REDWOOD CITY SCHOOL DISTRICT ADDENDUM NO. 2 MCKINLEY INSTITUTE OF TECHNOLOGY MEASURE T PHASE 1 MODERNIZATION Page 1 Measure T Bond Program Office 2565 Goodwin Avenue, Redwood City, CA 94061 phone: 650.482.2840 ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley Institute of Technology Measure T Phase 1 Modernization Bid No. 180724DD Owner: Redwood City School District Measure T Bond Program Office 2565 Goodwin Avenue Redwood City, CA 94061 The following revisions and/or clarifications shall be made to the bidding requirements and contract documents including, but not limited to, the subsequent addenda, if any. Bid submissions shall reflect all addenda revisions and/or clarifications and each bidder shall acknowledge this addendum on Document 00 41 13 Bid Form and Proposal. All bidding requirements and contract documents shall apply to this addendum as originally indicated in the applicable portions of the contract documents, unless otherwise modified by this addendum. Attachments: Attachment No. 1: Spencer Associates Addendum No. 2 Attachment No. 2: Pre-Bid RFI No. 1 Attachment No. 3: Pre-Bid RFI No. 2 Attachment No. 4: Pre-Bid RFI No. 3 Attachment No. 5: Pre-Bid RFI No. 4 I. PROJECT MANUAL REVISIONS Item No. 1 Engineer’s Estimate Reference: Document 00 11 16 Notice to Bidders Description: The engineer’s estimate for this project shall be revised to $3,455,000. Item No. 2 Guard Rail Infill Panels Reference: Section 00 52 Metal Railings Description: 1. Add the following to section 2.01: “H. Welded Steel Grillework: Manufacturer: Grating Pacific, Inc., 3651 Sausalito Street, Los Angeles, California 90720. Toll Free 800-321-4314. Phone 562-598-4314. Fax 562-598-2740. Website www.gratingpacific.com. E-mail [email protected]. a. Welded Steel Grillework: “Coda Architectural” “Opus30”. 1. Infill Panel Material: Steel, ASTM A 1011. 2. Banding Material: Steel. a. Flat Bars: ASTM A 36 or A 1011

Upload: others

Post on 04-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

REDWOOD CITY SCHOOL DISTRICT ADDENDUM NO. 2

MCKINLEY INSTITUTE OF TECHNOLOGY MEASURE T PHASE 1 MODERNIZATION Page 1

Measure T Bond Program Office

2565 Goodwin Avenue, Redwood City, CA 94061

phone: 650.482.2840

ADDENDUM NO. 2

Date: August 27, 2018

Projects: McKinley Institute of Technology Measure T Phase 1 Modernization

Bid No. 180724DD

Owner: Redwood City School District

Measure T Bond Program Office

2565 Goodwin Avenue

Redwood City, CA 94061

The following revisions and/or clarifications shall be made to the bidding requirements and

contract documents including, but not limited to, the subsequent addenda, if any. Bid

submissions shall reflect all addenda revisions and/or clarifications and each bidder shall

acknowledge this addendum on Document 00 41 13 Bid Form and Proposal.

All bidding requirements and contract documents shall apply to this addendum as originally

indicated in the applicable portions of the contract documents, unless otherwise modified by

this addendum.

Attachments:

Attachment No. 1: Spencer Associates Addendum No. 2

Attachment No. 2: Pre-Bid RFI No. 1

Attachment No. 3: Pre-Bid RFI No. 2

Attachment No. 4: Pre-Bid RFI No. 3

Attachment No. 5: Pre-Bid RFI No. 4

I. PROJECT MANUAL REVISIONS

Item No. 1 Engineer’s Estimate

Reference: Document 00 11 16 Notice to Bidders

Description: The engineer’s estimate for this project shall be revised to $3,455,000.

Item No. 2 Guard Rail Infill Panels

Reference: Section 00 52 Metal Railings

Description: 1. Add the following to section 2.01:

“H. Welded Steel Grillework: Manufacturer: Grating Pacific,

Inc., 3651 Sausalito Street, Los Angeles, California 90720. Toll

Free 800-321-4314. Phone 562-598-4314. Fax 562-598-2740.

