Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 2 of 14

Half yearly Compliance report for Environment and CRZ Clearance for the development of

Solid Cargo Port Terminal Phase – I and Phase – II.

Sr.

No. Specific Conditions Compliance

P2(i) All the conditions stipulated by Ministry of

Environment and Forests, Regional Office,

Western Region, Bhopal vide their latter No. 6-

GJ060/2006-BHO/1508, dtd., 16.6.2008 shall be

strictly adhered to

Complying with

P2(ii) All the conditions stipulated by Forest and

Environment Department, Govt. of Gujarat vide

their latter No.-FCA-1006(10-9)SF-76-K, dated.,

1.7.2008 dated 16.6.2008 shall be strictly

adhered to

Complying with

P2(iii) No reclamation will be carried out for the activity

Complied. Project has been developed within

existing land without any reclamation.

P2(iv) All the conditions stipulated by the Gujarat

Coastal Zone Management Authority including

Ministry of Environment and Forests clearance

dated 16.6.2008 under the Forest Conservation

Act shall complied.

Complying with

P2(v),

P1(i)

Sewage Treatment Plant should be included in

the project

Complied. Two Sewage Treatment Plant of

capacity 25 M3 / day and 2 M3 / day has been

installed and are in operations

P2(vi),

P1(ii)

Afforestation in 200 ha. with mangroves should

be undertaken under the project, as identified by

the Gujarat Forest Department

Mangrove afforestation has been carried out

in an area of 400 ha . Details are given below.

1. 100 ha near village Dandi,

Dist Surat– 2011

2. 50 ha near village Jakhau,

Dist Kutch – 2011

3. 50 ha near Padri bit,

Dist Bhavnagar – 2011

4. 200 ha near Malpur,

Dist Jambusar – 2013-14

P2(vii) Afforestation @1:3 shall be carried out in case of

any trees to be cut.

Complied. Details of afforestation were

submitted along with the half-yearly

compliance report dated 27th May, 2014 and

there is no further change.

P2(viii),

P1(iii)

The recommendations of the Risk Assessment

Report should be incorporated

Complied. Risk Assessment Report was

submitted along with compliance report dt.

20th February, 2008. The recommendation of

risk assessment are incorporated and

followed during construction and operation

phases.

P2(ix),

P1(v)

The materials for the filling and pavement

construction should be made available from

Complied. Construction of the project was

completed in February 2011.

Page 3: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 3 of 14

Half yearly Compliance report for Environment and CRZ Clearance for the development of

Solid Cargo Port Terminal Phase – I and Phase – II.

Sr.

No. Specific Conditions Compliance

approved quarries

P2(x),

P1(vi)

Sufficient fixed and mobile firefighting system

should be provided exclusively for the terminal in

consultation with the local statutory bodies.

Complied. Details of the fire-fighting system

were submitted along with the half-yearly

compliance report dated 27.05.2014 and there

is no further change.

P2(xi),

P1(x)

All development in the port should be carried out

in accordance with the Coastal Regulation Zone

Notification, 1991 and approved Coastal Zone

Management Plan of Gujarat.

Complied. Construction has been completed

in February 2011 and same is carried out in

accordance with CRZ Notification 1991.

P2(xii), P1(xi)There shall be no withdrawal of ground water in

CRZ area for this project. The proponent should

ensure that as a result of the proposed

constructions, ingress of saline water into ground

water does not take place. Peizometers shall be

installed for regular monitoring for this purpose

at appropriate locations on the project site.

Complied. Ground water is not tapped in CRZ

area for the project.

Two Piezometers has been installed at

different locations inside port. Regular

monitoring of ground water level & quality is

being monitored through accredited

laboratory. Copies of reports are enclosed as

Annexure 1.

P2(xiii),

P1(xii)

The project shall not be commissioned till the

requisite water supply and electricity to the

project are provided by the PWD/Electricity

Department.

Project is commissioned after obtaining

permission from PWD and Electricity

Department.

1. GIDC permission dtd 19.02.2013

2. Electricity Department approval dtd

18.02.2011

P2(xiv),

P1(xiii)

Specific arrangements for rain water harvesting

shall be made in the project design and the rain

water so harvested shall be optimally utilized.

Details in this regard shall be furnished to this

Ministry’s Regional Office at Bhopal within 3

months

The feasibility study for rain water harvesting

was conducted. Report was submitted along

with the half-yearly compliance report dated

22.05.2015.

P2(xv),

P1(xv)

No land reclamation should be carried out for

this project.

Complied. Project has been developed within

existing land without any reclamation.

P2(xvi)

,P1(xvi)

Green buffer zone should be provided all around

the project area in consultation with local forest

department and report submitted to this

Ministry’s Regional Office at Bhopal.

Considering the expansion plan, Green belt is

being developed on periphery of the project

boundary. So far 6.0 ha of Green belt is

developed which mainly includes casuarina,

wasigtonia palm, cassia samiea,

__peltoforum, delonix regia, ficus sps.

P2(xvii)

,P1(xiv)

The facilities to be constructed in the CRZ area as

part of this project should be strictly in

conformity with the provisions of the CRZ

Complied. Construction of the project was

completed in February 2011 and same is in

conformity with the provisions of the CRZ

Page 4: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 4 of 14

Half yearly Compliance report for Environment and CRZ Clearance for the development of

Solid Cargo Port Terminal Phase – I and Phase – II.

Sr.

No. Specific Conditions Compliance

Notification, 1991 as amended subsequently. Notification 1991..

P2(xviii),

P1(xvii)

No product other than those permissible in the

Coastal Regulation Zone Notification, 1991

should be stored in the Coastal Regulation Zone

area.

Complied. APPPL is handling dry cargo mainly

coal and other bulk cargos at designated

storage areasas per approval.

P1(iv) Location of general cargo berth should be taken

in to considerations with regard to location of

LNG terminal

Complied. General cargo berth (Solid Cargo

Port Terminal jetty) is approx. 500 m away

from the LNG jetty of Petronet LNG Ltd.

P1(vii) The wave tranquility study and the ship

maneuvering studies carried out should be taken

in to account while operating the Port.

Complied. Ship mooring study and wave

tranquility studies were carried out to

understand the wind wave and swell wave

conditions. The recommendations are being

regularly followed during port operations.

P1(viii) The project proponent should ensure that during

construction and operation of the port there will

be no impact on the livelihood of the fisherman.

The fisherman should be provided free access to

carry out the fishing activity.

Complied. There is no impact on fishermen

livelihood due to project activity and free

access to the “Pagadiya” fishermen has been

already provided. However, there is no

commercial fishing in the area.

P1(ix) All necessary precaution while undertaking

construction and operation of the port should be

taken keeping in view the bathymetric changes

caused due to cyclones.

Complied. Construction activities are

completed in February, 2011. APPPL has a

well-defined DMP and regular mock drills are

being conducted. DMP is also reviewed at

regular interval.

General Conditions

P2(i),

P1(i)

Construction of proposed structures shall be

undertaken meticulously conforming to the

existing Central/local rules and regulations

including Coastal Regulation Zone Notification

1991 & its amendments. All the construction

designs/drawings relating to the proposed

construction activities must have approvals of

the concerned state Government

Departments/Agencies.

Complied. All the development activities are

being taken up in accordance with the CRZ

notification, 1991 & its subsequent

amendments.

The approval for the project has been

obtained from concern government

department that is GMB as per their NOC

date 27 Jan 2006.

Necessary approval has been obtained from

GIDC for the setting of the project.

P2(ii),

P1(ii)

Adequate provision for infrastructure facilities

such as water supply, fuel, sanitation etc. should

be ensured for construction workers during the

construction phase of the project so as to avoid

felling of trees/mangroves and pollution of water

and the surrounding.

Complied. Construction of the project was

completed on February 2011.

Page 5: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 5 of 14

Half yearly Compliance report for Environment and CRZ Clearance for the development of

Solid Cargo Port Terminal Phase – I and Phase – II.

Sr.

No. Specific Conditions Compliance

P2(iii),

P1(iii)

The project authorities must make necessary

arrangements for disposal of solid waste and for

the treatment of effluents by providing a proper

wastewater treatment plant outside the CRZ

area. The quality of treated effluents, solid

wastes and noise level etc. must conform to the

standards laid down by the competent

authorities including the Central/State Pollution

Control Board and the Union Ministry of

Environment and Forest under the

Environmental (Protection) Act, 1986, whichever

are more stringent.

The Project activity is not generating any

trade effluent.

The monitoring results for the period from

Oct,15 to March, 16 are enclosed as Annexure

– 1

P2(iv),

P1(iv)

The proponent shall obtain the requisite

consents for discharge of effluents and emission

under the Water (Prevention and Control of

Pollution) Act, 1974 and the Air (Preventio0n and

Control of Pollution) Act, 1981 form the Gujarat

State Pollution Control Board before

commissioning of the project and a copy of each

of these shall be sent to this Ministry.

Comlied. APPPL has obtained CC&A AWH

73359 from GPCB which is valid up to

16/7/2020.

P2(v),

P1(v)

The proponent shall provide for a regular

monitoring mechanism so as to ensure that the

treated effluents conform to the prescribed

standards. The record of analysis reports must be

properly maintained and made available for

inspection to the concerned State/Central

officials during their visits.

Complied. Domestic effluent is being treated

in STPs. The treated water confirming to the

norms is being used for horticulture purpose.

The monitoring results of the treated

wastewater from STP for the period from Oct

2015 – March 2016 are enclosed as Annexure

– 1

P2(vi),

P1(vi)

In order to carry out the environmental

monitoring during the operational phase of the

project, the project authorities should provide an

environmental laboratory well equipped with

standard equipment and facilities and qualified

manpower to carry out the testing of various

environmental parameters.

APPPL has engaged NABL accredited and

MoEF recognised laboratory for

environmental monitoring. The monitoring

results for the period from Oct 2015 – Mach

2016 are enclosed as Annexure – 1

P2(vii),

P1(vii)

The sand dunes and mangroves, if any on the site

should not be disturbed in any way.

Complying with

P2(viii),

P1(viii)

A copy of the clearance letter will be marked to

the concern Panchayat/local NGO, if any, from

whom any suggestion/representation has been

received while processing the proposal.

Complied.

P2(ix),

P1(ix)

The Gujarat State Pollution Control Board should

display a copy of the clearance letter at the

This condition does not belong to the project

proponent.

Page 6: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 6 of 14

Half yearly Compliance report for Environment and CRZ Clearance for the development of

Solid Cargo Port Terminal Phase – I and Phase – II.

Sr.

No. Specific Conditions Compliance

Regional Office, District Industries Centre and

Collector’s Office/Tehsildar’s Office for 30 days.

P2(x),

P1(x)

The fund earmarked for environment protection

measures should be maintained in a separate

account and there should be no diversion of

these funds for any other purpose. A year-wise

expenditure on environmental safeguards should

be reported to this Ministry’s Regional Office at

Bhopal and the State Pollution Control Board.

Complied. Separate budget is allocated for

Environmental Management. Key

components of environment budget are

environmental Monitoring, STP’s (Operations

and Maintenance), Closed Conveyor System

Maintenance and etc. The allocation of

budget for Environment Cell for the FY 2015-

16 was approx. Rs. 126 lacs. Details of the

environmental budget and expenditure for

the FY 15-16 is enclosed as Annexure – 2

P2(xi),

P1(xi)

Full support should be extended to the officers of

this Ministry’s Regional Office at Bhopal and the

officers of the Central and State Pollution

Control Boards by the project proponents during

their inspection for monitoring purposes, by

furnishing full details and action plans including

the action taken reports in respect of mitigative

measures and other environmental protection

activities.

Complied. Full support is always extended to

the officers of Ministry/Regional Office, MoEF

as well as officers of Central and State

Pollution Control Board.

P2(xii),

P1(xii)

In case of deviation or alteration in the project

including the implementing agency, a fresh

reference should be made to this Ministry for

modification in the clearance conditions or

imposition of new ones for ensuring

environmental protection.

Noted and complied with.

P2(xiii),

P1(xiii)

This Ministry reserves the right to revoke this

clearance, if any of the conditions

stipulated are not complied with to the

satisfaction of the Ministry.

Noted.

P2(xiv),

P1(xiv)

This Ministry or any other competent authority

may stipulate any other additional conditions

subsequently, if deemed necessary, for

environmental protection, which shall be

complied with.

Noted.

Page 7: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 7 of 14

Half yearly Compliance report for Environment and CRZ Clearance for the development of

Solid Cargo Port Terminal Phase – I and Phase – II.

Sr.

No. Specific Conditions Compliance

P2(xv),

P1(xv)

The project proponent should advertise at least

in two local newspapers widely circulated in the

region around the project, one of which shall be

in the vernacular language of the locality

concerned informing that the project has been

accorded environmental clearance and copies of

clearance letters are available with the State

Pollution Control Board and may also be seen at

Website of the Ministry of Environment & Forest

at http://www.envfornic.in .The advertisement

should be made within 7 days from the date of

issue of the clearance letter and a copy of the

same should be forwarded to the Regional Office

of this Ministry at Bhopal.

Complied. Advertisement of phase 1 approval

was published in Gujarati language in

“Sandesh” newspaper dated 01/09/2007 and

in English language in “GUJARAT

SAMACHAR” newspaper dated 11.9.2007.

Advertisement of phase 2 approval was

published in gujarati language in “Divya

Bhaskar” newspaper and in English language

in “The Times of India” dated 19/11/2008.

P2(xvi),

P1(xvi)

The Project proponents should inform the

Regional Office at Bhopal as well as the Ministry

the date of financial closure and final approval of

the project by the concerned authorities and the

date of start of Land Development Work.

Financial closure date of Project was 31st July

2007.

Existing Facility – construction started date

July 2007. Land development work for phase

II stared in Jan. 2009.

The approval for the project has been

obtained from concern government

department that is GMB as per their NOC

date 27 Jan 2006.

Necessary approval has been obtained from

GIDC for the setting of the project.

P2(xvii) Any appeal against this environment clearance

shall lie with the National Environment Appellate

Authority, if preferred, within a period of 30 days

as prescribed under Section 11 of the National

Appellate Act, 1997

Noted.

Page 8: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 8 of 14

Compliance to the conditions stipulated in CRZ

clearance/ recommendation for proposed cargo

port terminal phase I and II at Dahej

Page 9: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 9 of 14

Half yearly Compliance report for CRZ Clearance/recommendation for development of Solid Cargo

Port Terminal Phase – I and Phase – II

Sr. no. Conditions Status/Action taken

P2(1),

P1(1)

The provisions of the CRZ notification of 1991

and subsequent amendments issued from

time to time shall be strictly adhered to by the

APPL. No activity in contradiction to the

provisions of the CRZ Notification shall be

carried out by the APPL.

Complied. All the activities are being

complying with the provisions of the CRZ

notification and subsequent amendments.

P2(2),

P1(2)

All necessary permissions from different

Government Departments / agencies shall be

obtained by the APPL before commencing

the expansion activities.

Complied. All the necessary permissions have

been obtained by M/s. APPPL.

P2(3),

P1(5)

The APPL shall carry out the construction

activities either in the CRZ area or into the sea

/ estuary only after having the detailed study

with respect to chances of erosion / accretion

due to the proposed activities conducted

through the NIO and vetted through the

CWPRS and shall implement all necessary

steps / actions as may be suggested by these

institutes for mitigating the potential

negative impacts including the checking of

erosion and/or accretion in the region.

Further, the company shall have to have the

construction drawings approved for this

purpose through a competent agency before

undertaking any construction and/or enabling

activities at the site

Complied. Construction of the port was

completed in February 2011. All the

recommendations of the EIA for construction

phase were implemented.

P2(4),

P1(7)

The APPL shall have to face the consequences

whatsoever due to implementation of the

Kalpsar Project proposed by the Government

of Gujarat and shall have to take all necessary

actions as may be desired by the

Government, from time to time.

Noted

Page 10: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 10 of 14

Half yearly Compliance report for CRZ Clearance/recommendation for development of Solid Cargo

Port Terminal Phase – I and Phase – II

Sr. no. Conditions Status/Action taken

P2(5),

P1(10)

No dredging and/or reclamation activity shall

be carried out in the CRZ area categorized as

CRZ I (i) and it shall have to be ensured that

the mangrove habitats and other ecologically

important and significant areas are not

affected due to any of the project activities.

No dredging/reclamation have been done in

CRZ I (i) .

There is no notified ecologically important

and significant area present in the project

vicinity.

P2(6),

P1(11)

No effluent or sewage shall be discharged into

the sea / creek or in the CRZ area and shall be

treated to conform to the norms prescribed

by the Gujarat Pollution Control Board and

would be reused / recycled within the plant

premises to the extract possible.

Complied. No effluent is being discharged

into the sea/creek. Domestic effluent is being

treated in STPs. The treated water confirming

to the norms is being used for horticulture

purpose.

P2(7),

P1(12)

All the recommendations and suggestions

given by the NIO in the Comprehensive

Environment Impact Assessment report for

conservation / protection and betterment of

environment shall be implemented strictly by

the APPL.

All the recommendations and suggestions

given by NIO are being complied.

P2(8),

P1(13)

The construction and operational activities

shall be carried out in such a way that there is

no negative impact on mangroves and other

coastal/marine habitat. The construction

activities shall be carried out only under the

constant supervision of the NIO.

Complied. Construction of the project was

completed on February 2011.

P2(9),

P1(14)

The APPL shall strictly ensure that no creeks

are blocked due to any activity at port and the

mangroves habitat are neither disturbed nor

destroyed due to any activity.

Complied. No creeks are blocked due to port

activity.

P2(10),

P1(15)

The APPL shall participate financially for any

common facility that may be established or

any common study that may be carried out

for the Gulf of Khambhat region for

environmental protection and/or

management purpose.

Noted. APPPL is committed for the

environment protection.

P2(11),

P1(16)

The construction debris and/or any other type

of waste shall not be disposed into the sea,

creek or in the CRZ areas. The debris shall be

removed from the construction site

immediately after the construction is over.

Complied. Construction of the project was

completed on February 2011. All the debris

has been removed.

Page 11: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 11 of 14

Half yearly Compliance report for CRZ Clearance/recommendation for development of Solid Cargo

Port Terminal Phase – I and Phase – II

Sr. no. Conditions Status/Action taken

P2(12),

P1(17)

The construction camps shall be located

outside the CRZ area and the construction

labour shall be provided the necessary

amenities, including sanitation, water supply

and fuel and it shall be ensure that the

environmental conditions are not

deteriorated by the construction labours.

Complied. Construction of the project was

completed on February 2011.

P2(13),

P1(18)

The APPL shall prepare and regularly update

their Local Oil Spill Contingency and Disaster

Management Plan in consonance with the

National Oil Spill and Disaster Contingency

plan and shall submit the same to this

Department after having it vetted through

the India Coast Guard.

Noted and complied

Oil Spill Contingency Plan is submitted to

Coast Guard, Gandhinagar for verification

vide letter dated. 10/10/2012.

P2(14),P

1(19)

The APPL shall bear the cost of the external

agency that may be appointed by this

Department for supervision/monitoring of

proposed activities and the environmental

impacts of the proposed activities.

Noted

P2 (15) The mangrove plantation in 50 ha. of area on

Gujarat cost line shall be carried out by the

applicant in a phased manner in five years

Complied. Mangrove afforestation has been

carried out in an area of 400 ha. Details are

given below.

5. 100 ha near village Dandi,

Dist Surat– 2011

6. 50 ha near village Jakhau,

Dist Kutch – 2011

7. 50 ha near Padri bit,

Dist Bhavnagar – 2011

8. 200 ha near Malpur,

Dist Jambusar – 2013-14

P2 (16) The construction activities in the Forest land

and the Gauchar land shall be carried out as

per the permission accorded by the

concerned Authority for the said purpose

Complied. Construction of the project was

completed on February 2011.

Page 12: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 12 of 14

Half yearly Compliance report for CRZ Clearance/recommendation for development of Solid Cargo

Port Terminal Phase – I and Phase – II

Sr. no. Conditions Status/Action taken

P1(3) The APPL shall take up massive mangrove

plantation in 200 ha of area in and around the

project site or at an alternative site to be

selected in consultation with this

Department.

Complied. Mangrove afforestation has been

carried out in an area of 400 ha. Details are

given below.

1. 100 ha near village Dandi,

Dist Surat– 2011

2. 50 ha near village Jakhau,

Dist Kutch – 2011

3. 50 ha near Padri bit,

Dist Bhavnagar – 2011

4. 200 ha near Malpur,

Dist Jambusar – 2013-14

P1(4) The approach road and trestle passing

through the forestland shall be constructed

only after obtaining necessary permissions

under the relevant forest laws including the

forest (Conservation) Act. further, no activity

shall be carried out in the forestland or in the

area having natural plantation / forest till all

mandatory clearances under various Forest

Acts including the Forests Conservation Act

obtained.

