activity: air monitoring equipment & maintenance database
TRANSCRIPT
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 1 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
ARD DATA MANAGEMENT (Current)
This section is responsible for design, development and implementation of various databases to support the Air Resources Divsion.12/04/2009
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Air Monitoring Equipment & Maintenance Database (Current)
Air Quality System (AQS) Database (Current)
Asbestos Database (Current)
Activity:
Activity:
Activity:
Includes the complete redesign of the current FoxPro db. FoxPro will no longer be supported by OIT and needs to be moved over to a .netfrontend with oracle back end database.
Develop and maintain database to track Air Quality System Data.
Design, develope and produce new Asbestos Database to house worker and entity information. Information will be combined from varioussources into one .net windows application with an Oracle backend.
Description:
Description:
Description:
01/01/2013
04/01/2010
12/01/2014
12/31/2018
12/31/2020
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Back Popolate Old Data
Convert AQS COGNOS Reports
Produce AQS User Interface Business Plan
Upload AQS Site & Monitor Data
OIT Development Phase 2
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
START DATE EXTENDED FROM 1/1/2016. END DATE EXTENDED FROM 12/31/2016. Use EPA files downloaded from EPA AQS to backpopulate DES AQS database. Plan is to back at least 20 years.
COGNOS to be replaced by SSRS. There are currently 50+ reports that need to be analyzed and determined by managemen onwhich ones to be converted over to SSRS. SSRS reports will pull from EMD but Once AQS has been populated with historicaldata, the reports will need to be re-written to pull data from AQS and not EMD.
This project has been moved numerous times due to constraints on the business analyst and developer. Current processworks but will need to be updated in near future. Need to develop business plan to address the lack of a user interfacewith the AQS database. Database structure was provided by Windsor Solutions during assistance with Node Upgrade.Currently no user front end capabilities. Access to data is limited to queries through 3rd party software.
Upload AQS site and Monitor data into the DES AQS Database
Track OIT progress during development of Phase 2.
Description:
Description:
Description:
Description:
Description:
01/01/2018
01/01/2018
01/01/2018
01/01/2018
04/01/2017
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Data Sets
Report Assessments
Business Plans
Sites
Databases
20
1
1
13
1
Lead Person:
Lead Person:
Lead Person:
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
27190
24050
20832
21015
29095
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 2 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
ARD DATA MANAGEMENT (Current)
Div/Bur:
Program:
Asbestos Database (Current)
Convert COGNOS reports to SSRS (Current)
Activity:
Activity:
SSRS is replacing COGNOS as third party software tool and reports need to be converted over.Description:04/01/2017 12/31/2017Start/End Dates: thru
OIT Development Phase 3
Update SSD Asbestos User Manual - Phase 2
Convert AQS Reports
Convert AQS Reports
Convert Application Reports
Convert Asbestos Reports
Convert Complaint Reports
Convert Deviations Reports
Convert EPA Title V Reports
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Track OIT progress during development of Phase 3
Updated the SSD User Manual to include AHERA.
Convert all AQS Reports that were done from the EMD
Need to do full analysis on whether all 50 reports are needed.
Analyze and convert Permitting Application Reports over to SSRS
Covert all Asbestos Reports
Convert all Complaint Reports
Convert all Deviation Reports
Convert all reports
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
11/01/2017
10/01/2017
04/01/2017
04/01/2017
04/01/2017
04/01/2017
04/01/2017
04/01/2017
04/01/2017
06/30/2018
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Databases
Manuals
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
1
1
25
50
17
20
9
4
10
Lead Person: CORNWELL, ANDREW
29096
30439
30440
29115
29099
29101
29102
29103
29114
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 3 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
ARD DATA MANAGEMENT (Current)
Div/Bur:
Program:
Convert COGNOS reports to SSRS (Current)
GIS Coverage (Current)
Activity:
Activity:
Description: thru
Convert Enforcement Reports
Convert FFCB reports.
Convert Facility Reports
Convert GSP reports
Convert Inspection Reports
Convert PBN Reports
Convert RTAPs Reports
Convert Referral Reports
Convert Stack Test Reports
Convert all Report Module Reports
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Convert all Envforcement Reports
Convert all Fire Fighter Controlled Burn reports.
Convert all Facility Reports
Convert all General State Permit reports.
Convert all Inspection Reports
Convert all Permit by Notification Reports
Convert all reports
Convert all Referral reports.
Convert all reports
Convert all reports
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
04/01/2017
04/01/2017
04/01/2017
04/01/2017
04/01/2017
04/01/2017
04/01/2017
04/01/2017
04/01/2017
04/01/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
14
3
6
14
12
5
3
5
10
3
Lead Person:
29104
29106
29105
29107
29108
29109
29112
29110
29113
29111
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 4 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
ARD DATA MANAGEMENT (Current)
Div/Bur:
Program:
GIS Coverage (Current)
On Line Permitting (Current)
Stationary Source Database (Current)
Activity:
Activity:
Activity:
ARD Coverages need to be updated and enhanced for display on the One Stop Web Site
Develope new on line forms and processes for various permits, reports, notifications, etc.
Includes the complete redesign of current AirDB housed in FoxPro. FoxPro will no longer be supported by OIT and needs to be moved overto a more user friendly database.
Description:
Description:
12/04/2009
07/01/2010
12/04/2009
12/31/2025
12/31/2020
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
2017-Maintain Stationary Source Database Coverage
2018-Maintain Stationary Source Database Coverage
2019-Maintain Stationary Source Database Coverage
PBN Upgrade Business Plan
2017 QA/QC of SSD
2017 QA/QC of SSD
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Maintenance mode of the coverage. Add new facilities, create maps, etc. as requested by staff.
Maintenance mode of the coverage. Add new facilities, create maps, etc. as requested by staff.
Maintenance mode of the coverage. Add new facilities, create maps, etc. as requested by staff.
Create a business plan to upgrade the OLP PBN module and incorporate processing directly into the SSD.
Continuation of 2014 Deliverable. Perform QA/QC of various modules (Complaints, Deviations, Facility, etc) to identifyerroneous data and fix for ease of transition over to new Stationary Source Database.
Continuation of 2014 Deliverable. Perform QA/QC of various modules (Complaints, Deviations, Facility, etc) to identifyerroneous data and fix for ease of transition over to new Stationary Source Database.
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
01/01/2019
10/01/2017
01/01/2017
01/01/2018
12/31/2017
12/31/2018
12/31/2019
12/31/2017
12/31/2017
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
GIS Coverages
GIS Coverages
GIS Coverages
Business Plans
Data Sets
Data Sets
1
1
1
1
1
1
Lead Person:
Lead Person:
CORNWELL, ANDREW
CORNWELL, ANDREW
CORNWELL, ANDREW
27195
27196
29097
27199
27204
29098
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 5 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
ATMOSPHERIC SCIENCE AND ANALYSIS UNIT (Current)
The Atmospheric Science & Analysis Unit (formerly the Atmospheric Analysis Unit (Modeling) is responsible for the preparation oftechnical support and data analysis, complex regional atmospheric analysis (including photochemical modeling and assessment of regionaltransport of air pollution), participation in regional/national air quality planning, dispersion modeling associated with stationarysource permit modeling, inventory preparation assistance, criteria pollutant re-designation, and implementation-phase policy planning andtechnical support for new National Ambient Air Quality Standards.10/01/2001
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General XState Fees XFederal EPA Federal Other X Grants X
A) Administrative Program Management (Current)
B) Continue to Improve DES Analytical Capacity (Current)
C) Involvement, as necessary, in Regional and/or National Issues (Current)
Activity:
Activity:
Activity:
Personnel administration, evaluation
To improve DES analytical capacity through partiicpating in reseach grade forums, MARMA, and coordination with local partnerships (i.e.UNH, Keene State, and HBRF).
Involvement, as necessary, in regional and/or national organization involving air quality issues (e.g., Northeast Regional Air QualityCommittee, NAFTA, ECOS, etc.)
Description:
Description:
Description:
10/01/2002
10/01/2001
10/01/1999
09/30/2019
09/30/2019
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Complete Performance Evaluations
c) Scientific Partnerships
6) Participate in MANE-VU modeling emission inventory development process
8a) Participate on NACAA Emissions and Modeling Committee
a) Attend OTC Annual and Fall Meetings to Address Transport
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Particiapte in partnerships with New Hamspshire research institutions such as: Keene State College University of New Hampshire Hubbard Brook Research Foundation
Provide and quality assure New Hamsphire Emission Inventory data for regional platform modeling development.
participate on quarterly conference calls
Attend OTC Meetings of the full commission
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
UNDERHILL, JEFFREY
UNDERHILL, JEFFREY
HEALY, DAVID
HEALY, DAVID
UNDERHILL, JEFFREY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Evaluations
Activities
Conference Calls
Conference Calls
Meetings
3
1
12
4
2
Lead Person:
Lead Person:
Lead Person:
UNDERHILL, JEFFREY
UNDERHILL, JEFFREY
UNDERHILL, JEFFREY
29892
29893
29130
29894
29896
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 6 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
ATMOSPHERIC SCIENCE AND ANALYSIS UNIT (Current)
Div/Bur:
Program:
C) Involvement, as necessary, in Regional and/or National Issues (Current)
D) Forecasting and Monitoring Analysis Activities (Current)
Activity:
Activity:
Description: thru
b) Attend OTC Air Director Meeings and Conference Calls to Address Transport
c) Attend OTC Modeling Committee Calls
d) Attend OTC Stationary and Area Committee Calls
e) Attend OTC Mobile Committee Calls
f) Attend MANE-VU Commission Meetings to Address Transport
g) Attend MANE-VU Air Director Meetings and Conference Calls to Address Transport
h) Attend MANE-VU Technical Support Committee Calls
i) Attend NAACA Criteria Pollutants Conference calls
l) Regional Haze SIP consultation
m) Participate on EPA Conference calls and meetings
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Class 1 area state consultation with emission contributing states, EPA and federal Land Managers
Participate in EPA meetings regarding changes in NAAQS, regional and national pollution control programs, nationalmodeling initiatives or other scientificically oriented forumns
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
UNDERHILL, JEFFREY
HEALY, DAVID
HEALY, DAVID
WILCOX, JESSICA
UNDERHILL, JEFFREY
UNDERHILL, JEFFREY
JANELLE, FELICE
JANELLE, FELICE
UNDERHILL, JEFFREY
UNDERHILL, JEFFREY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Conference Calls
Conference Calls
Conference Calls
Meetings
Conference Calls
Conference Calls
Conference Calls
Meetings
Meetings
14
12
12
12
2
14
12
12
2
5
Lead Person:
29501
29897
29898
29899
29895
29499
29900
29901
29902
29903
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 7 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
ATMOSPHERIC SCIENCE AND ANALYSIS UNIT (Current)
Div/Bur:
Program:
D) Forecasting and Monitoring Analysis Activities (Current)
E) Website Updates (Current)
Activity:
Activity:
This activity includes: 1) annual update of design values and trends, 2) annual review of PAMS data, 3) participate in regional/nationalPAMs networking and analytical improvement reviews, 4) provide current air quality on DES & EPA's Air Now program websites, 5) providedaily air quality forecasts, 6) issue air quality action days
Review and update of Air Resource's criteria pollutants, current air quality, air quality forecast, atmospheric deposition, and woodsmoke web pages
Description:
10/01/2011
10/01/2015
09/30/2019
09/30/2019
Start/End Dates:
Start/End Dates: thru
1) Provide daily air quality forecasts & post on DES website.
2) Review Air Quality Forecast and Issue Air Quality Action Days as Needed
3) Provide current air quality information to DES website and EPAs AirNow
4) Conduct a Summary Analysis for Each Monitor Exceedance of the NAAQS
5) Update Annual Design Values and Trends
a) Week day review of current air quality and forecasting webpages
b) Review of criteria pollutants, deposition, wood smoke webpages
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Forecast for ozone and PM2.5 (fine particles) throughout the year. Air Quality Action Days and Alerts issued as necessarywith corresponding update of Air Quality Information Line. Daily observations of real-time data to determine dataappropriateness and accuracy. (Per 2017 EPA P&C List-#8)
Air quality action days are based on forecasted air quality and may not indicate the actual exceedance days. Informationtracking number of the actual exceedance days is found in Environmental Indicators section.
Input daily air quality data to EPAs AirNow website and make data available to other interested parties
Develop a summary for each NAAQS exceedance occuring at a New Hampshire DES monitor
For each NAAQS
As part of the air quality forecasting process, the DES webPage is checked to ensure that the current air quality data isavailable and the page is functioning properly.
Review of criteria pollutants, atmospheric deposition and wood smoke webpages to ensure they are up to date, accurate,and all hyperlinks are working correctly.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LANDRY, LISA
LANDRY, LISA
LANDRY, LISA
Vacant
DUNBAR, JESSICA
LANDRY, LISA
Vacant
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Days
Days
Days
Analyses
Updates
Reviews
Reviews
365
365
365
5
1
260
2
Lead Person:
UNDERHILL, JEFFREY
UNDERHILL, JEFFREY
29904
29905
29906
29907
29908
29909
29910
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 8 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
DIVISION MANAGEMENT AND PLANNING (Current)
This section is responsible for various internal functions within the division, including development and implementation of a qualityassurance plan, budgeting, coordination of the Performance Partnership Agreement, strategic planning, and staff development.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
XFunding: State General XState Fees XFederal EPA Federal Other X Grants
Administration - Internal Management (Current)
Improve financial reporting. (Current)
Participate in Director level meetings to discuss common areas of collaboration (Current)
Activity:
Activity:
Activity:
Description:
Description:
Description:
10/01/1999
10/01/1999
10/01/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Attend two NESCAUM director's level meetings per year
Attend two NESCAUM directors level meetings per year
Deliverable:
Deliverable:
Description:
Description:
10/01/2017
10/01/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
WRIGHT, CRAIG
WRIGHT, CRAIG
Qty/Unit:
Qty/Unit:
Meetings
Meetings
2
2
Lead Person:
Lead Person:
Lead Person:
WRIGHT, CRAIG
WRIGHT, CRAIG
WRIGHT, CRAIG
28954
28955
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 9 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
SIP PLANNING & RULEMAKING (Current)
State Implementation Planning (SIP) & Rulemaking section was formed in 2011. This section is responsible for coordinating the SIP plansand rulemaking authority in the ARD.10/01/2011
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
A) Administrative Program Management (Current)
B) SIP Obligations (Current)
C) Amend Env-A 500, Federal NSPS and NESHAP, to include new federal standards (Current)
Activity:
Activity:
Activity:
Prepare and submit revisions to the State Implementation Plan in accordance with EPA requirements. Track EPA rulemaking related to SIPs.
This chapter incorporates by reference EPA's standards for new sources and hazardous air pollutants. The chapter must be updated everyyear to include any new standards or amendments EPA has adopted in previous year.
Description:
Description:
Description:
10/01/2011
10/01/2011
10/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
1) Submit attainment plan SIP updates, as required
1a) Submit regional haze interim progress report
1b) Begin development of low-sulfur fuel oil strategy
Prepare and submit SIP amendments as needed
Prepare and submit SIP amendments as needed
Submit Program Approval to EPA
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
In the 2015 P&C - #12Submit RACT SIP for 2008 ozone standard. SIP is due two years after designation (July 20, 2014) as stated in theproposed implementation rule.
P&C #24 (2017) If the MANE-VU states plan on adhering to the current deadline of July 31, 2018 for submission of the nextregional haze SIP, submit a draft for by February 2018
Submit as a SIP revision new SO2 fuel standards after Env-A 1600 is revised.
Ensure that NH is developing plans and programs consistent with the CAA requirements and that the SIP is approved by EPA
Ensure that NH is developing plans and programs consistent with the CAA requirements and that the SIP is approved by EPA
Develop plans consistent with the CAA and submit to EPA for approval/delegation
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
JANELLE, FELICE
JANELLE, FELICE
JANELLE, FELICE
JANELLE, FELICE
JANELLE, FELICE
JANELLE, FELICE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Plans
Submittals
Submittals
Submittals
Submittals
Submittals
1
1
1
3
5
2
Lead Person:
Lead Person:
Lead Person:
ROBERGE, MICHELE
JANELLE, FELICE
MCMANUS, KARLA
29516
29524
29525
28937
28938
29542
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 10 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
SIP PLANNING & RULEMAKING (Current)
Div/Bur:
Program:
C) Amend Env-A 500, Federal NSPS and NESHAP, to include new federal standards (Current)
D) Readopt Administrative Rules scheduled to expire in this or the next federal fiscal calendar year (Current)
E) Revise State Air Toxics Program rules (Env-A 1400) (Current)
F) 111d State Plans (Current)
Activity:
Activity:
Activity:
Activity:
Update rule annually as ACGIH revises their list of toxics
1) Submit annual progress reports for Major Solid Waste Combustors and Other Solid Waste Combustors.2) Submit state plans for Sewage Sludge and Solid Waste Incinerators3) Clean Power Plan
Description:
Description:
Description:
10/01/2006
10/01/2006
10/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Implementation of new federal wood stove standards
Env-A 1300 NOx RACT Rule
Env-A 2800 Sand-Gravel Cement Sources
Env-A 3800, Voluntary GHG Reduction Registry
Env-A 800 Testing-Monitoring Procedures
Env-A 1400 Regulated Toxic Air Pollutants
Clean Power Plan and RGGI update
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Implementation of New Federal Woodstove Standards: EPA has adopted new emission standards for residential woodstovesand outdoor wood boilers for the first time since 1988. The new standards became effective January 1, 2016. NH wouldaccept partial delegation of the new standards as they apply to the retail sale of new devices.
Readopt with amendments. Due to expire on October 31, 2018
Readoption with amendments
Readoption
Readoption with amendments
Update the RTAPS in accordance with ACGIH and IRIS
Develop RGGI Rules and Submit a clean power plan to EPA in conjunction with RGGI
Description:
Description:
Description:
Description:
Description:
Description:
Description:
07/01/2017
06/01/2017
07/01/2017
10/01/2016
07/01/2017
01/01/2017
01/01/2016
10/01/2017
12/31/2018
12/31/2018
12/31/2017
12/31/2018
12/31/2017
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCMANUS, KARLA
MCMANUS, KARLA
MCMANUS, KARLA
MCMANUS, KARLA
MCMANUS, KARLA
MCMANUS, KARLA
MCMANUS, KARLA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Rules
Rules
Rules
Rules
Rules
Rules
Rules
1
1
1
1
1
1
1
Lead Person:
Lead Person:
Lead Person:
MCMANUS, KARLA
MCMANUS, KARLA
MCMANUS, KARLA
30374
29249
29251
28927
29250
28923
28135
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 11 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
SIP PLANNING & RULEMAKING (Current)
Div/Bur:
Program:
F) 111d State Plans (Current)
G) Public Hearings (Current)
H) Air Rules mandated by state statute or Federally (Current)
Activity:
Activity:
Activity:
Public hearing scheduled and conducted by ARD for rulemaking, permitting, and other division activities.
Rules that are needed due to a new hampshire statute or federal mandate
Description:
Description:
10/01/2004
10/01/2016
Start/End Dates:
Start/End Dates:
thru
thru
MWC Annual report
Public Hearings for Permitting and Rules
C & D Rules
Env-A 3400 Emission Guidelines for Landfills
Env-A 705.03(g) Calculation of Emission-Based Fee
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Annual report of MWC emissions and compliance for EPA
Amend Env-A 3300 in accordance with the amendment to NH State Statute RSA 125-C:10-c
Federally mandated rule
Legislature transferred money to Air Account to help reduce the per ton fee for calendar year 2017. This rule reflectedthat. In the meantime, there is a fee stakeholder workgroup working on a long term fee change.
Description:
Description:
Description:
Description:
Description:
10/01/2017
07/01/2017
10/01/2016
04/01/2017
07/01/2017
09/30/2018
06/30/2018
12/31/2017
12/31/2017
01/01/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCMANUS, KARLA
MCMANUS, KARLA
MCMANUS, KARLA
MCMANUS, KARLA
MCMANUS, KARLA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Hearings
Rules
Rules
Rules
1
12
1
1
1
Lead Person:
Lead Person:
MCMANUS, KARLA
No one assigned
30375
30376
29062
29252
30436
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 12 of 313
AIR RESOURCES DIVISION AIR RESOURCES DIRECTOR'S OFFICE/ADMINISTRATION
WOOD SMOKE STUDIES (Current)
Winter time wood smoke exposure remains a significant potential health concern, especially in low-lying valley areas. There is limitedmonitoring data available to assess the potential exposure levels to NH citizens10/01/2016
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Conduct a three phase study to assess potential exposure levels to NH citizens (Current)Activity:
Description:10/01/2016Start/End Dates: thru
b) Phase II - Deploy monitoring equipment during winter 2016/2017 and 2017/2018
c) Tracking and Posting Data
e) Phase III - Prepare a written report of findings summer 2018
Deliverable:
Deliverable:
Deliverable:
Upload monitoring data for posting on NHDES website and email distribution. Develop and update tracking spreadsheet foranalyses
Description:
Description:
Description:
10/01/2016
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
UNDERHILL, JEFFREY
Vacant
UNDERHILL, JEFFREY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Installations
Activities
Reports, Final
2
1
1
Lead Person: UNDERHILL, JEFFREY
28905
29911
28908
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 13 of 313
AIR RESOURCES DIVISION COMPLIANCE
ASBESTOS PROGRAM (Current)
The asbestos section issues license/certification for asbestos workers, conducts inspections of abatement and ADS projects, approves andaudits training providers, manages the AHERA Grant and conducts outreach and education.10/01/2007
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General XState Fees Federal EPA Federal Other Grants X
Develop and Maintain an Asbestos Compliance Program. (Current)Activity:
Description:10/01/1999Start/End Dates: thru
AHERA Asbestos In-Schools Inspections
AHERA Grant Management and Reporting
Asbestos Licenses and Certificates Issued
Conduct Abatement Inspections, Complete Field Reports, and Send Letters to RP as necessary.
Conduct Abatement Inspections, Complete Field Reports, and Send Letters to RP as necessary.
Conduct AHERA, NESHAP asbestos outreach, education, and compliance assistance.
Develop and maintain an asbestos notification database.
Refer asbestos projects to enforcement as necessary.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Inspections completed in accordance with Grant commitments.
Submit Annual Enforcement Report to EPA.
ADS Contractor and Worker; AHERA Inspectors, Management Planners, and Project Designers; and Abatement Entity,Supervisor, and Worker.
Target/Goal is 125 inspections per year, which is approximately 10% of all asbestos abatement projects in NH each year.
Target/Goal is 125 inspections per year, which is approximately 10% of all asbestos abatement projects in NH each year.
Mailings, presentations, and requests for information. 100 is an estimate.
Maintain database and submit quarterly NARS reports to EPA.
Referral via SSD to Enforcement. Estimated at 12 referrals per year.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
11/01/2017
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2017
10/01/2017
09/30/2018
12/30/2017
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CULLINANE, STEPHEN
LEDGARD, MARK
CULLINANE, STEPHEN
CULLINANE, STEPHEN
CULLINANE, STEPHEN
CULLINANE, STEPHEN
CULLINANE, STEPHEN
CULLINANE, STEPHEN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Actions
Licenses
Inspections
Inspections
Outreach Activities
Submittals
Referrals
40
1
1000
125
125
100
4
12
Lead Person: CULLINANE, STEPHEN
29131
29132
29133
28939
28940
29147
29148
29149
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 14 of 313
AIR RESOURCES DIVISION COMPLIANCE
ASBESTOS PROGRAM (Current)
Div/Bur:
Program:
Develop and Maintain an Asbestos Compliance Program. (Current)Activity:
Report on AHERA outreach, education, and compliance assistance.Deliverable:
File Quarterly Reports in accordance with Grant commitments.Description:
10/01/2017 09/30/2018Start/End Dates: thruLead Person: CULLINANE, STEPHEN
Qty/Unit: Reports, Final4
29150
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 15 of 313
AIR RESOURCES DIVISION COMPLIANCE
COMPLIANCE ASSESSMENT (Current)
This section conducts inspections of stationary sources of air pollution and provides compliance assistance to the regulated community.In addition, the Compliance Assessment Section is responsible for complaint investigations, compliance assessment and determiningappropriate followup for non point sources of air pollution (e.g., fugivite dust, open burning program, live fire fighter trainingburns), and OWBs.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 02 02
XFunding: State General XState Fees Federal EPA Federal Other X Grants
Continuous Process Improvement Events for the Air Division (Current)
Develop and follow compliance monitoring plans for TV, SM-80, Minor and non-permitted sources. (Current)
Activity:
Activity:
Lead or Participate in ARD LEAN or other process improvement events.
Develop and follow compliance monitoring plans for EPA CMS Plan, and State requirements.
Description:
Description:
03/01/2009
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Year 2018 Events
Complete Activities Identified in the State CMS Plan for FFY 2018
Complete Full Compliance Evaluations as Specified in the FFY 2018 CMS Plan
Complete Full Compliance Evaluations as Specified in the FFY 2019 CMS Plan
Develop a CMS Plan for Title V and SM-80 Sources per EPA requirements for FFY 2019
Develop a compliance strategy for all non-CMS Plan sources FFY 2018
End of FFY 2017 CMS Close Out Report Completed and Submitted to EPA.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Lead or Participate in Events
Estimated at 100 actions
Complete file reviews, on-site inspections and submit report to RP. Refer to Enforcement as necessary. Target is 100% ofthe FCEs specified in the annual CMS (Compliance Monitoring Strategy)
Complete file reviews, on-site inspections and submit report to RP. Refer to Enforcement as necessary. Target is 100% ofthe FCEs specified in the annual CMS (Compliance Monitoring Strategy)
Develop target list and schedule for stationary source inspections based on EPA Compliance Monitoring Strategy and DESguidance.
A compliance strategy will include inspections, outreach and education and compliance assistance based on various factorsto include compliance history, sectors, EJ areas and other state or federal initiatives.
Report updated with each FFY quarters inspection results and final report prepared at end of FFY year 2017.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2018
07/01/2018
07/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2019
09/30/2018
10/01/2017
11/30/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
GUERTIN, THOMAS
GUERTIN, THOMAS
GUERTIN, THOMAS
GUERTIN, THOMAS
LEDGARD, MARK
GUERTIN, THOMAS
GUERTIN, THOMAS
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Events
Actions
Inspections
Inspections
Plans
Plans
Reports, Final
1
100
59
59
1
1
1
Lead Person:
Lead Person:
GUERTIN, THOMAS
GUERTIN, THOMAS
29160
29156
28941
28942
29168
29158
27634
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 16 of 313
AIR RESOURCES DIVISION COMPLIANCE
COMPLIANCE ASSESSMENT (Current)
Div/Bur:
Program:
Develop and follow compliance monitoring plans for TV, SM-80, Minor and non-permitted sources. (Current)
Outreach and Education, Compliance Assistance for all sources of air polllution. (Current)
Receive, track, and respond to complaints and deviations. (Current)
Activity:
Activity:
Activity:
Mailings, Presentations, Requests for Information and Other Compliance Assistance.Description:
Description:
10/01/2016
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
End of FFY 2018 CMS Close Out Report Completed and Submitted to EPA.
Conduct mailings relating to compliance
Outreach and Education regarding wood smoke - 2019
Outreach and Education regarding woodsmoke - FFY 2018
compliance outreach presentations
1-Complaints
2-Complaint Follow ups / Investigations / FCE.
2.5- Percent of complaint investigations conducted in 5 working days
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Report updated with each FFY quarters inspection results and final report prepared at end of FFY year 2018.
Send out mailings to targeted sectors to inform them of air regulations other new information
Conduct outreach and education regaridng woodsmoke and submit summary to EPA by April 30, 2019
Conduct outreach and education regarding woodsmoke and submit summary to EPA by April 30, 2018
Present to various groups on air regulations and new information
Develop and maintain a complaint system to receive, record, prioritize and manage complaints. An average of 275complaints per year are received. Reports will be prepared for each complaint received.
Complaint investigations will be conducted as appropriate. Investigations may be conducted through telephoneactivities/interviews or with an onsite investigation. Complaints concerning stationary sources may result in a fullcompliance evaluations. Inspection reports will be prepared and cases referred to Enforcement Section as appropriate.
Goal is 100% of all complaint investigations are conducted within 5 working days
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
11/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
GUERTIN, THOMAS
LEDGARD, MARK
LEDGARD, MARK
LEDGARD, MARK
LEDGARD, MARK
MAGOON, LINDA
MAGOON, LINDA
MAGOON, LINDA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Mailings
Summaries
Summaries
Presentations
Complaints
Investigations
Investigations
1
4
1
1
4
200
50
50
Lead Person:
Lead Person:
LEDGARD, MARK
MAGOON, LINDA
29157
29169
29172
29171
29170
29151
29152
28944
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 17 of 313
AIR RESOURCES DIVISION COMPLIANCE
COMPLIANCE ASSESSMENT (Current)
Div/Bur:
Program:
Receive, track, and respond to complaints and deviations. (Current)
Review Draft Permits (Current)
State Review Framework Coordination (Current)
Activity:
Activity:
Activity:
Review drafts of Title V, State Permits to Operate, and Temporary Permits for technical accuracy and enforceability.
Coordinate EPA's 5-year State Review Framework
Description:
Description:
10/01/2010
10/01/2017 09/30/2022
Start/End Dates:
Start/End Dates:
thru
thru
2.5- Percent of complaint investigations conducted in 5 working days
3-Outdoor wood boilers (OWB) Complaints
4-Permit Deviation Report Review
5-Permit Deviation Referral to Enforcement Section
Review Draft Permits FFY 2018
Progress report regarding recommendations identified in the SRF
Progress report regarding recommendations identified in the SRF
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Goal is 100% of all complaint investigations are conducted within 5 working days
Complaint investigations will be conducted as appropriate. Investigations may be conducted through telephoneactivities/interviews or with an onsite investigation. Inspection reports will be prepared and cases referred toEnforcement Section as appropriate.
Develop and maintain a system to receive, record, and manage permit deviation reports. Estimate more than 200 deviationreports will be received. Permit deviation reports will be reviewed and forwarded to Enforcement Section as appropriate.
Results of the permit deviation review are forwarded to the Enforcement Section with recommendations for enforcementaction as appropriate. Two referrals per year is an estimate.
Estimated at 50 draft permits per year
Note: Due by Sept. 30 of each year
Note: Due by Sept. 30 of each year
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MAGOON, LINDA
MAGOON, LINDA
MAGOON, LINDA
MAGOON, LINDA
GUERTIN, THOMAS
MULHOLLAND, EVAN
MULHOLLAND, EVAN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Investigations
Complaints
Assessments
Referrals
Permits Reviewed
Reports, Final
Reports, Final
50
6
120
2
50
1
1
Lead Person:
Lead Person:
SMITH, DAVID
MULHOLLAND, EVAN
28945
29153
29154
29155
29173
29235
29236
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 18 of 313
AIR RESOURCES DIVISION COMPLIANCE
COMPLIANCE MEASUREMENT AND DATA PROGRAMS (Current)
This includes activities encompassing the ARD Compliance Bureau's Testing and Monitoring Section and Emissions Inventory Section that arenot directly assigned to those 2 program areas.10/01/2007
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Participate in State-EPA IR Camera Information Exchange (Current)
Review Air Pollution Control Equipment (APCE) Monitoring Plans (estimate) (Current)
Review CEM system QA/QC (and Monitoring) Plan updates (Current)
Review and update air stationary source compliance information on DES website (Current)
Activity:
Activity:
Activity:
Activity:
Participate, as one of the states provided a FLIR by the EPA, in the electronic information exchange and teleconferences aranged by EPA.
Review APCE Monitoring Plans submitted by permitted sources to document how APCE will be monitored, operated and tested to verify itsemissions reductions.
Track submittals, review updated plans, and follow-up with sources.
Review DES website pages containing Testing and Monitoring Section information, Emissions Inventory information and Compliance Reportinginformation to make sure all information and links are current and correct.
Description:
Description:
Description:
Description:
10/01/2015
10/01/2015
10/01/2015
10/01/2010
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
P&C list #45 Complete End-of-FFY '17 Year Progress Report Related to IR camera
P&C list #45 Complete End-of-FFY 18 Year Progress Report Related to IR camera
Review any new or modified APCE Monitoring Plans (estimate)
Review any new or modified CEM system Monitoring Plans (estimate)
Verify QA/QC Plan annual reviews from CEM sources for CY 2017, due by April 15.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Submit an end of year report which: a) documents all activities using the IR camera including facility, location,timeframe, media and inspector name, and b) documents the outcomes/results of those activities.
Submit an end of year report which: a) documents all activities using the IR camera including facility, location,timeframe, media and inspector name, and b) documents the outcomes/results of those activities.
Review APCE Monitoring Plans required to be submitted to DES by sources installing any APCE. Plan documents operation,establishes monitoring parameters and acceptable ranges, alarms, and testing or verification of control efficiency. 5 isan estimate
Review any CEM system Monitoring Plans required to be submitted to DES for approval prior to new CEM system installation,and changes to Plans submitted by the source to document changes that have been made to current CEM systems.
Verify that all sources with a certified CEM system submits an annual statement of review of the QA/QC Plan. Review anychanges made and update QA/QC Plans on file.
Description:
Description:
Description:
Description:
Description:
09/01/2017
09/30/2018
10/01/2017
10/01/2017
10/01/2017
12/31/2017
12/31/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Reports, Final
Plans
Plans
Facilities/Companies
1
1
5
5
17
Lead Person:
Lead Person:
Lead Person:
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
28213
29174
29175
29176
29177
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 19 of 313
AIR RESOURCES DIVISION COMPLIANCE
COMPLIANCE MEASUREMENT AND DATA PROGRAMS (Current)
Div/Bur:
Program:
Review and update air stationary source compliance information on DES website (Current)
Review draft permits (Current)
SOPs for Testing and Monitoring Section (Current)
Title V report compliance monitoring (Current)
Activity:
Activity:
Activity:
Activity:
Review drafts of Title V, State Permits to Operate and Temporary Permits for clarity, technical accuracy, appropriate monitoringrequirements and enforceability.
