addendum #1 - esuhsd purchasing/rfq rfp … · add01-a05. notes: 1.to be provided by modular...

13
ARTIK ART AND ARCHITECTURE ADDENDUM #1 July 3rd, 2019 PAGE 1 OF 3 PIEDMONT HILLS HIGH SCHOOL CONCESSION BUILDING DSA Project # 01-118374 EAST SIDE UNION HIGHS CHOOL DISTRICT Prepared by Architect Artik Art and Architecture 394-A Umbarger Road San Jose, Ca 95127 (408) 224-9890 This Addendum forms a part of the Contract Documents and modifies the original bidding documents. Approved by DSA on 5/16/2019. Bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. CHANGES TO THE SPECIFICATIONS CHANGES TO THE DRAWINGS Architectural: Item 1 Sheet A0.01 TITLE SHEET A. Added Construction Manager to Project Directory, refer to sheet ADD01-A01 B. Added to general notes #17, refer to sheet ADD01-A01 Item 2 Sheet A0.02 OVERALL SITE PLAN A. Added keynote #6. Refer to sheet ADD01-A02 B. Moved concession building. Refer to sheet ADD01-02 and Item 3 Sheet A1.03 ENLARGED SITE PLAN & DEMO PLAN A. Revised demo keynote #3,4,5. Refer to sheet ADD01-A03 B. Added legend. Refer to sheet ADD01-A03 C. Changed drawing scale in demo site plan. Refer to sheet ADD01-A03 D. Added graphic scale. Refer to sheet ADD01-A03 E. Added general note #14. Refer to sheet ADD01-A03 F. Revised keynote #1,3. Refer to sheet ADD01-A03 G. Removed keynote #6. Refer to sheet ADD01-A03 H. Added keynote #7,8,9,10. Refer to sheet ADD01-A03 I. Revised concession building location, dimensions adjusted. Refer to sheet ADD01-A03 EAST SIDE UNION HIGH SCHOOL DISTRICT ADDENDUM #02 ARTIK ART AND ARCHITECTURE ADDENDUM #01

Upload: others

Post on 26-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

ARTIK ART AND ARCHITECTURE ADDENDUM #1

July 3rd, 2019

PAGE 1 OF 3

ADDENDUM #1

PIEDMONT HILLS HIGH SCHOOL – CONCESSION BUILDING

DSA Project # 01-118374

EAST SIDE UNION HIGHS CHOOL DISTRICT

Prepared by Architect

Artik Art and Architecture

394-A Umbarger Road

San Jose, Ca 95127

(408) 224-9890

This Addendum forms a part of the Contract Documents and modifies the original bidding documents.

Approved by DSA on 5/16/2019.

Bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to

do so may subject the Bidder to disqualification.

CHANGES TO THE SPECIFICATIONS

CHANGES TO THE DRAWINGS

Architectural:

Item 1 Sheet A0.01 TITLE SHEET

A. Added Construction Manager to Project Directory, refer to sheet ADD01-A01

B. Added to general notes #17, refer to sheet ADD01-A01

Item 2 Sheet A0.02 OVERALL SITE PLAN

A. Added keynote #6. Refer to sheet ADD01-A02

B. Moved concession building. Refer to sheet ADD01-02 and

Item 3 Sheet A1.03 ENLARGED SITE PLAN & DEMO PLAN

A. Revised demo keynote #3,4,5. Refer to sheet ADD01-A03

B. Added legend. Refer to sheet ADD01-A03

C. Changed drawing scale in demo site plan. Refer to sheet ADD01-A03

D. Added graphic scale. Refer to sheet ADD01-A03

E. Added general note #14. Refer to sheet ADD01-A03

F. Revised keynote #1,3. Refer to sheet ADD01-A03

G. Removed keynote #6. Refer to sheet ADD01-A03

H. Added keynote #7,8,9,10. Refer to sheet ADD01-A03

I. Revised concession building location, dimensions adjusted. Refer to sheet

ADD01-A03

EAST SIDE UNION HIGH SCHOOL DISTRICT ADDENDUM #02ARTIK ART AND ARCHITECTURE ADDENDUM #01

Page 2: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

ARTIK ART AND ARCHITECTURE ADDENDUM #1

July 3rd, 2019

PAGE 2 OF 3

J. Removed guard rails. Refer to sheet ADD01-A03

K. Added graphic scale. Refer to sheet ADD01-A03

L. Revised drawing scale in site plan. Refer to sheet ADD01-A03

Item 4 Sheet A3.01 CONCESSION BLDG. FLOOR PLAN (FOR REFERENCE ONLY)

