Mission Bay Development Group, LLC Page 1 of 1 Addendum No. 1 Mission Bay Park P6 Bid Date: 3:00 p.m. on Tuesday, December 3, 2013 All bids must be submitted no later than 3:00 p.m. on Tuesday, December 3, 2013 at the office of: Mission Bay Development Group, LLC 410 China Basin Street San Francisco, CA 94158 Attn: Joe Antonio General Notes 1.1 As discussed in the pre-bid meeting, the park project site is in a construction zone and the surrounding roadways and parcels are currently under construction. Please see the attached aerial view of the area. The access to the site will be from Fourth Street using either Long Bridge Street or China Basin Street. The project site is marked in orange, and the most likely staging area is marked in pink. The staging area has a layer of loose soil which may need to be compacted for use and the cost for this should be included in the mobilization item. There is no crew parking in the construction zone unless the project contractor designates a portion of the project site or staging area for parking. The bidder is responsible for site security for the project site and staging area. The access for the project site and staging area is over a sidewalk. The bidder should include provisions for protecting this sidewalk as well as all other installed facilities. 1.2 At the pre-bid meeting, the Office of Community Investment and Infrastructure (OCII), which is the Successor Agency to the San Francisco Redevelopment Agency, discussed the subcontracting goals. The Mission Bay Park P6 project has a 50% SBE goal which is slightly different than past projects. First consideration is for SBEs or LBEs located in San Francisco. Please find attached the New Successor Agency SBE Certification Procedures dated Nov 6, 2013 for your reference. Clarifications to Bidders 1.3 Please see the attached plan sheets with the noted revisions: Sheet L1.1 - Boulder call-outs added Sheet L1.5 - Sheet Scale updated from 1'=1/8" scale for a full size plan to 1' = 3/16" Sheet L2.5 - Details 2 and 6 updated Sheet L3.0 - Irrigation controller location moved to coordinate with electrical drawing Sheet E2 1.4 Contractor to furnish and install concrete collars around all precast pull boxes as noted on Sheet E1, Precast Pull Box Note 5, in landscaped or paved areas. All precast pull boxes located in concrete hardscape areas are to be installed with an AVC cover. Attachments 1.5 Aerial view of the project area with the project site and likely staging area noted. 1.6 New Successor Agency SBE Certification Procedures, dated 11/6/13. 1.7 The agenda and sign-in sheet from the pre-bid meeting on 11/19/13. 1.8 CCSF Surety Bond and Finance Program Information. 1.9 Plan holders list from 11/22/13. 1.10 Revised Plan Sheets L1.1, L1.5, L2.5, and L3.0

Upload: others

Post on 14-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Addendum No. 1 Park P6 - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA32128.pdfCompass Engineering Contractors Mike Moore (510) 264-0225 m.moore@compassec.com De Haro Ramirez

Mission Bay Development Group, LLC Page 1 of 1

Addendum No. 1

Mission Bay Park P6

Bid Date: 3:00 p.m. on Tuesday, December 3, 2013

All bids must be submitted no later than 3:00 p.m. on Tuesday, December 3, 2013 at the office of:

Mission Bay Development Group, LLC 410 China Basin Street

San Francisco, CA 94158 Attn: Joe Antonio

General Notes 1.1 As discussed in the pre-bid meeting, the park project site is in a construction zone and the

surrounding roadways and parcels are currently under construction. Please see the attached aerial view of the area. The access to the site will be from Fourth Street using either Long Bridge Street or China Basin Street. The project site is marked in orange, and the most likely staging area is marked in pink. The staging area has a layer of loose soil which may need to be compacted for use and the cost for this should be included in the mobilization item. There is no crew parking in the construction zone unless the project contractor designates a portion of the project site or staging area for parking. The bidder is responsible for site security for the project site and staging area. The access for the project site and staging area is over a sidewalk. The bidder should include provisions for protecting this sidewalk as well as all other installed facilities.

1.2 At the pre-bid meeting, the Office of Community Investment and Infrastructure (OCII), which is the Successor Agency to the San Francisco Redevelopment Agency, discussed the subcontracting goals. The Mission Bay Park P6 project has a 50% SBE goal which is slightly different than past projects. First consideration is for SBEs or LBEs located in San Francisco. Please find attached the New Successor Agency SBE Certification Procedures dated Nov 6, 2013 for your reference.

