Nurturing curiosity through design since 1953 towerpinkster.com ©2019 Tower Pinkster Titus Associates, Inc. ADDENDUM NO. 1 DATE OF ISSUANCE: May 1, 2019 PROJECT: CONSOLIDATED 911 DISPATCH FACILITY – CRAC-1 & 2 SOUND ATTENUATION 710 EAST JOLLY LANSING, MI 48910 OWNER: INGHAM COUNTY ARCHITECT’S PROJECT NO.: 18-177.0 ORIGINAL BID ISSUE DATE: April 8, 2019 SCOPE OF WORK This Addendum includes changes to, or clarifications of, the original Bidding Documents and any previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of the Contract Documents. The Bidder shall acknowledge receipt of this Addendum in the appropriate space provided on the Bid Form. Failure to do so may result in disqualification of the Bid. DOCUMENTS INCLUDED IN THIS ADDENDUM This Addendum includes Two (2) pages of text and the following documents: Response to Contractor Questions Bidding Documents: None Contract Conditions: None Specification Sections: None Drawings: None CHANGES TO PREVIOULSY ISSUED ADDENDA None. RESPONSE TO CONTRACTOR QUESTIONS 1. Control Dampers, (TYP. Of 4) on (D) M 101, are these new or relocated Control Dampers? If new please provide specification/requirements. The existing control dampers shall be relocated. 2. Is there a chemical fire suppression system in the Data Center? The Data Center is served by both a Double-Preaction Dry-Pipe Spinkler System and a Clean Agent Fire Suppression System (Novec 1230). Two heads from the Preaction system will need to be

Upload: others

Post on 19-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus

Nurturing curiosity through design since 1953 • towerpinkster.com

©2019 Tower Pinkster Titus Associates, Inc.

ADDENDUM NO. 1

DATE OF ISSUANCE: May 1, 2019

PROJECT: CONSOLIDATED 911 DISPATCH FACILITY – CRAC-1 & 2 SOUND

ATTENUATION

710 EAST JOLLY

LANSING, MI 48910

OWNER: INGHAM COUNTY

ARCHITECT’S PROJECT NO.: 18-177.0

ORIGINAL BID ISSUE DATE: April 8, 2019

SCOPE OF WORK

This Addendum includes changes to, or clarifications of, the original Bidding Documents and any

previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of

the Contract Documents. The Bidder shall acknowledge receipt of this Addendum in the appropriate space

provided on the Bid Form. Failure to do so may result in disqualification of the Bid.

DOCUMENTS INCLUDED IN THIS ADDENDUM

This Addendum includes Two (2) pages of text and the following documents:

• Response to Contractor Questions

• Bidding Documents: None

• Contract Conditions: None

• Specification Sections: None

• Drawings: None

CHANGES TO PREVIOULSY ISSUED ADDENDA

None.

RESPONSE TO CONTRACTOR QUESTIONS

1. Control Dampers, (TYP. Of 4) on (D) M 101, are these new or relocated Control Dampers? If new please

provide specification/requirements.

The existing control dampers shall be relocated.

2. Is there a chemical fire suppression system in the Data Center?

The Data Center is served by both a Double-Preaction Dry-Pipe Spinkler System and a Clean Agent

Fire Suppression System (Novec 1230). Two heads from the Preaction system will need to be

Page 2: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus

5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2

©2019 Tower Pinkster Titus Associates, Inc.

relocated, and two heads will need to be added in front of the new bulkhead. No changes are

anticipated to the clean agent system.

3. Can epoxy be used for fastening on the project?

No, mechanical fastening must be used on the project. Epoxy is not acceptable.

4. What color does the bulkhead in the Data Center get painted?

Paint shall match existing - Sherwin Williams – Alabaster SW 7008.

5. How many floor diffusers should the contractor expect to relocate in the Call Center?

Contractor shall include the relocation of twelve (12) floor diffusers. This will consist of relocating

the 2’x2’ floor access floor tiles, coordinating final locations with Owner, and patching carpet tile.

Owner will provide carpet tile.

END OF ADDENDUM.