A. Revised keynote #4, Refer to sheet ADD01-04

Item 5 Sheet A12.10 DETAILS

A. Revised details #19, 18, 13, 4. Refer to sheet ADD01-A05

B. Removed details #6, 7, 9. Refer to sheet ADD01-A05

C. Added details #6, 8, 9, 10, 11, 12. Refer to sheet ADD01-A05

Electrical:

Item 1 Drawing A1-E01/E1.1(Electrical Site Plan.)

A. Revised Panel feeder from existing panel PH1 To Distribution panel DP.

B. Revised note 10 to use existing 4”C.

C. Added a new conduit and new trench between existing pull boxes.

D. Added notes 13& 14.

Item 2 Drawing A1-E02/E2.1(Electrical Plan.)

E. Revised receptacles, backboard plywood to agree with the provided portable

manufacturer drawings.

F. Deleted notes 16 thru 20 as is no longer applied as all of the items are already

provided by portable manufacturer.

G. Revised cable Ladder (shorter)

Item 3 Drawing A1-E03/E3.1(Partial single line diagram)

H. Revised single line diagram to agree with the changes made on item 1.A.

I. Revised panel schedule to agree with the panel schedule provided by the portable manufacturer.(Please note that the 125A panel was changed to 200A)

Item 4 Drawing A1-E04/E3.2(Details)

J. Cable Ladder wall mounting details.

Fire Alarm:

Item 1 Drawing A1-FA0FA1.11(Fire Alarm Site Plan).

K. Revised note 1 to use existing 4”C.

L. Added a new conduit and new trench between existing pull boxes.

M. Added notes 6.

Attachments:

Specification Sections:

Drawings

Page 3: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

ARTIK ART AND ARCHITECTURE ADDENDUM #1

July 3rd, 2019

PAGE 3 OF 3

ADD01-A01

ADD01-A02

ADD01-A03

ADD01-A04

ADD01-A05

A1-E01

A1-E02

A1-E03

A1-E04

A1-FA01

END OF ADDENDUM #1

Page 4: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

ADDENDUM 01

CONCESSION BUILDING

PIEDMONT HILLS HIGH SCHOOL

EAST SIDE UNION HIGH SCHOOL DISTRICT

If this sheet is not 11" x 17" it is a reduced print - scale accordingly

XXX No.

SHEET NO.

REFERENCE SHEET

SCALE

DATE

PROJECT NO.

DSA #

135259

01-118374

T

A

I

C

W

S

L

No. C-23919

REN. 9-30-19

L

E

F

O

AC

T

F

I

N

R

O

I

A

C

E

I

A

M

E

.

I

L

L

E

N

S

D

RA

E

T

G

C

D

L

U

O

T

I

H

TITLE SHEET

N.T.S01

A0.01

07.03.2019

ADD01-A01

PROJECT DIRECTORY

ARCHITECT ARTIK ART & ARCHITECTURE

394-A UMBARGER ROAD

SAN JOSE, CA 95111

(408)224-9890

(408)224-9891 (FAX)

CLIENT EAST SIDE HIGH SCHOOL DISTRICT

830 NORTH CAPITOL AVNUE

SAN JOSE, CA 95133

(408) 347-5000

CONSTRUCTION GILBANE BUILDING CO.

MANAGER 1798 TECHNOLOGY DRIVE # 120

SAN JOSE, CA 95110

(408) 660-4400

CIVIL BRIO ENGINEERING

2858 STEVENS CREEK BOULEVARD, SUITE 208

SAN JOSE, CA 95128

(408) 241-5494

(408) 241-5493 (FAX)

ELECTRICAL ALLIANCE ENGINEERING CONSULTANTS, INC.

ENGINEER 4701 PATRICK HENRY DRIVE, BLDG. 10

SANTA CLARA, CA 95054

(408) 970-9888

1

ADD

GENERAL NOTES

17. CONTRACTOR TO MAINTAIN P.O.T ACCESS AND SPORTS FIELD

WILL BE IN USE DURING CONSTRUCTION

1

ADD

Page 5: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

C

O

N

C

E

S

S

I

O

N

S

#

2

PORTABLES #3

DSA# 10092

BLDG D1

DSA# 01-116180

1

2

3

6

ADDENDUM 01

CONCESSION BUILDING

PIEDMONT HILLS HIGH SCHOOL

EAST SIDE UNION HIGH SCHOOL DISTRICT

If this sheet is not 11" x 17" it is a reduced print - scale accordingly

XXX No.

