ADDENDUM #2 MARCH 26, 2015 BURRITT LIBRARY HVAC IMPROVEMENTS- PHASE II STATE PROJECT #BI -RC-343; CCSU PROJECT # 22-AF FEBRUARY 20, 2015; Page 1 of 3 PROJECT TITLE: BURRITT LIBRARY HVAC IMPROVEMENTS -PHASE II STATE PROJECT #: BI-RC-343 CCSU PROJECT #: 22-AF CONTRACT DOCUMENT DATE: FEBRUARY 20, 2015 MANDATORY PRE-BID CONFERENCE 10:00 AM MARCH 11, 2015 BID OPENING DATE: 3:00 PM, APRIL 9, 2015 CONTENTS OF ADDENDUM #2: Specification Addendum 1. Specification Section 024190 3.1 E a. Replace “perform” in the first sentence of E. with “Contractor shall retain the services of registered professional structural engineer with a CT license to perform” 2. Specification Section 230500 1.5 B 1 a. Replace “AWS D.1” with “AWS D1.1-2000”. b. Replace “B31.1” with “B31.1 – 1999”. 3. Specification Section 230500 2.4 H 2 a. Add to Section 2.4 H. 2., at end: “Primer shall be purple in color.” 4. Specification Section 230516 3.3 D a. Replace “B31.9” with “B31.9-2004” 5. Specification Section 230517 3.1 B 1 and 3.1 C 2a a. Delete Section 3.1.B.1 6. Specification Section 230529 3.2 I a. Delete 3.2 I. (Information is covered in 3.2. H. and in overall seismic restraint discussion.) 7. Specification Section 230593 3.17 D a. Replace “Prepare test and inspection reports.” with “Prepare test and inspection reports. Submit successful report to CT OSBI for review.”

Upload: vuongkien

Post on 24-Apr-2018

240 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

ADDENDUM #2

MARCH 26, 2015

BURRITT LIBRARY HVAC IMPROVEMENTS- PHASE II STATE PROJECT #BI -RC-343; CCSU PROJECT # 22-AF

FEBRUARY 20, 2015; Page 1 of 3

PROJECT TITLE: BURRITT LIBRARY HVAC IMPROVEMENTS -PHASE II STATE PROJECT #: BI-RC-343 CCSU PROJECT #: 22-AF CONTRACT DOCUMENT DATE: FEBRUARY 20, 2015 MANDATORY PRE-BID CONFERENCE 10:00 AM MARCH 11, 2015 BID OPENING DATE: 3:00 PM, APRIL 9, 2015 CONTENTS OF ADDENDUM #2: Specification Addendum

1. Specification

Section 024190

3.1 E

a. Replace “perform” in the first sentence of E. with “Contractor shall retain

the services of registered professional structural engineer with a CT license

to perform”

2. Specification

Section 230500

1.5 B 1

a. Replace “AWS D.1” with “AWS D1.1-2000”.

b. Replace “B31.1” with “B31.1 – 1999”.

3. Specification

Section 230500

2.4 H 2

a. Add to Section 2.4 H. 2., at end: “Primer shall be purple in color.”

4. Specification

Section 230516

3.3 D

a. Replace “B31.9” with “B31.9-2004”

5. Specification

Section 230517

3.1 B 1 and 3.1 C 2a

a. Delete Section 3.1.B.1

6. Specification

Section 230529

3.2 I

a. Delete 3.2 I. (Information is covered in 3.2. H. and in overall seismic

restraint discussion.)

7. Specification

Section 230593

3.17 D

a. Replace “Prepare test and inspection reports.” with “Prepare test and

inspection reports. Submit successful report to CT OSBI for review.”

Page 2: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

ADDENDUM #2

MARCH 26, 2015

BURRITT LIBRARY HVAC IMPROVEMENTS- PHASE II STATE PROJECT #BI -RC-343; CCSU PROJECT # 22-AF

FEBRUARY 20, 2015; Page 2 of 3

8. Specification

Section 230700

a. Add 1.4: “1.4 REFERENCES A. 2009 IECC – International Energy

Conservation Code.”

9. Specification

Section 232113

1.4

a. Add 1.3 K: “1.3 K. 2009 IMC – International Mechanical Code.”

