From: Eastern PCM, LLC Construction Manager – HACC 645 N. 12th Street, Suite 200 Lemoyne, PA 17043
To: All Planholders
This Addendum is hereby made part of the Plans and Project Manual dated June 14, 2014 for the above referenced project. The provisions of this Addendum are intended to supplement the provisions of the Plans and Project Manual and/or supersede them where contradictory thereto.
This Addendum contains changes to the requirements of the Plans and Project Manual. Such changes shall be incorporated into the Plans and Project Manual and shall apply to work with the same meaning and force as if they had been included in the original Plans and Project Manual. Where this Addendum modifies a portion of a paragraph or phrase of the Project Manual, the remaining unmodified portion of the paragraph or phrase shall remain in force.
The conditions and terms of the Plans and Project Manual shall govern work described in this Addendum. Whenever the conditions of work, or the quality or quantity of materials or workmanship are not fully described in this Addendum, the conditions of work etc. included in the Plans and Project Manual for similar items of work shall apply to the work described in this Addendum. If no similar items of work are included in the Plans and Project Manual, the quality of material and workmanship shall be subject to the written acceptance of the Architect.
1.1 PRE-BID MEETING MINUTES
Meeting minutes from the Pre-Bid Meeting held on June 17, 2014 are attached and are a part of this Addendum. In the event of a conflict between the information contained in the Pre-Bid Meeting Notes and the Drawings, Specifications and responses to questions contained in this Addendum, the latter shall take precedence.
1.2 SECOND SITE VISIT
A second opportunity for a site visit and tour will be available on June 26, 2014 at 9:00 am. The walk through will begin in the Lobby of the Main Building, adjacent to the existing Welcome Center. This will be an informal site visit. Questions raised will need to be submitted in writing to EPCM.
Page 2 ADDENDUM # 1
June 25, 2014
1.3 CHANGES TO THE DRAWINGS
A. A030: Overall Plan – Demolition
1. REVISE Demolition Note 16 to read:
“Remove floor trough drain and cap drain line. Infill opening to match existing. Refer toPlumbing Demolition Plan for locations of all floor openings to be infilled.”
2. REVISE Demolition Note 18 to read:
“Remove quarry tile floor as required so that there is a minimum ¼’’ below the existing adjacentconcrete subfloor at corridor near the elevator and stairwell. Due to the slope of the floor, someareas may not have to be disturbed if already at or below ¼’’ minimum requirement to theexisting adjacent concrete subfloor. Clean and prime subfloor (or existing tile) as recommendedper manufacturer’s warranty. Pour a minimum ¼’’ thick self leveling concrete to match existingadjacent subfloor level at corridor near the elevator and stairwell.”