Clarifications to Bidders 1.3 Please see the attached plan sheets with the noted revisions:

Sheet L1.1 - Boulder call-outs added Sheet L1.5 - Sheet Scale updated from 1'=1/8" scale for a full size plan to 1' = 3/16" Sheet L2.5 - Details 2 and 6 updated Sheet L3.0 - Irrigation controller location moved to coordinate with electrical drawing Sheet E2

1.4 Contractor to furnish and install concrete collars around all precast pull boxes as noted on Sheet E1, Precast Pull Box Note 5, in landscaped or paved areas. All precast pull boxes located in concrete hardscape areas are to be installed with an AVC cover.

Attachments 1.5 Aerial view of the project area with the project site and likely staging area noted. 1.6 New Successor Agency SBE Certification Procedures, dated 11/6/13. 1.7 The agenda and sign-in sheet from the pre-bid meeting on 11/19/13. 1.8 CCSF Surety Bond and Finance Program Information. 1.9 Plan holders list from 11/22/13. 1.10 Revised Plan Sheets L1.1, L1.5, L2.5, and L3.0

Page 2: Addendum No. 1 Park P6 - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA32128.pdfCompass Engineering Contractors Mike Moore (510) 264-0225 m.moore@compassec.com De Haro Ramirez
Page 3: Addendum No. 1 Park P6 - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA32128.pdfCompass Engineering Contractors Mike Moore (510) 264-0225 m.moore@compassec.com De Haro Ramirez

AGENDA- Pre - Bid Conference Mission Bay - Park P6

Date: 11/19/13

Time: 11:00am Location: Construction Trailer, 410 China Basin Street, San Francisco, CA

Introduction of Personnel and Agencies

Mission Bay Development Group, LLC: Owner/Developer Alta Engineering Group, Inc: Construction Manager Royston Hanamoto Alley & Abey: Project Designers Freyer and Laureta, Inc. : Project Engineers Treadwell & Rollo: Geotechnical Engineers

Iris Environmental : Environmental Monitoring / RMP Compliance CCSF- Department of Public Works (SFDPW-ID) : City Construction Management Team Office of Community Investment and Infrastructure (OCII), Successor Agency to the SFRA Project Scope / Requirements

• Park: Approx. 48,000 SF Site o Scope : Demo, Grading, Underground, Lights and Electrical, Concrete Hardscape, Pavers,

Asphalt Paving, Resin Paving, Two Play Areas with Structures and Resilient Matting, Benches, Fencing, other Furnishings and Signs, Nature Exploration Area with Architectural Features, Landscaping, Irrigation.

• Project Access • Site Logistics and Security • Hauling Requirements for Soil/EHASP • Safety • Project Schedule • SWPPP • Project Labor Agreement (Union Labor) • Bid Bonds, Payment/Performance Bonds, Warranty Bonds required.

Bid Related Items and Dates:

• Friday, November 22, 2013 @ 5:00 pm – RFI Deadline • Tuesday, December 3, 2013 @ 3:00 pm – Bids Due • Thursday, December 5, 2013@3:00 pm - Detailed Schedule of Values Due • The bid opening will be private. The three lowest bidders will be invited for an interview. The

attendees shall be the proposed project management and field supervision staff for this project. Office of Community Investment and Infrastructure - Successor Agency to the SF Redevelopment Agency

1. OCII - Successor Agency to SFRA Certified Contractors 2. Subcontracting Goals 3. Local Hiring Work Force Goals

City and County of San Francisco – Surety Bond and Finance Program

Page 4: Addendum No. 1 Park P6 - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA32128.pdfCompass Engineering Contractors Mike Moore (510) 264-0225 m.moore@compassec.com De Haro Ramirez
Page 5: Addendum No. 1 Park P6 - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA32128.pdfCompass Engineering Contractors Mike Moore (510) 264-0225 m.moore@compassec.com De Haro Ramirez

