR 2)
W/ MANUAL ACTUATOR
ST. STL. WEIR GATE
47
EFFLUENT SAMPLER
RELOCATE EXISTING
AS A SPARE.
AS SHOWN AND PROVIDE ONE NEW EFFLUENT SAMPLER TO OWNER
NOTE: CONTRACTOR SHALL RELOCATE EXISTING EFFLUENT SAMPLER
(TYP. FOR 2)
W/ MANUAL ACTUATOR
ST. STL. WEIR GATE
2'-9" WIDE BY 3'-0" HIGH
2 03/29/2018 ADD. NO. 2
KREBS 17045 ADDENDUM NO. 2
PAGE 4 THIS IS THE LAST PAGE Attachments to Addendum No. 2 preceding this page: Sheet C3-02A, Overall Site Grading Plan (Alternate), C4-02, Headworks Modification Mechanical Sections, C6-01, Final Clarifiers No. 1 and No. 2 Modification Plan and Section, S8-02, Post Aeration Structural Sections, S9-02, Parshall Flume Structural Plan and Sections, and C10-01, UV Basin Modification Mechanical Plan and Sections. A total of 10 pages or sheets of drawings (including this page) have been included in Addendum No. 2. General Contractors are requested to respond to this email as a verification of receipt . This will NOT be mailed. A copy of this Addendum may be picked up at the Krebs Engineering office.