All the activities on forest land have been

started only after obtaining forest land

clearance.

P1(6) The project proponent shall have to make a

separate application and shall have to obtain

prior clearance under the CRZ Notification for

any activities other than those proposed and

got approved as part of this phase I activities.

Complied. APPPL had obtained

Environmental & CRZ Clearance on Nov 11,

2008 for phase 2.

P1(8) The project proponents shall ensure that the

local people shall be provided with an

alternative access to the sea in case the

existing access to Rock-Bund could not be

made available to them.

Alternative access to the sea is available

adjoining to the project site.

P1(9) The project proponents shall ensure that the

construction period shall be reduced by

proper planning and executing the

construction program in time-bound manner

to avoid any time over-run.

Complied. Construction of the project was

completed in February 2011.

P1(20) The jetty and most of the approach would be

supported on piles allowing adequate flow of

water without significant obstruction.

Complied. The jetty and most of the approach

of 1270 meter is supported on piles allowing

adequate flow of water without significant

obstruction.

General Conditions

P2(17),P

1(21)

The groundwater shall not be tapped by the

APPPL to meet with the water requirements

Complied. No ground water is being tapped

by APPPL and water demand is met through

Page 13: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 13 of 14

Half yearly Compliance report for CRZ Clearance/recommendation for development of Solid Cargo

Port Terminal Phase – I and Phase – II

Sr. no. Conditions Status/Action taken

in any case. GIDC

P2(18),P

1(22)

The APPL shall take up massive green belt

development activities in consultation with

the Gujarat Institute of Desert Ecology/Forest

Department. A comprehensive plan for this

purpose has to be submitted to the Forests

and Environment Department.

Complied. Green belt is being developed in an

area of 6.0_ha including periphery of the

project boundary.

P2(19),P

1(23)

The APPL shall have to be contributing

financially for taking up the socio-economic

up-liftment activities in this region in

consultation with the Forests and

Environment Department and the District

Collector/District Development Officer.

Complied. The CSR activities are executed at

group level by Adani Foundation. Adani

Foundation is taking care of Social-economic

establishment activities and details of the

same for the period of Oct 2015–March 2016

is attached as Annexure – 3

P2(20),

P1(24)

A separate budget shall be earmarked for

environmental management and socio –

economic activities and details thereof shall

be furnished to this department as well as the

MoEF, GOI. The details with respect to the

expenditure from this budget head shall also

be furnished.

Complied. Separate budget is allocated for

Environmental Management and Socio

Economic activities.

• Key components of environment budget

are environmental Monitoring, STP’s

(Operations and Maintenance), Closed

Conveyor System Maintenance and etc. The

allocation of budget for Environment Cell

for the FY 2015-16 was approx. Rs. 126 lacs.

Details of the environmental budget and

expenditure for the FY 15-16 is enclosed as

Annexure – 2

• For Socio Economic activities funds are

being utilized in Education, Community

Health and Sustainable livelihood

development, Rural Infrastructure

development etc. Details with expenditure

is enclosed as Annexure – 3

P2(21),P

1(25)

A separate environmental management cell

with qualified personnel shall be created for

environmental monitoring and management

during construction and operational phases of

the project.

Complied. APPPL has a well structured

Environment Management Cell, staffed with

qualified manpower for implementation of

the Environment Management Plan.

P2(22),

P1(26)

Environmental Audit report indicating the

changes, if any, with respect to the baseline

environmental quality in the coastal and

marine environment shall be submitted every

year by the APPL to this Department as well

Sea water and sediment is being monitored

through NABL accredited agency. Monitoring

Report for the period Oct’15 to Mar’16 is

enclosed in Annexure 1

Page 14: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Adani Petronet (Dahej) Port Private Limited

From : Oct,15 To : March,16

Page 14 of 14

Half yearly Compliance report for CRZ Clearance/recommendation for development of Solid Cargo

Port Terminal Phase – I and Phase – II

Sr. no. Conditions Status/Action taken

as to the MoEF, GOI.

P2(23),P

1(28)

A six monthly report on compliance of the

condition mentioned in this letter shall have

to be furnished by the APPL on regular basis

to this Department.

Noted and Complied

.

P2(24),

P1(29)

Any other condition that may be stipulated by

this Department from time to time for

environmental protection/management

purpose shall also have to be complied with

by the APPL.

Noted.

P1(27) The APPL shall have to contribute financially

to support the National Green Corps scheme

being implemented in Gujarat by GEER

Foundation, Gandhinagar, in consultation

with Forests and Environment Department.

Complied. A request in this regard for asking

for the terms of Financial Contribution

submitted to the GEER Foundation vide letter

dated 17th April, 2009.

Page 15: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

1

CONTENTS

Sr. No. Title Page No.

1 AMBIENT AIR QUALITY MONITORING 2

2 SEA WATER & SEA SEDIMENT MONITORING 15

3 PIEZOMETRIC WATER QUALITY ANALYSIS 24

4 STP WATER QUALITY MONITORING 26

5 NOISE MONITORING 27

6 STACK MONITORING 47

Page 16: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

2

TABLE NO. 1.1 AMBIENT AIR QUALITY MONITORING LOCATIONS

SR.

NO. NAME OF LOCATION

1. NEAR MARINE BUILDING

2. NEAR PMC BUILDING

3. SUB STATION 7B BUILDING

4. GCPTL GATE

5. NEAR SILO POTA CABIN

6. S & S ENTERY GATE

PARAMETERS DETAILS:

PARAMETER UNIT LIMIT# TEST/SAMPLING METHOD

Particulate Matter (PM10) µg/m3 100 IS:5182(Part 23):Gravimetric CPCB -

Method (Vol.I,May-2011)

Particulate Matter (PM2.5) µg/m3 60 Gravimetric- CPCB - Method

(Vol.I,May-2011)

Lead as Pb µg/m3 1.0 CPCB Method

(Vol.I,May-2011)

Benzo (a) Pyrene (BaP)- particulate phase only

ng/m3 1.0 CPCB Method

(Vol.I,May-2011)

Arsenic as As ng/m3 6.0 CPCB Method

(Vol.I,May-2011)

Nickel as Ni ng/m3 20 CPCB Method

(Vol.I,May-2011)

Carbon Monoxide as CO mg/m3 4.0 NDIR Digital Gas Analyzer

Benzene as C6H6 µg/m3 5.0 IS 5182 (Part XI):2006/CPCB Method

Ammonia (NH3) µg/m3 400 CPCB Method

(Vol.I,May-2011)

Sulphur Dioxide (SO2) µg/m3 80 IS:5182(Part 2):

Improved West and Gaeke

Oxides of Nitrogen (NO2) µg/m3 80 IS:5182(Part 6):Modified Jacob &

Hochheiser (Na-Arsenite)

Ozone (O3) µg/m3 180 IS 5182 (PART IX) 1974/CPCB Method

(Vol.I,May-2011)

Page 17: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

3

TABLE NO. 1.2 AMBIENT AIR QUALITY MONITORING RESULTS – NEAR MARINE BUILDING

Date of Sampling

LOCATION 1 : NEAR MARINE BUILDING

PM10 PM2.5 Pb BaP As Ni CO C6H6 NH3 SO2 NOx O3

µg/m3

µg/m3

µg/m3

ng/m3

ng/m3

ng/m3

mg/m3

µg/m3

µg/m3

µg/m3

µg/m3

µg/m3

05/10/2015 80.18 42.65 BDL* BDL* BDL* BDL* 1.29 BDL* 27.47 28.47 27.83 26.78

06/10/2015 95.39 51.43 0.55 BDL* 2.34 10.66 1.02 BDL* 56.78 25.55 42.82 21.61

12/10/2015 85.52 39.72 BDL* BDL* BDL* BDL* 0.73 BDL* 30.83 12.57 39.43 23.2

13/10/2015 92.38 43.49 0.62 BDL* 2.45 10.38 0.94 BDL* 38.46 19.63 44.74 27.68

19/10/2015 79.19 35.69 BDL* BDL* BDL* BDL* 0.89 BDL* 39.68 21.59 36.39 30.37

20/10/2015 94.51 50.59 BDL* BDL* BDL* 10.29 1.13 BDL* 52.5 27.57 32.43 28.74

26/10/2015 89.4 45.58 0.54 BDL* BDL* BDL* 0.81 BDL* 47.62 18.57 38.64 22.65

27/10/2015 91.43 52.68 BDL* BDL* 2.18 10.58 0.65 BDL* 64.41 24.68 40.46 25.64

02/11/2015 81.49 44.74 BDL* BDL* BDL* BDL* 0.84 BDL* 47.92 25.36 36.57 25.57

03/11/2015 74.5 36.38 BDL* BDL* BDL* BDL* 1.19 BDL* 33.58 19.58 32.75 29.42

09/11/2015 91.52 51.43 0.58 BDL* 2.1 10.3 1.09 BDL* 49.15 21.5 42.54 21.47

10/11/2015 88.42 40.56 BDL* BDL* BDL* BDL* 0.68 BDL* 56.78 20.42 38.39 24.6

16/11/2015 94.52 53.33 0.68 BDL* BDL* 10.77 1.33 BDL* 23.2 23.44 40.52 28.62

17/11/2015 82.83 38.47 BDL* BDL* BDL* BDL* 0.77 BDL* 27.17 9.62 35.68 23.32

23/11/2015 90.89 52.68 0.54 BDL* 2.36 10.54 1.17 BDL* 54.64 22.6 29.49 26.46

24/11/2015 84.81 45.99 0.51 BDL* BDL* BDL* 0.86 BDL* 46.4 14.48 34.55 30.63

30/11/2015 95.52 54.36 0.72 BDL* 2.23 11.38 0.97 BDL* 32.36 15.49 39.88 27.43

01/12/2015 91.49 55.61 0.58 BDL* 2.22 10.82 1.01 BDL* 52.5 17.43 36.54 26.68

07/12/2015 79.52 42.65 BDL* BDL* BDL* BDL* 0.76 BDL* 29.7 22.36 31.36 31.91

08/12/2015 85.48 46.41 BDL* BDL* BDL* BDL* 0.62 BDL* 48.3 18.3 33.27 28.47

14/12/2015 72.71 34.7 BDL* BDL* BDL* BDL* 1.12 BDL* 36.6 21.67 28.65 24.24

15/12/2015 95.37 52.49 0.68 BDL* 2.54 10.42 0.89 BDL* 27.3 14.64 34.29 27.66

21/12/2015 88.39 40.56 BDL* BDL* BDL* BDL* 1.08 BDL* 45.9 19.66 39.54 29.68

22/12/2015 93.51 53.52 0.6 BDL* 2.42 11.67 1.25 BDL* 19.5 23.64 35.26 22.54

28/12/2015 81.58 41.39 BDL* BDL* BDL* BDL* 0.72 BDL* 24 20.37 30.57 25.2

29/12/2015 94.2 50.59 0.53 BDL* 2.18 10.51 0.81 BDL* 40.2 15.53 38.69 30.1

04/01/2016 86.3 48.5 BDL* BDL* BDL* BDL* 0.61 BDL* 27.47 22.53 28.65 22.66

05/01/2016 90.78 52.27 0.56 BDL* 2.36 10.48 0.53 BDL* 54.64 29.69 31.58 26.45

11/01/2016 82.5 41.39 BDL* BDL* BDL* BDL* 1.19 BDL* 62.27 19.66 35.69 28.57

12/01/2016 98.69 54.36 0.61 BDL* 2.77 11.28 0.76 BDL* 30.83 15.69 32.8 29.27

18/01/2016 75.69 44.51 BDL* BDL* BDL* BDL* 0.97 BDL* 41.21 23.45 26.73 25.35

19/01/2016 85.42 37.63 BDL* BDL* 2.42 BDL* 0.69 BDL* 68.07 16.46 37.56 30.29

25/01/2016 95.43 51.43 0.68 BDL* 2.64 10.52 0.95 BDL* 52.5 21.4 39.43 20.33

26/01/2016 78.43 43.49 BDL* BDL* BDL* BDL* 1.08 BDL* 21.67 25.6 33.27 27.59

01/02/2016 93.43 56.45 0.58 BDL* 2.18 10.3 1.33 BDL* 36.63 20.4 29.58 21.47

02/02/2016 70.87 39.72 BDL* BDL* BDL* BDL* 1.28 BDL* 40.6 25.7 39.58 27.65

08/02/2016 95.49 54.36 BDL* BDL* BDL* 10.43 1.51 BDL* 53.42 16.47 31.45 23.17

09/02/2016 80.41 37.63 BDL* BDL* 2.09 BDL* 1.1 BDL* 46.4 22.6 42.36 29.32

15/02/2016 76.53 40.73 BDL* BDL* BDL* BDL* 0.74 BDL* 23.81 19.44 32.52 26.63

Page 18: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

4

16/02/2016 86.82 46.41 0.61 BDL* BDL* BDL* 1.2 BDL* 51.59 23.72 38.39 22.51

22/02/2016 96.38 57.7 0.74 BDL* 2.45 10.57 0.93 BDL* 26.25 13.61 27.71 30.13

23/02/2016 72.07 42.65 BDL* BDL* BDL* BDL* 1.34 BDL* 18.62 21.47 30.15 19.5

29/02/2016 89.39 36.38 0.51 BDL* 2.06 BDL* 0.66 BDL* 48.54 24.34 35.46 24.6

01/03/2016 78.6 40.56 BDL* BDL* BDL* BDL* 1.01 BDL* 38.16 19.43 38.58 25.69

07/03/2016 88.6 46.41 0.63 BDL* BDL* BDL* 1.17 BDL* 46.7 24.5 34.22 22.23

08/03/2016 72.3 38.47 BDL* BDL* BDL* BDL* 0.71 BDL* 20.45 17.42 29.2 29.71

14/03/2016 86.5 41.39 0.54 BDL* 2.38 10.2 0.85 BDL* 54.64 12.65 24.75 26.15

15/03/2016 94.31 53.75 0.76 BDL* 2.84 10.34 0.89 BDL* 39.38 21.75 31.56 30.51

21/03/2016 80.27 35.54 BDL* BDL* BDL* BDL* 1.24 BDL* 32.36 15.76 36.39 21.2

22/03/2016 91.08 50.59 0.52 BDL* 2.46 10.44 1.37 BDL* 44.57 22.45 30.23 23.52

28/03/2016 67.49 32.61 BDL* BDL* BDL* BDL* 1.33 BDL* 15.57 18.59 39.45 24.23

29/03/2016 85.62 36.38 0.61 BDL* 2.36 BDL* 1.08 BDL* 29.61 20.63 27.67 27.56

BDL: Below Detection Limit *: Lead as Pb (µg/m3): 0.5, Benzo (a) Pyrene (BaP)-particulate phase only (ng/m3): 0.5, Ammonia NH3 (µg/m3): 10,

Carbon Monoxide as CO (mg/m3): 0.1, Benzene as C6H6 (µg/m3): 2, Arsenic as As (ng/m3): 2

Page 19: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

5

TABLE NO. 1.3 AMBIENT AIR QUALITY MONITORING RESULTS – NEAR PMC CANTEEN BUILDING

Date of

Sampling

LOCATION 2 : NEAR PMC CANTEEN BUILDING

PM10 PM2.5 Pb BaP As Ni CO C6H6 NH3 SO2 NOx O3

µg/m3

µg/m3

µg/m3

ng/m3

ng/m3

ng/m3

mg/m3

µg/m3

µg/m3

µg/m3

µg/m3

µg/m3

05/10/2015 67.8 36.52 BDL* BDL* BDL* BDL* 1.16 BDL* 31.79 15.7 41.56 21.42

06/10/2015 77.5 44.16 BDL* BDL* BDL* BDL* 0.69 BDL* 42.28 9.65 26.5 25.65

12/10/2015 96.49 50.53 0.54 BDL* 2.32 11.37 0.36 BDL* 20.68 7.43 21.1 27.64

13/10/2015 74.47 31.42 BDL* BDL* BDL* BDL* 0.79 BDL* 17.28 14.37 32.47 17.45

19/10/2015 82.08 42.46 BDL* BDL* BDL* BDL* 0.6 BDL* 22.53 17.39 27.3 20.39

20/10/2015 62.42 28.45 0.62 BDL* 2.23 BDL* 1.41 BDL* 33.64 16.49 25.43 24.5

26/10/2015 71.39 35.67 BDL* BDL* BDL* BDL* 0.55 BDL* 29.32 28.56 31.49 19.05

27/10/2015 58.6 24.63 BDL* BDL* BDL* BDL* 0.78 BDL* 13.58 11.4 39.41 28.55

02/11/2015 73.41 40.34 BDL* BDL* BDL* BDL* 0.38 BDL* 41.36 18.75 39.89 27.32

03/11/2015 85.41 42.46 0.57 BDL* 2.16 BDL* 0.6 BDL* 19.44 21.6 25.66 16.47

09/11/2015 74.42 36.52 BDL* BDL* BDL* BDL* 0.98 BDL* 36.11 6.62 22.64 18.47

10/11/2015 55.6 24.63 BDL* BDL* BDL* BDL* 0.81 BDL* 12.04 8.31 35.73 26.44

16/11/2015 67.52 30.57 BDL* BDL* BDL* BDL* 1.18 BDL* 29.32 12.34 37.62 17.69

17/11/2015 90.28 52.23 0.56 BDL* 2.42 10.17 0.37 BDL* 17.59 5.43 19.34 21.8

23/11/2015 60.49 34.82 BDL* BDL* BDL* BDL* 1.41 BDL* 28.7 13.74 23.56 24.63

24/11/2015 58.58 39.49 BDL* BDL* BDL* BDL* 0.57 BDL* 25.31 24.69 36.44 19.66

30/11/2015 72.01 26.33 BDL* BDL* BDL* BDL* 0.8 BDL* 15.12 11.54 29.54 22.44

01/12/2015 72.22 40.38 BDL* BDL* BDL* BDL* 0.9 BDL* 30.33 5.72 19.5 23.39

07/12/2015 65.52 36.52 BDL* BDL* BDL* BDL* 0.55 BDL* 35.79 16.7 36.41 27.57

08/12/2015 53.21 23.35 BDL* BDL* BDL* BDL* 0.73 BDL* 10.31 7.51 30.9 21.47

14/12/2015 87.2 41.61 BDL* BDL* 2.39 BDL* 0.66 BDL* 28.51 18.7 21.39 19.67

15/12/2015 70.7 30.57 BDL* BDL* BDL* BDL* 0.74 BDL* 13.04 10.75 25.17 29.47

21/12/2015 57.61 25.48 BDL* BDL* BDL* BDL* 1.29 BDL* 24.57 15.39 20.53 25.29

22/12/2015 64.5 37.37 BDL* BDL* BDL* BDL* 1.11 BDL* 34.58 11.42 32.39 28.69

28/12/2015 88.61 47.56 0.57 BDL* BDL* 10.56 0.34 BDL* 15.47 8.34 16.31 20.22

29/12/2015 56.81 29.72 BDL* BDL* BDL* BDL* 0.52 BDL* 21.53 22.76 31.47 18.42

04/01/2016 93.22 54.35 0.58 BDL* 2.08 10.25 0.31 BDL* 12.65 9.61 15.56 26.7

05/01/2016 56.88 21.23 BDL* BDL* BDL* BDL* 0.68 BDL* 39.5 17.43 29.38 21.59

11/01/2016 75.48 31.42 BDL* BDL* BDL* BDL* 0.8 BDL* 30.55 6.71 21.5 18.05

12/01/2016 61.51 35.67 BDL* BDL* BDL* BDL* 0.64 BDL* 19.44 11.35 24.63 20.43

18/01/2016 92.89 55.62 0.54 BDL* 2.46 10.33 0.57 BDL* 32.41 20.57 20.75 28.93

Page 20: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

6

19/01/2016 59.21 28.45 BDL* BDL* BDL* BDL* 0.46 BDL* 24.69 24.51 30.67 24.39

25/01/2016 65.4 23.78 BDL* BDL* BDL* BDL* 1.26 BDL* 46.6 16.45 19.27 22.47

26/01/2016 70.37 36.52 BDL* BDL* BDL* BDL* 0.98 BDL* 38.27 12.53 28.62 19.18

01/02/2016 83.52 45.43 BDL* BDL* BDL* BDL* 0.48 BDL* 40.74 18.71 35.26 30.14

02/02/2016 66.71 28.02 BDL* BDL* BDL* BDL* 0.7 BDL* 28.7 17.31 20.44 18.53

08/02/2016 78.62 42.46 BDL* BDL* BDL* BDL* 1.02 BDL* 23.46 6.59 18.61 21.49

09/02/2016 54.21 21.66 BDL* BDL* BDL* BDL* 0.6 BDL* 18.52 10.74 28.55 25.16

15/02/2016 84.91 52.65 0.52 BDL* BDL* BDL* 0.38 BDL* 10.8 8.41 15.53 23.33

16/02/2016 58.58 26.75 BDL* BDL* BDL* BDL* 1.4 BDL* 41.05 19.44 22.5 28.55

22/02/2016 79.53 41.61 BDL* BDL* BDL* BDL* 0.79 BDL* 16.36 5.43 32.45 26.41

23/02/2016 67.51 36.52 BDL* BDL* BDL* BDL* 1.21 BDL* 33.64 12.64 24.89 24.68

29/02/2016 55.58 22.5 BDL* BDL* BDL* BDL* 0.84 BDL* 26.23 14.6 21.58 27.71

01/03/2016 51.8 27.6 BDL* BDL* BDL* BDL* 0.54 BDL* 14.51 10.69 25.57 20.3

07/03/2016 65.41 30.57 BDL* BDL* BDL* BDL* 1.28 BDL* 31.48 18.68 22.37 24.15

08/03/2016 82.43 47.56 0.54 BDL* BDL* BDL* 0.34 BDL* 10.49 7.43 39.55 18.47

14/03/2016 70.31 28.45 BDL* BDL* BDL* BDL* 0.74 BDL* 46.6 5.72 30.45 21.53

15/03/2016 53.59 21.66 BDL* BDL* BDL* BDL* 0.81 BDL* 21.6 13.44 34.53 27.56

21/03/2016 67.43 29.72 BDL* BDL* BDL* BDL* 0.69 BDL* 48.45 23.78 19.61 25.68

22/03/2016 75.38 46.71 BDL* BDL* BDL* BDL* 0.94 BDL* 33.33 6.52 24.57 22.71

28/03/2016 83.6 41.61 BDL* BDL* BDL* BDL* 1.16 BDL* 27.47 11.55 29.61 26.35

29/03/2016 58.61 25.48 BDL* BDL* BDL* BDL* 0.53 BDL* 32.71 17.58 32.45 19.2

BDL: Below Detection Limit *: Lead as Pb (µg/m3): 0.5, Benzo (a) Pyrene (BaP)-particulate phase only (ng/m3): 0.5, Ammonia NH3 (µg/m3): 10, Carbon Monoxide as CO (mg/m3): 0.1, Benzene as C6H6 (µg/m3): 2, Arsenic as As (ng/m3): 2