SHEET NO.

REFERENCE SHEET

SCALE

DATE

PROJECT NO.

DSA #

135259

01-118374

T

A

I

C

W

S

L

No. C-23919

REN. 9-30-19

L

E

F

O

AC

T

F

I

N

R

O

I

A

C

E

I

A

M

E

.

I

L

L

E

N

S

D

RA

E

T

G

C

D

L

U

O

T

I

H

SITE PLAN

ADD01-A02

07.03.2019

A1.02

01

1/32"=1"-0"

1

ADD

1

ADD

KEYNOTES

RELOCATED (E) CONCESSIONS TRAILER. SEE A1.03 FOR ORIGINAL

LOCATION COORDINATE W/ CONSTRUCTION MANAGER AND ARCHITECT

FOR LOCATION

6

1

ADD

(E) CHAIN LINK FENCE

2

(E) FIRE HYDRANT

1

PROPOSED CONCESSION BLDG3

(E) PASSANGER DROP OFF PER DSA# 01-116180, SEE 13/ A12.104

(E) STRIPPED CROSS WALK5

Page 6: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

7

'

-

0

"

M

I

N

1

2

'

-

0

"

6

'

-

3

"

6

'

M

I

N

.

6

'

-

0

"

M

I

N

.

43-H10

01-118374

Application Number

Regulatory Agency Approval

Project No.

File NumberRef. Drawing No

Architect Seal

DateRevisions/Submissions

Drawing Title

No

Project Title

Key Plan

PIEDMONT HILLS

CONCESSION BLDG.

1377 Piedmont Rd,

San Jose, CA 95132

135259

Plot Date: 7/3/2019 4:35:52 PM

If th

is sh

ee

t is n

ot 2

4" x 3

6" it is a

re

du

ce

d p

rin

t - sca

le

a

cco

rd

in

gly

EAST SIDE UNION

HIGH SCHOOL DISTRICT

T

A

I

C

W

S

L

No. C-23919

REN. 9-30-19

L

E

F

O

AC

T

F

I

N

R

O

I

A

C

E

I

A

M

E

.

I

L

L

E

N

S

D

RA

E

T

G

C

D

L

U

O

T

I

H

CONSTRUCTION DOCUMENTS

05/15/2019

Drawing No

ENLARGED

SITE PLAN

& DEMO PLAN

A1.03

ADD01-A03

4

KEYNOTES

DEMO PLAN GENERAL NOTES

1 3/16 = 1' - 0"

DEMO

1

3

3

2

(E) CONC. WALKWAY

(E) FIELD

(E) TICKET BOOTH

1

CMU RETAINING WALL, REFER TO CIVIL DRAWINGS

2

CURB, REFER TO CIVIL DRAWINGS

3

ORNAMENTAL FENCE, MATCH (E), REFER TO DETAIL 8 & 12/ 12.10

1

CONCESSION BUILDING

(REFER TO SHEET A3.01

FOR THE FLOOR PLAN)

1

3

3

3/16" = 1' - 0"2 PARTIAL SITE DEMO PLAN

ENLARGED SITE PLAN

DEMO KEYNOTES

1 (E) FENCE AND CONC. CURB TO BE DEMOLISHED

2

3

(E) TREE AND TREE STUMP TO BE REMOVED

(E) TREE TO REMAIN

1. TYP. (E) TO REMAIN UNLESS OTHERWISE NOTED. PROTECT ALL WORK TO BE

RE-INSTALLED. ANY DAMAGE SHALL BE REPAIRED/REPLACED TO OWNER'S

SATISFACTION.

2. SEE CIVIL, ELECTRICAL, AND FIRE PROTECTION DRAWINGS FOR ADDITIONAL

REQUIREMENTS.

3. DEMOLITION PLAN IS DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY EXTENT OF

DEMOLITION REQUIRED TO ACCOMMODATE CONSTRUCTION EVEN IF NOT

SPECIFICALLY INDICATED ON ON THE DEMOLITION DRAWINGS.