Complete Standard Operating Procedures for section
Track submittals, review reports and follow-up as necessary.
Description:
Description:
Description:
10/01/2007
12/01/2016
10/01/2005
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Verify Compliance Reporting links and forms in FFY 2018.
Verify Emissions Inventory Section information in FFY 2018.
Verify Stationary Source Compliance Reporting information in FFY 2018.
Verify Testing and Monitoring Section Information FFY 2018.
Estimate of Draft State Permits and Temporary Permits reviewed in FFY 2018
Estimate of Draft Title V Permits (and TP's for new TV sources reviewed in FFY 18
Annual Compliance Certifications for CY 2017 due by April 15, 2018
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Check links; update Title V Operating Permit Reporting Guidance and permiting reporting forms.
Check links; update information as necessary.
Check links; update information as necessary.
Verify Testing and Monitoring Section Information
Track submittals; review for completeness, accuracy and identification of any instances of non-compliance; determine needfor follow-up action as neccesary; and address any late submittals of reports.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Web Sites
Web Sites
Web Sites
Web Sites
Permits Reviewed
Permits Reviewed
Reports, Final
1
1
1
1
15
15
36
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
WALTERS, RAYMOND
29178
29179
29180
29181
29182
29183
29184
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 20 of 313
AIR RESOURCES DIVISION COMPLIANCE
COMPLIANCE MEASUREMENT AND DATA PROGRAMS (Current)
Div/Bur:
Program:
Title V report compliance monitoring (Current)Activity:
Semi-annual Permit Deviation and Monitoring (PD/M) Reports due by 1/31/18 and 7/31/18Deliverable:
Track submittals; review for completeness, accuracy and consistency with all individually reported PDs; determine needfor follow-up action as neccesary; and address any late submittals of reports.
Description:
10/01/2017 09/30/2018Start/End Dates: thruLead Person: WALTERS, RAYMOND
Qty/Unit: Reports, Final72
29185
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 21 of 313
AIR RESOURCES DIVISION COMPLIANCE
EMISSIONS INVENTORY (Current)
This section maintains an accurate and extensive air pollution emissions inventory of New Hampshire sources. This data is used todetermine compliance with state and federal regulations, establish state and national emissions trends and to help in evaluating theeffectiveness of the State's air quality programs.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 02 05
Funding: State General XState Fees XFederal EPA Federal Other X Grants
Quality assure/quality control all annual emission and compliance data (Current)
Submit emissions inventory data, compliance data and ambient air quality monitoring data to EPA (Current)
Activity:
Activity:
Review QA/QC procedures for collecting and submitting emission and compliance data.
Submit emissions inventory data, compliance data and ambient air quality monitoring data to their respective federal databases.
Description:
Description:
10/01/2001
10/01/2001
Start/End Dates:
Start/End Dates:
thru
thru
Complete Annual Quality Assurance System Program Self-Audit
Ensure that the states air emissions database is compatible with EPAs ... NEI
NEI Submission for Calendar Year 2016
NEI Submission re Calendar Year 2017
P&C List #__ Submit air toxics data for NEI due Dec. 31, 2018
P&C List #__ Submit air toxics data for NEI due Dec. 31, 2018
Send Compliance Data to EPA (every 60 days, per ICR)
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Ensure that the states air emissions database is compatible with EPAs re-designed NEI database system.
Submit point source emissions data to EPA's NEI by December 31, 2017, for large, "Type A" point source emissions thatoccurred during calendar year 2016.
Submit emissions inventory data to EPA's NEI by December 31, 2018, for all inventory sectors for which the state hasprepared calendar year 2017 emission estimates.
Respond to EPA comments on data prior to publication, including submission of revisions as needed
Respond to EPA comments on data prior to publication, including submission of revisions as needed
[2018-19 P&C List] - Enter/send information necessary to satisfy the inspection, testing, compliance monitoring, andenforcement minimum data requirements (MDRs) to EPA's national data systems of record, every 60 days, or as specified in program guidance
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2018
12/31/2017
12/31/2018
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
STRICKLAND, NEWTON
STRICKLAND, NEWTON
STRICKLAND, NEWTON
STRICKLAND, NEWTON
STRICKLAND, NEWTON
STRICKLAND, NEWTON
STRICKLAND, NEWTON
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Audits
Activities
Submittals
Submittals
Responses
Responses
Submittals
1
1
1
1
1
1
4
Lead Person:
Lead Person:
STRICKLAND, NEWTON
STRICKLAND, NEWTON
28196
28198
29190
29191
29186
29187
29188
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 22 of 313
AIR RESOURCES DIVISION COMPLIANCE
EMISSIONS INVENTORY (Current)
Div/Bur:
Program:
Submit emissions inventory data, compliance data and ambient air quality monitoring data to EPA (Current)Activity:
Send Compliance Data to EPA (every 60 days, per ICR)Deliverable:
[2018-19 P&C List] - Enter/send information necessary to satisfy the inspection, testing, compliance monitoring, andenforcement minimum data requirements (MDRs) to EPA's national data systems of record, every 60 days, or as specified in program guidance
Description:
10/01/2018 09/30/2019Start/End Dates: thruLead Person: STRICKLAND, NEWTON
Qty/Unit: Submittals4
29189
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 23 of 313
AIR RESOURCES DIVISION COMPLIANCE
ENFORCEMENT (Current)
The Enforcement Section is responsible for developing and implementing policies and procedures for verifying the accuracy and determiningthe appropriate compliance or enforcement response to violations of air pollution control regulations, documenting reasons for theresponse, coordinating with other programs, and determining the appropriateness of a fine or penalty.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 02 03
Funding: State General XState Fees Federal EPA Federal Other X Grants
Enforcement (Current)
HPV Program Management (Current)
Activity:
Activity:
Description:
Description:
10/01/2001
10/01/2001
09/30/2019
09/30/2019
Start/End Dates:
Start/End Dates:
thru
thru
Take enforcement action for asbestos referrals. Estimate is 6
Take enforcement action for asbestos referrals. Estimate is 6
Take enforcement action for open burning referrals. Estimate is 6
stationary source
HPV (High Priority Violation) Identification
HPV (High Priority Violation) Identification
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
DES will take enforcement actions (which include a monetary penalty where appropriate) to bring violating facilities backinto compliance. Economic benefit realized by the violator as a result of the noncompliance will be documented by DES andcollected as part of a penalty action.
DES will identify HPVs in accordance with EPAs Timely and Appropriate Enforcement Response to High Priority Violations,August 2014. DES will inform the EPA Region 1 liaison in person, by phone, or by email within 45 days of identifying anHPV.
DES will identify HPVs in accordance with EPAs Timely and Appropriate Enforcement Response to High Priority Violations,August 2014. DES will inform the EPA Region 1 liaison in person, by phone, or by email within 45 days of identifying anHPV.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2017
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
TILLEY, JAMES
PEDUTO, JR., EDWARD
TILLEY, JAMES
TILLEY, JAMES
PEDUTO, JR., EDWARD
PEDUTO, JR., EDWARD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Actions
Actions
Actions
Actions
Actions
Actions
6
6
6
30
2
2
Lead Person:
Lead Person:
PEDUTO, JR., EDWARD
PEDUTO, JR., EDWARD
29748
30038
29749
29750
29230
29231
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 24 of 313
AIR RESOURCES DIVISION COMPLIANCE
ENFORCEMENT (Current)
Div/Bur:
Program:
HPV Program Management (Current)Activity:
HPV (High Priority Violation) Resolution
HPV (High Priority Violation) Resolution
HPV (High Priority Violator) Addressing
HPV (High Priority Violator) Addressing
Percent of HPV addressed in accordance with CARP and HPV Policy
Percent of HPV addressed in accordance with CARP and HPV Policy
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
DES will resolve HPVs in accordance with EPAs Timely and Appropriate Enforcement Response to High Priority Violations,August 2014. DES will inform the EPA Region 1 liaison in person, by phone, or by email within 45 days of resolving anHPV. Target is 100% consistency with the CARP and the timeframes in the HPV Policy. FY 18 Goal is 85%; FY 19 Goal is95%
DES will resolve HPVs in accordance with EPAs Timely and Appropriate Enforcement Response to High Priority Violations,August 2014. DES will inform the EPA Region 1 liaison in person, by phone, or by email within 45 days of resolving anHPV. Target is 100% consistency with the CARP and the timeframes in the HPV Policy. FY 18 Goal is 85%; FY 19 Goal is95%
DES will address HPVs in accordance with EPAs Timely and Appropriate Enforcement Response to High Priority Violations,August 2014. DES will inform the EPA Region 1 liaison in person, by phone, or by email within 45 days of addressing anHPV.
DES will address HPVs in accordance with EPAs Timely and Appropriate Enforcement Response to High Priority Violations,August 2014. DES will inform the EPA Region 1 liaison in person, by phone, or by email within 45 days of addressing anHPV.
This deliverable is a different way of looking at the HPV Addressing deliverable. The measure here is percent of HPVsaddressed in accordance with the CARP and the HPV policy at the end of each federal fiscal year.
This deliverable is a different way of looking at the HPV Addressing deliverable. The measure here is percent of HPVsaddressed in accordance with the CARP and the HPV policy at the end of each federal fiscal year.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PEDUTO, JR., EDWARD
PEDUTO, JR., EDWARD
PEDUTO, JR., EDWARD
PEDUTO, JR., EDWARD
PEDUTO, JR., EDWARD
PEDUTO, JR., EDWARD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Actions
Actions
Actions
Actions
Percent
Percent
2
2
2
2
100
100
29232
29233
28121
29234
29853
29854
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 25 of 313
AIR RESOURCES DIVISION COMPLIANCE
IMPLEMENTATION OF NEW FEDERAL WOODSTOVE STANDARDS (Current)
EPA has adopted new emission standards for residential woodstoves and outdoor wood boilers. NH will accept partial delegation of the newstandards as they apply to the retail sale of new devices.10/01/2016
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Wood heater program (Current)Activity:
Adopt rule, educate the public, conduct inspections, seek enforcement actions if neededDescription:10/01/2016 09/30/2019Start/End Dates: thru
FFY 2018 Wood heater program
FFY 2019 Wood heater program
Phase I FFY 2017
Phase III FFY 2017 / FFY 2018
Phase IV FFY 2017 / FFY 2018
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Pursuant to MPG workplan, accept partial delegation of the wood heater NSPS standards as they apply to the retail sale ofnew devices. NH DES should finish the necessary rulemaking by December 31, 2017. Ongoing actions should include aneducation and outreach campaign to retail dealers, and unnannounced inspections to ensure only compliant devices arebeing sold. After receiving partial delegation, DES should pursue appropriate enforcement actions, as warranted.
Ongoing actions should include an education and outreach campaign to retail dealers, and unnannounced inspections toensure only compliant devices are being sold. After receiving partial delegation, DES should pursue appropriateenforcement actions, as warranted.
Implement rulemaking regarding wood heater NSPS rules, and adopt rule
Conduct at least 10 unannounced inspections to ensure only compliant devices are being sold during 1/1/2017 to 4/1/2017and 11/1/2017-4/1/2018
Seek appropriate enforcement actions as warranted
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2016
01/01/2017
01/01/2017
09/30/2018
09/30/2019
10/01/2017
04/01/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MULHOLLAND, EVAN
MULHOLLAND, EVAN
MULHOLLAND, EVAN
MULHOLLAND, EVAN
TILLEY, JAMES
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Programs
Programs
Rules
Inspections
Actions
1
1
1
10
1
Lead Person: MULHOLLAND, EVAN
29192
29193
28900
28902
28903
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 26 of 313
AIR RESOURCES DIVISION COMPLIANCE
TESTING AND MONITORING (Current)
This section is primarily responsible for implementation of two air functions; a) the stationary source stack testing program; and b)the stationary source continuous emissions monitoring (CEM) program. The compliance stack testing effort oversees all emissions testingrequired by the state or EPA and involves reviewing pretest protocols, participating in the pretest meetings, witnessing/coordinatingthe actual stack testing in the field and technically reviewing the final report for state acceptance of the data. For those largestationary sources required to continuously monitor emissions, the CEM program involves overseeing the quarterly audits performed on theCEM systems to ensure accuracy of the monitors, witnessing the annual relative accuracy stack-testing audits conducted on each system,and reviewing the quarterly CEM excess emissions reports for compliance with the facility's emissions limits.10/01/2000
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 02 01
Funding: State General XState Fees Federal EPA Federal Other X Grants
Continuous Emissions Monitoring Program (Current)
Review Draft Permits (Current)
Stack Testing Program (Current)
Activity:
Activity:
Activity:
Implement continuous emisisons monitoring (CEM) program throughout the state.
Review drafts of Title V, State Permits to Operate and Temporary Permits for technical accuracy, appropriate monitoring requirements andenforceablity.
Witness all compliance stack emissions testing performed and technically review results for compliance.
Description:
Description:
Description:
10/01/2002
10/01/2007
10/01/2002
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Number of Qtrly Excess Emission Reports received in FFY2018
Number of Qtrly Excess Emission Reports reviewed in FFY 2018
Number of relative accuracy test audit reports technically approved in FFY 2018
Number of relative accuracy test audits (RATAs) witnessed in FFY 2018
Draft State Permits Reviewed in FFY 2018
Draft Title V Permits Reviewed in FFY 2018
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
O'BRIEN, MICHAEL
O'BRIEN, MICHAEL
O'BRIEN, MICHAEL
O'BRIEN, MICHAEL
O'BRIEN, MICHAEL
O'BRIEN, MICHAEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Reports, Final
Tests
Tests
Permits Reviewed
Permits Reviewed
96
96
24
24
15
5
Lead Person:
Lead Person:
Lead Person:
O'BRIEN, MICHAEL
O'BRIEN, MICHAEL
O'BRIEN, MICHAEL
29253
29254
29255
28561
29256
29257
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 27 of 313
AIR RESOURCES DIVISION COMPLIANCE
TESTING AND MONITORING (Current)
Div/Bur:
Program:
Stack Testing Program (Current)Activity:
No of compliance stack tests witnessed in FFY 2018
Number of stack test reports technically approved in FFY 2018
Deliverable:
Deliverable:
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
O'BRIEN, MICHAEL
O'BRIEN, MICHAEL
Qty/Unit:
Qty/Unit:
Tests
Tests
45
45
29258
29259
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 28 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
AIR TOXICS MANAGEMENT PROGRAM (Current)
This program is designed to protect public health by preventing, controlling, abating and limiting emissions of toxic air pollutants intothe ambient air pursuant to RSA 125-I and Section 112 of the 1990 Clean Air Act Amendments. The Air Toxics Program is responsible forthe implementation of the State Air Toxics Control Program codified in Env-A 1400 and sets Ambient Air Limits (AALs) or air qualitystandards for approximately 750 compounds. Sources that emit any of these regulated compounds are required to demonstrate compliancewith the AALs. The SSMB is responsible for implementing ENV-A 1400 including determining applicable sources, identification ofcompliance options and approving appropriate permit conditions for subject sources. This program is also responsible for implementationof the federal Maximum Achievable Control Technology (MACT) Program for NH sources, conducting ambient air toxics monitoring at sitesthroughout NH, and providing department-wide assistance on issues involving environmental impacts on public health.10/01/2001
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 01 04
Funding: State General XState Fees Federal EPA Federal Other X Grants X
Evaluate and Implement Programs to Address Current Air Toxics and Public Health Concerns (Current)
Implement Federal Air Toxics Control Program in NH (Current)
Activity:
Activity:
Air pollutants and toxic chemicals in the environment often have public health implications. The Air Toxics Management Program is oftenresponsible for evaluating and addressing the public health impacts of toxic air contaminants.
The US EPA has established a federal air toxics control program under Section 112 of the 1990 Clean Air Act Amendments. The program setsmaximum achievable control technology (MACT) standards for designated source categories that must be implemented by affected sourcesunder the Title V operating permit program. DES has been delegated by EPA to implement these MACT standards. The Air Toxics ManagementProgram is responsible for providing input and comments to EPA on proposed MACTstandards, tracking completed MACT standards, and assuringthat affected NH sources are identified and implement applicable MACT standards as part of the Title V permit process.
Description:
Description:
10/01/2001
10/01/2001
Start/End Dates:
Start/End Dates:
thru
thru
Participate in Activities of the NESCAUM Air Toxics and Public Health Committee
Residual Risk and Technology Review Program
Residual Risk and Technology Review Program
assist in accepting Delegation of Promulgated MACT and Area Source Standards
assist in accepting Delegation of Promulgated MACT and Area Source Standards
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
As a member of the Air Quality and Public health Committee, participate in all activities including monthly conferencecalls and annual meetings.
Per 2018 EPA P&C List - Item #33 - As resources allow, review sources lists provided by EPA under the residual risk andtechnology review (RTR) program to determine whether the sources identified are covered by the standard. In addition,review and comment on RTR emissions data for sources in the state.
Per 2018 EPA P&C List - Item #33 - As resources allow, review sources lists provided by EPA under the residual risk andtechnology review (RTR) program to determine whether the sources identified are covered by the standard. In addition,review and comment on RTR emissions data for sources in the state.
From the 2018 P&C list - Item #29 - Continue delegation and implementation of toxic requirements under section 112, 129and 111(d) for major source rules, area source rules, and residual risk rules
From the 2018 P&C list - Item #29 - Continue delegation and implementation of toxic requirements under section 112, 129and 111(d) for major source rules, area source rules, and residual risk rules
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NORTH, PATRICIA
NORTH, PATRICIA
NORTH, PATRICIA
NORTH, PATRICIA
NORTH, PATRICIA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Conference Calls
Reviews
Reviews
Deliverables
Deliverables
10
1
1
1
1
Lead Person:
Lead Person:
NORTH, PATRICIA
NORTH, PATRICIA
29085
29994
30002
29086
30001
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 29 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
AIR TOXICS MANAGEMENT PROGRAM (Current)
Div/Bur:
Program:
Implement State Air Toxics Control Program (Current)
Regional Air Toxics Workshop (Current)
Review & comment on NATA (Current)
Activity:
Activity:
Activity:
DES has adopted a new air toxics control program under RSA 125-I which became effective for all NH sources as of May 8, 2001. Thisprogram, codified under Env-A 1400, sets health risk-based ambient air limits (AALs) for each of over 750 regulated toxic air pollutants(RTAPs). Any NH source that emits an RTAP must demonstrate that its emissions will not result in an exceedance of the AAL. The AirToxics Management Program is responsible for working with the NH DES Environmental Health Risk Assessment section to update the list ofRTAPs each year based on recent health risk assessement data and for providing information, assistance and implementation policyrecommendations to affected sources as well as DES permitting activities.
participate in a regional air toxics workshop held by EPA Region 1 to discuss various NESHAP implementation issues
review and comment on EPA National Air Toxics Assessment
Description:
Description:
Description:
10/01/2001
10/01/2014
10/01/2010
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Provide Technical Assistance to Sources in Determining Air Toxics Control Program Compliance
EPA Region 1 NESHAP Workshop
EPA Region 1 NESHAP Workshop
Review and comment on the draft 2014 National Air Toxics Assessment (NATA) if it is available for c
Review and comment on the draft 2014 National Air Toxics Assessment (NATA) if it is available for c
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
From the 2018 P&C List - Item #28 - Participate in EPA Region 1 NESHAP workshop to discuss implentation issues
From the 2018 P&C List - Item #28 - Participate in EPA Region 1 NESHAP workshop to discuss implentation issues
From the 2018 P&C List - Item #31 - Review and comment on the draft 2014 National Air toxics Assessment (NATA) if it isavailable for comment
From the 2018 P&C List - Item #31 - Review and comment on the draft 2014 National Air toxics Assessment (NATA) if it isavailable for comment
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NORTH, PATRICIA
NORTH, PATRICIA
NORTH, PATRICIA
NORTH, PATRICIA
NORTH, PATRICIA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Assistances Provided
Workshops
Workshops
Assessments
Assessments
5
1
1
1
1
Lead Person:
Lead Person:
Lead Person:
NORTH, PATRICIA
NORTH, PATRICIA
NORTH, PATRICIA
29088
29089
30000
29544
30003
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 30 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
HEALTH RISK ASSESSMENT (Current)
The Health Risk Assessment Program performs technical risk assessments to evaluate the health risk associated with exposure to toxicchemicals released into the environment. The Program generates health advisories for statewide distribution, such as fish advisories andhealth information summaries on various chemicals.10/01/2005
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Health Risk Assessments (Current)Activity:
Description:10/01/2005Start/End Dates: thru
NH Mercury Fish Advisory Update
Risk Assessments - RCMP, Petroleum Product Sites
Deliverable:
Deliverable:
Reveiw data on mercury in NH fish, evaluate data for waterbody-specific specific advisories and communicate the basis ofthe freshwater fish advisories.
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
NORTH, PATRICIA
NORTH, PATRICIA
Qty/Unit:
Qty/Unit:
Evaluations
Assessments
1
40
Lead Person: NORTH, PATRICIA
29090
29128
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 31 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
IMPLEMENTATION OF RICE, SSI AND MSW FEDERAL AIR REGULATIONS (Current)
DES will continue to implement existing air standards for Reciprocation Internal Combusiton Engines (RICE) and would undertake rulemakingto implement the newly finalized federal plan for Sewage Sludge Incinerators (SSI) and proposed updates to Municipal Solid Waste (MSW)landfills07/01/2017
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
MSW - implementation of Federal standards for NH sources (Current)
RICE (Current)
SSI - adoption of Federal plan to enable DES oversight (Current)
Activity:
Activity:
Activity:
Process permit amendments/issue construction permits in response to recent court decisions which changed applicability of RICENSPS/NESHAP emergency/non-emergency engine status for engine owners that participate in emergency demand response programs
Rulemaking
Description:
Description:
Description:
07/01/2017
07/01/2017
07/01/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Update MSW rule
Pollution controls installed on previously uncontrolled emergency RICE
Adopt federal Sewage Sludge Incinerators (SSI) standards
Deliverable:
Deliverable:
Deliverable:
Per 2018 EPA P&C List - Item #27 - Pursuant to MPG workplan, continue to implement existing air standards forReciprocating Internal Combustion Engines (RICE). This includes processing permit amendments/ issuing constructionpermits in response to recent court decisions which changed applicability of RICE NSPS/NESHAP emergency/non-emergencyengine status for engine owners that participate in emergency demand response programs.
Adopt federal plan to enable DES oversight
Description:
Description:
Description:
07/01/2017
07/01/2017
07/01/2017
06/30/2018
06/30/2018
06/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
MCMANUS, KARLA
BEAHM, CATHERINE
MCMANUS, KARLA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Rules
Installations
Rules
1
10
1
Lead Person:
Lead Person:
Lead Person:
MCMANUS, KARLA
BEAHM, CATHERINE
MCMANUS, KARLA
28899
28897
28910
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 32 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
NEW SOURCE REVIEW PERMIT PROGRAM (Current)
The NSR Permit Program consists of two major federal permit programs, namely, Prevention of Significant Deterioration (PSD) and Non-attainment review. This program will also handle Preconstruction Permits for sources avoiding the PSD and Non-attaiment review programs.10/01/2001
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 01 02
Funding: State General XState Fees Federal EPA Federal Other X Grants
Conduct dispersion modeling for stationary source permitting programs. (Current)
Process all PSD/NSR Related Permit Applications (Current)
Special Projects for Air Resources Division (Current)
Activity:
Activity:
Activity:
Ongoing dispersion analysis for stationary source permitting
Either new major sources or major sources making modification may be subject to the federal New Source Review Permitting Program. Anysource that is subject to this regulation would be required to obtain either a PSD and/or Non-Attainment Permit or obtain a federallyenforceable synthetic minor permit opting out of the program.
Description:
Description:
Description:
10/01/2004
04/01/2001
04/01/2005
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Respond to permit modeling requests
Issue all major NSR Permits within 12 months of receiving a complete application
Issue all major NSR Permits within 12 months of receiving a complete application
Update EPAs RACT/BACT/LAER Clearinghouse
Update EPAs RACT/BACT/LAER Clearinghouse
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Air dispersion modeling analysis performed in support of air permit applications to determine compliance with state andfederal regulations
From the 2018 P&C List - Item 16 - During FY'18, issue all major NSR permits within 12 months of receiving a completepermit application. Provide necessary data to document the goal every six months.
From the 2018 P&C List - Item 16 - During FY18, issue all major NSR permits within 12 months of receiving a completepermit application. Provide necessary data to document the goal every six months.
From the 2018 P&C list - Item #17 - During FY'18, ensure that data are submitted to EPA's RACT, BACT, LAER Clearinghousefor new major sources and major modifications within 90 days of permit issuance. Provide the data documenting thetimeliness of the submissions every six months.
From the 2018 P&C list - Item #17 - During FY18, ensure that data are submitted to EPAs RACT, BACT, LAER Clearinghousefor new major sources and major modifications within 90 days of permit issuance. Provide the data documenting thetimeliness of the submissions every six months.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LANDRY, LISA
BARU, PADMAJA
BARU, PADMAJA
BARU, PADMAJA
BARU, PADMAJA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Requests
Person-days
Person-days
Updates
Updates
30
365
365
1
1
Lead Person:
Lead Person:
Lead Person:
LANDRY, LISA
BARU, PADMAJA
BEAHM, CATHERINE
30250
29993
29998
29607
29999
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 33 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
NEW SOURCE REVIEW PERMIT PROGRAM (Current)
Div/Bur:
Program:
Special Projects for Air Resources Division (Current)Activity:
Participate on NACAA Permitting/NSR Committee
Participation on NESCAUM Stationary Source Committee
Deliverable:
Deliverable:
Attend Committee meetings and participate on Committee conference calls
Continue to participate in Committee meetings and conference calls.
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
BEAHM, CATHERINE
BEAHM, CATHERINE
Qty/Unit:
Qty/Unit:
Conference Calls
Conference Calls
10
4
29966
29968
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 34 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
PUBLIC EDUCATION AND OUTREACH UNIT (Current)
The Education and Outreach Unit is responsible for developing and implementing outreach strategies to support each Air Resouces Bureausand programs. Activities include: planning and prioritizing outreach activities, developing displays and exhibits, preparing publicationson various topics, providing classroom materials, planning and holding press events, updating website materials and supporting outreachon specific technical initiatives.10/01/2004
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees XFederal EPA Federal Other Grants X
Education and Outreach (Current)
Environmental Justice (Current)
Outreach Materials (Current)
Activity:
Activity:
Activity:
Includes development of outreach plans for various bureaus / units within ARD; regular review and updating of ARD website; andparticipation in regional or national air outreach and communications committees.
Description:
Description:
Description:
10/01/2009
06/01/2006
10/01/2004
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Fish Consumption Advisory
Participate in Regional EJ Meetings and Conference Calls
Deliverable:
Deliverable:
P&C Item Goal 3 #1
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
NORTH, PATRICIA
NORTH, PATRICIA
Qty/Unit:
Qty/Unit:
Brochures
Meetings
2400
4
Lead Person:
Lead Person:
Lead Person:
Vacant
NORTH, PATRICIA
Vacant
29129
29822
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 35 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
STATE OPERATING PERMIT PROGRAM (Current)
State regulations require certain non-major sources of air pollution (State-sources) to obtain operating permits. In addition, Statesources are required to obtain construction permits and/or modify existing permits for the installation or modification of regulateddevices.07/01/2002
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 01 02
Funding: State General XState Fees Federal EPA Federal Other Grants
Process Permit Applications (Current)Activity:
New sources, existing sources requesting permit modifications, existing sources with Temporary Permits wishing to obtain State Permits toOperate, sources wishing to renew existing permits, and existing sources previously operating without permits are all required to submitpermit applications. Processing these permit applications is a primary responsibility of the Operating Permit Program.
Description:
10/01/2001Start/End Dates: thru
Process GSP applications
Process PBNs
Process SPO and TP applications for State sources (including SIP revisions)
Deliverable:
Deliverable:
Deliverable:
Process all GSP applications. Quantity includes new permits and amendments to existing permits.
Process Permit by Notifications.
Process all SPO and TP applications, including amendments to existing permits and single source SIP revisions. Quantitybased upon anticipated 100 such applications per year.
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
DORFSCHMIDT, BARBARA
DORFSCHMIDT, BARBARA
DORFSCHMIDT, BARBARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Applications, Permit
Applications, Permit
Applications, Permit
30
5
100
Lead Person: DORFSCHMIDT, BARBARA
29134
29135
29136
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 36 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
SUPPORT OF REGIONAL ADAPTATION WORKGROUPS (Current)
DES will participate in efforts focused on regional adaptation and planning for the effects of climate change with the Coastal AdaptationWorkgroup (CAW) and the Upper Valley Adaptation Workgroup (UVAW)10/01/2016
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 37 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
TITLE V OPERATING PERMIT PROGRAM (Current)
Title V Operating Permit regulations require that major sources of air pollution obtain a Title V Operating Permit (Title V sources). Inaddition, Title V sources are required to obtain construction permits and/or modify existing permits for the installation or modificationof regulated devices.06/30/1995
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 01 02
Funding: State General XState Fees Federal EPA Federal Other X Grants
Process Permit Applications (Current)Activity:
New sources, existing sources requesting permit modifications, existing sources with Temporary Permits wishing to modify Title V permits,sources wishing to renew existing permits, and existing sources previously operating without permits are all required to submit permitapplications. Processing these permit applications is a primary responsibility of the Operating Permit Program.
Description:
06/30/1996Start/End Dates: thru
Process new Title V permit applications received for new Title V sources
Process new Title V permit applications received for new Title V sources
Process renewals to existing Title V permits
Process renewals to existing Title V permits
Process requests for minor modifications and administrative amendments to existing Title V permits
Process significant modifications at existing Title V sources
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Per the 2018 P&C List #14 - Ensure that 100 percent of new Title V operating permits are issued within 18 months ofreceiving a complete permit application or settlement of an enforcement case. Provide necessary data through the TOPSTracking Form to document the goal every six months. (OAQPS P11)
Per the 2018 P&C List #14 - Ensure that 100 percent of new Title V operating permits are issued within 18 months ofreceiving a complete permit application or settlement of an enforcement case. Provide necessary data through the TOPSTracking Form to document the goal every six months. (OAQPS P11)
Per the 2018 P&C List #15 - Document the number of expired Title V permits as of Oct. 1, 2017 and reduce the totaluniverse by 10% during the fiscal year. Provide necessary data through the TOPS Tracking Form to document the goal everysix months. (OAQPS P11)
Per the 2018 P&C List #15 - Document the number of expired Title V permits as of Oct. 1, 2017 and reduce the totaluniverse by 10% during the fiscal year. Provide necessary data through the TOPS Tracking Form to document the goal everysix months. (OAQPS P11)
Process applications for modifications to existing Title V permits. Quantity based upon anticipated 10 such applicationsper year.
Per the 2018 P&C list #13 - Insure that 100 percent of Title V significant modifications are issued within 18 months ofreceiving a complete permit application or settlement of an enforcement case. Provide necessary data through the TOPSTracking Form to document the goal every six months. Note that this includes processing Temporary Permit applicationsfor modifications to Title V sources (done in place of a significant modification).
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DORFSCHMIDT, BARBARA
DORFSCHMIDT, BARBARA
DORFSCHMIDT, BARBARA
DORFSCHMIDT, BARBARA
DORFSCHMIDT, BARBARA
DORFSCHMIDT, BARBARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Applications, Permit
Applications, Permit
Permits Issued
Permits Issued
Applications, Permit
Applications, Permit
1
1
8
8
10
10
Lead Person: DORFSCHMIDT, BARBARA
29137
29995
29138
29997
29139
29140
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 38 of 313
AIR RESOURCES DIVISION PERMITTING & ENVIRONMENTAL HEALTH
TITLE V OPERATING PERMIT PROGRAM (Current)
Div/Bur:
Program:
Process Permit Applications (Current)Activity:
Process significant modifications at existing Title V sourcesDeliverable:
Per the 2018 P&C list #13 - Insure that 100 percent of Title V significant modifications are issued within 18 months ofreceiving a complete permit application or settlement of an enforcement case. Provide necessary data through the TOPSTracking Form to document the goal every six months. Note that this includes processing Temporary Permit applicationsfor modifications to Title V sources (done in place of a significant modification).
Description:
10/01/2018 09/30/2019Start/End Dates: thruLead Person: DORFSCHMIDT, BARBARA
Qty/Unit: Applications, Permit10
29996
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 39 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
ADAPTATION AND RESILIENCY (Current)
08/08/2017
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
HSEM Contract (Current)
Multi-purpose EPA Grant Compliance (Current)
Outreach Materials (Current)
Outreach and Education (Current)
Activity:
Activity:
Activity:
Activity:
Meet requirements of the contract and provide quarterly reports to HSEM program manager.
2018 P&C Cross-Media #9
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
08/08/2017
08/08/2017
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Other related activities
Submit HSEM Grant quarterly reports
Implement SB 452
State Environmental Resiliency Group
Support CAW and UVAW
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
* Work with named state agencies to assess statutes, rules and policies governing state properties, projects and actionsin the coastal and Great Bay regions to determine changes necessary to address and enable apprpriate stat actions andlocal actions to prepare for flood riskks such as projected storm surge, sea-level rile, and precipitation events.
2018 P&C Cross Media #10; Collaborate with other State agencies to assess our programs, and to utilize limited resourcesefficiently.