Page 21: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

7

TABLE NO. 1.4 AMBIENT AIR QUALITY MONITORING RESULTS - SUB STATION 7B BUILDING

Date of

Sampling

LOCATION 3 : SUB STATION 7B BUILDING

PM10 PM2.5 Pb BaP As Ni CO C6H6 NH3 SO2 NOx O3

µg/m3

µg/m3

µg/m3

ng/m3

ng/m3

ng/m3

mg/m3

µg/m3

µg/m3

µg/m3

µg/m3

µg/m3

05/10/2015 94.59 51.37 0.56 BDL* BDL* 11.11 0.54 BDL* 18.33 23.47 22.31 23.22

06/10/2015 83.47 47.25 BDL* BDL* BDL* BDL* 0.93 BDL* 27.96 29.67 37.7 30.43

12/10/2015 61.48 28.61 BDL* BDL* BDL* 10.5 0.92 BDL* 23.92 20.37 34.73 20.28

13/10/2015 82.38 37.6 BDL* BDL* BDL* BDL* 0.42 BDL* 43.81 12.67 36.46 26.05

19/10/2015 91.52 48.46 0.61 BDL* 2.16 10.35 0.53 BDL* 13.36 24.44 33.12 25.53

20/10/2015 88.42 45.38 BDL* BDL* BDL* BDL* 0.47 BDL* 42.57 22.73 21.46 27.22

26/10/2015 95.52 54.18 0.64 BDL* 2.49 BDL* 1.12 BDL* 38.53 25.47 44.51 29.08

27/10/2015 78.5 40.31 BDL* BDL* BDL* BDL* 0.58 BDL* 29.52 15.49 23.69 21.74

02/11/2015 51.51 36.39 BDL* BDL* BDL* BDL* 0.52 BDL* 29.52 15.68 23.83 21.63

03/11/2015 69.48 32.51 0.52 BDL* BDL* BDL* 0.54 BDL* 11.19 17.72 28.41 24.47

09/11/2015 79.42 41.18 BDL* BDL* BDL* BDL* 0.87 BDL* 23.61 25.34 35.06 27.62

10/11/2015 80.41 33.42 BDL* BDL* BDL* BDL* 0.58 BDL* 25.17 18.44 22.57 22.61

16/11/2015 90.26 50.55 0.62 BDL* BDL* 10.3 0.53 BDL* 15.85 20.56 20.97 25.48

17/11/2015 54.62 24.4 BDL* BDL* BDL* BDL* 0.92 BDL* 19.89 16.42 32.45 26.59

23/11/2015 82.41 48.11 0.62 BDL* BDL* BDL* 0.48 BDL* 35.11 19.65 21.54 29.71

24/11/2015 89.79 55.05 0.54 BDL* BDL* BDL* 1.13 BDL* 32.62 21.41 41.47 23.63

30/11/2015 78.6 35.96 BDL* BDL* BDL* BDL* 0.42 BDL* 37.29 9.61 33.43 20.6

01/12/2015 78.6 45.38 BDL* BDL* BDL* BDL* 0.8 BDL* 19.24 22.67 30.54 28.54

07/12/2015 52.38 27.74 BDL* BDL* BDL* BDL* 0.46 BDL* 25.65 12.65 20.45 25.87

08/12/2015 76.62 42.48 BDL* BDL* BDL* BDL* 0.53 BDL* 40.31 10.44 36.54 24.4

14/12/2015 68.4 28.41 BDL* BDL* BDL* BDL* 0.49 BDL* 10.38 16.59 23.82 30.54

15/12/2015 89.42 41.36 BDL* BDL* BDL* BDL* 0.38 BDL* 30.54 8.39 28.28 23.55

21/12/2015 79.6 37.67 BDL* BDL* BDL* BDL* 0.5 BDL* 29.62 17.65 38.46 27.85

22/12/2015 87.75 46.38 BDL* BDL* BDL* BDL* 0.47 BDL* 13.74 13.54 17.73 18.54

28/12/2015 70.52 38.58 BDL* BDL* BDL* BDL* 0.82 BDL* 17.41 15.61 29.5 22.71

29/12/2015 88.43 48.38 BDL* BDL* BDL* BDL* 1 BDL* 26.57 19.42 35.89 20.48

04/01/2016 73.55 43.67 BDL* BDL* BDL* BDL* 0.74 BDL* 19.57 17.75 32.37 19.8

05/01/2016 80.63 33.38 0.51 BDL* BDL* BDL* 0.44 BDL* 44.43 11.44 36.54 27.62

11/01/2016 71.19 37.28 BDL* BDL* BDL* BDL* 0.72 BDL* 15.54 25.68 28.82 23.49

12/01/2016 93.19 45.54 0.54 BDL* 2.2 10.12 0.32 BDL* 34.49 9.59 21.53 24.72

Page 22: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

8

18/01/2016 70.47 39.69 BDL* BDL* BDL* BDL* 0.38 BDL* 12.43 18.44 31.57 22.9

19/01/2016 94.38 50.52 0.62 BDL* 2.15 10.35 0.88 BDL* 29.52 21.64 35.59 18.62

25/01/2016 83.75 46.38 BDL* BDL* BDL* BDL* 0.45 BDL* 32.94 19.74 30.42 29.46

26/01/2016 54.57 29.48 BDL* BDL* BDL* BDL* 0.4 BDL* 16.47 15.56 17.62 26.15

01/02/2016 68.51 38.53 BDL* BDL* BDL* BDL* 0.39 BDL* 28.59 14.73 19.77 28.44

02/02/2016 56.27 24.71 BDL* BDL* BDL* BDL* 0.47 BDL* 10.56 11.39 26.35 24.23

08/02/2016 65.59 29.48 BDL* BDL* BDL* BDL* 0.88 BDL* 13.67 21.59 23.3 26.51

09/02/2016 86.45 42.62 0.52 BDL* BDL* BDL* 0.98 BDL* 25.17 18.52 30.92 23.5

15/02/2016 61.32 32.59 BDL* BDL* BDL* BDL* 0.87 BDL* 17.4 15.59 27.55 21.26

16/02/2016 77.42 37.67 BDL* BDL* BDL* BDL* 0.56 BDL* 29.52 13.76 28.64 25.63

22/02/2016 85.63 46.38 BDL* BDL* BDL* BDL* 0.4 BDL* 30.45 8.76 18.27 20.7

23/02/2016 50.57 27.74 BDL* BDL* BDL* BDL* 0.49 BDL* 14.6 16.38 15.57 18.27

29/02/2016 73.51 30.4 BDL* BDL* BDL* BDL* 0.54 BDL* 38.53 9.33 31.15 29.31

01/03/2016 84.37 48.38 BDL* BDL* BDL* BDL* 0.88 BDL* 20.51 9.71 29.48 22.8

07/03/2016 76.5 34.68 BDL* BDL* BDL* BDL* 0.52 BDL* 25.79 12.64 25.74 29.61

08/03/2016 58.61 28.61 BDL* BDL* BDL* BDL* 0.78 BDL* 13.67 14.7 37.62 23.42

14/03/2016 81.58 37.6 BDL* BDL* BDL* BDL* 0.38 BDL* 32.31 21.72 16.72 25.37

15/03/2016 70.63 42.62 BDL* BDL* BDL* BDL* 0.5 BDL* 26.72 18.69 23.65 28.7

21/03/2016 54.31 23.55 BDL* BDL* BDL* BDL* 0.95 BDL* 16.16 10.55 26.36 30.71

22/03/2016 63.5 38.58 BDL* BDL* BDL* BDL* 0.72 BDL* 10.25 19.44 21.25 26.74

28/03/2016 92.39 52.45 0.55 BDL* 2.26 10.22 0.9 BDL* 22.68 15.47 24.53 20.64

29/03/2016 66.84 29.54 BDL* BDL* BDL* BDL* 0.37 BDL* 40.39 13.58 18.58 24.1

BDL: Below Detection Limit *: Lead as Pb (µg/m3): 0.5, Benzo (a) Pyrene (BaP)-particulate phase only (ng/m3): 0.5, Ammonia NH3 (µg/m3): 10, Carbon Monoxide as CO (mg/m3): 0.1, Benzene as C6H6 (µg/m3): 2, Arsenic as As (ng/m3): 2

Page 23: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

9

TABLE NO. 1.5 AMBIENT AIR QUALITY MONITORING - GCPTL GATE

Date of

Sampling

LOCATION 4 : GCPTL Gate

PM10 PM2.5 Pb BaP As Ni CO C6H6 NH3 SO2 NOx O3

µg/m3

µg/m3

µg/m3

ng/m3

ng/m3

ng/m3

mg/m3

µg/m3

µg/m3

µg/m3

µg/m3

µg/m3

05/10/2015 65.38 36.44 BDL* BDL* BDL* BDL* 0.95 BDL* 10.84 13.73 37.04 20.6

06/10/2015 90.42 54.68 BDL* BDL* 2.14 10.31 0.56 BDL* 33.76 22.4 21.21 19.39

12/10/2015 78.5 35.6 BDL* BDL* BDL* BDL* 0.39 BDL* 16.42 23.64 27.86 22.47

13/10/2015 56.51 22.2 BDL* BDL* BDL* BDL* 0.66 BDL* 25.09 7.44 28.57 24.56

19/10/2015 73.37 38.53 BDL* BDL* BDL* BDL* 0.44 BDL* 18.9 15.73 39.65 28.45

20/10/2015 58.42 29.32 BDL* BDL* BDL* BDL* 1.03 BDL* 29.43 9.61 35.54 22.42

26/10/2015 64.54 29.86 BDL* BDL* BDL* BDL* 0.45 BDL* 24.47 12.48 25.64 26.42

27/10/2015 97.89 55.29 0.54 BDL* BDL* 10.96 0.7 BDL* 40.58 18.74 35.77 23.32

02/11/2015 67.12 31.41 BDL* BDL* BDL* BDL* 0.76 BDL* 25.09 10.5 19.3 18.76

03/11/2015 78.53 28.6 BDL* BDL* BDL* BDL* 0.44 BDL* 15.8 12.51 36.55 22.5

09/11/2015 85.82 48.59 BDL* BDL* 2.02 BDL* 0.78 BDL* 28.19 18.42 19.53 24.59

10/11/2015 95.52 38.53 0.58 BDL* 2.36 10.21 0.7 BDL* 33.15 15.54 31.52 19.49

16/11/2015 61.74 37.7 BDL* BDL* BDL* BDL* 0.96 BDL* 46.47 10.49 34.52 30.52

17/11/2015 70.59 32.67 BDL* BDL* BDL* BDL* 0.46 BDL* 38.41 19.48 25.64 28.62

23/11/2015 55.77 28.6 BDL* BDL* BDL* BDL* 1.05 BDL* 25.09 6.59 32.79 22.23

24/11/2015 63.39 36.44 BDL* BDL* BDL* BDL* 0.45 BDL* 20.44 9.55 24.56 20.71

30/11/2015 53.59 22.62 BDL* BDL* BDL* BDL* 0.65 BDL* 29.74 13.52 26.94 18.69

01/12/2015 83.43 51.52 BDL* BDL* 2.24 BDL* 0.69 BDL* 23.44 15.71 16.71 18.61

07/12/2015 60.32 31.55 BDL* BDL* BDL* BDL* 0.65 BDL* 20.4 8.42 25.48 29.29

08/12/2015 96.43 55.29 0.68 BDL* 2.24 10.47 0.64 BDL* 27.7 6.73 26.78 26.32

14/12/2015 77.33 36.44 BDL* BDL* BDL* BDL* 0.39 BDL* 19.48 10.68 31.13 22.67

15/12/2015 68.41 33.51 BDL* BDL* BDL* BDL* 0.6 BDL* 23.44 12.67 22.32 21.53

21/12/2015 52.41 19.27 BDL* BDL* BDL* BDL* 0.95 BDL* 19.48 5.73 28.04 19.52

22/12/2015 76.51 41.64 BDL* BDL* BDL* BDL* 0.84 BDL* 39.58 7.45 21.25 24.2

28/12/2015 58.41 28.48 BDL* BDL* BDL* BDL* 0.41 BDL* 30.44 17.57 26.78 29.1

29/12/2015 65.72 30.58 BDL* BDL* BDL* BDL* 0.4 BDL* 16.74 12.8 21.17 27.13

04/01/2016 59.32 34.35 BDL* BDL* BDL* BDL* 0.36 BDL* 34.07 20.43 25.52 21.57

05/01/2016 72.47 29.44 BDL* BDL* BDL* BDL* 0.54 BDL* 29.43 7.47 21.58 18.15

11/01/2016 52.54 20.52 BDL* BDL* 2.49 BDL* 0.58 BDL* 25.4 17.48 16.37 25.88

12/01/2016 69.18 28.48 BDL* BDL* BDL* BDL* 0.5 BDL* 13.63 22.67 29.53 22.76

Page 24: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

10

18/01/2016 81.54 32.25 BDL* BDL* BDL* BDL* 0.29 BDL* 26.33 12.7 37.54 19.29

19/01/2016 63.51 22.62 BDL* BDL* BDL* BDL* 0.33 BDL* 18.28 14.48 19.8 26.09

25/01/2016 54.51 30.7 BDL* BDL* BDL* BDL* 1.09 BDL* 21.68 6.68 26.67 24.51

26/01/2016 84.54 49.42 BDL* BDL* BDL* BDL* 0.7 BDL* 43.68 8.75 35.71 20.57

1/02/2016 62.27 33.51 BDL* BDL* BDL* BDL* 0.55 BDL* 23.23 9.68 24.32 23.42

2/02/2016 74.51 31.13 BDL* BDL* BDL* BDL* 0.36 BDL* 45.54 14.46 32.57 21.57

8/02/2016 60.38 35.18 BDL* BDL* BDL* BDL* 0.72 BDL* 19.21 19.37 35.52 22.5

9/02/2016 59.15 24.71 BDL* BDL* BDL* BDL* 0.41 BDL* 15.18 12.67 17.76 20.64

15/02/2016 67.52 37.28 BDL* BDL* BDL* BDL* 0.42 BDL* 30.67 17.69 21.17 18.57

16/02/2016 51.67 22.62 BDL* BDL* BDL* BDL* 1.35 BDL* 18.59 5.41 31.48 26.82

22/02/2016 72.63 32.39 BDL* BDL* BDL* BDL* 0.63 BDL* 12.08 20.44 25.4 24.43

23/02/2016 61.84 30.58 BDL* BDL* BDL* BDL* 0.82 BDL* 38.72 7.54 19.54 27.69

29/02/2016 80.62 46.49 BDL* BDL* BDL* BDL* 0.65 BDL* 21.37 6.6 15.7 19.59

1/03/2016 58.73 30.58 BDL* BDL* BDL* BDL* 0.36 BDL* 26.33 7.44 16.55 18.3

7/03/2016 71.72 25.66 BDL* BDL* BDL* BDL* 0.98 BDL* 14.56 9.74 29.29 26.31

8/03/2016 63.71 32.25 BDL* BDL* BDL* BDL* 0.39 BDL* 29.43 12.66 19.68 21.87

14/03/2016 76.51 29.74 BDL* BDL* BDL* BDL* 0.55 BDL* 38.72 18.36 23.25 20.6

15/03/2016 65.69 34.35 BDL* BDL* BDL* BDL* 0.57 BDL* 17.35 5.41 28.4 25.88

21/03/2016 74.6 38.53 BDL* BDL* BDL* BDL* 0.44 BDL* 37.48 13.34 38.67 23.25

22/03/2016 59.41 31.55 BDL* BDL* BDL* BDL* 0.65 BDL* 15.18 17.37 34.61 19.61

28/03/2016 61.37 26.39 BDL* BDL* BDL* BDL* 0.76 BDL* 30.36 6.6 32.46 22.53

29/03/2016 72.62 33.51 BDL* BDL* BDL* BDL* 0.48 BDL* 20.75 8.73 22.69 29.32

BDL: Below Detection Limit *: Lead as Pb (µg/m3): 0.5, Benzo (a) Pyrene (BaP)-particulate phase only (ng/m3): 0.5, Ammonia NH3 (µg/m3):

10, Carbon Monoxide as CO (mg/m3): 0.1, Benzene as C6H6 (µg/m3): 2, Arsenic as As (ng/m3): 2