Website www.gratingpacific.com. E-mail

[email protected].

a. Welded Steel Grillework: “Coda Architectural”

“Opus30”.

1. Infill Panel Material: Steel, ASTM A 1011.

2. Banding Material: Steel.

a. Flat Bars: ASTM A 36 or A 1011

Page 2: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

REDWOOD CITY SCHOOL DISTRICT ADDENDUM NO. 2

MCKINLEY INSTITUTE OF TECHNOLOGY MEASURE T PHASE 1 MODERNIZATION Page 2

Measure T Bond Program Office

2565 Goodwin Avenue, Redwood City, CA 94061

phone: 650.482.2840

b. Angles and Channels: ASTM A 36

c. Tubing: ASTM A 500

3. Grid: Rectangular

4. Main Bars: 1 inch by 1/8 inch (25 mm by 3 mm).

5. Cross Bars: Round, 3/16 inch (5-mm) diameter.

6. Spacing, Center-to-Center:

a. Main Bars: 1-5/8 inches (42 mm).

b. Cross Bars: 5-3/16 inches (132 mm).

7. Weight: 3.1 pounds per square foot.

8. Recycled Content: 20 percent.

9. Finish: Galvanized”

See attached AOR response.

Item No. 3 Drinking Fountains

Reference: Section 22 00 00 Plumbing

Description: 1. Add the following paragraph as section 2.01 D.

“D. Drinking Fountain

1. Manufacturer: Elkay

2. Type: Bottle Filling Station & Versatile B-Level ADA

Cooler Non-Filtered Non-Refrigerated Stainless

3. Model: EZSTLDDWSVRSK”

See attached AOR response.

II. DRAWING REVISIONS

Item No. 1 Urinal Screen Detail

Reference: Sheet A10.1 Interior Details

Description: See clarification drawing CD-A1 for new urinal screen detail 14.

Item No. 2 Resilient Flooring

Reference: Sheet A2.5 Floor Plan Building A 1st Floor West

Description: Note 3 change to “Install resilient flooring”.

Item No. 3 Security Camera Scope Deletion

Reference: Sheet E0.1 Symbol Legend, General Notes and Abbreviations,

Sheet E3.1 Electrical Plan Building A 1st Floor East and

Sheet E3.2 Electrical Plan Building A 1st Floor West

Description: Scope for replacement of existing security cameras with new shall be

deleted. See attached reissued plan sheets.

Item No. 4 Revised Electrical Plans

Reference: Sheet E3.5 Electrical Plan Buildings B, C, D, E & H

Description: Added clarifications to existing data outlets to be replaced in Buildings

B, C, D, E, and H as shown on drawing. See attached reissued plan

sheet.

Page 3: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

REDWOOD CITY SCHOOL DISTRICT ADDENDUM NO. 2

MCKINLEY INSTITUTE OF TECHNOLOGY MEASURE T PHASE 1 MODERNIZATION Page 3

Measure T Bond Program Office

2565 Goodwin Avenue, Redwood City, CA 94061

phone: 650.482.2840

III. REQUESTS FOR INFORMATION

Item No. 1 Drinking Fountain Clarification:

Questions per RFI No. 1 from O.C. McDonald Company, Inc.: 1. The following drawings call for removal and installation of new drinking

fountain. None shown on mechanical drawings. Please clarify. a. Drawing A2.2, Key Note 8 b. Drawing A2.3, Key Note 5 c. Drawing A2.4, Key Note 5 d. Drawing A2.6, Key Note 8 e. Drawing A2.7, Key Note 8 f. Drawing A2.8, Key Note 8

2. Reference Drawing A5.1, Key Note 12 and Detail 14/A1.01. None shown on

A5.1 or mechanical drawings.

