Addendum 1 IFB SA-1922 1 | Page Procurement Department P.O. Box 2266 · Woodbridge, Virginia 22195-2266 · Fax (703) 335-7954 July 16, 2019 Addendum #01 IFB SA-1922 Occoquan Forest SPS #36 Replacement and Occoquan Forest SPS #37 Rehabilitation THIS SOLICITATION IS HEREBY AMENDED AS FOLLOW: The attached responses to questions have been added for clarification. Attachments: 1. Pre-bid Meeting and Site-Visit Sign-In sheets 2. Plan Holders List 3. ADD Spec Section 15950 HVAC Testing Adjusting & Balancing 4. ADD New Drawing Sheets dated 7/15/19: a. G-110 Easements Available to Contractor Addendum 01 b. G-209 Easements Available to Contractor Addendum 01 5. REVISED Drawing Sheets dated 7/15/19: a. D-103 Water Treatment Facility Demolition Plan b. D-104 Well No. 2 and Well No. 5 Demolition Plan

Upload: others

Post on 18-Jul-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Addendum 1 IFB SA-1922

1 | P a g e

Procurement Department

P.O. Box 2266 · Woodbridge, Virginia 22195-2266 · Fax (703) 335-7954

July 16, 2019

Addendum #01

IFB SA-1922 Occoquan Forest SPS #36 Replacement and

Occoquan Forest SPS #37 Rehabilitation

THIS SOLICITATION IS HEREBY AMENDED AS FOLLOW:

The attached responses to questions have been added for clarification.

Attachments:

1. Pre-bid Meeting and Site-Visit Sign-In sheets

2. Plan Holders List

3. ADD Spec Section 15950 HVAC Testing Adjusting & Balancing

4. ADD New Drawing Sheets dated 7/15/19:

a. G-110 Easements Available to Contractor – Addendum 01

b. G-209 Easements Available to Contractor – Addendum 01

5. REVISED Drawing Sheets dated 7/15/19:

a. D-103 – Water Treatment Facility Demolition Plan

b. D-104 – Well No. 2 and Well No. 5 Demolition Plan

Page 2: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Addendum 1 IFB SA-1922

2 | P a g e

Acknowledgement: Bidders submitting a bid response for the above named solicitation shall take note of the following changes,

additions, deletions, clarification, etc., in the Contract Documents, which shall become a part of and have precedence over anything

shown or described in the Contract Documents, and as such shall be taken into consideration and be included in the Bidder’s response.

All other terms and conditions of the Invitation For Bid shall remain unchanged.

Bidders must acknowledge receipt of this amendment by signing and returning this addendum with the bid response or prior to the

bid due date and time.

Authorized Signature Date

Name Printed Title

Company Name

Direct all inquiries to: [email protected]

Page 3: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Addendum 1 IFB SA-1922

3 | P a g e

RESPONSES TO QUESTIONS FOR CLARIFICATION

SOLICITATION NO. IFB SA-1922

OCCOQUAN FOREST SPS #36 REPLACEMENT AND

OCCOQUAN FOREST SPS #37 REHABILITATION

1. Question: Occoquan Forest Pumping Station abandonment of Wells#2 & #5.

a. Is the pump still in each well and if so, what is the size of the riser pipe?

Response: The well pumps have been removed from all the wells. For information

only, the riser pipes have the following diameters:

Well #1 (within the water treatment facility) – 6” diameter.

Well #2 – 6” diameter.

Well #4 (within the water treatment facility) – 6” diameter.

Well #5 – 8” diameter.

Unknown well # (at Well No. 2 site) – 4” diameter.

b. What is the depth and diameter of each well?

Response: All wells are being abandoned by others, under separate contract with

PWCSA and are anticipated to be finished prior to project NTP.

2. Question: Spec Section 15950 HVAC Testing Adjusting & Balancing is listed in the TOC,

but it is not in the specbook. Please provide the missing Section.

Response: See attached for Specification Section 15950 HVAC Testing Adjusting &

Balancing.

Addendum 01 - Drawing Revision Item Summary:

Item 1: NEW DRAWING SHEETS titled “G-110 Occoquan Forest SPS #36 Easements

Available to Contractor – Addendum 01” and “G-209 Occoquan Forest SPS #37

Easements Available to Contractor – Addendum 01” show the limits of the existing

easements available to the contractor for the construction of the pump station and for the

bypass pumping operations. The Contractor shall remain within the indicated easements

all damages to property outside the project easements shall be the sole responsibility of

the contractor.