2018 P&C Cross Media #10: Pursuant to Multipurpose Grant workplan, support regional adaptation workgroups (CAW andUVAW), including:* Host continuing ed workshops and forums* Provide direct technical assistance to communities* Collaborate with others to maximize limited resources* Collaborate with Darmouth and UNH to bring up-to-date science to local communities
Description:
Description:
Description:
Description:
Description:
04/01/2017
07/01/2017
10/01/2017
10/01/2017
10/01/2017
06/30/2018
06/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
GODLEWSKI, SHARON
GODLEWSKI, SHARON
GODLEWSKI, SHARON
GODLEWSKI, SHARON
GODLEWSKI, SHARON
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Deliverables
Reporting Requirements
Evaluations
Meetings
Assistances Provided
4
4
4
2
10
Lead Person:
Lead Person:
Lead Person:
GODLEWSKI, SHARON
GODLEWSKI, SHARON
GODLEWSKI, SHARON
30004
29829
29926
29925
29835
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 40 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
ADAPTATION AND RESILIENCY (Current)
Div/Bur:
Program:
Outreach and Education (Current)Activity:
Lead Person: GODLEWSKI, SHARON
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 41 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
AIR MONITORING (Current)
The Ambient Air Monitoring Unit is responsible for operation and maintenance of New Hampshire's ambient air monitoring network. NewHampshire operates several remote facilities around the state, at which DES monitors for criteria air pollutants as prescribed by the USEPA, including sulfur dioxide, ozone, nitrogen oxides, particulate matter, volatile organic compounds, and mercury. The data collectedat these sites is used to determine air quality status, confirmation of air quality trends and predictions for the Northeast region, andto provide the basis for future policy planning. This data is transmitted into a federal database for both local and national use. TheAmbient Air Monitoring Unit also provides assistance with data collection and analysis for special studies related to ambient airquality.10/01/2001
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees XFederal EPA Federal Other Grants
Annual Reporting (Current)
Attend EPA programmatic and technical forums (Current)
Activity:
Activity:
Air Monitoring Network: Submit to EPA by July 1 the annual air monitoring network review and schedule (40CRF58.20d, 58.25 & 58.46) andannual PM report (40CFR58.26).
Description:
Description:
10/01/2006
10/01/2015
Start/End Dates:
Start/End Dates:
thru
thru
SLAMS data certification letter to EPA by May 1, 2018
SLAMS data certification letter to EPA by May 1, 2019
Submit network review to EPA by July 1
Submit network review to EPA by July 1
Air Monitoring Technical Forum Attendance
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2018 P&C list Air #20
2019 P&C list Air #20
[From 2018 P&C List #19] Air Monitoring Network: Submit to EPA by July 1, 2018 the annual air monitoring network plan (40CFR 58.10). State Plan should be made available for public and EPA review by May 31, 2018 at the latest. The Planshould include ensuring monitoring networks are consistent with the requirements of recent NO2, SO2, CO, lead and ozoneNAAQS rules, in particular. (FY '18-'19 DRAFT OAAR NPM Guidance: Ambient Air Monitoring for Criteria Pollutants, 2.4.1,#4)
[From 2018 P&C List #19] Air Monitoring Network: Submit to EPA by July 1, 2019 the annual air monitoring network plan (40CFR 58.10). State Plan should be made available for public and EPA review by May 31, 2019 at the latest. The Planshould include ensuring monitoring networks are consistent with the requirements of recent NO2, SO2, CO, lead and ozoneNAAQS rules, in particular. (FY '18-'19 DRAFT OAAR NPM Guidance: Ambient Air Monitoring for Criteria Pollutants, 2.4.1,#)
2018 P&C Air #23. Attend annual air monitoring technical forum. EPA Region 1 will help facilitate scheduling of atleast one technical forum during FY18 to help ensure the technical air monitroiong staff are properly trained and bestpractices are shared among all air staff in Region 1.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Letters
Letters
Reviews
Reviews
Attendees
1
1
1
1
1
Lead Person:
Lead Person:
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
29751
29766
29767
29768
29769
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 42 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
AIR MONITORING (Current)
Div/Bur:
Program:
Attend EPA programmatic and technical forums (Current)
Criteria Pollutants Data Capture (Current)
Activity:
Activity:
Have at least 75% quarterly capture rate for CO, NO2, O3, SO2, & PM 2.5Description:10/01/2002Start/End Dates: thru
Air Monitoring Technical Forum Attendance
National Air Monitoring Conference
Achieve a capture rate of at least 75% at all PM 2.5 monitoring stations.
Achieve a capture rate of at least 75% at all PM 2.5 monitoring stations.
Achieve a capture rate of at least 75% at all active CO monitoring stations.
Achieve a capture rate of at least 75% at all active CO monitoring stations.
Achieve a data capture of at least a 75 percent at all active SO2 monitoring sites.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2019 P&C Air #23. Attend annual air monitoring technical forum. EPA Region 1 will help facilitate scheduling of atleast one technical forum during FY18 to help ensure the technical air monitroiong staff are properly trained and bestpractices are shared among all air staff in Region 1.
2018 P&C Air #27. Send at least two state staff to the National Conference planned for FY18. (FY18 NPM Guidance -Monitoring Appendix)
Identify 1 complete data set if 75% data capture rate across all monitoring sites was achieved in quarter. Identify anyindividual sites, in comments, that did not have a 75% data capture rate.
Identify 1 complete data set if 75% data capture rate across all monitoring sites was achieved in quarter. Identify anyindividual sites, in comments, that did not have a 75% data capture rate.
Identify 1 complete data set if 75% capture rate across all sites was achieved in quarter. Identify any individualsites, in comments, that did not have a 75% data capture rate. Repair and replacement schedules may be impacted byreduced funds.
Identify 1 complete data set if 75% capture rate across all sites was achieved in quarter. Identify any individualsites, in comments, that did not have a 75% data capture rate. Repair and replacement schedules may be impacted byreduced funds.
Identify 1 complete data set if 75% capture rate across all monitoring sites was achieved in quarter. Identify anyindividual sites, in comments, that did not meet a 75% data capture rate. Repair and replacement schedules may beimpacted by reduced funds.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2019
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Attendees
Conferences
Data Sets
Data Sets
Data Sets
Data Sets
Data Sets
1
1
4
4
4
4
4
Lead Person: PERKINS, JR., KENDALL
29770
29794
29771
29772
29773
29774
29775
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 43 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
AIR MONITORING (Current)
Div/Bur:
Program:
Criteria Pollutants Data Capture (Current)
Operate and maintain air monitoring networks in conformance with 40 CFR Part 58. (Current)
Activity:
Activity:
Operate and maintain monitoring network (PAMS, NAMS, SLAMS), including quality control and assurance (equipment audit and performancecheck procedures), site maintenance, establishment of replacement and new monitoring sites, planning for expansion of existing network,and appropriate responses to federal and DES program audits.
Description:
10/01/2003Start/End Dates: thru
Achieve a data capture of at least a 75 percent at all active SO2 monitoring sites.
Achieve a data capture rate of at least 75% at all active NO2 monitoring sites.
Achieve a data capture rate of at least 75% at all active NO2 monitoring sites.
Achieve a data capture rate of at least 75% at all active O3 monitoring sites.
Achieve a data capture rate of at least 75% at all active O3 monitoring sites.
Operate EPA approved network, enter precision and accuracy data, and submit annual Air Quality Data
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Identify 1 complete data set if 75% capture rate across all monitoring sites was achieved in quarter. Identify anyindividual sites, in comments, that did not meet a 75% data capture rate. Repair and replacement schedules may beimpacted by reduced funds.
Identify 1 complete data set if 75% data capture rate across all monitoring sites was achieved in quarter. Identify anyindividual sites, in comments, that did not have a 75% capture rate. Repair and replacement schedules may be impacted byreduced funds.
Identify 1 complete data set if 75% data capture rate across all monitoring sites was achieved in quarter. Identify anyindividual sites, in comments, that did not have a 75% capture rate. Repair and replacement schedules may be impacted byreduced funds.
Identify 1 complete data set if 75% data capture rate across all monitoring sites was achieved in quarter. Identify anyindividual sites, in comments, that did not have a 75% data capture rate. Repair and replacement schedules may beimpacted by reduced funds.
Identify 1 complete data set if 75% data capture rate across all monitoring sites was achieved in quarter. Identify anyindividual sites, in comments, that did not have a 75% data capture rate. Repair and replacement schedules may beimpacted by reduced funds.
2018 P&C List Air #20. Operate EPA-approved network (SLAMS, PM), enter the air monitoring, precision and accuracy datainto AQS within 90 days (180 days for PAMS) of the end of each calendar quarter (40 CFR 58.12, 58.14, & 58.16) (OAQPSM11) and submit the Annual Air Quality Data certification by May 1, 2018 (40 CFR 58.15). (FY18-19 DRAFT OAR NPM Guidance:Ambient Air Monitoring for Criteria Pollutants 2.4.1 #1, #6, #7)
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Data Sets
Data Sets
Data Sets
Data Sets
Data Sets
Data Sets
4
4
4
4
4
4
Lead Person: PERKINS, JR., KENDALL
29776
29777
29778
29779
29780
29797
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 44 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
AIR MONITORING (Current)
Div/Bur:
Program:
Operate and maintain air monitoring networks in conformance with 40 CFR Part 58. (Current)
PAMS (Current)
Activity:
Activity:
report on PAMS data capture for PAMS seasonDescription:10/01/2002Start/End Dates: thru
Operate EPA approved network, enter precision and accuracy data, and submit annual Air Quality Data
Perform Quality Assurance on all analyzers at minimum frequency required by EPA.
Perform Quality Assurance on all analyzers at minimum frequency required by EPA.
Purchase equipment for low concentration audits
2018 FY data capture at Londonderry
2018 data capture at Pack Monadnock
Install new PAMS equipment for 2019
Perform data analysis from 2018 PAMS season & submit report
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2019 P&C List Air #20. Operate EPA-approved network (SLAMS, PM), enter the air monitoring, precision and accuracy datainto AQS within 90 days (180 days for PAMS) of the end of each calendar quarter (40 CFR 58.12, 58.14, & 58.16) (OAQPSM11) and submit the Annual Air Quality Data certification by May 1, 2019 (40 CFR 58.15). (FY18-19 DRAFT OAR NPM Guidance:Ambient Air Monitoring for Criteria Pollutants 2.4.1 #1, #6, #7)
2018 P&C air #25. Purchase new equipment to meet EPA requirements for low concentration audits for gaseous pollutants.They may include: Enivronics 9100 Calibrator (with 3 MFC's); API 751H Zeor Air Generator 9high volume ouput); MESA BIOSDry Cal High Precisions Flow Standard; and Gas regulators
Londonderry Site replaced Gilson Rd.
Pack Monadnock site replaced Kittery
Once purchased, the new VOC system, True NO2, and ceilometer needs to be installed at the Londonderry location.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERKINS, JR., KENDALL
VERVILLE, TIMOTHY
VERVILLE, TIMOTHY
PERKINS, JR., KENDALL
HROBAK, LARA
HROBAK, LARA
HROBAK, LARA
HROBAK, LARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Data Sets
Data Sets
Data Sets
Equipment
Data Sets
Data Sets
Data Sets
Data Sets
4
4
4
4
1
1
1
1
Lead Person: HROBAK, LARA
29801
29803
29805
29824
29830
29831
29833
29832
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 45 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
AIR MONITORING (Current)
Div/Bur:
Program:
PAMS (Current)
Preparation and submittal of Quality Assurance Project Plans (Current)
Technical Systems Audit (Current)
Wood Smoke Study (Current)
Activity:
Activity:
Activity:
Activity:
EPA is requiring that states prepare and submit updated QAPPs for gaseous criteria pollutants, continuous PM 2.5 and PM 10. SOPs whichreflect operating procedures for data collection, validation, and maintenance are to be prepared and incorporated into the QAPP's asappendices.
Phase I - Identify additional valley areas to conduct ambient air monitoring during winter months.Phase II - Deploy mobile monitoring equipment during winter 2016/17 and 17/18.Phase III - Prepare a written report of findings during Summer 2018
Description:
Description:
Description:
10/01/2001
10/01/2016
10/01/2016 09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Purchase air monitoring equipment
Annual review of approved Quality Assurance Project Plans
Annual review of approved Quality Assurance Project Plans
Wood Smoke Study
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2018 P&C Air #23. Air Monitoring Network: With money added tothe FY/17 grant for the PAMS program, purchase and begineoperation of the following: autoGC, true NO2 monitor and ceilometer (FY18-19 DRAFT OAR NPM Guidance: Ambient airMonitoring for Criteria Pollutants, 2.4.1 #1 & 4)
(2018 P&C, Item 21) Quality Assurance: Ensure all approved QAPPs are reviewed by November 1, 2017, and confirm this inwriting to EPA. Major changes will require a QAPP revision. Ensure adequate, independent QA audits of NAAQS monitors orparticipate in NPAP and PEP QA programs. (FY18-19 DRAFT OAR NPM Guidance: 2.4.4 Ambient Air Monitoring for CriteriaPollutants, 2.4.1, #2)
(2019 P&C, Item 21) Quality Assurance: Ensure all approved QAPPs are reviewed by November 1, 2018, and confirm this inwriting to EPA. Major changes will require a QAPP revision. Ensure adequate, independent QA audits of NAAQS monitors orparticipate in NPAP and PEP QA programs. (FY18-19 DRAFT OAR NPM Guidance: 2.4.4 Ambient Air Monitoring for CriteriaPollutants, 2.4.1, #2)
Phase I - Identify additional valley areas to conduct ambient air monitoring during winter months.Phase II - Deploy mobile monitoring equipment during winter 2016/17 and 17/18.Phase III - Prepare a written report of findings during Summer 2018
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2018
10/01/2016
09/30/2018
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
HROBAK, LARA
POISSON, JAMES
POISSON, JAMES
PERKINS, JR., KENDALL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Equipment
Reviews
Reviews
Sections
3
2
2
3
Lead Person:
Lead Person:
Lead Person:
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
PERKINS, JR., KENDALL
29823
29807
29812
28912
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 46 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
ECONOMIC INCENTIVE PROGRAMS (Current)
The Clean Air Act Amendments of 1990 recognized the merit of using market-based approaches to help achieve clean air goals. For example,the Amendments introduced a market-based allowance trading system for controlling sulfur dioxide emissions that contribute to acid rain.Reductions are achieved through an "emissions budget" or "cap" trading system that places a "cap" on emissions for a specific category ofsources, power plants. In contrast, an open market system allows, but does not require, any emissions source or facility, includingmobile sources, to participate and does not set a limit on the number of emissions reductions credits generated or sold. DES has bothtypes of trading programs, which are managed by a single Program Manager. The programs achieve reductions in emissions that contributeto ground level ozone.01/20/1997
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 01 03
Funding: State General XState Fees XFederal EPA Federal Other Grants
Clean Power Act (Env-A 2900) (Current)
Discrete Emissions Reduction (DER) Trading Program (Current)
Emissions Reductions Credit (ERC) Trading Program (Current)
Implement RGGI (Regional Greenhouse Gas Initiative) (Current)
Activity:
Activity:
Activity:
Activity:
New Hampshire rules (Env-A 2900) were adopted to implement New Hampshire's Clean Power Act, which became law on July 1, 2002. The Actcalls for annual reductions of multiple pollutants (SO2, NOx, and CO2) beginning in 2007 implemented through cap and trading programs.The Act differs from, but was based upon, DES's Clean Power Strategy. Trades are recorded in the NH Clean Power Act Allowances TrackingSystem. The Act also provides incentives for emissions reductions, and power plants could earn bonus allowances in various ways forvarious pollutants. The Clean Power Act was amended in 2006 to incorporate provisions for mercury reductions. While mercury trading isprohibited, provisions were added to allow mercury credits to be converted to sulfur dioxide allowances and used for compliance with theabove trading program.
The DER Trading Program (Env-A 3100) is an open market system of trading. The DERs are mass-based units (1 DER = 1 ton) representingdiscrete, retrospective emission reductions. DERs can be voluntarily generated by stationary, mobile, or area (e.g. off-road equipment,consumer products) sources. NOx and VOCs are included because New Hampshire is in the Ozone Transport Region. The DER Trading Programis intended to give RACT sources and sources subject to New Source Review (NSR) compliance flexibility and the opportunity to reducecompliance costs. Although it is not an attainment strategy, the program benefits the environment by requiring that 10 percent of allcredits are retired (discounted) before they are used.
The ERC Trading Program (Env-A 3000) is also an open market system of trading. The ERCs are rate-based units (1 ERC= 1ton/year)representing continuous, permanent emission reductions. ERCs can be voluntarily generated by stationary, mobile, or area (e.g., off-roadequipment, consumer products) sources. NOx and VOCs are included because New Hampshire is in the Ozone Transport Region. The ERCTrading Program is not intended to reduce emissions (for example, it is not an attainment strategy) but rather to give RACT sources andsources subject to New Source Review (NSR) compliance flexibility and the opportunity to reduce compliance costs. There is also aneconomic development aspect: shutdown credits can only be used by the generator (they can not be traded). If the generator cannot usethem, they become "public ERCs" in a state-controlled account. The state can then use these ERCs for purposes of job retention (highestpriority), economic development, and job creation.
Description:
Description:
Description:
Description:
10/01/2008
01/20/1997
01/20/1997
10/01/2008
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
RGGI Annual Report to NH LegislatureDeliverable:
Prepare report on program implementation status, including recommended changes that may involve statutory and/orregulatory amendments.
Description:
10/01/2017 09/30/2018Start/End Dates: thruLead Person: FONTAINE, JOSEPH
Qty/Unit: Reports, Final1
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FONTAINE, JOSEPH
FONTAINE, JOSEPH
FONTAINE, JOSEPH
FONTAINE, JOSEPH
29841
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 47 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
ECONOMIC INCENTIVE PROGRAMS (Current)
Div/Bur:
Program:
Implement RGGI (Regional Greenhouse Gas Initiative) (Current)
NITROGEN OXIDES (NOX) BUDGET TRADING PROGRAM (Current)
Activity:
Activity:
The NOx Budget Trading Program (Env-A 3200) implements the Ozone Transport Commission Memorandum of Understanding (OTC MOU), which wassigned on September 27, 1994 and called for regional NOx reductions beginning in 1999 implemented through a market-based budget (or cap)and trading program. Not only is NH's NOx Budget Trading Program designed to achieve the ozone season NOx reductions required by the OTCMOU, but also it is designed to achieve at least an additional 100 tons of NOx reductions per season for environmental benefit. By May1, 1999, the currently existing affected facilities (utility boilers and combustion turbines at 5 Public Service of New Hampshire (PSNH)facilities) in New Hampshire shall reduce their NOx emissions from their 1990 baseline emissions of 14,589 tons to 4,674 tons. Thesesignificant NOx emission reductions, combined with similar reductions in other OTR States, should help improve air quality by reducingground-level ozone concentrations. Exposure to ozone causes decreased lung capacity, particularly in children and elderly.
Description:
05/01/1999Start/End Dates: thru
RGGI Annual Report to NH Legislature
RGGI Auctions
RGGI Auctions
RGGI Leakage Report
RGGI Leakage Report
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Prepare report on program implementation status, including recommended changes that may involve statutory and/orregulatory amendments.
NOTE: 3 below indicates 3 Million Allowances auctioned annually, 750,000 auctioned quarterly
NOTE: 3 below indicates 3 Million Allowances auctioned annually, 750,000 auctioned quarterly
Prepare report documenting that in-region emissions reductions have occurred and emissions have not been shifted out ofregion.
Prepare report documenting that in-region emissions reductions have occurred and emissions have not been shifted out ofregion.
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FONTAINE, JOSEPH
FONTAINE, JOSEPH
FONTAINE, JOSEPH
FONTAINE, JOSEPH
FONTAINE, JOSEPH
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Tons
Tons
Reports, Final
Reports, Final
1
3
3
1
1
Lead Person: FONTAINE, JOSEPH
29842
29843
29844
29845
29846
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 48 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
ENERGY AND CLIMATE CHANGE (Current)
The Energy Programs Unit is responsible for activities related to global climate change, including maintenance of New Hampshire'sgreenhouse gas inventory, preparation of plans relative to reducing emissions of greenhouse gases and energy efficiency, planning andoutreach activities associated with global warming and climate change, and technical support for policy and program initiatives at thelocal, state, and national levels.10/01/2001
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees XFederal EPA Federal Other Grants X
EPA Energy Efficiency Programs (Current)
GHG Reporting (Current)
Implement and Update Climate Action Plan/Energy and Climate Collaborative (Current)
Activity:
Activity:
Activity:
Support and promote EPA's programs to enhance and promote energy efficiency.
2018 P&C #36: As resources allow, work with EPA on the implementation of the GHG Reporting Rule. Activities may include: 1) reviwing alist of NH facilities that may be subject to reporporting rule but did not report; 2) answering and/or directions questions fromfacilities on the rule.
Activities and programs to support, track and implement NH Climate Action Plan; participate in and provide oversight for NH Energy andClimate Collaborative.
Description:
Description:
Description:
10/01/2002
10/01/2017
10/01/2002
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
NHDES-EPA Coordination on Climate Change
Promote energy efficiency improvements in the municipal sector
Promote energy efficiency improvements in the municipal sector
Review list of facilities subject to, but not reporting
RPS (Renewable Portfolio Standards)
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2018 P&C #8: Continue with Staff level meetings between NHDES and EPA to determine actions on priority areas, and todevelop an implementation strategy of needed changes
2018 P&C Cross-Media #9 - Work with EPA to encourage local communities to target the reduction of energy use in municipaland school buildings through participation in the Local Energy Committee Working Group.
2019 P&C Cross-Media #9 - Work with EPA to encourage local communities to target the reduction of energy use in municipaland school buildings through participation in the Local Energy Committee Working Group.
Assist the PUC with implementation of NHs Renewable Portfolio Standard by providing quarterly approvals of emission ratesfor certified facilities
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SKOGLUND, CHRISTOPHER
SKOGLUND, CHRISTOPHER
SKOGLUND, CHRISTOPHER
FONTAINE, JOSEPH
FONTAINE, JOSEPH
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Consultations
Programs
Programs
Reviews
Approvals
4
1
1
1
4
Lead Person:
Lead Person:
Lead Person:
SKOGLUND, CHRISTOPHER
FONTAINE, JOSEPH
FONTAINE, JOSEPH
29927
29827
29828
29931
29848
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 49 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
ENERGY AND CLIMATE CHANGE (Current)
Div/Bur:
Program:
Implement and Update Climate Action Plan/Energy and Climate Collaborative (Current)
Participation in Regional/Federal Climate Change/Greenhouse Gas Initiatives (Current)
Activity:
Activity:
NESCAUM, OTC, NEG/ECP and STAPPA/ALAPCO, and EPA all have committees which focus primarily on Climate Change. Implement RGGI viaprogram oversight/continued promotion for federal actions. Ongoing.
Description:
10/01/2001Start/End Dates: thru
RPS (Renewable Portfolio Standards)
Multi-State Initiative for a Regional Greenhouse Gas Cap
Multi-State Initiative for a Regional Greenhouse Gas Cap
New England Governors/Eastern Canadian Premiers Committees
RGGI amended NH RGGI rule
RGGI amended NH RGGI rule
Work with EPA on the implementation of the Greenhouse Gas Reporting Rule
Work with EPA on the implementation of the Greenhouse Gas Reporting Rule
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Assist the PUC with implementation of NHs Renewable Portfolio Standard by providing quarterly approvals of emission ratesfor certified facilities
Maintain 3.6 million tons of emissions by Participating in regional workgroup to further develop a program to capgreenhouse gas emissions from the power sector in New England and other eastern states, to analyze imports and leakage,and to establish a regional organization for a registry.
Maintain 3.6 million tons of emissions by Participating in regional workgroup to further develop a program to capgreenhouse gas emissions from the power sector in New England and other eastern states, to analyze imports and leakage,and to establish a regional organization for a registry.
Participate in NEG/ECP Transportation and Air Quality Committee and Climate Change Steering Committee
Amend the NH RGGI rules
Amend the NH RGGI rules
2018 P&C Air #36 - As resources allow, work with EPA on the implementation of the Greenhouse Gas Reporting Rule.Activities may include: 1) reviewing a list of NH facilities that may be subject to reportin rule but did not report; 2)answering and/or directing questions from facilities on the rule.
2019 P&C Air #36 - As resources allow, work with EPA on the implementation of the Greenhouse Gas Reporting Rule.Activities may include: 1) reviewing a list of NH facilities that may be subject to reportin rule but did not report; 2)answering and/or directing questions from facilities on the rule.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FONTAINE, JOSEPH
FONTAINE, JOSEPH
FONTAINE, JOSEPH
OHLER, REBECCA
FONTAINE, JOSEPH
FONTAINE, JOSEPH
FONTAINE, JOSEPH
FONTAINE, JOSEPH
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Approvals
Tons
Tons
Committees
Approvals
Rules
Outreach Activities
Outreach Activities
4
3
3
2
1
1
1
1
Lead Person: FONTAINE, JOSEPH
29849
29834
29847
29852
28935
28936
29825
29826
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 50 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
MOBILE SOURCES UNIT (Current)
The Mobile Sources Unit is responsible for policy planning related to mobile sources (e.g., vehicles, equipment, fuels) and area sources(e.g., small business, populated based emissions) of air pollution, maintenance of the State's criteria air pollutant emissions inventoryfor mobile and area sources, issues related to new vehicle and fuel standards, state level vehicle emissions and inspection programs,transportation conformity, outreach relative to mobile and area sources, and technical and policy support for studies related to fuels,fuel components (i.e., MTBE), vehicles, and mobile and recreational equipment.10/01/2001
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 04 02
Funding: State General State Fees XFederal EPA Federal Other Grants X
Administrative program management (Current)
Conformity determinations (Current)
Diesel Emission Reduction Programs (Current)
Granite State Clean Cities Coalition (Current)
Activity:
Activity:
Activity:
Activity:
Personnel administration, evaluation
P&C #17 Process conformity determinations for CO maintenance areas with Limited Maintenance Plans in place (OTAQ 03a)
Manage state diesel emission reduction programs, including state grant DERA programs, federal stimulus DERA, and other diesel relatedprojects including the Northeast Diesel Collaborative.
Serve as coordinator of the Granite State Clean Cities Coalition and ensure continuation of the program in New Hampshire.
Description:
Description:
Description:
Description:
10/01/2002
10/01/2014
10/01/2009
10/22/2002
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Conduct annual evaluation of employees
Conformity
Conformity
Northeast Diesel Collaborative
Complete Alt fuel price reports
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2018 P&C Air #4 - Process conformity determinations for CO maintenance areas with Limited Maintenance Plans in place.
2019 P&C Air #4 - Process conformity determinations for CO maintenance areas with Limited Maintenance Plans in place.
2018 P&C #10: Attend the NEDC Stakeholder meeting in Fall 2017
Complete and submit price reports quarterly.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WHITE, TIMOTHY
WHITE, TIMOTHY
STRACHAN, ELIZABETH
STRACHAN, ELIZABETH
WILCOX, JESSICA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Evaluations
Programs
Programs
Meetings
Reports, Final
2
1
1
1
4
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WHITE, TIMOTHY
WHITE, TIMOTHY
WILCOX, JESSICA
WILCOX, JESSICA
29836
29837
29838
29929
29887
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 51 of 313
AIR RESOURCES DIVISION TECHNICAL SERVICES
MOBILE SOURCES UNIT (Current)
Div/Bur:
Program:
Granite State Clean Cities Coalition (Current)
Implement On Board Diagnostics Inspection Program (Current)
Regional Collaboration (Current)
Activity:
Activity:
Activity:
Work with Department of Safety to implement statewide program to incorporate a check of the OBD system on 1996 and newer vehicles intothe annual Enhanced Safety Inspection. Program includes training of inspection stations and vehicle inspectors, statewide enforcementefforts, education and outreach, and annual reporting of program statistics to EPA
Monthly/quarterly meeting with regional mobile source and air quality groups, i.e., NEDC, NESCAUM, OTC, TCI
Description:
Description:
10/01/2002
10/01/2012
Start/End Dates:
Start/End Dates:
thru
thru
Complete a program operating plan
Complete alt fuel station research as per item 5.1 in DOE contract
Guidance document, plan and summary report - Calstart
Present outreach tool, timeline and initial fleet survey - Calstart
Second round of survey's (county and muni fleets) Calstart
Submit annual report to US DOE
Complete and submit annual I/M reports to EPA. (OTAQ 06)
Complete and submit annual I/M reports to EPA. (OTAQ 06)
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Complete and submit a 12 months operating plan.
Research stations provided by NREL
Submit annual fleet report on petroleum reduction to US DOE
2018 P&C List (Item Air #3) Complete and submit the annual I/M report for calendar year 2017 to EPA by July 2018 (FY 18-19 DRAFT OAR NPM Guidance: Mobile Source Programs, 2.8.1, #5)
2019 P&C List (Item Air #3) Complete and submit, as a single report, the annual I/M report for calendar year 2017 and thebiennial report to EPA by July 2019 (FY 18-19 DRAFT OAR NPM Guidance: Mobile Source Programs, 2.8.1, #5)
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
02/01/2017
06/20/2016
06/20/2016
06/20/2016
10/01/2017
10/01/2017
10/01/2018
09/30/2018
01/31/2018
03/14/2018
03/14/2018
03/14/2018
09/30/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WILCOX, JESSICA
WILCOX, JESSICA
WILCOX, JESSICA
WILCOX, JESSICA
WILCOX, JESSICA
WILCOX, JESSICA
STRACHAN, ELIZABETH
STRACHAN, ELIZABETH
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Assignments
Reports, Final
Reports, Drafts
Surveys
Reports, Final
Reports, Final
Reports, Final
1
1
3
3
1
1
1
1
Lead Person:
Lead Person:
WHITE, TIMOTHY
WHITE, TIMOTHY
29888
29889
28230
28227
28229
30468
29890
29891
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 52 of 313
OFFICE OF THE COMMISSIONER ADMINISTRATIVE SERVICES
ADMINISTRATIVE SERVICES (Current)
General Catchall Program to house Form B Metrics07/01/2017
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Administrative Services Form B Metrics (Current)Activity:
Description:07/01/2017Start/End Dates: thru
Financial Reports and Invoices Processed
Financial Transactions Processed
Vehicles Maintained
Deliverable:
Deliverable:
Deliverable:
Need to define "FFR" Note: Only a placeholder - Kim/Susan need to groundtruth and update quantity figure. Total guessplaceholder added by V. Perelli 9/18/17
Note: Only a placeholder - Kim/Susan need to groundtruth and update quantity figure. Total guess placeholder added byV. Perelli 9/18/17
Note: Only a placeholder - Kim/Susan need to groundtruth and update quantity figure. Total guess placeholder added byV. Perelli 9/18/17
Description:
Description:
Description:
07/01/2017
07/01/2017
07/01/2017
06/30/2019
06/30/2019
06/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
BOONE, KIMBERLY
BOONE, KIMBERLY
BOONE, KIMBERLY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Transactions
Transactions
Vehicles
1000
1000
100
Lead Person: BOONE, KIMBERLY
30248
30247
30249
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 53 of 313
OFFICE OF THE COMMISSIONER GEOLOGY
DIGITAL HYDROGRAPHY (Current)
Development of digital data sets and GIS applications to support watershed analyses and hydrologic/hydraulic (H&H) studies10/01/2000
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 01 01 06
XFunding: State General State Fees XFederal EPA Federal Other Grants
GIS applications development (Current)
Quality control (Current)
Activity:
Activity:
Promote development of innovative GIS applications that utilize digital watershed boundaries and/or directional hydrographic network data
Ensure accuracy and vertical integration of digital watershed boundaries and the statewide directional centerline hydrographic network(NH Hydrography Dataset)
Description:
Description:
10/01/2000
10/01/1989
Start/End Dates:
Start/End Dates:
thru
thru
NHD event discovery tool
NH Hydrography Dataset (NHD) stewardship
Deliverable:
Deliverable:
Develop an ArcGIS Server application to enable virtual navigation of the centerline network and selective identificationof hydrologic features of interest
Maintenance of NHD network hydrography, representing 16 HUC8 watersheds, and oversight/standardization of network eventcreation
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
BARKER, GREGORY
KEELEY, JOSHUA
Qty/Unit:
Qty/Unit:
Applications, GIS
Data Sets
1
2
Lead Person:
Lead Person:
BARKER, GREGORY
BARKER, GREGORY
30366
30524
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 54 of 313
OFFICE OF THE COMMISSIONER GEOLOGY
FLOOD HAZARDS PROGRAM (Current)
Management of NH interagency flood management team, and conductance of fluvial geomorphology activities in support of multiple stateagencies, with a goal of flood risk reduction.10/01/2008
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 01 01 06
Funding: State General State Fees Federal EPA Federal Other X Grants
Administers NH interagency flood management team (Silver Jackets) (Current)
Administers state stream crossing steering team (Current)
Development and execution of New Hampshire stream crossing assessments and tasks (Current)
Activity:
Activity:
Activity:
Administers the multi-federal and state NH interagency flood management team, including coordination of post-flood event response, andpre-flood mitigation.
Provides administration of the state stream crossing steering team, a 4-agency parternship (DES, DOT, F & G, HSEM) that guides theconductance of stream crossing assessments in New Hampshire.
Maintain New Hampshire stream crossing assessment protocol.
Description:
Description:
Description:
05/01/2014
01/01/2016
01/01/2011
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Administration of New Hampshire Silver Jackets
Franconia/Sugar Hill-Gale River Silver Jackets collaborative project
Recovery Support Function #6 (State Disaster Recovery Plan)
Coordinates meetings of the state stream crossing steering team
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Administration of New Hampshire Silver Jackets, including coordination of all activities and conductance of four (4)quarterly meetings
This project is designed to provide technical assistance to Gale River communities by all members of Silver Jackets,coordinated by NHGS relative to ice jam formation processes to provide guidance to towns on potential reasons forformation. An Ice Observer Training Program, an element of the state hazard mitigation plan yet to be completed, will bedeveloped to provide outreach to towns throughout New Hampshire.
Review roles and responsibilities of agencies in RSF #6 relative to pre- and post-disaster roles that span multipleorganizations and work to determine roles that will require further establishment of coordination, program development ordata collection
Leads multi-agency collaboration for the state stream crossing initiative
Description:
Description:
Description:
Description:
10/01/2017
12/01/2016
10/01/2017
10/01/2017
09/30/2018
06/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CSIKI, SHANE
CSIKI, SHANE
CSIKI, SHANE
CSIKI, SHANE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Projects
Meetings
Meetings
4
1
4
4
Lead Person:
Lead Person:
Lead Person:
CSIKI, SHANE
CSIKI, SHANE
CSIKI, SHANE
29859
28973
29869
30370
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 55 of 313
OFFICE OF THE COMMISSIONER GEOLOGY
FLOOD HAZARDS PROGRAM (Current)
Div/Bur:
Program:
Development and execution of New Hampshire stream crossing assessments and tasks (Current)
Fluvial Erosion Hazard (FEH) Assessments (Current)
Public outreach (Current)
Technical support to DES units, state agencies, RPCs and towns (Current)
Activity:
Activity:
Activity:
Activity:
Oversees and conducts systematic fluvial geomorphic assessments of rivers to characterize sediment transport and channel stability at thereach-scale and determine probable future states of channel evolution.