Page 25: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

11

TABLE NO. 1.6 AMBIENT AIR QUALITY MONITORING RESULTS - NEAR SILO POTA CABIN

Date of

Sampling

LOCATION 5 : NEAR SILO POTA CABIN

PM10 PM2.5 Pb BaP As Ni CO C6H6 NH3 SO2 NOx O3

µg/m3

µg/m3

µg/m3

ng/m3

ng/m3

ng/m3

mg/m3

µg/m3

µg/m3

µg/m3

µg/m3

µg/m3

05/10/2015 91.39 48.53 0.52 BDL* 2.06 10.32 0.62 BDL* 15.11 9.54 30.18 22.48

06/10/2015 70.29 40.44 BDL* BDL* BDL* BDL* 0.34 BDL* 17.58 12.35 35.17 25.8

12/10/2015 80.23 44.7 BDL* BDL* BDL* BDL* 0.49 BDL* 13.26 14.55 21.2 18.4

13/10/2015 68.42 28.52 BDL* BDL* BDL* BDL* 0.4 BDL* 19.74 10.01 25.53 20.41

19/10/2015 54.47 21.71 BDL* BDL* BDL* BDL* 0.33 BDL* 26.22 13.53 20.44 17.58

20/10/2015 69.51 31.5 BDL* BDL* BDL* BDL* 0.96 BDL* 38.25 20.69 22.5 27.72

26/10/2015 77.22 41.72 BDL* BDL* BDL* BDL* 0.25 BDL* 20.36 16.48 19.3 24.41

27/10/2015 64.98 35.33 BDL* BDL* BDL* BDL* 0.41 BDL* 18.51 8.65 16.56 21.48

02/11/2015 58.79 23.41 BDL* BDL* BDL* BDL* 0.89 BDL* 20.05 12.38 26.4 23.47

03/11/2015 62.41 27.67 BDL* BDL* BDL* BDL* 0.32 BDL* 21.9 10.37 18.53 19.24

09/11/2015 54.53 20.43 BDL* BDL* BDL* BDL* 0.33 BDL* 14.81 9.58 31.85 22.48

10/11/2015 63.38 28.52 BDL* BDL* BDL* BDL* 0.41 BDL* 15.11 14.57 24.45 17.47

16/11/2015 72.42 45.55 0.56 BDL* BDL* BDL* 0.62 BDL* 12.65 6.64 29.34 20.68

17/11/2015 57.5 21.71 BDL* BDL* BDL* BDL* 0.49 BDL* 10.8 11.76 19.56 18.44

23/11/2015 66.22 31.5 BDL* BDL* BDL* BDL* 0.94 BDL* 30.54 16.72 39.47 27.57

24/11/2015 73.48 29.37 BDL* BDL* BDL* BDL* 0.25 BDL* 16.35 13.72 17.52 25.54

30/11/2015 65.29 30.65 BDL* BDL* BDL* BDL* 0.4 BDL* 42.57 7.5 23.38 28.61

01/12/2015 52.62 30.65 BDL* BDL* BDL* BDL* 0.3 BDL* 11.52 8.74 26.13 20.2

07/12/2015 71.62 38.74 BDL* BDL* BDL* BDL* 0.79 BDL* 16.37 10.45 29.37 19.79

08/12/2015 61.9 34.48 BDL* BDL* BDL* BDL* 0.37 BDL* 19.7 12.54 18.46 22.72

14/12/2015 54.58 23.41 BDL* BDL* BDL* BDL* 0.27 BDL* 15.46 9.67 35.52 27.28

15/12/2015 60.52 27.67 BDL* BDL* BDL* BDL* 0.7 BDL* 33.65 6.65 19.15 18.41

21/12/2015 70.52 32.35 BDL* BDL* BDL* BDL* 0.85 BDL* 44.56 14.55 24.29 21.14

22/12/2015 68.42 25.54 BDL* BDL* BDL* BDL* 0.56 BDL* 10.31 5.4 28.61 25.48

28/12/2015 51.47 18.3 BDL* BDL* BDL* BDL* 0.44 BDL* 22.74 13.45 21.54 30.28

29/12/2015 72.03 39.59 BDL* BDL* BDL* BDL* 0.22 BDL* 13.34 17.67 25.42 29.35

04/01/2016 52.68 28.52 BDL* BDL* BDL* BDL* 0.41 BDL* 24.68 14.65 21.54 17.51

05/01/2016 63.1 30.65 BDL* BDL* BDL* BDL* 0.3 BDL* 21.59 21.74 17.21 23.47

11/01/2016 58.59 26.39 BDL* BDL* BDL* BDL* 0.25 BDL* 12.65 9.51 25.64 19.94

12/01/2016 74.48 32.35 BDL* BDL* BDL* BDL* 0.6 BDL* 37.02 7.53 18.58 18.97

Page 26: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

12

18/01/2016 56.9 29.37 BDL* BDL* BDL* BDL* 0.23 BDL* 18.51 10.42 34.76 29.63

19/01/2016 68.47 34.48 BDL* BDL* BDL* BDL* 0.18 BDL* 15.42 20.53 24.16 21.41

25/01/2016 73.58 38.31 BDL* BDL* BDL* BDL* 0.73 BDL* 40.41 12.65 20.41 28.59

26/01/2016 61.49 31.5 BDL* BDL* BDL* BDL* 0.47 BDL* 11.72 6.59 27.81 25.62

01/02/2016 72.51 41.72 BDL* BDL* BDL* BDL* 0.66 BDL* 19.43 11.51 32.52 20.68

02/02/2016 61.52 25.12 BDL* BDL* BDL* BDL* 0.27 BDL* 15.73 8.74 29.21 25.71

08/02/2016 54.77 31.5 BDL* BDL* BDL* BDL* 0.3 BDL* 10.49 10.36 21.62 30.27

09/02/2016 65.42 27.67 BDL* BDL* BDL* BDL* 0.22 BDL* 12.34 15.68 24.53 18.9

15/02/2016 58.72 19.58 BDL* BDL* BDL* BDL* 0.5 BDL* 20.98 12.61 18.26 28.2

16/02/2016 66.58 32.35 BDL* BDL* BDL* BDL* 0.89 BDL* 34.24 9.76 35.37 19.5

22/02/2016 56.47 29.37 BDL* BDL* 2.16 BDL* 0.71 BDL* 22.52 6.58 15.67 29.59

23/02/2016 78.58 23.41 BDL* BDL* BDL* BDL* 0.57 BDL* 11.41 14.55 23.78 22.66

29/02/2016 64.61 26.39 BDL* BDL* BDL* BDL* 0.37 BDL* 16.35 16.81 38.7 26.32

01/03/2016 69.52 24.69 BDL* BDL* BDL* BDL* 0.21 BDL* 10.49 15.5 22.61 28.22

07/03/2016 56.31 21.71 BDL* BDL* BDL* BDL* 0.82 BDL* 27.76 7.47 19.55 19.52

08/03/2016 77.73 44.7 BDL* BDL* BDL* BDL* 0.49 BDL* 17.27 19.58 26.17 24.42

14/03/2016 57.32 25.54 BDL* BDL* 2.16 BDL* 0.7 BDL* 22.52 14.66 20.31 30.41

15/03/2016 76.8 38.74 BDL* BDL* BDL* BDL* 0.33 BDL* 13.57 16.68 38.33 22.28

21/03/2016 61.28 22.56 BDL* BDL* BDL* BDL* 0.27 BDL* 42.57 8.39 23.26 20.23

22/03/2016 70.29 41.72 BDL* BDL* BDL* BDL* 0.47 BDL* 28.38 10.68 18.67 25.3

28/03/2016 88.71 45.55 BDL* BDL* BDL* BDL* 0.66 BDL* 12.34 13.71 21.67 18.26

29/03/2016 78.52 39.59 BDL* BDL* BDL* BDL* 0.6 BDL* 16.35 9.71 28.24 21.14

BDL: Below Detection Limit *: Lead as Pb (µg/m3): 0.5, Benzo (a) Pyrene (BaP)-particulate phase only (ng/m3): 0.5, Ammonia NH3 (µg/m3): 10, Carbon Monoxide as CO (mg/m3): 0.1, Benzene as C6H6 (µg/m3): 2, Arsenic as As (ng/m3

): 2

Page 27: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

13

TABLE NO. 1.7 AMBIENT AIR QUALITY MONITORING RESULTS - S & S ENTERY GATE

Date of

Sampling

LOCATION 6 : S & S ENTRY GATE

PM10 PM2.5 Pb BaP As Ni CO C6H6 NH3 SO2 NOx O3

µg/m3

µg/m3

µg/m3

ng/m3

ng/m3

ng/m3

mg/m3

µg/m3

µg/m3

µg/m3

µg/m3

µg/m3

05/10/2015 88.61 45.59 BDL* BDL* BDL* BDL* 0.74 BDL* 43.2 19.62 32.66 18.57

06/10/2015 68.39 36.39 BDL* BDL* BDL* BDL* 0.85 BDL* 37.07 15.3 40.5 27.47

12/10/2015 70.69 32.62 BDL* BDL* BDL* 10.14 1.17 BDL* 38.29 21.58 44.37 25.38

13/10/2015 62.51 39.32 BDL* BDL* BDL* BDL* 0.57 BDL* 32.34 22.63 39.53 30.36

19/10/2015 96.68 54.37 BDL* BDL* 2.44 10.49 1.08 BDL* 42.68 28.58 43.51 24.45

20/10/2015 79.57 38.48 BDL* BDL* BDL* BDL* 0.77 BDL* 18.38 12.32 38.46 29.66

26/10/2015 90.57 50.61 0.58 BDL* 2.34 10.17 0.63 BDL* 41.66 20.61 34.81 20.58

27/10/2015 84.3 46.43 BDL* BDL* BDL* BDL* 1.0 BDL* 46.26 27.42 31.86 26.42

02/11/2015 88.39 48.52 BDL* BDL* BDL* BDL* 1.01 BDL* 52.39 20.63 33.55 29.44

03/11/2015 92.32 54.37 0.63 BDL* 2.34 10.7 1.08 BDL* 38.6 24.63 40.56 27.62

09/11/2015 65.88 37.22 BDL* BDL* BDL* BDL* 0.82 BDL* 30.63 12.56 38.52 25.48

10/11/2015 90.4 46.43 0.52 BDL* 2.48 10.48 1.0 BDL* 45.59 23.5 29.32 28.79

16/11/2015 85.4 41.41 BDL* BDL* BDL* BDL* 0.71 BDL* 35.89 15.37 26.54 22.89

17/11/2015 63.41 26.35 BDL* BDL* BDL* BDL* 1.15 BDL* 32.47 21.37 42.59 30.2

23/11/2015 76.72 40.57 BDL* BDL* BDL* BDL* 0.74 BDL* 48.4 9.68 37.5 21.76

24/11/2015 94.53 52.7 0.68 BDL* 2.24 11.54 0.61 BDL* 37.37 16.53 31.57 26.61

30/11/2015 86.41 47.68 0.62 BDL* BDL* 10.4 0.55 BDL* 27.26 18.61 36.94 24.49

01/12/2015 64.51 37.64 BDL* BDL* BDL* BDL* 0.78 BDL* 24.69 13.67 33.46 31.48

07/12/2015 85.91 46.43 BDL* BDL* 2.16 BDL* 0.96 BDL* 46.36 17.37 42.57 23.44

08/12/2015 90.57 55.63 0.66 BDL* 2.26 10.25 0.88 BDL* 35.83 20.46 38.39 29.53

14/12/2015 83.58 45.59 0.52 BDL* BDL* BDL* 0.94 BDL* 42.58 23.65 40.52 26.62

15/12/2015 76.49 34.72 BDL* BDL* BDL* BDL* 0.48 BDL* 18.75 16.74 31.53 27.71

21/12/2015 94.53 48.52 0.68 BDL* 2.54 10.61 0.68 BDL* 38.54 21.53 34.18 24.33

22/12/2015 80.9 32.62 0.52 BDL* BDL* BDL* 0.63 BDL* 27.4 18.33 39.46 30.18

28/12/2015 95.51 53.54 BDL* BDL* BDL* BDL* 1.02 BDL* 41.25 11.68 35.71 28.52

29/12/2015 77.49 42.66 BDL* BDL* BDL* BDL* 0.57 BDL* 32.52 14.39 41.54 25.82

04/01/2016 80.53 38.48 BDL* BDL* BDL* BDL* 0.84 BDL* 46.56 12.58 42.57 24.61

05/01/2016 95.98 41.41 0.64 BDL* 2.58 10.61 0.71 BDL* 64.33 26.58 37.32 29.47

11/01/2016 66.12 36.39 BDL* BDL* 2.18 BDL* 0.96 BDL* 54.53 14.53 31.31 21.57

12/01/2016 79.5 40.57 BDL* BDL* BDL* BDL* 1.05 BDL* 42.68 20.69 35.49 26.61

Page 28: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

14

18/01/2016 86.69 51.45 BDL* BDL* BDL* BDL* 0.77 BDL* 48.18 25.65 40.43 30.32

19/01/2016 75.52 42.66 BDL* BDL* BDL* BDL* 0.52 BDL* 36.15 15.36 43.47 23.43

25/01/2016 88.49 47.68 0.6 BDL* BDL* BDL* 1.42 BDL* 26.65 24.71 33.24 25.37

26/01/2016 92.42 52.7 0.54 BDL* 2.54 10.2 1.28 BDL* 30.33 19.67 39.28 22.62

01/02/2016 87.48 49.35 BDL* BDL* BDL* BDL* 0.87 BDL* 51.77 18.32 41.93 19.66

02/02/2016 92.52 54.37 0.62 BDL* BDL* 10.27 0.94 BDL* 62.49 21.31 35.75 29.23

08/02/2016 85.49 48.94 BDL* BDL* 2.26 BDL* 1.16 BDL* 46.26 14.75 26.18 28.14

09/02/2016 70.81 32.62 BDL* BDL* BDL* BDL* 0.61 BDL* 30.72 20.46 38.64 26.26

15/02/2016 94.52 58.56 0.56 BDL* 2.32 10.71 0.98 BDL* 39.45 10.56 36.38 22.71

16/02/2016 81.68 42.66 BDL* BDL* BDL* BDL* 1.52 BDL* 22.98 24.65 29.24 30.18

22/02/2016 90.57 50.61 BDL* BDL* BDL* 10.27 1.24 BDL* 36.76 16.45 39.55 18.55

23/02/2016 83.88 46.43 BDL* BDL* BDL* BDL* 1.55 BDL* 25.73 19.63 33.54 25.89

29/02/2016 93.51 41.41 0.6 BDL* 2.28 10.46 0.85 BDL* 54.53 22.46 42.61 23.5

01/03/2016 72.68 37.64 BDL* BDL* BDL* BDL* 0.64 BDL* 32.78 17.75 33.73 30.68

07/03/2016 94.63 38.48 0.68 BDL* 2.42 10.41 1.41 BDL* 18.99 21.74 39.5 28.71

08/03/2016 88.49 53.54 0.76 BDL* BDL* BDL* 0.87 BDL* 36.15 8.34 35.15 26.33

14/03/2016 92.32 46.43 0.62 BDL* 2.56 10.14 1.15 BDL* 65.64 16.48 38.18 22.73

15/03/2016 86.69 49.35 0.51 BDL* 2.06 BDL* 0.73 BDL* 43.65 11.43 36.66 24.27

21/03/2016 95.7 43.5 0.6 BDL* BDL* 10.48 0.86 BDL* 54.53 19.76 32.28 29.47

22/03/2016 85.1 55.63 BDL* BDL* 2.16 BDL* 1.07 BDL* 37.68 13.58 26.56 20.48

28/03/2016 76.68 35.55 BDL* BDL* BDL* BDL* 1.45 BDL* 42.28 24.59 34.49 25.9

29/03/2016 90.33 50.61 0.82 BDL* 2.68 10.32 0.93 BDL* 25.43 10.42 37.21 23.65

BDL: Below Detection Limit *: Lead as Pb (µg/m3): 0.5, Benzo (a) Pyrene (BaP)-particulate phase only (ng/m3): 0.5, Ammonia NH3 (µg/m3): 10, Carbon Monoxide as CO (mg/m3):0. 1, Benzene as C6H6 (µg/m3): 2, Arsenic as As (ng/m3): 2

Page 29: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

15

SEA WATER MONITORING (OCTOBER 2015 TO MARCH 2016)

PARAMETER DETAILS:

SR. NO.

TEST PARAMETERS UNIT TEST/SAMPLING METHOD

1 pH -- IS3025 (P11)83Re.02

2 Temperature oC IS3025(P9)84Re.02

3 Total Suspended Solids mg/L IS3025(P17)84Re.02

4 BOD (3 Days @ 27 oC) mg/L IS 3025 (P44)1993 Re.03Edition2.1

5 Dissolved Oxygen mg/L IS3025(P38)89Re.99

6 Salinity ppt APHA 2550 B

7 Oil & Grease mg/L APHA(22ndEdi)5520D

8 Nitrate as NO3 mg/L IS3025(P34)88

9 Nitrite as NO2 mg/L IS3025(P34)88 NEDA

10 Ammonical Nitrogen as NH3 mg/L IS3025(P34)88Cla.2.3

11 Phosphates as PO4 mg/L APHA(22ndEdi) 4500 C

12 Total Nitrogen mg/L IS3025(P34)88

13 Petroleum Hydrocarbon µg/L PLPL-TPH

14 Total Dissolved Solids mg/L IS3025(P16)84Re.02

15 COD mg/L APHA(22ndEdi) 5520-D Open Reflux

16 Oxidisable Particular Organic Carbon % SOP – PLPL - 06

A Flora and Fauna

17.1 Primary Productivity mgC/L/day APHA (22nd Edi) 10200-J

B Phytoplankton

18.1 Chlorophyll mg/m3 APHA (22nd Edi) 10200-H

18.2 Phaeophytin mg/m3 APHA (22nd Edi) 10200-H

18.3 Cell Count Unit x 103/L APHA (22nd Edi) 10200-H

18.4 Name of Group Number and name of group species of each group

-- APHA (22nd Edi) 10200-H

C Zooplanktons

19.1 Abundance (Population) no/m2 APHA (22nd Edi) 10200-G

19.2 Name of Group Number and name of

group species of each group -- APHA (22nd Edi) 10200-G

19.3 Total Biomass ml/100 m3 APHA (22nd Edi) 10200-G

D Microbiological Parameters

20.1 Total Bacterial Count CFU/ml IS 5402:2002

20.2 Total Coliform /ml APHA(22ndEdi)9221-D

20.3 E.coli /ml IS:1622:1981Edi.2.4(2003-05)

20.4 Enterococcus species /ml IS:15186:2002

20.5 Salmonella species /ml IS:5887(P-3)

20.6 Shigella species /ml IS:1887(P-7)

20.7 Vibrio species /ml IS:5887(P-5)

Page 30: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

16

TABLE 2.1 RESULTS SEA WATER SOUTH SIDES

27/10/2015 23/11/2015 28/12/2015 25/01/2016 16/02/2016 28/03/2016

SR. NO.

TEST PARAMETERS

UNIT RESULT

SURFACE BOTTOM SURFACE BOTTOM SURFACE BOTTOM SURFACE BOTTOM SURFACE BOTTOM SURFACE BOTTOM

1 pH -- 8.22 8.3 7.95 8.03 8.13 8.29 7.92 8.12 7.96 8.02 8.22 8.3

2 Temperature oC 29 30 29 30 29 29 29 30 29 30 29 30

3 Total Suspended Solids

mg/L 410 502 280 320 320 440 360 420 282 340 212 288

4 BOD (3 Days @ 27 oC)

mg/L BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL*

5 Dissolved Oxygen

mg/L 5.6 4.8 5.4 4.8 5.4 4.4 5.2 4.6 5.4 4.8 5.6 4.6

6 Salinity ppt 39.04 39.96 36.5 37.4 38.9 39.8 39.12 40.04 36.4 37.6 38.44 39.82

7 Oil & Grease mg/L BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL*

8 Nitrate as NO3 mg/L 0.352 0.581 0.44 0.62 0.52 0.6 0.47 0.58 0.442 0.64 0.293 0.556

9 Nitrite as NO2 mg/L 0.045 0.024 0.026 0.014 0.044 0.029 0.035 0.019 0.027 0.016 0.031 0.013

10 Ammonical Nitrogen as NH3

mg/L 0.24 0.258 0.6 0.5 0.46 0.58 0.52 0.63 0.592 0.5 0.195 0.204

11 Phosphates as PO4

mg/L 0.56 0.32 0.439 0.512 0.063 0.067 0.34 0.41 0.44 0.513 0.131 0.081

12 Total Nitrogen mg/L 0.637 0.863 1.6 1 1.027 1.217 1.03 1.23 1.061 1.156 0.519 0.773

13 Petroleum Hydrocarbon

µg/L 6 BDL* 0.92 BDL* 3 BDL* BDL* BDL* 0.94 BDL* BDL* BDL*

14 Total Dissolved Solids

mg/L 45920 46570 37335 39020 46830 47360 45050 46890 37660 38930 46190 47480

15 COD mg/L 29 19 24 19 26 20 24 19 28 24 28 19

16 Oxidisable Particular Organic Carbon

% 0.48 0.22 0.6 0.26 0.43 0.37 0.54 0.18 0.62 0.28 0.64 0.32

A Flora and Fauna

17.1 Primary Productivity

mgC/L/day

1.688 0.45 1.57 0.56 2.47 0.788 1.68 0.22 2.7 0.338 2.07 0.405

B Phytoplankton

18.1 Chlorophyll mg/m3

1.709 0.134 2.1 0.45 2.67 0.748 2.51 0.88 3.12 0.881 2.964 0.668

18.2 Phaeophytin mg/m3

0.347 1.754 BDL* 1.21 BDL* 0.71 BDL* 0.57 BDL* 2.17 BDL* 1.39

18.3 Cell Count Unit x 103/L

210 59 225 46 245 52 210 90 249 66 263 53

--

Name of Group Number and name of group species of each group

--

Bacillariophyceae

Bacillariophyceae

Bacillariophyceae

Bacillariophyceae

Bacillariophyceae

Bacillariophyceae

Bacillariophyceae

Bacillariophyceae

Bacillariophyceae

Bacillariophyceae

Bacillariophyceae

Bacillariophyceae

Coscinodiscus sp.

Fragillaria sp.

Amphora sp.

Fragillaria sp.

Asterionella sp.

Fragillaria sp.

Nitzschia sp.

Navicula sp. Nitzschia

sp. Navicula sp. Amphora sp.

Synedra sp.

Navicula sp.

Gyrosigma sp.

Biddulphia sp.

Nitzschia sp.

Gomphonema sp.

Nitzschia sp.

Synedra sp. Fragillaria

sp. Synedra sp.