Item 2: REMOVE and REPLACE drawing “D-103 – Water Treatment Facility Demolition

Plan.” Revisions include plan callout labels on “D-103 – Water Treatment Facility

Demolition Plan” to add information related to the demolition of the water treatment

building and well pump house label and the associated Well #1 and Well #4 well casing

pipes. Also revised the Water Treatment Demolition Note #1 indicating well

abandonment by others.

Item 3: REMOVE and REPLACE drawing “D-104 – Well No. 2 and Well No. 5 Demolition

Page 4: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Addendum 1 IFB SA-1922

4 | P a g e

Plan.” Revisions include plan callout labels on to REVISE PLAN LABELS adding

information related to the demolition of two well casing pipes (well #2 and unknown well

#) at the Well No. 2 site and the casing pipe at Well No. 5 (well #5) site. Drawing

additions include additional area for second concrete pad demolition and new Note #5

indicating well abandonment by others.

Addendum 01 – Direction to Contractor for additional consideration:

Item 4: The contractor is to note the tree clearing timeframe defined in the Supplementary

Conditions Section 1.6.G. “At the Occoquan Forest SPS 36 Replacement Project site, the

Contractor shall conduct tree clearing from September 16 thru April 14. No tree clearing

shall occur from April 15 thru September 15.”

Page 5: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922
Page 6: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922
Page 7: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922
Page 8: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922
Page 9: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922
Page 10: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922
Page 11: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922
Page 12: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922
Page 13: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

PLANHOLDERS LIST

IFB SA 1922 Occoquan Forest SPS #36 Replacement and Occoquan Forest SPS#37 Rehabilitation

Page 1 of 3

Company Name Point of Contact Phone

Email Address

VA Builders Inc. Rick Loy

[email protected]

WGK Construction Andrew Gregson 571-722-4138 [email protected]

Sherwood-Logan & Associates

John Logan

Patrick Foley

410-980-8763

410-353-5406

[email protected]

[email protected]

W. M. Schlosser Co. Inc. Candice Geter 240-455-1498 [email protected]

Virginia Bid Network/North America

Procurement Council (NAPC) Jam Ablay 970-712-5585

[email protected]

Tidewater Utility Construction Inc.

TUCI

Staci Lockhart

Jeanie Harrell 757-935-5899 x307

[email protected]

[email protected]

Corman Kokosing Construction

Company

Bonnie James 301-575-9840 [email protected]

Keystone Consultants

Richard Fagan 804-426-3082

[email protected]

Patterson Construction Co.

Joshua Gebhart 540-786-5645

[email protected]

Page 14: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

PLANHOLDERS LIST

IFB SA 1922 Occoquan Forest SPS #36 Replacement and Occoquan Forest SPS#37 Rehabilitation

Page 2 of 3

Company Name Point of Contact Phone

Email Address

Josh A. Whitney/Micro-Tech Designs Josh A. Whitney 410-239-2885

[email protected]

Wood Equipment Company Inc. Brent Yager 804-240-3997

[email protected]

Midas

Jenna Cohen 240-530-0005

[email protected]

Stonhard

Kyle Fisher 540-209-2413 [email protected]

Kimley Horn

Mohammed Shammet

Mohammed.Shammet@kimley-

horn.com

J. S. Haren Company 423-745-500

[email protected]

Dodge Data & Analytics

Brandi Flanagan 817-537-8232 [email protected]

The Blue Book Building &

Construction Network

Alex Gugliada 800-431-2584 [email protected]

Eatapping Services, LLC

Will Heiling 407-880-6786 [email protected]

Constructconnect Eric Mills [email protected]

Sherwood-Logan & Associates Patrick E. Foley 410-841-6810 x 1327 [email protected]

Page 15: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

PLANHOLDERS LIST

IFB SA 1922 Occoquan Forest SPS #36 Replacement and Occoquan Forest SPS#37 Rehabilitation

Page 3 of 3

Company Name Point of Contact Phone

Email Address

*Sydnor Hydro Tom Pomozzi 804-644-2289 [email protected]

Anchor Construction Corporation Erik Holden 202-269-6694

[email protected]

Watermark Environmental Systems Eric Dickson 610-675-7680

[email protected]

Page 16: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-i

`SECTION 15950

HVAC TESTING, ADJUSTING AND BALANCING

PARAGRAPH INDEX

Page No. PART 1 - GENERAL

1.01 Scope 15950-1 1.02 Submittals 15950-1 1.03 Related Documents 15950-1 1.04 Summary 15950-2 1.05 Quality Assurance 15950-2 1.06 Agenda 15950-3 1.07 Job Conditions 15950-4

