ADDENDUM #1 – 2015 STREET RECONSTRUCTION PROJECT 4/22/2015 PROJECT #2015-01,02 The purpose of this addendum to the 2015 Street Reconstruction Project is to ADD rehabilitation of bituminous trails within the street reconstruction area. This addendum shall be attached to the Contract Documents and included as part of said Contract Documents. Items herin shall take precedence over any clauses which they modify in the Contract Documents or portions of drawings which they modify or supplement. SCHEDULE OF PRICES CHANGES PART 3 – DEMOLITION AND REMOVALS 1. ADD the following Pay Item: 2331.604, RECLAIM BITUMINOUS TRAIL – 8FT WIDE, SQ YD, 2,300 PART 7 – PAVEMENT 1. REVISE the following Pay Item: 2330.501, TYPE SP 9.5 BITUMINOUS TRAIL MIX (2,B) 2.5” SPWEA240B, SQ YD, 2,500 2. ADD the following Pay Item: 2331.603, CRACK SEAL BITUMINOUS TRAIL, LIN FT, 150 3. ADD the following Pay Item: 2356.604, SEAL COAT BITUMINOUS TRAIL, SQ YD, 900 PART 8 – RESTORATION 1. REVISE the following Pay Item: 2575.505, 4” TOPSOIL AND SOD, SQ YD, 4,400 Please replace the Schedule of Prices in your Specification book for 2015-01,02 Street Reconstruction Project with the enclosed Schedule of Prices PROJECT MANUAL CHANGES The project manual has been revised to reflect the following changes: 1. Special Provisions to the Standard Street Specifications Replace Section 7.B (Reclamation of Bituminous Pavement) with the following: B. Reclamation of Bituminous Pavement The Contractor shall reclaim existing bituminous and Class 5 in Phases 1-4 in compliance with MNDOT 2215, Full Depth Reclamation (FDR). Payment for Reclaim 5”

Upload: others

Post on 26-Oct-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

ADDENDUM #1 – 2015 STREET RECONSTRUCTION PROJECT 4/22/2015

PROJECT #2015-01,02 The purpose of this addendum to the 2015 Street Reconstruction Project is to ADD rehabilitation of bituminous trails within the street reconstruction area. This addendum shall be attached to the Contract Documents and included as part of said Contract Documents. Items herin shall take precedence over any clauses which they modify in the Contract Documents or portions of drawings which they modify or supplement.

SCHEDULE OF PRICES CHANGES

PART 3 – DEMOLITION AND REMOVALS 1. ADD the following Pay Item:

2331.604, RECLAIM BITUMINOUS TRAIL – 8FT WIDE, SQ YD, 2,300

PART 7 – PAVEMENT 1. REVISE the following Pay Item:

2330.501, TYPE SP 9.5 BITUMINOUS TRAIL MIX (2,B) 2.5” SPWEA240B, SQ YD, 2,500 2. ADD the following Pay Item:

2331.603, CRACK SEAL BITUMINOUS TRAIL, LIN FT, 150 3. ADD the following Pay Item:

2356.604, SEAL COAT BITUMINOUS TRAIL, SQ YD, 900

PART 8 – RESTORATION 1. REVISE the following Pay Item:

2575.505, 4” TOPSOIL AND SOD, SQ YD, 4,400

Please replace the Schedule of Prices in your Specification book for 2015-01,02 Street Reconstruction Project with the enclosed Schedule of Prices

PROJECT MANUAL CHANGES

The project manual has been revised to reflect the following changes: 1. Special Provisions to the Standard Street Specifications

Replace Section 7.B (Reclamation of Bituminous Pavement) with the following: B. Reclamation of Bituminous Pavement