Communicates with designated river local advisory committees, local watershed groups and other non-governmental organizations, state andfederal agencies, and the private sector to promote the practical application of fluvial geomorphic concepts and principles.
Technical review of proposals for stream restoration projects to insure fluvial geomorphic processes are adequately considered inassessing the long-term sustainability of project benefits, in addition to providing a science advisor role to DES staff on projects andstudies as requested and needed
Description:
Description:
Description:
06/01/2009
07/01/2012
05/15/2009
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Culvert Hydraulic Modeling
Perform quality control review and priority ranking of collected stream crossings
Perform quality control review and priority ranking of collected stream crossings
Training of stream crossing data collectors
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Will develop the technical workflow for conductance of hydraulic modeling of culvert failures and analysis of theresulting impacts on critical downstream transportation and building infrastructure. Important aspects of the workflowinclude: identification of the most vulnerable culverts on which to perform modeling; collection, quality assessmentcontrol, and pre-processing of model inputs; the technical setup and running of the model; and review and post-processingof model outputs. Review of scientific literature will be performed to ensure that construction and operation of themodel will be founded within the current science of flood process analysis. Generated information will be made availableto units within DES and HSEM for use in emergency operations, with technical assistance provided to agency staff on useof the data identification of critical infrastructure identified as at-risk through the model output. Initial developmentof the modeling process will focus on the Merrimack Valley.
Conduct expert assessments of the state's culvert infrastructure to identify vulnerabilities and prioritize replacementsto reduce risk of failure during floods and increase public safety, while minimizing potential economic impacts andenvironnmental damage.
Perform all quality control assurance review for collected data, and development and enhancement of priority rankingcriteria for each crossing.
Provides training of DES staff, regional planning commission staff and contractors on the proper conductance of streamcrossing data collection at the department training site in Franklin
Description:
Description:
Description:
Description:
10/01/2017
07/01/2017
10/01/2018
10/01/2017
09/30/2018
06/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
TAGGART, THOMAS
TAGGART, THOMAS
TAGGART, THOMAS
TAGGART, THOMAS
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Projects
Units
Training Sessions
1
2000
5
Lead Person:
Lead Person:
Lead Person:
CSIKI, SHANE
CSIKI, SHANE
CSIKI, SHANE
29857
29860
30095
29861
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 56 of 313
OFFICE OF THE COMMISSIONER GEOLOGY
FLOOD HAZARDS PROGRAM (Current)
Div/Bur:
Program:
Technical support to DES units, state agencies, RPCs and towns (Current)Activity:
Collection and collation of flood hazard datasets
Hazard Mitigation Geodatabase
Program expert availability in SEOC during major flood events
Refinement of Structure-from-Motion Technology
Technical support to Wetlands Bureau
Technical support to state agencies
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
This project involves the search, obtainment and collation of multiple flood datasets across multiple state and federalagencies to ensure they are collectively available in the State Emergency Operations Center during flood events.
Geodatabase of flood hazard information contained with local hazard mitigation plans for use by HSEM and DES
Staff expert "on call" to be available in the state emergency operations center during flood events to interpret themeaning of flood hazards data in support of HSEM, DES and other staff in the SEOC, in support of emergency response andrecovery decisionmaking.
Continue refinement of SfM technology to rapidly collect and produce variable resolution topography data
Provision of technical support to Wetlands Bureau relative to bank stabilization techniques, review of site-specificissues, and support relative to administrative design processes.
Provision of technical support to agencies throughout state government in support of sound science and technical accuracyincorporation into state efforts to address flood-based hazard preparedness.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CSIKI, SHANE
CSIKI, SHANE
CSIKI, SHANE
CSIKI, SHANE
CSIKI, SHANE
CSIKI, SHANE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Towns
Databases
Assistances Provided
Projects
Assistances Provided
Assistances Provided
234
1
4
1
5
5
30371
29858
29864
29872
30372
30373
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 57 of 313
OFFICE OF THE COMMISSIONER GEOLOGY
GEOLOGIC MAPPING PROGRAM (Current)
Partnership with the USGS National Cooperative Geologic Mapping Program to map surficial and bedrock geology in New Hampshire07/01/1984
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 01 01 06
XFunding: State General State Fees Federal EPA Federal Other X Grants
1:24000-scale quadrangle mapping (Current)
Digital data access (Current)
Map catalog (Current)
Activity:
Activity:
Activity:
Production of completed geologic maps, surficial and/or bedrock
Expand access to site-specific data on stratigraphy and other subsurface characteristics. NOTE: SUSPENDED DUE TO LOSS OF GENERAL FUNDSTAFF AS OF 07/01/2011 AND LACK OF ALTERNATIVE SOURCES OF SUPPORT.
Maintain a current bibliography of NH geologic maps and related references
Description:
Description:
Description:
07/01/1984
10/01/2002
10/01/2001
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Mapping workshops
STATEMAP Geologic Mapping
Enable public access to current bibliography of geologic maps
Deliverable:
Deliverable:
Deliverable:
Conduct workshops designed to share information of general interest to the contract mappers and other program staff
Open-file status surficial geologic maps of the Bradford, Center Sandwich and Mount Chocorua 1:24000 scale quadrangles;open-file status bedrock geologic map for the southern half of the Mount Crescent 1:24000 scale quadrangles
Create and maintain a searchable catalog of geologic publications on the NHGS website
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
CHORMANN, JR., FREDERICK
CHORMANN, JR., FREDERICK
BARKER, GREGORY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Maps
Databases
1
3.5
1
Lead Person:
Lead Person:
Lead Person:
CHORMANN, JR., FREDERICK
CHORMANN, JR., FREDERICK
BARKER, GREGORY
30032
30033
30368
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 58 of 313
OFFICE OF THE COMMISSIONER GEOLOGY
GROUNDWATER LEVEL MEASUREMENT NETWORK (Current)
Monitoring of water levels in a statewide network of observation wells to assess current and historical hydrologic conditions10/01/1995
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 01 01 06
XFunding: State General State Fees Federal EPA Federal Other Grants
Database development (Current)
Monitoring (Current)
Well network maintenance and expansion (Current)
Activity:
Activity:
Activity:
Expand database for capturing other water level data received by the departmentNOTE: SUSPENDED DUE TO LOSS OF GENERAL FUND STAFF AS OF 07/01/2011; OTHER SOURCES OF SUPPORT ARE ACTIVELY BEING SOUGHT. Completedthrough 2014 NEIEN Grant
Monitor groundwater levels under ambient hydroclimatic conditions in a statewide network of observation wells
Maintain integrity of monitoring wells and expand the network to be more representative of hydrogeologic settings and to improveresolution of monitoring data. NOTE: SUSPENDED DUE TO LOSS OF GENERAL FUND STAFF AS OF 07/01/2011; OTHER SOURCES OF SUPPORT AREACTIVELY BEING SOUGHT AS A DELIVERABLE
Description:
Description:
Description:
10/01/1999
10/01/1999
10/01/2008
10/01/2017Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Hourly measurements
Monthly measurements (some by Volunteers)
Deliverable:
Deliverable:
Groundwater level data loggers have been installed and maintained in 18 monitoring wells. These data are downloadedmonthly, databased and analyzed.
Measure water levels in 20 of 28 network wells on a monthly basis, as well as 10 additional bedrock wells in the expandednetwork, resulting in 360 individual measurements annually
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
BARKER, GREGORY
BARKER, GREGORY
Qty/Unit:
Qty/Unit:
Measurements
Measurements
157680
360
Lead Person:
Lead Person:
Lead Person:
BARKER, GREGORY
BARKER, GREGORY
CHORMANN, JR., FREDERICK
30037
30367
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 59 of 313
OFFICE OF THE COMMISSIONER GEOLOGY
PUBLICATIONS, OUTREACH, AND EDUCATION (Current)
Public education pertaining to the state's geology and mineral and water resources07/01/1949
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 01 01 06
XFunding: State General State Fees Federal EPA Federal Other X Grants
Outreach (Current)Activity:
Promote, organize, and capitalize on educational opportunities to increase public understanding of the state's geologyDescription:07/01/1949Start/End Dates: thru
Educational OutreachDeliverable:
Provide public presentations including lunch time lectures, as well as presentations given to schools, civic groups,college classes,etc.
Description:
10/01/2017 09/30/2018Start/End Dates: thruLead Person: WILDER, LELAND
Qty/Unit: Presentations3
Lead Person: WILDER, LELAND
30036
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 60 of 313
OFFICE OF THE COMMISSIONER GEOLOGY
WATER WELL INVENTORY (Current)
Compilation of well construction information and georeferencing of well locations. NOTE: SUSPENDED DUE TO LOSS OF GENERAL FUND STAFF ASOF 07/01/2011.07/01/1984
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 01 01 06
XFunding: State General State Fees Federal EPA Federal Other Grants
Database maintenance (Current)Activity:
Maintain currency and reliablilty of well construction information reported by water well contractors and respond to requests for welldata
Description:
07/01/1984Start/End Dates: thru
Georeference well locations
Minimize backlog in data entry for well completion reports
Deliverable:
Deliverable:
Utilize any available opportunities and resources to assign geographic coordinates to well locations using the GISdesktop method
Utilize any available opportunities and resources to complete data entry for well completion reports that comprise thebacklog which has resulted from the elimation of dedicated staff in 2011
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
CHORMANN, JR., FREDERICK
CHORMANN, JR., FREDERICK
Qty/Unit:
Qty/Unit:
Wells
Wells
300
1000
Lead Person: CHORMANN, JR., FREDERICK
30034
30035
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 61 of 313
OFFICE OF THE COMMISSIONER LEGAL
COUNCIL SUPPORT (Current)
07/01/2017
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
XFunding: State General State Fees Federal EPA Federal Other Grants
Docket Appeals (Current)Activity:
Description:07/01/2017Start/End Dates: thru
Percentage of Appeals Docketed Within Established Time LimitsDeliverable:
Description:
07/01/2017 06/30/2018Start/End Dates: thruLead Person: SCOTT, PAULA
Qty/Unit: Percent100
Lead Person: SCOTT, PAULA
29744
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 62 of 313
OFFICE OF THE COMMISSIONER LEGAL
ENFORCEMENT (Current)
07/01/2017
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
XFunding: State General State Fees Federal EPA Federal Other Grants
Formal Enforcement Actions (Current)Activity:
Description:07/01/2017Start/End Dates: thru
Percentage of Enforcement Actions Overturned on AppealDeliverable:
Description:
07/01/2017 06/30/2018Start/End Dates: thruLead Person: BARNSLEY, KERRY
Qty/Unit: Percent15
Lead Person: BARNSLEY, KERRY
29745
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 63 of 313
OFFICE OF THE COMMISSIONER LEGAL
RULEMAKING (Current)
07/01/2017
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
XFunding: State General State Fees Federal EPA Federal Other Grants
Re-Adopt Existing Rules (Current)Activity:
Description:07/01/2017Start/End Dates: thru
Percent of DES Programs Remaining in Effect as Intended by the LegislatureDeliverable:
Description:
07/01/2017 06/30/2018Start/End Dates: thruLead Person: HAMEL, GRETCHEN
Qty/Unit: Percent100
Lead Person: HAMEL, GRETCHEN
29746
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 64 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
HOUSEHOLD HAZARDOUS WASTE PROGRAM (Current)
The Household Hazardous Waste Program provides municipalities with grant funding for HHW waste collection events and has initiated thepromotion of source reduction by consumers and more efficient management of HHW and Universal Wastes by municipalities. A component ofthe program is research into making more readily available permanent options for safe disposal of household hazardous waste. Statutoryand regulatory revisions underway at this point are aimed at making the process of collection more convenient, cost-effective andefficient.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 00 01
Funding: State General XState Fees Federal EPA Federal Other Grants
Data Management (Current)
Grants management (Current)
Activity:
Activity:
Compile waste management information to allow for informed decisionmaking in program operations.
Support Communities in Proper collection/disposal of HHW through financial assistance.
Description:
Description:
10/01/2001
10/01/2001
Start/End Dates:
Start/End Dates:
thru
thru
Continuous Improvements to HHW Grant Process
Meeting to Discuss N Form Options for HHW Application
Provide an annual fiscal report of the HHW program.
Track total pounds of HHW collected at all events
Update and amend HHW SOP as needed
1.Provide outreach to all NH Towns to inform them about grant availability
2. Process and provide funding for at least 25 grant applications per year.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Make periodic improvements to various areas within the HHW grant process.
Accounting and database information are used to generate an annual report detailing wastes collected, costs, etc.
Following submission of final collection event documents, track the total number of pounds (units) of HHW collected.
Mail grant announcements and information to the 234 towns, two times per year; update information on Web Page; provideguidance letters and other documents as needed
Ensure all grants are propely managed within time contraints of application/approval process. Ensure all eligible grantapplicants receive at least partial funding with emphasis on permanent facilities and multi-town collection events.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Improvements
Meetings
Reports, Final
Pounds of Hazardous Waste
Updates
Notifications
Applications
4
1
1
8000
1
234
25
Lead Person:
Lead Person:
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
30486
30498
30487
30488
30489
30490
30491
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 65 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
HOUSEHOLD HAZARDOUS WASTE PROGRAM (Current)
Div/Bur:
Program:
Grants management (Current)
Technical Assistance and Education (Current)
Activity:
Activity:
Promote proper management of HHW and Universal Wastes through Education and TrainingDescription:10/01/2001Start/End Dates: thru
3. Disburse $170,000 in grants annually.
4. Provide funding for at least 160 communities per year.
SOP for HHW G&C Processing
Activities
Attend Municipal and RPC Meetings
Climate Change Initiative
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide funding to eligible applicants in the amount of 0.20 cents per capita or 50% of the costs of a householdhazardous waste collection.
Homeowners in at least 200 NH communities should have access to at least one collection event, each year.
Complete one SOP using the DES SOP template
School presentations, eco-fairs, association meetings, etc...
Attend meetings that are focused on managing HHW for municipalities
Provide customers with information regarding HHW Management before flood situatiions via the NHDES web site.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Dollars
Communities
Drafts
Presentations
Meetings
Postings
170000
200
1
6
3
1
Lead Person: ROBINSON, JR., DEAN
30492
30493
30494
30495
30496
30497
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 66 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
MERCURY REDUCTION COORDINATION (Current)
NOTE: This position is currently vacant. With the exception of continuing to participate in the
Encompasses state and regional mercury reduction activities formerly grouped under "pollution prevention coordination".10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 01 06 01
Funding: State General XState Fees Federal EPA Federal Other Grants
ECOS Quicksilver Caucus (Current)
Interstate Mercury Education and Reduction Clearinghouse (Current)
Miscellaneous Mercury Reduction Activities (Current)
NH Mercury Reduction Strategy Implementation (Current)
Activity:
Activity:
Activity:
Activity:
NOTE: This position is currently vacant. No activity is expected in this area until the position is filled.
Participate in conference calls, workgroups, meetings, etc.
Various mercury activities that don't fit under other categories and / or are temporary in nature.
Description:
Description:
Description:
Description:
10/01/2008
10/01/2001
10/01/2008
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
IMERC Steering Committee
Mercury Product Notification and Phase-out Committees
Other IMERC Committee Participation
Participate in "transient" mercury activities as needed
Develop new programs, policies, regulations, legistlation, outreach
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Participate in conference calls and review notifications as needed.
Participate in "ad-hoc" committees such as education, budget, etc. on and as-needed basis
Covers national, regional activities etc not covered in other places
As needed
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
Vacant
Vacant
Vacant
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Activities
Activities
Activities
Activities
Activities
2
6
4
1
1
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
Vacant
Vacant
29260
29261
29262
29263
29264
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 67 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
MERCURY REDUCTION COORDINATION (Current)
Div/Bur:
Program:
NH Mercury Reduction Strategy Implementation (Current)Activity:
Thermostat RecyclingDeliverable:
Under RSA 149-M:58, manufacturers are required to provide and promote a thermostat recycling program. DES will providesupport for the program by providing outreach to thermostat stakeholders as well as by providing outreach to solid wastefacilities where thermostat disposal is banned.
Description:
10/01/2017 09/30/2018Start/End Dates: thruLead Person: Vacant
Qty/Unit: Activities2
29266
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 68 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
This unit was re-organized in January 2006. The previous 2-person Planning Unit in the Office of the Commissioner became the "Planningand Innovations Section" of the Planning, Prevention & Assistance Unit. The PPA Unit currently houses NHPPP, HHW, SBTAP, P2/MercuryCoordination, QA System, Lean, COOP, Planning, etc... These are represented as separate Programs in some instances. Note: TheSustainable Land Use/Innovative Permitting positions have been transferred to a new Project Management Office under the AssistantCommissioner.02/19/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 01 01 01
XFunding: State General State Fees Federal EPA Federal Other Grants
Continuity of Operations Planning (Current)Activity:
Description:07/01/2006Start/End Dates: thru
COOP Presentations (Internal)
COOP Re-Briefing for DES Senior Leadership Team
Conduct COOP Drills/Exercises
Convene COOP Team Meetings
Develop a written SOP describing the Event Planning/Response Process at DES
Distribution of COOP-Related Communications to DES Staff
External COOP Presentations
Finalized draft Joint Incident Response Support Center (JIRSC) SOP
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
EXTENDED END DATE FROM 12/31/17 - To be done in partnership with Kent Finemore COOP Co-Coordinator
Need to first re-create/re-constitute an NHDES COOP Team. This same team may also serve as the NHDES EmergencyRelocation Group should the agency need to activate its COOP. Working with Kent Finemore, COOP Co-Coordinator.
END DATE EXTENDED AGAIN FROM 6/20/17. END DATE EXTENDED FROM 3/31/16. V. Perelli working with T. Drew on this effort
END DATE EXTENDED AGAIN FROM 12/31/17. END DATE EXTENDED AGAIN FROM 6/30/17. END DATE EXTENDED AGAIN FROM 3/31/16. ENDDATE EXTENDED AGAIN FROM 12/31/15. END DATE EXTENDED FROM 12/31/14. Working with T. Drew on this effort. Very roughdraft already exists.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
07/01/2017
07/01/2017
07/01/2017
07/01/2017
10/01/2015
07/01/2017
07/01/2017
07/01/2014
06/30/2018
03/31/2018
06/30/2018
06/30/2018
12/31/2017
06/30/2018
06/30/2018
06/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Presentations
Presentations
Exercises
Meetings
SOPs (Standard Operating Procedures)
Messages
Presentations
SOPs (Standard Operating Procedures)
5
1
2
2
1
2
1
1
Lead Person: PERELLI, VINCENT
29068
29069
30295
30296
27727
30297
30298
26261
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 69 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Continuity of Operations Planning (Current)
Disadvantaged Business Enterprise Coordination (Current)
Activity:
Activity:
As a recipient of EPA financial assistance DES is required to file regular reports with EPA on activities related to minority and womenowned businesses.
Description:
07/01/2004Start/End Dates: thru
Gather information on HSEM's "Free" NHAlerts System
Meetings of the NH Inter-Agency COOP Coordinators Group
Produce Updated COOP "Red Book" Draft for Senior Leadership Team
Purchase Joint Incident Response Support Center "Go Kit" Per After-Action Report
Renew Swift911 On-line Subscriptions
Request COOP Contact and COOP Go-Kit Updates from Bureau/Unit Administrators
Conduct Availability Analysis and Draft Fair Share Proposal
Work with EPA New England and Region I States
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
END DATE EXTENDED AGAIN FROM 12/31/17. END DATE EXTENDED FROM 12/31/16. The current Swift911 subcription is renewedannually in February. The system is current working well and most staff are currently registered in the system. Thepurpose of this deliverable is to assess the feasibility and advisability of shifting over to HSEM's "free" NHAlertsSystem. To be determined
Vincent Perelli and/or Kent Finemore, NHDES COOP Co-Coordinators attend these meetings coordinated by Jennifer Harper ofHSEM.
END DATE EXTENDED AGAIN FROM 2/28/17. END DATE EXTENDED AGAIN FROM 2/28/17. END DATE EXTENDED AGAIN FROM 3/31/16. ENDDATE EXTENDED AGAIN FROM 3/31/15. EXTEND END DATE FROM 6/30/14.
END DATE EXTENDED AGAIN FROM 3/31/18. END DATE EXTENDED AGAIN FROM 6/30/17. EXTENDED END DATE AGAIN FROM 3/31/16.EXTEND END DATE FROM 12/31/14. Working with Tim Drew on this effort. Need to assess if this is even relevant anylonger.
Note: Need to evaluate HSEMs CodeRed System to see if an eventual switch is appropriate.
End date extended from 9/30/2017. The current Fair Share Objectives are valid for FFY 2015 - 2017. New Goals should be inplace by 10/1/2017. Note: proposed new regulations will extend goals to 5 years.
Participate in regional work group to enhance implementation of the DBE program in New England. Keeping as a placeholder,but due to federal resource constraints, no work may be completed.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2016
07/01/2017
01/01/2014
07/01/2014
01/01/2018
07/01/2017
04/01/2017
10/01/2017
06/30/2018
06/30/2018
03/31/2018
06/30/2018
02/28/2018
06/30/2018
12/31/2017
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
WASKIN, WENDY
WASKIN, WENDY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Evaluations
Meetings
Reports, Drafts
Activities
Subscription Services
Updates
Agreements
Meetings
1
3
1
1
1
2
1
0
Lead Person: WASKIN, WENDY
28735
30299
23628
26260
30300
30301
27170
29116
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 70 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Environmental and Program Measures (Current)
Integration of Climate Change Adaptation and Mitigation Practices in Unit Programs (Current)
Activity:
Activity:
Activity:
To further DES progress on the development and tracking of select outcome and environmental indicator measures. 2010 DES Strategic PlanGoal 4. For further information on Web presence of indicators see Exchange Network Grant FY2012 Activity
Tracking the implementation of specific Climate Change Adaptation and Mitigation practices within the Planning, Prevention, andAssistance Unit.
Description:
Description:
02/19/1999
01/01/2015
Start/End Dates:
Start/End Dates:
thru
thru
2017 Update NHDES Environmental Dashboard Measures
2018 Update NHDES Environmental Dashboard Measures
Continue to provide assistance with measures development and tracking
Develop Internal Dashboard of Performance Metrics/Outcomes
Test out QuickScore and Create Draft Performance Metrics
Integration/Implementation of Climate Change Adaptation & Mitigation Actions in the Unit
Integration/Implementation of Climate Change Adaptation & Mitigation Actions in the Unit
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Sixteen Indicators. Annually review measures and update accordingly
Sixteen Indicators. Measures will be updated as the data becomes available. At a minimum, information will be reviewedannually.
Provide assistance to DES staff and participate in internal and external workgroups dealing with environmental indicatorsand program outcomes. Will track Measures Team Meetings
END DATE EXTENDED AGAIN FROM 12/31/17. END DATE EXTENDED FROM 12/31/16. This work will be informed by the results ofthe effort to enhance the Environmental Dashboard (Highchart software, data extraction scripts, etc) as well as theBalanced Scorecard work in WRBP, LRMP, and department-wide.
END DATE EXTENDED FROM 3/31/17. With QuickScore subscription in place (2 Power Users), try to create a small set of testperformance metrics. Eventually expand to full NHDES Balanced Scorecard.
Need to work with all PPA Unit staff to ensure that there are specific deliverables within their specific programs thataddress the actions identified through the Department-wide Climate Change Initiative lead by Chris Skoglund of theTechnical Services Bureau in ARD.
Need to work with all PPA Unit staff to ensure that there are specific deliverables within their specific programs thataddress the actions identified through the Department-wide Climate Change Initiative lead by Chris Skoglund of theTechnical Services Bureau in ARD.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
10/01/2017
01/01/2016
07/01/2016
01/01/2017
01/01/2018
12/31/2017
12/31/2018
09/30/2018
12/31/2018
10/31/2018
12/31/2017
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WASKIN, WENDY
WASKIN, WENDY
WASKIN, WENDY
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Updates
Updates
Meetings
Dashboards
Dashboards
Actions
Actions
16
16
1
1
1
3
2
Lead Person:
Lead Person:
WASKIN, WENDY
PERELLI, VINCENT
28131
29117
29120
27759
28655
27718
30302
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 71 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Measures Tracking and Reporting System (MTRS) (Current)
NH Customer Service in Environmental Permitting Initiative (Current)
PPA Unit / Planning & Innovations Section Administration (Current)
Activity:
Activity:
Activity:
This Initiative was requested by Governor Lynch and DES Commissioner Tom Burack in 2008. NOTE: While interagency cooperation remains apriority and is still practiced, the formal CSI structure has deteriorated. This Activity will remain "Active" for now, but a decisionwill need to be made as to the disposition of CSI. Great concept - just not sustainable as structured. Need to work with T. Burack andT. Drew to discuss and resolve.
Tasks associated with administration of the Commissioner's Office Planning Unit
Description:
Description:
Description:
07/01/2001
07/01/2008
02/19/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Complete .Net Conversion of MTRS Database (Along w/ Database Upgrades)
Continuous improvements for Measures Tracking and Reporting System Database
Draft User's Manual for Updated MTRS Database
Provide Detailed MTRS Briefing/Demo of MTRS Database for Interested Staff
Participation in Future CSI Meetings Led by the New Dept. of Business & Economic Affairs
5S V. Perelli Work Space
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
END DATE EXTENDED AGAIN FROM 6/30/17. END DATE EXTENDED AGAIN FROM 6/30/16. END DATE EXTENDED AGAIN FROM 3/31/16. ENDDATE EXTENDED FROM 6/30/15. Note: V. Perelli is only tracking this, with R. Druding accomplishing the Deliverable. FYI- Measures Team and R. Druding (MTRS Programmers) met some time ago to discuss possible updates/enhancements to be madealong with the .net conversion of MTRS.
V. Perelli is tracking the work of R. Druding, MTRS Programmer. Database modifications/ Improvements based on userfeedback and otherwise. NOTE: This includes an additional related task: Modify Outcomes/Env. Indicators Portion ofMTRS to Allow for Direct Indicator Updates to the Web-based Environmental Dashboard.
Once MTRS gets converted to WPF format, a new User's Manual will need to be drafted. Need to work with Rick, Derek, andWendy to complete this task
END DATE EXTENDED AGAIN FROM 1/31/17. EXTENDED END AGAIN FROM 3/31/16. EXTENDED END DATE AGAIN FROM 12/31/15. EXTENDEDEND DATA AGAIN FROM 6/30/15. EXTENDED END DATE FROM 3/31/13.
Description:
Description:
Description:
Description:
Description:
Description:
07/01/2014
10/01/2016
10/01/2017
10/01/2017
07/01/2017
01/01/2015
06/30/2018
09/30/2018
03/31/2018
09/30/2018
06/30/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Updates
Improvements
Manuals
Demonstrations
Meetings
Assessments
1
2
1
4
3
1
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
26262
28742
30304
30475
30305
26031
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 72 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
PPA Unit / Planning & Innovations Section Administration (Current)Activity:
5S V. Perelli Work Space
Approval of Household Hazardous Waste Collection and Used Oil Grant Contracts & Invoices
Complete Annual Performance Evaluation for Sara Johnson
Complete Annual Performance Evaluation for Daniel Hrobak
Complete Annual Performance Evaluation for Laura Martel
Complete Annual Performance Evaluation for Melissa Zych
Development of Written Standard Operating Procedures for Critical Processes
Implement Non-Computer Equipment-related Aspects of the 2016 PPA Unit Strategic IT Plan
Monthly (or more frequest) staff meetings with direct and indirect reports
Order new replacement computers for PPA/PMI Unit Staff for SFY '18
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Right after New Year's Day!!
Actual Due Date: October 23, 2017
The Environmental Manager position is currently vacant.
END DATE EXTENDED FROM 3/31/17. See the SOP Inventory for the PPA Unit located at: S:\DES-COMMON\SOPforSOPs\DES-WideSOP Inventory Initiative\Commissioner's Office SOP Inventory
END DATE EXTENDED FROM 6/30/17
Shifting to mostly monthly meetings with direct reports: S. Johnson, L. Martel, and Dan Hrobak. Now includes DeanRobinson and Melissa Zych.
For Tim Nowack and Muriel Lajoie
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
07/01/2017
07/01/2017
01/01/2018
01/01/2018
01/01/2018
10/01/2016
07/01/2016
07/01/2017
07/01/2017
03/31/2018
06/30/2018
10/31/2017
03/31/2018
03/31/2018
03/31/2018
06/30/2018
06/30/2018
06/30/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Assessments
Transactions
Performance Evaluations
Performance Evaluations
Performance Evaluations
Performance Evaluations
SOPs (Standard Operating Procedures)
Actions
Meetings
Equipment
1
15
1
1
1
1
3
6
20
2
30476
30306
29072
29071
29073
30395
28960
28745
30307
30477
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 73 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
PPA Unit / Planning & Innovations Section Administration (Current)
Participation in Regional and National Planning Activities (Current)
Activity:
Activity:
1) ECOS Planning Committee2) ECOS Partnership and Performance Workgroup (P&P Workgroup)3) ECOS Region I Strategic Alignment Pilot4) EPA/State Grants Workgroup
Description:
10/01/2007Start/End Dates: thru
Order new replacement computers for PPA/PMI Unit staff for SFY '19
Re-Fill Vacant Environmental Manager Position 19886
Repeal the Repeal Provision for the NH Pollution Prevention Program
Co-Chair EPA/State Grants Workgroup
ECOS Measures Project
ECOS Planning Leaders and Full Committee Meetings
ECOS-EPA P&P Workgroup Meetings
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
For Dean Robinson, Dan Hrobak, and Melissa Zych (monitor-only?)
Vacant Since 8/1/17.
In 2015 Wendy Waskin appointed as co-chair. This work group was formed by members of EPA and invited state staff toimprove the effectiveness of the Performance Partnership Grant System and other on-going grants. It is a subarm of the P& P workgroup. Involves Conference calls, some meetings and drafting and review of national policy recommendations,including timeliness of grant awards, and implementing a national reporting template. Entails conference calls andinfrequent in person meetings.
States and State Media organizations will coordinate to develop a set of measures to better tell the state storiesrelated to environmental investments and improvements in meeting EPAs environmental protection goals. Initial Projectresults will be presented at ECOS Fall 2017 meeting. NH is one of the pilot sates and will be reporting on state specificmeasures.
Participate in ECOS Planning Committee Leaders and full committee calls
Includes co-chair and full Partnership and Performance Work Group Meetings.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
07/01/2018
08/01/2017
07/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
12/31/2018
02/28/2018
06/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
WASKIN, WENDY
WASKIN, WENDY
WASKIN, WENDY
WASKIN, WENDY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Equipment
Positions
Legislation
Meetings
Measures
Meetings
Meetings
2
1
1
8
4
10
8
Lead Person: PERELLI, VINCENT
30478
30308
30479
29406
29408
29409
29410
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 74 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Participation in Regional and National Planning Activities (Current)
Performance Partnership Agreement / DES Work Plan Coordination (Current)
Activity:
Activity:
Coordination of the DES/EPA Performance Partnership Agreement (PPA), the comprehensive workplan information for all of DES.Description:02/19/1999Start/End Dates: thru
Participation in New England Regional Priorities Activities
Partipate in National Priority Activities with EPA
2017 DES Work Plan Posted on DES Website
2018 DES Work Plan Posted on DES Website
Coordinate Quarterly PPA Work Plan Self-Assessments
Coordinate and Produce Annual End-Of-Year Progress Report for 2017 PPA Work Plan Year
Coordinate and Produce Annual End-Of-Year Progress Report for 2018 PPA Work Plan Year
Coordinate and Produce End-of-Year FFY 2017 Progress Report via P&C List
Coordinate and Produce End-of-Year FFY 2018 Progress Report via P&C List
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Joint priority setting meetings, joint letters to EPA Administrator or Congressional Delegation, joint comments on EPAsNPM Guidance, joint projects, etc... Does NOT include LEAN/E-Enterprise Activities which are captured under a separateActivity.
Incluldes ECOS Committes other than Planning
END DATE EXTENDED FROM 6/30/17.
For FFY 2018 PPA Work Plan Year
Includes Areas for Collaboration Annual Update and Output Results for the Year.
Includes Areas for Collaboration Annual Update and Output Results for the Year.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
01/01/2017
10/01/2017
10/01/2017
11/01/2017
11/01/2018
09/01/2017
09/01/2018
09/30/2018
09/30/2018
12/31/2017
02/28/2018
09/30/2018
01/31/2018
01/31/2019
12/31/2017
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Meetings
Web Site Postings
Web Site Postings
Self-Assessments
Reports, Final
Reports, Final
Reports, Final
Reports, Final
2
2
1
1
4
1
1
1
1
Lead Person: PERELLI, VINCENT
30309
30310
27429
30311
30312
27433
30313
27435
30314
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 75 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Performance Partnership Agreement / DES Work Plan Coordination (Current)
Performance Partnership Grant Coordination (Current)
Activity:
Activity:
Coordination and administration of DES's Performance Partnership Grant (PPG), the main federal funding vehicle that supports many of theDepartment's core environmental programs.
Description:
02/19/1999Start/End Dates: thru
Develop Written Standard Operating Procedures for Key PPA Processes
Draft New PPA Document
Finalize FFY '18-'19 Priorities & Commitments List Work Plan Negotiation
Make Decision Regarding the Next NHDES/EPAR1 PPA Document
Populate and Finalize FFY 18 P&C List with "Re-Openers"
Completion and submittal of DBE forms for PPG grants
Develop Written Standard Operating Procedures for Management of the PPG Application
Produce and submit PPG Application and Amendments as necessary
Review Expenses and Update tracking spreadsheet.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
END DATE EXTENDED FROM 9/30/17. See PPA Unit SOP Inventory at: S:\DES-COMMON\SOPforSOPs\DES-Wide SOP InventoryInitiative\Commissioner's Office SOP Inventory
Duration still to be determined
Need to create alignment strategy for the next three PPA/PPG cycles.