3. REVISE Detail 1: Overall Plan – Demolition per SK-A030.01.
B. A101: Enlarged Plans
1. REVISE Detail 1: Enlarged Floor Plan per SK-A101.01.
2. ADD Detail 5: Structural Framing Plan per SK-A101.01.
3. ADD Detail A per SK-A101.02.
4. ADD Detail B per SK-A101.02.
C. A301: Interior Elevations
1. REPLACE A301: Interior Elevations in its entirety.
D. M002: Overall Plan – Demolition
1. REPLACE drawing M002: Overall Plan in its entirety.
E. ID – 1: Floor Plan
1. REPLACE ID – 1: Floor Plan in its entirety.
F. ID – 2: Flooring Pattern & Layout
1. REPLACE ID – 2: Flooring Pattern & Layout in its entirety.
G. ID – 4: Elevations
1. REPLACE ID – 4: Elevations in its entirety.
H. S – 001: Structural Specifications
1. ADD S – 001: Structural Specifications in its entirety.
Page 3 ADDENDUM # 1
June 25, 2014
1.4 ATTACHMENTS
A. Pre-Bid Meeting Minutes dated June 17, 2014.
B. SK-A030.01: Overall Plan – Demolition dated June 20, 2014.
C. SK-A101.01: Enlarged Plans dated June 20, 2014.
D. SK-A101.02: Enlarged Plans dated June 20, 2014.
E. A301: Interior Elevations dated June 12, 2014.
F. M002: Overall Plan – Demolition dated June 12, 2014.
G. ID-1: Floor Plan dated June 20, 2014.
H. ID-2: Flooring Pattern & Layout dated June 20, 2014.
I. ID-4: Elevations dated June 20, 2014.
J. S-001: Structural Specifications dated June 20, 2014.
END OF ADDENDUM
Page 4 ADDENDUM # 1
June 25, 2014
Please sign and return this page, via fax, to Eastern PCM, LLC at (717) 233-1666 indicating receipt of this Addendum.
Lancaster Welcome Center SOLICITATION # RFB15-01
Addendum # 1 has been received.
Company:Print Company Name
Received By: Print Name Signature
Date:
Please check one:
We are bidding as a prime contractor We are not bidding We are a sub-contractor
_______________________________________________________________________________________
HACC, Central Pennsylvania’s Community College Lancaster Campus
Lancaster Welcome Center Renovations
Pre-Bid Meeting
June 17, 2014 9:00 am
Meeting Minutes
Attendees Jackie Bareuther – HACC Tom Davis – JEM Group Dan Mahan – HACC Claire McNally – JEM Group Dan Hoffman – Beers and Hoffmen Ltd., Architects Shawn Kingsley – New Age Development Greg Lamay – Eastern PCM Dexter Lanigan – New Age Development Peter Shkuda – Eastern PCM Deron Henise – High Construction Bill Zuck – Dorgan & Zuck Michel Gibeault – High Construction Matthew Hartman – Dorgan & Zuck Brett Lazicki – Silvertip, Inc. Jeff Heindel – Hogg Construction Steve Scholl – Silvertip, Inc. Bob Eppley – East Coast Contracting Mike Peachey – Poole Anderson Bill Raves – Titan Construction Chris Evans – Horst Construction Shawn Rose – Titan Construction DJ Risk – Paul Risk Associates
1.0 Team Introductions
i. Owner HACC, Central Pennsylvania’s Community College Lancaster Campus
Eleanor Bosserman – Business Director, Lebanon/Lancaster (Not Present)
Jackie Bareuther – Campus Dean – Student Affairs Dan Mahan – Campus Facilities Director
ii. Architect Beers and Hoffman Ltd., Architects Scott Shonk – Partner Architect (Not Present) Dan Hoffman – CADD Technician
iii. Construction Eastern PCM, LLC Manager Bill Morgan – Project Executive (Not Present)
Greg Lamay – Sr. Project Manager Peter Shkuda – Project Engineer
HACC – Central Pennsylvania’s Community College Lancaster Campus – Lancaster Welcome Center Pre-Bid Meeting Minutes June 17, 2014 Page 2
_______________________________________________________________________________________
1.1 Mr. Lamay noted that the Bid Form is made up of four to five pages, all of which must be filled out
completely. A Bid Security is required in the amount of 10% of the bid plus consent of surety to provide a Performance and Payment Bond. A Non-Collusion Affidavit and a MBE/WBE Utilization Form are also required.
1.2 Bid Documents can be obtained from Eastern PCM. The Project Manual and Plans are dated June 12, 2014.
1.3 The schedule of the project is as follows:
a) Bid Date: Thursday, July 10, 2014, 2:00 PM EST at the Purchasing Office in the Ted Lick Administration Building – Harrisburg Campus.
b) Contract Award: August 5, 2014 c) Notice to Proceed: August 18, 2014; Subject to receipt of all required supporting Contract
Documentation. d) Substantial Completion: March 15, 2015
1.4 A public bid opening will be held immediately following Bid receipt.
1.5 Working Hours will be 9:00 pm – 7:00 am, Monday night through Friday morning; (4) 10 hour shifts. Phasing Requirements
a) HACC will remain an active campus throughout the construction. Classes are held during the daytime, evening, and weekends. Contractors are to schedule work so as not to impact Owner activities.
b) The Contractor may begin work in the conference room and two kitchen areas on August 18, 2014. The Contractor may not begin work in Career Services and existing Welcome Center until September 2, 2014.
