addendum no. 01issued: 2/18/2020 - arnell-west · addendum no. 01 to the construction contract for...

16
420 East South Temple, Suite 100 . Salt Lake City . Utah . 84111 . 801.595.6700 . www.mhtn.com 2/18/20 12:50 PM . Page 1 of 4 document2 Addendum No. 01 Issued: 2/18/2020 Project Name: Oquirrh Hills MS Remodel 2020 Project No.: 2019587 Addendum No. 01 to the Construction Contract for the above referenced project: All Contractors submitting proposals on the above captioned project shall be governed by the following changes and explanations to the Bid Documents, dated [insert date of bid documents], and shall submit their bids in accordance therewith: Changes to the Project Manual 1.1 Prior Approvals PRIOR APPROVALS: The following manufacturers, trade names and products are allowed to bid on a name brand only basis with the provision that they completely satisfy all and every requirement of the drawings, specifications, and all addenda shall conform to the design, quality and standards specified, established and required for the complete and satisfactory installation and performance of the building and al its respective parts. Product Manufacture Resilient Athletic Flooring Durathon Elite Infield VAV Re-Heat Boxes Tuttle & Bailey, Krueger Packaged Rooftop Units American Standard, Lennox Packaged AC Units Lennox Make-Air Units Modine Exhaust Fans Loren Registers, Grilles, Diffusers Krueger Fire/Smoke Dampers United Enertech, Ruskin Fire Dampers United Enertech, Ruskin Manual Dampers United Enertech Flexible Duct JPL Plumbing Fixtures Sloan Faucets T&S Brass, American Standard, Hydrotek Flush Valves American Standard Drinking Fountains Oasis Ice Maker Box LSP Washer Box LSP Drainage Products Mifab Fixture Carriers Mifab Trap Guards Mifab Cleanouts Mifab Stops & Supplies LSP

Upload: others

Post on 11-Nov-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

420 East South Temple, Suite 100 . Salt Lake City . Utah . 84111 . 801.595.6700 . www.mhtn.com2/18/20 12:50 PM . Page 1 of 4

document2

Addendum No. 01 Issued: 2/18/2020Project Name: Oquirrh Hills MS Remodel 2020

Project No.: 2019587

Addendum No. 01 to the Construction Contract for the above referenced project:

All Contractors submitting proposals on the above captioned project shall be governed by the following changes and explanations to the Bid Documents, dated [insert date of bid documents], and shall submit their bids in accordance therewith:

Changes to the Project Manual

1.1 Prior Approvals

PRIOR APPROVALS:The following manufacturers, trade names and products are allowed to bid on a name brand only basis with the provision that they completely satisfy all and every requirement of the drawings, specifications, and all addenda shall conform to the design, quality and standards specified, established and required for the complete and satisfactory installation and performance of the building and al its respective parts.

Product Manufacture

Resilient Athletic Flooring Durathon Elite Infield

VAV Re-Heat Boxes Tuttle & Bailey, KruegerPackaged Rooftop Units American Standard, LennoxPackaged AC Units LennoxMake-Air Units ModineExhaust Fans LorenRegisters, Grilles, Diffusers KruegerFire/Smoke Dampers United Enertech, RuskinFire Dampers United Enertech, RuskinManual Dampers United EnertechFlexible Duct JPL

Plumbing Fixtures SloanFaucets T&S Brass, American Standard, HydrotekFlush Valves American StandardDrinking Fountains OasisIce Maker Box LSPWasher Box LSPDrainage Products MifabFixture Carriers MifabTrap Guards MifabCleanouts MifabStops & Supplies LSP

Page 2: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

420 East South Temple, Suite 100 . Salt Lake City . Utah . 84111 . 801.595.6700 . www.mhtn.com2/18/20 12:50 PM . Page 2 of 4

document2

Traps & Supplies McGuireToilets Seats American Standard

ELECTRIC ITEMSPRODUCT/TRADE MANUFACTURERCR1DL1FA1GA1GA2GA21GID1GID2HB1VF1X1

Approved Lighting Controls – Douglas Only – Match existing installed system.

Lithonia Williams Metalux Elite ILPLithonia Williams Halo Elite LitonLithonia Day-Brite Metalux Elite ColumbiaLithonia Day-Brite Metalux Elite ColumbiaLithonia Day-Brite Metalux Elite ColumbiaLithonia Day-Brite Metalux Elite ColumbiaLithonia Day-Brite Metalux Elite ColumbiaLithonia Day-Brite Metalux Elite ColumbiaLithonia GE Metalux Elite ILPLithonia Stonco Lumark Satco HubbleLithonia Williams Sure-Lites Elite Dual-Lite

Changes to the Drawings

A1.1 SHEET P101

a. At the contractor’s option, grease waste piping may be run south out of kitchen, then 4” grease waste main to run east out double doors of hall to avoid potential conflict with existing electrical conduits at east kitchen door.

b. Coordinate option with civil and location of grease interceptor and sampling manhole.

c. Contractor option shall be at no additional cost to owner or contract.

Page 3: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

420 East South Temple, Suite 100 . Salt Lake City . Utah . 84111 . 801.595.6700 . www.mhtn.com2/18/20 12:50 PM . Page 3 of 4

document2

A1.2 SHEET M501 – Exhaust Fan Schedule

d. EF-2 – Reference with note (4)

e. EF-3 – Reference with note (2)

f. EF-4 – Reference with note (1)(2)(3)(5)

E1.1 Sheet ED102 – Electrical Demolition Plan1. Change keyed note #13 to read as follows: “EXISTING ELECTRICAL GEAR IS

LOCATED IN THE BOILER ROOM BELOW AND IS TO REMAIN IN PLACE. PROTECT FROM DAMAGE DURING CONSTRUCTION.”

2. Change keyed note #21 to read as follows: “THERE ARE MANY 480 VOLT AND 208 VOLT PANEL FEEDERS EXTENDING THROUGH THE EXISTING FLOOR SLAB FROM PANEL M AND MP. CONTRACTOR TO WORK WITH THE CONTRACTOR REMOVING THE SLAB TO PROTECT ALL FEEDERS FROM BEING CUT OR DAMAGED DURING THE SLAB REMOVAL. ANY DAMAGED FEEDERS SHALL BE REPAIRED AND REPLACED AT NO ADDITIONAL COST TO THE OWNER.”

E1.2 Sheet ED111 – Audio Visual Demolition Plan1. Modify demolition schedule. 2. Modify keyed notes.3. See sheet ED111.

E1.3 Sheet ED112 – Audio Visual Demolition Ceiling Plan1. Modify keyed notes. 2. See sheet ED112.

E1.4 Sheet EL101 – Lighting Plan1. Add exit signs in the Kitchen as show.2. Rotate exit sign at Corridor B115 as shown.3. See sheet EL101.

E1.5 Sheet EL601 – Lighting Controls1. Update sheet to Douglas Controls to match the existing installed system.2. See sheet EL601.

E1.6 Sheet EP101 – Power Plan1. Change the disconnects for the Kitchen Exhaust fans to non-fused. 2. Add receptacles to Gym.3. See sheet EP101.

E1.7 Sheet EP102 – Bid Alternates1. Update receptacle requirements for elevator equipment room as shown.2. See sheet EP102.

E1.8 Sheet EP401 – Enlarged Kitchen Power Plan1. Remove unused disconnects. 2. See sheet EP401.

Page 4: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

420 East South Temple, Suite 100 . Salt Lake City . Utah . 84111 . 801.595.6700 . www.mhtn.com2/18/20 12:50 PM . Page 4 of 4

document2

E1.9 Sheet EP701 – One-Line Diagram and Schedules1. Change the disconnects for the kitchen exhaust fans to non-fused.2. Update wiring for the Dishwasher. 3. See sheet EP701.

E1.10 Sheet ET102 – Audio Visual Ceiling Plan1. Modify intercom layout.2. See sheet ET102.

E1.11 Sheet ET401 – Audio Visual Section and Elevations1. Modify detail #1.2. See sheet ET401.

E1.12 Sheet ET702 – Audio Visual Riser and Equipment List1. Modify detail #2.2. Modify school intercom equipment list.3. See sheet ET702.

E1.13 Sheet ET703 – Audio Visual Riser and Equipment List1. Modify details #3 and #4.2. Modify school intercom equipment3. See sheet ET703.

Attachments

ED111, ED112, EL101, EL601, EP101, EP102, EP401, EP701, ET102, ET401, ET702, ET703

End of Addendum

Page 5: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

DEMOLITION SCHEDULE

WORK INVOLVED

ROOM SYMBOL SYMBOL NAME DISCONNECT REMOVE REMOVE REMOVE ASSOCIATED REMOVE RETURN REMAIN REMOVE SAVE TO BE OTHER REFER KEYED

NAME AND REMOVE MOUNT BACKBOXES CONDUIT/WIREMOLD WIRES TO OWNER FOR BY REINSTALLED TO NOTE #

DEVICE COMPLETELY REUSE OWNER

FACULTY CALL SWITCH X X X X X ED111

ROOM

INTERCOM WALL SPEAKER & CLOCK X X X X X ED111

KITCHEN INTERCOM WALL SPEAKER & CLOCK X X X X X ED111

GYM PENDANT SPEAKER X X X X X ED112

MIC & AUX INPUTS X X X ED111

MIC & AUX INPUTS X X X X X ED111

DINING AREA TV X X X X

ED111

CS

S

TV

SPK

MA

MA2

SPK

FC

FC

SPK

SP

K

CS

MA

MA

2

TV

65

B

D4

D4

D2

D1

D1

2

ET501

1

ET501

3

ET5014

ET501

FACULTY

KITCHEN

GYM

DINING AREA

AUDIO VISUAL DEMOLITION GENERAL NOTES:

1. UNLESS SPECIFICALLY NOTED OTHERWISE, REMOVE ALL ELECTRICAL ITEMS SHOWN IN DARK & DASHED LINES. LIGHT & SOLID ITEMS ARE TO REMAIN. DEMOLITION ITEMS ARE SHOWN TO GIVE A BASIC DESCRIPTION OF THE EXTENT OF DEMOLITION WORK, BUT MAY NOT BE INCLUSIVE. PROVIDE DEMOLITION WORK IN ACCORDANCE WITH THE FOLLOWING REQUIREMENTS:

1.1. REMOVE AND DISPOSE OF ALL RACEWAYS, CONDUCTORS, BOXES, DEVICES, EQUIPMENT, ETC. THAT ARE NOT TO BE REUSED.

1.2. EXISTING RACEWAYS MAY BE REUSED, IF IN

PLACE, WHERE POSSIBLE, AND WHERE IN COMPLIANCE WITH THE UPGRADE AND OR PROVIDE NEW CONDUIT SUPPORTS WHERE NECESSARY FOR ALL RACEWAYS BEING REUSED. ENSURE INTEGRITY OF EXISTING RACEWAYS BEFORE REUSE.

1.3. DO NOT PENETRATE STRUCTURAL ELEMENTS OF FLOORS, WALLS, CEILINGS, ROOFS, ETC.

1.4. COORDINATE WITH OWNER WHAT EQUIPMENT SHOULD BE DISPOSED OF AND WHAT EQUIPMENT IS TO BE RETURNED TO OWNER.

BID INSTRUCTIONS:

1. PROVIDE A BASE BID FOR THE WORK NOTED ON ED111, ED112, ET101, ET102, ET401, ET501, ET701, AND ET702.

2. INLIER OF BASE BID, PROVIDE AN ALTERNATE BID FOR THE WORK NOTED ON SHEET ED111, ED112, ET101, ET102, ET501, ET701, AND ET703.

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:2

7 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

AUDIO VISUALDEMOLITIONPLAN

ED111

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

0

SCALE:

4' - 0" 8' - 0" 16' - 0"

1/8" = 1'-0"

AUDIO VISUAL DEMOLITION PLANN

KEYED NOTES

D1 DISCONNECT, REMOVE, AND RETURN THE MICROPHONEINPUT AND AUDIO AUX INPUT TO THE OWNER. REMOVECABLING ASSOCIATED WITH THESE INPUTS ONLY BACK TOTHE EXISTING CABINET COMPLETELY. REMOVE THE EXISTINGWIREMOLD COMPLETELY AS WELL.

D2 DISCONNECT, REMOVE, AND RETURN THE INTERCOM CALLSWITCH TO THE OWNER. REMOVE CABLING ASSOCIATEDWITH IT ONLY BACK TO THE EXISTING CABINET COMPLETELY.

D4 DISCONNECT, REMOVE, AND RETURN THE INTERCOMSPEAKER AND CLOCK TO THE OWNER. REMOVE CABLINGASSOCIATED WITH THESE DEVICES ONLY BACK TO THEEXISTING CABINET COMPLETELY.

#

1 02/18/20 Addendum #1

1

1

Page 6: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

FC

FC

FC

FC

SSS

C.

D3 TYP. 5

ET501TYP.

65

B

D

4

B

D

4

AUDIO VISUAL DEMOLITION GENERAL NOTES:

1. UNLESS SPECIFICALLY NOTED OTHERWISE, REMOVE ALL ELECTRICAL ITEMS SHOWN IN DARK & DASHED LINES. LIGHT & SOLID ITEMS ARE TO REMAIN. DEMOLITION ITEMS ARE SHOWN TO GIVE A BASIC DESCRIPTION OF THE EXTENT OF DEMOLITION WORK, BUT MAY NOT BE INCLUSIVE. PROVIDE DEMOLITION WORK IN ACCORDANCE WITH THE FOLLOWING REQUIREMENTS:

1.1. REMOVE AND DISPOSE OF ALL RACEWAYS, CONDUCTORS, BOXES, DEVICES, EQUIPMENT, ETC. THAT ARE NOT TO BE REUSED.

1.2. EXISTING RACEWAYS MAY BE REUSED, IF IN

PLACE, WHERE POSSIBLE, AND WHERE IN COMPLIANCE WITH THE UPGRADE AND OR PROVIDE NEW CONDUIT SUPPORTS WHERE NECESSARY FOR ALL RACEWAYS BEING REUSED. ENSURE INTEGRITY OF EXISTING RACEWAYS BEFORE REUSE.

1.3. DO NOT PENETRATE STRUCTURAL ELEMENTS OF FLOORS, WALLS, CEILINGS, ROOFS, ETC.

1.4. COORDINATE WITH OWNER WHAT EQUIPMENT SHOULD BE DISPOSED OF AND WHAT EQUIPMENT IS TO BE RETURNED TO OWNER.

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:2

9 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

AUDIO VISUALDEMOLITIONCEILING PLAN

ED112

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

0

SCALE:

4' - 0" 8' - 0" 16' - 0"

1/8" = 1'-0"

AUDIO VISUAL DEMOLITION CEILING PLAN

N

KEYED NOTES

D3 DISCONNECT, REMOVE, AND RETURN THE PENDANTSPEAKERS TO THE OWNER. REMOVE CABLING ASSOCIATEDWITH THEM ONLY BACK TO THE EXISTING CABINETCOMPLETELY.

#

1 02/18/20 Addendum #1

1

Page 7: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

TYPICAL LIGHT FIXTURE CONVENTION

NOTE:

a

14L-4

14EL-3

LOWERCASE LETTER DESIGNATESSWITCHING OR CIRCUIT ASSIGNMENT.ASSIGNMENTS, SUCH AS a/b, INDICATEDUAL LEVEL SWITCHING.

CIRCUIT DESIGNATION

CIRCUIT DESIGNATION A2 LETTER DESIGNATESFIXTURE TYPE.

SHADING INDICATES EGRESS LIGHTFIXTURE. CONNECT TO UNSWITCHEDHOT EMERGENCY LIGHTING CIRCUIT.

EXIT SIGNS. CONNECTTO UNSWITCHED HOTEMERGENCY LIGHTINGCIRCUIT.

SCALE: NONE

1. SEE ELC SHEETS FOR LIGHTING

CONTROL REQUIREMENTS.

FC

FC

FC

FC

K

KK

KK

VS

LV2

LV2

LV2

LVVS

LV2

VS

LV2LV2

LV2

LV2

LV2

LV2

LV4D

LV2

LV2

LV2

LV2

KKKK

K K

KC.

1

2

3

BYY-8

1

2

6

6

2

21

21

3

ALTERNATE #2

4

ALTERNATE #2

4

7

7

HB1

HB1

HB1

HB1

HB1

HB1

HB1

HB1

HB1 HB1

HB1

HB1

HB1 HB1

GID1 GID1 GID1

GID1GID1

VF1 VF1

FA1FA1

FA1 FA1X1

X1

X1

DL1

DL1

DL1

DL1

DL1

DL1

GID1

GID1

GA21

GA21

GA21

GA21

GA21

GA21GA21

FA1

GID2

GA2GA2

GA2

GA2GA2

GA2

GA2 GA2 GA2

GA1

GA1

GA1

X1

5

5

5

X1X1

1

X1

1

X1

1

X1

1

1

KEYED NOTES:

1. RECONNECT TO EXISTING EMERGENCY LIGHTING CIRCUIT THAT WAS IN PLACE PRIOR TO THE DEMOLITION. CONTRACTOR TO VERIFY NEW LOAD ON EXISTING CIRCUIT AND MAKE SURE CIRCUIT IS NOT OVERLOADED.

2. RECONNECT TO EXISTING LIGHTING CIRCUIT THAT WAS IN PLACE PRIOR TO THE DEMOLITION. CONTRACTOR TO VERIFY NEW LOAD ON EXISTING CIRCUIT AND MAKE SURE CIRCUIT IS NOT OVERLOADED.