Page 3: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus

SHOP DRAWING ROUTING SLIP

Review Required Reviewed By Primary (P) Secondary (S)

P Project Manager / S Project Coordinator

P Architectural Designer S

P Interior Designer S

P Mechanical Designer S

P Electrical Designer S

P Structural Designer S

P Landscape Designer / S Civil Designer

Returned via Email on

Posted to Web Site on Project Manager / Project Coordinator must fill out routing slip identifying disciplines required to review and who is primary before routing.

mstrange
Text Box
x
jrumohr
Text Box
X
mstrange
Text Box
x
ehackman
Text Box
Ingham County 911 Project: 10-143
ehackman
Text Box
MDS
ehackman
Text Box
0115 - 096813 -0 Tile Carpeting PD
ehackman
Text Box
x
ehackman
Text Box
KEG - 11-18-2011
kgrimwood
Stamp
kgrimwood
Text Box
11-18-2011
kgrimwood
Text Box
Please furnish as corrected LEED information as required per our specification to meet credit EQ 4.3 in specification section 09 6813
kgrimwood
Cloud
mstrange
Date
Page 4: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus

Detailed, Grouped by Each Number

Submittal Transmittal

Clark Construction CompanyIngham County Consolidated 911 Facility Project # 10-2572

Tel: Fax:

Date: 11/2/2011 Reference Number: 0115

Transmitted To: Transmitted By: Larry HolleyEric Hackman

Tower Pinkster Clark Construction Company

242 East Kalamazoo

Suite 200

Kalamazoo, MI 49007-5828

Tel: 269.343.6133

Fax: 269.343.6633

3535 Moores River Drive, P.O. Box

40087

Lansing, MI 48901

Tel: 517.372.0940

Fax: 517.372.0668

Submittal Package No Description Due Date Package ActionQty

For Approval11/15/201109 68 13 - Tile Carpeting - Product Data0115 - 09 68 13 - 01

Transmitted For Delivered Via Tracking Number

E-MailReview

Notes Item ActionItems DescriptionQty

001 09 68 13 - Tile Carpeting -

Product Data - CPTL-1

1e

Contact Name Copies NotesCompany NameCc:

Remarks

Signature Signed Date

Page 5: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus

REVIEWED Clark Construction Company

Job #:

Date:

Reviewed By:

Submittal Pkg. #:

Review of this Submittal by Clark Construction Company

does not relieve the Contractor from responsibility for errors,

correctness of details/conformance with the Contract

Documents.

2572

November 2, 2011LRH

0115-096813-0

Page 6: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus
kgrimwood
Rectangle
Page 7: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus
Page 8: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus
Page 9: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus
Page 10: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus
Page 11: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus
Page 12: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus
Page 13: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus
Page 14: ADDENDUM NO. 1pu.ingham.org/Portals/PU/Bids/2019/58-19ADD1.pdf · 2019-05-02 · 5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2 ©2019 Tower Pinkster Titus

COMPANY NAME ATTENDEE ADDRESS SIGNATURE

Moore Trosper Construction Co. Richard Darr 4224 Keller Rd., Holt MI 48842 Present

Nielsen Construction Matt Riggins 4604 W. Holt Rd., Holt MI 48842 Present

FD Hayes Thomas Norris 2301 Beal Ave, Lansing MI Present

Allied Mechanical H. Reed

3860 Roger B Chaffee Memorial Dr., SE,

Grand Rapids MI 49548 Present

Tower Pinkster Jon Rumohr Present

Tower Pinkster Adam Doubblestein Present

Trumble Group Jim H. 6850 Aurelius Rd., Lansing MI 48911 Present

Hurst Mechanical Nick Barscewski 5800 Safety Dr., Belmont MI 49306 Present

Pre-Proposal Meeting: April 23, 2019 @ 10:00 AM

Location: Conference Room of the Ingham County 9-1-1 Central Dispatch Center, 710 E. Jolly, Lansing, MI 48910

RFP: 58-19 Sound Attenuation Improvements for the 9-1-1 Central Dispatch Center

SIGN IN- PLEASE PRINT- THANK YOU.