Fragillaria sp.

Synedra sp. Nitzschia

sp.

Nitzschia sp.

Nitzschia sp.

Asterionella sp.

Synedra sp. Pinnularia

sp. Pinnularia

sp. Navicula sp.

Biddulphia sp.

Navicula sp. Pleurosigma

sp. Navicula sp.

Coscinodiscus sp.

Rhizosolenia sp.

Biddulphia sp.

Cocconeis sp.

Pleurosigma sp.

Thallasionema sp.

Gyrosigma sp.

Fragillaria sp.

Melosira sp. Fragillaria

sp. Pinnularia

sp. Nitzschia sp.

Pinnularia sp.

Page 31: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

17

Pinnularia sp.

Green Algae Fragillaria

sp. Gomphone

ma sp. Fragillaria

sp. Cyclotella

sp. Coscinodisc

us sp. Nitzschia sp.

Coscinodiscus sp.

Nitzschia sp. Coscinodisc

us sp. Fragillaria

sp.

Cymbella sp.

Ulothrix sp. Rhizosolenia

sp. Cyanophyce

ae

Biddulphia sp.

Cyanophyce

ae

Rhizosolenia sp.

Cyanophyce

ae

Rhizosolenia sp.

Green Algae Cyclotella

sp. Rhizosoleni

a sp. Green

algae Chlorella sp.

Thallasionema sp.

Oscillatoria sp.

Cyanophyce

ae

Microcystis sp.

Gyrosigma sp.

Microcystis sp.

Cymbella sp.

Chlorella sp. Melosira sp. Cyanophyc

eae

Chlorella sp.

Cyanophyce

ae

Cyanophyce

ae Green Algae

Phormidium sp.

Spirulina sp. Asterionella

sp. Anabaena

sp. Thallasione

ma sp. Pandorina

sp. Pleurosigma

sp. Oscillatoria

sp. Pandorina

sp. Oscillatoria

sp. Microcystis

sp. Chlorella sp.

Oscillatoria sp.

Green Algae Cyanophyce

ae --

Cyanophyce

ae --

Thallasionema sp.

Green

Algae

Pediastrum sp.

-- Anabaena

sp. Pandorina

sp. Microcystis

sp. Ankistrodes

mus sp. Oscillatoria

sp. --

Oscillatoria sp.

-- Skeletonem

a sp. Pediastrum

sp. Cyanophyc

eae -- Green Algae -- Green Algae Chlorella sp. Nostoc sp. -- Nostoc sp. --

Tabellaria sp.

Scenedesmus sp.

Oscillatoria sp.

-- Ankistrodes

mus sp. -- Chlorella sp.

Scenedesmus sp.

Green Algae -- Green Algae -- Cyanophyce

ae --

Anabaena sp.

-- Hydrodictyo

n sp. --

Oedogonium sp.

-- Chlorella sp. -- Chlorella sp. -- Microcystis

sp. --

-- -- Pediastrum

sp. --

Pandorina sp.

-- Pandorina

sp. --

Scenedesmus sp.

-- Spirulina sp. --

-- -- Scenedesm

us sp. -- Volvox sp. --

Pediastrum sp.

-- Ulothrix sp. -- Green Algae --

-- -- -- -- -- -- -- -- -- -- Hydrodictyo

n sp. --

-- -- -- -- -- -- -- -- -- -- Pandorina

sp. --

19.1 Abundance (Population)

no/m2

280 120 240 100 160 40 220 40 263 38 240 80

19.2

Name of Group Number and name of group species of each group species of each group

--

Copepods Gastropods Copepods Chaetognat

hes Copepods Crustaceans Copepods Nematodes Mysids Nematodes Copepods

Polychaete

worms

Decapods Ostracods Polychaete

worm Copepods

Polychaete worm

Copepods Isopods Foraminifera

ns Isopods Gastropods Decapods Krill

Crustaceans

Krill Krill Decapods Crustaceans -- Nematodes -- Nematodes -- Polychaete

worms Crustacean

s

Gastropods

Cyclops Crustaceans -- Ostracods -- Polychaete

worms --

Polychaete worms

-- Gastropods --

Ostracods -- Ctenophora -- -- -- -- -- Echinoderm

s -- Snail --

Cyclops -- Ostracods -- -- -- -- -- Hydrozoa -- Nematodes --

19.3 Total Biomass ml/100 m3

95 15 92.5 12 72.58 4.7 80 10 93.6 14.5 113 10.14

D Microbiological Parameters

20.1 Total Bacterial Count

CFU/ml

1910 1760 1420 1060 1280 1020 1420 1280 1400 1100 1960 2060

20.2 Total Coliform /ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

20.3 E.coli /ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

20.4 Enterococcus species

/ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

20.5 Salmonella species

/ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

20.6 Shigella species /ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

20.7 Vibrio species /ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

Page 32: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

18

TABLE 2.2 RESULTS SEA WATER NORTH SIDE

27/10/2015 23/11/2015 28/12/2015 25/01/2016 16/02/2016 28/03/2016

SR. NO. TEST PARAMETERS UNIT

RESULT SURFACE BOTTOM SURFACE BOTTOM SURFACE BOTTOM SURFACE BOTTOM SURFACE BOTTOM SURFACE BOTTOM

1 pH -- 8.18 8.33 7.96 8.11 8.19 8.33 7.85 8.08 7.98 8.12 8.21 8.32

2 Temperature oC 28 29 29 30 28 29 29 30 29 30 29 30

3 Total Suspended Solids

mg/L 320 430 340 400 240 320 280 330 350 410 258 336

4 BOD (3 Days @ 27 oC)

mg/L BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL*

5 Dissolved Oxygen mg/L 5.6 4.4 5.4 4.4 5.2 4.8 5.4 4.6 5.2 4.6 5 4.4

6 Salinity ppt 36.82 37.44 35.8 37.1 37.26 38.81 37.22 38.36 35.64 37.18 35.86 36.44

7 Oil & Grease mg/L BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL* BDL*

8 Nitrate as NO3 mg/L 0.535 0.734 0.54 0.74 0.477 0.646 0.39 0.61 0.549 0.747 0.061 0.092

9 Nitrite as NO2 mg/L 0.033 0.018 0.03 0.02 0.081 0.055 0.031 0.014 0.034 0.027 0.021 0.017

10 Ammonical Nitrogen as NH3

mg/L 0.388 0.462 0.38 0.48 0.307 0.316 0.44 0.53 0.407 0.481 0.596 0.819

11 Phosphates as PO4 mg/L 0.699 0.518 0.322 0.346 0.766 0.459 0.21 0.24 0.322 0.336 0.086 0.063

12 Total Nitrogen mg/L 0.956 1.214 0.92 1.22 0.865 1.017 0.87 1.16 0.99 1.255 0.67 0.92

13 Petroleum Hydrocarbon

µg/L BDL* BDL* BDL* BDL* 1.4 BDL* BDL* BDL* 0.7 BDL* 1.8 BDL*

14 Total Dissolved Solids

mg/L 42896 43458 36622 38680 44080 45120 43530 44010 36844 37990 43060 43660

15 COD mg/L 24 19 19 14 26 18 19 14 24 14 24 14

16 Ox disable Particular Organic Carbon

% 0.81 0.56 0.46 0.23 0.7 0.32 0.72 0.51 0.46 0.22 0.84 0.48

A Flora and Fauna

17.1 Primary Productivity mgC/L

/day 1.35 0.225 1.35 0.225 2.58 0.563 2.47 0.45 2.13 0.788 1.91 0.338

B Phytoplankton

18.1 Chlorophyll mg/m3 1.682 0.214 1.549 0.107 2.51 0.774 2.48 0.8 2.59 0.828 3.017 0.828

18.2 Phaeophytin mg/m3 0.299 1.599 0.526 1.78 BDL* 0.833 BDL* 0.806 BDL* 1.84 BDL* 1.45

18.3 Cell Count Unit x 103/L

196 67 210 53 244 48 259 58 220 51 252 63

18.4

Name of Group Number and name of group species of each group

--

Bacillarioph

yceae

Bacillarioph

yceae

Bacillarioph

yceae

Bacillarioph

yceae

Bacillarioph

yceae

Bacillarioph

yceae

Bacillarioph

yceae

Bacillarioph

yceae

Bacillarioph

yceae

Bacillarioph

yceae

Bacillarioph

yceae

Bacillarioph

yceae

Biddulphia sp.

Gyrosigma sp.

Biddulphia sp.

Navicula sp. Asterionella

sp. Fragillaria

sp. Nitzschia

sp. Navicula sp.

Fragillaria sp.

Nitzschia sp.

Asterionella sp.

Navicula

sp.

Coscinodiscus sp.

Coscinodiscus sp.

Cocconeis sp.

Nitzschia sp.

Coscinodiscus sp.

Cocconeis sp.

Navicula sp. Fragillaria

sp. Nitzschia

sp. Synedra sp.

Biddulphia sp.

Nitzschia

sp.

Asterionella sp.

Fragillaria sp.

Pinnularia sp.

Fragillaria sp.

Fragillaria sp.

Pleurosigma sp.

Synedra sp. Gyrosigma

sp. Synedra sp.

Pinnularia sp.

Cocconeis sp.

Fragillaria

sp.

Gyrosigma sp.

Cyclotella sp.

Synedra sp. Gomphone

ma sp. Gomphone

ma sp. Synedra sp.

Pleurosigma sp.

Rhizosolenia sp.

Coscinodiscus sp.

Coscinodiscus sp.

Navicula sp. Rhizosoleni

a sp.

Navicula sp. Green algae Rhizosoleni

a sp. Pinnularia

sp. Pleurosigma

sp. Cyanophyce

ae

Cyclotella sp.

Coscinodiscus sp.

Cyclotella sp.

Fragillaria sp.

Nitzschia sp.

Pinnularia

sp.

Nitzschia Chlorella Melosira sp. Cyanophyce Rhizosolenia Anabaena Achnanthes Cyanophyce Thallasiosir Cyanophyce Rhizosoleni Cyanophyc

Page 33: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

19

sp. sp. ae sp. sp. sp. ae a sp. ae a sp. eae

Green algae Pandorina

sp. Coscinodisc

us sp. Oscillatoria

sp. Thallasiosira

sp. Oscillatoria

sp. Asterionella

sp. Anabaena

sp. Achnanthes

sp. Oscillatoria

sp. Tabellaria

sp. Oscillatoria

sp.

Volvox sp. Hydrodictyo

n sp. Cyanophyce

ae Green Algae

Cyanophyceae

Green Algae Cyanophyce

ae Microcystis

sp. Rhizosoleni

a sp. Microcystis

sp. Cymbella

sp. Microcystis

sp.

Scenedesmus sp.

-- Oscillatoria

sp. Chlorella sp.

Oscillatoria sp.

Oedogonium sp.

Oscillatoria sp.

-- Cyanophyce

ae Green Algae

Cyanophyceae

Green Algae

Hydrodictyon sp.

-- Anabaena

sp. Ulothrix sp. Nostoc sp.

Hydrodictyon sp.

microcystis sp.

-- microcystis

sp. Chlorella

sp. Microcystis

sp. Ankistrodes

mus sp.

Cyanophyceae

-- Microcystis

sp. Scenedesm

us sp. Spirulina sp.

Pandorina sp.

Green Algae -- Oscillatoria

sp. --

Oscillatoria sp.

--

Oscillatoria sp.

-- Green Algae -- Green Algae Ulothrix sp. Chlorella

sp. -- Nostoc sp. -- Green Algae --

Spirulina sp. -- Pediastrum

sp. -- Chlorella sp. --

Pediastrum sp.

-- Green Algae -- Ankistrodes

mus sp. --

-- -- Ulothrix sp. -- Hydrodictyo

n sp. --

Pandorina sp.

-- Pediastrum

sp. --

Chlorella sp.

--

-- -- Pandorina

sp. --

Pediastrum sp.

-- -- -- Pandorina

sp. -- Ulothrix sp. --

-- -- -- -- Volvox sp. -- -- -- Chlorella

sp. -- -- --

C Zooplanktons

19.1 Abundance (Population)

no/m2 260 140 220 80 225 75 260 80 238 63 320 60

19.2

Name of Group Number and name of group species of each group species of each group

--

Copepods Gastropods Ctenophore

s Rotifers

Ctenophore

s Ostracods

Echinoderm

s

Polychaete

worms

Echinoderm

s

Polychaete

worms Copepods Nematodes

Ostracods Krill Decapods Cyclops Decapods Gastropods Decapods Isopods Mysids Nematodes Ostracods Gastropods

Nematodes Crustaceans Ostracods Fish egg Ostracods -- Gastropods -- Gastropods Gastropods Gastropods Crustacean

s

Polychaete Daphnia Gastropods Copepods Gastropods -- Rotifers -- Isopods -- Krill --

Isopods -- Polychaete

worms -- Rotifers -- -- --

Polychaete

worms -- Cyclops --

Chaetognat

hs -- -- -- Crustaceans -- -- -- -- -- Nematodes --

19.3 Total Biomass ml/100

m3 89 11 82.8 9.5 85.24 6.9 79.5 7.4 86.9 18 123 10.96

D Microbiological Parameters

20.1 Total Bacterial Count

CFU/ml 1540 1370 1660 1220 1260 1080 1380 1220 1650 1210 2290 2390

20.2 Total Coliform /ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

20.3 E.coli /ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

20.4 Enterococcus species

/ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

20.5 Salmonella species /ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

20.6 Shigella species /ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

20.7 Vibrio species /ml Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent

Page 34: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

20

SEDIMENT MONITORING (OCTOBER 2015 TO MARCH 2016)

PARAMETER DETAILS:

SR. NO.

TEST PARAMETERS UNIT TEST/SAMPLING

METHOD

1 Organic Matter % FCO: 2006

2 Phosphorus as P mg/kg APHA(22ndEdi) 4500 C

3 Texture -- --

4 Petroleum Hydrocarbon mg/kg PLPL-TPH

5 Heavy Metals

5.1 Aluminum as Al % AAS APHA 3111 B

5.2 Total Chromium as Cr+3 mg/kg AAS 3111B

5.3 Manganese as Mn mg/kg AAS APHA 3111 B

5.4 Iron as Fe % AAS APHA(22ndEdi)3111 B

5.5 Nickel as Ni mg/kg AAS APHA(22ndEdi)3111 B

5.6 Copper as Cu mg/kg AAS APHA(22ndEdi)3111 B

5.7 Zinc as Zn mg/kg AAS APHA(22ndEdi)3111 B

5.8 Lead as Pb mg/kg AAS APHA(22ndEdi)3111 B

5.9 Mercury as Hg mg/kg AAS APHA- 3112 B

6 Benthic Organisms

6.1 Macrobenthos (No and name of groups present, No and name of species of each group present)

-- APHA (22nd Edi) 10500-C

6.2 MeioBenthos(No and name of groups present, No and name of species of each group present)

-- APHA (22nd Edi) 10500-C

6.3 Population no/m2 APHA (22nd Edi) 10500-C

Page 35: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

21

TABLE 2.3 RESULTS SEA SEDIMENT SOUTH SIDE

SR. NO.

TEST PARAMETERS UNIT 27/10/2015 23/11/2015 28/12/2015 25/01/2016 16/02/2016 28/03/2016

SEA SEDIMENT SOUTH SIDE

1 Organic Matter % 0.714 0.58 0.69 0.48 0.617 0.72

2 Phosphorus as P mg/kg 178 190 189 211 193 210

3 Texture -- Sandy Silt Sandy Silt Sandy Silt Sandy Silt Sandy Silt Sandy Silt

4 Petroleum Hydrocarbon mg/kg BDL* BDL* BDL* BDL* BDL* BDL*

5 Heavy Metals

5.1 Aluminum as Al % 5.47 5.4 5.41 5.21 5.43 5.23

5.2 Total Chromium as Cr+3 mg/kg 101 116 137 119 117 119

5.3 Manganese as Mn mg/kg 625 660 778 563 657 819

5.4 Iron as Fe % 2.76 2.36 2.4 2.51 2.33 2.89

5.5 Nickel as Ni mg/kg 40.75 44 53.98 46.67 44.4 61.98

5.6 Copper as Cu mg/kg 50.08 36 46.64 38.88 36.56 49.99

5.7 Zinc as Zn mg/kg 139 160 141 148 163 150

5.8 Lead as Pb mg/kg 2.02 1.86 1.9 1.77 1.88 1.74

5.9 Mercury as Hg mg/kg BDL* BDL* BDL* BDL* BDL* BDL*

6 Benthic Organisms

6.1 Macrobenthos (No and name of groups present, No and name of species of each group present)

--

Polychaete worms Polychaete worms Crustaceans Mysids Mysids Polychaete worms

Mysids Isopods Isopods Echinoderms Isopods Bivalves

Isopods Decapods Decapods Decapods Decapods Echinoderms

Crabs -- Mysids -- Polychaete worms Prawns

Decapods -- -- -- -- --

6.2 MeioBenthos (No and name of groups present, No and name of species of each group present)

-- Nematodes Nematodes Nematodes Foraminiferans Nematodes Foraminiferans

Foraminiferans Copepods Copepods -- Ciliates Hydrozoa

6.3 Population no/m2 440 337 481 377 357 692

Page 36: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

22

TABLE 2.4 RESULTS SEA SEDIMENT NORTH SIDE

SR. NO.

TEST PARAMETERS UNIT 27/10/2015 23/11/2015 28/12/2015 25/01/2016 16/02/2016 28/03/2016

SEA WATER NORTH SIDE

1 Organic Matter % 0.853 0.54 0.745 0.628 0.605 0.835

2 Phosphorus as P mg/kg 170 160 220 179 191 189

3 Texture -- Sandy Silt Sandy Silt Sandy Silt Sandy Silt Sandy Silt Sandy Silt

4 Petroleum Hydrocarbon mg/kg BDL* BDL* BDL* BDL* BDL* BDL*

5 Heavy Metals

5.1 Aluminum as Al % 5.63 5.44 5.35 5.51 5.43 5.65

5.2 Total Chromium as Cr+3 mg/kg 87.96 118 93.98 92.74 117 101

5.3 Manganese as Mn mg/kg 659 666 701 627 665 705

5.4 Iron as Fe % 1.85 1.88 2.13 1.75 2.39 2.87

5.5 Nickel as Ni mg/kg 48.44 38 48.11 50.2 46.79 61.99

5.6 Copper as Cu mg/kg 38.72 52 55.98 42.77 38.21 40.01

5.7 Zinc as Zn mg/kg 147 140 162 163 161 172

5.8 Lead as Pb mg/kg 2.02 1.72 2.07 2.08 2 1.6

5.9 Mercury as Hg mg/kg BDL* BDL* BDL* BDL* BDL* BDL*

6 Benthic Organisms

6.1 Macrobenthos (No and name of groups present, No and name of species of each group present)

--

Decapods Decapods Decapods Polychaete worms Polychaete worms Polychaete worms

Crabs Mysids Anthozoans Mysids Decapods Crabs

Anthozoans Isopods Isopods Isopods Isopods Isopods

Echinoderms Amphipods -- -- Echinoderms Decapods

Copepods -- -- -- -- --

Bryozoans -- -- -- -- --

6.2 MeioBenthos (No and name of groups present, No and name of species of each group present)

-- Foraminiferans Foraminiferans Nematodes Nematodes Foraminiferans

Copepods Copepods Ostracods Foraminiferans Copepods

-- -- Hydrozoa -- -- --

6.3 Population no/m2 377 288 385 440 317 503

Page 37: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

23

PIEZOMETER WATER QUALITY MONITORING

(OCTOBER 2015 TO MARCH 2016)

PARAMETERS DETAILS:

SR.

NO. TEST PARAMETER UNIT TEST/SAMPLING METHOD

1 Temperature oC IS3025(P9)84Re.02

2 pH -- IS3025(P11)83Re.02

3 Total Dissolved Solids mg/L IS3025(P16)84Re.02

4 Salinity ppt APHA 2520B

5 Chloride as Cl mg/L IS3025(P32)88Re.99

6 Depth of Water Level from Ground Level meter --

7 Status of Tide** -- --

TABLE NO. 4.1 RESULTS OF ANALYSIS OF PIEZOMETER WATER QUALITY MONITORING [OCTOBER 2015 TO

MARCH 2016]

SR.

NO

SAMPLING LOCATION Near Sub Station 7B

TEST PARAMETER UNIT

RESULTS

Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16

27/10/15 23/11/15 07/12/15 25/01/16 29/02/16 28/03/16

1 Temperature oC 29 29 29 29 30 29

2 pH -- 8.45 8.5 8.26 8.39 8.43 8.36

3 Total Dissolved Solids mg/L 1334 1390 1311 1239 1288 1416

4 Salinity ppt 0.397 0.415 0.26 0.187 0.193 0.2

5 Chloride as Cl mg/L 218 229 145 103 106 111

6 Depth of Water Level from Ground Level

meter 2.5 2 2 2 2.2 2

7 Status of Tide** -- High Tide High Tide High Tide Low Tide Low Tide High Tide

Page 38: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

24

SR.