Administered by Merriwether & Williams Insurance Services. For additional program information contact: Surety Department [email protected] 415-986-3999 415-391-5910-fax T:\Team\MB Development\600-800 SOC Projects\608. Park P6\608.01.04. Bid & Award\608.01.04.02. Bid Documents\Addendum No. 1\What We Do 11-26-12.doc

Bridge to Opportunity City and County of San Francisco Surety Bond & Finance Program

SURETY BOND & FINANCE ASSISTANCE PROGRAM The City and County of San Francisco is committed to providing local small and emerging contractors access to contract

opportunities on City construction projects. The Surety Bond & Finance Program facilitates this objective by providing you, the contractor, with the tools needed to become

competitive for public works construction projects. Recognizing that bonding and working capital are common barriers contractors face when bidding and completing contracts, the

program addresses these challenges. The program benefits both the contractors and the City’s economy in a positive way by reducing public work construction costs

and increasing job opportunities available to local contractors. Securing the employment of more local contractors, results in a strong local economy and keeps money cycling within the City.

ELIGIBILITY Program is for Contract Monitoring Division certified Small or Micro LBE Contractors bidding on City construction contracts. Program is for SF PUC Water System Improvement Program certified Contractors bidding on SFPUC contracts. Contact the Contract Monitoring Division at (415) 252-2500, for eligibility or to become certified. Contact the San Francisco Public Utilities Commission website at http://contracts.sfwater.org, for eligibility or to become certified.

SERVICES - Bid, Performance & Payment Bond Guarantees** - Contract Financing Guarantees - Accounting Assistance and Referrals - Third Party Funds Administration - Bonding & Financing Consultation & Technical Assistance - Individual Counseling & Group Workshops on Contractor Related Topics

WHAT WE DO Individual Counseling Available:

In depth explanation of the bonding and lending process Provide Group Workshops Such As:

Outreach to contractors and subcontractors regarding upcoming work Explanation of bonding and lending process Explanation of bookkeeping essentials and the necessity of financial statements Explanation of funds control process How to estimate for upcoming bids Wage Determination and Scope of Work

Technical Assistance: Assistance with completion of Paperwork/Package required by sureties and lenders Identify possible deficiencies that might preclude contractor/subcontractor from bonding and/or lending Determine means to overcome possible deficiencies

Assist contractors/subcontractors in obtaining first bond/loan and/or in increasing their bonding/loan capacity

RELATIONSHIPS Assemble team to best assist contractor’s/subcontractor’s needs, i.e. surety broker, surety company, lender, and professional

services Work with contractor’s/subcontractor’s existing relationships, i.e. surety broker, surety-company, and lender

EXAMPLES Utilize guarantee, when necessary, to obtain bond/loan Bond/Loan have been approved through obtaining better quality financial statements Funds Administration has been utilized with or without a guarantee to mitigate risk on the bond and/or loan Introduced to a surety broker with surety markets responsive to small and emerging contractors Introduced to a lender responsive to contractors

COST Program may subsidize fees associated with Third Party Funds Administration up to $5,000 * Program may subsidize fees associated with Accounting Assistance up to $3,200 * * Subsidy Provided Based Upon Availability of Funds **Contractors/Subcontractors are responsible for bond premiums to Surety Companies

SUCCESSES Contractors and Subcontractors were able to bid on $281 million in contracts Contractors and Subcontractors were awarded $81 million in contractors Contractors and Subcontractors obtained $6.1 million in working capital loans

Page 6: Addendum No. 1 Park P6 - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA32128.pdfCompass Engineering Contractors Mike Moore (510) 264-0225 m.moore@compassec.com De Haro Ramirez