PART 2 - PRODUCTS

2.01 Patching Materials 15950-4 2.02 Test Instruments 15950-5

PART 3 - EXECUTION

3.01 Procedures and Instruments, General 15950-5 3.02 Air System Procedures 15950-6 3.03 Certified Reports 15950-7 3.04 Air System Data 15950-7 3.05 Final Commissioning Tests, Inspections 15950-9

and Acceptance

Page 17: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-ii

This page intentionally left blank

Page 18: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-1

SECTION 15950

HVAC TESTING, ADJUSTING AND BALANCING

PART 1 - GENERAL 1.01 SCOPE

Contractor shall provide all labor, materials, equipment and services necessary for and incidental to the complete and satisfactory testing, adjusting and balancing of the HVAC equipment and ductwork as specified herein.

1.02 SUBMITTALS

A. Conform to the requirements of DIVISION 1.

B. Test Reports: Provide certified test reports, signed by the test and balance

supervisor who performed the work. In addition, have the reports certified by a Professional Engineer who is familiar with testing and balancing and the project, and is registered in the jurisdiction where testing is being conducted. The final reports shall include identification and types of instruments used, and their most recent calibration date.

C. Standards: The Contractor shall deliver a copy of either NEBB or AABC

standards for testing and balancing work associated with the project. This document shall serve as specific guidance to construction engineers as to minimum requirements.

D. Maintenance Data: Include, in maintenance manuals, copies of certified test

reports and identification of instruments.

E. Qualifications: The Contractor shall submit the certified individual qualifications of all persons responsible for supervising and performing the actual work, the name of the certifying engineer, and the qualifications of the independent Registered Professional Engineer certifying the report.

1.03 RELATED DOCUMENTS

Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.04 SUMMARY

Page 19: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-2

A. Systems: Testing, adjusting and balancing specified in this Section

B. Related Sections: Refer to other Division 15 sections.

1.05 QUALITY ASSURANCE

A. Tester's Qualifications: A specialist certified by the National Environmental

Balancing Bureau (NEBB) or Associated Air Balance Council (AABC) with at least 3 years of experience in those testing, adjusting and balancing requirements similar to those required for this project, who is not the installer of the system to be tested and is otherwise independent of the project.

B. Codes and Standards: Provide testing, adjusting and balancing conforming to

American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE), American National Standards Institute (ANSI), and either NEBB or AABC the following:

1. American National Standards Institute (ANSI): Comply with the

following:

a. S1.4 Specification for Sound Level Meters b. S1.11 Specification for Octave-Band and

Fractional-Octave-Band Analog and Digital Filters

2. American Society of Heating, Refrigerating, and Air-Conditioning

Engineers (ASHRAE): Comply with ASHRAE recommendations pertaining to measurements, instruments, and testing, adjusting, and balancing.

3. NEBB or AABC: Comply with NEBB'S "Procedural Standards for

Testing, Adjusting, Balancing of Environmental Systems" or comply with AABC MN-1 "National Standards," as applicable to mechanical air distribution systems, and associated equipment and apparatus.

C. The Contractor shall submit the name of the organization he proposes to

employ for approval within [30] days after contract award. If the Contractor fails to submit the name of an acceptable agency within the specified time, a firm may be selected to accomplish the work, and this selection shall be binding upon the Contractor at no additional cost.

D. Calibration of Testing Instruments: All measurement instruments used for

testing, adjusting, balancing, and commissioning shall be calibrated. The

Page 20: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-3

time between the most recent calibration data and the final test report date shall not be over 1 year.

1.06 AGENDA

A. Agenda: A preliminary report and agenda shall be submitted and approved

prior to the start of testing and balancing work.

1. Review plans and specifications prior to installation of any of the affected systems, and submit a report indicating any deficiencies in the systems that would preclude the proper adjusting, balancing, and testing of the systems.

2. The agenda shall include a general description of each air system

with its associated equipment and operation cycles for heating, ventilation, odor control and cooling as applicable.

3. The agenda shall include a list of all air flow and air terminal

measurements to be performed.

4. The agenda shall incorporate the proposed selection points for sound measurements, including typical spaces as well as sound sensitive areas like offices and conference rooms, if applicable.

5. The agenda shall also include specific test procedures and parameters

for determining specified quantities (e.g. flow, drafts, sound levels) from the actual field measurements to establish compliance with contract requirements. Samples of forms showing application of procedures and calculations to typical systems shall be submitted.