EXTENDED END DATE FROM 12/31/16
Will be filed during the first quarter following the end of the last quarter.
END DATE EXTENDED FROM 3/31/2017. V. Perelli will work with Wendy Waskin on this task
Will need to extend end date for 2016-2018 PPG and apply for new 2019 - 2021 PPG. Will do mid-year check-ins once finaltargets are received and will develop revised internal budgets to match targets annually.
Quarterly or more frequent review of exenses. The p:\drive has not been an accurate way of tracking the PPG budget andexpenses for some time. Will continue to review expense reports and compare to operating budget.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2016
07/01/2018
07/01/2017
10/01/2017
07/01/2018
10/01/2017
10/01/2016
10/01/2017
10/01/2017
06/30/2018
01/01/2019
12/31/2017
03/01/2018
12/31/2018
12/31/2017
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
WASKIN, WENDY
WASKIN, WENDY
WASKIN, WENDY
WASKIN, WENDY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
SOPs (Standard Operating Procedures)
PPAs (Performance Partnership Agreements)
Workplans
Decisions
Workplans
Reports, Final
SOPs (Standard Operating Procedures)
Applications, Grants
Updates
2
1
1
1
1
2
1
2
6
Lead Person: WASKIN, WENDY
28963
30481
30315
30480
30316
29413
28961
29418
29430
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 76 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Performance Partnership Grant Coordination (Current)
Public Participation Coordination (Internal and External) / Public Service (Current)
Quality Management System Implementation (Current)
Activity:
Activity:
Activity:
Putting into place internal and external mechanisms to ensure that all stakeholders are fully involved in all levels of DES decision-making. Includes responding to information requests.
The Quality Management System is being developed per EPA requirements as provided in EPA Guidance Document R-2. See EPA websitewww.epa.gov/quality
Description:
Description:
02/19/1999
07/01/2000
Start/End Dates:
Start/End Dates:
thru
thru
Review PPG Grant Applications and Amendments
Review and Sign Annual MBE_WBE Reports for PPG
Assist with Presentations/Special Requests/Special Projects/Public Inquiries
Number of Bicycle Reservations Associated with the DES Bicycle Share Program
Number of Bicycle Reservations Associated with the DES Bicycle Share Program
Participation in DES Green Team Meetings
Provide Detailed Logistical Support for NHDES Annual Awards Ceremony Logistics
Staff suggestions submitted to the DES Suggestion Box & Statewide Suggestion Box
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Note: This applications and amendments are drafted by Wendy Waskin. Vince Perelli reviews and approves.
Forms drafted by Wendy Waskin - Reviewed, Signed, and Submitted by Vince Perelli
2017 Biking Season
2018 Biking Season
The DES Green Team is the environmental "conscience" of DES and focuses of staff education and outreach to help DESreduce its environmental impact through recycling, environmentally-preferable purchasing habits, composting, energy andwater conservations, etc...
With T. Drew and rest of Annual Awards Program Planning Team (plus R&R Team)
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
07/01/2017
05/01/2017
05/01/2018
07/01/2017
07/01/2017
07/01/2017
09/30/2018
09/30/2018
06/30/2018
11/30/2017
11/30/2018
06/30/2018
12/31/2017
06/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Approvals
Reports, Final
Actions
Reservations
Reservations
Meetings
Programs
Entries
2
2
6
15
10
2
1
25
Lead Person: PERELLI, VINCENT
30317
30318
30319
28755
30320
30321
30482
30322
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 77 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Quality Management System Implementation (Current)Activity:
Annual Review of DES QMP for Calendar Year 2017
Annual Review of DES QMP for Calendar Year 2018
Annual Review of DES Quality Management System (QMS) for Calendar Year '17
Annual Review of DES Quality Management System (QMS) for Calendar Year 18
Calendar Year 2016 QA Self-Audit Participation Rate
Calendar Year 2017 QA Self-Audit Participation Rate
Calendar Year 2018 QA Self-Audit Participation Rate
Calendar Year 2018 QA Self-Audit Participation Rate
Conduct OPTIONAL/VOLUNTARY 2nd Party Audits of DES Programs
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
FOR CALENDAR YEAR 2017 -- As required in the DES Quality Management Plan, the DES QA Manager must conduct an annualreview of its Quality Management System and report the results of the review to Senior Leadership and to EPA. Thisannual review is a key component to any successful quality management system.
FOR CALENDAR YEAR 2018 -- As required in the DES Quality Management Plan, the DES QA Manager must conduct an annualreview of its Quality Management System and report the results of the review to Senior Leadership and to EPA. Thisannual review is a key component to any successful quality management system.
The 2nd party audits would be conducted by DES QA Team members. The purpose of the audits would be to test if the QASystem Self-Assessment process is value-added to the DES QA System.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
01/01/2017
01/01/2018
01/01/2018
01/01/2019
01/01/2017
03/31/2018
03/31/2019
03/31/2018
03/31/2019
12/31/2017
09/30/2018
12/31/2018
09/30/2019
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reviews
Reviews
Assessments
Assessments
Percent
Percent
Percent
Percent
Audits
1
1
1
1
100
100
100
100
2
Lead Person: PERELLI, VINCENT
27389
30323
27391
30324
27392
27393
29754
30325
27395
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 78 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Quality Management System Implementation (Current)Activity:
Conduct OPTIONAL/VOLUNTARY 2nd Party Audits of DES Programs
Conduct Regular QA Team Meetings
Conduct Regular QA Team Meetings
Convert Programs to Form A
Copy and send to EPA New England Calendar Year 2017 QA Self-Audits and Responses
Copy and send to EPA New England Calendar Year 2017 QA Self-Audits and Responses
Develop Written SOPs for Key Quality Assurance Processes
Distribute QA Self-Audit guidance/forms to staff for Calendar Year 2017 Self-Audits
Distribute QA Self-Audit guidance/forms to staff for Calendar Year 2018 Self-Audits
Maintenance of QAPP Inventory for Air, Water, Waste and Commissioners Office Divisions
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The 2nd party audits would be conducted by DES QA Team members. The purpose of the audits would be to test if the QASystem Self-Assessment process is value-added to the DES QA System.
Will need QA team assistance and approval of form
Or use EPA SharePoint Site
Or use EPA SharePoint Site
END DATE EXTENDED FROM 9/30/17. See PPA Unit SOP Inventory Located at: S:\DES-COMMON\SOPforSOPs\DES-Wide SOP InventoryInitiative\Commissioner's Office SOP Inventory
FOR CALENDAR YEAR 2017. This is now an on-going/real-time updating process utilizing a shared QAPP Inventory on GoogleDocs. The measure will be annual and will simply indicate "1" to de1monstrate that the process is being maintained.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
10/01/2017
01/01/2019
10/01/2017
01/01/2018
01/01/2019
10/01/2016
10/01/2017
10/01/2018
01/01/2017
12/31/2018
09/30/2018
12/31/2019
09/30/2018
03/31/2018
03/31/2019
06/30/2018
01/30/2018
01/31/2019
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
HROBAK, DANIEL
PERELLI, VINCENT
PERELLI, VINCENT
HROBAK, DANIEL
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Audits
Meetings
Meetings
Programs
Submittals
Submittals
SOPs (Standard Operating Procedures)
Guidance
Guidance
Updates
2
4
4
5
1
1
3
1
1
1
30326
30327
30328
30411
30329
30330
28962
27401
30331
27403
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 79 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Quality Management System Implementation (Current)Activity:
Maintenance of QAPP Inventory for Air, Water, Waste and Commissioners Office Divisions
Maintenance of QAPP Inventory for Air, Water, Waste and Commissioners Office Divisions
Manage QAPP Library
Meetings with DES Program Managers to Assist With QA Implementation
Meetings with DES Program Managers to Assist With QA Implementation
Participation in Regional Quality Assurance Roundtable Meetings/Conference Calls
Participation in Regional Quality Assurance Roundtable Meetings/Conference Calls
Provide QA-related Training opportunities for staff/Roll-out On-Line QA Training Module
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
FOR CALENDAR YEAR 2018. This is now an on-going/real-time updating process utilizing a shared QAPP Inventory on GoogleDocs. The measure will be annual and will simply indicate "1" to de1monstrate that the process is being maintained.
FOR CALENDAR YEAR 2017. This is now an on-going/real-time updating process utilizing a shared QAPP Inventory on GoogleDocs. The measure will be annual and will simply indicate "1" to de1monstrate that the process is being maintained.
Need to institute it, then update, as necessary
The QA Team will remind all staff that Team members are willing and able to meet with requesting staff regarding theimplementation of Program-level QA Systems.
The QA Team will remind all staff that Team members are willing and able to meet with requesting staff regarding theimplementation of Program-level QA Systems.
Dan Hrobak also participates in these meetings. Note: The decision was made to meet face-to-face once or twice a year,with other meetings taking place (if deemed necessary) via conference call or GoToMeetings. Also, EPA will be settingup a new Sharepoint space to facilitate inter-agency sharing.
Dan Hrobak also participates in these meetings. Note: The decision was made to meet face-to-face once or twice a year,with other meetings taking place (if deemed necessary) via conference call or GoToMeetings. Also, EPA will be settingup a new Sharepoint space to facilitate inter-agency sharing.
END DATE EXTENDED AGAIN FROM 6/30/17. END DATE EXTENDED AGAIN FROM 3/31/16. END DATE EXTENDED AGAIN FROM 12/31/15.EXTENDED END DATE FROM 3/31/14. An on-line training module is envisioned utilizing a web-based platform such as"Moodle."
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
01/01/2019
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2013
12/31/2018
12/31/2019
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
06/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
HROBAK, DANIEL
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
HROBAK, DANIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Updates
Updates
Updates
Meetings
Meetings
Meetings
Meetings
Training Sessions
1
1
4
2
2
3
3
1
30332
30333
30412
30334
30335
30336
30337
24034
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 80 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Quality Management System Implementation (Current)
Strategic Planning Coordination (Current)
Activity:
Activity:
Assisting the DES Senior Leadership Team with strategic planning related activities.Description:02/19/1999Start/End Dates: thru
Provide responses to QA System program self-audits for CY 2016
Provide responses to QA System program self-audits for CY 2017
Provide responses to QA System program self-audits for CY 2018
Review Quality Assurance Project Plans
Review Quality Assurance Project Plans
Track Corrective Actions From June 2017 EPAR1 NHDES QA System Assessment
Track Corrective Actions From June 2017 EPAR1 NHDES QA System Assessment
Communicate DES Employee Survey Results to Staff
Conduct Bi-Annual Assessment of DES 2010-2015 DES Strategic Plan
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
For calendar year 2016. Need to confirm final program count for this year.
For calendar year 2017. Need to confirm final program count for this year.
For calendar year 2018. Need to confirm final program count for this year.
Vince Perelli and Dan Hrobak review Quality Assurance Project Plans, as needed, and as requested.
Vince Perelli and Dan Hrobak review Quality Assurance Project Plans, as needed, and as requested.
Work with Dan Hrobak on this.
END DATE EXTENDED AGAIN FROM 6/30/17. EXTENDED AGAIN FROM 12/31/16. EXTENDED END DATE FROM 12/31/15
EXTENDED AGAIN FROM 6/30/17. EXTENDED AGAIN FROM 3/31/16. EXTENDED END DATE AGAIN FROM 12/31/15. EXTENDED END DATEAGAIN FROM 6/30/15. EXTENDED AGAIN FROM 6/30/12. EXTENDED DEADLINE FROM 12/31/11. Original Goal was in July andDecember 2011!
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
01/01/2019
10/01/2017
10/01/2018
10/01/2017
10/01/2018
01/01/2015
01/01/2011
12/31/2017
12/31/2018
12/31/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
03/31/2018
03/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
PERELLI, VINCENT
PERELLI, VINCENT
HROBAK, DANIEL
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Responses
Responses
Responses
Reviews
Reviews
Updates
Updates
Communications
Assessments
67
25
68
30
30
3
3
6
2
Lead Person: PERELLI, VINCENT
27408
30338
30339
30340
30341
30342
30343
26556
20510
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 81 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Strategic Planning Coordination (Current)
Support to DES Continous Process Improvement Initiative (Current)
Activity:
Activity:
Description:09/01/2008Start/End Dates: thru
Convene Strategic Planning Teams to Begin Drafting Updated Strategic Plan
Create New Strategic Implementation Teams
Create Shell/Structure for 2018-2021 NHDES Strategic Plan
Fully Analyze the Results of DES's First Employee Survey
Get SLT Approval to Proceed With new 2018-2021 NHDES Strategic Plan Structure/Framework
Help Craft Draft DES Balanced Scorecard Shell
Provide Strategic Planning Assistance to Other Bureas/Units
Report Results of Assessment of 2010-2015 Strategic Plan to SLT
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
EXTENDED AGAIN FROM 6/30/17. EXTENDED AGAIN FROM 3/31/16. EXTENDED END DATE AGAIN FROM 3/31/15. EXTENDED AGAIN FROM06/30/14. EXTENDED AGAIN FROM 12/31/12. EXTENDED FROM 6/30/12 AND AGAIN FROM 12/31/12. To Follow SLT Approval ofStrategic Communications/Implementation Framework
END DATE EXTENDED AGAIN FROM 6/30/17. EXTENDED END DATE AGAIN FROM 3/31/16. END DATE EXTENDED FROM 12/31/15.
END DATE EXTENED AGAIN FROM 3/31/17. EXTENDED END DATE AGAIN FROM 2/29/16. EXTENDED END DATE AGAIN FROM 12/31/15.EXTENDED END DATE FROM 12/31/14. V. Perelli is working with S. Johnson and a Team of other DES staff on this effort.
Per the Commissioners Request, the PPA Unit has been tasked with assisting Watershed Management, LRMP, the WaterDivision, and ultimately the Commissioners Office with strategic/organizational development to help cope with thenegative effects of substantial budget cuts.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
05/01/2018
07/01/2011
01/01/2018
01/01/2015
04/01/2018
07/01/2014
07/01/2017
01/01/2018
09/30/2018
06/30/2018
03/31/2018
03/31/2018
04/30/2018
03/31/2018
06/30/2018
04/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Workgroups
Committees
Formats
Analyses
Approvals
Strategies
Consultations
Meetings
1
6
1
1
1
1
1
1
Lead Person: PERELLI, VINCENT
30348
21760
30346
26555
30347
26043
30345
30349
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 82 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Support to DES Continous Process Improvement Initiative (Current)Activity:
Carry out Joint Lean Events w/ EPA Staff Under the Lean/E-Enterprise Area for Collaboration
Carry out Joint Lean Events w/ EPA Staff Under the Lean/E-Enterprise Area for Collaboration
Complete Implementation Plan for new Joint DES/EPA Lean Event for FFY '18
Complete Implementation Plan for new Joint DES/EPA Lean Event for FFY `19
Draft Case Study for Joint Lean Event with EPA for FFY '18
Draft Case Study for Joint Lean Event with EPA for FFY '19
Draft Case Study for Joint Lean Event with EPA on PPA/P&C List
Draft Case Study for DES Annual Awards Ceremony A3 Project
Draft Charter for FFY '18 Joint Lean Event w/ EPA Region I and Other States
Draft Charter for FFY '19 Joint Lean Event w/ EPA Region 1 and Other States
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
For FFY '18
END DATE EXTENDED FROM 12/31/16. Mostly drafted. Never finalized it!
END DATE EXTENDED AGAIN FROM 6/30/17. EXTEND END DATE FROM 3/31/16 AND AGAIN FROM 12/31/16. Work with T. Drew on thecase study development.
SIP Process was selected, and possiblity Asbestos Abatement Program Improvements.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
01/01/2018
01/01/2019
07/01/2018
07/01/2019
07/01/2016
01/01/2016
12/01/2017
10/01/2018
09/30/2018
09/30/2019
03/31/2018
03/31/2019
09/30/2018
09/30/2019
03/31/2018
12/31/2017
02/28/2018
01/31/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
HROBAK, DANIEL
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Projects
Meetings
Plans, Lean Implementation
Charters
Case Studies
Case Studies
Case Studies
Case Studies
Charters
Charters
1
6
1
1
1
1
1
1
1
1
30350
30351
30362
30353
30354
30355
28760
27916
30352
27482
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 83 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PLANNING AND INNOVATIONS PROGRAM (Current)
Div/Bur:
Program:
Support to DES Continous Process Improvement Initiative (Current)Activity:
For V. Perelli - Maintain NH Lean Green Belt Credential for CY '17
For V. Perelli - Maintain NH Lean Green Belt Credential for CY '18
Participate in LEAN, Six Sigma, Kaizen-type Process Improvement Training
Participate in New England Lean Government Exchange Conference Calls
Participation in LEAN/Kaizen Events at DES or Other NH State Agencies
Pursue Lean Black Belt Certification
Working w/ EPA Staff, Select a Joint Lean Project to Focus on for FFY '18
Working w/ EPA Staff, Select a Joint Lean Project to Focus on for FFY '19
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Training TAKEN by V. Perelli
Would include completion of Current State Value Stream Maps and Future State Value Stream Maps
END DATE EXTENDED FROM 9/30/16. Working with Linda Darveau of EPA Region 1.
END DATE EXTENDED FROM 9/30/16. Working with Linda Darveau of EPA Region 1.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
07/01/2017
10/01/2017
07/01/2017
01/01/2017
01/01/2017
01/01/2018
12/31/2017
12/31/2018
06/30/2018
09/30/2018
06/30/2018
12/31/2018
12/31/2017
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
PERELLI, VINCENT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Certifications
Certifications
Training Sessions
Conference Calls
Events
Certifications
Decisions
Decisions
1
1
2
2
2
1
1
1
27779
30356
30357
30358
30359
28765
30360
30361
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 84 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
POLLUTION PREVENTION COORDINATION (Current)
P2 Section Supervisor activities detailed here10/01/1999
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 01 06 01
Funding: State General XState Fees Federal EPA Federal Other Grants
NEWMOA Board of Directors (Current)
P2 Outreach (Current)
Activity:
Activity:
Serve as the Assistance & P2 representative for NH on the BoardDescription:
Description:
10/30/2011
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Conference calls and subcommittee meetings
Conference calls and subcommittee meetings
Meetings
Policy initiatives / outreach activities
Biennial Report to the Legislature
National Pollution Prevention Roundtable Board of Directors
Networking and P2 outreach with other organizations and agencies as needed
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
As needed
As needed
3 face to face and one webinar per year
Collect P2 program data, results and draft report to the legislature every other year. Next one due November 1, 2017.
Serve as Region 1 representative on the board and various workgroups as needed.
includes participation in advisory committees and workgroups, misc. EPA "initiatives"Administration of NEWMOA P2/Rx grant
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2016
10/02/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
Vacant
Vacant
Vacant
Vacant
Vacant
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Activities
Activities
Meetings
Activities
Analyses
Activities
Activities
4
4
4
4
1
2
3
Lead Person:
Lead Person:
Vacant
Vacant
28600
29267
29268
29269
29270
30517
29271
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 85 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
POLLUTION PREVENTION COORDINATION (Current)
Div/Bur:
Program:
P2 Outreach (Current)
Promote Regulatory Integration of P2 (Current)
Toxics in Packaging Clearinghouse (TPCH) (Current)
Activity:
Activity:
Activity:
Promote Regulatory Integration of P2 (rule development, permitting, inpections, enforcement, etc.)
Represent NH on the TPCH Board and complete activities as needed and appropriate. This is an "add-on" activity taken over by the P2section after the retirement of the Solid Waste staff person previously charged with this task. The amount of effort will correspond tothe level of available staff resources.
Description:
Description:
10/01/1999
10/01/2016
Start/End Dates:
Start/End Dates:
thru
thru
Participate in EPA Region 1 Annual Pollution Prevention & Assistance Forum
Safer Chemicals Initiatives
P2 Integration policies & activities
Engage in outreach and compliance activites as resources allow
Participate in 80% of TPCH monthly meetings
Participate in Annual TPCH face-to-face meeting
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
As described in the P & C list
Includes UMASS Lowell state chemical policy dialoge and NEWMOA / TURI Interstate Chemicals Clearinghouse, EPA GreenChemistry initiative, TSCA reform.
Activities to be developed, based on input from P2 staff
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
Vacant
Vacant
Vacant
Vacant
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Activities
Activities
Activities
Conference Calls
Meetings
1
2
2
2
6
1
Lead Person:
Lead Person:
Vacant
Vacant
30518
30519
29272
30520
30521
30522
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 86 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
POLLUTION PREVENTION PROGRAM (Current)
The New Hampshire Pollution Prevention Program is a free, confidential, non-enforcement pollution prevention and compliance assistanceprogram available to all New Hampshire businesses, institutions, municipalities and agencies. NHPPP services include on-site pollutionprevention & compliance assessments, information research, training workshops, on-line information and publications like newsletters,guidance manuals, etc. NHPPP success is demonstrated by wastes reduced/reused and behavioural changes by stakeholders resulting fromprogram efforts as well as successful completion of program outreach and education efforts and grant project tasks as well as recurringrequests for information and assistance.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 01 01
XFunding: State General XState Fees XFederal EPA Federal Other Grants
Core NHPPP Pollution Prevention Activities (Current)
Hospitality Project (Current)
Participation with Related Programs & OES Planning Meeting (Current)
Activity:
Activity:
Activity:
These are the non-grant funded, ongoing activities including Governor's Award for Pollution Prevention, technical information requests &assistance, on-site Pollution Prevention & Compliance Assistance, documents created and disributed, etc.
Promote green cleaning and environmentally preferable purchasing to the hospitality industry and reinvigorate the 2001 sustainablelodging program.
Description:
Description:
Description:
10/01/2009
10/01/2007
Start/End Dates:
Start/End Dates:
thru
thru
Measurement for Outreach & Education Activities
On-Site Pollution Prevention & Compliance Assistance assessments
Outreach & Education Activities
Hospitality Project Measurement
Outreach and Assistance
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Survey results, pounds of pollution reduced, etc. due to technical assistance activities, outreach and on-siteassessments.
Provide P2 & CA assesments when requested by stakeholders including institutions, schools and municipal facilities.
Create and provide pollution prevention & compliance assistance information through a variety of activities.Informational responses sent by mail or e-mail to stakeholders not covered by EPA Grant sector projects. This willinclude information requests, public presentations, conference booths and other forms of education provided.
Measure behavioral changes such as water use reductions, recycling strategies adopted, energy use changes, "green"cleaning techniques,etc.
Provide technical assistance, conduct site visits, organize workshops, form partnerships, create web pages and documents,and collect and analyze data. Attend seminars.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ZYCH, MELISSA
ZYCH, MELISSA
ZYCH, MELISSA
ZYCH, MELISSA
ZYCH, MELISSA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Activities
Site Visits
Activities
Changes
Activities
4
10
75
8
10
Lead Person:
Lead Person:
Lead Person:
ZYCH, MELISSA
ZYCH, MELISSA
29933
29934
29935
29936
29937
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 87 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
POLLUTION PREVENTION PROGRAM (Current)
Div/Bur:
Program:
Participation with Related Programs & OES Planning Meeting (Current)
Pollution Prevention Intern Program (Current)
Rain Garden Installation Project (Current)
Activity:
Activity:
Activity:
Participate with and provide assistance to regional programs such as Northeast Waste Management Officials Association (NEWMOA).Participate with and provide assistance to local programs such as Safety & Health Council of Northern New England, Small BusinessDevelopment Center, etc. Participate with and provide assistance to DES programs through training, web conferences, etc. Participateinfall 2014 NE P2 & Assistance Forum
Develop and support programs utilizing college students to provide Pollution Prevention projects and assistance at NH businesses,institutions and municipal facilities.
Work with DES Soak Up the Rain Program to install rain gardens at businesses throughout the state.
Description:
Description:
10/01/2001
10/01/2009
10/01/2016
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
P2 Workgroups - NH and Regional
P2 Workgroups - NH and Regional
P2 Intern Program Activities
Measurement
Rain Gardens Installed
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Participate with interstate workgroups, by conference calls or meetings:1. (NEWMOA) participate in P2 Steering Committee and Roundtable.2. (NH3E) participate in the NH Hospitals for a Healthy Environment meetings.3. (NEWMOA) participate in Hazardous Waste Calls4. (NPPR) Board and Membership Committee Meetings and Conference calls.5. (NPPR) Tribal P2 Workgroup conference calls.6. (EPA/NE States) P2 Regional Forum
Participate with interstate workgroups, by conference calls or meetings:1. (NEWMOA) participate in P2 Steering Committee and Roundtable.2. (NH3E) participate in the NH Hospitals for a Healthy Environment meetings.3. (NEWMOA) participate in Hazardous Waste Calls4. (NPPR) Board and Membership Committee Meetings and Conference calls.5. (NPPR) Tribal P2 Workgroup conference calls.6. (EPA/NE States) P2 Regional Forum
Provide support to UNH Summer P2 Intern program by promoting the program to NH businesses.
Pounds of pollutants reduced
Number of Rain Gardens installed
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ZYCH, MELISSA
ZYCH, MELISSA
ZYCH, MELISSA
NELSON, CYNTHIA
NELSON, CYNTHIA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Meetings
Activities
Measures
Activities
15
15
1
3
3
Lead Person:
Lead Person:
ZYCH, MELISSA
Vacant
NELSON, CYNTHIA
29855
29856
29938
29940
29941
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 88 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PROCESS IMPROVEMENT AT DES (Current)
Using tools known as "Lean", work to improve various processes at DES. Goal is to decrease headaches and frustration, free up energy todo better stuff.05/01/2009
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Complete Lean Projects (Current)
DES Lean Team (Current)
External Lean Activities (Current)
Activity:
Activity:
Activity:
Includes management of incoming-ideas queue, and completion of projects
Maintain, and improve the skills of, the DES Lean Team
Works at NH LEC and Regional Lean Activities, including:a. Regional Lean network (NY and NE England), meet quarterly (usually calls)b. Newmoa, usually call in quarterlyc. Lean Executive Committee (UNH, safety, lottery, DoIT, DOT, PUC, DHHS, banking, etc) monthlyd. Transportation Lean forum (every 2 months) calle. E-Enterprise (recently)f. Working with EPA Region 1 on project for PPG
Description:
Description:
Description:
10/01/2009
10/01/2009
10/01/2009
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Complete Lean Projects
Creation of Lean Case Studies/A3 or Storyboard on Project Completion
Update Lean Project Tracking Spreadsheet
Lean Team meetings
Lean Executive Committee meetings
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Lean projects are deemed complete when implementation starts
Lead Lean Facilitator or Implementation Manager drafts Case Study at completuion of project. Lean Team Chair ensurescompletion.
Update the tracking spreadsheet to identify what Lean ideas are generated, numbering (eg Year-0X), facilitator, link tofolder and case study
average at least one per month, counting work sessions
Monthly Lean Executive Committee meetings
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Projects
Case Studies
Updates
Meetings
Meetings
5
5
6
12
12
Lead Person:
Lead Person:
Lead Person:
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
30363
30364
30377
30264
30267
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 89 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PROCESS IMPROVEMENT AT DES (Current)
Div/Bur:
Program:
External Lean Activities (Current)
Lean / CI Roadmap (Current)
Lean Education and Outreach (Current)
Activity:
Activity:
Activity:
Description:
Description:
10/01/2017
10/01/2017
Start/End Dates:
Start/End Dates:
thru
thru
Lean.nh.gov website updates
Participation in Regional Lean Activities
State Lean Network meetings
Charter
Final Lean Roadmap
Intranet and Internet updates
New Employee Orientation
Skip level meetings
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Periodic updates and meetings to discuss
Meetings, conference calls, conferences
Network begins meeting quarterly as of Sept. 2011. Assume well be represented at all of them
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
12/31/2017
03/31/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Hours
Meetings
Meetings
Charters
Plans
Web Site Postings
Meetings
Meetings
20
12
4
1
1
50
6
4
Lead Person:
Lead Person:
HROBAK, DANIEL
HROBAK, DANIEL
30269
30270
30268
30265
30266
30273
30274
30272
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 90 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
PROCESS IMPROVEMENT AT DES (Current)
Div/Bur:
Program:
Lean Education and Outreach (Current)
Lean Training (Current)
Activity:
Activity:
Description:10/01/2016Start/End Dates: thru
Townhall
Develop Moodle-Based "Lean 101" Training
Deliverable:
Deliverable:
White Belt training developed by Kate McGovern (BET) and Dan Hrobak. It has been deployed to all DES staff by theCommissioner on 11/13/17
Description:
Description:
10/01/2017
01/01/2017
09/30/2018
12/31/2017
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
HROBAK, DANIEL
HROBAK, DANIEL
Qty/Unit:
Qty/Unit:
Meetings
Curriculums
2
1
Lead Person: HROBAK, DANIEL
30271
28848
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 91 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
SMALL BUSINESS TECHNICAL ASSISTANCE PROGRAM (Current)
The Small Business Technical Assistance Program (SBTAP) provides small businesses free environmental assistance to comply withenvironmental regulations.10/01/1992
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 00
Funding: State General XState Fees Federal EPA Federal Other Grants
A. Customer Feedback (Current)
B. Performance/Mission of SBTAP (Current)
Activity:
Activity:
Balance Scorecard - give opportunity to clients/customers to provide feedback on SBTAP services. Use information to improve service,review outreach tools, and assist in strategic planning.
Balance Scorecard - Provide technical assistance and advocate for the small business community.
Description:
Description:
10/01/2017
10/01/2017
Start/End Dates:
Start/End Dates:
thru
thru
Create SBTAP Customer Feedback Survey
Implement Customer Feedback Survey
Review Customer Feedback Data
Information Requests
Promotional Activities
Publications
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Create a survey to be used emails and web page.
Embed link in e-mail signature block. Embed link in proposed DES Customer Feedback Webpage.
Review and make program improvements based on survey data.
1) Information requests via phone or email2) Presentations provided
1) SBTAP brochures distributed2) Meetings with other programs3) Presentations - numbers of attendees
1) Press releases2) Newsletter articles/Ecolinks (NESHAP 6X and RTAP)3) Letters distributed4) New publications for NESHAP 6X if needed
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Surveys
Tasks
Reviews
Assistances Provided
Brochures
Tasks
1
2
1
100
50
25
Lead Person:
Lead Person:
JOHNSON, SARA
JOHNSON, SARA
29211
29212
29213
29225
29229
29228
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 92 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
SMALL BUSINESS TECHNICAL ASSISTANCE PROGRAM (Current)
Div/Bur:
Program:
B. Performance/Mission of SBTAP (Current)
C. Operations (Current)
Activity:
Activity:
Balance Scorecard - Activities within DES to promote SBTAP, improve efficiency, and other projects assigned.Description:10/01/2017Start/End Dates: thru
Site Visit
Small Business Ombudsman
Web Page
Balance Scorecard
GIS Project
Internal Training
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
1) Compliant referrals from Air Compliance, Waste Management, Water, EPA or town official.2) Small business contacts SBTAP for assessment.3) NESHAP 6X sector
1) Advocate for small businesses to mediate disputes2) Comment on legislation and proposed rules
1) Open burning2) Outdoor wood burning3) Wood stove4) RTAP5) General/Other
1) Web page visits - most popular page and document2) Develop new page - NESHAP 6X3) Review and Update RTAP pages
Promote Balance Scorecard to other DES Programs1) PPA Unit Administrator
Add site visit addresses to GIS to create a layer. 1) Auto Body Shops2) SBTAP visits - 2009-present
Coordinate training to Air Resources staff.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Site Visits
Tasks
Outreach Activities
Web Pages
Meetings
Spreadsheets
Training Sessions
12
4
40
5
12
2
4
Lead Person: JOHNSON, SARA
29224
29239
29226
29227
30442
30443
29244
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 93 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
SMALL BUSINESS TECHNICAL ASSISTANCE PROGRAM (Current)
Div/Bur:
Program:
C. Operations (Current)
D. Employee Development (Current)
Activity:
Activity:
Balance Scorecard - Network, training, and increase overall knowledge of SBTAP staffDescription:10/01/2017Start/End Dates: thru
Lean Activities
NSC Annual Report
Pre-Application Meetings / Referrals
SOP Development
Work Plan Development
Individual Employee Plan
National and Regional Calls
Training and Webinars
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
1) Participate in Lean / Continuous Improvement Team2) Facilitate lean event
Provide data to the National Steering Committee on the activities and task of SBTAP over the past year.
1) Participate in pre-app meetings2) Refer businesses to pre-app process
Create standard operating procedures for SBTAP activities
Annual meeting with Air Resource Division staff (Permitting, Compliance) to determine work plan for the next federalfiscal year. Work plan was modified to Balance Scorecard format.
DES is encouraging staff to create individual employee plans to encourage promotion within DES, build successiontraining, and cross training.
Participate on conference calls hosted by1) National Steering Committee2) Northeast Waste Management Officials Association3) Small Business Administration Environmental Roundtable
Participate in training and webinars to increase / improve knowledge of environmental rules, issues effecting smallbusinesses, and strategic planning.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
JOHNSON, SARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Reports, Final
Referrals
SOPs (Standard Operating Procedures)
Workplans
Plans
Conference Calls
Training Sessions
25
1
4
2
1
1
40
24
Lead Person: JOHNSON, SARA
29240
29245
29241
29242
29243
29247
29246
29248
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 94 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
STANDARD OPERATING PROCEDURES (SOPS) (Current)
Manage the universe of department-wide procedures at DES.
10/01/2015
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
XFunding: State General State Fees Federal EPA Federal Other Grants
Produce new SOPs (Current)
Straighten out inventory (Current)
Update intranet (Current)
Update old SOPs into new format (Current)
Activity:
Activity:
Activity:
Activity:
NOTE: This is currently a vacant position. Starting with what SLT wants.
NOTE: This is currently a vacant position. Figure out what we've got, what's the last revision, and who's responsible
NOTE: This is currently a vacant position.