4. CONTRACTOR TO PROTECT ALL (E) SITE FIXTURES FROM DAMAGE INCLUDING BUT

NOT LIMITED TO; STRUCTURES, UTILITIES, TREES, LANDSCAPING, AND SITE WORK.

5. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ACTUAL CONDITIONS PRIOR

TO COMMENCEMENT OF ACTUAL WORK.

GENERAL NOTES

1. TYPICAL, EXISTING TO REMAIN U.O.N.; PROTECT ALL WORK TO BE REINSTALLED.

ANY DAMAGE SHALL BE REPAIRED/ REPLACED TO OWNER'S SATISFACTION.

2. SEE CIVIL AND ELECTRICAL DWGS. FOR ADDITIONAL REQUIREMENTS.

3. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ACTUAL FIELD CONDITIONS

PRIOR TO COMMENCEMENT OF WORK.

4. CONTRACTOR TO PROTECT ALL (E) SITE FEATURES FROM DAMAGE INCLUDING

BUT NOT LIMITED TO, STRUCTURES, UTILITIES, TREES, LANDSCAPING, AND SITE

WORK.

5. CONTRACTOR SHALL CO-ORDINATE ON-SITE STAGING AND INSTALLATION OF

BUILDING WITH BUILDING MANUFACTURER.

6. NO CHANGES OR REVISIONS SHALL BE MADE THAT AFFECT ACCESS COMPLIANCE

ITEMS UNLESS SUCH CHANGES OR REVISIONS ARE SUBMITTED TO THE DSA FOR

APPROVAL.

7. SUBSTITUTIONS AFFECTING DSA REGULATED ITEMS SHALL BE SUBMITTED AS A

CONSTRUCTION CHANGE DOCUMENT OR ADDENDA, AND SHALL BE PROVIDED BY

DSA PRIOR TO FABRICATION AND INSTALLATION.

8. CONSTRUCTION CHANGE DOCUMENTS MUST BE SIGNED BY THE FOLLOWINGS:

· ARCHITECT OR ENGINEER OF RECORD

· STRUCTURE ENGINEER (WHEN APPLICABLE)

· DELEGATED PROFESSIONAL ENGINEER

· DSA

13. MATERIALS AND THEIR INSTALLATION SHALL COMPLY WITH APPLICABLE CODES,

STANDARDS AND MANUFACTURER'S RECOMMENDATION.

14. CONTRACTOR TO OBTAIN 2020 DATE STAMP AT START OF PROJECT, WILL

BECOME PROPERTY OF OWNER

2

3

4

(E) ACCESSIBLE RAMP

5

(E) GATE

5

4

6

NOT USED

(E) CONCESSIONS TRAILER TO BE REMOVED. SEE SHEET A1.02 AND

4

5

5

REMOVE (E) FENCE AS INDICATED

1

ADD

EXISTING ITEM

PROPOSED ITEM

1

ADD

5

ADD01-A02 FOR AREA OF RELOCATION

7

7

MAINTAIN AND PROTECT (4) PALM TREES DURING CONSTRUCTION, TYP

TYP.

8

8

INSTALL (5) TRIMCO 1265 FLOOR STOPS W/ 626 SATIN CHROME FINISH DOOR

8

8

8

1

ADD

1

ADD

1

ADD

1

ADD

5' 10' 20'0'

1

ADD

9

9

LANDSCAPE FORMS TRASH RECEPTACLE W/ FLOOR ATTACHMENT SEE

9

10

10

10

DOOR SCREENING PANELS W/ CUT STL. . SEE 6/12.10 FOR DETAILS

1

ADD

1

ADD

6

'-

3

"

6

'

-

3

"

DETAIL 20/ A12.10. COORDINATE WITH ARCHITECT FOR LOCATION

LEGEND

DEMO LEGEND

LEGEND

1

ADD

5' 10' 20'0'

1

ADD

1

ADD

STOP

7

TYP.

CORDINATE WITH CPNSTRUCTION MANAGERS

1

ADD

1

ADD

SPLIT FACE 40%, PRECISION 60%

Page 7: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

ADDENDUM 01

CONCESSION BUILDING

PIEDMONT HILLS HIGH SCHOOL

EAST SIDE UNION HIGH SCHOOL DISTRICT

If this sheet is not 11" x 17" it is a reduced print - scale accordingly

XXX No.

SHEET NO.