Mission Bay Park P6 Planholders List

Company Contact Phone Email or FaxShooter and Butts Keith Hollon (925) 460-5155 [email protected] Albanese Bob Rogers (408) 727-5700 [email protected] Playgrounds David Braun (415) 891-8200 [email protected] Unlimited Richard MacDermott (408) 639-5096 [email protected] Landscape and Construction Chris Bauman (415) 447-4800 [email protected] Construction Tin Tran (415) 643-1900 [email protected] Construction Mike Clancy (415) 368-4351 [email protected] Landscape Inc. Nick Mangels (707) 588-8677 [email protected] Works David Hudson (415) 505-2393 [email protected] Electric Wilson Lew (415) 671-3858 [email protected] Young Construction Chris Young (925) 766-3588 [email protected] A. Bothman Angie Ramos (408) 279-2277 [email protected]. Flores Brian Gleghorn (415) 337-2934 [email protected] Corporation Robert O. Valentine, Jr. (415) 453-3732 [email protected] Hester Annie Hester (510) 632-7676 [email protected] Crest Landscape Noel Tristan (925) 924-8921 [email protected] Fence Co., Inc. Keith Trask (408) 200-1720 [email protected] Repair Service Jim Sedlack (415) 467-2150 [email protected] Construction, Inc. Sharon Alberts (925) 406-4756 [email protected] W. Smith, Inc. Sean Smith (415) 290-2921 [email protected] Brothers Construction Henry Wu (415) 516-3783 [email protected] Electric Lucy Chiang (510) 812-4918 [email protected] Construction David Metzger (415) 747-2238 [email protected] Suzanne Mendoza (415) 235-4915 [email protected] Engineering Contractors Mike Moore (510) 264-0225 [email protected] Haro Ramirez Group Marco A. Ramirez (415) 552-3504 [email protected] Tree Care Company Charles Slesinger (415) 265-0028 (510) 548-0214Mission Constructors Isabelle Concio (415) 282-8453 [email protected] & Reilly Kevin Marshall (415) 575-1320 [email protected]. Ferrando & Co. Fred Canavero (650) 756- 2800 [email protected] Builders, Inc. Rosario Castro (415) 285-5000 [email protected] Brothers Electric Alex Jones (510) 402-4177 [email protected] and Company, Inc. Joe Miller (925) 602-8800 [email protected]

Updated : 11/22/2013

Page 7: Addendum No. 1 Park P6 - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA32128.pdfCompass Engineering Contractors Mike Moore (510) 264-0225 m.moore@compassec.com De Haro Ramirez

T I MB

EE DL

E

BLOCK 13

FUTURE DOG PARK

BLOCK 12

LONG BRIDGE STREET

CHINA BASIN STREET

BLOCK 11

LIMIT O

F WORK

LIMIT O

F WO

RK

BLOCK 6

BLOCK 5

CHINA BASIN STREET

AB

B

ABB

BC

C

A

B

B AC

A

CBB

CB

SITE AMENITIES LEGENDSYMBOL EQUIPMENT DETAIL

BENCH WITH BACK 1/L2.6

BENCH WITHOUT BACK 2/L2.6

TRASH/RECYCLING RECEPTACLE 8/L2.6

BOULDERS 2/L2.5

BIKE RACK 7/L2.6

DRINKING FOUNTAIN 6/L2.6

LIGHT PADSEE ELECTRICAL FOR LIGHTING 3/L2.5

7/L2.2

7/L2.2

DRY CREEK 13/L2.2

3/L2.6ACCESSIBLE PICNIC TABLE

PEDESTRIANCONCRETE PAVING 1/L2.2

CONCRETE UNIT PAVERS 5/L2.2

BLUE BLEND RESILIENT MATTING45% RH20 STANDARD BLUE45% RH61 LIGHT GREY10% RH23 AZURE BLUEGREEN BLEND RESILIENT MATTING60% RH10 STANDARD GREEN40% RH61 LIGHT GREY

VEHICULARCONCRETE PAVING 2/L2.2

REMOVABLE BOLLARDS 4/L2.5

File N

am

e: S

:\A

ctive Jo

b F

iles\S

an

F

ran

cisco

M

issio

n B

ay C

hild

ren

's P

ark P

6 12024A

\C

AD

\C

D\R

HA

A\P

lo

t\L

1.1_S

ite C

on

stru

ctio

n P

lan

.d

wg

P

lo

tted

B

y: K

SA

TT

LE

R D

ate P

lo

tted

: 11/20/2013 5:01 P

M

OWNER / MASTER DEVELOPER:

FOCIL-MB, LLC.