NOTE: This is currently a vacant position. Four year max review period
Description:
Description:
Description:
Description:
10/01/2015
10/01/2015
10/01/2015
10/01/2015
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Development of Financially-related SOPs Identified in the Dept.-wide SOP Inventory
Draft Recommendations Memo for SLT Regarding an SOP Management System
Work on Financial SOPs
Next steps on what to do with SOP Inventory
Update Intranet with new Dept-wide SOPs
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
END DATE EXTENDED FROM 3/31/17 -- Note: This is just a placeholder. The actual target number of financially-relatedprocesses that must be documented in writing will be determined after the Phase I Assessment is conducted. Also, V.Perelli will not be responsible for developing these SOPs. He is monitoring and overseeing the development by others.This duty will be transferred to whomever fills the vacant CE V Position.
A function of what SLT wants to do
function of what SLT wants to do
As needed
Description:
Description:
Description:
Description:
Description:
12/01/2016
01/01/2018
10/01/2017
10/01/2017
10/01/2017
03/31/2018
03/31/2018
12/31/2018
12/31/2017
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PERELLI, VINCENT
PERELLI, VINCENT
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
SOPs (Standard Operating Procedures)
Memos
Reviews
Reviews
Updates
89
1
1
1
4
Lead Person:
Lead Person:
Lead Person:
Lead Person:
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
HROBAK, DANIEL
28959
30499
30378
30379
30380
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 95 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
STANDARD OPERATING PROCEDURES (SOPS) (Current)
Div/Bur:
Program:
Update old SOPs into new format (Current)Activity:
Update SOPs and put into new formatDeliverable:
As neededDescription:
10/01/2017 09/30/2018Start/End Dates: thruLead Person: HROBAK, DANIEL
Qty/Unit: Updates4
30381
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 96 of 313
OFFICE OF THE COMMISSIONER PLANNING, PREVENTION, AND ASSISTANCE
USED OIL GRANT PROGRAM (Current)
Issue grant gifts for the purpose of encouraging the establishment, improvement, and operation of used oil collection centers thatcollect "do it youself" used oil from NH residents.11/01/2012
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General XState Fees Federal EPA Federal Other Grants
Grants Management (Current)
Technical Assistance and Education (Current)
Activity:
Activity:
Support used oil collection centers in proper collection/disposal of used oil through financial assistance
Provide outreach, education and assistance on the used oil grant program to grantees and others
Description:
Description:
10/01/2013
10/01/2013
Start/End Dates:
Start/End Dates:
thru
thru
1) Process and provide funding to at least 12 grant applicants per year
2) Disburse $27,000 in grants annually
3) Update documentation and related web content
4) Develop annual report on grant activities and post to the website
5) Update and amend Used Oil Grant Program SOP
1) Presentations and Workshops
2) Publications & webpage
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide presentations as needed / requested
Create / update publications, and web pages as needed
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
03/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Applications
Dollars
Updates
Reports, Final
Updates
Events
Activities
12
27000
2
1
1
4
3
Lead Person:
Lead Person:
ROBINSON, JR., DEAN
ROBINSON, JR., DEAN
30508
30509
30510
30511
30512
30513
30514
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 97 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
01 NH ONLINE FORMS (Current)
Develop process, create guidance, develop training in cooperation with DoIT to use DoIT enterprise application (nForm) to build, publishand use NH Online Forms.07/01/2017 07/01/2018
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
XFunding: State General State Fees Federal EPA Federal Other Grants
01Develop Process & Create Guidance (Current)
02Paper to Electronic Forms Conversion (Current)
Activity:
Activity:
Define how a user would use prepopulation, signatory credentials, push and fee collection using NH Online FormsLean Event: 2017-05Folder: \\granite\inter-agency\DoIT - nForms Enterprise\Agency Implementations
Support the training of staff in forms development, testing and deployment of conversion of paper forms to electronic equivalents
Description:
Description:
07/01/2017
07/01/2017
07/01/2018
06/30/2019
Start/End Dates:
Start/End Dates:
thru
thru
01Credentialing - Electronic Signatures
02Data Mapping from nForm to Oracle
03Pre-Population Process
04Payment Data Flows
05Total Project Complete
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Define when certain signatory credentials are necessary and the steps by which an agency would set up credentialing forusers at the 5 levels available (e.g. self-registered user, verified user, e-signatory) Lean Event: 2017-10Folder: \\granite\inter-agency\DoIT - nForms Enterprise\Agency Implementations\2017-10_SignatureGuide
Define the steps which define how form fields are mapped and data is pushed to a back end database using both FormViewerand nForm. NOTE: On 1/2/2018 deliverable end date changed from 12/31/17 to 7/1/2018. See outputs for status update.Lean Event: 2017- Folder: \\granite\inter-agency\doit - nForms Enterprise\Agency Implementations\2017-
Develop procedures for the current version of software that could be used to inform the Form Designer, DES BusinessAnalysts and DoIT of the basic steps necessary to use pre-population. NOTE: On 1/2/2018 deliverable end date changedfrom 12/31/17 to 7/1/2018. See outputs for status update.Lean Event 2017-07Folder: \\granite\inter-agency\DoIT - nForms Enterprise\Agency Implementations\2017-07_Prepopulation
Define the steps which show how payment flows work from initial form payment setup to destination account credit and thesteps by which an agency would connect payment into a nForm.Lean Event: 2017-06 Folder: \\granite\inter-agency\doit - nForms Enterprise\Agency Implementation\2017-06_Payment
Develop process and create guidance
Description:
Description:
Description:
Description:
Description:
07/01/2017
07/15/2017
07/01/2017
07/01/2017
07/01/2017
12/31/2017
07/01/2018
07/01/2018
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LAJOIE, MURIEL
LAJOIE, MURIEL
LAJOIE, MURIEL
MCLEAN, HAMILTON
LAJOIE, MURIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Hours
Hours
Hours
Hours
Percent
50
50
50
50
1
Lead Person:
Lead Person:
LAJOIE, MURIEL
MICHENER, KATHRYN
29632
30256
30405
30406
30407
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 98 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
01 NH ONLINE FORMS (Current)
Div/Bur:
Program:
02Paper to Electronic Forms Conversion (Current)Activity:
01NH FY 2018 Conversions
02NH FY 2019 Conversions
03Total Project Complete
Deliverable:
Deliverable:
Deliverable:
Paper to Electronic Forms Conversion for FY18-19
Description:
Description:
Description:
07/01/2017
07/01/2018
07/01/2017
06/30/2018
06/30/2019
06/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
MICHENER, KATHRYN
MICHENER, KATHRYN
MICHENER, KATHRYN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Forms
Forms
Percent
40
60
1
30259
30260
30408
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 99 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
02 SR-2016-257 EXCHANGE NETWORK GRANT FY2015 (Current)
Implementation of Virtual Node (ASD-DES) and developing CROMERR compliance application (NHDES)10/01/2016 07/01/2018
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees XFederal EPA Federal Other Grants
01 SR-2016-257-0 Virtual Node Flows (Current)
02 Implement Shared Services (Current)
Activity:
Activity:
Convert 5 flows from Node 2.0 to Virtual Node
File AG letter, EPA checklist and crosswalks for 3 systems to AG and EPA
Description:
Description:
06/12/2017
01/01/2017
09/30/2018
07/01/2018
Start/End Dates:
Start/End Dates:
thru
thru
SR-2016-257-2 Drinking Water
SR-2016-257-6 ICIS (Air)
SR-2016-257-7 WQX (Watershed)
SR-2016-257-8 Beaches (Watershed)
01CROMERR Application for CMDP
02CROMERR Application for SLEIS
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
1. Send SDWIS Prime & CMDP package with associated statutes, draft rules, crosswalk, draft AG letter and draftforms to EPA for review.2. Receive comments from EPA and revise above items in Item 1. as necessary.3a. DES revise SDWIS Prime and CMDP package per EPA comments and send revised draft items to NHAG for review.3b. DES revise 2 remaining CROMERR technical packages (i.e. crosswalk, draft AG letter and technical checklist for SLEISand NH Online Forms (nForm)).4. DES send items in item 3b. to EPA for review.5a. DES receives comments from NHAG and finalizes rules and forms5b. DES receives comments from EPA and finalizes 2 technical CROMERR packages6. DES submits final SDWIS Prime/CMDP, SLEIS and NH Online Forms (nForm) packages to NHAG.
Description:
Description:
Description:
Description:
Description:
Description:
05/12/2017
03/01/2018
06/12/2017
06/15/2017
01/01/2017
01/01/2017
03/31/2018
06/01/2018
09/30/2018
09/30/2018
07/01/2018
07/01/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
Vacant
Vacant
LAJOIE, MURIEL
LAJOIE, MURIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Percent
Percent
Percent
Hours
Hours
Hours
1
1
1
0
60
450
Lead Person:
Lead Person:
Vacant
LAJOIE, MURIEL
30449
30448
30446
30447
30453
30455
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 100 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
02 SR-2016-257 EXCHANGE NETWORK GRANT FY2015 (Current)
Div/Bur:
Program:
02 Implement Shared Services (Current)Activity:
03CROMERR Application for nForms
Total Project Complete - Implement Shared Services
Deliverable:
Deliverable:
Description:
Description:
01/01/2017
01/01/2017
07/01/2018
07/01/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
LAJOIE, MURIEL
LAJOIE, MURIEL
Qty/Unit:
Qty/Unit:
Hours
Units
500
1
30454
30456
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 101 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
03 EXCHANGE NETWORK GRANT 2017-GEOSPATIAL DATA AVAILABILITY PROJECT (Current)
Increase the quality and availability of geospatial data for resumption of flow to FRS and for new flows to EPA's Central data Exchange(CDX).Introduction
10/01/2016 09/30/2018
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants X
Approval of Data Lifecycle Framework & Global Geospatial Identification System Project (Current)
DES Programs adopting DLC standards (Current)
Activity:
Activity:
Approval consists of three parts with each part representing 33% of total % Complete: 1) Grant Time Extension (Amendment); 2) FiscalCommittee; 3) Governor & Council
Description:
Description:
12/18/2017
07/01/2017
03/31/2018
06/30/2019
Start/End Dates:
Start/End Dates:
thru
thru
Approval Complete
DLC Standards Adopted
Deliverable:
Deliverable:
Approval consists of three parts with each part representing 33% of total % Complete: 1) Grant Time Extension(Amendment); 2) Fiscal Committee; 3) Governor & Counc
Description:
Description:
12/18/2017
07/01/2017
03/31/2018
06/30/2019
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
NOWACK, TIMOTHY
NOWACK, TIMOTHY
Qty/Unit:
Qty/Unit:
Approvals
Programs
1
2
Lead Person:
Lead Person:
NOWACK, TIMOTHY
NOWACK, TIMOTHY
30515
30261
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 102 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
04 PROJECTS SUPPORTING DES GIS INFRASTRUCTURE AND FUNCTION (Current)
Any projects managed by DES or ASD-DES involving GIS licensure, servers, upgrades, desktop, specifications, training10/01/2016 09/30/2018
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
XFunding: State General State Fees Federal EPA Federal Other Grants
01 Workflow Implementation SR-2017-225 (Current)
02 Server Upgrades, Configuration and Testing (Current)
03 User Desktop Applications and Specifications (Current)
04 GIS Web - Implementation (Current)
Activity:
Activity:
Activity:
Activity:
Program based workflows using GIS tools and techniques to improve and streamline DES activities and functions.
Installing new GIS applications, reconfigure existing applications, upgrade certificates, memory, security requirements, ports andpatches.
Installation, troubleshooting, licensure, tracking, hardware and software specifications
Assist staff with project implementations using ArcGIS Online and ArcGIS Maps for Office.
Description:
Description:
Description:
Description:
10/01/2016
10/01/2016
10/01/2016
10/01/2016
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
01 DES/WAT SWPA (Source Water Protection Area) Maps and Reports
02 Portal for ArcGIS Server installation and testing
01 Hardware Spec Decision
02 ESRI license and EEAP
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Team: Kristen Svendsen, Dongmei WangS:/DES-COMMON/GIS_Team/Executive Board/Project Coordination/Projects/Assigned-Ranked and S:\DES-COMMON\Projects\SR-2017-225-0\DESWAT SWPA. Complete Chemical Monitoring Waiver Program workflow for customer/public use as part of the ChemicalMonitoring Waiver Application. Built within OneStop Data Mapper (GeoCortex) application.
Worked with Kristen Svendson to plan on testing of apps of Portal starting this week. Planning to federate ArcGIS Serverwith Portal; Working with Heather and George to request SSL for Portal; Working on configuring Portal to accept ourhomemade certificate; trying to configure Portal for Maps for Office. Working on SSL certificate for Portal.
Determine desktop and laptop minimum requirements to run ARCGIS Pro
Researching EAP. Talked to Chris, Heather, Ham, and Kristen to get feedbacks. Meeting with ESRI representatives on Dec 19to discuss ESRI license and EEAP. reviewed DES current license structure; Looking into options for the future; Teamlooking into EA and EEAP.
Description:
Description:
Description:
Description:
09/11/2017
10/16/2017
10/01/2016
11/22/2017
12/31/2017
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SONDEREGGER, DEBRA
Vacant
Vacant
Vacant
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Projects
Projects
Projects
Projects
1
1
1
1
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
Vacant
NOWACK, TIMOTHY
30463
30505
30464
30506
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 103 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
04 PROJECTS SUPPORTING DES GIS INFRASTRUCTURE AND FUNCTION (Current)
Div/Bur:
Program:
04 GIS Web - Implementation (Current)Activity:
Benjamin Giorgi, Water Division in LRM, Subsurface Bureau
Melissa Zych, Commissioner's Office in PPA
Deliverable:
Deliverable:
Provided Ben ArcGIS Online credentials after assisting him with completion of GIS Project Request according to guidance.Prohect objective is to create an easy to use point collection tool that will be used by Subsurface field inspectors tocollect the location of all future operationally approved septic systems and display results on a map.
Creating a map we could use internally to document our visits will allow us (Melissa, Sara, Cynthia) to track businesseswe have assisted. First attemped using ArcGIS Online Web App was unsuccessful. Exploring/testing ArcGIS Maps for Office.Installing required Microsoft Office to use with ArcGIS Portal on the ArcGIS server. Team: Dongmei Wang.S:\DES-COMMON\GIS_Team\Executive Board\Project Coordination\Projects\Completed\20170607 Zych, Melissa GIS request.docx
Description:
Description:
11/15/2017
06/07/2017
12/11/2017
03/31/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
NOWACK, TIMOTHY
NOWACK, TIMOTHY
Qty/Unit:
Qty/Unit:
Plans
Applications, GIS
1
1
30504
30473
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 104 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
05 STAFF GOALS, REQUIREMENTS, ASSIGNMENTS & TRAINING (Current)
Staff required activities, assignments for participation, state committees, liaison functions07/01/2017 09/30/2018
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
01 PMP Prepratory Class (Current)
02 Cybersecurity (Current)
03 SB377 GIS Advisory Committee (Current)
04 Business Analyst Group (Current)
Activity:
Activity:
Activity:
Activity:
Training, desktop excercises, liaison
Assignments and functions related to the state subcommittee on GIS. Provide liasion between DES, GTAC and HB377 GIS Advisory Committee
Participation in required BA activities including Bureau IT Plans, topical discussions, system inventory, surveys, inter-BA assistance.
Description:
Description:
Description:
Description:
07/01/2017
10/01/2016
10/01/2016
10/01/2016
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
PMP Prep Class
Attend Tabletop excerise
Required Training
01 Needs Analysis
Funding plan for ortho Imagery refresh
GeoCortex Pilot
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
event in November 2107
required training courses in support of cyber security table top events
GIS Technical Advisory Committee identified Statewide GIS strategies; receive approval from 377 committee
develop, present and receive approval of a funding plan for ortho imagery refreshing to thwethen current standards toshare across the enterprise.
request funding from DoIT through its capital appropriation to share between DOT and DES a UNH hosted instance ofGeoCortex to establish scalable governance, updating and credentialing of users over 18 month period ~ $150,000
Description:
Description:
Description:
Description:
Description:
Description:
10/23/2017
10/01/2017
10/01/2017
10/01/2016
10/01/2017
10/01/2017
10/26/2017
09/30/2018
09/30/2018
09/30/2018
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LAJOIE, MURIEL
MCLEAN, HAMILTON
MCLEAN, HAMILTON
MCLEAN, HAMILTON
MCLEAN, HAMILTON
MCLEAN, HAMILTON
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Percent
Percent
Percent
Reports, Final
Percent
Percent
1
1
1
1
1
1
Lead Person:
Lead Person:
Lead Person:
LAJOIE, MURIEL
MCLEAN, HAMILTON
MCLEAN, HAMILTON
30409
30503
30507
30467
30502
30500
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 105 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
05 STAFF GOALS, REQUIREMENTS, ASSIGNMENTS & TRAINING (Current)
Div/Bur:
Program:
04 Business Analyst Group (Current)
05 Chair - GIS Advisory Committee, GIS Executive Board, GIS Ranking Board (Current)
Activity:
Activity:
Coordinate membership, develop agendas, schedule meetings.Description:10/01/2016 09/30/2018Start/End Dates: thru
GIS Advisory Committee meetingDeliverable:
agenda at: S:\DES-COMMON\GIS_Team\Agendas and Minutes\2017\20171130_GISTeamAgenda.docxDescription:
11/30/2017 11/30/2017Start/End Dates: thruLead Person: NOWACK, TIMOTHY
Qty/Unit: Meetings1
Lead Person:
Lead Person:
LAJOIE, MURIEL
NOWACK, TIMOTHY
30501
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 106 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
06 SR-2017-086 (Current)
DES/WAS CATTS-23 Oracle Forms Conversion RFQ01/01/2017 09/30/2018
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
DES/WAS CATTS-23 Oracle Forms Conversion RFQ (Current)Activity:
RFQ process up until PO issuance. Team Lead: Heather PikePositions/Employee Name: Druding, Leighton, Puthota, Burleigh
Description:
01/01/2017 08/30/2018Start/End Dates: thruLead Person: Vacant
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 107 of 313
OFFICE OF THE COMMISSIONER PROJECT MANAGEMENT & INNOVATION
07 DOTNET CONVERSIONS (Current)
Conversions of department wide application front ends to .NET10/01/2015 09/30/2018
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
XFunding: State General State Fees Federal EPA Federal Other Grants
02MTRS SR-2014-445-4 (Current)Activity:
Convert the MTRS system from an Oracle forms interface to .NETDescription:01/01/2017 12/31/2017Start/End Dates: thru
Lead Person: Vacant
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 108 of 313
OFFICE OF THE COMMISSIONER PUBLIC INFORMATION AND PERMITTING
FILE REVIEW SERVICES (Current)
Create and maintain a fully staffed, multi-program file review service in the DES Public Information Center to serve the ever-wideningdiscovery needs of agency clients and/or their agents.12/15/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 01 03
Funding: State General XState Fees Federal EPA Federal Other Grants
File review services provided to Public Information Center clients (Current)Activity:
File review clients requesting information on various DES recordsDescription:10/01/2009Start/End Dates: thru
Lead Person: EGAN, CALI
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 109 of 313
OFFICE OF THE COMMISSIONER PUBLIC INFORMATION AND PERMITTING
INTERNET/INTRANET SERVICES (Current)
The DES Web Content Manager resides within the PIP Unit and is responsible for providing state-of-the-art information to users. Certainkey activities will be monitored to ensure the greatest efficiency possible and effective and timely services to DES customers.07/01/2007
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Chair Website Editorial Board - internal DES customers (Current)
Project management with Dept. of Information Technology (Current)
Upgrades and maintains content on DES website, Intranet, and OneStop navigation (Current)
Website-related customer service - external and internal customers (Current)
Activity:
Activity:
Activity:
Activity:
The Web Content Manager serves as chair and calls WEB meetings on a regular basis to address new developments, operation and maintenanceissues, and concerns raised by program representives.
Project management and coordination of DES projects with DoIT
Web Content Manager is responsible for these websites.
Web Content Manager will lead the effort to monitor and improve customer service.
Description:
Description:
Description:
Description:
09/30/2007
10/01/2007
07/01/2007
10/01/2007
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NOWACK, TIMOTHY
NOWACK, TIMOTHY
NOWACK, TIMOTHY
NOWACK, TIMOTHY
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 110 of 313
OFFICE OF THE COMMISSIONER PUBLIC INFORMATION AND PERMITTING
PERMIT COORDINATION/MAJOR PROJECT MGMT/UNIT ADMINISTRATION (Current)
Provide timely and accurate permit coordination and major project management services to assist clients with integrated permitapplication processing and compliance assistance needs.01/02/1987
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 01 03
XFunding: State General State Fees Federal EPA Federal Other Grants
Administration of the Public Information and Permitting Unit (Current)
Major project coordination (Current)
Prepare official DES reviews for projects with varying environmental impacts. (Current)
Activity:
Activity:
Activity:
Activities carried out routinely to effect efficient operations of the PIP Unit.
Respond to initial requests for guidance on multiple-permit, multi-discipline, multi-agency projects and identify likely requirements forthe project.
Review, critique, draft, and transmit official DES policy position and consolidated technical comment douments for NEPA EIS's, CORDreviews, Intergovernmental Reviews, etc.
Description:
Description:
Description:
01/02/1987
01/02/1987
01/02/1987
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Manage and monitor the DES Publications Revolving Fund
Update PIP Unit Supplemental Job Descriptions (as needed)
Arrange and convene pre-application meetings
Monitor use of Guidebook for Environmental Permits in New Hampshire
Prepare official agency response to multi-discipline projects.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The Publications Revolving Fund was established to ensure ready access to funds to publish and reproduce agency educationand outreach documents and to support operator training programs.
NH Division of Personnel rules require that a staff members Supplemental Job Description be updated at the time of his orher annual performance evaluation if it has been two years or more since its last amendment.
For those who choose direct discussions with DES staff, these meetings are arranged to allow for an active discussion inthe pre-planning phase of projects to identify which regulatory programs and permits may be triggered by a specificproposal.
Monitor use by constituents of the new Permit Guidebook through Web "hits", sales, and other distribution methods.
Coordinate the review of, and response to, multiple-program, multi-discipline projects with environmental impacts.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DREW, TIMOTHY
DREW, TIMOTHY
DREW, TIMOTHY
DREW, TIMOTHY
DREW, TIMOTHY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Report Assessments
Evaluations
Meetings
Web Site Hits
Responses
4
3
10
40000
10
Lead Person:
Lead Person:
Lead Person:
DREW, TIMOTHY
DREW, TIMOTHY
DREW, TIMOTHY
29080
29081
29082
29092
29093
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 111 of 313
OFFICE OF THE COMMISSIONER PUBLIC INFORMATION AND PERMITTING
PERMIT COORDINATION/MAJOR PROJECT MGMT/UNIT ADMINISTRATION (Current)
Div/Bur:
Program:
Prepare official DES reviews for projects with varying environmental impacts. (Current)Activity:
Represent DES concerning international agreements, task forces, and multi-disciplinary committeesDeliverable:
The PIP Unit serves as the official agency representative for such activities at the Mt. Sunapee Advisory Committee, theCommittee on Resources and Development, and the Transboundary Environmental Impact Agreement with the Province of Quebec.
Description:
10/01/2017 09/30/2018Start/End Dates: thruLead Person: DREW, TIMOTHY
Qty/Unit: Meetings20
29094
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 112 of 313
OFFICE OF THE COMMISSIONER PUBLIC INFORMATION AND PERMITTING
PUBLIC INFORMATION DISSEMINATION (Current)
Improve communication with stakeholders through broader education and outreach initiatives, enhanced public participation techniques, andcollaborative partnerships with environmental advocacy groups, legislators, trade associations, the news media, and the general public.01/02/1987
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 01 03
XFunding: State General State Fees Federal EPA Federal Other Grants
DES Press (Current)
Legislative support for DES Senior Leadership Team (Current)
Measure and improve effectiveness of DES public relations, education and outreach efforts (Current)
Publication Activity (Current)
Activity:
Activity:
Activity:
Activity:
The Public Information Officer serves agency spokesperson to the media. The PIP Unite prepares, coordinates and issues press releasesfor the Department.
The PIP Unit is charged with maintaining the most current chart of new bills, LSR's, hearings, amendments, and status updates to ensuretimely and appropriate DES participation in legislative activities.
The PIP Unit will work to ensure a positive public perception and reputation for DES in the eyes of the public and our stakeholders.
The PIP Unit prepares, reviews and updates various DES publications to foster and expand our education and outreach efforts with ourstakeholders, most importantly the public.
Description:
Description:
Description:
Description:
01/02/1987
01/02/1987
01/01/2003
10/01/2009
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MARTIN, JAMES
MARTIN, JAMES
MARTIN, JAMES
MARTIN, JAMES
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 113 of 313
OFFICE OF THE COMMISSIONER PUBLIC INFORMATION AND PERMITTING
PUBLICATIONS SALES (Current)
Expand and improve customer service efficiency offered by the DES Public Information Center relative to the collection, maintenance,availability, and dissemination of documents, data, and staff referrals.04/01/2011
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 01 03
XFunding: State General State Fees Federal EPA Federal Other Grants
Fulfill external stakeholder requests for information (Current)
Fulfill internal (DES) requests for information (Current)
Fulfill sales of Geo Publications, NHDES clothing and the loaning of A/V Equipment to NHDES Staff (Current)
Provide adequate supply of DES documents to stakeholders (Current)
Activity:
Activity:
Activity:
Activity:
The publications sales section of the Public Information Center serves the needs of external customers who request specific informationconcerning DES activities and programs in support of their efforts to better understand environmental issues.
The publications sales section of the Public Information Center responds to requests by DES staff members by providing specificinformation and data to enhance daily business operations, in addition to providing support materials for conducting internal andexternal education and outreach activities.
Fulfill the sales of Geologic Publications to External Customers, as well as, the sales of NHDES Clothing and the loaning of A/VEquipment to NHDES Staff.
The publications sales section of the Public Information Center is charged with providing sufficient variety and numbers of documents toensure that all stakeholders are able to obtain the information, data, and guidance necessary to comply with DES programs.
Description:
Description:
Description:
Description:
01/02/1987
01/02/1987
07/01/2017
06/01/1999
06/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Loaned A/V Equipment to NHDES Staff
Sale of Geological Publications to External Customers
Sale of NHDES Clothing to NHDES Staff
Deliverable:
Deliverable:
Deliverable:
Number of pieces of A/V Equipment loaned to NHDES Staff
Number of Geologic Publications sold to External Customers
Number of articles of clothing sold to NHDES Staff
Description:
Description:
Description:
07/01/2017
07/01/2017
07/01/2017
06/30/2018
06/30/2018
06/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
DETHLEFS, LAUREN
DETHLEFS, LAUREN
DETHLEFS, LAUREN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Articles
Maps
Articles
50
10
25
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DETHLEFS, LAUREN
DETHLEFS, LAUREN
DETHLEFS, LAUREN
DETHLEFS, LAUREN
30031
30030
30029
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 114 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE COMPLIANCE
HAZARDOUS WASTE COMPLIANCE PROGRAM (Current)
The Hazardous Waste Compliance Program functions to assure the compliance of the requlated community, which is achieved through a threepart approach: compliance monitoring, compliance assistance, and education/outreach. The Hazardous Waste Compliance Section conductsinspections of hazardous waste generators and provides technical assistance to the regulated community. A Hazardous Waste AssistanceHotline is maintained by the Hazardous Waste Management Bureau (HWMB) for the regulated community to contact the HWMB to ask questionsconcerning the New Hampshire Hazardous Waste Rules and compliance issues which affect hazardous waste management programs.
07/01/1979
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 02 01
XFunding: State General XState Fees XFederal EPA Federal Other Grants
Data Management (Current)
Enforcement (Current)
Inspections (Current)
Activity:
Activity:
Activity:
Maintain EPA and HWMB compliance/enforcement databases with evaluation, violation and enforcement data.
Ensure that inspected facilities with documented violations receive a timely and appropriate enforcement action. High Priority Violators(HPVs)/Significant Non-Compliers (SNCs) are to receive a formal enforcement action which may include a penalty action.
Description:
Description:
Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Federal Compliance Monitoring Database - RCRAInfo
Federal Compliance Monitoring Database - RCRAInfo
Administrative Enforcement Actions
Administrative Enforcement Actions
Penalty Actions
Penalty Actions
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Note: Actual number to be negotiated in 2018 Planning Meeting. Enter and count initial evaluation inspections into theEPA compliance monitoring and enforcement database (RCRAInfo) for hazardous waste handlers that have been inspected,update as necessary with violation and enforcement data. FFY 2018-2019 P & C List.
Note: Actual number to be negotiated in 2019 Planning Meeting. Enter and count initial evaluation inspections into theEPA compliance monitoring and enforcement database (RCRAInfo) for hazardous waste handlers that have been inspected,update as necessary with violation and enforcement data. FFY 2018-2019 P & C List.
Issue non-penalty enforcement actions (i.e.,RHWIs, LODs, NOPVs, AOs) and compliance letters to inspected facilities.
Issue non-penalty enforcement actions (i.e.,RHWIs, LODs, NOPVs, AOs) and compliance letters to inspected facilities.
Issue Administrative Fines (AFs) and Request for Enforcement Action (RFEs) to facilities deemed to be SNCs/HPVs .
Issue Administrative Fines (AFs) and Request for Enforcement Action (RFEs) to facilities deemed to be SNCs/HPVs .
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Entries
Entries
Enforcement Actions
Enforcement Actions
Penalty Actions
Penalty Actions
39
39
39
39
12
12
Lead Person:
Lead Person:
Lead Person:
LEEDBERG, TOD
LEEDBERG, TOD
29608
30006
29609
30008
29610
30007
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 115 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE COMPLIANCE
HAZARDOUS WASTE COMPLIANCE PROGRAM (Current)
Div/Bur:
Program:
Inspections (Current)
Outreach/Education (Current)
Activity:
Activity:
Inspection of facilities to determine compliance with the NH Hazardous Waste Rules.
Provide training to the regulated community through workshops, conferences, and speaking engagements.Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Generator inspections in Federal Fiscal Year 2018
Generator inspections in Federal Fiscal Year 2019
Limited Permit inspections in Federal Fiscal Year 2018
Limited Permit inspections in Federal Fiscal Year 2019
Submit Report of Completed Inspections & End-of-Year Outcome Report for Alternative Plan for FFY 17
Submit Report of Completed Inspections & End-of-Year Outcome Report for Alternative Plan for FFY 17
Submit a draft FY19 Alternative Compliance Monitoring Strategy to EPA
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
DRAFT: Conduct 39 hazardous waste generator inspections in FFY 2018, which includes 11 "traditional " LQGs, 2 retailpharmacy LQGs, and 26 "others" (i.e, non-LQGs). The Large Quantity Generator (i.e., >1,000 kgs/mo) universe is basedon the State HZWMs database which as of 3/24/2017 has 159 active LQGs. The 159 LQGs are made up of 113 traditional LQGsand 46 retail pharmacy LQGs. As allowed under the FFY 2018-2019 OECA NPM Guidance (draft 6/29/17) and OECAs ComplianceMonitoring Strategy (CMS) (9/2015), DES has proposed to use the flexibility offered in the CMS as "Alternative 3 - TheStraight Trade-Off Approach" for the traditional LQGs (sixth consecutive year) and inspect 10% of these for a total of 11traditional LQGs. (i.e., flexing away from 11 LQGs) and to put those 11 LQG inspection resources into "others" (i.e.,non-LQGs). In addition, DES is participating in the Region 1 States Retail Flexibility Plan for the fourth consecutiveyear and will inspect 5% of the retail pharmacy LQG universe for a total of 2 retail pharmacy LQGs. DES further proposesto conduct at least 11 (and up to 26 as staff resources allow) "other" inspections of primarily 100-1,000kgs/mogenerators, should staff resources allow. FFY2018-19 P & C list.
To be determined in FFY 2019 Planning meeting
Conduct 5 inspections at facilities that require Limited Permits for elementary neutralization or wastewater treatmentsystems.
Conduct 5 inspections at facilities that require Limited Permits for elementary neutralization or wastewater treatmentsystems. To be determined in FFY 19 Planning meeting
For FY 17. In FY 18-19 P&C List.
For FY 18 In FY 18-19 P&C List.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
04/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
11/30/2017
11/30/2018
07/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Inspections
Inspections
Inspections
Reports, Final
Reports, Final
Strategies
39
39
5
5
2
2
1
Lead Person:
LEEDBERG, TOD
LEEDBERG, TOD
29611
30010
29612
30011
30009
29618
29619
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 116 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE COMPLIANCE
HAZARDOUS WASTE COMPLIANCE PROGRAM (Current)
Div/Bur:
Program:
Outreach/Education (Current)
Program Development (Current)
Technical Assistance (Current)
Activity:
Activity:
Activity:
Participate in EPA and the environmental associations meetings and trainings to promote and develop the hazardous waste program and itsstaff.
Provide assistance to the regulated community for compliance with the Hazardous Waste Rules.
Description:
Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Presentations on Hazardous Waste Management
Participation in EPA meetings and trainings, NEWMOA work groups, NEEP, etc.
Hazardous Waste Compliance Assistance Telephone Hotline
Hazardous Waste Fact Sheets and Guidance Documents
Regulatory Interpretations
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide hazardous waste training to the public and regulated community through speaking engagements, and assisting theHazardous Waste Coordinator Certification Program.
Participation in EPA meetings and trainings, workgroup meetings for Northeast Waste Management Officials Association,Northeast Environmental Enforcement Project, Association of State and Territorial Solid Waste Management Officials, etc.FFY 2018-2019 P&C list.
Hotline is available for the regulated community to receive information and guidance on the NH Hazardous Waste Rules fromknowledgeable HWMB staff.
Keep Fact sheets current and create new ones as needed, as well as create new Guidebooks.