3. REINSTALL AND RECONNECT EXISTING KEYED SWITCHES THAT WERE REMOVED DURING THE DEMOLITION. KEYED SWITCHES TO FUNCTION THE SAME AS PRIOR TO THE DEMOLITION.

4. ALL WORK IN THIS AREA TO BE INCLUDED IN ALTERNATE #2.

5. IF EXISTING EMERGENCY CIRCUIT DOES NOT EXIST, CONNECT TO PANEL EM. PROVIDE NEW 20 AMP, 1-POLE CIRCUIT BREAKER FOR EACH CIRCUIT. NEW BREAKER TO BE OF THE SAME MANUFACTURE AND INTERRUPTING CURRENT AS THE EXISTING INSTALLED. CONTRACTOR TO FIELD VERIFY ALL REQUIREMENTS.

6. REINSTALL EXISTING LIGHT FIXTURE THAT WAS REMOVED DURING THE DEMOLITION.

7. PROVIDE ADDITIONAL POWER PACK FOR OCCUPANCY SENSOR AS REQUIRED TO SWITCH THE 120 VOLT EXHAUST FAN IN THIS ROOM. SEE EP101 FOR ADDITIONAL INFORMATION.

#

LIGHTING GENERAL NOTES:

1. REFER TO EL701 FOR TYPICAL CONTROL WIRING DIAGRAMS. PROVIDE COMPLETE SYSTEM WITH ALL REQUIRED CONDUIT, WIRING, SWITCHES, SENSORS, POWER PACK, ETC.

2. LOCATE POWER PACKS AND ROOM CONTROLLERS ABOVE ACCESSIBLE CEILING NEAR ROOM ENTRANCES.

3. CONFIRM ALL LOCATIONS OF LIGHT FIXTURES WITH ARCHITECT PRIOR TO INSTALLATION.

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:3

2 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

LIGHITNG PLAN

EL101

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

0

SCALE:

4' - 0" 8' - 0" 16' - 0"

1/8" = 1'-0"

LIGHTING PLAN

N

1 02/18/20 Addendum #1

Page 8: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

SCALE:

SCALE:

LV

4D

LV

2

LV VS

VS

LOW VOLTAGE LIGHTING CONTROL WALL SWITCH DETAILS

LINE VOLTAGE LIGHTING CONTROL WALL SWITCH DETAILS

LIGHTING CONTROL SYSTEM REQUIREMENTS:

GENERAL NOTES:

TYPICAL SMALL OFFICE LIGHTING CONTROLS

CLASSROOM LIGHTING CONTROLS

TYPICAL KITCHEN LIGHTING CONTROLS

NONE

NONE

4

SYMBOL SYMBOL

5

SYMBOL

STANDALONE LOW VOLTAGE LIGHTING CONTROL SYSTEMS: PROVIDE DIGITAL STANDALONE LOW VOLTAGE LIGHTING CONTROL SYSTEMS IN THE

FOLLOWING ROOMS/AREAS:

LARGE BOYS AND GIRLS RESTROOMS

LARGE STORAGE ROOMS

TEACHERS LOUNGES

KITCHEN

THE SYSTEMS SHALL INCLUDE, BUT IS NOT LIMITED TO CEILING-MOUNTED OCCUPANCY SENSORS, LIGHT LEVELS SENSORS, LOW VOLTAGE CONTROL

WALL SWITCHES, POWER PACKS, LOW VOLTAGE CABLES, PROGRAMMING, ETC.

PROVIDE POWER PACKS IN TYPES AND RATINGS AS MAY BE REQUIRED FOR A COMPLETE AND FULLY FUNCTIONAL SYSTEM WHETHER SHOWN ON

THE DRAWINGS OR NOT. WHERE POWER PACKS ARE SERVING LOADS IN HIGH CEILING AREAS, LOCATE POWER PACKS IN THE ELECTRICAL ROOM

WHERE LINE VOLTAGE WIRING IS ORIGINATING FROM.

OCCUPANCY SENSORS SHALL BE SET FOR “MANUAL ON - AUTO OFF” WITH A 10 MINUTE DELAY IN THE FOLLOWING SPACES:

OFFICES

OCCUPANCY SENSORS SHALL BE SET FOR “AUTO ON - AUTO OFF” WITH A 10 MINUTE DELAY IN THE FOLLOWING SPACES:

LARGE BOYS AND GIRLS RESTROOMS

LARGE STORAGE ROOMS

TEACHERS LOUNGES

ALL CEILING-MOUNTED OCCUPANCY SENSORS SHALL BE PROVIDED WITH AN AUXILIARY CONTACT FOR HVAC CONTROL.

ALL LOW VOLTAGE LIGHTING CONTROL SWITCHES SHALL HAVE EACH SCENCE NAME SILKSCREENED ONTO THE FRONT OF THE SWITCH IN BLACK

LETTERS.

REFER TO LOW VOLTAGE LIGHTING CONTROL SCHEDULES FOR A COMPLETE DESCRIPTION ON PROGRAMMING SCENCES, TASK TUNING, ETC. EACH

STANDALONE SYSTEM SHALL BE PROGRAMMED TO REVERT BACK TO ITS NORMAL “ON” POSITION ONE HOUR AFTER SELECTING A SCENE OR

RAISING OR LOWERING A LIGHTING ZONE.

LINE-VOLTAGE LIGHTING CONTROL SYSTEM: PROVIDE LINE-VOLTAGE LIGHTING CONTROL SYSTEMS IN THE FOLLOWING ROOMS/AREAS:

WALL BOX OCCUPANCY SENSORS:

SMALL STORAGE ROOMS

SMALL TOILET ROOMS

LAUNDRY

SET OCCUPANCY SENSOR TO HAVE A 10 MINUTE DELAY

OCCUPANCY SENSORS: PLEASE NOTE THAT ELECTRICAL DRAWINGS INDICATE LOCATIONS OF OCCUPANCY SENSORS IN APPROXIMATE LOCATIONS

AND QUANTITIES. PROVIDE OCCUPANCY SENSORS IN LOCATIONS, QUANTITIES, AND TYPES AS RECOMMENDED BY THE MANUFACTURE. PROVIDE

COMPLETE PRODUCT DATA AND SHOP DRAWINGS INDICATING THE PROPOSED TYPES, COVERAGE PATTERNS, LOCATIONS, AND QUANTITIES.

COORDINATE THE LOCATION OF ALL DEVICES WITH CEILING GRIDS, LIGHT FIXTURES, CEILING DIFFUSERS, SPRINKLER HEADS, ETC.

LIGHT LEVEL SENSORS: PLEASE NOTE THAT THE ELECTRICAL DRAWINGS INDICATED LOCATIONS OF LIGHT LEVEL SENSOR IN APPROXIMATE

LOCATIONS ONLY. PROVIDE LIGHT LEVEL SENSORS IN LOCATIONS AND TYPES AND RECOMMENDED BY THE MANUFACTURER. PROVIDE COMPLETE

PRODUCT DATA AND SHOP DRAWINGS INDICATING THE PROPOSED TYPES AND LOCAITONS. COORDINATE THE LOCATION OF ALL DEVICES WITH

CEILING GRIDS, LIGHT FIXTURES, CEILING DIFFUSERS, SPRINKLER HEADS, ETC.

ZONING REQUIREMENTS: IT IS PERMISSIBLE FOR ZONES OF LIGHT FIXTURES TO BE CONTROLLED BY COMMON POWER PACKS IN LIEU OF INDIVIDUAL

POWER PACKS FOR EACH LIGHT FIXTURE EXCEPT AS FOLLOWS:

1. EGRESS LIGHT FIXTURES IN EACH ZONE SHALL BE PROVIDED WITH A POWER PACK UL LISTED FOR EMERGENCY OPERATIONS. SEE EMERGENCY

OPERATIONS BELOW.

2. EACH ROOM OR AREA SHALL BE CONSIDERED A SEPARATE ZONE, UNLESS NOTED OTHERWISE. PLEASE NOTE THE SOME ROOMS HAVE

MULTIPLE ZONES. REFER TO THE LIGHTING PLANS FOR DELINATED LIGHTING ZONES.

3. DIFFERENT LIGHT FIXTURE TYPES IN EACH ZONE SHALL HAVE SEPARATE POWER PACKS.

4. POWER PACKS SHALL BE RATED IN AMERPAGES AND VOLTAGES AS MAY BE REQUIRED TO SUIT APPLICATION.

5. PROVIDE A MINIMUM OF AT LEAST 10% EXTRA POWER PACKS OF EACH SIZE AND TYPE UTILZIED AND ZONE AS MAY BE DIRECTED BY THE

ELECTRICAL ENGINEER.

TASK TUNING:

SET THE DEFAULT (MAXIMUM) LIGHT LEVELS TO SUIT THE PARTICULAR TASK OR USE OF A WORKSPACE AS FOLLOWS:

FUNCTION / SPACE IILUMINANCE (AVG. FOOTCANDLES)

CLASSROOMS 50 FC

VESTIBULES 10 FC

OFFICES 50 FC

TEACHER'S LOUNGES 30 FC

LARGE STORAGE ROOMS 10 FC

CORRIDORS 10 FC

LARGE RESTROOMS: 10 FC

SMALL TOILET ROOMS: 10 FC

MULTIPURPOSE:

ASSEMBLY 50 FC

COMPETITIVE SPORTS 50 FC

GENERAL 50 FC

PHYSICAL EDUCATION 50 FC

KITCHEN 50 FC

VALUES INDICATED ABOVE ARE AVERAGE FOOTCANDLE LEVELS ON THE TASK SURFACE. TAKE METER READING AT THE COMPLETION OF THE

PROJECT AS MAY BE REQUIRED TO APPROPIRATELY TUNE EACH SPACE; METER TO BE FURNISHED BY LIGHTING CONTROL SUPPLIER.

EMERGENCY OPERATION: PROVIDE A UL 924 LISTED METHOD FOR OPERATING EGRESS LIGHT FIXTURES. FOR THE NLIGHT SYSTEM, THIS SHALL

INCLUDE “FOR USE WTH GENERATOR SUPPLY EM POWER” OPTION FOR EACH EGRESS LIGHT FIXTURE OR A UL 924 LISTED POWER PACKS FOR

GROUPS OF LIGHT FIXTURES. FOR OTHER LIGHTING CONTROL SYSTEMS THAT DO NOT HAVE A “FOR USE WITH GENERATOR SUPPLY EM POWER”

OPTION FOR DESIGNATED EGRESS LIGHT FIXTURES, PROVIDE A GENERATOR TRANSFER DEVICES EQUIVALENT TO BODINE GTD OR ITOA ETS FOR

EACH INDIVIDUAL OR GROUPS OF LIGHT FIXTURES DEPENDING UPON THE APPLICATION. REFER TO DRAWINGS AND LIGHT FIXTURES SCHEDULE. ALL

EGRESS LIGHT FIXTURES SHALL BE SWITCHED OFF WITH OTHER NORMAL-POWERED LIGHT FIXTURES DURING NORMAL OPERATION, BUT POWERED

“FULL ON” DURING AN EMERGENCY OPERATION.

ELECTRIC WATER COOLERS AND VENDING MACHINES: PROVIDE A POWER PACK FOR EACH WATER COOLER OR VENDING MACHINE BRANCH

CIRCUIT. PROGRAM POWER PACKS TO SWITCH OFF ELECTRIC WATER COOLERS AT 11:00 PM AND BE SWITCHED ON AT 6:00 AM, OR AS OTHERWISE

REQUESTED BY THE DISTRICT.

LOW VOLTAGE CABLES: PROVIDE CABLES IN TYPES AND SIZES IN ACCORDANCE WITH ALL MANUFACTURER'S WRITTEN INSTRUCTIONS AND

RECOMMENDATIONS. CABLES SHALL BE PLENUM RATED AND SUPPORTED BY J-HOOKS ATTACHED TO LIGHT FIXTURE DROP WIRES AT 12” ABOVE

RECESSED LAY-IN LIGHT FIXTURES. SECURE CABLES AT A SPACING OF NOT MORE THAN 60” ON CENTERS. PROVIDE J-HOOKS SUPPORTED FROM

ALL-THREAD AS MAY BE REQUIRED TO MEET SPACING CRITERIA. INSTALLATION SHALL MEET ALL APPLICABLE REQUIREMENTS OF THE NEC 300.11.

ALL CABLES SHALL BE ROUTED IN A NEAT WORKMANLIKE MANNER PARRALLEL AND/OR PERPENDICULAR TO CEILING GRIDS.

SHOP DRAWINGS AND PRODUCT DATA:

PRODUCT DATA: PROVIDE PRODUCT DATA FOR ALL SYSTEM COMPONENTS CLEARLY DELINEATING THE DEVICES WHICH ARE TO BE PROVIDED.

SHOP DRAWINGS: PROVIDE 1/8” SCALED 30” X 42” AUTOCAD DRAWINGS SHOWING THE LIGHTING CONTROL SYSTEM DEVICES PLACED ON THE

CEILING AND FLOOR PLANS. OBTAIN FLOOR AND CEILING PLANS FROM THE ARCHITECT. DRAWINGS SHALL INCLUDE COMPLETE LINE AND LOW

VOLTAGE INTERCONNECTION REQUIREMENTS. PROVIDE SEPARATE LINE AND LOW VOLTAGE DRAWINGS AS MAY BE REQUIRED FOR CLARITY. LOW

VOLTAGE DRAWING SHALL INCLUDE LENGTHS OF ALL CABLES. INCLUDE COMPLETE WIRING DIAGRAMS, ONE-LINE DIAGRAMS, DETAILS, ETC.

PROGRAMMING SCHEDULES: PROVIDE COMPLETE SEQUENCING AND PROGRAMMING SCHEDULES FOR ALL DEVICES, ZONES, AND SCENCES.

RECORD DRAWINGS: AT THE COMPLETION OF THE PROJECT, PROVIDE UPDATED SHOP DRAWINGS INCLUDING ALL CHANGES MADE DURING

CONSTRUCTION. INDICATE EXACT LOCATION BY DIMENSION OF ALL POWER PACKS AND OTHER DEVICES MOUNTED ABOVE ACCESSIBLE CEILINGS.

WARRANTY: WARRANTY ALL WORK INCLUDING PARTS AND LABOR FOR A PERIOD OF ONE YEAR.

PROGRAMMING: PROGRAMNG ALL SYSTEMS AS DIRECTED BY THE ELECTRICAL ENGINEER. MEET WITH THE ELECTRICAL ENGINEER AT THEIR OFFICE

PRIOR TO PREPARATION OF SHOP DRAWINGS TO DISCUSS SPECIFIC PROGRAMMING AND ZONING REQUIREMENTS. EACH NETWORKED OR

STANDALONE SYSTEM SHALL BE PROGRAMMED TO REVERT BACK TO ITS NORMAL “ON” POSITION ONE HOUR AFTER SELECTING A SCENE OR

RAISING OR LOWERING A LIGHTING ZONE.

COMMISSIONING: COMMISSION EACH PORTION OF THE LIGHTING CONTROL SYSTEMS AT THE COMPLETION OF THE PROJECT TO VERIFY THAT THE

SYSTEM PERFROMS AS INTENDED. COORDINATE COMMISSION SERVICES WITH COMMISSIONING AGENT. ASSIST THE CANYONS SCHOOL DISTRICT IN

PROGRAMMING AND MAPPING THE SYSTEM FOR INTEGRATION INTO THE BACNET BUILDING MANAGEMENT SYSTEM TO THEIR SATISFACTION.

RETRO-COMMISSIONING: DURING THE ONE YEAR WARRANTY PERIOD, PROVIDE RETRO-COMMISSIONING SERVICES AT THREE MONTH, SIX MONTH,

NINE MONTH, AND ONE YEAR MARKS. PROVIDE AT LEAST 8 HOURS OF COMMISSIONING SERVICE FOR EACH OF THE FOUR RETRO-COMMISSIONING

PERIODS. THIS WILL INCLUDE MEETING WITH THE CANYONS SCHOOL DISTRICT TO RECEVIE FEEDBACK ON THE SYSTEM AND MAKING CHANGES TO

THE SYSTEM INCLUDING PROGRAMMING, TASK TUNING, ETC.

TRAINING: PROVIDE EIGHT HOURS OF TRAINING FROM A FACTORY TRAINED AND CERTIFIED TECHNICIAN AT THE COMPLETION OF THE PROJECT.

SCHEDULE TRAIING WITH THE CANYONS SCHOOL DISTRICT.

BIDDING REQUIREMENTS: BIDDERS SHALL BREAK OUT THE LIGHT FIXTURE PACKAGE SEPARATE FROM THE LIGHTING CONTROL SYSTEM. ALL SPECIAL

FEATURES PERTAINING TO LIGHTING CONTROLS ASSOCIATED WITH THE LIGHT FIXTURES SHALL BE CONSIDERED LIGHTING CONTROLS. BIDDERS

WHO DO NOT CONFORM TO THIS REQUIREMENT MAY BE DISQUALIFIED.

1. THE LIGHTING CONTROLS AS SHOW ARE DOUGLAS LIGHTING CONTROLS.

NO OTHERS SYSTEMS WILL BE APPROVED.

2. COORDINATE ALL REQUIREMENTS, CONNECTIONS AND CABLE TYPE WITH

THE SUPPLIER PRIOR TO ANY INSTALLATION.

3. THE LIGHTING CONTROLS SYSTEM SUPPLIER SHALL PROVIDE COMPUTER

DRAFTED SHOP DRAWINGS OF THE ENTIRE LIGHTING CONTROL SYSTEM

USING FLOOR PLANS PROVIDED BY THE ENGINEER. SHOP DRAWINGS TO

INCLUDE PLANS, SECTIONS, ELEVATIONS, FINAL DEVICE LOCATIONS,

CONDUIT SIZE AND ROUTING AND ALL CONDUCTOR SIZES. TYPICAL

RISERS AND COPYING AND SUBMITTING THE CONTRACT DOCUMENTS

WILL NOT BE ACCEPTED.