NO

Sampling Location Near QHSE Office

TEST PARAMETER UNIT

RESULTS

Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16

27/10/15 23/11/15 07/12/15 25/01/16 29/02/16 28/03/16

1 Temperature oC 30 30 30 29 30 29

2 pH -- 8.29 8.15 8.31 8.61 8.42 8.4

3 Total Dissolved Solids mg/L 1881 1801 1619 1438 1510 1490

4 Salinity ppt 1.06 0.948 0.72 0.657 0.682 0.686

5 Chloride as Cl mg/L 589 524 399 363 377 379

6 Depth of Water Level from

Ground Level meter 3 2.5 2.5 2.5 2.3 2.1

7 Status of Tide** -- High Tide High Tide High Tide Low Tide Low Tide High Tide

Page 39: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

25

STP QUALITY MONITORING

(OCTOBER 2015 TO MARCH 2016)

TEST PARAMETER UNIT TEST/ SAMPLING METHOD

pH -- IS3025(P11)83Re.02

Total Suspended Solids mg/L IS3025(P17)84Re.02

BOD (3 Days @ 27 oC) mg/L IS3025 P44)1993 Re.03Edition2.1

Residual Free Chlorine mg/L APHA(22ndEdi)4500 Cl

TABLE NO.5.1 RESULTS OF STP WATER [October 2015 – March 2016]

TEST PARAMETER UNIT RESULTS

Date of Sampling 27/10/2015 23/11/2015 07/12/2015 25/01/2016 29/02/2016 28/03/2016

Sampling Location STP OUTLET

pH -- 7.09 7.19 7.23 6.96 8.01 7.94

Total Suspended Solids mg/L 20 26 26 26 24 28

BOD (3 Days @ 27 oC) mg/L 12 19 19 14 16 19

Residual Free Chlorine mg/L 0.5 0.5 0.5 0.6 0.8 0.7

Page 40: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

26

NOISE LEVEL MONITORING

(OCTOBER 2015 TO MARCH 2016) TABLE NO. 6.1 RESULTS OF BEHIND QHSE OFFICE DAY TIME NOISE

Sampling

Location

October-15 November-15 December-15 January-16 February-16 March-16

Behind QHSE Office

Date of Monitoring

1/10/2015 2/11/2015 1/12/2015 1/01/2016 1/02/2016 1/03/2016

6:00-7:00 54.8 57.4 44.8 44.2 45.5 41.8

7:00-8:00 55.6 55.2 45.9 48.6 48.7 43.4

8:00-9:00 57.9 60.8 50.3 50 49.2 48.4

9:00-10:00 60.3 58.3 51.9 55.2 57.7 52.3

10:00-11:00 63.8 62.3 55.8 55.9 56.3 54.8

11:00-12:00 65.9 66 58.3 60 62.5 60.5

12:00-13:00 68.7 69.5 59.4 63.3 60.3 62.3

13:00-14:00 69.3 72.3 61.3 63.6 62.8 64.8

14:00-15:00 70.4 70.8 63.4 65.5 65 66.9

15:00-16:00 69.5 66.5 65.9 66.5 66.2 67.8

16:00-17:00 68.3 69.9 68.9 67.1 66.6 68.9

17:00-18:00 67.7 69.3 69.3 67.2 66.9 69.1

18:00-19:00 66.4 68.3 66.4 62.8 63.5 63.7

19:00-20:00 65.5 62.2 64.8 62.1 59.3 62.1

20:00-21:00 64.9 66.2 63.7 61.6 62.9 60.8

21:00-22:00 62.8 64.7 62.4 59.8 57.7 60

LIMIT :-75 dB(A)

TABLE NO. 6. 2 RESULTS OF BEHIND QHSE OFFICE NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

Behind QHSE Office

Date of

Monitoring

01 &

02/10/2015

02 &

03/11/2015

01 &

02/12/2015

01 &

02/01/2016

01 &

02/02/2016

01 &

02/03/2016

22:00-23:00 62.5 60.6 61.9 56.3 57.2 59.3

23:00-00:00 61.3 62.1 58.3 53.8 53.9 58.4

00:00-01:00 60.8 62.6 56.2 50.2 50.6 56.4

01:00-02:00 58.2 59.4 54.8 52.4 50.3 54.3

02:00-03:00 56.3 56.2 52.7 47.5 46.7 53.2

03:00-04:00 55.9 56.4 49.3 46.8 47.3 50.4

04:00-05:00 54.7 54.8 47.4 43.2 42.6 50

05:00-06:00 53.2 51.6 45.3 42.4 43.8 48.3

LIMIT :-70 dB(A)

Page 41: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

27

TABLE NO. 6.3 RESULTS OF PMC OFFICE BACK SIDE DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

PMC OFFICE BACK SIDE

Date of Monitoring

2/10/2015 3/11/2015 2/12/2015 2/1/2016 2/2/2016 2/3/2016

6:00-7:00 53.2 52.7 43.2 46.1 48.7 40.9

7:00-8:00 55.7 55.7 44.8 47.8 49 41.8

8:00-9:00 56.9 58.5 48.9 51.4 50.8 47.3

9:00-10:00 59.3 60.3 52.1 57.5 57.8 49.2

10:00-11:00 61.7 61.7 53.8 57.5 55.2 53.1

11:00-12:00 64.9 62.3 59.2 60.5 59.9 59.4

12:00-13:00 67.3 67.3 61.9 62.1 64.6 62.4

13:00-14:00 69.8 68.2 63.4 64.1 66.6 64.8

14:00-15:00 71.5 73.1 64.3 63.7 60.7 67.3

15:00-16:00 70.6 67.6 66.4 67.4 64.7 68.9

16:00-17:00 69.5 67.1 67.4 68.6 66.1 69.3

17:00-18:00 68.4 68.6 68.1 66.8 67.6 68.4

18:00-19:00 66.5 66.2 66 65.8 62.9 66.5

19:00-20:00 65.8 63.8 65.2 62.8 63 65.3

20:00-21:00 64.9 64.1 63.2 63 64.8 62.8

21:00-22:00 62.1 64.1 62.7 59.3 60.7 61.4

LIMIT :-75 dB(A)

TABLE NO. 6. 4 RESULTS OF PMC OFFICE BACK SIDE NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

PMC OFFICE BACK SIDE

Date of

Monitoring

02 &

03/10/2015

03 &

04/11/2015

02 &

03/12/2015

02 &

03/01/2016

02 &

03/02/2016

02 &

03/03/2016

22:00-23:00 61.7 63 61.7 60 63 60.2

23:00-00:00 60.9 60.4 59.2 55.3 53.6 58.3

00:00-01:00 59.3 57.2 57.3 53.1 54.7 57.4

01:00-02:00 58.4 55.3 55.4 53.7 54.4 53.6

02:00-03:00 57.2 54.7 53.9 51.8 53.5 52.7

03:00-04:00 55 54.4 50.1 48.3 45.7 51.8

04:00-05:00 54.6 51.3 48.3 46.8 45.3 50.7

05:00-06:00 52.9 52 45.9 46.1 46.8 47.3

LIMIT :-70 dB(A)

Page 42: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

28

TABLE NO. 6.5 RESULTS OF SUB STATION - 6 BACK SIDE DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

SUB STATION - 6 BACK SIDE

Date of Monitoring

3/10/2015 4/11/2015 3/12/2015 4/1/2016 3/2/2016 3/3/2016

6:00-7:00 56.3 53.3 44.7 43.3 41.7 41.7

7:00-8:00 57.9 60 45.7 44.4 43.2 42.9

8:00-9:00 59.3 61.6 48.3 49.8 52.6 45.8

9:00-10:00 62.4 61.4 51.4 51.9 53.3 49

10:00-11:00 63.7 65.2 55.2 54 56.3 52.3

11:00-12:00 65.6 64.4 59.1 57.8 57.4 56.9

12:00-13:00 68.5 67.2 62.4 62.7 61.1 58.2

13:00-14:00 69.7 69.5 65.6 62.7 65.1 61.3

14:00-15:00 71.6 69.3 67.9 66.3 68.9 64.3

15:00-16:00 72.8 73.2 68.3 68.7 71 67.4

16:00-17:00 69.5 71.7 69.3 70.9 73.3 69.3

17:00-18:00 68 66.6 67.3 66.8 64 68.6

18:00-19:00 67.3 65.2 65.8 69 70.3 67.3

19:00-20:00 66.4 67.2 64.2 63.8 62.1 66.1

20:00-21:00 64.5 66.4 62.9 64.7 64.5 64.2

21:00-22:00 62 58.5 61.8 62.5 61.2 62.3

LIMIT :-75 dB(A)

TABLE NO. 6.6 RESULTS OF SUB STATION - 6 BACK SIDE NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

SUB STATION - 6 BACK SIDE

Date of

Monitoring

03 &

04/10/2015

03 &

04/11/2015

03 &

04/12/2015

03 &

04/01/2016

03 &

04/02/2016

03 &

04/03/2016

22:00-23:00 62.8 65.4 60.3 58.5 55.5 61.3

23:00-00:00 61.9 61.5 58.7 60.1 60.8 60.2

00:00-01:00 60.5 61.6 56.9 56.9 58.6 60

01:00-02:00 59.4 58.1 54.3 55.7 56.8 58.7

02:00-03:00 57.2 60 52.1 54.4 55.5 54.6

03:00-04:00 56.8 56.5 50.8 52.9 50.7 52.7

04:00-05:00 54.9 57.4 47.4 46.8 45.3 51.9

05:00-06:00 53.6 56.1 44.2 45.9 45.3 48.6

LIMIT :-70 dB(A)

Page 43: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

29

TABLE NO. 6.7 RESULTS OF SUB STATION - 8 (MARINE BUILDING) DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

SUB STATION - 8 (MARINE BUILDING)

Date of

Monitoring 3/10/2015 4/11/2015 3/12/2015 4/1/2016 3/2/2016 3/3/2016

6:00-7:00 52.7 54.3 46.2 43.6 42 42.3

7:00-8:00 54.9 52.1 47.9 47 48.2 44.8

8:00-9:00 58.7 55.4 51.4 48.4 47.5 46.9

9:00-10:00 62.9 61.5 53.9 52.7 55.7 48.7

10:00-11:00 65.4 64.6 55.4 55.3 55.1 51.4

11:00-12:00 66.8 67.1 59.2 57.1 55.9 54.8

12:00-13:00 67.3 64 61.3 61.2 59.1 56.7

13:00-14:00 68.5 66.2 64.8 63.2 60.3 60.4

14:00-15:00 70.8 72.6 66.3 64.1 65.6 65.7

15:00-16:00 71.9 69.4 69.4 66.9 64.5 68.4

16:00-17:00 69.3 70.4 68.7 66.8 66.9 69.3

17:00-18:00 68.5 67.3 67.1 69 68.2 68.5

18:00-19:00 67.9 69.4 66.9 67.2 65.6 66.4

19:00-20:00 66 64.9 64.6 66.2 63.5 65.5

20:00-21:00 65.2 62.4 62.8 63.8 64.6 63.6

21:00-22:00 64.3 62 61.9 58.1 57.2 61.7

LIMIT :-75 dB(A)

TABLE NO. 6.8 RESULTS OF SUB STATION - 8 (MARINE BUILDING) NIGHT TIME NOISE

Sampling

Location

October-15 November-15 December-15 January-16 February-16 March-16

SUB STATION - 8 (MARINE BUILDING)

Date of Monitoring

05 &

06/10/2015

05 &

06/11/2015

04 &

05/12/2015

05 &

06/01/2016

04 &

05/02/2016

04 &

05/03/2016

22:00-23:00 61.3 58.9 60.6 57.5 54.6 60.3

23:00-00:00 60.7 62.1 59.3 57.4 56.1 59.4

00:00-01:00 59.6 57 56.2 54 56.2 57.6

01:00-02:00 58.4 57.7 53.8 55.3 55.8 55.3

02:00-03:00 57.2 58.5 51.7 52.1 51.8 52.8

03:00-04:00 55.5 54.8 50.1 51.7 53 50.3

04:00-05:00 53.1 54.5 49.3 47.2 46.4 49.7

05:00-06:00 51.7 48.2 48.2 47.1 47.4 46.7

LIMIT :-70 dB(A)

Page 44: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

30

TABLE NO. 6.9 RESULTS OF NEAR SUB STATION - 7B DAY TIME NOISE

Sampling

Location

October-15 November-15 December-15 January-16 February-16 March-16

NEAR SUB STATION - 7B

Date of Monitoring

06/10/2015 06/11/2015 05/12/2015 06/01/2016 05/02/2016 05/03/2016

6:00-7:00 51.3 48.5 45.1 42.9 45.2 43.4

7:00-8:00 53.7 51.4 48.3 46.3 46 45.4

8:00-9:00 56.9 53.5 49.1 47.1 50 48.9

9:00-10:00 60.5 62.1 51.6 50.6 49.7 49.1

10:00-11:00 63.9 64 54.9 54.9 57 50.9

11:00-12:00 65.7 64.3 58.7 60.6 62.2 52.8

12:00-13:00 68.4 65.5 60.2 61.6 60.9 54.9

13:00-14:00 69.3 70.4 63.4 63.2 63.4 60.1

14:00-15:00 71.5 70.1 64.8 66.5 64.3 66.3

15:00-16:00 72 70.3 67.3 67.7 64.7 68.4

16:00-17:00 69.9 72.4 68.4 71.3 72.7 67.1

17:00-18:00 69 71.3 67.5 67.4 66.5 67.5

18:00-19:00 68.5 71.3 65.3 65.6 65.5 66.4

19:00-20:00 66.2 69.2 63.8 66.4 65.1 63.2

20:00-21:00 64.3 62.4 61.9 63.4 65.1 62.1

21:00-22:00 63.9 63 60.8 63 62.7 60.8

LIMIT :-75 dB(A)

TABLE NO. 6.10 RESULTS OF NEAR SUB STATION - 7B NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

NEAR SUB STATION - 7B

Date of Monitoring

06 &

07/10/2015

06 &

07/11/2015

05 &

06/12/2015

06 &

07/01/2016

05 &

06/02/2016

05 &

06/03/2016

22:00-23:00 62.3 64.5 59.7 59.8 62.7 59.4

23:00-00:00 61.5 61.9 58.6 58.3 56.2 58.3

00:00-01:00 60.9 57.8 56.2 54.5 56.6 57.6

01:00-02:00 58.7 58.7 54.3 55.5 52.7 54.2

02:00-03:00 56.3 56.7 50.2 50.5 49.6 51.8

03:00-04:00 54.2 52.2 48.9 47.9 49.5 49.3

04:00-05:00 53.6 50.4 47.1 43.7 41.9 47.7

05:00-06:00 52.9 54.3 45.3 44.8 44.8 45.3

LIMIT :-70 dB(A)

Page 45: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

31

TABLE NO. 6.11 RESULTS OF JS -1 (NEAR LAKHIGAM) DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

JS -1 (NEAR LAKHIGAM)

Date of Monitoring

07/10/2015 07/11/2015 07/12/2015 07/01/2016 06/02/2016 03/07/2016

6:00-7:00 50.7 51.8 42.8 49.3 52.2 41.9

7:00-8:00 57.9 55.5 43.9 44.6 43.1 42.8

8:00-9:00 61.7 59.5 45.8 49.2 50.7 47.4

9:00-10:00 62.3 62.8 49.3 54.4 53.5 49.3

10:00-11:00 65.4 63.2 52.9 55.9 54.8 51.6

11:00-12:00 67.3 70 55.9 60.5 58.4 53.8

12:00-13:00 69.5 71.6 57.8 61.5 61.1 54.9

13:00-14:00 70.4 68.9 60.8 63.5 65.9 61.5

14:00-15:00 71.9 70.3 63.4 66 66.9 62.6

15:00-16:00 72.6 72.4 65.9 68 68.8 68.8

16:00-17:00 70.7 73.6 67.8 67.2 69.8 67.3

17:00-18:00 69.3 67.8 66.9 71 71.6 69.8

18:00-19:00 67.7 68.5 64.8 69.5 67.7 68.3

19:00-20:00 65.9 67.2 62.7 68.1 70.5 66.5

20:00-21:00 64.3 63.6 61 66 63.2 64.3

21:00-22:00 63.8 66 60.5 64.4 62.7 62.1

LIMIT :-75 dB(A)

TABLE NO. 6.12 RESULTS JS -1 (NEAR LAKHIGAM) NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

JS -1 (NEAR LAKHIGAM)

Date of

Monitoring

07 &

08/10/2015

07 &

08/11/2015

07 &

08/12/2015

07 &

08/01/2016

06 &

07/02/2016

07 &

08/03/2016

22:00-23:00 63 59.9 59.3 62.2 65.1 61.4

23:00-00:00 62.7 62.4 58.3 58.2 59.4 60.2

00:00-01:00 61.3 63.7 55.3 59 59 58.4

01:00-02:00 60.4 61.8 54.7 53 51.5 56.2

02:00-03:00 58.4 61.1 52.9 51.8 54.4 54.7

03:00-04:00 55.2 55.3 50.1 51.3 48.7 52.8

04:00-05:00 54.5 53.8 49.3 48.3 46.4 51.6

05:00-06:00 53.7 55.6 47.4 45.6 47.8 49.3

LIMIT :-70 dB(A)

Page 46: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

32

TABLE NO. 6.13 RESULTS OF BEHIND S.S. - 11 (SILO) DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

BEHIND S.S. - 11 (SILO)

Date of Monitoring

08/10/2015 09/11/2015 08/12/2015 08/01/2016 08/02/2016 03/07/2016

6:00-7:00 53.1 52.9 43.7 47.9 48.2 40.3

7:00-8:00 57.5 55.5 45.9 47 44.4 41.9

8:00-9:00 60.4 62.2 48.3 51 50.6 47.9

9:00-10:00 62.4 62.7 51.6 52.1 53 49.2

10:00-11:00 64.3 66.6 54.9 55.4 56.5 50.8

11:00-12:00 66.2 62.7 58.2 58.5 59.7 54.9

12:00-13:00 68.5 65.4 59.4 63.8 65.4 56.8

13:00-14:00 69.4 72.1 61.2 62 61.3 60.9

14:00-15:00 69.9 72.4 63.5 64.7 65.3 64.8

15:00-16:00 70.8 69.9 65.9 68.2 70.1 65.8

16:00-17:00 69.7 69.8 67 69.3 68.5 68.3

17:00-18:00 68.5 71.4 66.5 68.9 70 66.5

18:00-19:00 66.2 67.3 65.2 69 67.7 64.3

19:00-20:00 64.3 65.2 63.8 67.8 66.7 63.2

20:00-21:00 63.4 63.9 62.4 64.5 63.2 62.1

21:00-22:00 62.5 64.2 61.9 61.2 62.5 60.3

LIMIT :-75 dB(A)

TABLE NO. 6.14 RESULTS BEHIND S.S. - 11 (SILO) NIGHT TIME NOISE

Sampling

Location

October-15 November-15 December-15 January-16 February-16 March-16

BEHIND S.S. - 11 (SILO)

Date of Monitoring

08 &

09/10/2015

09 &

10/11/2015

08 &

09/12/2015

08 &

09/01/2016

08 &

09/02/2016

08 &

09/03/2016

22:00-23:00 62.4 63.2 59 59.5 61.2 59.8

23:00-00:00 61.9 63.6 59.1 54.4 53.6 58.2

00:00-01:00 60.3 60.7 57.2 53.6 53.6 57.6

01:00-02:00 59.4 61.9 55.3 50 52.1 55.3

02:00-03:00 57.6 56 53.1 47.7 49 52.4

03:00-04:00 55.4 55.4 50.4 46.1 47.1 48.7

04:00-05:00 53 53.6 48.7 45.3 43.5 46.2

05:00-06:00 52.8 55.8 45.2 45.9 47.1 45.3

LIMIT :-70 dB(A)

Page 47: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

33

TABLE NO. 6.15 RESULTS OF NEAR S & S ENTRY GATE (DAHEJ ROAD) DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

NEAR S & S ENTRY GATE (DAHEJ ROAD)