The Contractor shall reclaim existing bituminous and Class 5 in Phases 1-4 in compliance with MNDOT 2215, Full Depth Reclamation (FDR). Payment for Reclaim 5”

of Bituminous Pavement and Class 5, or Reclaim Bituminous Trail, shall be at the contract unit price per Square Yard and shall include the tolerancing and compacting of the reclaimed aggregate base. After tolerancing and compacting have been completed, the aggregate material shall be proof rolled prior to the bituminous placement. The City’s representative must be present for all proof rolling. Any areas not meeting the City’s standard shall be repaired with contract quantities. Reclaimed material used for Class 5 base shall meet MNDOT 3135. Reclamation Depths: Streets: 5” Trails: 4” (based upon site limitations, 3” may be acceptable)

Add the following Section 24 (Bituminous Trail Maintenance):

24. BITUMINOUS TRAIL RECONSTRUCTION AND MAINTENANCE

Bituminous trails within the street reconstruction area shall be reconstructed and/or maintained as identified on the Contract Documents or at the direction of the Owner. Typical trails in this project are 8’ wide. Other surface improvements, such as restoration and pedestrian ramps, will be paid for at the contract unit price for those items. Typically, new trail or seal coat installation will be installed through driveways, however, concrete driveways shall remain as-is, unless directed otherwise by the Owner. The Contractor shall protect concrete driveways and pedestrian ramps during reconstruction or seal coat installation. Damage or tracking bituminous materials onto concrete driveways is not acceptable and will be repaired at the Contractor’s expense. The Contractor is responsible for placing barricades, cones, tape, or signs to warn trail users that trails are closed for maintenance, including duration.

A. Trail reconstruction shall include reclamation of the existing trail and installation of

new trail pavement. Reference previous sections of this specification for guidance.

B. Trail maintenance shall include bituminous patching, crack sealing, and seal coating shall include patching areas of existing trail as identified by the Owner, sealing all existing cracks, and seal coat installation. Trails shall be swept to remove all dirt and debris prior to completing any maintenance.

1) Patch Bituminous Trail

Reference previous sections of this specification for guidance.

2) Crack Seal Bituminous Trail Fill all cracks with hot rubberized crack filler, per MNDOT 3723. Payment for Crack Seal Bituminous Trail shall be at the contract unit price of Linear Foot and includes all equipment, materials and labor.

3) Seal Coat Bituminous Trail Apply two (2) separate coats of MasterSeal Concentrate as manufactured by SealMaster, Inc., or Owner approved equal. Each coat shall contain a minimum of 4 lbs. silica sand per gallon of sealer. Sealer shall be modified with Top Tuff at a rate of 2%. Coverage rate of sealer for two (2) coats shall be at the rate of 0.23 gallons/square yard. Payment for Seal Coat Bituminous Trail shall be at the

contract unit price of Square Yard and includes all equipment, materials and labor. The Contractor shall protect all surfaces adjacent to the trail receiving seal coat including, but not limited to, sod/turf, landscaping, pedestrian ramps, and driveways. Seal coat material shall not be installed on concrete driveways that cross bituminous trail.

PLAN SHEETS

1. REPLACE sheet 2 with the revised Sheet 2 attached to this addendum. State of Estimated Quantities updated to reflect revised and added quantities for additional work related to bituminous trails.

2. REPLACE sheet 14 with the revised Sheet 14 attached to this addendum. Location of bituminous trail reconstruction on Elm Road was added.

3. REPLACE sheet 15 with the revised Sheet 15 attached to this addendum. Location of bituminous trail reconstruction on Elm Road was added.

4. REPLACE sheet 21 with the revised Sheet 21 attached to this addendum. Location of bituminous trail maintenance (patch, crack seal, and seal coat) on Polaris Lane was added.

5. REPLACE sheet 23 with the revised Sheet 23 attached to this addendum. Location of bituminous trail reconstruction on 64th Place and 65th Place was added.