4. PROVIDE CABLE SUPPORTS FROM DROP WIRE SUPPORTS (CADDY PCS2

OR APPROVED EQUIVALENT) AND SECURING CLIPS IN QUANTITIES AS MAY

BE REQUIRED FOR ROUTING OF LOW VOLTAGE LIGHTING CONTROL

CABLES. INSTALL SUPPORTS ABOVE LIGHT FIXTURES. SECURE CABLES AT

A SPACING OF NOT MORE THAN 60” ON CENTERS. SUPPLEMENT WITH

J-HOOKS SUSPENDED BY ALL-THREAD AS MAY BE REQUIRED TO MEET

SPACE CRITERIA. INSTALLATION SHALL MEET ALL APPLICABLE

REQUIREMENTS OF THE NEC 300.11. ALL CABLES SHALL BE ROUTED IN A

NEAT WORKMANLIKE MANNER PARALLEL AND PERPENDICULAR TO

STRUCTURE. SEE DETAIL 1/EL601.

5. THE RISER DIAGRAMS ON THIS SHEET REPRESENT THE MAJOR AREAS OF

THE BUILDING. THE LIGHTING CONTROL SUPPLIER SHALL PROVIDE ALL

LIGHTING CONTROLS FOR EACH SPACE AND ARE OF THE BUILDING AS CALLED

OUT IN THE LIGHTING CONTROL SYSTEM REQUIREMENTS ON SHEET EL602.

OFFICE

DIMMIMG LEADS:

PROVIDE DIMMING LEADS TO ALL FIXTURES THAT HAVE THE FOLLOWING :

1. NETWORK LOW-VOLTAGE LIGHTING CONTROL SYSTEMS.

2. STAND ALONE LOW-VOLTAGE LIGHTING CONTROL SYSTEMS.

3. ANYWHERE TASK TUNING IS REQUIRED.

4. EXTERIOR LIGHT FIXTURES AND POLE LIGHTS.

LIGHTING CONTROLS DIAGRAMS AS SHOWNARE FOR BASIC CONCEPT AND LAYOUT.LIGHTING CONTROLS SYSTEM SUPPLIER TOPROVIDE INSTALLATION DRAWINGS THATREFLECT THE ACTUAL INSTALLATIONREQUIREMENTS, WIRING AND ALL REQUIREDDEVICES. SEE ELC102 AND LIGHTING PLANSFOR ADDITIONAL INFORMATION ANDREQUIREMENTS.

OCCUPANCY SENSOR ON/OFF + RAISE LOWER

SYMBOL

ON/OFF

SCALE:2

NONE

WRC-3160

RoomController

LOAD 1

LOAD 2

LOAD 3

LOAD 4

To AdditionalDialog Devices

DIM 1

DIM 2

DIM 3

DIM 4

120-277V

Typical Dialog connectionfor room controllers

ab ab

From LCP orDRC-3160

SCALE:1

NONE

WRC-3160

Room

Controller

LOAD1 LOAD2 LOAD3 LOAD4

ToAdditionalDialogDevices

DIM1DIM

2DIM3DIM

4

120-277V

Typical Dialogconnectionfor roomcontrollers

ab ab abab

WORSDG1-P-NDataline VacancySensor

From LCPor

DRC-3160

WRC-3160

RoomController w/Emergency

Back Up

WUL-3924

LOAD 1

LOAD 2

LOAD 3

LOAD 4

LOAD 5

LOAD 6

DIM 1

DIM 2

DIM 3

DIM 4

120-277V

Typical Dialog connectionfor room controllers

ab

WSW-3528

4 SCENE CONTROL STATIONON/OFF + RAISE/LOWER

SCENE 1

SCENE 2

SCENE 3

SCENE 4

ON

OFF

WSW-3512

SINGLE CHANNEL ON/OFF

ONON

OFF

WSW-3528

4 SCENE CONTROL STATIONON/OFF + RAISE/LOWER

SCENE 1

SCENE 2

SCENE 3

SCENE 4

ON

OFF

WSW-3512

SINGLE CHANNEL ON/OFF

ONON

OFF

WOSSDU1-P-VW

OCCUPANCY SENSOR WALL SWITCH

BIDDERS SHALL BREAK OUT THE LIGHT

FIXTURE PACKAGE SEPARATE FROM THE

LIGHTING CONTROL SYSTEM. ALL

SPECIAL FEATURES PERTAINING TO

LIGHTING CONTROLS ASSOCIATED WITH

THE LIGHT FIXTURES SHALL BE

CONSIDERED LIGHTING CONTROLS.

BIDDERS WHO DO NOT CONFORM TO

THIS REQUIREMENT MAY BE

DISQUALIFIED.

SCALE:3

NONE

WRC-3160

RoomController

LOAD 1

LOAD 2

LOAD 3

LOAD 4

To AdditionalDialog Devices

DIM 1

DIM 2

DIM 3

DIM 4

120-277V

Typical Dialog connectionfor room controllers

ab

WSW-3512SINGLE CHANNEL

ON/OFF

ab

From LCP orDRC-3160

ONON

OFF

OCCUPANCY SENSORON/OFF + RAISE

LOWER

ON/OFF

WRC-3160

RoomController w/Emergency

Back Up

WUL-3924

LOAD 1

LOAD 2

LOAD 3

LOAD 4

LOAD 5

LOAD 6

DIM 1

DIM 2

DIM 3

DIM 4

120-277V

Typical Dialog connectionfor room controllers

ab

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:3

3 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

LIGHTINGCONTROLS

EL601

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

1 02/18/20 Addendum #1

1

Page 9: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

SCALE:

TYPICAL OUTLET CONVENTION

A1-40 DESIGNATION OF CIRCUIT.WIRE COMPLETE.

ISOLATED GROUND CIRCUIT.A1-40/IG

NONE

A1-40 DESIGNATION OF CIRCUIT.WIRE COMPLETE.

L6-30 PLUG TYPE. VERIFY EXACTPLUG TYPE WITH OWNER /EQUIPMENT SUPPLIER.

PROVIDE 4" SQUARE, 2-1/8" DEEPJUNCTION BOX WITH SINGLEGANG PLASTER RING ANDEXTEND 1" CONDUIT TO THEACCESSIBLE CEILING SPACETERMINATE CONDUIT IN CEILINGSPACE WITH A NYLON BUSHING.

DATA/COMMUNICATIONS SYMBOLS LEGEND:

WIFI ACCESS POINT LOCATION (YELLOW JACKET - DATA)

QTY. OF CAT. 6 CABLES.

DATA LOCATION (BLUE JACKET - DATA)

QTY. OF CAT. 6 CABLES.

1A

1

T

T

T

T

T

T

PP

PP

PP

PP PP

AT

S

K

F

K

K

TT

TT

K

T

POWER GENERAL NOTES:

1. ROUTE CONDUIT A MINIMUM OF 6" BELOW THE GRAVEL BASE.

2. PROVIDE A MINIMUM OF 12" SEPARATION BETWEEN POWER AND COMMUNICATIONS CONDUITS.

3. ALL CONDUITS THAT EXTEND THROUGH CONCRETE SHALL BE GALVANIZED RIGID CONDUIT AND SHALL BE WRAPPED WITH TWO (2) LAYERS OF PVC TAPE.

4. ALL CONDUIT ELBOWS THAT ARE LOCATED BELOW THE FLOOR SLAB SHALL BE GALVANIZED RIGID CONDUIT AND SHALL BE WRAPPED WITH TWO (2) LAYERS OF PVC TAPE.

KEYED NOTES:

1. POWER AND DATA FOR TV. SEE ET DRAWING FOR EXACT LOCATION.

2. POWER AND DATA FOR A/V RACK. SEE ET DRAWINGS FOR EXACT LOCATION. DO NOT SURFACE MOUNT CONDUIT ON FITNESS ROOM WALL. ROUTE CONDUIT IN STORAGE ROOM AND ON STORAGE ROOM WALL.

3. POWER FOR VENDING MACHINE. CONFIRM EXACT LOCATION WITH THE OWNER PRIOR TO ANY ROUGH-IN.

4. DO NOT SURFACE MOUNT CONDUIT ON CORRIDOR WALL. ROUTE CONDUIT IN STORAGE ROOM AND ON STORAGE ROOM WALL.

5. REINSTALL AND RECONNECT EXISTING WIFI DEVICE. DEVICE TO FUNCTION THE SAME AS PRIOR TO THE DEMOLITION.

6. DOOR CONTROLS FOR COILING DOORS ARE PROVIDED BY THE DOOR SUPPLIER AND INSTALLED AND WIRED COMPLETELY BY THE CONTRACTOR. CONFIRM EXACT LOCATION WITH THE OWNER PRIOR TO ROUGH-IN.

7. PROVIDE EDWARDS ELECTRIC CHIME # C212-W (OR APPROVED EQUIVALENT). PROVIDE NEMA 3R PUSH BUTTON AND TRANSFORMER AS NECESSARY FOR A COMPLETE INSTALLATION. PROVIDE ALL WIRING AS REQUIRED BY THE MANUFACTURER. VERIFY LOCATION OF CHIMES WITH THE OWNER. LOCATE PUSH BUTTON AT EXISTING BUTTON LOCATION.

8. REMOVE EXISTING SURFACE MOUNTED PANEL COVER AND PROVIDE NEW FLUSH MOUNT PANEL COVER. REINSTALL EXISTING PANEL TAG.

9. CONNECT TO EXISTING CIRCUIT THAT WAS IN PLACE PRIOR TO THE DEMOLITION.

10. PROVIDE NEW 20A, 1-POLE GFCI CIRCUIT BREAKER IN SPACE CALLED OUT. RETURN EXISTING BREAKER TO OWNER.

11. ALL NEW DATA CABLING TO BE EXTENDED TO DATA ROOM 139A, UNLESS OTHERWISE DIRECTED BY THE OWNER. DATA ROOM IS APPROXIMATELY 130' TO THE WEST OF TEACHER LOUNGE B17. PROVIDE NEW 48 PORT PATCH PANEL AND JACKS AS NECESSARY FOR A COMPLETE SYSTEM. PROVIDE ONE PATCH CORD PER CABLE INSTALLING AT THE PATCH PANEL AND FIELD JACK. CONFIRM LENGTHS WITH OWNER.

12. WIRELESS ACCESS POINT AND MOUNTING HARDWARE ARE FURNISHED BY THE OWNER AND INSTALLED AND CONNECTED BY THE CONTRACTOR. CONFIRM EXACT LOCATION WITH THE OWNER.

13. DATA FOR WIRELESS ACCESS POINT. MOUNT ABOVE CEILING.

14. INTERLOCK WITH HOOD CONTROLS. COORDINATE WORK WITH HOOD INSTALLER.

15. PROVIDE NEW NEMA 0 STARTER BUCKET IN EXISTING MCC. NEW BUCKET TO BE THE SAME MANUFACTURER AND INTERRUPTING CURRENT AS THE EXISTING INSTALLED. CONTRACTOR TO FIELD VERIFY ALL REQUIREMENTS. PROVIDE ADDITIONAL CONTACTS FOR CONNECTIONS TO HOOD SYSTEM AND TO SHUNT-TRIP UNIT UPON FIRE ALARM OR HOOD SUPPRESSION SYSTEM ACTIVATION.

16. PROVIDE NEW NEMA 0 STARTER BUCKET IN EXISTING MCC. NEW BUCKET TO BE THE SAME MANUFACTURER AND INTERRUPTING CURRENT AS THE EXISTING INSTALLED. CONTRACTOR TO FIELD VERIFY ALL REQUIREMENTS. PROVIDE ADDITIONAL CONTACTS TO CONNECT TO HOOD SYSTEM.

17. SWITCH WITH LIGHTS. SEE LIGHTING PLAN.

18. PROVIDE NEW 30 AMP, 3-PHASE CIRCUIT BREAKER FOR AIR HANDLER. NEW CIRCUIT BREAKER TO BE OF THE SAME MANUFACTURER AND INTERRUPTING CURRENT AS THE EXISTING INSTALLED. CONTRACTOR TO FIELD VERIFY ALL REQUIREMENTS.

19. RECONNECT FIRE/SMOKE DAMPERS TO EXISTING BRANCH CIRCUIT THAT WAS IN PLACE PRIOR TO THE DEMOLITION.

#

65

B

EP101 1

1

EP401

65

B

2

'K3'

'K2'

'K1'

CORRIDOR

B15

FITNESS ROOM

B11

BOYS

B41

GIRLS

B40

TEACHER LOUNGE

B17SERVING

B18

KITCHEN

B39

FREEZER

B33

REFRIGERATOR

B32

OFFICE

B37

TOILET

B36

LOCKERS

B35

LAUNDRY

B34

RECEIVING

B29

DISH WASH

B31

'B1'

GYMNASIUM

A41

DRY FOOD STORAGE

B38

STORAGE

B13'B3'

'ACC'

'BY''BYY'

8

5

+60"

1

5

3 3

4 4

3

2

+60"

'B2'

'BX'

7

7

7

7

7

7

7

6

6

5

5

1+72"

+72"

+72"

+72"

+72" 1

1

1

1

11

1

1

1

1

1

1 1

1

1

1

B3-1 B3-1 B3-1

B3-2B3-2B3-8

B3-8

B3-7

B3-7

B3-7

B3-7

B1-5

10

B3-10

B3-10 B3-12 B3-12

B3-6

1A

13

12

K3-17

K3-19

K3-15

K3-19

K3-13

K3-11

K3-9

K3-7

K3-21

K3-21

K3-23

K3-23

B1-18

B1-18

B1-15

B1-15

B1-7 B1-7

B1-

9

7

B2-15

B2-17

10

10

B2-21B2-19

10 10

1A

13

12

1A

13121A

13

12

K3-25

M MP

11

11

11

11

11

'MCC'

'EM'

'EM2'

'EM3'

MAU2

MAU1

(ON ROOF)

(ON ROOF)

AC1

(ON ROOF)

AC1

K3-8

WP

WP

K3-31

1414

MCCMCC

1515

WPWP

K3-31K3-31

14

MCCMCC

14

1616 WPWP

EF4

EF3

(ON ROOF) (ON ROOF)

BYY-14

18

WP

K3-31

RT1

(ON ROOF)

14

K3-29

WPWP

K3-

31

EF5

(ON ROOF)

WP

WP

B3-3

B3-11

EF1

(ON ROOF)

19

WP

WP

B1-17

B1-23

EF6

(ON ROOF)

EF2

K3-27

17

1

B3-26 B3-26 B3-261

B1-22B1-20

B1-25B1-25

B2-14

B1-35

B1-33

B1-31

B1-24B1-24

B1-32

B2-11

PP PP

10

10

10 10

GFCIGFCI

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:3

5 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

POWER PLAN

EP101

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

0

SCALE:

4' - 0" 8' - 0" 16' - 0"

1/8" = 1'-0"

POWER PLAN

0

SCALE:

1' - 0" 2' - 0" 4' - 0"

1/2" = 1'-0"1

FACULTY 15 - SOUTH POWER ELEVATION

N

1 02/18/20 Addendum #1

Page 10: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

SCALE:

TYPICAL OUTLET CONVENTION

A1-40 DESIGNATION OF CIRCUIT.WIRE COMPLETE.

ISOLATED GROUND CIRCUIT.A1-40/IG

NONE

A1-40 DESIGNATION OF CIRCUIT.WIRE COMPLETE.

L6-30 PLUG TYPE. VERIFY EXACTPLUG TYPE WITH OWNER /EQUIPMENT SUPPLIER.

PROVIDE 4" SQUARE, 2-1/8" DEEPJUNCTION BOX WITH SINGLEGANG PLASTER RING ANDEXTEND 1" CONDUIT TO THEACCESSIBLE CEILING SPACETERMINATE CONDUIT IN CEILINGSPACE WITH A NYLON BUSHING.

DATA/COMMUNICATIONS SYMBOLS LEGEND:

WIFI ACCESS POINT LOCATION (YELLOW JACKET - DATA)

QTY. OF CAT. 6 CABLES.

DATA LOCATION (BLUE JACKET - DATA)

QTY. OF CAT. 6 CABLES.

1A

1

CO

LV2

LV2

LV4D

LV2

VS

Z Z II

K

FF

Z

K

CO

F

K

B3-2B3-2B3-8

B3-8

B3-10 B3-12 B3-12

B3-6

B3-7

B3-7

+60"

5

41

21

110cd 6 FITNESS ROOM

B11

STORAGE

B13 'B3'

'ACC'

'BY''BYY'

7 8

1A

18

6

CR1

CR1

CR1

FITNESS ROOM

B11

STORAGE

B13

BYY-8

1

2

GA1

KEYED NOTES:

1. UP TO LIGHT FIXTURES FOR STORAGE ABOVE.

2. SEE EL101 FOR CONTINUATION.

3. DOWN TO FITNESS ROOM FIXTURES.

4. POWER AND DATA FOR A/V RACK. SEE ET DRAWINGS FOR EXACT LOCATION. DO NOT SURFACE MOUNT CONDUIT ON FITNESS ROOM WALL. ROUTE CONDUIT IN STORAGE ROOM AND STORAGE ROOM WALL.