Date of

Monitoring 09/10/2015 10/11/2015 09/12/2015 09/01/2016 09/02/2016 03/07/2016

6:00-7:00 55.9 53.8 41.4 44.4 43.5 45.4

7:00-8:00 57.8 60.8 43.4 46.4 46 47.8

8:00-9:00 60.7 63.7 46.9 53.7 54.9 49.3

9:00-10:00 62.5 59.2 50.8 56.8 59.2 50.2

10:00-11:00 64.4 66.9 52.4 60.6 59.3 54.3

11:00-12:00 65.3 67.9 59.3 60.8 61.3 56.9

12:00-13:00 67.2 67.6 61.4 62.6 61.3 52.6

13:00-14:00 68.3 66.7 62.8 62.9 60.4 57.8

14:00-15:00 70.5 68.9 63.4 67.3 65.6 60.3

15:00-16:00 71.6 74.2 65.7 67.2 68.9 62.5

16:00-17:00 70.5 72.9 68.9 68 70.7 64.9

17:00-18:00 69.3 70.7 67.4 67.2 68.2 68.7

18:00-19:00 67 70 66.2 61.8 59.3 66.2

19:00-20:00 65.4 68.3 65.4 60.7 59.9 64.3

20:00-21:00 63.6 65.9 63.2 59.9 61.9 62.9

21:00-22:00 62.9 60.5 61.4 56.5 53.8 61

LIMIT :-75 dB(A)

TABLE NO. 6.16 RESULTS NEAR S & S ENTRY GATE (DAHEJ ROAD) NIGHT TIME NOISE

Sampling

Location

October-15 November-15 December-15 January-16 February-16 March-16

NEAR S & S ENTRY GATE (DAHEJ ROAD)

Date of

Monitoring

09 &

10/10/2015

10 &

11/11/2015

09 &

10/12/2015

09 &

10/01/2016

09 &

10/02/2016

09 &

10/03/2016

22:00-23:00 61.9 59 59.3 57.8 55.7 60.8

23:00-00:00 60.4 61.7 58.4 57.4 57.1 60.1

00:00-01:00 59.5 61.4 56.2 55.6 54 57.3

01:00-02:00 58.3 55.4 54.9 52 49.6 55

02:00-03:00 56.2 57.1 52.8 51.4 52.4 52.7

03:00-04:00 54.7 51.2 50.7 51.3 53.6 50.6

04:00-05:00 52.6 52.7 47.3 50.9 50.8 48.7

05:00-06:00 51.9 52.1 44.2 50.1 50.2 46.2

LIMIT :-70 dB(A)

Page 48: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

34

TABLE NO. 6.17 RESULTS OF GCPTL GATE DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

GCPTL GATE

Date of Monitoring

10/10/2015 11/11/2015 10/12/2015 11/01/2016 10/02/2016 03/07/2016

6:00-7:00 54.7 51.8 44.7 46.7 45.9 44.8

7:00-8:00 55.3 56.7 45.9 45.2 46.1 46.9

8:00-9:00 57.9 60.5 47.8 47.7 46.8 49.1

9:00-10:00 59.3 58.2 50.9 49.5 49.1 50.3

10:00-11:00 62.2 65.2 53.2 56.3 57.4 52.9

11:00-12:00 64.5 64.1 57.8 56.4 53.5 54.8

12:00-13:00 68 68.7 59.7 61.8 63.8 56.9

13:00-14:00 69.5 70.4 61.4 63.3 65.2 60.3

14:00-15:00 71.2 71.7 65.4 66.8 64 63.8

15:00-16:00 72.6 71.9 68.9 67.8 69.1 64.5

16:00-17:00 70.6 72 69.7 68.2 66.1 66.8

17:00-18:00 69.1 70 68.2 68.4 67 68.7

18:00-19:00 68.7 69 67 69.5 67.6 67.5

19:00-20:00 66.9 68.3 65 66.7 69.5 66.4

20:00-21:00 64.4 61.6 64.9 64.2 62.3 63.2

21:00-22:00 62.5 62.8 62.8 63.4 61.9 62.5

LIMIT :-75 dB(A)

TABLE NO. 6.18 RESULTS GCPTL GATE NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

GCPTL GATE

Date of

Monitoring

10 &

11/10/2015

11 &

12/11/2015

10 &

11/12/2015

11 &

12/01/2016

10 &

11/02/2016

10 &

11/03/2016

22:00-23:00 62 60.5 61.4 60.7 61 61.3

23:00-00:00 61.6 61.3 60.3 59.4 61.2 59.8

00:00-01:00 60.4 63 58.7 57.9 57.1 57.4

01:00-02:00 59.6 57.9 56.4 55.4 55.7 55.3

02:00-03:00 57.3 55.2 50.3 53.3 51.7 52.7

03:00-04:00 55.9 56.6 49.4 53.1 50.4 50.6

04:00-05:00 53.2 52.5 45.3 50.3 51.2 48.7

05:00-06:00 52.7 50.2 43.2 47 44 45.9

LIMIT :-70 dB(A)

Page 49: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

35

TABLE NO. 6.19 RESULTS OF LAKHI VILLAGE (PRIMARY SCHOOL) DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

LAKHI VILLAGE (PRIMARY SCHOOL)

Date of Monitoring

12/10/2015 12/11/2015 11/12/2015 12/01/2016 11/02/2016 03/07/2016

6:00-7:00 51.4 50.9 42.8 40.9 40.8 41.9

7:00-8:00 52.7 50.8 44.7 45.9 47.9 42.7

8:00-9:00 54.9 53.9 49.1 46.1 43.6 44.6

9:00-10:00 56.8 54.8 51.7 54 54.1 48.7

10:00-11:00 59.2 61 54.9 57.4 59.9 50.6

11:00-12:00 61.5 60.1 58.9 60.1 62.3 52.8

12:00-13:00 63.7 64.9 60.4 62.7 60.1 57.9

13:00-14:00 65.1 64.2 62.9 64.9 62.9 61.4

14:00-15:00 68.7 66.6 65.3 64.9 63.3 64.9

15:00-16:00 69.4 72.4 67.9 66.3 67.6 65.3

16:00-17:00 70.3 66.8 68.3 71.3 69.1 66.6

17:00-18:00 68.5 71.1 67.4 69.2 67 68.9

18:00-19:00 67.3 66.6 66.3 67.9 69.6 69.3

19:00-20:00 65.1 67.6 64.9 66.7 68.8 67.2

20:00-21:00 64.9 66.2 63.8 62.8 65.4 66.5

21:00-22:00 63.7 61.9 61.2 62.7 63.9 64.4

LIMIT :-75 dB(A)

TABLE NO. 6.20 RESULTS LAKHI VILLAGE (PRIMARY SCHOOL) NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

LAKHI VILLAGE (PRIMARY SCHOOL)

Date of

Monitoring

12 &

13/10/2015

12 &

13/11/2015

11 &

12/12/2015

12 &

13/01/2016

11 &

12/02/2016

11 &

12/03/2016

22:00-23:00 62.5 60.1 60.4 61.2 62 62.7

23:00-00:00 61.7 61.1 59.3 61.3 59.1 60.2

00:00-01:00 60.3 57.9 55.3 56.1 57.6 57.8

01:00-02:00 59.3 62 54.9 56.2 58.1 56.4

02:00-03:00 58.1 55.5 52.7 54.6 56 53.2

03:00-04:00 56.3 57.4 50.3 53.7 52.3 50.7

04:00-05:00 54.1 51.8 48.9 49.5 46.7 47.8

05:00-06:00 52.7 50.8 46.5 46.8 46 45.3

LIMIT :-70 dB(A)

Page 50: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

36

TABLE NO. 6.21 RESULTS OF ERMS WORKSHOP DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

ERMS WORKSHOP

Date of Monitoring

13/10/2015 13/11/2015 12/12/2015 13/01/2016 02/12/2016 03/12/2016

6:00-7:00 54.1 55.2 44.8 43.9 41.3 40.9

7:00-8:00 52.7 52.2 45.9 48.8 48.9 41.8

8:00-9:00 54.9 54.7 50.3 51.2 51.4 47.3

9:00-10:00 56.8 57.4 51.9 57.1 55.3 49.2

10:00-11:00 59.2 55.7 55.8 59.8 59.2 53.1

11:00-12:00 61.5 60.7 57.9 59.5 57.8 59.4

12:00-13:00 63.7 63.8 58.3 62.8 60.5 62.4

13:00-14:00 65.1 63.4 59.4 63.4 63.5 64.8

14:00-15:00 68.7 70.4 61.3 67 68.7 67.3

15:00-16:00 69.4 71.2 63.1 68.6 67.1 68.9

16:00-17:00 70.3 71.3 65.9 69.1 72.1 69.3

17:00-18:00 68.5 68.9 68.7 67.5 68.3 68.4

18:00-19:00 67.3 64.9 69.3 65.6 67.4 66.5

19:00-20:00 65.1 66.8 66.4 64.7 62.1 65.3

20:00-21:00 64.9 66.8 64.8 62.8 64.6 62.8

21:00-22:00 63.7 63.8 63.7 62.1 61.4 61.4

LIMIT :-75 dB(A)

TABLE NO. 6.22 RESULTS OF ERMS WORKSHOP NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

ERMS WORKSHOP

Date of

Monitoring

13 &

14/10/2015

13 &

14/11/2015

12 &

13/12/2015

13 &

14/01/2016

12 &

13/02/2016

12 &

13/03/2016

22:00-23:00 62 61.2 61.9 59.2 57.2 62.7

23:00-00:00 61.6 59.3 58.3 61.3 59.3 60.2

00:00-01:00 60.4 62 56.2 59.7 59.8 57.8

01:00-02:00 59.6 61.6 54.8 56.8 57.6 56.4

02:00-03:00 57.3 54.5 52.7 52.5 52.5 53.2

03:00-04:00 55.9 58.4 49.3 52.6 53.7 50.7

04:00-05:00 53.2 50.7 47.4 48 48.7 47.8

05:00-06:00 52.7 53.6 45.3 48.1 48.9 45.3

LIMIT :-70 dB(A)

Page 51: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

37

TABLE NO. 6.23 RESULTS OF BEHIND PUMP HOUSE DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

BEHIND PUMP HOUSE

Date of Monitoring

14/10/2015 14/11/2015 14/12/2015 15/01/2016 13/02/2016 14/03/2016

6:00-7:00 54.7 57.6 46.2 48.9 47.4 42.3

7:00-8:00 55.3 53.8 47.9 46.8 47.7 44.8

8:00-9:00 57.9 60.9 51.4 51.8 49.7 46.9

9:00-10:00 59.3 61.5 53.9 56.3 53.9 48.7

10:00-11:00 62.2 59.9 55.4 55.3 55.1 51.4

11:00-12:00 64.5 66.8 57.4 59.7 61.5 54.8

12:00-13:00 68 68.3 59.2 59.4 57.3 56.7

13:00-14:00 69.5 66 61.3 61.7 60.3 60.4

14:00-15:00 71.2 68.4 64.8 66.3 67 65.7

15:00-16:00 72.6 74.9 66.3 68.1 66.5 68.4

16:00-17:00 70.6 69.2 69.4 69.6 68.3 69.3

17:00-18:00 69.1 68.6 68.7 66.3 67.1 68.5

18:00-19:00 68.7 66.7 67.1 67.7 68.2 66.4

19:00-20:00 66.9 63.7 66.9 65.5 67.8 65.5

20:00-21:00 64.4 63.6 64.6 63.5 65.9 63.6

21:00-22:00 62.5 62.7 62.8 61.4 61.8 61.7

LIMIT :-75 dB(A)

TABLE NO. 6.24 RESULTS OF BEHIND PUMP HOUSE NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

BEHIND PUMP HOUSE

Date of

Monitoring

14 &

15/10/2015

14 &

15/11/2015

14 &

15/12/2015

15 &

16/01/2016

13 &

14/02/2016

14 &

15/03/2016

22:00-23:00 62.5 64.9 60.8 58.1 58.2 60.8

23:00-00:00 61.7 63.4 59.3 58.1 60.7 60.2

00:00-01:00 60.3 61.6 56.2 53.4 50.9 57.4

01:00-02:00 59.3 59.7 53.8 51.9 51.1 55.8

02:00-03:00 58.1 57.5 51.7 49.4 47 52.7

03:00-04:00 56.3 55.5 50.1 49.1 49.7 50.6

04:00-05:00 54.9 51.8 49.3 47.7 50.6 47.8

05:00-06:00 53.1 51.9 48.2 48.2 48.5 46.3

LIMIT :-70 dB(A)

Page 52: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

38

TABLE NO. 6.25 RESULTS OF ROCK BOND APPROACH (JETTY) DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

ROCK BOND APPROACH (JETTY)

Date of Monitoring

15/10/2015 16/11/2015 15/12/2015 16/01/2016 15/02/2016 15/03/2016

6:00-7:00 54.2 54.7 41.4 47.1 48.7 41.8

7:00-8:00 57.8 56.8 43.4 49 51.6 43.4

8:00-9:00 60.7 61.2 46.9 50.3 52.2 48.7

9:00-10:00 62.5 63.5 50.8 56.2 55.3 52.3

10:00-11:00 64.4 64.1 52.4 56.3 55.6 54.8

11:00-12:00 65.3 67.1 56.8 60 59 60.5

12:00-13:00 67.2 65.4 59.3 63.1 66 62.3

13:00-14:00 68.2 66.3 61.4 63 65.9 64.8

14:00-15:00 70.5 73.5 62.8 67 69 66.9

15:00-16:00 71.6 70.7 63.4 68 66.9 67.8

16:00-17:00 70.5 67.2 65.7 70.4 71.8 68.9

17:00-18:00 69.3 68.7 68.9 67.4 65.7 69.1

18:00-19:00 67 65 67.4 66.5 65 63.7

19:00-20:00 65.4 64.7 66.2 65.4 65.3 62.1

20:00-21:00 63.6 65 65.4 63.6 63.4 60.8

21:00-22:00 62.9 64.2 63.2 64.1 61.9 60.1

LIMIT :-75 dB(A)

TABLE NO. 6.26 RESULTS ROCK BOND APPROACH (JETTY) NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

ROCK BOND APPROACH (JETTY)

Date of

Monitoring

15 &

16/10/2015

16 &

17/11/2015

15 &

16/12/2015

16 &

17/01/2016

15 &

16/02/2016

15 &

16/03/2016

22:00-23:00 61.9 64.2 59.3 62.5 63.3 61.3

23:00-00:00 60.4 56.9 58.4 58.8 57.4 59.8

00:00-01:00 59.5 62.5 56.2 60.1 59.1 57.4

01:00-02:00 58.3 58.1 54.9 55.1 53.8 55.3

02:00-03:00 56.2 57.7 52.8 53.1 54.1 52.7

03:00-04:00 54.7 51.2 50.7 51.1 53.2 50.8

04:00-05:00 52.6 50.5 47.3 48.9 48.4 48.9

05:00-06:00 51.9 53.3 44.2 51.3 52.4 45.6

LIMIT :-70 dB(A)

Page 53: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

39

TABLE NO. 6.27 RESULTS OF NEW GATE DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

NEW GATE

Date of

Monitoring 16/10/2015 17/11/2015 16/12/2015 18/01/2016 16/02/2016 16/03/2016

6:00-7:00 53.1 52.8 44.7 46.6 45.2 41.9

7:00-8:00 57.5 59 45.9 49.3 48.5 42.8

8:00-9:00 60.4 57.4 47.8 55.2 53.9 47.4

9:00-10:00 62.4 60.2 50.9 56.2 54.1 49.3

10:00-11:00 64.3 63.7 53.2 59.4 58.4 51.6

11:00-12:00 66.2 64.8 55.9 63.5 60.8 53.8

12:00-13:00 68.5 68.1 57.8 62.6 62.1 54.9

13:00-14:00 69.4 71.9 59.7 65.9 63.4 61.5

14:00-15:00 69.9 68.3 61.4 67.8 68.8 62.6

15:00-16:00 70.8 71.4 62.9 69.3 72.3 64.8

16:00-17:00 69.7 67.6 67.8 66.9 67 67.3

17:00-18:00 68.5 65.2 69.7 69.4 69.3 69.8

18:00-19:00 66.2 68.4 68.2 68.7 68.5 68.3

19:00-20:00 64.3 64.7 67.3 63.7 65.6 66.5

20:00-21:00 63.2 64.2 65 66.1 65 64.3

21:00-22:00 62.5 62 64.9 64 61.7 62.1

LIMIT :-75 dB(A)

TABLE NO. 6.28 RESULTS OF NEW GATE NIGHT TIME NOISE

Sampling

Location

October-15 November-15 December-15 January-16 February-16 March-16

NEW GATE

Date of Monitoring

16 &

17/10/2015

17 &

18/11/2015

16 &

17/12/2015

18 &

19/01/2016

16 &

17/02/2016

16 &

17/03/2016

22:00-23:00 62.4 60.3 61.4 62.9 63.3 59.8

23:00-00:00 61.9 61.7 60.3 59.8 61.4 58.2

00:00-01:00 60.3 62.6 59.3 54.6 54.9 57.6

01:00-02:00 59.4 60.4 56.4 52.5 54.6 55.3

02:00-03:00 57.6 54.3 50.3 50.8 51.7 52.4

03:00-04:00 55.4 55.5 49.4 50.9 50.9 49.3

04:00-05:00 53 53.8 44.8 49.5 47.8 47.7

05:00-06:00 52.8 54.4 43.7 47.8 47.1 45.3

LIMIT :-70 dB(A)

Page 54: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

40

TABLE NO. 6.29 RESULTS OF SECURITY BARRIER GATE DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

SECURITY BARRIER GATE

Date of Monitoring

17/10/2015 18/11/2015 17/12/2015 19/01/2016 17/02/2016 17/03/2016

6:00-7:00 50.7 50.1 45.1 45.4 47.2 40.3

7:00-8:00 57.9 55.2 48.3 52.2 53.4 41.9

8:00-9:00 61.7 60.8 49.4 54 52.7 47.9

9:00-10:00 62.3 59.8 51.6 54.8 56.9 49.2

10:00-11:00 65.4 63.3 54.9 56.9 57.9 50.8

11:00-12:00 67.3 65.2 56.8 61.9 64.9 54.9

12:00-13:00 69.5 71 58.7 61.6 60.1 56.8

13:00-14:00 70.4 69.2 60.2 65.8 66.5 60.9

14:00-15:00 71.9 72.1 63.4 65.5 67.6 64.8

15:00-16:00 72.6 72.8 64.9 67.8 68.4 65.8

16:00-17:00 70.7 70.6 67.3 69.1 69.9 68.3

17:00-18:00 69.3 67.9 68.4 67.3 69.1 66.5

18:00-19:00 67.7 70.3 67.5 65.3 65.9 64.3

19:00-20:00 65.9 63.3 65.3 66.5 68.5 63.2

20:00-21:00 64.3 62.9 63.8 63.6 61.1 62.1

21:00-22:00 63.8 62.3 61.9 62.6 63.3 60.3

LIMIT :-75 dB(A)

TABLE NO. 6.30 RESULTS OF SECURITY BARRIER GATE NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

SECURITY BARRIER GATE

Date of

Monitoring

17 &

18/10/2015

18 &

19/11/2015

17 &

18/12/2015

19 &

20/01/2016

17 &

18/02/2016

17 &

18/03/2016

22:00-23:00 63 64.6 59.7 59 61.6 59.3

23:00-00:00 62.7 63.9 58.6 57.2 55.6 58.4

00:00-01:00 61.3 61 56.2 58.2 55.3 56.4

01:00-02:00 60.4 58.7 54.3 56.9 57.4 54.3

02:00-03:00 58.4 55.2 50.2 54.2 55.3 53.2

03:00-04:00 55.2 53.6 48.9 50.1 52.3 50.4

04:00-05:00 53.5 54.8 47.1 48.3 46.9 50

05:00-06:00 52.7 55.5 45.3 47.4 45.6 48.3

LIMIT :-70 dB(A)

Page 55: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

41

TABLE NO. 6.31 RESULTS OF JS – 2 DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

JS – 2

Date of Monitoring

19/10/2015 19/11/2015 18/12/2015 20/01/2016 18/02/2016 18/03/2016

6:00-7:00 51.3 53 44.7 44.2 42 43.4

7:00-8:00 53.7 54.5 45.7 46.6 48.9 45.4

8:00-9:00 56.9 54.7 48.3 48.7 51.2 48.9

9:00-10:00 60.5 60.3 51.4 53.9 51.1 47.1

10:00-11:00 63.9 63.4 55.2 54.8 56.4 50.9

11:00-12:00 65.7 65.7 58.9 57.8 60.3 52.8

12:00-13:00 68.4 71 59.1 62.3 63.4 54.9

13:00-14:00 69.3 66.9 62.4 64.9 64.6 60.1

14:00-15:00 71.5 73.8 65.6 65.3 67.2 66.3

15:00-16:00 72 69.4 67.9 70.1 69.7 68.4

16:00-17:00 69.9 69.8 68.3 68.2 70.7 69.1

17:00-18:00 69 66.8 69.2 70.1 70.2 67.5

18:00-19:00 68.5 70.6 67.3 68.8 69.4 66.4

19:00-20:00 66.2 65.2 65.8 64.6 64.9 63.2

20:00-21:00 64.3 65.9 64.2 63.9 66.9 62.1

21:00-22:00 63.9 66.3 62.9 62.3 63.9 60.8

LIMIT :-75 dB(A)