Answers per Spencer Associates (AOR):

1. On the Architectural Drawings, the demolition notes and floor plan notes are

repeated on each sheet. On demolition plans, key note 5 is called out to

remove existing drinking fountains on sheets A2.1 and A2.3. For floor plans,

key note 8 is called out on the plan only on sheets A2.5 and A2.7. These

sheet numbers correspond to existing drinking fountains to be replaced in

Building A West on the first and second floors. The drinking fountain model is

being added in this addendum. See item I.B.1. Mechanical drawing M2.1

shows the first floor drinking fountain. The second floor drinking fountain is

not shown on the mechanical drawings. Refer to sheet A2.3 and A2.7 for

location. See attached RFI/response.

2. Drawing A5.1, key note 12 references a urinal screen. The detail reference is

14/A10.1. This detail was missing, and has been added in this addendum. See

item II.A.1.

Item No. 2 Guard Rail Infill Panel Clarification

Question per RFI No. 2 from Rodan Builders, Inc. – Per sheet A8.4 it calls for OPUS 30 infill

panels for the guard rails, this is typical throughout. However, in the specifications it calls

for cable railing. There are also no specifications for the OPUS 30 panels. Please advise.

Answer – Refer to Section II. Project Manual Revisions Item No. 2 of this addendum. See

attached RFI/response.

Item No. 3 Data Cabling Clarifications

Questions per RFI No. 3 from Rodan Builders, Inc.:

1. On plan sheet E3.5 sheet note #7 is states to replace existing Cat5 with new

Cat6, however there are no outlets shown for this work. We need to know

how many cables we are supposed to replace in all of these rooms.

2. In addition, on plan sheets E3.1-E3.4 same sheet note #7 states to replace

existing Cat5 with new Cat6, however in all of these rooms, it is only showing

two outlets in the rooms. Are we to figure on just two one cable locations in

all these rooms, or is there more required?

3. For the open triangle data symbol, are we to assume that this is a single Cat6

cable outlet or are more required at each of these outlets?

Page 4: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

REDWOOD CITY SCHOOL DISTRICT ADDENDUM NO. 2

MCKINLEY INSTITUTE OF TECHNOLOGY MEASURE T PHASE 1 MODERNIZATION Page 4

Measure T Bond Program Office

2565 Goodwin Avenue, Redwood City, CA 94061

phone: 650.482.2840

Answers per Spencer Associates (AOR):

1. See attached revised drawing E3.5.

2. There shall be replacement of (2) existing single-jack data outlets and the

associated cabling in each classroom. All other existing cabling and data

outlet plates to be removed. In other areas, such as offices or conference

rooms, replace number of outlets as indicated on drawings. Exact location of

each outlet on existing wiremold to be verified in field. Note that as indicated

on drawings, new Cat. 6 or Cat. 6A shall be provided to new data outlets at

new locations throughout the classrooms, as noted on drawings. (Sheet notes

#13, 14, 15 on E3.3. Other sheets similar). Typical classroom data outlet

provisions, are (2) existing to be replaced on existing wiremold, (2) high on

wall, (2) on ceiling for Wireless Access Point, (1) at +46” AFF adjacent to

entry door for VoIP telephone system, as shown for each classroom on

drawings E3.1 through E3.4.

3. Per E0.1, the data symbol is a single Cat. 6 cable outlet, except where shown

with subscript # to indicate additional jacks. Note that most data outlets are

installed in existing wiremold, as shown on drawings.

Item No. 4 Material Clarification / Installation Coordination

Question per RFI No. 4 from JB Jordan & Associates – In Part 2 – Products, Tandus carpet

tile is specified, but I do not see a finish schedule included in the architectural plans. Will

the flooring be going in a different phase?

Answer – There is no carpet flooring in this project. Refer to Section III. Drawing Revisions

Item No. 2 of this addendum. See attached RFI/response.

