Feasability Study and Site Report
ServicesAs with many costal towns in Northumberlandthe only power utility is electricity, as a result if gas wanted to be used a line would have to be installed which would be costly. Or gas containers would have to substitute. For this reason likely to stay with Electricity
Height sufficient for an intermediate floor to be installed if needed.
Uninsultated roof using a timber truss system
Single glazed windows with timber frames which have begun to rot away
Rendering:Due to the costal loca-tion and poor maintenance pebble dash has begun to crack and fall away from the structure
Undergone recent pointing of front elevation in places
No wall insulation
1 .Main Building made up of 3 spaces; Main (largest) space where the life boat is stored has outward opening doors to allow quick deployment of the boat in an emer-gency, with the smaller behind this is to accommodate the tractor which is used to launch the boat.
1.2.
3.
The existing site dimensions where taken from DIGI-MAPS, (2014). The site length is around 50 meteres at its longest, with an average width of 20-25 meteres, The total Site Area roughly calculates at
4
Existing DimensioNS
KEY
Ditch with Stream
Boundry Lines
Electricity Line overhead
Potential source of ‘Noise’,
OS MAP
REFERENCE WILL BE MADE TO THE BUILDING STYLES IN THE SURROUNDING AREA.MADE FROM THICK RANDOM RUBBLE MADE FROM THICK RANDOM RUBBLE WALLS AND HEAVY SLATED ROOFS WHICH IS A GREAT TOOL FOR THERMAL MASS GIVING THE HARSH WINTER ENVIRON-MENT WHERE TEMPRETURES CAN CALL BELLOW 15 DEGREES.
THE ‘RUBUSTNESS’ OF THE MATERIALS HAVE BEEN SPECIFICLY CHOSEN DUE TO THE HARSH WEATHER IT MUST WITH-STAND, MANY BUILDINGS SUCH AS THE CHURCH AND DOMESTIC HOUSING HAS STOOF FOR MORE THAN A CENTURY.
SUMMER SUN PATH
WINTER SUN PATH
WIND MAP & RAINthe wind speedson average assupplied byThe Met Office,(2014)suggest between46 - 48 Meteres46 - 48 Meteresper Second (M/s)
The diagram to the right also shows previalingwind direct,a possible cause of driven raindriven rainfrom inland aswell as from the North SeaApprox 33-56.5 Ltr M/s
MATERIALS & STYLE
SITE AND RESTRICTIONS
As the sun path sweeps around the south of the bounding at a high level it could possibly be incorporated into the design.
COMPARISON,
The winter sun path is much lowerThe winter sun path is much lowerand as nearby building isvery close no lightwill be able to get intowindows on this elevation.
Background ContextA traditional fishing village with as little as 25 houses and has changed little in the past 100 years and is one of few true fishing villages still in existence. Located Northumberland, Alnwick,England. Though fishing has been the focal point for this vilThough fishing has been the focal point for this vil-lage for over the centuries, this was changed as a result of World War Two with the RAF making a base close by. The main function now for RAF Boulmer search and rescue base, helping to aid those lost at sea alongside the volunteers at the lifeboat station. With in some practises there is a feeling that the sig-nificance of the Lifeboat house to the community has a great cultural and sympothetic indulgence of the area; Robin Kent Architecture & Conservation who have already explored the importance of this building to the commu-nity went on to say
Rear ElevationSide Elevation
From the front side and rear elevations above the typical shape of the building footprint is typically in keeping with the surrounding area of boulmer, with weathered random rubble stone and a series of pitched roofs, the histroical context of this village community on a social. histric and cultural aspect of this type of housing will need to be thought about in much depth to allow a proposal which will be accepted by the community.
Front Elevation
Level 0
181
Level 14061
ABCDE
Roof Level
8461
4049
104005003000820 2650 1590
300
300
300
200
440
4400
3043
1357
10 11 12 13
ABCDE
7654321 9
35094
1080
0
12869 159156440
NORTH
Level 0181
Level 14061
101112131415
Roof Level
8461
16 7 6 5 4 3 2 1917
15760 6500 12669
2338
6020
523
1366
791
964
407
1128
1523
1585
1359 30
60
1200
940 1655
357
Level 1
4061
10 11 12 13 14 15
Roof Level8461