The regulatory policy binder (RPB) is a compilation of the regulatory interpretation letters issued to facilities toclarify a specific requirement under the Hazardous Waste Rules.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
LEEDBERG, TOD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Presentations
Meetings
Assistances Provided
Fact Sheets
Assistances Provided
10
10
500
4
5
Lead Person:
Lead Person:
LEEDBERG, TOD
LEEDBERG, TOD
29613
29614
29615
29616
29617
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 117 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE COMPLIANCE
HAZARDOUS WASTE COORDINATOR CERTIFICATION PROGRAM (Current)
The Certification Program is responsible to provide hazardous waste management training and certification to the full quantity and smallquantity generator facilities. Each full quantity generator that generates more than 220 pounds of hazardous waste per month shall haveon staff at the facility where the hazardous waste is generated a hazardous waste coordinator certified by the department. Each smallquantity generator that generates less than 220 pounds of hazardous waste per month shall self-certify their compliance under thehazardous waste rules once every 3 years.01/01/2003
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General XState Fees Federal EPA Federal Other Grants
Full Quantity Generator - Hazardous Waste Coordinator Certification (Current)
Small Quantity Generator - Self-Certification (Current)
Activity:
Activity:
Provide the necessary hazardous waste management training to certify the hazardous waste coordinators at the full quantity generatorfacilities.
Provide the necessary hazardous waste management guidance to allow small quantity generators to self-certify their compliance under thehazardous waste rules.
Description:
Description:
01/01/2003
10/01/2003
Start/End Dates:
Start/End Dates:
thru
thru
Advanced Modular Courses Workshops
Basic training course
Issue New Certifications
Issue Renewal Certifications
SQG Referrals For Inspection
Self-Certifications (Belknap, Carroll, Coos, Grafton, Merrimack & Sullivan) - 1/2018
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide workshops for modular courses for those who have completed basic certification. Modular courses will cover suchtopics as Inspection & Enforcement, Hazardous Waste Determination, P2/Waste Minimization, Reporting & Information Mgmt.,etc.
Provide initial certification courses to hazardous waste coordinators.
Provide testing and certification for Hazardous Waste Coordinators NEW to the system.
Provide certifications for Hazardous Waste Coordinators renewing their annual certification.
Refer SQGs from the SQG Self-Certification Section with identified deficiencies and other concerns to the Hazardous WasteCompliance Section for inspection.
Self-certification forms returned from the 672 small quantity generator facilities that will participate in the 2018mailing event for facilities in Belknap, Carroll, Coos, Grafton, Merrimack & Sullivan counties. The self-certificationpackages were sent to these facilities before 10/1/17.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
Vacant
Vacant
FARO, CHRISTIE
FARO, CHRISTIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Workshops
Courses
Certifications
Certifications
Inspections
Certifications
10
8
150
475
6
672
Lead Person:
Lead Person:
Vacant
FARO, CHRISTIE
29445
29449
29450
29451
29074
29075
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 118 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE COMPLIANCE
HAZARDOUS WASTE COORDINATOR CERTIFICATION PROGRAM (Current)
Div/Bur:
Program:
Small Quantity Generator - Self-Certification (Current)Activity:
Self-Certifications (Cheshire & Hillsborough) - 1/2017
Self-Certifications (Rockingham & Strafford) - 1/2016
Deliverable:
Deliverable:
Self-certification forms returned from the 700 small quantity generator facilities that participated in the 2017 mailingevent for facilities in Cheshire and Hillsborough counties. 649 self-certification packages were sent to the facilitieson 10/1/17 and 51 additional packages were sent through 9/30/17. Of the 700 facilities that received packages from the2017 mailing round, 28 still need resolution as of 9/30/2017.
Self-certification forms returned from the 764 small quantity generator facilities that participated in the 2016 mailingevent for facilities in Rockingham and Strafford counties. 669 self-certification packages were sent to the facilitieson 10/1/15 and 95 additional packages were sent through 9/30/17. Of the 764 facilities that received packages from the2016 mailing round, 19 still need resolution as of 9/30/17.
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
FARO, CHRISTIE
FARO, CHRISTIE
Qty/Unit:
Qty/Unit:
Certifications
Certifications
28
19
29076
29077
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 119 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE COMPLIANCE
HAZARDOUS WASTE PERMIT PROGRAM (Current)
The Permitting Program reviews and processes applications for all hazardous waste/RCRA permits. These permits include StandardTreatment, Storage, or Disposal Facility (TSDF) Permits, Transfer Facility Permits, Limited Permits (which allow generators to treathazardous wastewater) and Emergency Permits. The section provides technical support and engineering assistance to the staff of the HWMBin reviewing generator treatment, permitting considerations for universal and household hazardous waste, pollution prevention, wastestream evaluation, waste reduction and recycling issues.07/01/1979
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 02 04
Funding: State General State Fees XFederal EPA Federal Other Grants
Issue Permits (Current)
Quality Assurance (Current)
Activity:
Activity:
The Permitting Section reviews and processes applications for all hazardous waste/RCRA permits. These permits include Standard Permits,Transfer Facility Permits, Limited Permits and Emergency Permits.
The Permitting Section is responsible for updating and maintaining the generic Quality Assurance Project Plan (QAPP) for RCRA Subtitle C. The QAPP covers all environmentally related sample collection and analytical activites pertaining to hazardous waste identification.The Lead Person for the Permitting Section is also a member of the NH DES Quality Assurance Team, which maintains the NH DES QualityManagement Plan, provides assistance with internal audits, etc.
Description:
Description:
10/01/2001
10/01/2001
Start/End Dates:
Start/End Dates:
thru
thru
Emergency Permits
Limited Permits
Transfer Facility Permits
Complete Annual Quality Assurance System Program Self-Audit
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Emergency Permits allow on-site treatment of unstable hazardous wastes so the waste can be safely transported to apermitted, off-site hazardous waste facility for disposal. These permits are issued in reponse to specific events suchas laboratory clean-outs, and as a result it is difficult to predict how many will be requested in a given time period.
Limited Permits allow hazardous waste generators to treat their own hazardous wastewater.
Transfer Facility Permits allow facilities to receive hazardous wastes generated off site and store it for up to 10 days,at which time the waste must be transported to a permitted, off-site hazardous waste facility for treatment, storage ordisposal.
Tradebe Treatment and Recycling Northeast, LLC (formerly United Oil Recovery, Inc.) renewal application has beenreceived and a draft permit is under review.
Heritage-Crystal Clean submitted a new transfer permit application and the application is under review.
Per the DES Quality Management Plan (QMP) all DES programs (regardless of funding source) that manage environmental datamust report on the status of their QA systems. The purpose of this effort is to help program staff, the QA Team, and theSenior Leadership Team better understand and assess how well the DES QA System is functioning.
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LORCH, ZACHARY
LORCH, ZACHARY
LORCH, ZACHARY
LORCH, ZACHARY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Permits Issued
Permits Issued
Permits Reviewed
Self-Assessments
3
10
1
1
Lead Person:
Lead Person:
LORCH, ZACHARY
LORCH, ZACHARY
29122
29123
29124
29125
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 120 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE COMPLIANCE
RCRA AUTHORIZATION PROGRAM (Current)
The Authorization Program coordinates hazardous waste rulemaking as a result of federal authorization and state requirements. Thefunction of this program is to plan and schedule program activities, coordinate the development of regulations to keep pace with changesin the federal program and changing state needs, and coordinate the development of the state's application to maintain and expand federalauthorization of NH's hazardous waste program.07/01/1979
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 02 03
XFunding: State General State Fees Federal EPA Federal Other Grants
Maintaining and Expanding Authorization of Hazardous Waste Program by US EPA (Current)
State Rulemaking Initiatives (Current)
Activity:
Activity:
Federal law mandates that States must adopt hazardous regulations that are equivalent to and no less stringent than the hazardous wasteregulations adopted by the US Environmental Protection Agency. NH is required to submit applications ( Program Description, AttorneyGeneral's Statement, Memorandum of Agreement) to demonstrate that its hazardous waste program is equivalent to and consistent with thefederal program.
Federal and State statutes allow New Hampshire to adopt hazardous waste rules more stringent or broader-in-scope than federal hazardouswaste rules
Description:
Description:
11/03/1981
07/01/1979
Start/End Dates:
Start/End Dates:
thru
thru
Adopt rules that are equivalent to selected rules adopted by EPA through 6/30/17
Adopt rules that are equivalent to selected rules adopted by EPA through 6/30/18
Draft rules that are equivalent to selected rules adopted by EPA through 6/30/17
Draft rules that are equivalent to selected rules adopted by EPA through 6/30/18
Pilot the revised authorization process developed during the June 2016 LEAN RCRA Authorization event
Adopt rules to implement NH Statutes
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BONNER, WENDY
BONNER, WENDY
BONNER, WENDY
BONNER, WENDY
BONNER, WENDY
BONNER, WENDY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Rules
Rules
Rules
Rules
Pilot Programs
Rules
1
1
1
1
1
1
Lead Person:
Lead Person:
BONNER, WENDY
BONNER, WENDY
29700
29707
29710
29712
29740
29718
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 121 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE COMPLIANCE
RCRA AUTHORIZATION PROGRAM (Current)
Div/Bur:
Program:
State Rulemaking Initiatives (Current)Activity:
Adopt rules to implement NH Statutes
Draft rules to implement NH statutes
Draft rules to implement NH statutes
Deliverable:
Deliverable:
Deliverable:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
BONNER, WENDY
BONNER, WENDY
BONNER, WENDY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Rules
Rules
Rules
1
1
1
29721
29723
29725
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 122 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE REMEDIATION
STATE SITES CORRECTIVE ACTION PROGRAM (Current)
The State Sites Corrective Action Program combines the technical staff involved with groundwater and hazardous waste corrective actionissues, including the RCRA C Corrective Action Program and the Brownfields Program. The work load is divided across multiple programelements including: Brownfields Program implementation, site resolution of "small" but high volume sites through timely (less than 60days) reviews, resolution of more complex "large" sites, and program development.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 04 01
XFunding: State General XState Fees XFederal EPA Federal Other Grants
Brownfields (Current)
Groundwater Management Permit Oversight (Current)
Groundwater Release Detection Permit Oversight (Current)
Pre-Remedial Program (Current)
Activity:
Activity:
Activity:
Activity:
Groundwater management permits are a mechanism to establish a groundwater management zone (GMZ) where contaminated groundwater exists.Groundwater quality within the GMZ is monitored until ambient groundwater quality standards are met.
Groundwater release detection permits are a mechanism to protect groundwater resources via early detection of impacts to groundwaterquality at lined landfills, lined wastewater lagoon facilities and soil processing facilities.
Assessment of contaminated sites to determine whether they should be added to CERCLIS, and what is the most effective approach forgetting them cleaned up.
Description:
Description:
Description:
Description:
10/01/2001
10/01/2001
10/01/2001
10/01/2001
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Enroll two new program participants per year in State Brownfields Covenant Program
Make $400,000 in Revolving Loan Fund (RLF) loans or subgrants per year
Perform site assessments or cleanup planning at two Brownfields sites
Technical review and processing of management permits (including revisions)
Technical Review and Processing of Release Detection Permits (including revisions)
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCCLUSKEY, MICHAEL
MCCLUSKEY, MICHAEL
MCCLUSKEY, MICHAEL
RYDEL, PAUL
RYDEL, PAUL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Sites
Dollars
Sites
Permits Issued
Permits Issued
2
400000
2
40
4
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCCLUSKEY, MICHAEL
RYDEL, PAUL
RYDEL, PAUL
Vacant
29950
29951
29952
29953
29967
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 123 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE REMEDIATION
STATE SITES CORRECTIVE ACTION PROGRAM (Current)
Div/Bur:
Program:
Pre-Remedial Program (Current)
RCRA Corrective Action (Current)
Activity:
Activity:
Oversite of RCRA cleanup activitiesDescription:01/01/2001Start/End Dates: thru
Reach a Final Assessment Decision (FAD) for a contaminated site
Achieve Construction Complete
Achieve Construction Complete
Achieve Contaminated Groundwater Migration Under Control
Achieve Contaminated Groundwater Migration Under Control
Achieve Human Exposures Controlled Under Current Conditions
Achieve Human Exposures Controlled Under Current Conditions
Achieve Site-wide Remedy Selection
Achieve Site-wide Remedy Selection
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Goal is 2 to 4 Final Assessment Decisions during the 2016 Grant periodDescription:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
KENISON, KARLEE
BOWEN, DAVID
BOWEN, DAVID
BOWEN, DAVID
BOWEN, DAVID
BOWEN, DAVID
BOWEN, DAVID
BOWEN, DAVID
BOWEN, DAVID
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Assessments
Facilities/Companies
Facilities/Companies
Facilities/Companies
Facilities/Companies
Facilities/Companies
Facilities/Companies
Facilities/Companies
Facilities/Companies
2
1
1
1
1
1
1
1
1
Lead Person: BOWEN, DAVID
29954
29955
29956
29957
29958
29959
29960
29961
29962
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 124 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE REMEDIATION
STATE SITES CORRECTIVE ACTION PROGRAM (Current)
Div/Bur:
Program:
RCRA Corrective Action (Current)
Site Remediation Oversight (Current)
Activity:
Activity:
Oversight of hazardous waste site investigations and cleanups conducted by site owners, consultants, and contractors.Description:10/01/2001Start/End Dates: thru
Verify adequacy of financial assurance instruments
Verify adequacy of financial assurance instruments
Deliverable:
Deliverable:
Description:
Description:
10/01/2017
10/01/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
BOWEN, DAVID
BOWEN, DAVID
Qty/Unit:
Qty/Unit:
Assessments
Assessments
1
1
Lead Person: Vacant
29963
29964
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 125 of 313
WASTE MANAGEMENT DIVISION HAZARDOUS WASTE REMEDIATION
SUPERFUND PROGRAM (Current)
The Department of Environmental Services (DES) continues to provide management assistance to EPA to clean up the 18 NPL sites in NewHampshire and undertake site assessments for sites not yet on the NPL.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 04 02
XFunding: State General State Fees XFederal EPA Federal Other Grants
Site Management (Current)Activity:
This activity involves the management of all remedial investigations and actions at the National Priorities List sites where the State isacting on USEPA's behalf (i.e., delegated authority/State lead), management assistance where USEPA is maintaining lead authority, andmanagement oversight where potentially responsible parties have agreed to conduct remedial activities.
Description:
10/01/2001Start/End Dates: thru
20 groundwater and surface water monitoring events per year
Complete Biennial Quality Assurance System Program Self-Audit
Timely review of 300 technical documents per year
Deliverable:
Deliverable:
Deliverable:
An event is one synoptic round of monitoring well water elevations or sampling, or residential well sampling.
60 day or less review time for document is the target. Documents include investigation reports, design submittals, andconstruction documents.
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
MONGEON, ROBIN
PERKINS, SHARON
MONGEON, ROBIN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Events
Self-Assessments
Documents
20
1
300
Lead Person: KENISON, KARLEE
29944
29946
29948
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 126 of 313
WASTE MANAGEMENT DIVISION MTBE
MTBE REMEDIATION FUND (Current)
The MtBE Remediation Fund was established with money obtained from settlements with MtBE manufacturers and marketers. It is jointlyadministered with NH DOJ under the provisions of a MOU. The program is 100% state funded and can address MtBE related problems.04/01/2014
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05
Funding: State General XState Fees Federal EPA Federal Other Grants
Collect and analyze drinking water samples (Current)
Complete investigation and remedial projects (Current)
Implement Infrastructure Project Program (Current)
Implement Prevention Program (Current)
Activity:
Activity:
Activity:
Activity:
The sampling program seeks to obtain data on MtBE contamination of private wells in high risk of contamination settings.
This activity consists of the completion of MtBE investigation or remedial projects
Develop and implement an infrastructure assistance program to address MtBE contaminated drinking water wells with permanentinfrastructure solutions.
The prevention program consists of at risk UST removals and the development of a MVSY BMP program.
Description:
Description:
Description:
Description:
10/01/2014
01/01/2015
10/01/2014
10/01/2014
12/31/2017
09/30/2018
06/30/2018
06/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Drinking water samples collected
Completed investigations or remedial projects
Complete infrastructure projects
Permanently address contaminated water supplies
Eliminate non-compliant tank systems
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
This deliverable is to average the collection of 1500 drinking water samples per year.
This deliverable is the completion of 5 MtBE contamination investigations or remediations per fiscal year.
This deliverable is to complete two infrastructure projects per year.
Address contaminated water supplies by installation of treatment systems or by connection to an alternate source ofpotable water.
Elimination of single wall tanks and piping systems is a key release prevention goal. Initially, there were 200 non-compliant systems. The objective is 100% compliance with the single wall deadline. For 2018, 94%.
Description:
Description:
Description:
Description:
Description:
01/01/2017
07/01/2017
01/01/2017
07/01/2017
07/01/2017
12/31/2017
06/30/2018
12/31/2017
06/30/2018
06/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LYNN, GARY
LYNN, GARY
LYNN, GARY
LYNN, GARY
LYNN, GARY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Samples
Projects
Projects
Units
Percent
1500
5
2
38
94
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LYNN, GARY
LYNN, GARY
LYNN, GARY
LYNN, GARY
29011
29012
29013
29119
29121
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 127 of 313
WASTE MANAGEMENT DIVISION MTBE
MTBE REMEDIATION FUND (Current)
Div/Bur:
Program:
Implement Prevention Program (Current)
Implement SB380 (Current)
Activity:
Activity:
SB380 creates a Drinking Water and Groundwater Trust Fund.Description:06/30/2016Start/End Dates: thru
Implement MVRF Assistance Program
Implement MVRF Assistance Program - Concrete Pads
Increase use of spill prevention equipment at MVRF
Remove USTs
Obtain Advisory Commission Advice and Prioritization
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide spill prevention equipment to 40 Motor Vehicle Recycling Facilities (MVRF) that applied for assistance.
Install concrete pads at 16 MVRFs
Currently there are 115 licensed yards and spill prevention equipment has been provided to 79 of the yards. The goal is73% or 5 more units supplied to MVRFs.
This program consists of the removal of gasoline USTs. One unit = 1 tank.
SB380 requires the establishment of an Advisory Commission. DES will assist the commission with meetings and thedevelopment of a report advising on the use of the Trust Fund monies.
Description:
Description:
Description:
Description:
Description:
01/01/2015
01/01/2017
07/01/2017
01/01/2017
06/28/2016
12/30/2017
12/31/2017
06/30/2018
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LYNN, GARY
LYNN, GARY
LYNN, GARY
LYNN, GARY
LYNN, GARY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Actions
Projects
Units
Units
Reports, Final
40
16
5
20
1
Lead Person: LYNN, GARY
27813
29014
29118
29015
28115
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 128 of 313
WASTE MANAGEMENT DIVISION OIL REMEDIATION AND COMPLIANCE
ABOVEGROUND STORAGE TANK PROGRAM (Current)
The Aboveground Storage Tank (AST) Program has the responsibility for conducting compliance and facility registration activities forregulated ASTs. The program is 100% State funded by the Fuel Oil Discharge Cleanup Fund and the Oil Pollution Control Fund.04/21/1997
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 05 02
Funding: State General XState Fees Federal EPA Federal Other Grants
Design and Construction Review (Current)
Facility Compliance Monitoring (Current)
Activity:
Activity:
Description:
Description:
04/21/1997
04/21/1997
Start/End Dates:
Start/End Dates:
thru
thru
Review Design Plans for AST Facilities
On-Site Compliance Inspections at AST Facilities
Deliverable:
Deliverable:
Description:
Description:
10/01/2017
10/01/2017
12/31/2017
12/31/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
JURANTY, MICHAEL
JURANTY, MICHAEL
Qty/Unit:
Qty/Unit:
Reviews
Inspections
9
4
Lead Person:
Lead Person:
JURANTY, MICHAEL
JURANTY, MICHAEL
29630
29631
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 129 of 313
WASTE MANAGEMENT DIVISION OIL REMEDIATION AND COMPLIANCE
FEDERAL LUST PROGRAM (Current)
The Federal Leaking Underground Storage Tank (LUST) Program managed by DES has the responsibility for the remediation of petroleumcontaminated sites where the release occurred from federally regulated underground storage tanks (USTs). This involves emergencyresponse, project management and Groundwater Management Permit oversight to ensure that sites move through investigation to cleanup andsite closure in a timely and cost-effective manner. This program is mostly funded by the Federal LUST Trust Cooperative Agreement withlimited additional support from the state Petroleum Reimbursement Funds and the state Oil Pollution Control Fund.10/01/1986
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 05 01
Funding: State General XState Fees XFederal EPA Federal Other Grants
Site Remediation Oversight (Current)Activity:
Project ManagementDescription:10/01/1986Start/End Dates: thru
Close LUST Sites
Review Technical Documents for LUST Sites
Deliverable:
Deliverable:
For Governors Dashboard Report, track the number of new sites as well as sites that are mitigated and closed (provideinformation in Output comment field).
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
BASTIEN, MARGARET
BASTIEN, MARGARET
Qty/Unit:
Qty/Unit:
Closures
Reviews
0
0
Lead Person: BASTIEN, MARGARET
29692
29694
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 130 of 313
WASTE MANAGEMENT DIVISION OIL REMEDIATION AND COMPLIANCE
PETROLEUM REIMBURSEMENT FUNDS AND CONTAMINATION NOTIFICATION PROGRAM (Current)
The Petroleum Reimbursement Funds (Funds) include four separate funds: Oil Discharge and Disposal Cleanup Fund (ODDCF), Fuel OilDischarge Cleanup Fund, Motor Oil Discharge Cleanup Fund and Gasoline Remediation & Elimination of Ethers Fund. These Funds are managedby DES for the Oil Fund Disbursement Board, which is authorized to adopt rules and distribute reimbursements. These Funds providefinancial responsibility (i.e., insurance) to specific sectors of the petroleum industry, and provides monies for clean up of gasolineether contamination, e.g., MtBE. Each Fund is supported by fees on specific types of imported petroleum products including motor fuels,heating oils and motor oil. The ODDCF is available to owners of regulated motor fuel USTs to address federal financial responsibilityrequirements. About $12 million per year is reimbursed to clean up petroleum contaminated sites.
Under the groundwater contamination Notification Program, DES notifies owners of properties with on-site water supply wells whencontamination is detected in groundwater at nearby locations. All property owners within 500 feet of a (confirmed) groundwatercontamination detection location receive notification by certified mail.07/01/1988
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 05 03
Funding: State General XState Fees Federal EPA Federal Other Grants
Gasoline Ether Fund Claims Processing (Current)
Groundwater Contamination Notification (Current)
Petroleum Funds Claims Processing (Current)
Activity:
Activity:
Activity:
Complete notification(s) within 30 days of contamination discovery confirmation.
Description:
Description:
Description:
01/29/2002
07/01/2002
10/01/2001
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Process Gasoline Ether Claims
Process Gasoline Ether Claims
Process Reimbursement Claims
Deliverable:
Deliverable:
Deliverable:
Description:
Description:
Description:
10/01/2016
10/01/2017 12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
MUZZEY, WORTHEN
MUZZEY, WORTHEN
MUZZEY, WORTHEN
Qty/Unit:
Qty/Unit:
Qty/Unit: Percent1
Lead Person:
Lead Person:
Lead Person:
MUZZEY, WORTHEN
MUZZEY, WORTHEN
MUZZEY, WORTHEN
27799
29696
29703
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 131 of 313
WASTE MANAGEMENT DIVISION OIL REMEDIATION AND COMPLIANCE
SAFETANK PROGRAM (Current)
07/01/1999
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 05 05 02
Funding: State General XState Fees Federal EPA Federal Other Grants
Financial Assistance for Residential Heating Oil Tank Upgrade (Current)Activity:
Description:07/01/1999Start/End Dates: thru
Process Financial Assistance Applications for Residential Heating Oil Tank UpgradeDeliverable:
Description:
10/01/2017 12/31/2018Start/End Dates: thruLead Person: JURANTY, MICHAEL
Qty/Unit: Reviews29
Lead Person: AL-EGAILY, GENEVIEVE
29709
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 132 of 313
WASTE MANAGEMENT DIVISION OIL REMEDIATION AND COMPLIANCE
SPILL RESPONSE AND COMPLAINT INVESTIGATION PROGRAM (Current)
(NOTE: THE ORIGINAL SIS [Special Investigations Section] WAS REORGANIZED INTO THIS PROGRAM -- RECOMMEND PULLING THE FULL PROGRAMINFORMATION FROM ITS ORIGINAL LOCATION) The Spill Response and Compaint Investigation Program is responsible for managing and directingpetroleum and hazardous waste spill prevention, preparedness & response activities and petroleum, solid waste, & hazardous wastecomplaint investigations. At least one staff member is on-call for spill response at all times.07/01/1971
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 05 02
Funding: State General XState Fees XFederal EPA Federal Other Grants
Complaint Investigation (Current)
Spill Preparedness (Current)
Spill Response (Current)
Activity:
Activity:
Activity:
Description:
Description:
Description:
10/10/2005
07/01/1971
07/01/1971
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Investigate All Reported Petroleum, Hazardous Waste and Solid Waste Complaints
Homeland Security and Emergency Response Coordination
Respond to All Reported Spills
Deliverable:
Deliverable:
Deliverable:
Note: actual goal is to respond to 100% of all complaints regardless of the actual number of reports.
EPA will continue to work with the New England states on Homeland Security and emergency response readiness issuesthrough routine, day-to-day coordination and the existing Regional Response Team mechanism.
Note: actual goal is to respond in a timely manner to 100% of reported spills regardless of the actual number.
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
12/31/2018
12/31/2018
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
BISHOP, ROBERT
BISHOP, ROBERT
BISHOP, ROBERT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Complaints
Initiatives
Spills
25
1
37
Lead Person:
Lead Person:
Lead Person:
BISHOP, ROBERT
BISHOP, ROBERT
BISHOP, ROBERT
29711
29714
29716
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 133 of 313
WASTE MANAGEMENT DIVISION OIL REMEDIATION AND COMPLIANCE
STATE PETROLEUM REMEDIATION PROGRAM (Current)
The State Petroleum Remediation Program investigates and remediates petroleum spills at sites which are not covered by the federally-regulated Underground Storage Tank (UST) program. These sites consist of heating oil USTs, petroleum Aboveground Storage Tanks (AST) andin-land oil spills not associated with storage facilities (spills from petroleum tanker trucks, etc.). Funding for this program isprovided through the Petroleum Reimbursement Funds, the Oil Pollution Control Fund and responsible parties. The sites in the StatePetroleum Remediation Program require active project management and Groundwater Management Permit oversight to ensure that sites movefrom discovery to cleanup and closure in a timely and cost-effective way.07/01/1971
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 05 01
Funding: State General XState Fees XFederal EPA Federal Other Grants
Site Remediation Oversight (Project Management) (Current)Activity:
Description:07/01/1971Start/End Dates: thru
Close State Petroleum Sites
Review Technical Documents for State Petroleum Sites
Deliverable:
Deliverable:
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
BASTIEN, MARGARET
BASTIEN, MARGARET
Qty/Unit:
Qty/Unit:
Closures
Reviews
0
0
Lead Person: BASTIEN, MARGARET
29706
29708
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 134 of 313
WASTE MANAGEMENT DIVISION OIL REMEDIATION AND COMPLIANCE
UNDERGROUND STORAGE TANK PROGRAM (Current)
The Underground Storage Tank (UST) Program has the responsibility for conducting active compliance and permitting activities forregulated USTs. The program is partially funded by a federal LUST Prevention grant but is mainly funded from the State Oil PollutionControl Fund. The UST program reviews engineered design plan submittals for completenes, approves construction of systems meetingregulatory requirements, and performs backfill and installation inspections for new or modified UST systems to ensure that installationwas per the approved plan. The UST section also performs on-site operational compliance inspections and compliance record reviews andconducts enforcement actions as required to ensure compliance.10/01/1986
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 05 02
Funding: State General XState Fees XFederal EPA Federal Other Grants
Design & Construction Review (Current)
Enforcement (Current)
Facility Compliance Monitoring (Current)
Gasoline Vapor Recovery (Current)
Activity:
Activity:
Activity:
Activity:
Description:
Description:
Description:
Description:
10/01/1986
10/01/1986
10/01/1986
10/01/2002
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Inspect Construction at New of Substantially Modified UST Facilities
Review Design Plans for UST Facilities
Inspect all federally regulated UST facilities once every 3 yrs
Train UST Operator
Number of Stage I inspections performed
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Maintain 3 year inspection schedule.
Track the number of operators trained either directly by DES or by a training program approved by DES
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
JURANTY, MICHAEL
JURANTY, MICHAEL
JURANTY, MICHAEL
JURANTY, MICHAEL
JURANTY, MICHAEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Reviews
Inspections
Operators
Inspections
112
71
178
121
138
Lead Person:
Lead Person:
Lead Person:
Lead Person:
JURANTY, MICHAEL
JURANTY, MICHAEL
JURANTY, MICHAEL
JURANTY, MICHAEL
29720
29726
29732
29733
29734
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 135 of 313
WASTE MANAGEMENT DIVISION OIL REMEDIATION AND COMPLIANCE
UNDERGROUND STORAGE TANK PROGRAM (Current)
Div/Bur:
Program:
Gasoline Vapor Recovery (Current)Activity:
Number of Stage II inspections performedDeliverable:
Description:
10/01/2017 12/31/2018Start/End Dates: thruLead Person: JURANTY, MICHAEL
Qty/Unit: Inspections41
29735
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 136 of 313
WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT
ASSURE PROPER MANAGE OF INACTIVE SOLID WASTE DISPOSAL FACILTIIES (Current)
The SWMB assures proper management of inactive solid waste disposal facilities. The activities and deliverables for this program comefrom the Efficiency Budget Form-B, WMD-7.10/01/2017 09/30/2018
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
XFunding: State General State Fees Federal EPA Federal Other Grants
Enforcement Actions and Compliance Letters (Current)
Groundwater Management Permits Reviews (Current)
Inspections at Inactive Solid Waste Facilities Completed (Current)
Notices of Non-Compliance for Groundwater Management Permit (Current)
Activity:
Activity:
Activity:
Activity:
Non-penalty enforcement actions and compliance letters (LOD, NPV, AO, and LOC) for inactive/closed landfills issued.
Groundwater Management Permit regulatory submittal reviews for inactive/closed solid waste facilities completed.
Inspections of inactive/closed solid waste facilities, including landfills, completed.
Notices of Non-Compliance for Groundwater Management Permits for inactive/closed solid waste facilities.
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Number of enforcment actions.
Groundwater Managment Permit Reviews
Number of Inspections of closed landfills
Notices of Non-Compliance for Groundwater Release Detection Permits
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Document the number of non-penalty enforcement actions issued including LOD, NPV, AO, and Letters of Compliance issued.
Actions taken by SWMB/HWRB relative to a GW Management Permits including: comments, approval letters, issuance of permit,etc. Data compiled from HWRB database entries classified as LAND/UNLN for inactive SW facilities.
Document the number of inspections of inactive/closed landfills completed.
Notices of Non-Compliance for GW management permits for inactive SW facilities issued by HWRB/SWMB. Data compiled fromHWRB database entries classified as LAND/UNLN for active SW facilities.
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NOETHER, LAUREN
O'ROURKE, JAMES
BIRMINGHAM, LINDA
O'ROURKE, JAMES
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Enforcement Actions
Actions
Inspections
Notices
10
130
15
0
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NOETHER, LAUREN
O'ROURKE, JAMES
BIRMINGHAM, LINDA
O'ROURKE, JAMES
30238
30241
30237
30245
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 137 of 313
WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT
ASSURE PROPER MANAGEMENT OF SOLID WASTE AT ACTIVE SW FACILITIES (Current)
The SWMB assures proper management of solid waste at active permitted facilities. The activities and deliverables for this program comefrom the Efficiency Budget Form-B, WMD-6.10/01/2017 09/30/2018
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
XFunding: State General State Fees Federal EPA Federal Other Grants
Enforcement Actions (Current)
Groundwater Release Detection Permit Reviews (Current)
Inspections (Current)
Notices of Non-Compliance for Groundwater Release Detection Permits (Current)
Regulatory Reviews Completed (Current)
Activity:
Activity:
Activity:
Activity:
Activity:
Non-penalty enforcment actions and compliance letters (LOD,NPV,AO and LOC) for active solid waste faciltiies issued.
Groundwater Release Detection Permit regulatory submittal reviews completed.
Inspections of operating and under construction facilities completed.
Notices of Non-Compliance for Groundwater Release Detection Permits for inactive/closed solid waste facilities.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Number of enforcement actions
Groundwater Release Detection Permit Reviews
Number of inspection at scrap metal facilities and MVRFs
Number of inspections
Notices of Non-Compliance for Groundwater Release Detection Permits
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Number of enforcment actions issued including LOD,NPV,AO, and Letters of Compliance issued.
Actions taken by SWMB/HWRB relative to a GW Release Detection Permits including: comments, approval letters, issuance ofpermit, etc. Data compiled from HWRB database entries classified as LAND/LN for active SW facilities.
Number of inspections at solid waste facilties including scrap metal facilties and motor vehicle recycling facilitiescompleted.
Number of inspections completed including commercial transfer stations, municipal transfer stations, other completed.
Notices of Non-Compliance for GW release detection permits for active SW facilities issued by HWRB/SWMB. Data compiledfrom HWRB database entries classified as LAND/LN for active SW facilities.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NOETHER, LAUREN
O'ROURKE, JAMES
WATSON, DONALD
BIRMINGHAM, LINDA
O'ROURKE, JAMES
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Enforcement Actions
Actions
Inspections
Inspections
Notices
25
21
25
25
0
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NOETHER, LAUREN
O'ROURKE, JAMES
BIRMINGHAM, LINDA
O'ROURKE, JAMES
30242
30243
30240
30239
30244
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 138 of 313
WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT
ASSURE PROPER MANAGEMENT OF SOLID WASTE AT ACTIVE SW FACILITIES (Current)
Div/Bur:
Program:
Regulatory Reviews Completed (Current)
Solid Waste Facility Operators Trained (Current)
Activity:
Activity:
Operating and proposed solid waste facility regulatory reviews completed.
The Solid Waste Operator Training & Certification Program was implemented in 1989 to train any operator working at a permitted SolidWaste Facility. Program activities were not documented until March of 2016, when a Coordinator was hired that was dedicated to theprogram. There are approximately 1,300 operators that work at over 300 permitted SW facilities in the state.
