How to unload resin from the bulk tanks.

TRANSCRIPT

Slide 1

Maintenance Engineer- Production Department

1At Acwapipe we have 5 bulk tanks for Resin. 2 for Ortho Resin, 2 for Iso Resin and 1 for VE resinsIn order to correctly and safely collect resin from these we need to follow this checklist.Maintenance Engineer- Production Department

Maintenance Engineer- Production Department

KNOW YOUR TANK

Maintenance Engineer- Production DepartmentPREPARE STORAGE VESSELS:Shift the storage tanks/drums under the filling valve.

Maintenance Engineer- Production DepartmentClose the ValvesClose the valves of the unrelated tanks and their routes

Maintenance Engineer- Production DepartmentOpen the ValvesOpen the valves of the tank and its route which will give the resin

Maintenance Engineer- Production DepartmentTurn on the pump:Open the valve of the diaphragm pump and turn on the air for the diaphragm pump to begin pumping the resin into the vessel.

Maintenance Engineer- Production DepartmentTurn off the Pump: After filling the vessel, be ready to close the airline to stop the diaphragm pump

Maintenance Engineer- Production DepartmentClose the valve: Close the valves from the diaphragm pump and unloading route of the tank from which resin was removed.

Maintenance Engineer- Production DepartmentRemove the vessel: After making sure it is safe, transport the tank/drums to the required location.