Please contact the Engineering Department, 763-494-6350, with any questions. Thank You, Justin Utpadel Project Coordinator City of Maple Grove

Justin Utpadel

4/22/2015 Schedule Of Prices By Category

http://mg­int:82/RtAEC/Reports/rpt_womScheduleOfPrices.asp?numLines=16&WorkOrderId=15&Category=Y 1/5

4/22/2015 MGENG

Schedule Of Prices By Category

Addendum Date Created1 04/22/2015 5:19 PM

Project Number: 2015­01,02Project Title or Road Number: 2015 Maple Grove Street Reconstruction ProjectWork Type: Civil EngineeringBIDDER MUST FILL IN UNIT PRICES IN NUMERALS; MAKE EXTENSION FOR EACH ITEM AND TOTAL. FORCOMPLETE INFORMATION CONCERNING THESE ITEMS, SEE PLANS AND SPECIFICATIONS, INCLUDINGSPECIAL PROVISIONS.Line No. Item No. Description Units Quantity Unit Price Total Price PART 1 ­ GENERAL ITEMS

1 2021.501 MOBILIZATION LUMP SUM 1.00

2 2563.602 TRAFFIC CONTROL LUMP SUM 1.00

3 2540.602 INSTALL TEMP MAIL BOX EACH 464.00

4 2540.602 SALVAGE AND INSTALL MAILBOX EACH 95.00

5 2130.501 WATER FOR DUST CONTROL M GALLONS 2,500.00

6 2130.501 SPECIAL WATER USE M GALLONS 2,500.00

7 2104.523 SALVAGE AND INSTALL SIGN EACH 30.00

Total PART 1 ­ GENERAL ITEMS

PART 2 ­ EROSION CONTROL

8 2573.502 SILT FENCE, TYPE PREASSEMBLED LIN FT 1,000.00

9 2573.602 DRAINAGE STRUCTURE SEDIMENTPROTECTION EACH 239.00

Total PART 2 ­ EROSION CONTROL

PART 3 ­ DEMOLITION AND REMOVALS

10 2232.501 MILL & REMOVE 2.0" EXISTINGBITUMINOUS STREET SQ YD 49,280.00

11 2232.501 MILL & REMOVE 2.5" EXISTINGBITUMINOUS STREET SQ YD 89,270.00

12 2331.604 RECLAIM 5" BITUMINOUS & CLASS5 SQ YD 89,270.00

13 2331.604 RECLAIM BITUMINOUS TRAIL ­ 8FT WIDE SQ YD 2,300.00

14 2013.607 DISPOSING OF EXCESS RECLAIMEDMATERIAL CU YD 2,478.00

15 2104.511 SAWING CONCRETE PAVEMENT LIN FT 7,876.00

4/22/2015 Schedule Of Prices By Category

http://mg­int:82/RtAEC/Reports/rpt_womScheduleOfPrices.asp?numLines=16&WorkOrderId=15&Category=Y 2/5

BIDDER MUST FILL IN UNIT PRICES IN NUMERALS; MAKE EXTENSION FOR EACH ITEM AND TOTAL. FORCOMPLETE INFORMATION CONCERNING THESE ITEMS, SEE PLANS AND SPECIFICATIONS, INCLUDINGSPECIAL PROVISIONS.Line No. Item No. Description Units Quantity Unit Price Total Price