5. POWER FOR VENDING MACHINE. CONFIRM EXACT LOCATION WITH THE OWNER PRIOR TO ANY ROUGH-IN.

6. REINSTALL AND RECONNECT EXISTING WIFI DEVICE. DEVICE TO FUNCTION THE SAME AS PRIOR TO THE DEMOLITION.

7. WIRELESS ACCESS POINT AND MOUNTING HARDWARE ARE FURNISHED BY THE OWNER AND INSTALLED AND CONNECTED BY THE CONTRACTOR, CONFIRM EXACT LOCATION WITH THE OWNER.

8. DATA FOR WIRELESS ACCESS POINT. MOUNT ABOVE CEILING.

9. EXISTING FIRE ALARM DEVICE TO REMAIN IN PLACE. PROTECT FROM DAMAGE DURING CONSTRUCTION.

10. DISCONNECT POWER FROM EXISTING ELEVATOR CONTROLLER. REMOVE CONDUCTORS AND CONDUIT BACK TO DISCONNECT.

11. DISCONNECT POWER FROM EXISTING ELEVATOR CONTROLLER. EXISTING BRANCH CIRCUIT TO REMAIN IN PLACE FOR REUSE.

12. DISCONNECT PHONE LINE FROM EXISTING ELEVATOR CONTROLLER. EXISTING PHONE LINE TO REMAIN IN PLACE FOR REUSE.

13. EXISTING KEY SWITCH TO REMAIN IN PLACE. PROTECT FROM DAMAGE DURING CONSTRUCTION.

14. SEE ONE-LINE DIAGRAM AND EQUIPMENT SCHEDULE FOR FEEDER REQUIREMENTS.

15. PROVIDE NEW 60 AMP FUSES IN EXISTING DISCONNECT.

16. RECONNECT EXISTING PHONE LINE TO NEW ELEVATOR CONTROLLER. PHONE LINE TO FUNCTION THE SAME AS PRIOR TO THE DEMOLITION.

17. RECONNECT EXISTING KEYED SWITCH TO ELEVATOR CONTROLLER AS DIRECTED BY THE ELEVATOR INSTALLER. CONFIRM PRIOR TO ROUGH-IN.

18. PROVIDE NEW FIRE ALARM INITIATING DEVICE. NEW DEVICE TO BE THE SAME MANUFACTURE AS THE EXISTING INSTALLED. CONNECT TO ADDRESSABLE LOOP AS DIRECTED BY THE FIRE ALARM SUPPLIER. CONFIRM PRIOR TO THE ROUGH-IN.

19. HEAT DETECTOR TO HAVE A LOWER TEMPERATURE SETTING THAN THE SPRINKLER HEAD IN THE SPACE.

20. EXISTING LIGHTING AND POWER IN THIS SPACE TO REMAIN. PROTECT FROM DAMAGE DURING CONSTRUCTION.

21. DISCONNECT, REMOVE AND DISPOSE OF EXISTING RECEPTACLE. EXISTING BRANCH CIRCUIT TO REMAIN IN PLACE FOR REUSE.

22. PROVIDE NEW RECEPTACLE AS SHOWN. RECONNECT TO EXISTING BRANCH CIRCUIT THAT WAS IN PLACE PRIOR TO THE DEMOTION.

#

DD

19

18

18

17

1918

16

14 15

1

M

EM2-14ELEV1

221

D

18

17

STORAGE

B45

B3-7

6

18

6

STORAGE

B45

3

CR1

CR1

CR1

D

20

9

13

11

10

20

12

EM2-14

1

M

211

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:3

8 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

BIDALTERNATIVES

EP102

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

SCALE: 1/8" = 1'-0"1

FITNESS POWER AND SYSTEMS PLAN BID ALTERNATE #1

SCALE: 1/8" = 1'-0"2

FITNESS LIGHTING PLAN - BID ALTERNATE #1

SCALE: 1/8" = 1'-0"6

FIRST FLOOR ELEVATOR ELECTRICAL PLAN - BID ALTERNATE #3

SCALE: 1/8" = 1'-0"7

BASEMENT ELEVATOR ELECTRICAL PLAN - BID ALTERNATIVE #3

SCALE: 1/8" = 1'-0"3

STORAGE POWER AND SYSTEMS PLAN - BID ALTERNATE #1

SCALE: 1/8" = 1'-0"4

STORAGE LIGHTING PLAN - BID ALTERNATE #1

SCALE: 1/8" = 1'-0"5

FIRST FLOOR ELEVATOR ELECTRICAL DEMOLITION PLAN - BIDALTERNATE #3

1 02/18/20 Addendum #1

1

Page 11: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

KITCHEN GENERAL NOTES:

1. COORDINATE EXACT LOCATION, TERMINATIONS, AND

MOUNTING HEIGHTS WITH EQUIPMENT MANUFACTURER

DRAWINGS AND OWNER IN FIELD PRIOR TO ANY

INSTALLATION. REFER TO THE EQUIPMENT

INSTALLATION DRAWINGS FOR ADDITIONAL

INFORMATION.

2. VERIFY ALL MOUNTING HEIGHTS PRIOR TO INSTALLATION

WITH THE EQUIPMENT INSTALLER/SUPPLIER.

3. CONTRACTOR SHALL COORDINATE EXACT ELECTRICAL

REQUIREMENTS WITH EQUIPMENT MANUFACTURER FOR

EACH SPECIFIC MODEL AND PIECE OF EQUIPMENT.

PROVIDE ELECTRICAL SERVICE AS REQUIRED.

4. ALL COVER PLATES IN THE KITCHEN SHALL BE STAINLESS

STEEL.

5. THE CONTRACTOR SHALL PROVIDE ALL DISCONNECT

SWITCHES, STARTERS, ETC. AS REQUIRED BY NEC. VERIFY

ALL ELECTRICAL REQUIREMENTS WITH THE EQUIPMENT

INSTALLER/SUPPLIER PRIOR TO ROUGH-IN.

6. THE ELECTRICAL CONTRACTOR TO PROVIDE ALL

HARDWIRED CONNECTIONS TO EQUIPMENT.

7. PROVIDE WATERTIGHT FITTINGS, BOXES, COUPLINGS, ETC.

IN ALL PREP AREAS THAT ARE EXPOSED TO SPRAY DOWN.

8. ANY CONNECTION TO EQUIPMENT SHALL BE MADE USING

SEALTIGHT CONDUIT AND WATERTIGHT FITTINGS.

9. ALL DISCONNECT SWITCHES LOCATED IN THE KITCHEN

AREAS SHALL BE RATED FOR SPRAY DOWN, NEMA 4X

STAINLESS STEEL.

10. ALL EQUIPMENT ROUGH-IN REQUIREMENTS SHALL

COORDINATED WITH THE EQUIPMENT SUPPLIER PRIOR TO

ANY ROUGH-IN. CONTRACTOR TO OBTAIN CUT SHEETS FOR

EACH PIECE OF EQUIPMENT FROM THE EQUIPMENT

SUPPLIER AND VERIFY EXACT ROUGH-IN LOCATIONS. IF THE

CONTRACTOR FAILS TO COORDINATE THE LOCATIONS WITH

THE SUPPLIER, THE CONTRACTOR FIX THE ROUGH-IN AT NO

ADDITIONAL COST TO THE OWNER.

SCALE:

TYPICAL ELECTRICAL SHUT-TRIP DETAILNONE

C

PROVIDE MICRO SWITCH

PROTECTION CYLINDER

WITH NORMALLY OPEN

ELECTRICAL PANEL

CONTACT AT FIRE

120V GAS SOLENOID (CLOSE)

VERIFY EXACT LOCATION.

#12 CU. THRU-OUT

CIRCUIT TO NEAREST

AVAILABLE 120V POWER.

SHUNT TRIP COIL C

TYP.

TO EQUIPMENT BELOW HOOD.SEE PANEL SCHEDULES FOR EQUIPMENT.

SCALE:

TYPICAL OUTLET CONVENTION

A1-40 DESIGNATION OF CIRCUIT.WIRE COMPLETE.

ISOLATED GROUND CIRCUIT.A1-40/IG

NONE

A1-40 DESIGNATION OF CIRCUIT.WIRE COMPLETE.

L6-30 PLUG TYPE. VERIFY EXACTPLUG TYPE WITH OWNER /EQUIPMENT SUPPLIER.

PROVIDE 4" SQUARE, 2-1/8" DEEPJUNCTION BOX WITH SINGLEGANG PLASTER RING ANDEXTEND 1" CONDUIT TO THEACCESSIBLE CEILING SPACETERMINATE CONDUIT IN CEILINGSPACE WITH A NYLON BUSHING.

DATA/COMMUNICATIONS SYMBOLS LEGEND:

WIFI ACCESS POINT LOCATION (YELLOW JACKET - DATA)

QTY. OF CAT. 6 CABLES.

DATA LOCATION (BLUE JACKET - DATA)

QTY. OF CAT. 6 CABLES.

1A

1

CONNECTION REQUIREMENTSROUGH-IN REQUIREMENTS REMARKS

ELECTRICAL ROUGH-IN/FINAL CONNECTION SCHEDULE

ITEMS A THROUGH I. NOTE #4.

INTERCONNECT WITH SHUNT TRIPBREAKERS FOR HOOD EQUIPMENT.PROVIDED WITH FIVE CONTACTS.

PROVIDED WITH HOOD. NOTE #5.

AND TO HOOD LIGHTS

CONNECTION REQUIREMENTSROUGH-IN REQUIREMENTS REMARKS

ELECTRICAL ROUGH-IN/FINAL CONNECTION SCHEDULE

NOTE #1: VERIFY THE REQUIREMENTS OF THE POS SYSTEM WITH THE SUPPLIER INCLUDING ELECTRICAL REQUIREMENTS AND THE INTERCONNECTION REQUIREMENTS.

NOTE #2: PROVIDE DATA CONDUIT AS REQUIRED BY POS SUPPLIER. VERIFY INTERCONNECTION REQUIREMENTS BETWEEN COMPONENTS OF SYSTEM.

NOTE #5: ELECTRICIAN TO FIELD WIRE LOW VOLTAGE FROM EACH TEMPERATURE CONTROLLER TO HEAT SENSOR PROVIDED WITH HOOD AT EACH EXHAUST RISER.

ELECTRICIAN TO INTERLOCK CONTACTORS OR STARTERS SPECIFIED BY MECHANICAL SYSTEM TO THE CONTACTS AT THE TERMINAL BLOCK TO OPERATE FAN.

HP: HORSE POWER

AMP: AMPERESDFA: DROP FROM ABOVE

J-BOX: JUNCTION BOX CONNECTION

C&P: CORD AND PLUG CONNECTION

ARE FURNISHED AS PART OF THE SYSTEM BY THE KEC. THE ELECTRICAL CONTRACTOR IS TO INSTALL THESE CORDS AND CORD CAPS TO

NOTE #4: ROUGH-INS ARE FED FROM ITEM #K-39 ENERGY DISTRIBUTION SYSTEM. HEAVY DUTY CORDS WITH RESTRAINING DEVICES AND CORD CAPS

EACH ITEM AS REQUIRED. REMOVE ANY FACTORY CORDS, IF INSTALLED ON INDIVIDUAL ITEMS. ELECTRICAL CONTRACTOR SHALL FURNISH ALL

ADDITIONAL MATERIAL AS REQUIRED AND MAKE ALL INTERCONNECTIONS AS REQUIRED.

NOTE #3: RUN FROM ROUGH-IN TO CONNECTION AT UNDERSIDE OF SERVING SHELF/BREATH GUARD, IN SERVING SHELF/BREATH GUARD SUPPORT LEG.