End of Addendum No. 2

Page 5: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

ADDENDUM #2 ISSUED AUGUST 27, 2018

REDWOOD CITY SCHOOL DISTRICT

MEASURE T PHASE 1 MODERNIZATION

MCKINLEY INSTITUTE OF TECHNOLOGY 400 DUANE STREET

REDWOOD CITY, CALIFORNIA 94062

DSA File No: 41-22 DSA Application No.: 01-117248

SPENCERASSOCIATES

Architects & Planners 1121 San Antonio Road, Suite C201

Palo Alto, CA 94303(650) 965-7000

Page 6: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

Measure T Phase 1 Improvements McKinley Institute of Technology Redwood City School District

8/27/2018 Addendum #2

2

I. PROJECT MANUAL CHANGES:

a. Section 05 52 00 – Metal Railings

1. Add the following to section 2.01:

“H. Welded Steel Grillework: Manufacturer: Grating Pacific, Inc., 3651 Sausalito Street, Los Alamitos, California 90720. Toll Free 800-321-4314. Phone 562-598-4314. Fax 562-598-2740. Website www.gratingpacific.com. E-mail [email protected].

a. Welded Steel Grillework: “Coda Architectural” “Opus30”. 1. Infill Panel Material: Steel, ASTM A 1011. 2. Banding Material: Steel.

a. Flat Bars: ASTM A 36 or A 1011. b. Angles and Channels: ASTM A 36. c. Tubing: ASTM A 500.

3. Grid: Rectangular. 4. Main Bars: 1 inch by 1/8 inch (25 mm by 3 mm). 5. Cross Bars: Round, 3/16-inch (5-mm) diameter. 6. Spacing, Center-to-Center:

a. Main Bars: 1-5/8 inches (42 mm). b. Cross Bars: 5-3/16 inches (132 mm).

7. Weight: 3.1 pounds per square foot. 8. Recycled Content: 20 percent.” 9. Finish: Galvanized.

b. Section 22 00 00 – Plumbing 1. Add the following paragraph as section 2.01 D.

“D. Drinking Fountain 1. Manufacturer: Elkay 2. Type: Bottle Filling Station & Versatile B-Level ADA Cooler Non-Filtered Non-

Refrigerated Stainless 3. Model: EZSTLDDWSVRSK”

II. DRAWING CHANGES:

A. ARCHITECTURAL:

1. Sheet A10.1 – Interior Details:

a. See clarification drawing CD-A1 for new urinal screen detail 14.

2. Sheet A2.5 – Floor Plan Building A 1st Floor West: a. Note 3 change to “Install resilient flooring”.

Page 7: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

Measure T Phase 1 Improvements McKinley Institute of Technology Redwood City School District

8/27/2018 Addendum #2

3

B. ELECTRICAL: 1. Sheet E0.1 (reissued):

a. Revised camera symbol description to indicate camera location only as shown on drawing.

2. Sheet E3.1 (reissued): a. Revised sheet notes 12 and 15 to remove security cameras from scope of work, and to

provide cabling and rough-in only to existing / future camera locations as shown on drawing.

3. Sheet E3.2 (reissued): a. Revised sheet notes 9 and 12 to remove security cameras from scope of work, and to

provide cabling and rough-in only to existing / future camera locations as shown on drawing.

b. Deleted sheet note 19.

4. Sheet E3.5 (reissued): a. Added clarifications to existing data outlets to be replaced in Buildings B, C, D, E, and H

as shown on drawing.

III. CONTRACTOR QUESTIONS: 1. Question: The following drawings call for removal and installation of new drinking fountain.

None shown on mechanical drawings. Please clarify. a. Drawing A2.2, Key Note 8 b. Drawing A2.3, Key Note 5 c. Drawing A2.4, Key Note 5 d. Drawing A2.6, Key Note 8 e. Drawing A2.7, Key Note 8 f. Drawing A2.8, Key Note 8

Response: On the Architectural Drawings, the demolition notes and floor plan notes are repeated on each sheet. On demolition plans, key note 5 is called out to remove existing drinking fountains on sheets A2.1 and A2.3. For floor plans, key note 8 is called out on the plan only on sheets A2.5 and A2.7. These sheet numbers correspond to existing drinking fountains to be replaced in Building A West on the first and second floors. The drinking fountain model is being added in this addendum. See item I.B.1. Mechanical drawing M2.1 shows the first floor drinking fountain. The second floor drinking fountain is not shown on the mechanical drawings. Refer to sheet A2.3 and A2.7 for location.

2. Question: Reference drawing A5.1, Key Note 12 and Detail 14/A1.01. None shown on A5.1 or mechanical drawings. Response: Drawing A5.1, key note 12 references a urinal screen. The detail reference is 14/A10.1. This detail was missing, and has been added in this addendum. See item II.A.1.