1.6 All questions are to be directed to the office of the Construction Manager in writing via fax or e-mail
(attn.: Greg Lamay): Fax (717) 233-1666, E-mail: [email protected]. The last day for questions is July 3, 2014 by end of business.
1.7 Addenda are expected to be issued via fax or UPS (depending on size) on the following dates subject to number and substance of questions received:
i. Addendum No. 1 – Expected June 20, 2014; Including Meeting Minutes from the Pre-Bid Meeting
ii. Addendum No. 2 – To be determined, if needed
1.8 This is a prevailing wage project. Refer to specifications for rate determination.
1.9 The building permit will be obtained and paid for by the Owner. Any trade specific permits (i.e. Electrical, Plumbing, etc.) are to be obtained and paid for by applicable contractors in accordance with jurisdictional requirements
1.10 Project Overview – Scope of Work a) The work will be performed under Single Prime Contract and consists of the renovation of
approximately 15,000 sq. ft. of the first floor of the main building at the HACC – Lancaster
HACC – Central Pennsylvania’s Community College Lancaster Campus – Lancaster Welcome Center Pre-Bid Meeting Minutes June 17, 2014 Page 3
_______________________________________________________________________________________
Campus. The work includes selective demolition, construction of interior partitions and aluminum & glass wall systems, modifications to the electrical, plumbing, fire protection, and HVAC systems (including controls) and other related improvements to accommodate the planned renovations. Finishes include carpet, VCT, and ceramic tile.
1.11 Contractors are to schedule site visits through Eastern PCM. Any questions answered during site visits are not official. Official questions must be submitted in writing.
1.12 Contractor parking and the dumpster location will be located at the loading dock in the back of the building.
1.13 The Contractor is responsible for temporary utilities and temporary toilet facilities.
1.14 Mr. Lamay noted that the new window penetrations in the back of the building may be used for a trash disposal.
1.15 Site Tour & Questions
Q: Will there be Liquidated Damages on this project? A: Yes
Q: Will the Contractor have access to the first floor under the existing kitchen for utility access? A: Access will be coordinated through the College.
Q: Will the spray-on fire protection need to be replaced when adding new hangers in the mechanical room?
A: This will be answered in an Addendum if not already addressed in the Bid Documents.
Respectfully Submitted, Peter J. Shkuda, Eastern PCM, LLC
The above summations are the interpretation of the author as to the items discussed and the decisions reached. Corrections or additions to these minutes are to be made in writing and sent to the attention of the writer no later than 5 days after receipt; otherwise, these minutes will stand as written.
cc: All Attendees Eleanor Bosserman Scott Shonk Bill Morgan
STAIR
1
COORDINATOR
2043
COORDINATOR
2042
D
D
D
D
D
D
D
D
RECEIVING/SHIPPING
B036CATERING KITCHEN
B035
MEN
B038
CORRIDOR
B042
ELEVATORMACH. RM.
B047
EQUIPMENTSTORAGE
B047
N
MAU
12
M002
OV
ER
ALL
PLA
N -
DE
MO
LIT
ION
DLE
DBL
Date
Drawn By
Checked By
JOB NO.
TH
IS D
RA
WIN
G A
S A
N IN
ST
RU
ME
NT
OF
SE
RV
ICE
, IS
PR
OP
ER
TY
OF
TH
EA
RC
HIT
EC
T, A
ND
MA
Y N
OT
BE
RE
PR
OD
UC
ED
WIT
HO
UT
HIS
PE
RM
ISS
ION
AN
D U
NL
ES
S T
HE
RE
PR
OD
UC
TIO
N C
AR
RIE
SH
IS N
AM
E A
S A
RC
HIT
EC
T.