ICE MAKER/DISPENSEROUTLETE-101 :#K83+18 115/60/1 -C&P11 AMP

POS COMPUTERDATA OUTLETE-100 :#E1+24" -GROMMET TO CONNECTION.NOTE #2. RUN CABLE THROUGH--

POS COMPUTEROUTLETE-99 :#E1+24" 120/60/1GROMMET TO OUTLETNOTE #1. RUN CORD THROUGHC&PVERIFY

COUNTER REFRIGERATOROUTLETE-98 :#K77+18" 115/60/1TO OUTLET IN COUNTER BASE.RUN CORD THROUGH GROMMETC&P2.7 AMP

HEAT LAMPJUNCTION BOXE-97 :#K74+18" 120/60/1CONTROLS AT APRON.NOTE #3. INTERCONNECTJ-BOX8.18 AMP

HOT FOOD WARMERJUNCTION BOXE-96 :#K73+18" 208/60/3 INTERCONNECT CONTROLS.J-BOX3720 WATT

WORK COUNTERCONVENIENCE OUTLETE-95 :#K66+48" 120/60/1 -C&P10 AMP

WORK COUNTERCONVENIENCE OUTLETE-94 :#K66+48" 120/60/1 -C&P10 AMP

HOT FOOD WARMING CABINETOUTLETE-93 :#K64+18" 115/208/60/1 -C&P7.8 AMP

REACH-IN REFRIGERATOROUTLETE-92 :#K65+90" 115/60/1 -C&P5.5 AMP

NOT USEDE-91

POS COMPUTERDATA OUTLETE-90 :#E1+24" -GROMMET TO CONNECTION.NOTE #2. RUN CABLE THROUGH--

POS COMPUTEROUTLETE-89 :#E1+24" 120/60/1GROMMET TO OUTLETNOTE #1. RUN CORD THROUGHC&PVERIFY

COUNTER REFRIGERATOROUTLETE-88 :#K77+18" 115/60/1TO OUTLET IN COUNTER BASE.RUN CORD THROUGH GROMMETC&P2.7 AMP

HEAT LAMPJUNCTION BOXE-87 :#K74+18" 120/60/1CONTROLS AT APRON.NOTE #3. INTERCONNECTJ-BOX8.18 AMP

HOT FOOD WARMERJUNCTION BOXE-86 :#K73+18" 208/60/3 INTERCONNECT CONTROLS.J-BOX3720 WATT

WORK COUNTERCONVENIENCE OUTLETE-85 :#K63+48" 120/60/1 -C&P10 AMP

WORK COUNTERCONVENIENCE OUTLETE-84 :#K63+48" 120/60/1 -C&P10 AMP

WORK COUNTERCONVENIENCE OUTLETE-83 :#K63+48" 120/60/1 -C&P10 AMP

HOT FOOD WARMING CABINETOUTLETE-82 :#K64+18" 115/208/60/1 -C&P7.8 AMP

REACH-IN REFRIGERATOROUTLETE-81 :#K65+90" 115/60/1 -C&P5.5 AMP

NOT USEDE-80

POS COMPUTERDATA OUTLETE-79 :#E1+24" -GROMMET TO CONNECTION.NOTE #2. RUN CABLE THROUGH--

POS COMPUTEROUTLETE-78 :#E1+24" 120/60/1GROMMET TO OUTLETNOTE #1. RUN CORD THROUGHC&PVERIFY

COUNTER REFRIGERATOROUTLETE-77 :#K77+18" 115/60/1TO OUTLET IN COUNTER BASE.RUN CORD THROUGH GROMMETC&P2.7 AMP

HEAT LAMPJUNCTION BOXE-76 :#K74+18" 120/60/1CONTROLS AT APRON.NOTE #3. INTERCONNECTJ-BOX8.18 AMP

HOT FOOD WARMERJUNCTION BOXE-75 :#K73+18" 208/60/3 INTERCONNECT CONTROLS.J-BOX3720 WATT

HOT FOOD WARMING CABINETOUTLETE-74 :#K64+18" 115/208/60/1 -C&P7.8 AMP

REACH-IN REFRIGERATOROUTLETE-73 :#K65+90" 115/60/1 -C&P5.5 AMP

WORK COUNTERCONVENIENCE OUTLETE-72 :#K63+48" 120/60/1 -C&P10 AMP

WORK COUNTERCONVENIENCE OUTLETE-71 :#K63+48" 120/60/1 -C&P10 AMP

WORK COUNTERCONVENIENCE OUTLETE-70 :#K63+48" 120/60/1 -C&P10 AMP

NOT USEDE-69

POS COMPUTERDATA OUTLETE-68 :#E1+24" -GROMMET TO CONNECTION.NOTE #2. RUN CABLE THROUGH--

POS COMPUTEROUTLETE-67 :#E1+24" 120/60/1GROMMET TO OUTLETNOTE #1. RUN CORD THROUGHC&PVERIFY

COUNTER REFRIGERATOROUTLETE-66 :#K77+18" 115/60/1TO OUTLET IN COUNTER BASE.RUN CORD THROUGH GROMMETC&P2.7 AMP

REFRIGERATED COLD PANOUTLETE-65 :#K72+18" 115/60/1TO OUTLET.INTERCONNECT SWITCH AT APRONJ-BOX7 AMP

HEAT LAMPJUNCTION BOXE-64 :#K74+18" 120/60/1CONTROLS AT APRON.NOTE #3. INTERCONNECTJ-BOX8.18 AMP

HOT FOOD WARMERJUNCTION BOXE-63 :#K73+18" 208/60/3 INTERCONNECT CONTROLS.J-BOX3720 WATT

HOT FOOD WARMING CABINETOUTLETE-62 :#K64+18" 115/208/60/1 -C&P7.8 AMP

REACH-IN REFRIGERATOROUTLETE-61 :#K65+90" 115/60/1 -C&P5.5 AMP

NOT USEDE-60

POS COMPUTERDATA OUTLETE-59 :#E1+24" -GROMMET TO CONNECTION.NOTE #2. RUN CABLE THROUGH--

POS COMPUTEROUTLETE-58 :#E1+24" 120/60/1GROMMET TO OUTLETNOTE #1. RUN CORD THROUGHC&PVERIFY

COUNTER REFRIGERATOROUTLETE-57 :#K77+18" 115/60/1TO OUTLET IN COUNTER BASE.RUN CORD THROUGH GROMMETC&P2.7 AMP

REFRIGERATED COLD PANOUTLETE-56 :#K72+18" 115/60/1TO OUTLET.INTERCONNECT SWITCH AT APRONJ-BOX7 AMP

HEAT LAMPJUNCTION BOXE-55 :#K74+18" 120/60/1CONTROLS AT APRON.NOTE #3. INTERCONNECTJ-BOX8.18 AMP

HOT FOOD WARMERJUNCTION BOXE-54 :#K73+18" 208/60/3 INTERCONNECT CONTROLS.J-BOX3720 WATT

WORK COUNTERCONVENIENCE OUTLETE-53 :#K63+48" 120/60/1 -C&P10 AMP

WORK COUNTERCONVENIENCE OUTLETE-52 :#K63+48" 120/60/1 -C&P10 AMP

WORK COUNTERCONVENIENCE OUTLETE-51 :#K63+48" 120/60/1 -C&P10 AMP

EQUIPMENT DESCRIPTIONROUGH-IN TYPERI# :ITEM #HGT. VLY/CYC/PH REMARKCONNLOAD

HOT FOOD WARMING CABINETOUTLETE-50 :#K64+18" 115/208/60/1 -C&P7.8 AMP

REACH-IN REFRIGERATOROUTLETE-49 :#K65+90" 115/60/1 -C&P5.5 AMP

WORK COUNTERCONVENIENCE OUTLETE-48 :#K66+48" 120/60/1 -C&P10 AMP

WORK COUNTERCONVENIENCE OUTLETE-47 :#K66+48" 120/60/1 -C&P10 AMP

NOT USEDE-46

30 GALLON TILT SKILLET:#K43I 120/60/1NOTE #4.CONNECT TO UDS SYSTEM.C&P1.8 AMP

40 GALLON TILT KETTLE: CONTROLS:#K44H 120/60/1NOTE #4.CONNECT TO UDS SYSTEM.C&P10 AMP

CONVECTION OVEN:#K45G 120/60/1NOTE #4.CONNECT TO UDS SYSTEM.C&P8 AMP

CONVECTION OVEN:#K45F 120/60/1NOTE #4.CONNECT TO UDS SYSTEM.C&P8 AMP

MINI ROTATING RACK CONVECTION OVEN:#K42E 120/60/1NOTE #4.CONNECT TO UDS SYSTEM.C&P6.6 AMP

COMBI-OVEN:#K40D 208/60/1NOTE #4.CONNECT TO UDS SYSTEM.J-BOX3.85 AMP

STEAMER:#K37C 120/60/1NOTE #4.CONNECT TO UDS SYSTEM.C&P300 WATT

CONVECTION OVEN:#K36B 120/60/1NOTE #4.CONNECT TO UDS SYSTEM.C&P8 AMP

CONVECTION OVEN:#K36A 120/60/1NOTE #4.CONNECT TO UDS SYSTEM.C&P8 AMP

EXHAUST HOOD: HEAT SENSOR SYSTEMTEMPERATURE SENSORE-44 :#K34+48" CONTROL WIREBOX PROVIDED WITH HOOD.INTERCONNECT FROM CONTROL--

EXHAUST HOOD: HEAT SENSORJUNCTION BOXE-43 :#K34+30" 120/60/1SENSOR AND CONTROL BOXINTERCONNECT TO DUCT HEATJ-BOX15 AMP

GAS SHUT OFF VALVEJUNCTION BOXE-42 :#K35DFA 120/60/1AND HOOD CONTROLS AS REQ'D.CONNECT TO GAS SHUT OFFJ-BOX1 AMP

UTILITY DISTRIBUTION SYSTEMJUNCTION BOXE-45 :#K39DFA 120-208/60/3SYSTEM TO POWER FOLLOWINGCONNECT MAIN POWER TO UDSJ-BOX50 AMP

EXHAUST HOODJUNCTION BOXE-41 :#K34+30" 120/60/1PANEL TO MECHANICAL SYSTEMINTERCONNECT FROM CONTROLJ-BOX1200 WATT

NOT USEDE-40

WORK TABLECONVENIENCE OUTLETE-39 :#K20+48" 120/60/1 -C&P10 AMP

FOOD PROCESSOROUTLETE-38 :#K22+48" 120/60/1 -C&P3.5 AMP

WORK TABLECONVENIENCE OUTLETE-37 :#K20+48" 120/60/1 -C&P10 AMP

HOT FOOD WARMING/PROOFING CABINETOUTLETE-36 :#K16+18" 120/60/1 -C&P16.7 AMP

SHEETEROUTLETE-35 :#K18+18" 120/60/1 -C&P3/4 HP

BAKERY WORK TABLECONVENIENCE OUTLETE-34 :#K13+48" 120/60/1 -C&P10 AMP

BAKERY WORK TABLECONVENIENCE OUTLETE-33 :#K13+48" 120/60/1 -C&P10 AMP

BAKERY WORK TABLECONVENIENCE OUTLETE-32 :#K13+48" 120/60/1 -C&P10 AMP

60 QUART MIXERJUNCTION BOXE-31 :#K12+18" 200-240/60/3 -J-BOX10 AMP

MICROWAVE OVENOUTLETE-30 :#K25+48" 120/60/1 -C&P16.8 AMP

WORK TABLECONVENIENCE OUTLETE-29 :#K20+48" 120/60/1 -C&P10 AMP

WORK TABLECONVENIENCE OUTLETE-28 :#K20+48" 120/60/1 -C&P10 AMP

30 QUART MIXEROUTLETE-27 :#K26+18" 120/60/1 -C&P9.5 AMP

WORK TABLECONVENIENCE OUTLETE-26 :#K27+48" 120/60/1 -C&P10 AMP

WORK TABLECONVENIENCE OUTLETE-25 :#K27+48" 120/60/1 -C&P10 AMP

WORK TABLECONVENIENCE OUTLETE-24 :#K27+48" 120/60/1 -C&P10 AMP

SLICEROUTLETE-23 :#K29+48" 120/60/1 -C&P5.6 AMP

WORK TABLECONVENIENCE OUTLETE-22 :#K23+48" 120/60/1 -C&P10 AMP

ICE MAKERJUNCTION BOXE-21 :#K30+84" 208/60/1 -J-BOX13.1 AMP

NOT USEDE-20

DISHWASHER: BOOSTER HEATERJUNCTION BOXE-19 :#K57+18" 480/60/3 -J-BOX40.1 AMP

DISHWASHER: MOTOR/CONTROLS/TANKJUNCTION BOXE-18 :#K57+18" 480/60/3 -J-BOX27.9 AMP

VENT HOOD: SWITCHSWITCH/CONTROLSE-17 :#K58+48" 120/60/1EXHAUST SYSTEM.INTERCONNECT WITH VENT HOOD--

POS COMPUTEROUTLETE-15 :#E2+18" 120/60/1 NOTE #1.C&PVERIFY

POS COMPUTERDATA OUTLETE-16 :#E2+18" - NOTE #2.--

POS COMPUTEROUTLETE-13 :#E2+18" 120/60/1 NOTE #1.C&PVERIFY

POS COMPUTERDATA OUTLETE-14 :#E2+18" - NOTE #2.--

TEMPERATURE MONITORJUNCTION BOXE-10 :#K4BDFA 120/60/1 -J-BOX2 AMP

COOLER REFRIGERATION SYSTEMDATA OUTLETE-11 :#K4BDFA -CABLE TO I.T.RUN CONDUIT FOR DATA--

WALK-IN COOLER: LIGHTS AND HEATERJUNCTION BOXE-12 :#K3DFA 115/60/1 INTERCONNECT (4) LIGHTS.J-BOX1.76 AMP

WALK-IN COOLER REF: BLOWER COILSJUNCTION BOXE-09 :#K4BDFA 115/60/1REMOTE CONDENSER.INTERCONNECT CONTROLS WITHJ-BOX1.6 AMP

WALK-IN COOLER REF: CONDENSERJUNCTION BOXE-08 :#K4ASTUB 208/60/1ON ROOF.VERIFY LOCATION OF REMOTEJ-BOX11.4 AMP

WALK-IN FREEZER: LIGHTS AND HEATERJUNCTION BOXE-07 :#K3DFA 115/60/1 INTERCONNECT (4) LIGHTS.J-BOX2.29 AMP

TEMPERATURE MONITORJUNCTION BOXE-05 :#K5BDFA 120/60/1 -J-BOX2 AMP

WALK-IN FREEZER REF: HEAT TRACEJUNCTION BOXE-04 :#K5BDFA 120/60/1 CONNECT TO DRAIN HEAT CABLE.J-BOX3 AMP

FREEZER REFRIGERATION SYSTEMDATA OUTLETE-06 :#K5BDFA -CABLE TO OFFICERUN CONDUIT FOR DATA--

WALK-IN FREEZER REF: DEFROSTJUNCTION BOXE-03 :#K5BDFA 208/60/1REMOTE CONDENSER.INTERCONNECT DEFROST WITHJ-BOX9.8 AMP

WALK-IN FREEZER REF: BLOWER COILSJUNCTION BOXE-02 :#K5BDFA 208/60/1REMOTE CONDENSER.INTERCONNECT CONTROLS WITHJ-BOX1 AMP

EQUIPMENT DESCRIPTIONROUGH-IN TYPERI# :ITEM #HGT. VLY/CYC/PH REMARKCONNLOAD

WALK-IN FREEZER REF: CONDENSERJUNCTION BOXE-01 :#K5AVER. 208/60/1UNIT IN MECHANICAL ROOM.VERIFY LOCATION OF REMOTEJ-BOX17 AMP

LL

PENETRATION TO SPLICE BOX

WITH FREEZER DEFROST.

TYPICAL COLD STORAGE ROOMS ELEC. DIAGRAM

HEATED VACUUM VENT

CEILING BY ELEC.DIVISION (TYP)

RUN ABOVE C.S.R.

C.S.R. - COLD STORAGE ROOM

EMT RIGID CONDUIT

CONDUIT & WIRING.

COLD STORAGE ROOMS. ELECTRICAL

BUILDING SERVICE TO COMPONENTS.

COMPONENTS.

ELECTRICAL DIVISION TO PROVIDE ALLBUILDING SERVICES INCLUDING J-BOXES,INTERCONNECTING CONDUIT & WIRING FROM

EYS FITTING FURNISHED WITH COLD STORAGE

& SPLICE BOXES ARE FURNISHED LOOSE WITH

DIVISION TO INSTALL ALL ITEMS FURNISHEDLOOSE INCLUDING ALL INTERCONNECTING

EVAPORATORS FOR COLD STORAGE ROOMARE FURNISHED & INSTALLED COMPLETE WITHROOM THERMOSTAT, LIQUID LINE SOLENOID &DISCONNECT SWITCH. ELECTRICAL DIVISIONTO PROVIDE INTERCONNECTING CONDUIT &WIRING FORM BUILDING SERVICE TO ALL

LIGHT FIXTURES, SWITCH BOXES, SWITCHES,

WIRE & SEAL BY ACCEPTED INDUSTRY

& EXTERIOR ESCUTCHEON PLATES.

HOLES THROUGH INSULATED PANELS ARE

EVAPORATOR FAN MOTORS FOR REFRIGER-ATORS RUN CONTINUOUSLY. DO NOT WIREINTERNALLY WITH THERMOSTAT. EVAPOR-ATOR FAN MOTORS FOR FREEZERS CYCLE

FURNISHED WITH COLD STORAGE ROOM.ELECTRICAL DIVISION TO SEAL ALL PENE-TRATIONS WITH CAULKING ON THE C.S.R.INTERIOR & EXTERIOR AND INSTALL INTERIOR

STAINLESS STEEL ESCUTCHEON PLATES &

ROOMS. ELECTRICAL DIVISION TO INSTALL,

.2

5.

J

FREEZER

S

J

J

6.S 3P4P S

A

HEATER CABLE

KW HIGH TEMP. ALARM (WHEN SPECIFIED)

S

T *****L

DRAIN LINE CABLE

L

4.

PRACTICE.

VIEWPORT &DOOR HEATER

3.

HIGH TEMP. ALARM

EVAPORATOR, TERMINAL BLOCK, ROOM THERMOSTAT, LIQUID LINESOLENOID & ELECTRIC PANEL AT COMPRESSOR RACK SUPPLIED ASPART OF THE REFRIGERATION SYSTEM. ELECTRICAL DIVISION TOFURNISH & INSTALL CONDUIT, J-BOXES AND WIRING BETWEEN COLDSTORAGE ROOM AND COMPRESSOR RACK. SEE PLAN FOR LOCATION.

110 V. ABOVE COLD STORAGE ROOM CEILINGKW LIGHTS (EACH)KW VIEWPORT & DOOR HEATER (FREEZER)

.2

.4

REFRIGERATOR

2.

(WHEN SPECIFIED)

1.

TO LIGHTS AS REQUIRED.SEE PLAN FOR QUANTITY

VERIFY KW EVAPORATOR MOTORS

110 V. ABOVE C.S.R. CEILING

J

T

J

S

*****EXTEND CONDUIT

A SWITCH

NOTES:

EXTERIORINTERIOR/

LIGHT

SS

J

*****

THERMOSTAT

JUNCTION BOX

EYS & NIPPLE FOR CEILING

LIQUID LINE SOLENOID

S

LIGHT FIXTUREVAPOR PROOF

EVAPORATOR

J

T

S

HIGH TEMP. ALARM(WHEN SPECIFIED)

REQUIRMENTS WITH POS SYSTEM SUPPLIER.)

120V, 1 PHASE, SERVICE, 10.0 AMPS, STUB AS NOTED,

FOR POS/PRE-CHECK SYSTEM STATIONS. (DEDICATED

CIRCUIT, ISOLATED GROUND, PROVIDE (ADD PHONE LINE)

EMPTY J-BOX WITH CONDUIT FOR INTERCONNECTING POS

SYSTEM, PRE-CHECK AND PRINTERS) (VERIFY ALL

POINT OF CONNECTION. UNDER NO CIRCUMSTANCES, WILL

ALL CONDUIT SHALL BE RUN ON THE EXTERIOR CEILING OF ALL

COLD STORAGE ROOMS AND SHALL PENETRATE THE CEILINGAT A POINT WHERE THE CONDUIT CAN DROP DIRECTLY TO THE

ELECTRICAL CONDUIT BE PERMITTED ON THE INTERIOR.

NOTE: WALK-IN ELECTRICAL

TO PROVIDE MINIMUM WALL FURRING IF REQUIRED.

ALL WALL MOUNT ELECTRICAL RECEPTACLE AND J-BOXES

CONDUIT SHOWING ON SURFACE OF WALLS. ARCHITECT

ARE TO BE FLUSH MOUNTED IN WALLS WITH NO EXPOSED

BRUSHED STAINLESS STEEL FURNISHED BY ELECTRICAL DIVISION.

DIVISION. CONDUIT SHALL HAVE 24" (600MM) MINIMUM RADIUS BENDS.

SYSTEM LINES SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL

ALL CONDUIT RUNS INDICATED FOR REFRIGERATION, DRINK AND LIQUOR

PRE-FABRICATED COLD STORAGE ROOMS ARE FURNISHED BY THE KITCHEN

CONDUIT AND WIRE BETWEEN SWITCH, DISPOSER AND COMPONENTS.

ELECTRICAL DIVISION SHALL FURNISH AND INSTALL INTER-CONNECTING

JUNCTION BOXES FOR INSTALLATION OF OWNER SUPPLIED I.T. EQUIPMENT

INCLUDING POS/ ELECTRONIC CASH CONTROL SYSTEM. ELECTRICAL

CONDUIT AND WIRING BETWEEN MICRO-SWITCH AND SOLENOID FUEL SHUT

REQUIREMENTS AND MANUFACTURER'S INSTRUCTIONS.

BLOCK, SWITCH, FAN DOOR SWITCH AND COMPRESSOR CONTROL PANEL.

ELECTRICAL DIVISION SHALL FURNISH AND INSTALL ALL INTERCONNECTING

ELECTRICAL DIVISION SHALL FURNISH AND INSTALL EMPTY CONDUIT WITH

CONDUIT AND WIRING BETWEEN KITCHEN EQUIPMENT CONTRACTOR

FURNISHED LOW TEMP COLD STORAGE ROOM EVAPORATOR TERMINAL

EQUIPMENT CONTRACTOR COMPLETE WITH SPLICE BOXES, LIGHT FIXTURES,

TO INSTALL SAME AND SHALL FURNISH AND INSTALL INTERCONNECTING

CONDUIT, WIRING SEALOFFS, SEALANT AND MAKE FINAL CONNECTIONS.

LAMPS, LIGHT SWITCHES AND DOOR HEATERS. ELECTRICAL DIVISION

ALL ELECTRICAL EQUIPMENT UNDER HOOD ACTIVATED BY FIRE

ELECTRICAL DIVISION SHALL FURNISH AND INSTALL DISCONNECTS FOR

DIVISION TO VERIFY INSTALLATION IN ACCORDANCE WITH OWNER'S

BY THE ELECTRICAL ENGINEER/ ARCHITECT AND AS REQUIRED BY CODE.

OFF VALVE FURNISHED WITH FIRE SUPPRESSION SYSTEM SUPPLIED BY

THE KITCHEN EQUIPMENT CONTRACTOR.

PROOF VENTILATOR LIGHTS COMPLETE WITH LAMPS. INTERCONNECTING

CONDUIT, WIRING WITH WALL SWITCH FURNISHED AND INSTALLED BY THE

ADDITIONAL CONVENIENCE RECEPTACLES, TELEPHONE AND INTERCOM

KITCHEN EQUIPMENT CONTRACTOR SHALL FURNISH AND INSTALL VAPOR

KITCHEN EQUIPMENT CONTRACTOR SHALL FURNISH DISPOSER CONTROLS.