Page 8: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

Measure T Phase 1 Improvements McKinley Institute of Technology Redwood City School District

8/27/2018 Addendum #2

4

3. Question: Per sheet A8.4 it calls for OPUS 30 infill panels for the guard rails, this is typical throughout. However, in the specifications it calls for cable railing. There are also no specifications for the OPUS 30 panels. Please advise. Response: See addendum item I.a.1.

4. Question: On plan sheet E3.5 sheet note #7 is states to replace existing Cat5 with new Cat6, however there are no outlets shown for this work. We need to know how many cables we are supposed to replace in all of these rooms. Response: See attached revised drawing E3.5.

5. Question: In addition, on plan sheets E3.1-E3.4 same sheet note #7 states to replace existing Cat5 with new Cat6, however in all of these rooms, it is only showing two outlets in the rooms. Are we to figure on just two one cable locations in all these rooms, or is there more required? Response: There shall be replacement of (2) existing single-jack data outlets and the associated cabling in each classroom. All other existing cabling and data outlet plates to be removed. In other areas, such as offices or conference rooms, replace number of outlets as indicated on drawings. Exact location of each outlet on existing wiremold to be verified in field.

Note that as indicated on drawings, new Cat. 6 or Cat. 6A shall be provided to new data outlets at new locations throughout the classrooms, as noted on drawings. (Sheet notes #13, 14, 15 on E3.3. Other sheets similar). Typical classroom data outlet provisions, are (2) existing to be replaced on existing wiremold, (2) high on wall, (2) on ceiling for Wireless Access Point, (1) at +46” AFF adjacent to entry door for VoIP telephone system, as shown for each classroom on drawings E3.1 through E3.4.

6. Question: For the open triangle data symbol, are we to assume that this is a single Cat6 cable

outlet or are more required at each of these outlets? Response: Per E0.1, the data symbol is a single Cat. 6 cable outlet, except where shown with subscript # to indicate additional jacks. Note that most data outlets are installed in existing wiremold, as shown on drawings.

7. Question: In Part 2 – Products, Tandus carpet tile is specified, but I do not see a finish schedule included in the architectural plans. Will the flooring be going in a different phase? Response: There is no carpet flooring in this project. See addendum item II.A.2.a.

Page 9: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

Measure T Phase 1 Improvements McKinley Institute of Technology Redwood City School District

8/27/2018 Addendum #2

5

8. Question: Have we made any room on the camera spec? I see that there are a couple ptz’s on the spec sheet for this one, which would not be a direct replacement of the fixed domes that are already there. Is the spec still calling for the ptz’s? Response: Security cameras are no longer in contract. See addendum item II.B items 1-3 above for associated work.

IV. ENCLOSURES:

1. Architectural Clarification Drawing CD-A1. 2. Electrical Drawings E0.1, E3.1, E3.2, and E3.5 (Reissued).

END OF ADDENDUM #2

Page 10: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking
Page 11: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking
Page 12: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking
Page 13: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking
Page 14: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking
Page 15: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

Page 1 of 1

August 2, 2018 OCM Bid #18-168

Redwood City School District (RCSD)Measure T Bond Program Team2565 Goodwin AvenueRedwood City, CA 94061 E-Mail: [email protected]

Kyle Cell: (510) 459-1809Attn: Kyle Brower E-Mail: [email protected]: Ola Gbadamosi E-Mail: [email protected]

Re: RCSD Orion/North Star/McKinley Modernizations

Subj.: OCM RFI #01

To Whom It May Concern:

Orion Alternate School:1. Drawing C1.1, Key Note 5 Gas Pipe Re-Routing – Please indicate the extent of the work since

this gas line connects to furnaces shown on M2.10.

North Star Academy:1. Drawing A2.1, Key Note 11 and A2.3, Key Note 8 – Replacing plumbing fixtures, none shown

on mechanical and plumbing drawings. Please clarify.