16 2104.513 SAWING BITUMINOUS PAVEMENT LIN FT 8,118.00

17 2104.501 REMOVE CURB AND GUTTER ­ ALLTYPES LIN FT 22,599.00

18 2104.503 REMOVE CONCRETE DRIVEWAYPAVEMENT SQ FT 7,578.00

19 2104.503 REMOVE CONCRETE SIDEWALK SQ FT 600.00

20 2104.503 REMOVE BITUMINOUS DRIVEWAY ORBITUMINOUS TRAIL SQ YD 2,633.00

21 2540.618 REMOVE AND REPLACE PAVERSTONEDRIVEWAYS SQ FT 840.00

Total PART 3 ­ DEMOLITION AND REMOVALS

PART 4 ­ UTILITIES

22 2104.523 SALVAGE AND INSTALL CASTING EACH 288.00

23 2104.509 REMOVE AND NEW CASTING EACH 2.00

24 2506.521 INSTALL MODIFIED CASTINGASSEMBLY R3250A EACH 28.00

25 2104.509 REMOVE DRAINAGE STRUCTURE EACH 4.00

26 2506.602 CONNECT INTO EXISTING CATCHBASIN OR MANHOLE EACH 3.00

27 2501.573 INLET STRUCTURE WITH OVERFLOW EACH 2.00

28 2503.603 12" HDPE PIPE SEWER LIN FT 256.00

29 2503.603 12" HDPE PIPE SEWER(DIRECTIONAL DRILL) LIN FT 760.00

30 2506.602 INSTALL CATCH BASIN 2' x 3' EACH 8.00

31 2506.602 INSTALL CATCH BASIN MANHOLE ­48" EACH 1.00

32 2506.602 INSTALL 4' SUMP STORM MANHOLE­ 48" DIA ­ 6' to 10' BUILD EACH 2.00

33 2504.602 ADJUST GATE VALVE EACH 48.00

4/22/2015 Schedule Of Prices By Category

http://mg­int:82/RtAEC/Reports/rpt_womScheduleOfPrices.asp?numLines=16&WorkOrderId=15&Category=Y 3/5

BIDDER MUST FILL IN UNIT PRICES IN NUMERALS; MAKE EXTENSION FOR EACH ITEM AND TOTAL. FORCOMPLETE INFORMATION CONCERNING THESE ITEMS, SEE PLANS AND SPECIFICATIONS, INCLUDINGSPECIAL PROVISIONS.Line No. Item No. Description Units Quantity Unit Price Total Price

34 2502.541 4" PERFORATED PVC PIPESUBDRAIN LIN FT 2,470.00

35 2502.521 6" PVC SUMP DRAIN LIN FT 160.00

36 2503.602 6" PVC 'END OF LINE' SUMPDRAIN CLEANOUT W/ SERVICE WYE EACH 1.00

37 2502.602 CONNECT 4" or 6" PVC INTODRAINAGE STRUCTURE EACH 125.00

38 2506.602 GROUT CATCH BASIN OR MANHOLE EACH 34.00

39 2506.602 STORM SEWER BAFFLE DEVICE ­DISSIPATOR; 12" PIPE EACH 2.00

40 2506.602 STORM SEWER BAFFLE DEVICE ­DISSIPATOR; 15" PIPE EACH 5.00

41 2506.602 STORM SEWER BAFFLE DEVICE ­SKIMMER; 15" PIPE EACH 4.00

42 2506.602 STORM SEWER BAFFLE DEVICE ­SKIMMER; 18" PIPE EACH 2.00

43 2013.601 STORM WATER TREATMENT DEVICE LUMP SUM 1.00

Total PART 4 ­ UTILITIES

PART 5 ­ EARTHWORK

44 2105.507 SUBGRADE EXCAVATION CU YD 4,466.00

45 2105.604 GEOTEXTILE FABRIC TYPE 5 SQ YD 8,929.00

46 2105.522 SELECT GRANULAR BORROW MOD(CV) CU YD 4,466.00

47 2211.503 AGGREGATE BASE (CV) CLASS 5 CU YD 2,976.00

Total PART 5 ­ EARTHWORK

PART 6 ­ CONCRETE

48 2531.501 CONCRETE CURB & GUTTER ­SURMOUNTABLE LIN FT 20,417.00

49 2531.501 CONCRETE CURB & GUTTER DESIGNB618 LIN FT 2,182.00

50 2531.502 MEMBRANE CURING COMPOUND ONCURB AND GUTTER LIN FT 54,025.00

51 2401.515 5" CONC. DRIVEWAY W/ 4" CL 5BASE SQ FT 30,315.00

4/22/2015 Schedule Of Prices By Category

http://mg­int:82/RtAEC/Reports/rpt_womScheduleOfPrices.asp?numLines=16&WorkOrderId=15&Category=Y 4/5

BIDDER MUST FILL IN UNIT PRICES IN NUMERALS; MAKE EXTENSION FOR EACH ITEM AND TOTAL. FORCOMPLETE INFORMATION CONCERNING THESE ITEMS, SEE PLANS AND SPECIFICATIONS, INCLUDINGSPECIAL PROVISIONS.LineNo. Item No. Description Units Quantity Unit Price Total Price