Mission Bay

Park P6

PROJECT NUMBER

SHEET TITLE

SAN FRANCISCO MILL VALLEY TAHOE DELHI

2 2 5 M i l l e r A v e n u e , M i l l V a l l e y , C A 9 4 9 4 1T 415 383 7900 F 415 383 1433 www.rhaa.com

REVISIONS

Drawn By:

REGISTRATION AND SIGNATURE

No. Date Description

Checked By:

NO

T FO

R C

ON

STR

UC

TIO

N

CONSULTANTS

DATE

9 October 2013

TF

CH

01

11/15/12

75% Construction

Documents

02

03

100% ConstructionDocuments #2

SUBMITTAL

100% Construction

Documents #1

10/09/13

100% Construction

Documents #2

DEVELOPMENT MANAGER:

MISSION BAY DEVELOPMENT

GROUP, LLC

07/19/13

11/20/13

Addendum 1

1

ADDENDUMS

No. Date Description

L1.1

Site ConstructionPlan

0 20 40 60

CONSTRUCTION NOTES:1. ALL WRITTEN DIMENSIONS SUPERCEDE SCALED

DIMENSIONS.

2. REFER TO IRRIGATION PLAN FOR REQUIREMENTSOF SLEEVING UNDER PAVING

.3. ALL CURVES SHALL BE SMOOTH AND CONTINUOUS

WITH CAREFULLY MATCHED TANGENTS FORWALKS BASED ON CENTERLINE DIMENSION.

4. SEE ENLARGEMENT DETAILS FOR ADDITIONALLAYOUT INFORMATION.

5. GRADE WOOD FIBER & RESILIENT MATTINGSUBSURFACE FOR POSITIVE DRAINAGE INTOCATCH BASIN.

6. SEE SHEET CIVIL, C1.0 FOR CONNECTION TOSTORM DRAIN SYSTEM.

PREFABRICATED SITE AMENITIES, GENERAL NOTES :7. DO NOT USE MANUFACTURER DRAWINGS PROVIDED

IN THIS SET FOR CONSTRUCTION. ONLY USEDRAWINGS PROVIDED WITH STRUCTURE OR SITEAMENITY BY MANUFACTURER. DESIGNIMPROVEMENTS MAY RESULT IN CHANGES TO LOADSAND DIMENSIONS. THESE DRAWINGS PROVIDED FORBIDDING & REFERENCE ONLY.

8. SEE SPECIFICATIONS FOR PREFABRICATED SITEAMENITY MAKE AND MODEL NUMBERS

9. INSTALL PREFABRICATED SITE AMENITIES PERMANUFACTURERS RECOMMENDATIONS

10. WHEN INSTALLING PLAY EQUIPMENT CONTRACTORTO STRICTLY ADHERE TO ALL FALL ZONEREQUIREMENTS PER THE U.S CONSUMER PRODUCTSAFETY COMMISSION PUBLIC PLAYGROUND SAFETYHANDBOOK AND ASTM F1487-07. CONTRACTOR TONOTIFY OWNERS REP IMMEDIATELY OF ANYDISCREPANCY WITH DRAWINGS.

1

1

1

1

1

Page 8: Addendum No. 1 Park P6 - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA32128.pdfCompass Engineering Contractors Mike Moore (510) 264-0225 m.moore@compassec.com De Haro Ramirez

TI

MB

EE

DL

E

BOULDERSTYP.

ANIMAL STAMPS

C

C

C

B

EXPLORATIONZONE PLANTING

ACCESSIBLEPICNIC TABLE

C

EXPLORATION ZONESIGN

R10'-11"

R5'-6"

R9'-1"

R9'-9"

R6'-7"

R7'-8"

R9'-6"

10'-2"

2'-5"

R6'-11"R17'

7'-6"

2'-4"

1'-5"

1'-1"R9'-6"

R10'-6"

R9'-6"R12'-4"

R13'

BC

RESIN PAVE, TYP.

R7'

R25'-8"

2'-4

"

8'-6"

R5'-6"

R18'-3" R6'-11"R17'

R6" TYP.