6. Specific test procedures for measuring air quantities at terminals

shall specify type of instrument to be used, method of instrument application (by sketch) and factors for: a. Air terminal configuration. b. Flow direction (supply or exhaust). c. Velocity corrections. d. Effective area applicable to each size and type of air terminal. e. Density corrections.

7. The agenda shall include identification and types of measurement

instruments to be used, and their most recent calibration date. 1.07 JOB CONDITIONS

Page 21: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-4

A. General: Do not proceed with testing, adjusting and balancing work until the following conditions have been met:

1. Work has been completed and is operable. Ensure that there is no

latent residual work yet to be completed on the tested equipment.

2. Work scheduled for testing, adjusting and balancing is clean and free from debris, dirt and discarded building materials.

3. All architectural openings (doors, windows, and other openings)

which may affect the operation of the system to be tested, adjusted, and balanced shall be positioned at their normal states.

4. All related mechanical systems which may affect the operation of the

system to be tested, adjusted, and balanced shall be at their normal operating conditions.

PART 2 - PRODUCTS 2.01 PATCHING MATERIALS

A. Material: Seal, patch and repair ductwork, piping and equipment drilled or

cut for testing purposes.

1. Plastic plugs with retainers may be used to patch drilled holes in ductwork and housings.

2. Piping shall be capped with materials the same as the piping system.

3. Insulation shall be neatly hemmed with metal or plastic edging,

leaving test points visible for future testing. 2.02 TEST INSTRUMENTS

A. Standards: Utilize instruments and equipment of type, precision, and

capacity as recommended in the following standards:

1. NEBB "Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems."

2. AABC Manual MN-1.

B. Test Instruments: All instruments used for measurements shall be accurate

and calibration histories for each instrument shall be available for

Page 22: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-5

examination. Each test instrument shall be calibrated by an approved laboratory or by the manufacturer. The Owner or Engineer has the right to request instrument recalibration, or the use of other instruments and test methodology, where accuracy of readings is questionable.

C. Additional Instruments: Permanently installed measuring instruments, such

as temperature and pressure gauges, shall be verified with standard portable instruments. Any instrument which does not meet specification requirement shall be replaced or recalibrated.

D. Cone Instruments: The Contractor shall employ manufactured enclosure type

cones, capable of air volume direct readings, for all diffuser air flow measurements, as applicable. The readout meters shall meet calibration requirements.

PART 3 - EXECUTION 3.01 PROCEDURES AND INSTRUMENTS, GENERAL

A. Requirements: All systems and components thereof shall be adjusted to

perform as required by drawings and specifications.

B. Test Duration: Operating tests of Heating and Cooling Terminal Units, fans, and other equipment shall be of not less than four hours duration after stabilized operating conditions have been established. Capacities shall be based on temperatures and air and water quantities measured during such tests.

C. Instrumentation: Method of application of instrumentation shall be in

accordance with the approved agenda.

1. All instruments shall be applied in accordance with the manufacturer's certified instructions.

2. All labor, instruments, and appliances required shall be furnished by

the Contractor. Permanently installed instruments used for the tests (e.g., flow meters) shall not be installed until the entire system has been cleaned and ready for operation.

3.02 AIR SYSTEM PROCEDURES

Page 23: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-6

A. Adjustments: Adjust all air handling systems to provide approximate design

air quantity to or through each component, and to maintain stable and comfortable interior temperatures, free of drafts or stagnant conditions. Adjusting and balancing of all systems shall be conducted during periods of the year approximating maximum seasonal operation, with all other ancillary systems in simultaneous operation.

B. Equalizers: Equalizing devices shall be adjusted to provide uniform velocity

across the inlets (duct side for supply) of terminals prior to measuring flow rates.

C. Balance: Flow adjusting (volume control) devices shall be used to balance

air quantities (i.e., proportion flow between various terminals comprising system) to the extent that their adjustments do not create objectionable air motion or sound (i.e., in excess of specified limits).

1. Balancing between runs (submains, branch mains, and branches)

generally shall be accomplished by flow regulating devices at, or in, the divided-flow fitting.

2. Restriction imposed by flow regulating devices in or at terminals

shall be minimal. Final measurements of air quantity shall be made after the air terminal has been adjusted to provide the optimum air patterns of diffusion.

D. Fan Adjustment: Total air system quantities, generally, shall be varied by

adjustment of fan speeds in accordance with air system data. Damper restriction of a system's total flow may be used only for systems with direct-connected fans (without adjustable pitch blades), provided system pressure is less than ½-inch W.G. and sound level criteria is met.

E. Air Measurement: Where air quantity measuring devices are specified in

other sections such systems shall be used as a cross-check of portable measuring equipment.