10. Specification

Section 232113

3.4

a. Add to 3.4 A. at end of section: “Contractor shall document all test

procedures including test pressures and test durations. Contractor shall

submit successful test report to CT OSBI for review.”

11. Specification

Section 233113

1.3

a. Replace 1.3 B. with “ASTM A 240-2015 Specification for Heat-Resisting

Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for

Pressure Vessels And General Applications.”

b. Add 1.3. G: “G. ASTM A 480-2014a, General Requirements For Flat-

Rolled Stainless And Heat-Resisting Steel Plate, Sheet, And Strip.”

c. In 1.3 C. replace “90A” with “90A-2002”

d. In 1.3 F. replace “UL 181 - Factory-Made Air Ducts and Connectors” with

“UL 181A-94 Closure Systems for Use with Rigid Air Ducts and Air

Connectors, and UL 181B-95 Closure Systems for Use with Flexible Air

Ducts and Air Connectors”

e. Add 1.3 G: “G. 2009 IMC – International Mechanical Code.”

f. Add 1.3 H: “H. 2009 IECC – International Energy Conservation Code.”

12. Specification

Section 233600

1.4 A and B

a. In 1.4 A, replace “NFPA 70” with “NFPA 70-2011”

b. In 1.4. B., replace “ASHRAE 62” with “ASHRAE 62-2007”

13. Specification

Section 233600

3.2 A and 3.3 A

a. In 3.2 A. replace “90A” with “90A-2002”

b. In 3.3 A. replace “Metal and Flexible” with “Metal and Flexible - 1985”

14. Specification

Section 233600

3.4

a. Delete all references to seismic requirements.

15. Specification

Section 233713

3.2

a. (RDG will sit in suspended ceiling grid. If seismic restraint not required,

restraint cables at 2 corners will not be required.)

16. Specification

Section 234100

1.4 A and B

a. In 1.4 A. 1. replace “62.1” with “62.1-2007”

b. In 1.4 A. 2, replace “Comply with ASHRAE 52.1 for arrestance and

ASHRAE 52.2 for MERV for methods of testing and rating air-filter units.”

with “Comply with ASHRAE 52.2-2012 for arrestance and for MERV for

methods of testing and rating air-filter units.”

17. Specification

Section 237313

1.3 B

a. Delete all references to seismic requirements.

Page 3: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

ADDENDUM #2

MARCH 26, 2015

BURRITT LIBRARY HVAC IMPROVEMENTS- PHASE II STATE PROJECT #BI -RC-343; CCSU PROJECT # 22-AF

FEBRUARY 20, 2015; Page 3 of 3

18. Specification

Section 237313

1.5

a. In 1.5 A, replace “NFPA 70” with “NFPA 70-2011”

b. In 1.5 B. replace “90A” with “90A-2002”

c. In 1.5 C, replace “ARI 430” with “AHRI 430-2104”, and “ARI” with

AHRI”.

d. In 1.5 F, replace “NFPA 70” with ‘NFPA 70-2011”

19. Specification

Section 238239

2.3

a. In 1.4. B. 1. , replace “ASHRAE 62” with “ASHRAE 62-2007”

b. In 2.3. A, replace “ASHRAE 62” with “ASHRAE 62-2007”

c. In 2.3. B., replace “ASHRAE 90.1” with “ASHRAE 90.1-2007”

d. In 2.3. C., replace “ASCE/SEI 7” with “ASCE/SEI -02”

20. New Specification

Section 230130

a. New 230130, “HVAC Air Duct Cleaning”

Mechanical Drawings Addendum 1. Drawing A-0 a. Update code reference in Drawing A-0 to 2009 IECC. Update NFPA 70

reference to 2011.

2. Drawings MD-1

through MD-4

a. Add new general note stating that, “All new hydronic piping shall be tested

at 1.5 times the system relief valve setpoint, or to a pressure not less than

100 psi, whichever is higher, for duration of 15 minutes per Section 1208.1

of the 2003 International Mechanical Code.”

3. Drawings M-1

through M-4

a. Add General Note 2: “All VAV boxes shall be installed per manufacturer’s

recommendations, including service clearances.”