DU
E T
O D
IST
OR
TIO
N F
RO
M R
EP
RO
DU
CT
ION
PR
OC
ED
UR
ES
, D
IME
NS
ION
S S
HA
LL N
OT
BE
SC
AL
ED
FR
OM
TH
E D
RA
WIN
GS
. O
NLY
DIM
EN
SIO
NS
AS
SH
OW
N A
RE
VA
LID
.
CO
NT
RA
CT
OR
S S
HA
LL V
ER
IFY
ALL
DIM
EN
SIO
NS
AN
D C
ON
DIT
ION
S A
T T
HE
SIT
EB
EF
OR
E P
RO
CE
ED
ING
WIT
H T
HE
WO
RK
.
20
A E
as
t R
os
eville
Ro
ad
La
nc
as
ter,
Pe
nn
sy
lvan
ia 17601
P:
(71
7)
56
9-4
955
F:
(71
7)
56
0-1
952
81
5 C
um
be
rlan
d S
treet
Leb
an
on
, P
en
nsy
lvan
ia
17
042
P:
(71
7)
27
3-7
774
ww
w.b
ee
rslt
d.c
om
BE
ER
S +
HO
FF
MA
NN
O.
DA
TE
RE
LE
AS
E D
ES
CR
IPT
ION
BY
06/12/2014
14008.00/14030
AREA OF RENOVATION
IN EXISTING BUILDING
KEY PLANNOT TO SCALE
PR
OP
OS
ED
RE
NO
VA
TO
NS
TO
TH
E:
HA
RR
ISB
UR
G A
RE
A C
OM
MU
NIT
Y C
OLLE
GE
1641
OL
D P
HIL
AD
ELP
HIA
PIK
E, LA
NC
AS
TE
R, P
EN
NS
YL
VA
NIA
17
602
EA
ST
LA
MP
ET
ER
TO
WN
SH
IP
05
.02
.14
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
06
.05
.14
ISS
UE
D F
OR
OW
NE
R R
EV
IEW
06
.12
.14
ISS
UE
D F
OR
BID
PARTIAL UPPER LEVEL - HVAC DEMOLITION PLANSCALE: 1/8"=1'-0"
PARTIAL LOWER LEVEL - HVAC DEMOLITION PLANSCALE: 1/8"=1'-0"
PARTIAL LOWER LEVEL MECHANICAL ROOM
HVAC DEMOLITION PLANSCALE: 1/8"=1'-0"
1
DRAWING DEMOLITION NOTES:
2
CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING
DUCTWORK AND MAKE-UP UNIT AND ALL ASSOCIATED
APPURTENANCES IN THEIR ENTIRETY FROM POINT OF
DISCONNECTION INDICATED NO LONGER REQUIRED.
CONTRACTOR SHALL PATCH AND SEAL EXISTING DUCT OPENING NO
LONGER REQUIRE TO MAKE CLOSURE AIR TIGHT.
1
DRAWING DEMOLITION NOTES:
CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING
DUCTWORK FROM POINT OF DISCONNECTION INDICATED WITH
REMOVAL AND ALTERATION OF LARGE GROUP TOILET AREA ABOVE.
REFER TO DRAWING M100 FOR NEW HVAC WORK THIS AREA.