167654321 9 17
3226
4417
960
300020002500
1700
400
3303
2901
1904
600 500
738
511
2000
1600
2338
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
As indicated
01/0
4/20
14 1
9:24
:19
Site andElevations
001
Boulmer VirtualProject
Adam Nixon
29/03/2014
Author
Checker
1
No. Description Date
1 : 100Main Building East Elevation2
1 : 250Site Plan1
1 : 200North Elevation3
1 : 200South Elevation4
3D View 105
10 11 12 13 1415
A
B
C
D
E
167654321 9
10 m²112.8 SF
Staff Kitchen9
15 m²157.1 SF
Staff Room7
57 m²616.4 SF
Open Plan Space20
6 m²64.8 SF
Disabled WC19
52 m²563.4 SF
Main Reception2
9 m²92.4 SF
Enterance1
15 m²160.4 SF
Meeting Room8
6 m²62.3 SF
Female WC17
By Room Name LegendDisabled WC
Enterance
Female WC
Large Teaching Space
Main Reception
Male WC
Meeting Room
Open Plan Space
OUTDOOR DECKING AREA
Small Conference Room
Small Teaching Space
Staff Kitchen
Staff Room 9 m²98.0 SF
Small ConferenceRoom
3
54 m²583.4 SF
Large Teaching Space5
15 m²166.4 SF
Small Teaching Space4
NORTH
33 m²354.8 SF
OUTDOOR DECKINGAREA
6
4 m²43.2 SF
Male WC18
10 11 12 13 14 15
A
B
C
D
E
167654321 9
6 m²62.1 SF
Female Shower25
6 m²63.5 SF
Male Shower26
22 m²232.0 SF
Kit Drying Room24
43 m²462.6 SF
Bar/ Bistro22
31 m²338.4 SF
Lounge Area23
By Room Name LegendBalcony
Bar/ Bistro
Communal Space
Female Shower
Kit Drying Room
Lounge Area
Male Shower
Staff WC41 m²
439.9 SF
Communal Space27
19 m²209.4 SF
Balcony28
NORTH
4 m²44.5 SF
Staff WC29
www.autodesk.com/revit
SCALE ( @A2 )
CHECKED BYDRAWN BY DATE
CODE
STATUS
SUITABILITY DESCRIPTION
PURPOSE OF ISSUE
PROJECT
TITLE
PROJECT NUMBER
DRAWING NUMBER
CLIENT
REV
1 : 100
01/0
4/20
14 1
2:46
:11
General Floor Plans
Boulmer Virtual Project
Adam Nixon29/03/2014Author Checker
General Floor Plans
001
No. Description Date 1 : 100General Floor Plan Ground Level1
1 : 100General Floor Plan Level 12
10 11 12 13 14 15
A
B
C
D
E
167654321 9 17
12669
6500
15760
5100
3040
4800
2183
4800
2800
5298
2498
1823
3304
1705
33962200
1823
9725
4194
2794
100
1630
1010
810
640 600
1280
1770
2653
1669
3120
2500 2000 30002994738
638 10331 3000 600 1660
10233
5300
4528
181012805
3780
1375
1100
1305
3780
1925
820
1075
1075
1590
3000
500
15760
6505
2920
2500
2480
1040
0
600
1840
1100
10 11 12 13 14 15
A
B
C
D
E
167654321 9 17
4020
1900
31583090
1867
9725
2000
3644
1709
869
9656
7545
4140
14852
42221451
1539
3500
10331 2338
1040
0
3218
15915
1000
1600
5360
2000 20001655 9453731
565
5378
4457
7731
899
1334
500
1940
www.autodesk.com/revit
SCALE ( @A2 )
CHECKED BYDRAWN BY DATE
CODE
STATUS
SUITABILITY DESCRIPTION
PURPOSE OF ISSUE
PROJECT
TITLE
PROJECT NUMBER
DRAWING NUMBER
CLIENT
REV
1 : 100
01/0
4/20
14 1
2:43
:01
Dimensioned Floor Plans
Boulmer Virtual Project
Adam Nixon29/03/2014Adam Nixon Checker
1.3
001
No. Description Date 1 : 100Ground Floor Plan1
1 : 100First Floor Plan2
440 9615
25
657
62
EXISTING RANDOMRUBBLE WALL
RIGID BOARD INSULATION
LIGHT STEEL CSTUDBRACKETS 85 X85 mm
MASONARYSCREW 100 mm
SHEETHINGBOARD 2.5 mm
BREATHABLEMEMBRANE1 mm thick
THERMAL CONDUCTIVITYK Value: 0.022W/mKTHERMAL RESISTANCER value: 5.00m2K/W
MINERAL WOOLINSULATIONTHERMAL CONDUCTIVITYK Value: 0.40W/mKTHERMAL RESISTANCER Value: 1.40m2K/W
SERVICE VOID
PLASTERBOARDAPPROVEDDOCUMENT: CCOMPLIANT82
9
EXTERNAL INTERNAL
6718
651522
EXTERNAL INTERNAL
TIMBERCONNECTIONTO DRYWALL
RIGID BOARD2.5 mm
BREATHABLE MEMBRANERUNNING ACROSS WALL ANDJOINED TP WINDOW FRAMEWITH ADHESIVE
JOINTING TAPE AT EVERY CHANGE OFDIRECTIONAL PLANE
EXTENDED SILLALLOWING WATER TORUN AWAY FROMBUILDING FACE
DOUBLE GLAZED WINDOW WITHROLLER WINDOW
Check on site
Level 0
181
10
220220
4 MM FINISH LAYER, CARPET/LAMINATE
756
SCREED FINISH 65 MM
RIGID INSULATION BOARD WITH AIR /VAPOUR BARRIER80MM
CONCRETE 100 MM
STRUCTURALCONCRETE 75 MMHARDCORE
150
INTERNALEXTERNAL
300
RIGID INSULATION WITH AIR/VAPOUR BARRIER80 MM
SCREED FINISH 65 MM
JOINING OF BREATHABLE MEMBRANE TO STRUCTURAL FLOORALLOWING A CONTINUATION IN THE MEMBRANE OF THE STRUCTURE
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 10
01/0
4/20
14 1
4:03
:40
Details
001
Boulmer VirtualProject
Adam Nixon
29/03/2014
A N
Checker
003
No. Description Date 1 : 10Wall Section A- Existing Building1
1 : 10Window Detail2
1 : 10Junction - Floor to Wall3