4. Drawing M-4 a. Modify per MSK-1: The FSD has been changed to CFS. Note 4 does not

apply to this location.

b. Modify Note 7 to read, “Install 3 new combination fire/smoke dampers.”

c. Delete Note 8.

d. Modify per MSK-2: The valves located within the space near the elevator

are to be installed outside the shaft space as shown.

5. Drawing M-7 a. Modify per MSK-3: Detail A1 modified to show piping anchors.

b. Modify per MSK-5: Detail B2 added to show unit heater supports.

c. Modify per MSK-6: Detail C2 added to show VAV supports.

6. Drawing M-8 a. Add note to Detail A2, “Installation must comply with 2003 International

Mechanical Code for access to mechanical equipment.”

b. Modify per MSK-4: Detail C2 changed to C3 and modified to show

threaded rod as hot dipped galvanized.

c. Modify per MSK-10: New Detail C3 added to show heat trace.

7. Drawing M-10 a. Delete HVAC Note 6.

b. Modify per MSK-7: New Detail C1 added to show EF-3 Supports.

c. Modify per MSK-8: New Detail C2 added to show grilles and diffuser

anchorage and support details.

d. Modify per MSK-9: New Detail C3 added to show new roof drain

modification.

** END OF ADDENDUM #2 **

Page 4: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

File P

ath: J:\D

WG

\P

2008\0749\A

30\M

EP

\M

echanical\20080749A

30-M

104.dw

g Layout: M

SK

-1

P

lotted: T

hu, M

arch 26, 2015 - 9:31 A

M U

ser: jthurber

Plotter: D

WG

T

O P

DF

.P

C3

C

TB

F

ile: F

O H

ALF

.S

TB

20080749.A30

03/26/2015

CENTRAL CONNECTICUT STATE UNIVERSITY

4TH FLOOR - COMBINATION FIRE/SMOKE DAMPERS

BURRITT LIBRARY HVAC IMPROVEMENTSPHASE II

NEW BRITAIN CONNECTICUT

1/4" - 1'

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

Page 5: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

File P

ath: J:\D

WG

\P

2008\0749\A

30\M

EP

\M

echanical\20080749A

30-M

104.dw

g Layout: M

SK

-2

P

lotted: T

hu, M

arch 26, 2015 - 9:34 A

M U

ser: jthurber

Plotter: D

WG

T

O P

DF

.P

C3

C

TB

F

ile: F

O H

ALF

.S

TB

20080749.A30

03/26/2015

CENTRAL CONNECTICUT STATE UNIVERSITY

4TH FLOOR - NEW HYDRONIC VALVES

BURRITT LIBRARY HVAC IMPROVEMENTSPHASE II

NEW BRITAIN CONNECTICUT

1/4" - 1'