REFERENCE SHEET

SCALE

DATE

PROJECT NO.

DSA #

135259

01-118374

T

A

I

C

W

S

L

No. C-23919

REN. 9-30-19

L

E

F

O

AC

T

F

I

N

R

O

I

A

C

E

I

A

M

E

.

I

L

L

E

N

S

D

RA

E

T

G

C

D

L

U

O

T

I

H

ADD01-A04

A3.01

01N.T.S

07.03.2019

KEYNOTES

4MOP HANGERS ABOVE THE MOP SINK BY ENVIROPLEX

1

ADD

CONCESSION BLDG. FLOOR PLAN (FOR REFERENCE ONLY)

Page 8: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

43-H10

01-118374

Application Number

Regulatory Agency Approval

Project No.

File NumberRef. Drawing No

Architect Seal

DateRevisions/Submissions

Drawing Title

No

Project Title

Key Plan

PIEDMONT HILLS

CONCESSION BLDG.

1377 Piedmont Rd,

San Jose, CA 95132

135259

Plot Date: 7/3/2019 4:34:28 PM

If th

is sh

ee

t is n

ot 2

4" x 3

6" it is a

re

du

ce

d p

rin

t - sca

le

a

cco

rd

in

gly

EAST SIDE UNION

HIGH SCHOOL DISTRICT

T

A

I

C

W

S

L

No. C-23919

REN. 9-30-19

L

E

F

O

AC

T

F

I

N

R

O

I

A

C

E

I

A

M

E

.

I

L

L

E

N

S

D

RA

E

T

G

C

D

L

U

O

T

I

H

CONSTRUCTION DOCUMENTS

05/15/2019

Drawing No

DETAILS

A12.10

ADD01-A05

NOTES:

1. TO BE PROVIDED BY MODULAR MANUFACTURER, REFER TO MODULAR

MANUFACTURERS DRAWINGS FOR FOUNDATION VENT LOCATIONS AND SIZES.

2. ALL STEEL TO BE HOT DIPPED GALVANIZED, ALL CONNECTIONS TO BE WELDED.

3. ATTACH GRATE TO FRAME WITH GALVANIZED STEEL CLIPS AND TEK SCREWS.

1/8"x1" GALV. STEEL

BAR, TYP. (4) SIDES

3-1/2" MAX. TYP.

VARIES, MATCH OPENING

IN FOUNDATION. REFER TO

MODULAR DRAWINGS.

3/8" Ø STEEL BOLTS,

WELDED TO FRAME,

MIN. (2) PER SIDE,

TYP. (3) SIDES

6" / 2

4"

EQ.

1"

1/2

" C

LR

.

MA

X. T

YP

.

1/8"x1" GALV. STEEL

BEARING BAR, TYP.

1/4" EQ.

EXPANSION JOINT TO

CONTINUE BETWEEN VENT

COVER AND BUILDING

1/8"x1"x1" GALV.

STEEL ANGLE

TYP. (4) SIDES

SECTION

FRAME PLAN

GRATE PLAN

1" = 1'-0"

FF

VENT COVER, TYP

1

3" = 1'-0"

6"

6"

LA

P

24 GA. 'Z' FLASHING

BY MODULAR MFG.

CONTINUOUS 22 GA.

GALVANIZED FLASHING.

LAP UNDER MODULAR

MFG. 'Z' FLASHING, TYP.

6"

MIN

.

CARRY CONT. 22 GA.

GALV. FLASHING 6"

MIN. BELOW TOP OF

FOOTING, TYP.

NOTES:

1. THIS DETAIL IS FOR FLASHING ONLY.

2. REFER TO CIVIL DRAWINGS FOR

ADJACENT FLAT WORK

FLASHING, TYP.

2

ROOM SIGN

NOTES:

1. ALL SIGN LETTERING TO BE HELVETICA MEDIUM.

2. CUSTOM SIGN COLOR TO BE SELECTED BY

ARCHITECT.

3. CUSTOM TEXT COLOR TO BE SELECTED BY

ARCHITECT.

4. BRAILLE TO CONFORM WITH CBC SECTION

11B-703.3. MOUNT PLAQUE ON LATCH SIDE OF

DOOR. INSIDE THE ROOM / SPACE. PLACE ON

RIGHT WALL AT PAIRS OF DOORS.

ELEVATION

2

1

4

"

3

4

"

+60" MAX

A.F.F.