R6'-7"

R14'-1"

1'-4"

1'-11"

R4'-3"

R10'-11"

R12'-4"

B C

B

C

B

R12'-4"

R12'-4"

R43'-4"

R18'-2"

R8'

R3'-6"

R23'-8"

R5'-2"

R1'-5"

R13'-11"

R13'

R10'-9"

R13'-11"

R13'-5"

R13'-7"

3'-10"

2'

1'

R1'

R6"

R9'-1"

R11'-11"

1'

2'

6'-2"

7'-2"

R11'-11"R1'

R9'-1"

6'-8"

6'-8"

B

BB

C

C

RESIN PAVE, SEE DETAIL7/L2.5

LEGEND BOULDER SCHEDULE

ROCKHEIGHT ABOVE

GRADE

DIMENSIONS

A

B

C

30"

WIDTH ATGRADE

36"

24"12"-18"

18"-24"

24"-30"

File N

am

e: S

:\A

ctive Jo

b F

iles\S

an

F

ran

cisco

M

issio

n B

ay C

hild

ren

's P

ark P

6 12024A

\C

AD

\C

D\R

HA

A\P

lo

t\L

1.5_E

xp

lo

ratio

n C

on

stru

ctio

n &

L

ayo

ut.d

wg

P

lo

tted

B

y: K

SA

TT

LE

R D

ate P

lo

tted

: 11/20/2013 5:03 P

M

OWNER / MASTER DEVELOPER:

FOCIL-MB, LLC.

Mission Bay

Park P6

PROJECT NUMBER

SHEET TITLE

SAN FRANCISCO MILL VALLEY TAHOE DELHI

2 2 5 M i l l e r A v e n u e , M i l l V a l l e y , C A 9 4 9 4 1T 415 383 7900 F 415 383 1433 www.rhaa.com

REVISIONS

Drawn By:

REGISTRATION AND SIGNATURE

No. Date Description

Checked By:

NO

T FO

R C

ON

STR

UC

TIO

N

CONSULTANTS

DATE

9 October 2013

TF

CH

01

11/15/12

75% Construction

Documents

02

03

100% ConstructionDocuments #2

SUBMITTAL

100% Construction

Documents #1

10/09/13

100% Construction

Documents #2

DEVELOPMENT MANAGER:

MISSION BAY DEVELOPMENT

GROUP, LLC

07/19/13

11/20/13

Addendum 1

1

ADDENDUMS

No. Date Description

L1.5

Exploration ZoneConstruction &Layout Plan

16 0 8 16 32SCALE 3/16"=1'-0" 1

Page 9: Addendum No. 1 Park P6 - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA32128.pdfCompass Engineering Contractors Mike Moore (510) 264-0225 m.moore@compassec.com De Haro Ramirez

NOTE:1. SEE L1.1 & L1.5 FOR LOCATION OF BOULDERS. SEE L1.5

EXPLORATION ZONE CONSTRUCTION & LAYOUT PLANFOR SIZE OF BOULDERS.

2. BOULDERS ARE CONSIDERED A SEATING ELEMENT,CONTRACTOR TO SELECT FLAT TOPPED BOULDERSWITH RELATIVELY LEVEL AND SMOOTH TOP SURFACE.

3. DETAIL REPRESENTS TYPICAL LAYOUT

AP

PR

OX

12"

SE

EB

OU

LDE

RS

CH

ED

ULE

WIDEST PART OF BOULDER MEETS GRADE.

BURY BOULDERS 1/3 TO 1/2 DEPTH.BOULDERS, SEE SPECS

CONCRETE PAVING OR DECOMPOSEDGRANITE, SEE LAYOUT PLANS

9"MIN

PLACE BOULDER WITH A MINIMUM 9"SEPARATION TO AVOID HEAD/HANDENTRAPMENT.

9"MIN

CLASS 2 AGGREGATEBASE LEVELINGCOURSE 3/4"- SEE SPECS.

COMPACTED SUBGRADE.SEE SPECS.