COPIER
SAFE
COPIER
K-10433FORTE FAUCETSBRASS
K-10433FORTE
FAUCETSBRASS
K-10433FORTE FAUCETSBRASS
VESTIBULE220F
CPT-A
CT-1 CT-1
CPT-1
MAINLOBBY
220CT-1
RECEPTION218
CPT-4
DIRECTOROFFICE
218ACPT-4
STORAGE218CCPT-4
WORKROOM218DCPT-4
RECEPTION212HCPT-4
CORRIDOR212J
CPT-5
TECHOFFICE
214HCPT-4
ASSIST.DIRECTOR
OFFICE212GCPT-4
DEANOFFICE
212BCPT-4
BREAKROOM214E
CT-1
TOILET214FCT-3 COLLEGE
PATHWAYS214CCPT-4
FINANCIALAID
WAITING214
CPT-5
RECRUITEROFFICE
214ACPT-4
CORRIDOR220DCT-1
WAYFINDINGHUB220CCT-2
CORRIDOR220BCT-1
MEN223MCT-3
WOMEN223WCT-3
FAMILYTOILET
225CT-3
CT-1
CORRIDOR220ECT-1CT-2 CT-2
CT-1
CT-2
CT-1CT-2
CT-1
VCT-1
STORAGE227ACPT-6
UNISEXTOILET
221SCT-3
UNISEXTOILET
221RCT-3
CORR.221DDCPT-5
STAFFBREAKROOM
221Q
CT-1
STORAGE221P
CPT-5
COUNSLEROFFICE
221NCPT-4
STORAGECLOSET
221MCPT-5
CORRIDOR221CCCPT-5
ODS221DCPT-4
DIRECTOROFFICE
221ECPT-4
ADVISOROFFICE
221FCPT-4
COUNSLEROFFICE
221GCPT-4
COUNSLEROFFICE
221HCPT-4
COUNSLEROFFICE
221JCPT-4
COUNSLEROFFICE
221KCPT-4
COUNSLEROFFICE
221LCPT-4
ADVISOROFFICE
221YCPT-4
ADVISOROFFICE
221XCPT-4
ADVISOROFFICE
221WCPT-4 ADVISOR
OFFICE221VCPT-4
ADVISOROFFICE
221UCPT-4
ADVISOROFFICE
221TCPT-4
COMPUTERKIOSKS
221CPT-5
CT-2
WELCOMECENTERKIOSK
216CPT-1
RECEPTION221BBCPT-5
WORKROOM221Z
CPT-5
COUNSLEROFFICE
221BCPT-4
INTERNSHIPOFFICE
221CCPT-4
AST.DIRECTOR
OFFICE221ACPT-4
CPT-5
CONFERENCE/MEETINGROOM
227CPT-5
CPT-5 CPT-5
CPT-6
CPT
-6
CPT
-6
CPT
-6
CT-1
CT-
2
CT-2CT-1
CT-
2 CT-1
CPT-3
VWC-4
CPT-6
CPT-6
CPT-1
CPT-6
WORKSTATIONS218B
CPT-4
CORRIDOR218E
CPT-4
ADMIN.OFFICE
212ACPT-5
CORR.212
CPT-5
TECHOFFICE
214DCPT-4
RECRUITEROFFICE
214BCPT-4
CPT-2
PSECU220A
CORRIDOR221EECPT-5
OFFICE221AACPT-4
CPT-5
CPT-3
CPT-6
CPT-2
CPT-2
PLA
NK
DIR
ECTIO
N
AP-
1
CPT-3
CPT-3
CPT-3
CT-2
CT-2PNT-6
PNT-4PNT-4
PNT-4
PNT-4
PNT-6
PNT-4
PNT-7
ID-4
6
ID-4
6
CPT-6
PNT-4
CPT-3
PNT-4
PNT-4
VWC-1
PNT-3
PNT-3 PNT-3
VWC-1
VWC-1
ATM
PNT-6
PNT-4
CG-1 CG-1 CG-1
CG-1
CG-1
CG-1CG-1 CG-1CG-1
CG-1
CG-1 CG-1
CG-1 CG-1
PLANKDIRECTION
PNT-6
PNT-4
CG-1
VWC-4
PNT-1PNT-2
END
PNT-1PNT-2
START
ID-4 5
1
1
CG Corner GuardCPT CarpetCT Ceramic TileD DoorsHDW HardwareLVT Luxury Vinyl TilePL Plastic LaminatePNT PaintQT Quartz TileRS Rubber StripsRT Rubber TileSS Solid SurfaceST Stair TreadSTN StainSV Sheet VinylTB Tack BoardVCT Vinyl Composition TileVWC Vinyl WallcoveringWB Wall Base
FINISH BBREVIATION EYA K
SCALE:
SHEET:
REVISIONS
AS NOTED
CHECKED BY:
DRAWN BY: DATE:
PRO
POSE
D R
ENO
VA
TION
S FO
R:
FLOOR PLAN
6/5/14
ID-1
HA
CC
WEL
CO
ME
CEN
TER
HARR
ISBU
RG A
REA
CO
MM
UNITY
CO
LLEG
E
ISSUE
D F
OR
BID
JUN
E 5
, 20
14
L.G & C.D.