CALIFORNIA

GRADE 2 BRAILLE

SECTION

RAISED TACTILE

CHARACTER,

1/32" MIN., TYP.

7 8

"

VARIES DEPENDING ON ROOM NAME

+48" MIN

A.F.F.

6" = 1'-0"

3

4

"

3/8

" - 1

/2

"3

/8

"

ROOM SIGNAGE

3

4

1'-0"

1'-0"

9"

9"

1'-0"

4"

TY

P.

7"

9" T

YP

.

3"

TY

P.

CALIFORNIA

CONTRACTED

GRADE 2

BRAILLE TEXT.

TEXT TO READ

AS SHOWN ON

SIGN FOR EACH

CONDITION,

TYP.

TYP.

RAISED LETTER

(1/32" MIN.), TYP.

CHARACTER HEIGHT

5/8" MIN. - 2" MAX., TYP.

EQUILATERAL

TRIANGLE SIGN

1/4" THICK PLASTIC

EQUILATERAL TRIANGLE

SUPERIMPOSED OVER 1/4"

THICK CIRCLE.

A. UNISEX TOILET ROOM SIGN

TEXT AT UNISEX TOILET TO READ "STAFF"

B.

TEXT AT MENS TOILET TO READ "MEN"

C.

TEXT AT WOMENS TOILET TO READ "WOMEN"

WOMEN

MEN

MEN

WOMEN6"

MIN

.

3/8

" M

IN

.

1/2

" M

AX

.

3/8

"

MIN

.

N.T.S.

RESTROOM SIGNAGE (FOR

REFERENCE ONLY)

N.T.S.

60

"

EQ.

4"

EQ.

C

L

TOILET ROOM DOOR

SIGNAGE, REFER TO

DETAIL 3

SIGNAGE, MOUNTED ON

LEVER SIDE OF DOOR,

REFER TO DETAIL 3

CENTERLINE

OF SIGNSTAFF

RESTROOM DOOR SIGNAGE

(FOR REFERENCE ONLY)

5

6

11

1

ADD

1

ADD

1

ADD

1

ADD

1

ADD

1

ADD

(E) HANDRAIL (FOR REFERENCE)1/8" = 1'-0"

(E) ACCESSIBLE RAMP (FOR REF.)

1617

N.T.S

(E) ACCESSIBLE PARKING TO BE PAINTED AS REQUIRED

19

N.T.S

1

ADD

(E) ACCESSIBLE CURB CUT (FOR REFERENCE)

18

N.T.S

1

ADD

(E) ACCESSIBLE DROP OFF (REF. ONLY)

13

N.T.S

1

ADD

STL. FENCE PLAN3/32" = 1'-0"

8'-2

"

(E) CONCRETE COLUMN

(E) RAMP

(E) CHAIN LINK FENCE

PROPOSED STL. FENCE, BUILD

AND MATERIAL TO MATCH (E).

REFER TO 12/- FOR TYPICAL

FENCE ELEVATION

2" DIA FENCE POST, TYP.

(E) CONCRETE CURB

PROPOSED CONCRETE CURB, SEE

CIVIL DRAWINGS

8'-2

"8

'-2

"8

'-2

"

3'-10" 1'-4"

LEAVE 2" GAP FROM END OF

FENCE TO (E) COLUMN

℄ ℄

TYPICAL STL. FENCE ELEVATION

1/4" = 1'-0"

7'-3

3 4

"

2"

3"

3"

2"

3" CLR.

TYP.

3'-6

"

3'-3

"

1" STL. PICKET

16" DIA DRILLED PIER, TYP.

2" DIA. FENCE POST, SEE 8/-

FOR LOCATION, TYP

SEE CIVIL DRAWINGS FOR

GRADING

STL. FENCE, MATERIAL AND

CONSTRUCTION TO MATCH (E)

MA

TC

H (E

)

CU

RB

CONCRETE CURB

MATCH (E) STEEL PICKET FENCE

A

-

STL. SCREEN PLAN/ ELEVATION1/8" = 1'-0"

B

-

7'-2

" P

OS

T

TY

P.

7'-3"

TYP.

5'-0

"

TY

P.

3'-6

"

3'-3

"

MIN

A

-

9'-3"

℄ ℄ ℄

CUT STL. SCREEN, TYP. N.I.C

PROPOSED CONCESSION

BUILDING

7'-3"

9'-3" 7'-3"

3" SQUARE STEEL POST, TYP

5'-9

1 2

"

℄ ℄ ℄ ℄

7'-2

" P

OS

T

TY

P.