ELECTRICAL DIVISION SHALL FURNISH AND INSTALL ALL INTERCONNECTING

JACKS AND TEMPERATURE MONITORING SYSTEM ETC.. SHALL BE LOCATED

SUPPRESSION SYSTEM.

ELECTRICAL DIVISION.

EXCEPT WHERE NOTED. RECEPTACLES AND COVER PLATES SHALL BE

DRAWINGS FOR CONSTRUCTION.

60 HERTZ, 4 WIRE SYSTEM.

ELECTRICAL PLAN SHOWS ROUGH-IN POINTS AND SCHEDULED CONNECTIONS.

KITCHEN EQUIPMENT CONTRACTOR WILL PROVIDE DIMENSIONED ROUGH-IN

ELECTRICAL SYSTEM IS DESIGNED FOR 120/208 VOLTS, 1&3 PHASE,

ELECTRICAL DIVISION SHALL FURNISH AND INSTALL ALL JUNCTION BOXES,

RECEPTACLES, COVER PLATES, PULL BOXES, CONDUIT AND WIRING

ELECTRICAL NOTES

NOTE: POS ELECTRICAL

NOTE: ELECTRICAL MOUNTING

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

JJ

JJ

JJ

JJ

JJ

J

J

J

J

J

J

J

J

J

J

J

J

J J

JJ

JJ

FF

FF

5

B

A

A

A

A

A

AAA

A

A

AA

A

A

A

A

A

A

A

A

A A

A

A

A

A

A

+90"

E- 95

E- 94

E- 93

E- 92

E- 85

E- 84

E- 83

E- 98

E- 82

E- 81

E- 88

E- 77

E- 74

E- 73

E- 72

E- 71

E- 70

E- 62

E- 61

E- 30

E- 29

E- 28

E- 26

E- 25

E- 24

E- 32E- 33E- 34E- 35E- 36

E- 37

E- 38

E- 39

E- 22 E- 23

E- 53

E- 52

E- 51

E- 48

E- 47

E- 57

E- 66

E- 65

E- 56

E- 50

E- 49+90"

+90"

+90"

+90"

E- 27

E- 54

E- 55

E- 63

E- 64

E- 75

E- 76

E- 86

E- 87

E- 96

E- 97

E- 99

E- 100

E- 90

E- 89

E- 78

E- 79

E- 68

E- 67

E- 58

E- 59

+24"

+24"

+24"

+24"

+24"

+24"

+24"

+24"

+24"

+24"

E- 31

E- 45

E- 42

+84"

E- 12

E- 9

E- 10

E- 4

E- 3

E- 2

E- 7

E- 5

E- 11

E- 6 1

1

E- 21

E- 18E- 19

E- 17

E- 43

+30"

E- 41

E- 44+30"

+48"

E- 15

E- 13

E- 16

E- 14

E- 1

E- 8

1

1

1

1

1

2

2

1

+48"

K1-32

K2-7

K1-26

K2-5

K2-3

K1-48

K1-46

K1-44

K1-42

K1-40

K1-38

K1-36

K2-7K2-4

K2-14K2-20K2-22K2-24K2-26K2-28

K1-32

K1-45

K1-20

K1-45

K1-34

K1-47

K1-41

K1-14

K1-41

K1-43

K1-21

K1-8

K1-23

K1-23

K1-25

K1-15

K1-12

K1-17

K1-17

K1-19

K2-7

K2-37

K2-35

K2-33

K2-31

K2-29

K2-27

K2-25 K1-27

K1-29

K1-31

K1-33

K1-35

K1-37

K1-39

K2-11

K2-7

K2-11K2-11

K2-30

K2-32

K2-34

K2-41

K2-39

K2-13

K2-13

K2-13

K2-9

K2-9

K2-1

K2-2K2-9

K2-9

K2-9

K2-11

+48"

K2-6

K2-36

K2-21 K2-23

K1-13

K1-11

K1-9

K1-7

K1-5

K1-3

K1-1

K2-7

K2-15

1

4

5

1

2

3

1

9

9

9

9

9

9

9

'K1'

'K2'

'K3'

8

8

M

M

7

6

EM3-1

EM3-2

EM3-5

EM3-5

EM3-5

EM3-15

EM3-15

EM3-6

EM3-6

EM3-61

1

1

KEYED NOTES:

1. INTERCONNECT TO VENT HOOD EXHAUST SYSTEM. COORDINATE ALL WORK WITH THE HOOD INSTALLER.

2. INTERCONNECT TO VENT HOOD LIGHTS. COORDINATE ALL WORK WITH THE HOOD INSTALLER.

3. INTERCONNECT WITH DUCT HEATER AND CONTROL PANEL. COORDINATE ALL WORK WITH THE KITCHEN EQUIPMENT INSTALLER.

4. PROVIDE 4" SQUARE JUNCTION BOX FOR HOOD SUPPRESSION PULL STATION. EXTEND A 3/4" CONDUIT TO THE CEILING SPACE.

5. KITCHEN TELEPHONE. CONFIRM EXACT LOCATION WITH THE OWNER PRIOR TO ANY ROUGH-IN.

6. TO DISHWASHER E-18.

7. TO BOOSTER HEATER E-19.

8. TO DISCONNECT.

9. ALL NEW DATA CABLING TO BE EXTENDED TO DATA ROOM 139A, UNLESS OTHERWISE DIRECTED BY THE OWNER. DATA ROOM IS APPROXIMATELY 130' TO THE WEST OF TEACHER LOUNGE B17. PROVIDE NEW 48 PORT PATCH PANEL AND JACKS AS NECESSARY FOR A COMPLETE SYSTEM. PROVIDE ONE PATCH CORD PER CABLE INSTALLING AT THE PATCH PANEL AND FIELD JACK. CONFIRM LENGTHS WITH OWNER.

#

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:4

0 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

ENLARGEDKITCHEN POWERPLAN

EP401

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

SCALE: 1/4" = 1'-0"1

KITCHEN POWER PLAN

1 02/18/20 Addendum #1

Page 12: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

PANELBOARD SCHEDULEPANEL NAME: K1 (EXISTING) VOLTAGE: MAINS TYPE: SPD:

MOUNTING: PHASE: BUS MATERIAL: NEUTRAL:ENCLOSURE: WIRE: BUS RATING: BRANCH OCP TYPE:

DOOR STYLE: MIN. A.I.C. RATING: MCB RATING: ISOLATED GROUND:

KEYEDCIRCUIT DESCRIPTION

BREAKER LOAD CKT. CONNECTED LOAD/PHASE (VA) CKT. LOAD BREAKERCIRCUIT DESCRIPTION

KEYEDNOTE AMPS POLE TYPE # A B C # TYPE AMPS POLE NOTE

TOTAL CONNECTED LOAD PER PHASE (VA):TOTAL ESTIMATED DEMAND LOAD PER PHASE (VA):

TOTAL ESTIMATED DEMAND LOAD PER PHASE (AMPS):

TYPE LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

208Y/120 MLO NONE

SURFACE 3 ALUMINUM 100% RATEDNEMA 1 4 225 AMPS BOLT-ON CBs

STANDARD CONTRACTOR TO VERIFY NONE NO

6,8 WORK COUNTER C.O. E-47 20 1 K 1 1,200 1,240 2 K 20 3 HOT FOODK WARMER K-54 6,106,8 WORK COUNTER C.O. E-48 20 1 K 3 1,200 1,240 4 K - - - -

1,6,8 REACH-IN REFRIGERATOR E-49 20 1 K 5 660 1,240 6 K - - - -1,6,8 WARMING CABINET E-50 20 1 K 7 936 1,240 8 K 20 3 HOT FOODK WARMER K-63 6,10

WORK COUNTER C.O. E-51 20 1 K 9 1,200 1,240 10 K - - - -WORK COUNTER C.O. E-52 20 1 K 11 1,200 1,240 12 K - - - -WORK COUNTER C.O. E-53 20 1 K 13 1,200 1,240 14 K 20 3 HOT FOODK WARMER K-75 6,8

1,6,8 HEAT LAMP E-55 20 1 K 15 982 1,240 16 K - - - -1,6,8 COLD PAN E-56 / REFRIG E-57 20 1 K 17 1,200 1,240 18 K - - - -

POS E-58 20 1 K 19 1,200 1,240 20 K 20 3 HOT FOODK WARMER K-86 6,81,6,8 HEAT LAMP E-64 20 1 K 21 982 1,240 22 K - - - -1,6,8 COLD PAN E-65 / REFRIG E-66 20 1 K 23 1,200 1,240 24 K - - - -

POS E-67 20 1 K 25 1,200 1,240 26 K 20 3 HOT FOODK WARMER K-96 6,81,6,8 REACH-IN REFRIGERATOR E-61 20 1 K 27 660 1,240 28 K - - - -1,6,8 WARMING CABINET E-62 20 1 K 29 936 1,240 30 K - - - -

WORK COUNTER C.O. E-70 20 1 K 31 1,200 1,200 32 K 20 1 COLD PAN E-97 / REFRIG E-98 1,6,8WORK COUNTER C.O. E-71 20 1 K 33 1,200 1,200 34 K 20 1 POS E-99 6,8WORK COUNTER C.O. E-72 20 1 K 35 1,200 660 36 K 20 1 REACH-IN REFRIGERATOR E-81 1,6,8

1,6,8 REACH-IN REFRIGERATOR E-73 20 1 K 37 660 936 38 K 20 1 WARMING CABINET E-82 1,6,81,6,8 WARMING CABINET E-74 20 1 K 39 936 1,200 40 K 20 1 WORK COUNTER C.O. E-83 6,81,6,8 COLD PAN E-76 / REFRIG E-77 20 1 K 41 1,200 1,200 42 K 20 1 WORK COUNTER C.O. E-84 6,86,8 POS E-78 20 1 K 43 1,200 1,200 44 K 20 1 WORK COUNTER C.O. E-85 6,8

1,6,8 COLD PAN E-87 / REFRIG E-88 20 1 K 45 1,200 660 46 K 20 1 REACH-IN REFRIGERATOR E-92 1,6,86,8 POS E-89 20 1 K 47 1,200 936 48 K 20 1 WARMING CABINET E-93 1,6,8

18,332 17,620 17,79211,916 11,453 11,565

99 95 96

P SUB-PANEL SUB-PANEL LOADS BROKEN OUT BY LOAD CLASIFICATION BELOWR RECEPTACLES - - - TOTAL CONNECTED LOAD: 53,744 VAL LIGHTING - - - 25% OF LARGEST MOTOR: -C CONTINUOUS - - - TOTAL ESTIMATED DEMAND LOAD: 34,934 VAE EQUIPMENT - - - TOTAL ESTIMATED DEMAND BALANCED CURRENT: 97 AMPSM MOTOR - - - MAXIMUM ESTIMATED DEMAND PHASE CURRENT: 99 AMPSK KITCHEN 53,744 VA 65% 34,934 VA

OTHER - - -

PANELBOARD SCHEDULEPANEL NAME: K2 (EXISTING) VOLTAGE: MAINS TYPE: SPD:

MOUNTING: PHASE: BUS MATERIAL: NEUTRAL:ENCLOSURE: WIRE: BUS RATING: BRANCH OCP TYPE:

DOOR STYLE: MIN. A.I.C. RATING: MCB RATING: ISOLATED GROUND:

KEYEDCIRCUIT DESCRIPTION

BREAKER LOAD CKT. CONNECTED LOAD/PHASE (VA) CKT. LOAD BREAKERCIRCUIT DESCRIPTION

KEYEDNOTE AMPS POLE TYPE # A B C # TYPE AMPS POLE NOTE

TOTAL CONNECTED LOAD PER PHASE (VA):TOTAL ESTIMATED DEMAND LOAD PER PHASE (VA):

TOTAL ESTIMATED DEMAND LOAD PER PHASE (AMPS):

TYPE LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

208Y/120 MLO NONE

SURFACE 3 ALUMINUM 100% RATEDNEMA 1 4 225 AMPS BOLT-ON CBs

STANDARD CONTRACTOR TO VERIFY NONE NO

9 WASHER 20 1 M 1 1,200 2,496 2 M 30 2 DRYER 9WORK TABLE C.O. E-94 20 1 K 3 1,200 2,496 4 M - - - -WORK TABLE C.O. E-95 20 1 K 5 1,200 6,000 6 K 70 3 UTILITY DISTRIBUTION SYSTEM E-45 6,8

KITCHEN C.O. 20 1 R 7 600 6,000 8 K - - -KITCHEN C.O. 20 1 R 9 600 6,000 10 K - - -KITCHEN C.O. 20 1 R 11 600 12 K - - SHUNT-TRIPOFFICE C.O. 20 1 K 13 600 1,200 14 K 20 3 MIXER E-31 6,10

VENT HOOD SWITCH E-17 20 1 K 15 600 1,200 16 K - - - -9 FIRE RISER BELL 20 1 E 17 1,200 1,200 18 K - - - -

1,6,8 ICE MAKER E-21 20 1 K 19 1,572 1,200 20 K 20 1 WORK TABLE C.O. E-32 8WORK TABLE C.O. E-22 20 1 K 21 1,200 1,200 22 K 20 1 WORK TABLE C.O. E-33 8

8 SLICER E-23 20 1 K 23 720 1,200 24 K 20 1 WORK TABLE C.O. E-34 88 WORK TABLE C.O. E-24 20 1 K 25 1,200 1,680 26 K 25 1 SHEETER E-35 1,6,88 WORK TABLE C.O. E-25 20 1 K 27 1,200 2,040 28 K 25 1 HOT FOOD CABINET E-36 1,6,8

WORK TABLE C.O. E-26 20 1 K 29 1,200 1,200 30 K 20 1 WORK TABLE C.O. E-37 81,6,8 MIXER E-27 20 1 K 31 1,200 480 32 K 20 1 FOOD PROCESSOR E-38 8

8 WORK TABLE C.O. E-28 20 1 K 33 1,200 1,200 34 K 20 1 WORK TABLE C.O. E-39 88 WORK TABLE C.O. E-29 20 1 K 35 1,200 120 36 K 20 1 GAS VALVE E-42 88 MICROWAVE. E-30 25 1 K 37 2,040 38 40 3 SPARE

1,6,8 EXHAUST HOOD E-41 20 1 K 39 1,200 40 - - -1,6,8 HEAT SENSOR E-43 20 1 K 41 1,800 42 - - -

21,468 21,336 17,64016,082 15,576 12,096

134 130 101

P SUB-PANEL SUB-PANEL LOADS BROKEN OUT BY LOAD CLASIFICATION BELOWR RECEPTACLES 1,800 VA 100% 1,800 VA TOTAL CONNECTED LOAD: 60,444 VAL LIGHTING - - - 25% OF LARGEST MOTOR: 1,248 VAC CONTINUOUS - - - TOTAL ESTIMATED DEMAND LOAD: 43,754 VAE EQUIPMENT 1,200 VA 100% 1,200 VA TOTAL ESTIMATED DEMAND BALANCED CURRENT: 121 AMPSM MOTOR 6,192 VA 100% 6,192 VA MAXIMUM ESTIMATED DEMAND PHASE CURRENT: 134 AMPSK KITCHEN 51,252 VA 65% 33,314 VA

OTHER - - -

PANELBOARD SCHEDULEPANEL NAME: K3 (EXISTING) VOLTAGE: MAINS TYPE: SPD:

MOUNTING: PHASE: BUS MATERIAL: NEUTRAL:ENCLOSURE: WIRE: BUS RATING: BRANCH OCP TYPE:

DOOR STYLE: MIN. A.I.C. RATING: MCB RATING: ISOLATED GROUND:

KEYEDCIRCUIT DESCRIPTION

BREAKER LOAD CKT. CONNECTED LOAD/PHASE (VA) CKT. LOAD BREAKERCIRCUIT DESCRIPTION

KEYEDNOTE AMPS POLE TYPE # A B C # TYPE AMPS POLE NOTE

TOTAL CONNECTED LOAD PER PHASE (VA):TOTAL ESTIMATED DEMAND LOAD PER PHASE (VA):

TOTAL ESTIMATED DEMAND LOAD PER PHASE (AMPS):

TYPE LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

208Y/120 MLO NONE

SURFACE 3 ALUMINUM 100% RATEDNEMA 1 4 225 AMPS BOLT-ON CBs

STANDARD CONTRACTOR TO VERIFY NONE NO

SPACE 1 2 SPACESPACE 3 4 SPACESPACE 5 6 SPACE

8 SERVING OHD 30 1 M 7 1,920 1,352 8 M 25 2 SPLIT SYSTEM AC-1 88 SERVING OHD 30 1 M 9 1,920 1,352 10 M - - -8 SERVING OHD 30 1 M 11 1,920 12 40 2 SPARE8 SERVING OHD 30 1 M 13 1,920 14 - - -8 SERVING OHD 30 1 M 15 1,920 16 40 2 SPARE

DISHWASH AREA OHD 20 1 M 17 1,200 18 - - -DISPLAYS 20 1 E 19 1,200 20 30 2 SPAREDISPLAYS 20 1 E 21 1,200 22 - - -DISPLAYS 20 1 E 23 1,200 24 30 2 SPARE

KITCHEN DOOR BELL 20 1 E 25 1,200 26 - - -EXHAUST FAN EF-2 20 1 M 27 87 28 30 2 SPAREEXHAUST FAN EF-5 20 1 M 29 720 30 - - -

