ADDENDUM NO. 1
DATE OF ISSUANCE: May 1, 2019
PROJECT: CONSOLIDATED 911 DISPATCH FACILITY – CRAC-1 & 2 SOUND
ATTENUATION
710 EAST JOLLY
LANSING, MI 48910
OWNER: INGHAM COUNTY
ARCHITECT’S PROJECT NO.: 18-177.0
ORIGINAL BID ISSUE DATE: April 8, 2019
SCOPE OF WORK
This Addendum includes changes to, or clarifications of, the original Bidding Documents and any
previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of
the Contract Documents. The Bidder shall acknowledge receipt of this Addendum in the appropriate space
provided on the Bid Form. Failure to do so may result in disqualification of the Bid.
DOCUMENTS INCLUDED IN THIS ADDENDUM
This Addendum includes Two (2) pages of text and the following documents:
• Response to Contractor Questions
• Bidding Documents: None
• Contract Conditions: None
• Specification Sections: None
• Drawings: None
CHANGES TO PREVIOULSY ISSUED ADDENDA
None.
RESPONSE TO CONTRACTOR QUESTIONS
1. Control Dampers, (TYP. Of 4) on (D) M 101, are these new or relocated Control Dampers? If new please
provide specification/requirements.
The existing control dampers shall be relocated.
2. Is there a chemical fire suppression system in the Data Center?
The Data Center is served by both a Double-Preaction Dry-Pipe Spinkler System and a Clean Agent
Fire Suppression System (Novec 1230). Two heads from the Preaction system will need to be
5.2.2019 Addendum No. 1 // CRAC-1 & 2 SOUND ATTENUATION// 18-177.00 2
©2019 Tower Pinkster Titus Associates, Inc.
relocated, and two heads will need to be added in front of the new bulkhead. No changes are
anticipated to the clean agent system.
3. Can epoxy be used for fastening on the project?
No, mechanical fastening must be used on the project. Epoxy is not acceptable.
4. What color does the bulkhead in the Data Center get painted?
Paint shall match existing - Sherwin Williams – Alabaster SW 7008.
5. How many floor diffusers should the contractor expect to relocate in the Call Center?
Contractor shall include the relocation of twelve (12) floor diffusers. This will consist of relocating
the 2’x2’ floor access floor tiles, coordinating final locations with Owner, and patching carpet tile.
Owner will provide carpet tile.
END OF ADDENDUM.
SHOP DRAWING ROUTING SLIP
Review Required Reviewed By Primary (P) Secondary (S)
P Project Manager / S Project Coordinator
P Architectural Designer S
P Interior Designer S
P Mechanical Designer S
P Electrical Designer S
P Structural Designer S
P Landscape Designer / S Civil Designer
Returned via Email on
Posted to Web Site on Project Manager / Project Coordinator must fill out routing slip identifying disciplines required to review and who is primary before routing.
Detailed, Grouped by Each Number
Submittal Transmittal
Clark Construction CompanyIngham County Consolidated 911 Facility Project # 10-2572
Tel: Fax:
Date: 11/2/2011 Reference Number: 0115
Transmitted To: Transmitted By: Larry HolleyEric Hackman
Tower Pinkster Clark Construction Company
242 East Kalamazoo
Suite 200
Kalamazoo, MI 49007-5828
Tel: 269.343.6133
Fax: 269.343.6633
3535 Moores River Drive, P.O. Box
40087
Lansing, MI 48901
Tel: 517.372.0940
Fax: 517.372.0668
Submittal Package No Description Due Date Package ActionQty
For Approval11/15/201109 68 13 - Tile Carpeting - Product Data0115 - 09 68 13 - 01
Transmitted For Delivered Via Tracking Number
E-MailReview
Notes Item ActionItems DescriptionQty
001 09 68 13 - Tile Carpeting -
Product Data - CPTL-1
1e
Contact Name Copies NotesCompany NameCc:
Remarks
Signature Signed Date
REVIEWED Clark Construction Company
Job #:
Date:
Reviewed By:
Submittal Pkg. #:
Review of this Submittal by Clark Construction Company
does not relieve the Contractor from responsibility for errors,
correctness of details/conformance with the Contract
Documents.
2572
November 2, 2011LRH
0115-096813-0
COMPANY NAME ATTENDEE ADDRESS SIGNATURE
Moore Trosper Construction Co. Richard Darr 4224 Keller Rd., Holt MI 48842 Present
Nielsen Construction Matt Riggins 4604 W. Holt Rd., Holt MI 48842 Present
FD Hayes Thomas Norris 2301 Beal Ave, Lansing MI Present
Allied Mechanical H. Reed
3860 Roger B Chaffee Memorial Dr., SE,
Grand Rapids MI 49548 Present
Tower Pinkster Jon Rumohr Present
Tower Pinkster Adam Doubblestein Present
Trumble Group Jim H. 6850 Aurelius Rd., Lansing MI 48911 Present
Hurst Mechanical Nick Barscewski 5800 Safety Dr., Belmont MI 49306 Present
Pre-Proposal Meeting: April 23, 2019 @ 10:00 AM
Location: Conference Room of the Ingham County 9-1-1 Central Dispatch Center, 710 E. Jolly, Lansing, MI 48910
RFP: 58-19 Sound Attenuation Improvements for the 9-1-1 Central Dispatch Center
SIGN IN- PLEASE PRINT- THANK YOU.