1'-0"

± 40

3 8", TY

P18

" MIN

, TY

P

20" TYP

± 12

3 8"

TYP

28" TYP

± 2

12"

± 8

58"

ONE PIECE CAST ALUMINUM BOLLARDW/ THREADED HOLES TO RECEIVE

BASE PLATE, SEE SPECS

12" CAST THICKNESS, TYP

ONE PIECE WELDED UPPER BASEPLATE W/ MALE PIPE AND HASP HOLE,

BOLT ATTACHES TO BOLLARD

ONE PIECE WELDED IN-GROUNDBASE PLATE W/ #3 REBAR ANCHOR,

FEMALE PIPE SLEEVE AND HASPFOR LOCK, IMBED FLUSH TO GRADE

(X4) 38" Ø X 112"

TAMPER-RESISTANTBUTTON-HEADMOUNTINGSCREW

ALUMINUMPADLOCKBY OTHERS

SECTION - FRONT SECTION - SIDE

CONC FOOTING, PER MFGRECOMMENDATION

CONC PAVING(VEHICULAR)

2L2.2

4'-0"CLR

PRESSURE TREATEDDOUG FIR TIMBER S4S

#4 REBAR CENTER INTIMBER, EPOXY INPRE-DRILLED HOLES

RESIN PAVEMENT 7L2.5

SECTION

PLAN

#4 REBAR CENTER INTIMBER, EPOXY INPRE-DRILLED HOLES

PRESSURE TREATEDDOUG FIR TIMBER S4S

BOULDERS 2L2.5

1 CUBIC FOOT CONC.FOOTING, TYP.

BOULDERS 2L2.5

6"

4"

RESIN PAVING, SEE SPECS,SLOPE TO DRAIN 1% MIN,2% MAX CROSS SLOPEDSEE SPECS.

BASE ROCK, CLASS IICOMPACTED PER SPECS.SUBGRADE COMPACTEDPER SPECS.

RW HEADER,SEE DETAIL 7/L4.2

2'-0"

21 2"6"

File N

am

e: S

:\A

ctive Jo

b F

iles\S

an

F

ran

cisco

M

issio

n B

ay C

hild

ren

's P

ark P

6 12024A

\C

AD

\C

D\R

HA

A\P

lo

t\L

2.5_C

on

stru

ctio

n D

etails.d

wg

P

lo

tted

B

y: K

SA

TT

LE

R D

ate P

lo

tted

: 11/20/2013 5:02 P

M

OWNER / MASTER DEVELOPER:

FOCIL-MB, LLC.

Mission Bay

Park P6

PROJECT NUMBER

SHEET TITLE

SAN FRANCISCO MILL VALLEY TAHOE DELHI

2 2 5 M i l l e r A v e n u e , M i l l V a l l e y , C A 9 4 9 4 1T 415 383 7900 F 415 383 1433 www.rhaa.com

REVISIONS

Drawn By:

REGISTRATION AND SIGNATURE

No. Date Description

Checked By:

NO

T FO

R C

ON

STR

UC

TIO

N

CONSULTANTS

DATE

9 October 2013

TF

CH

01

11/15/12

75% Construction

Documents

02

03

100% ConstructionDocuments #2

SUBMITTAL

100% Construction

Documents #1

10/09/13

100% Construction

Documents #2

DEVELOPMENT MANAGER:

MISSION BAY DEVELOPMENT

GROUP, LLC

07/19/13

11/20/13

Addendum 1

1

ADDENDUMS

No. Date Description

L2.5

Construction Details

TREE WELL IN RESILIENT MATTING1 SCALE: 3/4" = 1'-0"

BOULDERS2SCALE:1/2"=1'-0"

REMOVABLE BOLLARD4 SCALE: 1" = 1'-0"

LIGHT PAD3SCALE:1"=1'-0"

TREE WELL IN CONC.5SCALE: 3/4" = 1'-0"

ACCESSIBLE CREEK CROSSING6 SCALE: 1/2" = 1'-0"

RESIN PAVE7SCALE: 1 1/2"=1'-0"

1

1

Page 10: Addendum No. 1 Park P6 - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA32128.pdfCompass Engineering Contractors Mike Moore (510) 264-0225 m.moore@compassec.com De Haro Ramirez

BLOCK 13

FUTURE DOG PARK

BLOCK 5

LONG BRIDGE STREET

CHINA BASIN STREET

BLOCK 11

LIMIT O

F WORK

LIMIT O

F WO

RK

BLOCK 6

MV

FS

BF

C

372 sf

5.4 151.0"

5.7 161.0"

3.4 171.0"

4.5 181.0"

15.7 191.0"

5.7 201.0"

6.1 211.0"