3'-6

"

5'-3"

TYP.

℄℄

3'-3

"

MIN

CUT STL. SCREEN, TYP. N.I.C

3" SQUARE STEEL POST, TYP

16" DIAMETER DRILLED PIER,

TYP.

GRADE, REFER TO CIVIL

DRAWINGS

6.5"

5'-0

"

PROPOSED CONCESSION

BUILDING

16" DIAMETER DRILLED PIER,

TYP.

11

-

10

-

STL. PLATE WELDED TO POST

6

1 2

"

ELEVATION A

ELEVATION B

PROPOSED CONCESSION

BUILDING

9

-

3" SQUARE STEEL POST, TYP.

3"

STEEL TAB WELDED TO

STEEL POST. N.I.C

CUT STL. SCREEN. N.I.C

6"

6"

3/16

TYP.

NOTE:

1. GRIND ALL WELDS FLAT/SMOOTH

TO REMOVE ANY EDGES/BURRS.

STEEL SCREEN CONNECTION1 1/2" = 1'-0"

2"

STEEL TAB WELDED TO

STEEL POST. N.I.C

STEEL PLATE CONNECTION1 1/2" = 1'-0"

3" SQUARE STEEL POST

STL SCREEN REFER TO

DETAIL 11/-

3/16 " THINK STL PLATE

WELDED TO STL. POST

5'-0

"

5

1

2

"

1"

3/16

TYP.

NOTE:

1. GRIND ALL WELDS

FLAT/SMOOTH TO

REMOVE ANY

EDGES/BURRS.

PROPOSED CONCESSION

BUILDING

2"

8"

10

12 8

1

ADD

STL. SCREEN TO BUILDING3" = 1'-0"

3" SQUARE POST

1/4" PLATE, WELDED TO POST

2.5"X2.5" ANGLE

CONCESSION BUILDING

EXTERIOR WALL

FASTNER

AL

IG

N

1"

5

1 2

"

9

TRASH RECEPTACLE PAD/ MOUNTING

20

SECTION

1/2" = 1'-0"

1

ADD

1

ADD

Page 9: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

R6'

-117 8"

CONCESSIONS#2

PORTABLES #3DSA# 10092

STUDENT/ STAFFDSA# 01-111121

FACP

PNL

LCP

IDF

S

ADDENDUM

CONCESSION BUILDINGPIEDMONT HILLS HIGH SCHOOL

EAST SIDE UNION HIGH SCHOOL DISTRICT

If th

is s

heet

is n

ot 1

1" x

17"

it is

a re

duce

d pr

int -

sca

le a

ccor

ding

ly

SHEET TITLE

ADDENDUM No.

SHEET NO.

REFERENCE SHEET

SCALE

DATE

PROJECT NO.

DSA #

135259

01-118374

TA

ICW

S

L

No. C-23919REN. 9-30-19

LE

FO AC

T

FI

NRO

IA

CE IAM E.

IL

L

ENS D RA

ETG CDL

UO

T

IH

ELECTRICAL SITE PLAN

A1 - E01

07-03-2019

AS NOTED 1

E1.1

Page 10: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

12

3

12

3

AA

BB

FAC

PP

NL

LCP

IDF

WH

2302

181

SF

ME

NS

'R

ES

TRO

OM

2303

181

SF

WO

ME

NS

'R

ES

TRO

OM

2304

55 S

F

ELE

CTR

ICA

L23

0153

SF

CU

STO

DIA

N

2300

368

SF

CO

NC

ES

SIO

NS

S

FAC

PP

NL

LCP

IDF

WH

ME

NS

'R

ES

TRO

OM

2304

55 S

F

ELE

CTR

ICA

L

ADDENDUM

CONCESSION BUILDINGPIEDMONT HILLS HIGH SCHOOL

EAST SIDE UNION HIGH SCHOOL DISTRICT

If th

is s

heet

is n

ot 1

1" x

17"

it is

a re

duce

d pr

int -

sca

le a

ccor

ding

ly

SHEET TITLE

ADDENDUM No.

SHEET NO.

REFERENCE SHEET

SCALE

DATE

PROJECT NO.