8 ROOF C.O. 20 1 R 31 720 32 SPACESPACE 33 34 SPACESPACE 35 36 SPACESPACE 37 38 SPACESPACE 39 40 SPACESPACE 41 42 SPACESPACE 43 44 SPACESPACE 45 46 SPACESPACE 47 48 SPACE

8,312 6,479 5,0408,650 6,817 5,040

72 57 42

P SUB-PANEL SUB-PANEL LOADS BROKEN OUT BY LOAD CLASIFICATION BELOWR RECEPTACLES 720 VA 100% 720 VA TOTAL CONNECTED LOAD: 19,831 VAL LIGHTING - - - 25% OF LARGEST MOTOR: 676 VAC CONTINUOUS - - - TOTAL ESTIMATED DEMAND LOAD: 20,507 VAE EQUIPMENT 4,800 VA 100% 4,800 VA TOTAL ESTIMATED DEMAND BALANCED CURRENT: 57 AMPSM MOTOR 14,311 VA 100% 14,311 VA MAXIMUM ESTIMATED DEMAND PHASE CURRENT: 72 AMPSK KITCHEN - - -

OTHER - - -

EQUIPMENT SCHEDULEUNIT CONDUIT WIRES STARTER / DISCONNECT/ CONNECTION AT UNIT

NAME DESCRIPTION LOAD TYPE VOLTAGE PHASE AMPERAGE SIZE OCP DISCONNECT REMARKS

NO. SIZE NOTE STARTER SIZE SIZE POLES SIZE POLES

AC-1 SPLIT SYSTEM - INDOOR UNIT 1 MCA 208 1 1 3/4" 2 12 1A - - - 1 HP 2 POWERED FROM OUTDOOR UNITSPLIT SYSTEM - OUTDOOR UNIT 13 MCA 208 1 13 3/4" 2 12 10A - 25 2 30 2 NEMA 3R DISCONNECT

EF-1 EXHAUST FAN 1/4 HP 120 1 5.8 3/4" 2 12 1A - - - 1 HP 1 NEMA 3R DISCONNECTEF-2 EXHAUST FAN 87 WATTS 120 1 0.73 3/4" 2 12 1A - - - 1 HP 1EF-3 EXHAUST FAN 1-1/2 HP 480 3 3 3/4" 3 12 9A - - - 30 3 NEMA 3R DISCONNECTEF-4 EXHAUST FAN 1-1/2 HP 480 3 3 3/4" 3 12 9A - - - 30 3 NEMA 3R DISCONNECTEF-5 EXHAUST FAN 1/4 HP 120 1 5.8 3/4" 2 12 1A - - - 1 HP 1 NEMA 3R DISCONNECTEF-6 EXHAUST FAN 1/4 HP 120 1 5.8 3/4" 2 12 1A - - - 1 HP 1 NEMA 3R DISCONNECT

ELEV-1 ELEVATOR 25 HP 480 3 50 1-1/2" 3 4 10A - 60 3 60 3GROUND TO BE THE SAME SIZE AS THEPHASE CONDUCTORS. REUSE EXISTING

FEDER CONDUIT AND DISCONNECTELEVATOR CAB LIGHTS AND CONTROLS 10 AMPS 120 1 10 3/4" 2 12 10A - 20 1 30 1

MAU-1 MAKE-UP AIR UNIT 10 MCA 480 3 10 3/4" 3 12 12A - - - - - DISCONNECT BY MECHANICALMAU-2 MAKE-UP AIR UNIT 10 MCA 480 3 10 3/4" 3 12 12A - - - - - DISCONNECT BY MECHANICAL

RT-1 ROOF TOP UNIT 22 MCA 480 3 22 3/4" 3 10 12A - - - - - DISCONNECT BY MECHANICAL

SIZE ALL FUSES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

STARTER / DISCONNECT NOTES: INSTALLATION NOTES:

1. MANUAL STARTER WITH THERMAL OVERLOAD 9. NON-FUSED DISCONNECT SWITCH A. FURNISHED, INSTALLED, & CONNECTED UNDER DIVISION 26.2. MANUAL STARTER WITH THERMAL OVERLOAD PROTECTION & 10. FUSED DISCONNECT SWITCH B. FURNISHED & INSTALLED UNDER ANOTHER DIVISION

LOW VOLTAGE RELAY / CONTACTOR FOR ATC CONTROL 11. BREAKER AND ENCLOSURE REQUIRING CONNECTIONS UNDER DIVISION 26.3. COMBINATION MAGNETIC STARTER / FUSED DISCONNECT 12. DIRECT CONNECTION C. FURNISHED UNDER ANOTHER DIVISION BUT INSTALLED4. COMBINATION MAGNETIC STARTER / MOTOR CIRCUIT PROTECTOR (MCP) 13. DUPLEX RECEPTACLE OUTLET AND CONNECTED UNDER DIVISION 26.5. COMBINATION VARIABLE FREQUENCY DRIVE / MOTOR CIRCUIT PROTECTOR (MCP) 14. SPECIAL PURPOSE OUTLET D. FURNISHED, INSTALLED, & CONNECTED UNDER ANOTHER DIVISION6. REDUCED VOLTAGE STARTER 15. SHUNT-TRIP BREAKER AND ENCLOSURE E. FURNISHED BY OWNER, INSTALLED & CONNECTED BY DIVISION 267. COMBINATION TWO-SPEED STARTER / FUSED DISCONNECT 16. TOGGLE SWITCH8. COMBINATION TWO-SPEED STARTER / MOTOR CIRCUIT PROTECTOR (MCP) 17. MAGNETIC STARTER

PANELBOARD SCHEDULEPANEL NAME: EM3 (EXISTING) VOLTAGE: MAINS TYPE: SPD:

MOUNTING: PHASE: BUS MATERIAL: NEUTRAL:ENCLOSURE: WIRE: BUS RATING: BRANCH OCP TYPE:

DOOR STYLE: MIN. A.I.C. RATING: MCB RATING: ISOLATED GROUND:

KEYEDCIRCUIT DESCRIPTION

BREAKER LOAD CKT. CONNECTED LOAD/PHASE (VA) CKT. LOAD BREAKERCIRCUIT DESCRIPTION

KEYEDNOTE AMPS POLE TYPE # A B C # TYPE AMPS POLE NOTE

TOTAL CONNECTED LOAD PER PHASE (VA):TOTAL ESTIMATED DEMAND LOAD PER PHASE (VA):

TOTAL ESTIMATED DEMAND LOAD PER PHASE (AMPS):

TYPE LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

208Y/120 MCB NONE

SURFACE 3 ALUMINUM 100% RATEDNEMA 1 4 100 AMPS BOLT-ON CBs

STANDARD CONTRACTOR TO VERIFY 50 AMPS NO

6,8 WALK-IN CONDENSER E-1 25 2 M 1 1,768 1,186 2 M 20 2 WALK-IN CONDENSER E-8 6,8- - - - M 3 1,768 1,186 4 M - - - -8 WALK-IN HEAT / MONITOR E-4,5,7 20 1 E 5 960 720 6 E 20 1 WALK-IN LTS / HEAT / COIL E-9,10,12 89 OUTLET AT PHONE PANEL 20 1 E 7 960 8 20 2 SPARE9 FIRE PANEL 20 1 E 9 960 10 - - -9 FRONT DOOR 20 1 E 11 1,200 960 12 E 20 1 DATA RACK 9

SPARE 20 1 13 1,200 14 E 20 1 ELEVATOR 96,8 WALK-IN COIL / DEFROST E-2, E-3 20 2 E 15 1,144 16 SPACE- - - - E 17 1,144 18 SPACE

SPACE 19 20 SPACESPACE 21 22 SPACESPACE 23 24 SPACESPACE 25 26 SPACESPACE 27 28 SPACESPACE 29 30 SPACESPACE 31 32 SPACESPACE 33 34 SPACESPACE 35 36 SPACESPACE 37 38 SPACESPACE 39 40 SPACESPACE 41 42 SPACE

5,114 5,058 4,9845,556 5,500 4,984

46 46 42

P SUB-PANEL SUB-PANEL LOADS BROKEN OUT BY LOAD CLASIFICATION BELOWR RECEPTACLES - - - TOTAL CONNECTED LOAD: 15,156 VAL LIGHTING - - - 25% OF LARGEST MOTOR: 884 VAC CONTINUOUS - - - TOTAL ESTIMATED DEMAND LOAD: 16,040 VAE EQUIPMENT 9,248 VA 100% 9,248 VA TOTAL ESTIMATED DEMAND BALANCED CURRENT: 45 AMPSM MOTOR 5,908 VA 100% 5,908 VA MAXIMUM ESTIMATED DEMAND PHASE CURRENT: 46 AMPSK KITCHEN - - -

OTHER - - - BRANCH CIRCUIT GENERAL NOTES: PANELBOARD SCHEDULE NOTES:

ONE-LINE DIAGRAM

3P150A

3P150A

3P150A

3P100A

3P100A

3P150A

3P100A

3P50A

G

3P800A

EXISTING DISTRIBUTION PANEL 'MP'(120/208V, 3 PHASE, 4W, 800A)

PANEL'K1'

EXISTPANEL

'K2'

EXISTPANEL

'K3'

EXIST

EXISTING DISTRIBUTION PANEL 'M'(277/480V, 3 PHASE, 4W, 1600A)

PANEL'BYY'

EXISTPANEL

'BY'

EXISTPANEL

'BX'

EXISTPANEL

'B1'

EXIST

TRANSFORMEREXISTING

PANEL'B2'

EXIST

TRANSFORMEREXISTING

PANEL'B3'

EXIST

3P70A

BOOSTERTO

HEATER E-19DISHWASHER

TO

E-18

3P40A

50A40A

PANEL'EM'

EXIST

ATSEXISTING

GENERATOREXISTING 60KW

TRANSFORMEREXISTING

PANEL'EM2'

EXIST

TRANSFORMEREXISTING

PANEL'EM3'

EXIST

3P50A

MCCTO

SCALE:1

NONE

3. PROVIDE 30 MILLIAMPERE EQUIPMENT GROUND FAULT PROTECTOR TYPE CIRCUIT BREAKER.

6. PROVIDE HANDLE CLAMP FOR HOLDING CIRCUIT BREAKER IN THE "ON" OR "OFF" POSITION.

8. PROVIDE NEW CIRCUIT BREAKER IN EXISTING PANELBOARD (WHERE PANEL IS INDICATED AS EXISTING) OF SAME MANUFACTURER AND A.I.C. RATING AS EXISTING.

1. PROVIDE CLASS A GROUND FAULT INTERRUPTER TYPE CIRCUIT BREAKER.

2. PROVIDE ARC FAULT CIRCUIT INTERRUPTER TYPE CIRCUIT BREAKER.

4. PROVIDE SHUNT-TRIP TYPE CIRCUIT BREAKER WITH 120V COIL.

9. EXISTING LOAD.

5. PROVIDE HACR RATED CIRCUIT BREAKER.

7. PROVIDE SWITCHING RATED CIRCUIT BREAKER.

PANELBOARD SCHEDULE KEYED NOTES:

1. PROVIDE DEDICATED NEUTRAL FOR ALL BRANCH CIRCUITS.

2. CONTRACTOR SHALL UPSIZE ALL BRANCH CIRCUITS AS NECESSARY FOR VOLTAGE DROP

WHETHER SHOWN OR NOT.

1. CONTRACTOR SHALL USE THE ROOM NAMES LISTED ON

THE ARCHITECTURAL SIGNAGE PLAN FOR ALL ROOM

NAMES ON THE FINAL PANEL SCHEDULE CIRCUIT

DESCRIPTIONS. IF IT IS FOUND THAT THE ARCHITECTURAL

FLOOR PLAN ROOM NAMES HAVE BEEN USED THE

SCHEDULES WILL BE UPDATED TO FOR THE CORRECT

ROOM NAMES AT NO ADDITIONAL COST TO THE OWNER.

10. REUSE EXISTING BREAKER.

KEYED NOTES:

1. CONTRACTOR TO PROVIDE ALTERNATE PRICE TO REPLACE

PANELBOAD COMPLETELY.

2. REMOVE EXISTING BREAKER THAT WAS FEEDING EXISTING

ELEVATOR AND RETURN TO OWNER. PROVIDE NEW BREAKER AS

CALLED OUT. NEW BREAKER TO BE OF THE SAME MANUFACTURE

AND INTERRUPTING CURRENT AS THE EXISTING INSTALLED.

CONTRACTOR TO FIELD VERIFY ALL REQUIREMENTS.

3. REMOVE EXISTING BREAKER THAT WAS FEEDING EXISTING

BOOSTER HEATER AND RETURN TO OWNER. PROVIDE NEW

BREAKER AS CALLED OUT. NEW BREAKER TO BE OF THE SAME

MANUFACTURE AND INTERRUPTING CURRENT AS THE EXISTING

INSTALLED. CONTRACTOR TO FIELD VERIFY ALL REQUIREMENTS.

4. PROVIDE NEW 600 VOLT, 60 AMP, 3 PHASE STAINLESS STEEL

FUSED DISCONNECT WITH FUSES INDICATED. CONFIRM ALL

POWER REQUIREMENTS WITH THE KITCHEN EQUIPMENT

INSTALLER.

5. PROVIDE NEW BREAKER AS CALLED OUT. NEW BREAKER TO BE OF

THE SAME MANUFACTURE AND INTERRUPTING CURRENT AS THE

EXISTING INSTALLED. CONTRACTOR TO FIELD VERIFY ALL

REQUIREMENTS.

6. CONTRACTOR TO VERIFY LOADING ON EXISTING PANEL PRIOR TO

THE DEMOLITION AND AFTER THE NEW CONSTRUCTION TO

ENSURE PANEL IS NOT OVERLOADED. IF THE PANEL IS

OVERLOADED ONCE THE NEW LOADS ARE ADDED CONTACT THE

ENGINEER FOR OTHER OPTIONS.

#

111

ELEV

1

23

EXISTING CONDUITWITH NEW4 #41 #8 GND.THWN, CU.

1-1/4" C4 #61 #10 GND.THWN, CU.

1-1/4" C4 #61 #10 GND.THWN, CU.

1" C4 #81 #10 GND.THWN, CU.

44

3

666

6 6

6666

6 6

6

6

1" C4 #81 #10 GND.THWN, CU.

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:4

1 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

ONE-LINEDIAGRAM ANDSCHEDULES

EP701

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

1 02/18/20 Addendum #1

1

1

Page 13: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

FC

FC

C

C

C

C

V

V FITNESS ROOM

B11

GIRLS

B40

BOYS

B41

CORRIDOR

B15

TEACHER LOUNGE

B17

SERVING

B18

KITCHEN

B39

DISH WASH

B31

RECEIVING

B29

REFRIGERATOR

B32

FREEZER

B33

OFFICE

B37

TOILET

B36

LOCKERS

B35

LAUNDRY

B34

A21

AUDIO VISUAL GENERAL NOTES:

1. NO CHANGES SHALL BE MADE WITHOUT THE AV CONSULTANT'S WRITTEN CONSENT.

2. PROVIDE #6 AWG THHN WIRE WITH GREEN INSULATION FROM EACH AV EQUIPMENT CABINET TO THE MAIN BUILDING ELECTRICAL PANEL.

3. COLORS OF ALL SOUND DEVICES THAT ARE EXPOSED, INCLUDING INPUT AND OUTPUT PLATES, VOLUME CONTROLS, SWITCHES, SPEAKERS, SPEAKER ENCLOSURES, SPEAKER MOUNTING HARDWARE, ETC. SHALL BE REVIEWED AND APPROVED BY OWNER PRIOR TO ORDERING.

4. CABLE ROUTES SHOWN ON DRAWINGS DO NOT ACTUALLY REFLECT THE RACEWAYS. THE RACEWAYS SHALL BE DETERMINED IN THE FIELD.

5. REFER TO RISER DIAGRAMS AND EQUIPMENT LISTS FOR THE TYPES AND NUMBERS OF WIRES REQUIRED FOR EACH AV DEVICE.

6. SETUP COMPRESSORS AND LIMITTERS IN ALL OF THE DSPS TO PROTECT THE AMPLIFIERS AND SPEAKERS. ALSO SETUP A PASSWORD ON THE DSP, TO CONTROL THE ACCESS TO THEM.

7. CONTRACTORS ARE REQUIRED TO VISIT THE JOBSITE, DOCUMENT EXISTING CONDITIONS THAT WILL AFFECT FINAL CONSTRUCTION COSTS PRIOR TO FINAL BID.

8. PROVIDE AND INSTALL ALL NECESARY INTERCOM HARDWIRES TO COMPLETE THE INSTALLATION.

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:4

2 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

AUDIO VISUALCEILING PLAN

ET102

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

0

SCALE:

4' - 0" 8' - 0" 16' - 0"

1/8" = 1'-0"

AUDIO VISUAL CEILING PLANN

KEYED NOTES

A2 RUN A SPEAKER CABLE TO THE EXISTING INTERCOM RACK WHICH ISAPPROXIMATELY 200' AWAY. THE CABLE MUST BE CONCEALED.

#

1 02/18/20 Addendum #1

Page 14: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

HO

HH

MLC CS

12

' -

0"

2

ET401

________

FITNESS ROOM

B11

3

ET401

________

(2)

(2)

ET401

5

A3

1

ET501

2

ET501

1

1

12

' -

0 1

/8"

50.0

6' -

0"

3/4" C. 3/4" C.

1-GANG BOXSPEAKER

1-GANG BOXSPEAKER

3/4" C.

3/4" C.

3/4" C.