5 011.0"

13.9 021.0"

9.9 031.0"

3 041.0"

6.7 051.0"

18.8 061.0"

13.1 071.0"

12.5 081.0"

8.1 091.0"

11.9 101.0"

11.4 111.0"

9.0 121.0"

9.0 131.0"

6.9 141.0"

19.8 291.0"

8.2 281.0"

6.3 221.0"

7.0 231.0"

23.7 261.0"

6.6 271.0"

4.2 241.0"

3.6 251.0"

14.8 331.0"

6.0 321.0"

8.3 311.0"

11.2 341.0"

7.7 351.0"

6.0 301.0"

C

MV

FS

REMOTE CONTROL VALVEGRISWOLD 2000 SERIES, SIZE PER PLAN

QUICK COUPLING VALVERAINBIRD 44NPISOLATION VALVENIBCO T113, LINE SIZEMAINLINESCHEDULE 40 GALVANIZED STEEL SIZE PER PLANLATERAL LINESCHEDULE 40 PVC, SIZE PER CHARTSLEEVESCORRUGATED STEELCONTROLLER W/ PEDESTAL ENCLOSURE:ET WATER SYSTEM MODEL #205

MASTER VALVEGRISWOLD 2160 SERIES, 2"FLOW SENSORBADGER 250BR-1006, 1"

IN LINE DRIP IRRIGATIONTORO - DL2000-RGP-4-12(12" ROW SPACING) WITHROOT GUARD, 1.0 GAL/HRFCH-H FLUSH VALVEYD-500-374 AIR VACUUM RELIEF

IRRIGATION LEGEND

SYMBOL DESCRIPTION

TREE BUBBLERS:RAIN BIRD RWS-B-C-1402, 2 PER TREE

BFBACKFLOW PREVENTERWILKINS-975LX2-2"

CONTROLLER STATION NO.VALVE SIZEGALLONS PER MINUTE

REMOTE CONTROL VALVE - DRIP ZONEGRISWOLD 2000 SERIES W/ DRIP ASSEMBLY,SIZE PER PLAN

13.1 011.0"

NOTES

BURYDRIPLINEWITH 4" SOILCOVER PERMFR.

00 - 12 GPM: 1.0"13 - 28 GPM: 1.5"29 - 45 GPM: 2.0"46 - 65 GPM: 2.5"66 - 100 GPM: 3.0"

PVC LATERAL LINE SIZING

00 - 25 GPM: 1.0" VALVE26 - 35 GPM: 1.25"36 - 50 GPM:1.5"51 - 100 GPM: 2.0"

TYPICAL VALVE SIZING

0.5 GPM EACHBUBBLER

File N

am

e: S

:\A

ctive Jo

b F

iles\S

an

F

ran

cisco

M

issio

n B

ay C

hild

ren

's P

ark P

6 12024A

\C

AD

\C

D\R

HA

A\P

lo

t\L

3.0_Irrig

atio

n P

lan

.d

wg

P

lo

tted

B

y: K

SA

TT

LE

R D

ate P

lo

tted

: 11/20/2013 5:06 P

M

OWNER / MASTER DEVELOPER:

FOCIL-MB, LLC.

Mission Bay

Park P6

PROJECT NUMBER

SHEET TITLE

SAN FRANCISCO MILL VALLEY TAHOE DELHI

2 2 5 M i l l e r A v e n u e , M i l l V a l l e y , C A 9 4 9 4 1T 415 383 7900 F 415 383 1433 www.rhaa.com

REVISIONS

Drawn By:

REGISTRATION AND SIGNATURE

No. Date Description

Checked By:

NO

T FO

R C

ON

STR

UC

TIO

N

CONSULTANTS

DATE

9 October 2013

TF

CH

01

11/15/12

75% Construction

Documents

02

03

100% ConstructionDocuments #2

SUBMITTAL

100% Construction

Documents #1

10/09/13

100% Construction

Documents #2

DEVELOPMENT MANAGER:

MISSION BAY DEVELOPMENT

GROUP, LLC

07/19/13

11/20/13

Addendum 1

1

ADDENDUMS

No. Date Description

L3.0

IrrigationPlan

0 20 40 60

1