McKinley Institute of Technology:1. The following Drawings call for removal and installation of new drinking fountain. None

shown on mechanical drawings. Please clarify.

a. Drawing A2.2, Key Note 8b. Drawing A2.3, Key Note 5c. Drawing A2.4, Key Note 5d. Drawing A2.6, Key Note 8e. Drawing A2.7, Key Note 8f. Drawing A2.8, Key Note 8

2. Reference Drawing A5.1, Key Note 12 and Detail 14/A1.01. None shown on A5.1 ormechanical drawings.

Thank you for the opportunity to present our RFI for the above-reference project. Should you haveany questions, please contact the undersigned.

Respectfully submitted,O.C. McDonald Co., Inc.

Ray SheikProject Coordinator

Page 16: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

From: Gary Chen <[email protected]> Date: Tue, Aug 7, 2018 at 10:25 AM

Subject: OR-NSA-MIT Bid question To: "[email protected]" <[email protected]>

Hello,

Per sheet A8.4 it calls for OPUS 30 infill panels for the guard rails, this is typical throughout. However, in the specifications it calls for cable railing. There are also no specifications for the

OPUS 30 panels. Please advise.

Thank you,

Gary Chen — Sr. Project Manager

859 Cowan Rd. Burlingame, CA 94010

Office: (650) 508-1700 Cell: (650) 863-9240

Bid Fax: (650)508-1705 Gen. Fax: (650) 508-1708

www.rodanbuilders.com

Page 17: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

From: Gary Chen [mailto:[email protected]] Sent: Wednesday, August 15, 2018 2:32 PM To: Kyle Brower <[email protected]> Cc: Olakunle Gbadamosi <[email protected]> Subject: OR-NSA-MIT Data questions Hello Kyle, I have another clarification request.

McKinley school.

1. On plan sheet E3.5 sheet note #7 is states to replace existing Cat5 with new Cat6, however there are

no outlets shown for this work. We need to know how many cables we are supposed to replace in a ll of

these rooms.

2. In addition, on plan sheets E3.1-E3.4 same sheet note #7 states to replace existing Cat5 with new

Cat6, however in all of these rooms, it is only showing two outlets in the rooms. Are we to figure on just

two one cable locations in all these rooms, or is there more required?

3. For the open triangle data symbol, are we to assume that this is a single Cat6 cable outlet or are more

required at each of these outlets? Thank you, Gary Chen — Sr. Project Manager

859 Cowan Rd. Burlingame, CA 94010

Office: (650) 508-1700 Cell: (650) 863-9240

Bid Fax: (650)508-1705 Gen. Fax: (650) 508-1708

www.rodanbuilders.com

Page 18: ADDENDUM NO. 2 Date: August 27, 2018 Projects: McKinley ...€¦ · Sheet E3.1 Electrical Plan Building A 1st Floor East and ... Mechanical drawing M2.1 shows the first floor drinking

RFI # 1

TO: DATE: August 13, 2018

PROJECT: McKinley Institute of Technology

ARCHITECT: Spencer Associates

ATTENTION: SPECIFICATION SECTION: 09 68 13 Carpet Tile Flooring

RFI SENT FOR:

COMMENTS:

SIGNED:

RFI RESPONSE:

EXPLANATION:

SIGNED:

Ola Gbadamosi

In Part 2- Products, Tandus carpet tile is specified, but I do not see a finish schedule included in the

architectural plans. Will the flooring be going in a different phase?

Michaela Barney

Redwood City USD

DATE OF RESPONSE:

REQUEST FOR INFORMATION

Operations / Administration:P.O. Box 3629 Eureka, CA 95502Ph. 707-442-6423 Fax 707-444-0272CA Contractor License 955247DIR nr. 1000001320

MATERIAL CLARIFICATION

INSTALLATION COORDINATION

SUBMITTAL INFORMATION

INSTALLATION SCHEDULE

APPROVAL TO PROCEED

CHANGE ORDER REQUIREMENT

PROCEED AS NOTED BELOW

SUBMIT ADDITIONAL INFORMATION

PROCEED AS PER ATTACHED

SUBMIT CHANGE ORDER QUOTE

PROCEED WITHOUT CHANGE

REVISIONS FORTHCOMING