G.H.
1641
OLD
PHI
LAD
ELPH
IA P
IKE,
LA
NC
AST
ER, P
ENN
SYLV
AN
IA 1
7602
1/8" = 1'-0"ID-11 FLOOR PLAN - FLOOR FINISHES
DATE DESCRIPTION6/20/14 GCI ADDENDUM #1 PER B&H
COPIER
SAFE
COPIER
K-10433FORTE FAUCETSBRASS
VESTIBULE220F
CPT-A
CT-1 CT-1
CPT-1
MAINLOBBY
220
CT-1
RECEPTION218
CPT-4
DIRECTOROFFICE
218A
CPT-4
STORAGE218C
CPT-4
NO WORK
WORKROOM218D
CPT-4
RECEPTION212H
CPT-4
CORRIDOR212J
CPT-5
COLLEGEPATHWAYS
214C
CPT-4
FINANCIALAID
WAITING214
CPT-5
RECRUITEROFFICE
214A
CPT-4
WAYFINDINGHUB220C
CT-2
CORRIDOR220B
CT-1MEN223M
CT-3
WOMEN223W
CT-3
FAMILYTOILET
225
CT-3
CT-1 CORRIDOR220E
CT-1
CT-2 CT-2CT-1
CT-2
CT-1
CT-2
VCT-1
STORAGE227A
CPT-6
UNISEXTOILET
221S
CT-3
CORRIDOR221CC
CPT-5
ADVISOROFFICE
221Y
CPT-4
ADVISOROFFICE
221X
CPT-4
ADVISOROFFICE
221W
CPT-4
ADVISOROFFICE
221V
CPT-4
ADVISOROFFICE
221U
CPT-4
COMPUTERKIOSKS
221
CPT-5
CT-2
WELCOMECENTERKIOSK
216
CPT-1
RECEPTION221BB
CPT-5
WORKROOM221Z
CPT-5
CPT-5
CONFERENCE/MEETINGROOM
227
CPT-5
CPT-5 CPT-5
CPT-6
CPT
-6
CPT
-6
CPT
-6
CT-1
CT-
2
CT-1
CPT-3
CPT-6
CPT-6
CPT-1
CPT-6
WORKSTATIONS218B
CPT-4
CORRIDOR218E
CPT-4
RECRUITEROFFICE
214B
CPT-4
CPT-2
PSECU220A
OFFICE221AA
CPT-4
CPT-5
CPT-3
CPT-6
CPT-2
CPT-2
8'-0"
4'-0
"
R 18' - 8"
R 31' - 3 1/2"
R 50' - 10 3/4"
R 19' - 0"
R 33' - 0"
PLANKDIRECTION
PLA
NK
DIR
ECTIO
N
PLA
NK
DIR
ECTIO
N
PLANKDIRECTION
PLANKDIRECTION PLANK
DIRECTION
PLANKDIRECTION
PLANKDIRECTION
PLANKDIRECTION
PLA
NK
DIR
ECTIO
N
PLA
NK
DIR
ECTIO
N
PLANKDIRECTION PL
AN
KD
IREC
TION
TILE SHAPE AND SIZE AREFOR DESIGN INTENT ONLYAND DO NOT REPRESENTEXACT SIZES
CPT-1CPT-3
CPT
-1
CPT
-2
BEGIN ATWALL BREAK
BEGIN ATNORTH SIDEOF WALL
R 30' - 0"
R 46' - 7 3/4"
R 41' - 7 1/4"
R 41' - 0 1/2"
R 22' - 9"
R 17' - 0"
CPT-3CPT-5
CPT-5
CPT-3
CPT
-5C
PT-3
CPT
-5C
PT-3
WHERE INSERT MEETSSOFFIT LINE ABOVE,FOLLOW SOFFIT LINETO WALL
R 33'
- 0"
10'-2 3/8" +/- 2'-0" EQ 2'-0" EQ 2'-0" 10'-2 1/8" +/-
18'-9
"
CPT-5
SIDE TILE INSERT TOBE THREE TILES WIDE