DSA #

135259

01-118374

TA

ICW

S

L

No. C-23919REN. 9-30-19

LE

FO AC

T

FI

NRO

IA

CE IAM E.

IL

L

ENS D RA

ETG CDL

UO

T

IH

A1 - E02

07-03-2019

AS NOTED 1

E2.1ELECTRICAL PLAN

Page 11: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

ADDENDUM

CONCESSION BUILDINGPIEDMONT HILLS HIGH SCHOOL

EAST SIDE UNION HIGH SCHOOL DISTRICT

If th

is s

heet

is n

ot 1

1" x

17"

it is

a re

duce

d pr

int -

sca

le a

ccor

ding

ly

SHEET TITLE

ADDENDUM No.

SHEET NO.

REFERENCE SHEET

SCALE

DATE

PROJECT NO.

DSA #

135259

01-118374

TA

ICW

S

L

No. C-23919REN. 9-30-19

LE

FO AC

T

FI

NRO

IA

CE IAM E.

IL

L

ENS D RA

ETG CDL

UO

T

IH

A1 - E03

07-03-2019

NONE 1

E3.1PARTIAL SINGLE LINE DIAGRAM AND SCHEDULE

Page 12: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

ADDENDUM

CONCESSION BUILDINGPIEDMONT HILLS HIGH SCHOOL

EAST SIDE UNION HIGH SCHOOL DISTRICT

If th

is s

heet

is n

ot 1

1" x

17"

it is

a re

duce

d pr

int -

sca

le a

ccor

ding

ly

SHEET TITLE

ADDENDUM No.

SHEET NO.

REFERENCE SHEET

SCALE

DATE

PROJECT NO.

DSA #

135259

01-118374

TA

ICW

S

L

No. C-23919REN. 9-30-19

LE

FO AC

T

FI

NRO

IA

CE IAM E.

IL

L

ENS D RA

ETG CDL

UO

T

IH

DETAILS

A1 - E04

07-03-2019

NONE 1

E3.2

Page 13: ADDENDUM #1 - ESUHSD Purchasing/RFQ RFP … · add01-a05. notes: 1.to be provided by modular manufacturer, refer to modular manufacturers drawings for foundation vent locations and

20'-0"

20'-0"

20'-0"

20'-0"

R100'-11"

R80'-11"

R24'-9

"

R44'-9"

CONCESSIONS

#2

#1

107'-5"

173'-0"

BLDG D

SCIENCE CLASSROOMS

DSA# 54509

BLDG D

MATH CLASSROOMS

DSA# 54509

DSA# 54509, 01-104539

BLDG KCLASSROOM

DSA# 24509, 27183,

01-10092

PORTABLES #3

DSA# 10092

NO PARKING - DROP OFF ONLY

BLDG D1DSA# 01-116180

BLDG D2DSA# 01-116180

E PARKING LOT D

STUDENT/ STAFF

DSA# 01-111121

20'-0"

20'-0"

20'-0"

20'-0"

R100'-11"

R80'-11"

R24'-9

"

R44'-9"

CONCESSIONS

#2

#1

107'-5"

173'-0"

BLDG D

SCIENCE CLASSROOMS

DSA# 54509

BLDG D

MATH CLASSROOMS

DSA# 54509

DSA# 54509, 01-104539

BLDG KCLASSROOM

DSA# 24509, 27183,

01-10092

PORTABLES #3

DSA# 10092

NO PARKING - DROP OFF ONLY

BLDG D1DSA# 01-116180

BLDG D2DSA# 01-116180

E PARKING LOT D

STUDENT/ STAFF

DSA# 01-111121

A1 - FA01

07-03-2019

1"=40'-0" 1

FA1.1FIRE ALARM SITE PLANADDENDUM

CONCESSION BUILDINGPIEDMONT HILLS HIGH SCHOOL

EAST SIDE UNION HIGH SCHOOL DISTRICT

If th

is s

heet

is n

ot 1

1" x

17"

it is

a re

duce

d pr

int -

sca

le a

ccor

ding

ly

SHEET TITLE

ADDENDUM No.

SHEET NO.

REFERENCE SHEET

SCALE

DATE

PROJECT NO.

DSA #

135259

01-118374

TA

ICW

S

L

No. C-23919REN. 9-30-19

LE

FO AC

T

FI

NRO

IA

CE IAM E.

IL

L

ENS D RA

ETG CDL

UO

T

IH