52 2401.515 5" CONC. SIDEWALK W/ 4" CL 5BASE SQ FT 600.00

53 2401.515 8" CONC. SIDEWALK OR DWY WITH6" CL 5 BASE SQ FT 500.00

54 2531.604 8" CONCRETE VALLEY GUTTER SQ FT 255.00

55 2531.602 REMOVE AND INSTALL PEDESTRIAN CURB RAMP­ ONE­WAY DIRECTIONAL EACH 32.00

56 2531.602 REMOVE AND INSTALL PEDESTRIANCURB RAMP ­ FAN EACH 1.00

Total PART 6 ­ CONCRETE

PART 7 ­ PAVEMENT

57 2360.503 TYPE SP 12.5 NON WEAR COURSEMIX (2,B) 2" SPNWB230B SQ YD 89,270.00

58 2357.502 BITUMINOUS MATERIAL FOR TACKCOAT GALLON 7,475.00

59 2360.501 TYPE SP 9.5 WEARING COURSEMIX (2,B) 1.5" SPWEA230B SQ YD 89,270.00

60 2360.501 TYPE SP 9.5 WEARING COURSEMIX (2,B) 2" SPWEA230B SQ YD 12,070.00

61 2360.501 TYPE SP 9.5 WEARING COURSEMIX (4,C) 2" SPWEA440C SQ YD 37,210.00

62 2360.501 TYPE SP 9.5 DRIVEWAY PATCHMIX (2,B) 3" SPWEA240B SQ YD 248.00

63 2360.501 TYPE SP 9.5 BITUMINOUS TRAILMIX (2,B) 2.5" SPWEA240B SQ YD 2,500.00

64 2331.603 CRACK SEAL BITUMINOUS TRAIL LIN FT 150.00

65 2356.604 SEAL COAT BITUMINOUS TRAIL SQ YD 900.00

Total PART 7 ­ PAVEMENT

PART 8 ­ RESTORATION

66 2575.505 4" TOPSOIL & SOD SQ YD 4,400.00

67 2511.602 LANDSCAPE RESTORATION EACH 147.00

68 2504.602 SALVAGE AND REPAIR IRRIGATIONSYSTEM EACH 100.00

69 2557.602 REPAIR UNDERGROUND PETCONTAINMENT SYSTEM EACH 100.00

Total PART 8 ­ RESTORATION

4/22/2015 Schedule Of Prices By Category

http://mg­int:82/RtAEC/Reports/rpt_womScheduleOfPrices.asp?numLines=16&WorkOrderId=15&Category=Y 5/5

Bidder Name:

BidderAddress:

Bidder Phone: BidderSignature:

Date:

BIDDER MUST FILL IN UNIT PRICES IN NUMERALS; MAKE EXTENSION FOR EACH ITEM AND TOTAL. FORCOMPLETE INFORMATION CONCERNING THESE ITEMS, SEE PLANS AND SPECIFICATIONS, INCLUDINGSPECIAL PROVISIONS.Line No. Item No. Description Units Quantity Unit Price Total Price PART 9 ­ PAVEMENT MARKING

70 2582.502 4" SOLID LINE WHITE­PAINT LIN FT 7,300.00

71 2582.502 4" BROKEN LINE WHITE­PAINT LIN FT 1,200.00

72 2582.502 4" SOLID LINE YELLOW­PAINT LIN FT 4,400.00

73 2582.502 4" BROKEN LINE YELLOW­PAINT LIN FT 1,400.00

74 2582.502 4" DOUBLE SOLID LINEYELLOW­PAINT LIN FT 1,500.00

75 2582.502 24" SOLID LINE YELLOW­PAINT LIN FT 600.00

76 2582.503 CROSSWALK MARKING­PAINT SQ FT 690.00

77 2582.501 PAVT MSSG (LT ARROW) PAINT EACH 20.00

78 2102.502 PAVEMENT MARKING REMOVAL LIN FT 50.00

Total PART 9 ­ PAVEMENT MARKING

Total