2'-0"2'-0"
ATM
CG-1
CG-1
CG-1
CG-1CG-1
CG-1CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1CG-1
CG-1CG-1
CG-1 CG-1CG-1
CG-1 CG-1
CG-1
CG-1
CG-1 CG-1
CG-1CG-1 CG-1
CG-1 CG-1CG-1
CG-1
CG-1
CG-1
CG-1CG-1CG-1
CT-2
CPT-6
CT-2
CG-1 CG-1
PLA
NK
DIR
ECTIO
N
PLA
NK
DIR
ECTIO
N
R 8' - 11"
R 9' - 0
"
R 12' - 5"
R 20'
- 9"
1
1
SCALE:
SHEET:
REVISIONS
AS NOTED
CHECKED BY:
DRAWN BY: DATE:
PRO
POSE
D R
ENO
VA
TION
S FO
R:
FLOORINGPATTERN &
LAYOUT
6/5/14
ID-2
HA
CC
WEL
CO
ME
CEN
TER
HARR
ISBU
RG A
REA
CO
MM
UNITY
CO
LLEG
E
ISSUE
D F
OR
BID
JUN
E 5
, 20
14
L.G & C.D.
G.H.
1641
OLD
PHI
LAD
ELPH
IA P
IKE,
LA
NC
AST
ER, P
ENN
SYLV
AN
IA 1
7602
DATE DESCRIPTION6/20/14 GCI ADDENDUM #1 PER B&H
3/16" = 1'-0"ID-21
PARTIAL FLOOR PLANFLOORING DETAIL & PATTERNS
SOLID SURFACE
1X3 WD. TRIM W/ EASEDEDGE (PTD.)
WELCOMECENTER / KIOSK
216CORRIDOR
220B
1_4" LAMINATED FROSTED GLASS
1X3 LEDGER -ALL SIDES
1X3 LEDGER -ALL SIDES
EXIST. CONC. FLR.
RECEPTION218
WELCOMECENTER / KIOSK
216
7'-0
"
7'-0
"
PNT-5 PNT-5
CT-3a TP-1 TYPICAL
START FULL TILEAT BULLNOSEFOR PATTERN
3" x 12" BULLNOSECRAFTSMAN WHEAT
EPOXY CLEARCAULK JOINTAT JOINTWHERE WALLTILE MEETSFLOOR(TYPICAL)
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
PNT-6PNT-6
7'-0
"
7'-0
"
CT-3a
START FULL TILE ATBULLNOSE FOR PATTERN
3" x 12" BULLNOSECRAFTSMAN WHEAT
EPOXY CLEARCAULK JOINTAT JOINTWHERE WALLTILE MEETSFLOOR(TYPICAL)
TP-1 TYPICAL
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
PNT -6
7'-0
"
CT-3a
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
BY MEGANITENAVARRA STONE 507
MAPLE WOOD SPECIESPL-1 PL-1
PNT-4
PNT-4
PNT-8
WB-2 WB-1
WITH LIGHT STAIN COLOR TO MATCH CT-2
PNT-4
NOTE: BEGIN 8'-0" WIDEPLAM SHEET IN CENTER OFWALL LENGTH. EVERY 4'-0"A 1" WIDE BY 2" THICK TRIMMOULDING STRIP SHALL BEADDED VERTICALLY. ALLSEAMS OCCURING AT 8'-0"WIDTHS SHALL BE COVEREDBY THIS TRIM PIECE. TRIMPIECE SHALL BE MAPLEWOOD STAINED TO MATCHCT-1.