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

Page 6: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

File P

ath: J:\D

WG

\P

2008\0749\A

30\M

EP

\M

echanical\20080749A

30-M

107-108.dw

g Layout: M

SK

-3

P

lotted: T

hu, M

arch 26, 2015 - 10:38 A

M U

ser: jthurber

Plotter: D

WG

T

O P

DF

.P

C3

C

TB

F

ile: F

O H

ALF

.S

TB

20080749.A30

03/26/2015

CENTRAL CONNECTICUT STATE UNIVERSITY

DETAIL A1/M-7 MODIFICATION

BURRITT LIBRARY HVAC IMPROVEMENTSPHASE II

NEW BRITAIN CONNECTICUT

NTS

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

Page 7: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

File P

ath: J:\D

WG

\P

2008\0749\A

30\M

EP

\M

echanical\20080749A

30-M

107-108.dw

g Layout: M

SK

-4

P

lotted: T

hu, M

arch 26, 2015 - 10:39 A

M U

ser: jthurber

Plotter: D

WG

T

O P

DF

.P

C3

C

TB

F

ile: F

O H

ALF

.S

TB

20080749.A30

03/26/2015

CENTRAL CONNECTICUT STATE UNIVERSITY

DETAIL MODIFICATION C2/M-8

BURRITT LIBRARY HVAC IMPROVEMENTSPHASE II

NEW BRITAIN CONNECTICUT

NTS

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

Page 8: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

File P

ath: J:\D

WG

\P

2008\0749\A

30\M

EP

\M

echanical\20080749A

30-M

107-108.dw

g Layout: M

SK

-5

P

lotted: T

hu, M

arch 26, 2015 - 11:16 A

M U

ser: jthurber

Plotter: D

WG

T

O P

DF

.P

C3

C

TB

F

ile: F

O H

ALF

.S

TB

20080749.A30

03/26/2015

CENTRAL CONNECTICUT STATE UNIVERSITY

MODIFIED DETAIL B2/M-7

BURRITT LIBRARY HVAC IMPROVEMENTSPHASE II

NEW BRITAIN CONNECTICUT

NTS

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

Page 9: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

File P

ath: J:\D

WG

\P

2008\0749\A

30\M

EP

\M

echanical\20080749A

30-M

107-108.dw

g Layout: M

SK

-6

P

lotted: T

hu, M

arch 26, 2015 - 1:22 P

M U

ser: pfiejdasz

Plotter: D

WG

T

O P

DF

.P

C3

C

TB

F

ile: F

O.S

TB

20080749.A30

03/26/2015

CENTRAL CONNECTICUT STATE UNIVERSITY

NEW VAV SUPPORT DETAIL C2/M-7

BURRITT LIBRARY HVAC IMPROVEMENTSPHASE II

NEW BRITAIN CONNECTICUT

NTS

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

Page 10: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

File P

ath: J:\D

WG

\P

2008\0749\A

30\M

EP

\M

echanical\20080749A

30-M

109-110.dw

g Layout: M

SK

-7

P

lotted: T

hu, M

arch 26, 2015 - 11:24 A

M U

ser: jthurber

Plotter: D

WG

T

O P

DF

.P

C3

C

TB

F

ile: F

O H

ALF

.S

TB

20080749.A30

03/26/2015

CENTRAL CONNECTICUT STATE UNIVERSITY

NEW DETAIL C1/M-10

BURRITT LIBRARY HVAC IMPROVEMENTSPHASE II

NEW BRITAIN CONNECTICUT

NTS

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

Page 11: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

File P

ath: J:\D

WG

\P

2008\0749\A

30\M

EP

\M

echanical\20080749A

30-M

109-110.dw

g Layout: M

SK

-8

P

lotted: T

hu, M

arch 26, 2015 - 11:59 A

M U

ser: pfiejdasz

Plotter: D

WG

T

O P

DF

.P

C3

C

TB

F

ile: F

O.S

TB

20080749.A30

03/26/2015

CENTRAL CONNECTICUT STATE UNIVERSITY

NEW DETAIL C2/M-10

BURRITT LIBRARY HVAC IMPROVEMENTSPHASE II

NEW BRITAIN CONNECTICUT

NTS

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

Page 12: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

File P

ath: J:\D

WG

\P

2008\0749\A

30\M

EP

\M

echanical\20080749A

30-M

109-110.dw

g Layout: M

SK

-9

P

lotted: T

hu, M

arch 26, 2015 - 11:58 A

M U

ser: pfiejdasz

Plotter: D

WG

T

O P

DF

.P

C3

C

TB

F

ile: F

O.S

TB

20080749.A30

03/26/2015

CENTRAL CONNECTICUT STATE UNIVERSITY

NEW DETAIL C3/M-10

BURRITT LIBRARY HVAC IMPROVEMENTSPHASE II

NEW BRITAIN CONNECTICUT

NTS

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

Page 13: ADDENDUM #2 - See Yourself @ CCSU Addendum 2.pdfB., replace “ASHRAE 62” with “ASHRAE 62-2007” 13. Specification Section 233600 3.2 A and 3 ... ASHRAE 52.2 for MERV for methods

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

File P

ath: J:\D

WG

\P

2008\0749\A

30\M

EP

\M

echanical\20080749A

30-M

105-106.dw

g Layout: M

SK

-10

P

lotted: T

hu, M

arch 26, 2015 - 1:46 P

M U

ser: pfiejdasz

Plotter: D

WG

T

O P

DF

.P

C3

C

TB

F

ile: F

O.S

TB

20080749.A30

03/26/2015

CENTRAL CONNECTICUT STATE UNIVERSITY

SKETCH C1 FOR DRAWING M-6 HEAT TRACE CLARIFICATION

BURRITT LIBRARY HVAC IMPROVEMENTSPHASE II

TOWN CONNECTICUT

?" - ??'

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com