TABLE NO. 6.32 RESULTS OF JS – 2 NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

JS – 2

Date of

Monitoring

19 &

20/10/2015

19 &

20/11/2015

18 &

19/12/2015

20 &

21/01/2016

18 &

19/02/2016

18 &

19/03/2016

22:00-23:00 62.3 64.8 60.3 61.4 59.3 60.2

23:00-00:00 61.5 60.1 58.7 60.8 63.1 58.3

00:00-01:00 60.9 59.7 56.9 58.7 57.8 57.4

01:00-02:00 58.7 58.5 54.3 57.5 57.5 53.6

02:00-03:00 56.3 53.1 52.1 49.3 49 52.7

03:00-04:00 54.2 51.6 50.8 49.7 51.4 51.8

04:00-05:00 53.2 55.4 47.4 49.9 51.2 50.7

05:00-06:00 52.9 52.2 44.2 45 42.5 47.3

LIMIT :-70 dB(A)

Page 56: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

42

TABLE NO. 6.33 RESULTS OF RAILWAY DEAD END DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

RAILWAY DEAD END

Date of Monitoring

20/10/2015 20/11/2015 19/12/2015 21/01/2016 19/02/2016 19/03/2016

6:00-7:00 52.7 53 43.8 47 45.6 41.7

7:00-8:00 54.9 53.2 44.7 46.6 45 42.9

8:00-9:00 58.7 61.1 49.1 51.1 49.6 45.8

9:00-10:00 62.9 61.4 51.7 53.9 51 49

10:00-11:00 65.4 64.2 54.9 56.7 53.7 52.3

11:00-12:00 66.8 67 56.4 59.1 56.9 56.9

12:00-13:00 67.3 67.3 58.9 59.2 56.4 58.2

13:00-14:00 68.5 66.3 60.4 62.6 60.4 61.3

14:00-15:00 70.8 69.4 62.9 64.4 63.8 64.5

15:00-16:00 71.9 69.5 65.3 68.3 67.1 67.4

16:00-17:00 69.3 67.2 67.9 67.9 68.1 69.3

17:00-18:00 68.5 68.2 68.3 69.1 66.8 68.6

18:00-19:00 67.9 66.3 67.4 69.9 69.6 67.3

19:00-20:00 66 67.2 66.3 68.7 71 66.1

20:00-21:00 65.2 64.4 64.9 67.4 68.5 64.2

21:00-22:00 63.4 60.3 63.8 65.2 64.8 62.3

LIMIT :-75 dB(A)

TABLE NO. 6.34 RESULTS OF RAILWAY DEAD END NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

RAILWAY DEAD END

Date of

Monitoring

20 &

21/10/2015

20 &

21/11/2015

19 &

20/12/2015

21 &

22/01/2016

19 &

20/02/2016

19 &

20/03/2016

22:00-23:00 61.3 57.9 60.4 61.4 58.8 61.3

23:00-00:00 60.7 58.8 59.3 57.8 57.1 60.2

00:00-01:00 59.6 57.7 55.3 56.3 56.4 60

01:00-02:00 58.4 56.8 54.9 53.1 52.6 58.7

02:00-03:00 57.2 53.9 52.7 50.8 53 54.6

03:00-04:00 55.5 56.2 50.3 51.5 54.1 52.7

04:00-05:00 53.1 51.9 48.9 50.2 49.7 51.9

05:00-06:00 52.7 54.4 46.5 46.4 46.8 48.6

LIMIT :-70 dB(A)

Page 57: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

43

TABLE NO. 6.35 RESULTS OF S AND S YARD (SOUTH) DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

S AND S YARD (SOUTH)

Date of Monitoring

21/10/2015 21/11/2015 21/12/2015 22/01/2016 20/02/2016 21/03/2016

6:00-7:00 56.3 58.4 42.7 42.2 42.9 45.4

7:00-8:00 57.9 59.8 45.9 46.3 44.6 47.8

8:00-9:00 59.3 61.9 48.3 47.5 45.5 49.3

9:00-10:00 62.4 63.8 51.6 48.9 49.8 50.2

10:00-11:00 63.7 61 54.9 53.7 52.9 54.3

11:00-12:00 65.6 63.1 57.8 54.5 54.7 56.9

12:00-13:00 68.5 65.9 58.2 60.7 60.8 52.6

13:00-14:00 69.7 71.7 59.4 60.7 57.7 57.8

14:00-15:00 71.6 72.5 61.2 64.3 62.6 60.3

15:00-16:00 72.8 72.5 63.5 64.9 64.8 62.5

16:00-17:00 69.5 70 65.9 67.4 68.4 64.9

17:00-18:00 68 68.9 67 68.4 65.6 68.7

18:00-19:00 67.3 69.8 66.5 68 70.3 66.2

19:00-20:00 66.4 66.1 65.2 66.1 68.6 64.3

20:00-21:00 64.5 63.4 63.8 65.6 66.2 62.9

21:00-22:00 62.9 59.6 62.4 61.4 61.1 61

LIMIT :-75 dB(A)

TABLE NO. 6.36 RESULTS OF S AND S YARD (SOUTH) NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

S AND S YARD (SOUTH)

Date of

Monitoring

21 &

22/10/2015

21 &

22/11/2015

21 &

22/12/2015

22 &

23/01/2016

20 &

21/02/2016

21 &

22/03/2016

22:00-23:00 62.8 63 59.6 62.6 60.4 59.4

23:00-00:00 61.9 60.4 58.2 58.3 56.4 58.3

00:00-01:00 60.5 62.8 56.3 55 53.8 57.6

01:00-02:00 59.4 60.2 55.2 50.4 53.3 54.2

02:00-03:00 57.2 60.2 53.1 50.3 51.9 51.8

03:00-04:00 56.8 55.9 50.4 50.3 49.3 49.3

04:00-05:00 54.9 52.6 48.7 46.6 48.4 47.7

05:00-06:00 53.6 52.3 45.2 44.8 43.2 48.3

LIMIT :-70 dB(A)

Page 58: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

44

TABLE NO. 6.37 RESULTS OF S AND S YARD (NORTH) BOUNDARY WALL DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

S AND S YARD (NORTH) BOUNDARY WALL

Date of Monitoring

22/10/2015 23/11/2015 22/12/2015 23/01/2016 22/02/2016 22/03/2016

6:00-7:00 53.2 51.2 42.8 45.2 43.2 41.9

7:00-8:00 55.7 55.9 43.9 46.4 48.2 42.7

8:00-9:00 56.9 59.4 45.8 50.9 52.2 44.6

9:00-10:00 59.3 56.9 49.3 51.1 48.6 48.7

10:00-11:00 61.7 64.5 52.9 55.1 52.1 50.6

11:00-12:00 64.9 61.4 54.8 56.4 59.4 52.8

12:00-13:00 67.3 68 55.9 62.1 59.8 57.9

13:00-14:00 69.8 68.9 57.8 62.7 64.3 61.4

14:00-15:00 71.5 71.8 60.8 65.9 66.5 64.9

15:00-16:00 70.6 68.1 63.4 65.7 68.7 65.3

16:00-17:00 69.5 69 65.9 67.6 66 66

17:00-18:00 68.4 68.1 67.8 68.4 68.7 68.9

18:00-19:00 66.5 63 66.9 69.3 67.2 69.3

19:00-20:00 65.8 64.4 64.8 65.5 65 67.2

20:00-21:00 64.8 61.9 62.7 67.1 65.5 66.8

21:00-22:00 62.1 62.4 61 62.6 65.3 64.5

LIMIT :-75 dB(A)

TABLE NO. 6.38 RESULTS OF S AND S YARD (NORTH) BOUNDARY WALL NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

S AND S YARD (NORTH) BOUNDARY WALL

Date of

Monitoring

22 &

23/10/2015

23 &

24/11/2015

22 &

23/12/2015

23 &

24/01/2016

22 &

23/02/2016

22 &

23/03/2016

22:00-23:00 61.7 62.1 59.3 63.5 63.8 60.3

23:00-00:00 60.9 59.7 58.4 59.6 59 59.4

00:00-01:00 59.3 59.5 55.3 57.4 56.5 57.6

01:00-02:00 58.4 58.1 54.7 57.4 58.7 55.3

02:00-03:00 57.2 54.6 52.9 52 50.3 52.8

03:00-04:00 55.2 52.2 50.1 52.3 51.4 50.3

04:00-05:00 54.5 52.9 49.3 48.1 46.1 49.7

05:00-06:00 52.3 50.6 47.4 46.6 48.7 46.7

LIMIT :-70 dB(A)

Page 59: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

45

TABLE NO. 6.39 RESULTS OF LAKHI VILLAGE (BELOW CONVEYER BELT) DAY TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

LAKHI VILLAGE (BELOW CONVEYER BELT)

Date of Monitoring

23/10/2015 24/11/2015 23/12/2015 25/01/2016 23/02/2016 23/03/2016

6:00-7:00 54.8 56.4 43.2 44 44.5 44.8

7:00-8:00 55.6 53.5 44.8 45.2 46.6 46.9

8:00-9:00 57.9 58.1 48.9 50.1 51.6 49.1

9:00-10:00 60.3 58.2 52.1 50.9 50.3 50.3

10:00-11:00 63.8 61.5 53.8 55.4 55.9 52.9

11:00-12:00 65.9 67.9 56.7 58.5 55.6 54.8

12:00-13:00 68.7 70.1 59.2 58.9 56.5 56.9

13:00-14:00 69.3 70 61.9 61.6 63.9 60.3

14:00-15:00 70.4 72 63.4 64.1 64.1 63.8

15:00-16:00 69.5 69.4 64.3 67.9 69.5 64.5

16:00-17:00 68.3 70.2 66.4 68 66.7 66.8

17:00-18:00 67.7 65 67.4 67.4 70.2 68.7

18:00-19:00 66.4 64.1 68.1 68.1 70.6 67.5

19:00-20:00 65.5 67.9 66 69 66.5 66.4

20:00-21:00 64.9 64.6 65.2 67.7 67.5 63.2

21:00-22:00 62.8 65 63.2 64 62.1 62.5

LIMIT :-75 dB(A)

TABLE NO. 6.40 RESULTSOF LAKHI VILLAGE (BELOW CONVEYER BELT) NIGHT TIME NOISE

Sampling Location

October-15 November-15 December-15 January-16 February-16 March-16

LAKHI VILLAGE (BELOW CONVEYER BELT)

Date of

Monitoring

23 &

24/10/2015

24 &

25/11/2015

23 &

24/12/2015

25 &

26/01/2016

23 &

24/02/2016

23 &

24/03/2016

22:00-23:00 62.5 59.7 61.7 65.5 68.3 61.8

23:00-00:00 61.3 60.1 59.3 60.9 62.1 60.3

00:00-01:00 60.8 58.6 57.3 61 60.4 60.1

01:00-02:00 58.2 55.5 55.4 55 56.2 58.6

02:00-03:00 56.3 57.1 53.9 50.8 48.7 54.2

03:00-04:00 55.9 57.4 50.1 51.6 53.4 52.6

04:00-05:00 54.7 55.1 48.3 49.4 47.6 51.8

05:00-06:00 53.2 55.9 45.9 49.9 52.4 48.5

LIMIT :-70 dB(A)

Page 60: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

46

STACK MONITORING (OCTOBER 2015 TO MARCH 2016)

PARAMETER DETAILS:

Table no. 7.1 Result of DG stack monitoring

SR.

NO. TEST PARAMETER UNIT

DG SET # 1 MRSS (SS5) 125 KVA

27/10/2015 26/01/2016

1 Particulate Matter mg/Nm3 16.83 30.5

2 Sulfur Dioxide as SO2 ppm 6.15 8.6

3 Oxides of Nitrogen as NOX ppm 34.71 29.55

4 Non Methyl Hydro Carbon (NMHC) mg/m3 BDL* BDL*

5 Carbon Monoxide mg/m3 5.61 6.11

DG Noise Leq dB (A) 71.5 70.3 BDL*: Below Detection Limit, Minimum Detection Limit: Hydro Carbon: 75 mg/m3, Results on 11 % O2 Correction when Oxygen is greater than 11 %

SR.

NO. TEST PARAMETER UNIT

DG SET # 2 SS7B 125 KVA

27/10/2015 26/01/2016

1 Particulate Matter mg/Nm3 20.46 18.55

2 Sulfur Dioxide as SO2 ppm 5.22 7.41

3 Oxides of Nitrogen as NOX ppm 30.58 35.96

4 Non Methyl Hydro Carbon (NMHC) mg/m3 BDL* BDL*

5 Carbon Monoxide mg/m3 8.96 8.41

DG Noise Leq dB (A) 71.5 73.2 68.1 BDL*: Below Detection Limit, Minimum Detection Limit: Hydro Carbon: 75 mg/m3, Results on 11 % O2 Correction when Oxygen is greater than 11 %

Sr. No. Sampling Location Unit Test/Sampling Method

1 Particulate Matter mg/Nm3 IS:11255 (Part-1) : 1985

2 Sulphur Dioxide ppm IS:11255 (Part-2) : 1985

3 Oxide of Nitrogen ppm IS: 11255 (Part-7) : 2005

4 Carbon Monoxide (CO) mg/m3 Digital Gas Analyzer

5 Non Methyl Hydro Carbon (NMHC) mg/m3 Gas Chromatography

Page 61: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 1 (Environment Clearance Compliance report Oct 2015 to March 2016)

47

SR.

NO. TEST PARAMETER UNIT

DG SET # 3 Marine (SS8)125 KVA

27/10/2015 26/01/2016

1 Particulate Matter mg/Nm3 40.72 23.54

2 Sulfur Dioxide as SO2 ppm 6.35 5.49

3 Oxides of Nitrogen as NOX ppm 35.19 32.55

4 Non Methyl Hydro Carbon (NMHC) mg/m3 BDL* BDL*

5 Carbon Monoxide mg/m3 7.31 7.16

DG Noise Leq dB (A) 70.8 66.2 B BDL*: Below Detection Limit, Minimum Detection Limit: Hydro Carbon: 75 mg/m3, Results on 11 % O2 Correction when Oxygen is greater than 11 %

SR.

NO. TEST PARAMETER UNIT

DG SET # 4 Silo (SS11)125 KVA

27/10/2015 26/01/2016

1 Particulate Matter mg/Nm3 24.72 26.81

2 Sulfur Dioxide as SO2 ppm 7.49 6.49

3 Oxides of Nitrogen as NOX ppm 38.28 26.3

4 Non Methyl Hydro Carbon (NMHC) mg/m3 BDL* BDL*

5 Carbon Monoxide mg/m3 4.29 4.48

DG Noise Leq dB (A) 69.4 68.4 BDL*: Below Detection Limit, Minimum Detection Limit: Hydro Carbon: 75 mg/m3, Results on 11 % O2 Correction when Oxygen is greater than 11 %

Page 62: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure – 2

Environment Expenditure & Budget for F.Y. 2015-16

SN

No Activity/ Category

Budget Expenditure

(INR) (INR)

1 Environmental Study / Audit and Consultancy -- 14.61

2 Legal & Statutory Expenses 0.20 3.14

3 Environmental Monitoring Services 18.0 18.0

4 Mangrove Plantation 0.0 0.0

5 Hazardous Waste Management & Disposal 0.50 0.75

6 Greenbelt Development and Plantation 19.60 19.76

7 O&M of Pollution control measures 41.36 38.95

8 Environment Day Celebration 1.50 1.60

9 Treatment and Disposal of Bio-Medical Waste 1.80 1.92

Total Amount (INR) 82.96 98.73

Capital Expenditure

1 Organic waste converter (kitchen waste & garden debris ) 8.0 8.0

2 Trailer mounted fog canon 15.5 16.0

3 Environment Information Board 3.0 2.75

4 Horticulture (Green Belt Development) 10.63 10.50

5 Flow Meter - Engg. Services 6.0 5.85

Total Amount (INR) 43.13 43.10

Page 63: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Annexure 3

ADANI FOUNDATION, DAHEJ

CSR ACTIVITY DETAILS (OCTOBER 2015 TO MARCH 2016)

Sr.

No Month Action Items

Budge

t

Utilize

d

(INR

Lacs)

Beneficiaries

Direct

Beneficiaries

Indirect

Beneficiaries Access Beneficiaries

EDUCATION 1 Jan ‘16 Strengthenin

g Pragna

Project

1.55 313 Students 994 Students -

2 Feb ‘16 Port

Exposure

Visit

0.47 336 Students &

Teachers

- -

COMMUNITY HEALTH 3 All Year

Round

Medical

Health Care

Unit

20.00 7609 Patients

from 12 different

villages/locations

- The remainder

population of 13168

from these 12

different

villages/locations

who could have

availed the benefits

of MHCU, but did

not.

SUSTAINABLE LIVELIHOOD DEVELOPMENT 4 Mar ‘16 Initiatives

for Fisher

Folk

Communitie

s (Fishing

Net

Distribution)

2.92 85 Fishermen 340

Dependent

family

members of

these

fishermen

-

5 Feb ‘16 Swachhata

Abhayan

1.77 4000 Students &

Staff from 8

Primary Schools,

13 Aanganwadis

and 3 High

Schools

- -

6 Jan ‘16 Community

Engagemen

t

Programme

s

0.55 156 Participants - -

RURAL INFRASTRUCTURE DEVELOPMENT 7 Dec ‘15 Solar Street

Lights at 2.15 1100 distinct - The population from

Page 64: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Lakhabava

Temple - devotees who’d

visited the temple

during late

evening hours

during FY 15-16

nearby villages who

could have availed

the benefits of this

facility, but did not

8 Feb ‘16 Constructio

n of 7

houses at

Luwara

village

14.71 35 inhabitants of

these newly built

houses

- -

9 Mar ‘16 Construction

of 10 Houses

at Lakhigam

Village

8.87 50 inhabitants of

these newly built

houses

- -

10 Feb ‘16 Renovating

Primary

School at

Ambetha

5.12 198 Students - -

11 Jan ‘16 Solar Street

Lights at

Rukhneshwar

Mahadev

Temple

2.15 3357 distinct

devotees who’d

visited the temple

during FY 2015-16

- The population from

nearby villages who

could have availed

the benefits of this

facility, but did not. 12 Oct ‘15 Renovating

38 Houses of

Navinagri

34.26 190 inhabitants of

these renovated

houses

- -

Total 94.52 17429

Beneficiaries

1334 Indirect

Beneficiaries

13168 Access

Beneficiaries

Page 65: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Glimpse of CSR activity by Adani Foundation Team for APDPPL

Education

The core focus of this domain is on below parameters:

• Efforts to improve the quality of education

• Education of girls

• Encourage community participation through meetings and trainings

• Maximum (100%) enrollment and retention in schools

Sustainable

Livelihood

Development

Community

Health

Education

Rural

Infrastructure

Development

Page 66: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Port Exposure Visit:-

AF - Dahej team facilitated a study tour visit of Adani

Petronet Port Pvt. Ltd (Dahej) for the students studying in

nearby village schools.

COMMUNITY HEALTH

Mobile Health Care Unit & Health Awareness Program

The team has deployed a Mobile Health Care Unit, scheduled to visit villages in the closed vicinity of the

Adani Petronet Port, for provision of basic healthcare/medical services to the patients

AF Dahej team carried out a Hygiene & Sanitation awareness campaign in Aanganwadi at Lakhigam-

Navinagri.

Page 67: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

SUSTAINABLE LIVELIHOOD DEVELOPMENT

Initiatives for Fisher Folk Communities

AF Dahej team drove this program by distributing fishing nets to 85 fishermen from Navinagri

(Lakhigam) and Jageshwar. The motive behind this drive was to uplift the fishermen by helping them

endure their livelihood/source of income to support themselves and their families, thereby enhancing

the social and economic life of these fishermen.

Swachhata Abhayan & Community Engagement Programmes

Cleanliness Drive for Swachh Bharat - AF (Dahej) team offered material/ancillaries support associated

with cleanliness and hygiene, to improve the hygiene and sanitation levels in these villages

Page 68: Adani Petronet (Dahej) Port Private To : March,16€¦ · Adani Petronet (Dahej) Port Private Limited From : Oct,15 To : March,16 Page 2 of 14 Half yearly Co mpliance report for Environment

Solar Street Lights at Lakhabava Temple & Construction of 10 Houses at Lakhigam

Renovation of 38 Houses at Navinagri & Renovation of Primary School at Ambheta