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
OPENTO
BEYOND
PNT-4 (UNDERSIDE)
PNT-4ALL SIDESPNT-4
ALL SIDES
OPEN TO BEYOND
PNT-4 ALLSIDES
PNT-4 ALLSIDES
PNT-3
PNT-8
WB-1
MAINLOBBY
CORRIDORPSECU
PNT-1
PNT-8
PNT-1
PNT-2a
PNT-2a
GLASS CURTAIN WALL
TILE ON COLUMNS. REFERTO DETAIL THIS SHEET
PNT-1DECORATIVEPENDANT LIGHT
PNT-1
PNT-4
PNT-4
WB-1
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
1 11
9'-0
"
2'-1
1"6"
EQ6"
EQ6"
CT-4 - ON DIAGONAL CENTERED ONCOLUMN
CT-4 - ON DIAGONAL
3 STACKED ROWS OF MUSKMATTONCINO ES32996
3 STACKED ROWS OF MUSKMATTONCINO ES32996
FINISH TOP EXPOSED EDGE OF TILEWITH SCHLUTER RONDEC - SATINNICKEL - ALL SIDES
CENTER ROW OF TILES SHALL BECENTERED RIGHT TO LEFT TOCENTERLINE OF COLUMN ON ALLSIDES
TILE ACCENT BANDS ALL SIDES OFCOLUMN
3 STACKED ROWS OF MUSKMATTONCINO ES32996
CT-4 - ON DIAGONAL
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
PNT-4SOFFIT
PNT-4 SOFFIT
MAPLE WOODSPECIES WITH LIGHTSTAIN COLOR TOMATCH CT-2
MAPLE WOODSPECIES WITH LIGHTSTAIN COLOR TOMATCH CT-2
PNT-2 ALLSIDES
PNT-2ALL SIDES
WB-2
PL-4TB-1
PNT-4
PL-3
PNT-2
PL-11
3" RECESSED TOE KICK -BLACK MATTE LAMINATE
(PNT-2)
(PNT-2)
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
PNT-1
PNT-4
WALL BASEWB-1
CHAIR RAILWP-1
3'-4
" AFF
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
RECEPTION
(5) EQUAL WIDTH PANELS
HEIGHT OF WALL PANELSHALL BE TO UNDERSIDEOF WINDOWS
INSTALL AT TOP OFWALL BASE
4"
NOTE: DRAWING REPRESENTS FINISH TYPES & LOCATIONS ONLY.REFER TO ARCHITECTURAL SET FOR ALL OTHER SPECIFICATONSAND DIMENSIONS
SCALE:
SHEET:
REVISIONS
AS NOTED
CHECKED BY:
DRAWN BY: DATE:
PRO
POSE
D R
ENO
VA
TION
S FO
R:
ELEVATIONS
6/5/14
ID-4
HA
CC
WEL
CO
ME
CEN
TER
HARR
ISBU
RG A
REA
CO
MM
UNITY
CO
LLEG
E
ISSUE
D F
OR
BID
JUN
E 5
, 20
14
L.G & C.D.
G.H.
1641
OLD
PHI
LAD
ELPH
IA P
IKE,
LA
NC
AST
ER, P
ENN
SYLV
AN
IA 1
7602
1/2" = 1'-0"ID-42 ELEVATION - MEN - TYP. TILE
1/2" = 1'-0"ID-43 ELEVATION - WOMEN - TYP. TILE
1/2" = 1'-0"ID-44 ELEVATION - TYP. SINGLE TOILET
3/4" = 1'-0"ID-41 SECTION @ GLASS WALL
DATE DESCRIPTION6/20/14 GCI ADDENDUM #1 PER B&H
3/8" = 1'-0"ID-48 LOBBY ELEVATION - FINISHES
3/4" = 1'-0"ID-46 TYPICAL COLUMN - MAIN LOBBY 220
3/4" = 1'-0"ID-47 SECTION @ RECEPTION DESK
1/2" = 1'-0"ID-45 TYPICAL CORRIDOR WALL FINISHES
1/2" = 1'-0"ID-49 RECEPTION