1. Except as specifically indicated herein, pitot tube traverses shall be

made of each duct to measure air flow therein. Pitot tubes, associated instruments, traverses, and techniques shall conform to the ASHRAE "Handbook Fundamentals Inch Pound Edition."

2. Where the duct design velocity and air quantity are both less than 1000 (fpm/cfm), air quantity may be determined by measurements at terminals served.

Page 24: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-7

F. Test Holes: Test holes shall be in a straight duct, as far as possible

downstream from elbows, bends, take-offs, and other turbulence generating devices, to optimize reliability of flow measurements.

G. Air Motion: Air motion and distribution shall be as specified and indicated

on drawings. The Contractor at no additional cost shall, in addition to air motion measurements, make smoke tests wherever requested to demonstrate the air distribution from air terminals.

3.03 CERTIFIED REPORTS

A. Submittals: Three copies of the reports described herein, covering air system

performance, air motion (fpm) shall be submitted prior to final tests and inspection.

B. Instrument Records: Types, serial numbers, and dates of calibration of all

instruments shall be included.

C. Reports: Reports shall conspicuously identify items not conforming to contract requirements, or obvious mal-operation and design deficiencies.

D. Certification: The reports shall be certified by an independent Registered

Professional Engineer who is versed in the field of air balancing and who is not affiliated with any firm involved in the design or construction phases of the project. Certification shall include checking of adherence to agenda, of calculations, of procedures, and evaluation of final summaries.

3.04 AIR SYSTEM DATA

A. Report: The certified report shall include, for each air handling system, the

data listed below.

1. Equipment:

a. Installation data

(1) Manufacturer and model (2) Size (3) Arrangement, discharge and class (4) Motor Hp, voltage, phase, cycles, and full load amps (5) Location and local identification data

Page 25: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-8

b. Design data

(1) Data listed in schedules on drawings and specifications.

c. Fan recorded (test) data

(1) cfm (2) Static pressure (3) rpm (4) Motor operating amps, motor operating bhp

2. Duct Systems:

a. Duct air quantities (maximum and minimum) - main,

submains, branches, outdoor (outside) air, total air, and exhaust

(1) Duct size(s) (2) Number of Pitot tube (pressure measurements) (3) Sum of velocity measurements (Note: Do not add

pressure measurements) (4) Average velocity (5) Recorded (test) cfm vs. design cfm

b. Individual air terminals

(1) Terminal identification supply or exhaust, location

and number designation

(2) Type, size, manufacturer and catalog identification applicable factor for application, velocity, area, etc., and designated area

(3) Design and recorded velocities - fpm (state "core,"

"inlet," etc., as applicable)

(4) Design and recorded quantities - cfm deflector vane or diffusion cone settings

3.05 FINAL COMMISSIONING TESTS, INSPECTIONS AND ACCEPTANCE

A. Scope: Tests shall be made to demonstrate that capacities and performance

of air and water systems comply with contract requirements.

Page 26: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-9

1. At the time of final inspection, the Contractor shall recheck a random

selection of data (air quantities and air motion) recorded in the certified report.

2. Points and areas for recheck shall be selected by the Engineer.

3. Measurement and test procedures shall be the same as approved for

work forming basis of certified report.

4. Selections for recheck (specific plus random), in general, will not exceed 25 percent of the total number tabulated in the report, except that special air systems may require a complete recheck for safety reasons.

B. Retests: If random tests show a measured flow deviation of 10 percent or

more from, or a sound level of 2 db or more greater than, that recorded in the certified report listings, for 10 percent or more of the rechecked selections, the report shall be automatically rejected. In the event the report is rejected, all systems shall be readjusted and tested, new data recorded, new certified reports submitted, and new inspection tests made, all at no additional cost.

C. Marking of Settings: Following final acceptance of certified reports, the

settings of all valves, splitters, dampers, and other adjustment devices shall be permanently marked by the Contractor so that adjustment can be restored if disturbed at any time. Devices shall not be marked until after final acceptance.

END OF SECTION

Page 27: Addendum #01 Occoquan Forest SPS #37 Rehabilitation 1922... · 2020. 1. 6. · Addendum 1 IFB SA-1922 3 | P a g e RESPONSES TO QUESTIONS FOR CLARIFICATION SOLICITATION NO. IFB SA-1922

Occoquan Forest: SPS #36 Replacement & HVAC TESTING, ADJUSTING SPS #37 Rehabilitation AND BALANCING

15950-10

THIS PAGE

INTENTIONALLY

LEFT BLANK