1-GANG BOXINTERCOM CALL SWITCH

AV CONTROLLER2-GANG BOX

HUBBELL HBL OR EQUIVALENTWITH HDMI INPUT

PROJECTOR MOUNTHUBBELL LARGE CAPACITY OUTLET BOX HBL 260 OR EQUIVALENT WITH

2-GANG MUD RING

3/4" C.

3' -

6"

58" X 104"

REFER TO PROJECTORMANUAL FOR ROUGH-IN REQUIREMENTS

3' -

10

"

SIGNAGE DISPLAY 65" TYP.

FLOOR

3' -

6"

DISPLAY

HDMI OUTPUT2-GANG BOX

HDMI INPUT2-GANG BOX

1-1/4" C.

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:4

3 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

AUDIO VISUALSECTION ANDELEVATIONS

ET401

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

SCALE: 1/4" = 1'-0"2

ENLARGED FITNESS ROOM B11 SECTION

SCALE: 1/4" = 1'-0"1

ENLARGED FITNESS ROOM B11 PLAN

SCALE: 1/4" = 1'-0"3

ENLARGED FITNESS ROOM B11 SECTION 2

SCALE: 1/4" = 1'-0"5

ENLARGED FITNESS ROOM B11 ELEVATION

SCALE: 1/4" = 1'-0"4

ENLARGED CORRIDOR B15 ELEVATION

SCALE: 1/4" = 1'-0"6

ENLARGED TEACHER LOUNGE B17 ELEVATION

KEYED NOTES

A3 RUN A INTERCOM CABLE TO THE EXISTING INTERCOM RACK, WHICH ISAPPROXIMATELY 200' AWAY. THE CABLE NEEDS TO BE CONCEALED.

#

1 02/18/20 Addendum #1

Page 15: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

SCHOOL INTERCOM EQUIPMENT LIST

SYMBOL DESCRIPTION QTY SUPPLIER MODEL ROUGH-IN CABLE

CALL SWITCH A/R QUAM CIB3 1 GANG, 3" DEEP

3/4" C. TO ACCESSIBLE CEILING WEST PENN 25355B

RECESSED INTERIOR CEILING SPEAKER:

ROUND BACK BOX A/R QUAM ERD8U 3/4" C. TO ACCESSIBLE CEILING

SPEAKER/GRILLE ASSEMBLY A/R ATLAS SOUND SD72W PAINT GRILL IN COLOR AS SELECTED BY WEST PENN 25225B

TILE SUPPORT A/R QUAM SSB-2 ARCHITECT

RECESSED INTERIOR WALL SPEAKER:

SQUARE BACK BOX A/R LOWELL P875X-4 3/4" C. TO ACCESSIBLE CEILING

SPEAKER A/R ATLAS SOUND SD72W PAINT GRILL IN COLOR AS SELECTED BY WEST PENN 25225B

GRILL, WHITE A/R LOWELL JG8X ARCHITECT

VOLUME CONTROL SWITCH A/R QUAM QC10 1-GANG 3" DEEP 22/4 SOLID BC, SHIELDED

SWITCH HEIGHT 3/4" C. TO ACCESSIBLE CEILING WEST PENN 25225B

RECESSED ENCLOSURE A/R ATLAS CS-195B WEST PENN 25225B

SPEAKER A/R SD-72W

A/R = AS REQUIRED

SCALE:

Flexmike.

lightspeed

AMPLYFIED AUDIO OUT AUDIO OUT PAGINGSENSOR

LANINPUTS OUTPUT

VO

ICELIF

T REMOTE OVER PVT INPUT 7 AUX

PVT IN PVT IN HDMI HDMI

PVS 407D

SCREEN

AUDIO/VIDEO EQUIPMENT LIST (FITNESS B11)

SYMBOL DESCRIPTION QTY/RM SUPPLIER MODEL ROUGH-IN CABLE

EQUIPMENT CABINET, WALL MOUNT, 18RU 1 MIDDLE ATLANTIC DWR-18-26 12"X12"X4" OR SIZE TO FIT, 45" AFF

DOOR 1 MIDDLE ATLANTIC LVFD-18 (2) 3/4" CONDUITS TO

SURGE SUPPRESSOR 1 SURGE X SX-1115 ACCESSIBLE CEILING SPACE

BLANK PANEL A/R MIDDLE ATLANTIC

WALL MOUNT SPEAKER MOUNTING KIT 2 JBL 5215/95 3" DEEP, 1-GANG BOX WEST PENN 25227B

ROTATE HORN BY 90 DEGREE 2 MTUI 3/4" CONDUIT THROUGHOUT

AMPLIFIER, 1250X2 1 CROWN DCI 2/1250

SWITCHER / POWER AMPLIFIER 1 EXTRON PVS 407D EXTRON HDMI CABLE

MEDIA LINK CONTROLLER WITH ETHERNET CONTROL 1 EXTRON MLC 104 IP PLUS 2 GANG 2-1/2" DEEP WESTPENN 254246, TO DATA RACK

48" AFF 3/4" C. TO CEILING ENCLOSURE EXTRON MLC IR/RS-232-50, TO PROJECTOR

EXTRON MLC PW/RS-232/VC-50, TO SWITCHER

HDMI AND STEREO AUDIO INPUTS 1 EXTRON PVT HDMI 2 GANG 2-1/2" DEEP EXTRON VGA WITH AUDIO CABLE, COMPUTER TO WALL, 2 REQUIRED

18" AFF 3/4" C. TO CEILING ENCLOSURE EXTRON HDMI CABLE, COMPUTER TO WALL

EXTRON XTP DTP 24P

RF WIRELESS RECEIVING SYSTEM 1 LIGHT SPEED AR-FS

INCLUDES:

ACCESS LINK BASIC STATION WITH POWE SUPPLY

TEACHER'S MICROPHONE FLEXMIKE

RECHARGEABLE BATTERY

LANYARD, AND CABLE

STUDENT MICROPHONE SHARE MIKE

WALL MOUNTED ULTRA SHORT-THROW PROJECTOR 1 EPSON POWERLITE 700U 2-GANG BOX

ULTRA SHORT-THROW PROJECTOR MOUNT 1 EPSON ELPMB53

SCREEN, MANUAL, 58"X104" 1 DA-LITE MODEL C WITH CSR 79884

HDMI TX 1 CRESTRON HD-TX-101-C-E WEST PENN 254246

CRESTRON HDMI CABLE

HDMI RX 1 CRESTRON HD-RX-101-C-1G-E-B-T 2-GANG BOX WEST PENN 254246

3/4" C. ACCESSIBLE CEILING SPACE

DIGITAL SIGNAL PROCESSOR 1 SYNTRIX SOLUS NX4X4 WEST PENN 25291B

A/R = AS REQUIRED

1

INTERCOM SYSTEM RISER

AV SYSTEM - FITNESS B11

SCALE:2

NONE

2W

RESTROOMS

2W

CALLSWITCH

FITNESS ROOM

EXISTING INTERCOM RACK (BOGEN)

NONE1

PVT HDMI

Cat 6 A

RS232

25291BL

SPEAKER

HDMI

MLC 104 IP PLUSA

B

C

D

E

B

C

F

F XTP DTP 24P

E

G MLC IR/RS232

G

AMP

C

CABINET #1

* INSTALL THE ACCESS LINK OUTSIDE THE CABINET

*

TEACHER'S MICROPHONE

STUDENT'S MICROPHONE

NOTE:1. PROGRAM WALL CONTROLLER TO CONTROL MASTER AUDIO

VOLUME, PROJECTOR AUDIO INPUT VOLUME, PROJECTORPOWER ON/OFF AND INPUT SELECTIONS.

CACCESS LINK

TO NEARESTDATA RACK

A

A

PVS 407D

PROJECTOR

SCREEN

DSP

HDMI

TX

HDMI

RX

2W 2W

2W

KITCHEN, ETC.

CS

MLC

HH

HI

HO

C

V

C

V

VOLUME

DISPLAY

MLC 104 IP PLUS

ON OFF VCR

DVD

PC

HDMI IN

IR OUT

S

G

AUDIO IN

HDMI IN

IR OUT

S

G

AUDIO IN

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:4

3 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

AUDIO VISUALRISER ANDEQUIPMENT LIST

ET702

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

1 02/18/20 Addendum #1

1 1

Page 16: Addendum No. 01Issued: 2/18/2020 - Arnell-West · Addendum No. 01 to the Construction Contract for the above referenced project: ... SPK FC FC SPK SPK CS MA MA 2 TV 5 6 B D4 D4 D2

SCHOOL INTERCOM EQUIPMENT LIST (ALTERNATE #1)

SYMBOL DESCRIPTION QTY SUPPLIER MODEL ROUGH-IN CABLE

CALL SWITCH A/R QUAM CIB3 1 GANG, 3" DEEP

3/4" C. TO ACCESSIBLE CEILING WEST PENN 25355B

RECESSED INTERIOR CEILING SPEAKER:

ROUND BACK BOX A/R QUAM ERD8U 3/4" C. TO ACCESSIBLE CEILING

SPEAKER/GRILLE ASSEMBLY A/R ATLAS SOUND SD72W PAINT GRILL IN COLOR AS SELECTED BY WEST PENN 25225B

TILE SUPPORT A/R QUAM SSB-2 ARCHITECT

RECESSED INTERIOR WALL SPEAKER:

SQUARE BACK BOX A/R LOWELL P875X-4 3/4" C. TO ACCESSIBLE CEILING

SPEAKER A/R ATLAS SOUND SD72W PAINT GRILL IN COLOR AS SELECTED BY WEST PENN 25225B

GRILL, WHITE A/R LOWELL JG8X ARCHITECT

VOLUME CONTROL SWITCH A/R QUAM QC10 1-GANG 3" DEEP 22/4 SOLID BC, SHIELDED

SWITCH HEIGHT 3/4" C. TO ACCESSIBLE CEILING WEST PENN 25225B

RECESSED ENCLOSURE A/R ATLAS CS-195B WEST PENN 25225B

SPEAKER A/R SD-72W

A/R = AS REQUIRED

SCALE:

Flexmike.

lightspeed

AMPLYFIED AUDIO OUT AUDIO OUT PAGINGSENSOR

LANINPUTS OUTPUT

VO

ICELIF

T REMOTE OVER PVT INPUT 7 AUX

PVT IN PVT IN HDMI HDMI

PVS 407D

SCREEN

AUDIO/VIDEO EQUIPMENT LIST (FITNESS B11 ALTERNATE #1)

SYMBOL DESCRIPTION QTY/RM SUPPLIER MODEL ROUGH-IN CABLE

EQUIPMENT CABINET, WALL MOUNT, 18RU 1 MIDDLE ATLANTIC DWR-18-26 12"X12"X4" OR SIZE TO FIT, 45" AFF

DOOR 1 MIDDLE ATLANTIC LVFD-18 (2) 3/4" CONDUITS TO

SURGE SUPPRESSOR 1 SURGE X SX-1115 EACH CEILING ENCLOSURE

BLANK PANEL A/R MIDDLE ATLANTIC

WALL MOUNT SPEAKER MOUNTING KIT 2 JBL 5215/95 3" DEEP, 1-GANG BOX WEST PENN 25227B

ROTATE HORN BY 90 DEGREE 2 MTUI 3/4" CONDUIT THROUGHOUT

AMPLIFIER, 1250X2 1 CROWN DCI 2/1250

SWITCHER / POWER AMPLIFIER 1 EXTRON PVS 407D EXTRON HDMI CABLE

MEDIA LINK CONTROLLER WITH ETHERNET CONTROL 1 EXTRON MLC 104 IP PLUS 2 GANG 2-1/2" DEEP WESTPENN 254246, TO DATA RACK

48" AFF 3/4" C. THROUGHOUT EXTRON MLC IR/RS-232-50, TO PROJECTOR

EXTRON MLC PW/RS-232/VC-50, TO SWITCHER

HDMI AND STEREO AUDIO INPUTS 1 EXTRON PVT HDMI 2 GANG 2-1/2" DEEP EXTRON VGA WITH AUDIO CABLE, COMPUTER TO WALL, 2 REQUIRED

18" AFF 3/4" C. THROUGHOUT EXTRON HDMI CABLE, COMPUTER TO WALL

EXTRON XTP DTP 24P

RF WIRELESS RECEIVING SYSTEM 1 LIGHT SPEED AR-FS

INCLUDES:

ACCESS LINK BASIC STATION WITH POWE SUPPLY

TEACHER'S MICROPHONE FLEXMIKE

RECHARGEABLE BATTERY

LANYARD, AND CABLE

STUDENT MICROPHONE SHARE MIKE

WALL MOUNTED ULTRA SHORT-THROW PROJECTOR 1 EPSON POWERLITE 700U 2-GANG BOX

ULTRA SHORT-THROW PROJECTOR MOUNT 1 EPSON ELPMB53 3/4" C. THROUGHOUT

SCREEN, MANUAL, 58"X104" 1 DA-LITE MODEL C WITH CSR 79884

HDMI TX 1 CRESTRON HD-TX-101-C-E WEST PENN 254246

CRESTRON HDMI CABLE

HDMI RX 1 CRESTRON HD-RX-101-C-1G-E-B-T 2-GANG BOX

DIGITAL SIGNAL PROCESSOR 1 SYNTRIX SOLUS NX4X4 WEST PENN 25291B

A/R = AS REQUIRED

1

AV SYSTEM - FITNESS B11 ALTERNATE

ALTERNATE #1

INTERCOM SYSTEM RISER (ALTERNATE)

NONE1

PVT HDMI

Cat 6 A

RS232

25291BL

SPEAKER

HDMI

MLC 104 IP PLUS A

B

C

D

E

B

C

F

F XTP DTP 24P

E

G MLC IR/RS232

G

AMP

C

CABINET #1

* INSTALL THE ACCESS LINK OUTSIDE THE CABINET

*

TEACHER'S MICROPHONE

STUDENT'S MICROPHONE

NOTE:1. PROGRAM WALL CONTROLLER TO CONTROL MASTER AUDIO

VOLUME, PROJECTOR AUDIO INPUT VOLUME, PROJECTORPOWER ON/OFF AND INPUT SELECTIONS.

CACCESS LINK

TO NEARESTDATA RACK

A

A

PVS 407D

PROJECTOR

SCREEN

DSP

HDMI

TX

HDMI

RX

SCALE:3

NONE

2W

RESTROOMS

2W

CALLSWITCH

FITNESS ROOM

EXISTING INTERCOM RACK (BOGEN)

2W 2W

2W

KITCHEN, ETC.

MLC

HH

HI

HO

C

V

CS

C

V

VOLUME

DISPLAY

MLC 104 IP PLUS

ON OFF VCR

DVD

PC

HDMI IN

IR OUT

S

G

AUDIO IN

HDMI IN

IR OUT

S

G

AUDIO IN

HH

MLC CS

HO

FITNESS ROOM

B11

ET703

2

1

(2)

(2)

1

ET501

2

ET501

A3

3/4" C. TO ACCESSIBLE

CEILING SPACE

1

3/4" C.

1-GANG BOXSPEAKER

1-GANG BOXSPEAKER

3/4" C.

3/4" C.

3/4" C.

1-GANG BOXINTERCOMCALL SWITCH

AV CONTROLLER2-GANG BOX

HUBBELL HBL OR EQUIVALENTWITH HDMI INPUT

PROJECTOR MOUNT

HUBBELL LARGE CAPACITY OUTLET BOX HBL 260 OR EQUIVALENT WITH

2-GANG MUD RING

3/4" C. TO EQUIPMENT CABINET

3' -

6"

INTERCOM SPEAKER

58" X 104"

REFER TO PROJECTORMANUAL FOR ROUGH-IN REQUIREMENTS

1TO

3/4" C.

TO ACCESSIBLECEILING SPACE

240 E. MORRIS AVE. SUITE 200SALT LAKE CITY, UT 84115

P (801) 534-1130F (801) 534-1080

www.envisioneng.com

SHEET NUMBER

1

E

D D

C

B

A

E

C

B

A

2 3 4 5

1 2 3 4 5

MHTN PROJECT NO.

SEAL

SHEET NAME

REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.

DESCRIPTIONDATE

MHTN Architects, Inc.420 East South Temple Suite 100 Salt Lake City, Utah 84111Telephone (801) 595-6700Telefax (801) 595-6717www.mhtn.com

NO.

ISSUE

Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.

Original drawing is 30 x 42. Do not scale contents of this drawing.

2/1

8/2

020

11:5

2:4

4 A

M

C:\R

evit 2

020

Lo

ca

l F

iles\2

01

9-1

82

_E

LE

C-C

EN

TR

AL

_V

20_

SK

ing

ery

.rvt

AUDIO VISUALRISER ANDEQUIPMENT LIST

ET703

FEBRUARY 6, 2020

CONSTRUCTION DOCUMENTS

2019587

OQ

UIR

RH

HIL

LS

M.S

. R

EM

OD

EL

129

49 S

OU

TH

27

00

WE

ST

RIV

ER

TO

N, U

TA

H 8

40

65

JO

RD

AN

SC

HO

OL D

IST

RIC

T

©2020 MHTN ARCHITECTS, INC.

0

SCALE:

2' - 0" 4' - 0" 8' - 0"

1/4" = 1'-0"4

AUDIO VISUAL - FITNESS BID ALTERNATE #1

0

SCALE:

2' - 0" 4' - 0" 8' - 0"

1/4" = 1'-0"2

ENLARGED FITNESS ROOM B11 ELEVATION ALTERNATE #1

KEYED NOTES

A3 RUN A INTERCOM CABLE TO THE EXISTING INTERCOM RACK, WHICH ISAPPROXIMATELY 200' AWAY. THE CABLE NEEDS TO BE CONCEALED.

#

1 02/18/20 Addendum #1

1

1