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Number of Application Reviews Completed
Number of Report Reviews Completed
No. Attendees at Basic Training Events
No. Attendees at NHDES Hosted CPD Events
No. of Renewals submitted with non-NHDES Hosted CPD Events
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Permit application reviews completed, whether approved or denied, for active facilities. Applications include those fornew permits and permit modifications. The number of application reviews completed is taken from the Solid Waste Databasefor facilities marked "Proposed" or "Operating," and includes application activities marked with an activity status of"Done."
Report reviews completed for active facilities. Reports include, but are not limited to, annual facility reports,quarterly operating reports, tri-annual leachate reports, and incident reports. The number of report reviews completedis taken from the Solid Waste Database for facilities marked "Proposed" or "Operating," and includes reports marked withan activity status of "Done."
Operators trained at Basic Training. Includes operators who are either attending Basic Training for the first time orwho are recertifying after allowing their certification to lapse. The comments will reflect where and when the classestook place.
Operators trained at a NHDES hosted CPD Event. The comments will reflect the course title, date and location.
Operators trained using third-party CPD. Based on the number of renewal applications submitted to the SWOT Program thathave third-party training included as CPD.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COLBY, JAIME
COLBY, JAIME
ALBERT, TARA
ALBERT, TARA
ALBERT, TARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Applications
Reports, Final
Attendees
Attendees
Applications, Certification
30
65
240
1000
400
Lead Person:
COLBY, JAIME
ALBERT, TARA
30233
30232
30229
30230
30231
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 139 of 313
WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT
AUTO SALVAGE YARDS (Current)
A two-phase program to improve environmental practices at motor vehicle salvage yards (MVSYs): Phase I is an education and complianceassistance work effort. Phase II requires yard owners to certify compliance based on an environmental self-audit.10/01/2004
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 140 of 313
WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT
INACTIVE ASBESTOS DISPOSAL SITES (Current)
Management of inactive asbestos disposal sites, primarily located in Hudson and Nashua, pursuant to Env-Sw 2100 and RSA 141-E10/01/2016
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
XFunding: State General State Fees Federal EPA Federal Other Grants
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 141 of 313
WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT
PERMITTING AND DESIGN REVIEW (Current)
Process permit applications and applications for certified waste-derived products. Perform detailed engineering reviews of plans andspecifications for various solid waste facility construction projects, including the closure of unlined landfills. Reviewhydrogeological reports for unlined landfills and new lined landfills. Provide oversight of motor vehicle junkyards. Write and revisethe Solid Waste Rules.10/01/2007
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 02 01
XFunding: State General State Fees Federal EPA Federal Other Grants
Permitting (Current)Activity:
Process solid waste facility permit applications to ensure adequate solid waste disposal capacity and compliace with applicable rules.Description:10/01/2004Start/End Dates: thru
Lead Person: MOORE, TODD
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 142 of 313
WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT
REPORTING & INFORMATION MANAGEMENT (Current)
The Reporting & Information Management Program (RIMS) is responsible for the implementation of all information management functionsrelative to the Resource Conservation and Recovery Act (RCRA) Subtitle C program. Activities include: maintaining the HazWims databaseof Hazardous Waste Generators and updating the EPA RCRA Database (RCRA Info) through data transfer; collecting and processing therequired biennial report to EPA; collection and processing of hazardous waste manifests; management of the hazardous waste fee program;tracking declassification requests; and re-engineering information management to meet the changing business needs of the RCRA program.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 01 00
XFunding: State General XState Fees XFederal EPA Federal Other Grants
Accounts Receivable (Current)
Manifest Data Collection to aid with Biennial Reporting (Current)
Activity:
Activity:
Delinquent accounts as well as the number of letters sent to pursue payments for Hazardous Waste Quarterly Activity Reports.
Collect and process Biennial Report information through manifests and notification forms. Process and compile information and translateto EPA Region 1.
Description:
Description:
10/01/2008
10/02/2001
Start/End Dates:
Start/End Dates:
thru
thru
Delinquent Letters Issued
Collect Data for Biennial Report
Declassification Forms Processed
Notification Forms Processed
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Number of delinquent letters sent for delinquent Hazardous Waste Quarterly Activity Reports.
Number of manifests entered into the database.
Declassification Forms Received & Processed for Hazardous Waste Generators.
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MICHEL, MARIA
MICHEL, MARIA
MICHEL, MARIA
MICHEL, MARIA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Letters
Forms
Forms
Forms
100
7000
25
400
Lead Person:
Lead Person:
MICHEL, MARIA
MICHEL, MARIA
29144
29141
29142
29143
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 143 of 313
WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT
SOLID WASTE COMPLIANCE (Current)
Assure compliance at permitted solid waste facilities through a combination of activities, including facilty inspections, evaluation ofreporting data, technical assistance, operator training and certification, and enforcement action when needed.10/01/2001
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 04 02 01
XFunding: State General State Fees Federal EPA Federal Other Grants
Compliance Assurance Submittals (Current)Activity:
Process compliance submittals by permitted facilities, including financial assurance plans, annual reports, and landfill operations andpost-closure monitoring data.
Description:
10/01/2008Start/End Dates: thru
Financial Assurance Updates
Financial Assurance Updates
Deliverable:
Deliverable:
Closure and/or Post-Closure cost estimates submitted.
Closure and/or Post-Closure cost estimates submitted.
Description:
Description:
10/01/2016
10/01/2017 09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
FILIAU, LAURA
FILIAU, LAURA
Qty/Unit:
Qty/Unit: Submittals9
Lead Person: FILIAU, LAURA
28947
29635
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 144 of 313
WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT
SOLID WASTE OPERATOR TRAINING (Current)
The Solid Waste Operator Training & Certification Program was implemented in 1989 to train any operator working at a permitted SolidWaste Facility. Program activities were not documented until March of 2016, when a Coordinator was hired that was dedicated to theprogram. There are approximately 1,300 operators that work at over 300 facilities in the state. Activities include: Training eventsfor continuing professional development and initial training; Processing renewal and initial application forms; Rulemaking events;Developing education and outreach.01/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Basic Training and Continuing Professional Development (Current)
Development of Education & Outreach (Current)
Processing Renewal and Initial SWOT Certification Applications (Current)
Rulemaking Events (Current)
Activity:
Activity:
Activity:
Activity:
All training events for solid waste operators hosted by the NHDES SWOT Program and the number of attendees at each event.
Tracking development activities for workshops, outreach or informational packages that pertains to Solid Waste Opertor Training Program.
Tracking all applications submitted to the Program and whether they were accepted or rejected for various reasons. Tracking remindersand renewal paperwork.
Tracking all rule amendments or development for the Solid Waste Operator Training Program.
Description:
Description:
Description:
Description:
03/01/2016
03/01/2016
03/01/2016
03/01/2016
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ALBERT, TARA
ALBERT, TARA
ALBERT, TARA
ALBERT, TARA
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 145 of 313
WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT
SOLID WASTE TECHNICAL ASSISTANCE (Current)
The Solid Waste Technical Assistance Section is responsible for planning and technical assistance for solid waste. Planning activitiesinclude the preparation of the State Solid Waste Plan and Annual Legislative Report. Major components of these documents are projectionsof statewide solid waste capacity needs and the development of strategies for achieving the legislative goal of 40% waste reduction. Ofthe many outreach activities offered by the section, the Solid Waste Operator Certification is the most comprehensive, with annualcertification and a variety of workshops provided throughout the year, including the annual solid waste conference.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 05 01 02
XFunding: State General State Fees Federal EPA Federal Other Grants
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 146 of 313
WATER DIVISION ALTERATION OF TERRAIN
ALTERATION OF TERRAIN PROGRAM (Current)
Permitting program for erosion and stormwater controls for projects which cause earth disturbance of greater than 100,000 sq. ft (50,000within Protected Shoreland).10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03
Funding: State General State Fees Federal EPA Federal Other Grants
Permitting (Current)Activity:
Description:10/01/1999Start/End Dates: thru
Applications Reviewed
Amended Permits Issued
Applications Received
Permits issued
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
Vacant
Vacant
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reviews
Amendments
Applications
Permits Issued
175
50
175
170
Lead Person: Vacant
30397
30400
30402
30404
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 147 of 313
WATER DIVISION DAM
DAM BUREAU (Current)
The dam bureau has existed in some form since the late 1930's.10/01/1999
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 03 08
Funding: State General State Fees Federal EPA Federal Other Grants
Annual Dam Registration Fees (Current)
Collection of Fines due to non payment of Annual Dam Registration Fees (Current)
Collection of Fines for not responding within 45 days of a written directive from the department (Current)
Emergency Action Planning for non State owned H & S hazard dams by dam owners (Current)
Activity:
Activity:
Activity:
Activity:
Per RSA 482:8a, Env-Wr 303.01 the Annual Dam Registration fee is collected annually.
Pursuant to ENVC613.02e fines are calculated for nonpayment of ADRF required by 482:8a. Any fines collected are deposited in the DamMaintenance Revolving loan fund per RSA 482:55-a. This was established to provide low interest loans for the maintenance, repair, orreconstruction of privately owned dams.
Pursuant to RSA482:89 V the department shall commence a proceeding against any person who does not respond within 45 days of receipt ofwritten order, directive or any notice of needed maintenance, repair or reconstruction issue by the department. Fines collected aredeposited into the Dam Maintenance Revolving Loan Fund which was established to provide low interest loans for the maintenance, repair,or reconstruction of privately owned dams. 482:55-a
Description:
Description:
Description:
10/01/1999
10/01/2010
10/01/2010
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Annual Dam Registration Fee Invoices Sent
Annual Dam Registration Fees Received
NPF Hearings for unpaid ADRFs
NPFs for unpaid ADRF
Notices of Past Due ADRFs
Dam Maintenance Revolving Fund deposits from not responding in 45 days
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The # of ADRF bills sent by 10/31 per Env-Wr303.01 and RSA 482:8-a
The monies received from ADRF invoices.
The # of Notice of Proposed Fine Hearings for past due Annual Dam Registratin Fees held - Decisions issued
The # of Notice of Proposed Fines issued for past due Annual Dam Registration Fees
The # of second notices for past due Annual Dam Registration Fees issued, Env-Wr 303.01c
The monies deposited in revolving fund during reporting period
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Invoices
Dollars
Hearings
Notices
Invoices
Dollars
456
494200
2
3
30
5000
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
29590
29591
29592
29593
29594
29595
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 148 of 313
WATER DIVISION DAM
DAM BUREAU (Current)
Div/Bur:
Program:
Emergency Action Planning for non State owned H & S hazard dams by dam owners (Current)
Facilitate the Restoration of Rivers (Current)
Permitting the Construction of New Dams and Reconstruction of Existing Dams (Current)
Activity:
Activity:
Activity:
Per Env-wr 500 EAP's are required for significant and high hazard dams.
To facilitate the restoration of rivers and the elimination of safety hazards through selective dam removals.
Per Env-wr 400 any person wishing to construct a dam must submit a permit.
Description:
Description:
Description:
10/01/1999
10/01/2002
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Non State owned Dam EAPs tested
Non State owned Dam EAPs updated
Correspondence requesting funding for dam removal projects
Dam Owners consulted about Dam removal
Dam removal projects completed
Dam removal projects permitted
Authorization to fill
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The # of non state owned Dam EAP have been tested.
The # of non state owned Dam EAPs that have been updated.
The # of official letters/applications/formal emails, etc submitted to river restoration advocates requesting funding fordam removal projects.
The # of Dam owners consulted to assess the feasibility of Dam removal
The # of dam removal projects that have been completed regarding the Dam Safety aspect
The # of dam removal projects that have received permit approvals from ACOE and/or DES for Wetlands (includes Dam Safetyand Cultural Resources)
The # of authorizations to fill issued.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
THOMAS, WILLIAM
THOMAS, WILLIAM
THOMAS, WILLIAM
THOMAS, WILLIAM
BAILLARGEON, NANCY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Tests
EAPs (Emergency Action Plans)
Letters
Dams
Projects
Projects
Dams
40
80
5
5
3
3
4
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
29741
29742
29664
29665
29666
29667
29668
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 149 of 313
WATER DIVISION DAM
DAM BUREAU (Current)
Div/Bur:
Program:
Permitting the Construction of New Dams and Reconstruction of Existing Dams (Current)
Precipitation Events/Emergency Operations Center (Current)
Public Outreach (Current)
Safety Inspections of Non Menace Dams (Current)
Activity:
Activity:
Activity:
Activity:
The Dam Bureau sometimes responds to high precipitation events that are not necessarily considered an emergency situation, however itstill represents a significant allocation of resources to respond to provide services to the residents of the state.
Most staff are involved in various avenues of public outreach, and a public outreach position was created in 2001.
Description:
Description:
10/01/2008
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Dam Permits issued
Permit applications received
Requests for additional information
Number of times the Dam Bureau manned the EOC for flood/disaster events
Number of weather events responded to
Distribution of DES Dam Safety Newsletters or informational emails to dam owners
Outreach events
Training received
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The # of Dam permits issued by the Dam Safety Section
The # of permit applications received by Dam Bureau
The # of letters sent to applicants requesting additional information for review of dam permit applications
The # of times the Dam Bureau manned the Emergency Operations Center for flood/disaster events as called for by others.This represents a major allocation of resources.
The # of weather events responded to. These events may be large storms that do not require EOC activation.
The # of newsletters or informational emails sent to dam owners.
The # of dam related outreach/education events conducted or participated in by staff.
The # of dam related training events attended by staff.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Permits Issued
Applications
Requests
Events
Events
Newsletters
Outreach Activities
Training Sessions
15
15
10
4
4
4
15
35
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
29669
29670
29671
29672
29673
29674
29675
29676
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 150 of 313
WATER DIVISION DAM
DAM BUREAU (Current)
Div/Bur:
Program:
Safety Inspections of Non Menace Dams (Current)
Safety Inspections of Regulated Dams (Current)
Activity:
Activity:
Per Env-wr 302.02 certain non hazard dams are required to be inspected at certain intervals, also non hazard dams are inspected atrequest.
Per Env-Wr 302.02 dams are required to be inspected at certain intervals.
Description:
Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Inspections of NM dams
The # of NOI letters issued for Non Menace dams
The # of Non Menace, non state dams that reconstruction/major repairs are ongoing
The # of Non Menace, non state dams that reconstruction/major repairs have been completed
The # of newly constructed Non Menace Dams
Hazard Classification Changes
Hazardous, non state owned, dams that reconstruction is ongoing but not completed
Hazardous, non state owned, dams that reconstruction/major repairs have been completed.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The # of inspections of Non Menace, non state owned dams as requested or required
The # of NOI letters issued to Non Menace, non state owned Dam owners
The # of Non Menace, non state owned dams where reconstruction/major repairs, due to hydraulic or structuraldeficiencies, is ongoing but not complete.
The # of Non Menace, non state owned dams that have had reconstruction/major repairs, due to hydraulic or structuraldeficiencies, completed.
The # of Non Menace, non state owned, newly constructed, not reconstructed, dams
The # of dams that had hazard classification changes.
The # of hazardous, non state owned dams that have reconstruction/major repairs, due to hydraulic or structuraldeficiencies, is ongoing but not completed.
The # of hazardous, non state owned dams that reconstruction/major repairs, due to hydraulic or sturctural deficiences,has been completed.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Letters
Dams
Dams
Dams
Dams
Dams
Dams
15
5
5
5
5
6
5
5
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
29677
29680
29678
29679
29683
29684
29685
29686
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 151 of 313
WATER DIVISION DAM
DAM BUREAU (Current)
Div/Bur:
Program:
Safety Inspections of Regulated Dams (Current)
Special Projects (Current)
Activity:
Activity:
The Dam Bureau is assigned various special projects, including but not limited to Lake Level Investigations, Natural Mean High Water Markdeterminations, contracts (and amendments) with consultants/others, MOU's with municipalities/other agencies and other special projectsthat vary in complexity.
Description:
07/31/2008Start/End Dates: thru
Inspection reports completed for H, S or L hazard dams
Inspections completed per year for H, S or L hazard dams
Newly constructed hazardous dams
Number of AOs issued for H, S or L hazard dams
Number of Dam failures, breaches or incidents
Number of LODs issued for H, S or L hazard dams
Number of MODs issued for State owned H, S or L hazard dams
Number of NOIs issued for H, S & L hazard dams
Number of G&C and fiscal requests submitted
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The # of inspection reports or memos completed for H, S & L hazard dams.
The # of inspections of hazardous dams. By law the Dam Bureau is required to inspect the hazardous dams on a particularinterval dependant upon classification.
The # of newly constructed, not reconstructed, hazardous dams.
The # of Administrative Orders issued for hazardous dams.
The # and basic information regarding dam failures, breaches or incidents.
The # of Letters of Deficiency issued for hazardous dams.
The # of Memos of Definciency issued for state owned hazardous dams.
The # of Notice Of Inspections issued for hazardous dams.
The # of G&C and fiscal requests submitted related to dam projects.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Inspections
Dams
Administrative Orders
Dams
LODs (Letters of Deficiency)
Memos
Notices
Requests
150
153
2
2
3
100
15
20
10
Lead Person: BAILLARGEON, NANCY
29687
29688
29689
29690
30246
29691
29693
29695
29697
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 152 of 313
WATER DIVISION DAM
DAM BUREAU (Current)
Div/Bur:
Program:
Special Projects (Current)Activity:
Number of Lake Level Investigations assigned
Number of Lake Level Investigations completed
Number of NMHWM determinations assigned
Number of NMHWM determinations completed
Number of other special projects assigned
Number of special projects completed
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The # of of Lake Level Investigations assigned, Env-Wr 102.
The # of Lake Level Investigations completed, Env-Wr 102.
The # of Natural Mean High Water Marks determinations assigned, Env-Wr 102.
The # of Natural Mean High Water Marks determinations completed, Env-Wr 102.
The # of other special projects assigned.
The # of special projects completed.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Investigations
Investigations
Determinations
Determinations
Projects
Projects
1
1
1
1
4
4
29698
29699
29701
29702
29704
29705
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 153 of 313
WATER DIVISION DAM
OPERATION AND MAINTENANCE OF STATE-OWNED DAMS (Current)
The maintanence section operates and maintains the DES owned dams, and as of June 2001 maintains the NH F&G dams.10/01/1999
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 03 08
Funding: State General State Fees Federal EPA Federal Other Grants
Collection of Hydrologic Data (Current)
Emergency Action Planning for State owned H & S hazard dams (Current)
Maintenance of State-Owned Dams (Current)
Activity:
Activity:
Activity:
To assist in operation the state owned dams 35 gauging and weather stations are placed.
Per Env-Wr 500 EAP's are required for high and significant hazard dams.
To ensure the safety of dams in the state.
Description:
Description:
Description:
10/01/2008
10/01/2010
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Number of station maintained
Number of stations added
State owned EAPs tested
State owned EAPs updated
DES dams that reconstruction/major repairs are ongoing
DES dams that reconstruction/major repairs have been completed
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The # of gauging or weather stations that the Dam Bureau operated and maintained.
The # of gauging or weather stations that the Dam Bureau added.
The # of state owned EAP's that have been tested.
The # of state owned EAPs that were reviewed and/or updated.
The # of DES dams where reconstruction/major repairs, due to hydraulic or structural deficiencies, is ongoing but notcompleted.
The # of DES dams that have had reconstruction/major repairs, due to hydraulic or structural deficiencies, completed.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Stations
Stations
Tests
EAPs (Emergency Action Plans)
Dams
Dams
35
3
25
20
3
3
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
29596
29597
29598
29599
29713
29715
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 154 of 313
WATER DIVISION DAM
OPERATION AND MAINTENANCE OF STATE-OWNED DAMS (Current)
Div/Bur:
Program:
Maintenance of State-Owned Dams (Current)
Operation of DES-Owned Dams (Current)
Activity:
Activity:
To operate the DES owned dams.Description:10/01/1999Start/End Dates: thru
F&G dams that reconstruction/major repairs are ongoing
F&G dams that reconstruction/major repairs have been completed
Maintain the NH Fish & Game Dams
Other State Agency dams that reconstruction/major repairs have been completed
Other state dams where reconstruction/major repairs are ongoing
Number of dams upgraded for automation
Operation & maintenance of DES dams
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The # of F&G dams where reconstruction/major repairs, due to hydraulic or structural deficiencies, is ongoing but notcompleted.
The # of F&G dams that have had reconstruction/major repairs, due to hydraulic or structural deficiencies, completed.
The # of maintenance projects conducted per a MOA with NH F&G in 07/2001> The dam maintenance section mantains the F&Gdams. This includes adressing minor deficiencies such as tree cutting.
The # of state agency dams, other than DES & F&G, that have had reconstruction/major repairs, due to hydraulic orstructural deficiencies, completed.
The # of state agency dams, other than DES & F&G, where reconstruction/major repairs, due to hydraulic or structuraldeficiencies, is ongoing but not completed.
The # of NHDES dams that have been upgraded to accommodate some level of automation
Operation & maintenance of all NHDES-owned dams including control of flows, water levels, maintenance of outlet works andspillways, vegetation control on earthen embankments and other minor deficiencies.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Dams
Dams
Dams
Dams
Dams
Dams
Dams
2
2
15
1
1
1
20
Lead Person: BAILLARGEON, NANCY
29717
29719
29722
29724
29727
29728
29729
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 155 of 313
WATER DIVISION DAM
PROPERTY MANAGEMENT (DAMS) (Current)
The bureau manages properties at or around numerous dams in the state.10/01/1999
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Hydropower Leases (Current)
Lot Leases (Current)
Water User Contracts (Current)
Activity:
Activity:
Activity:
Execution and management of Hydropower Leases on DES owned dams
Execution and management of Lot Leases on DES owned property
Execution and management of Water User Contracts on DES owned dams
Description:
Description:
Description:
10/01/1999
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Number of hydro facilities with revenue received
Revenue received from hydro leases
Number of lot licenses with revenue received
Revenue recd from lot leases
Number of existing contracts current
Revenue Received from water user contracts
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
actual number of hydros who responded to billing with payment
Monies received as a result of billing
Number of lot licenses with revenue received
actual revenue received under lot licensing program
Number of existing water user contracts that are reestablished (supposed to be done periodically)
Monies received as a result of billing
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Facilities/Companies
Dollars
Invoices
Dollars
Contracts
Dollars
12
75000
80
30000
25
600000
Lead Person:
Lead Person:
Lead Person:
BAILLARGEON, NANCY
BAILLARGEON, NANCY
BAILLARGEON, NANCY
29730
29731
29736
29737
29738
29739
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 156 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
ENFORCEMENT AND RULES (Current)
Formerly Monitoring Program.10/01/2010
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Enforcement (Current)
Primacy (Current)
Activity:
Activity:
Primacy is the formal designation of DES' drinking water program as the lead agency for US EPA's Safe Drinking Water Act (SDWA).NOTE: Lead Person changed from S. Makofsky to B. Lucey effective 1/03; Lead changed from B. Lucey to K. McManus Fall 2005 and toH.Green July 2006.
Description:
Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Enforcement action totals
Enforcement action totals
Formal Enforcement Actions to Address EPA ETT list
Formal Enforcement Actions to Address EPA ETT list
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The Enforcement program issues enforcement documents, enforcing Federal and NH DES DWGB rules (Consumer ConfidenceReports, Permit-to-Operate, Groundwater Discharge Permitting, Well Siting, Source Capacity, Sanitary Surveys, WaterConservation, Water Well Program, Water Use Registration and Reporting, etc.) and are processed and tracked by thissection. Note that monitoring staff sends MCL and M/R LoDs. Quantity is estimate based on prior years enforcementactions totaling # of LODs, AOs, AFs issued and Referrals to the NHAGO. Because requirements for the Revised TotalColiform Rule have been changed, the Quantity estimate for FFY 2015 were lowered from 175 to 125. Otherwise, this hasbeen copied forward with some edits as this is ongoing work.
The Enforcement program issues enforcement documents, enforcing Federal and NH DES DWGB rules (Consumer ConfidenceReports, Permit-to-Operate, Groundwater Discharge Permitting, Well Siting, Source Capacity, Sanitary Surveys, WaterConservation, Water Well Program, Water Use Registration and Reporting, etc.) and are processed and tracked by thissection. Note that monitoring staff sends MCL and M/R LoDs. Quantity is estimate based on prior years enforcementactions totaling # of LODs, AOs, AFs issued and Referrals to the NHAGO. Because requirements for the Revised TotalColiform Rule have been changed, the Quantity estimate for FFY 2015 were lowered from 175 to 125. Otherwise, this hasbeen copied forward with some edits as this is ongoing work.
Percentage of systems on the quarterly EPA Enforcement Tracking Tool list (ETT list) which are being addressed/broughtback into compliance through the issuance of enforcement actions as specified in the DES Compliance Assurance ResponsePolicy (i.e. systems with greater than or equal to 11 ETT points)
Percentage of systems on the quarterly EPA Enforcement Tracking Tool list (ETT list) which are being addressed/broughtback into compliance through the issuance of enforcement actions as specified in the DES Compliance Assurance ResponsePolicy (i.e. systems with greater than or equal to 11 ETT points)
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
JONES, EMILY
JONES, EMILY
JONES, EMILY
JONES, EMILY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Enforcement Actions
Enforcement Actions
Percent
Percent
125
125
90
90
Lead Person:
Lead Person:
JONES, EMILY
GREEN, HOLLY
29206
30469
29207
29583
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 157 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
ENFORCEMENT AND RULES (Current)
Div/Bur:
Program:
Primacy (Current)
Rules (Current)
Activity:
Activity:
Rulemaking effort for the entire Bureau changed from S. Makofsky to Karla McManus effective 6/05. Changed to Holly Green 7/06. ACTIVITYformerly Rulemaking under OTHER program (10/1/10)
Description:
10/01/1999Start/End Dates: thru
Obtain Primacy for IESWTR
Complete Primacy Package for Lead Copper and Public Notice
Obtain Primacy for GW Rule
Obtain primacy for Arsenic
Obtain primacy for Long Term 2 and Stage 2 DBP Rules
Obtain primacy for Radionuclide Rule
Obtain primacy for Revised Total Coliform Rule
Arsenic , rads and Shortterm LCR Implementation
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
END DATE EXTENDED FROM 9/30/16. Interim Enhanced Surface Water Treatment Rule (Env-Ws 380) adopted 8/21/02NOTE: Lead person changed from S. Makofsky to B. Lucey effective 1/03> END DATE EXTENDED FROM 09/30/04.
END DATE EXTENDED FROM 09/30/04. END DATE EXTENDED FROM 9/30/15. EPA approved NH for 1991 Original Lead and Copper Ruleand Lead and Copper MInor Rwvisions, but not yet for Lead and Copper Short Term Revisions.
Extension for application submittal granted by EPA until 11/8/2010. END DATE EXTENDED FROM 9/30/10. END DATE EXTENDEDFROM 9/30/2015.
Arsenic MCL change - State rule adopted 2/02NOTE: Lead person changed from S. Makofsky to B. Lucey effective 1/03. END DATE EXTENDED FROM 09/30/04. END DATEEXTENDED FROM 9/30/2015
Long Term 2 Surface Water Rule and Stage 2 Disinfectant By-Product Rule. END DATE EXTENDED FROM 9/30/10. END DATEEXTENDED FROM 9/30/2015.
END DATE EXTENDED FROM 09/30/04. END DATE EXTENDED FROM 9/30/2015
Application due in 2015.
Implementation in accordance with EPA expectations (P&C List)
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2015
10/01/2003
10/01/2007
10/01/2002
10/01/2009
10/01/2002
10/01/2015
10/01/2017
09/30/2019
09/30/2019
09/30/2019
09/30/2019
09/30/2019
09/30/2019
09/30/2019
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
PILLSBURY, SARAH
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Approvals
Approvals
Approvals
Approvals
Approvals
Approvals
Approvals
Percent
1
1
1
1
1
1
1
100
Lead Person: GREEN, HOLLY
26892
9997
17413
7128
19545
8248
26940
29580
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 158 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
ENFORCEMENT AND RULES (Current)
Div/Bur:
Program:
Rules (Current)Activity:
Env-C 602 Fines Relating to Public Drinking Water Supplies
Env-Dw 1002 Water Supply Land Protection Grant Program
Env-Dw 1100 Drinking Water State Revolving Loan Fund
Env-Dw 1200 Privately Owned Redistribution Systems (PORS)
Env-Dw 304 Emergency Bulk Water for Public Water Supplies
Env-Dw 401-407 Design Standards for Public Water Systems
Env-Dw 701-706 Drinknig Water Standards
Env-Dw 707, 708, 710 - 713, & 719 Sampling, Monitoring & Reporting
Env-Dw 715 and Env-Dw 716 Disinfection By-Products, Filtration, Disinfectant and Waste Recycling
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Env-C 602 needs to be re-adopted and amended as needed - will expire 2/24/08. End date extended due to being part oflarger Admin Fine Rules package stalled in Legal Unit. END DATE EXTENDED TO 12/31/17. Env-C 620 - 626 has been added.
Rules expired 6/23/17, but existing rules were extended since Initial Proposal was filed before rules expired. FinalProposal must be filed within 150 days of 6/29/17, the date notice was published in the NH Rulemaking Register.
Env-Dw 1100 needs to be amended to address the findings of a single audit conducted in 2015.
Existing rules will expire on 2/24/18. Initial Proposal to readopt Env-Dw 1200 will need to be filed by 2/24/18 in orderto keep these rules from expiring. Final Proposal must be filed within 150 days of Rulemaking Notice publication.
Rules expire 10/23/2017.
Rules will be substantially revised. End date has been extended to 12/31/2019 due to heavy workload in Legal Unit.
Existing rules will expire on 5/1/18. Initial Proposal to readopt Env-Dw 701 - 706 will need to be filed by 2/24/18 inorder to keep these rules from expiring. Final Proposal must be filed within 150 days of Rulemaking Notice publication.
Existing rules will expire on 5/1/18. Initial Proposal to readopt Env-Dw 707, 708, 710 - 713, & 719 will need to be filedby 5/1/18 in order to keep these rules from expiring. Final Proposal must be filed within 150 days of Rulemaking Noticepublication.
Rules expire 1/10/2018. If Inital Proposal is filed prior to this date, exisitng rules will be extended.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
07/01/2007
01/01/2016
04/01/2017
07/01/2017
07/01/2016
07/01/2014
07/01/2017
07/01/2017
07/01/2016
12/31/2018
12/31/2018
12/31/2019
12/31/2018
12/31/2017
12/31/2019
12/31/2018
12/31/2018
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Rules
Rules
Rules
Rules
Rules
Rules
Rules
Rules
Rules
1
1
1
1
1
1
1
1
1
15461
28027
29629
29621
28175
25576
29626
29622
28177
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 159 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
ENFORCEMENT AND RULES (Current)
Div/Bur:
Program:
Rules (Current)Activity:
Env-Dw 717 Groundwater Monitoring and Treatment
Env-Dw 800 Public Notification
Env-Wq 402.24 & 402.25 amendments
Env-Wq 403 Large Groundwater Withdrawals
Env-Wq 404 Underground Injection Control
Env-Wq 405 Geothermal System Rules
Env-Wq 900 Youth Recreational Camps
Various parts of Subtitle Env-Dw - Drinking Water Primacy Amendments
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Rules expire 11/21/2017. If Inital Proposal is filed prior to this date, exisint rule will be extended.
Existing rules will expire on 6/30/18. Initial Proposal to readopt Env-Dw 800 will need to be filed by 5/1/18 in order tokeep these rules from expiring. Final Proposal must be filed within 150 days of Rulemaking Notice publication.
Revise Env-Wq 402.24 & 402.25 to align the Groundwater Discharge rules with the new value for 1,4-dioxane at Env-Or602.02 Ambient Groundwater Quality Standards (AGQS).
Rules expire 10/17/2017.
Existing rules will expire on 12/23/18. Initial Proposal to readopt Env-Wq 404 will need to be filed by 12/23/18 in orderto keep Env-Dw 1200 from expiring. Final Proposal must be filed within 150 days of Rulemaking Notice publication.
New rules. END DATE HAS BEEN EXTENDED TO 12/31/19 due to draft rules being stalled in the Legal Unit.
Exisiting rules were to expire 3/12/2017, but were extended, since Inital Propoal was filed with olS prior that date.Final Proposal must be filed within 150 days of date notice was published in the NH Rulemaking Register.
NH needs to adopt revsiions to drinking water rules to maintain base primacy and obtain primacy for the federal Lead andCopper Rule and the Revised Total Coliform Rule.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
07/01/2016
07/01/2017
09/01/2017
07/01/2016
10/01/2017
01/01/2011
01/01/2016
01/01/2016
12/31/2018
12/31/2018
09/30/2018
12/31/2017
09/30/2019
12/31/2019
09/30/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
GREEN, HOLLY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Rules
Rules
Rules
Rules
Rules
Rules
Rules
Rules
1
1
1
1
1
1
1
1
28176
29623
30005
28174
29625
22454
28024
28189
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 160 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
ENGINEERING/SURVEY/OPERATIONS (Current)
10/01/2010
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Capacity Development (Current)
Cross connection control program activities (Current)
Develop SOPS for programs (Current)
Engineering Reviews (Current)
Activity:
Activity:
Activity:
Activity:
Technical assistance including Asset Management, New system outreach, Site visits / Capacity Meetings and Bucket list tracking
Develop SIPs for operator certification, Drinking Water State Revolving loan program, sanitary surveys and other programs
Description:
Description:
Description:
Description:
07/01/2010
10/01/2010
10/01/2010
10/01/2010
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Asset Management Grants & Technical Assistance
SFY 2018 New capacity development candidates
SFY 2018 Site visits to systems in need of capdev assistance
SFY 2018 Transient system outreach - new system site visits
SOPS for Drinking Water State Revolving Program
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide asset management grants and technical assistance to CWS.
Four quarters of SFY 18
DWGB technical staff, 2T and CM site visit codes. (See separate deliverable New N system visits)
One-on-one visits (by Tech staff Allyson Gourley) to deliver new system Welcome Packet and educate new owners regardingtheir SDWA responsibilities.
Description:
Description:
Description:
Description:
Description:
10/01/2017
07/01/2017
07/01/2017
07/01/2017
10/01/2017
09/30/2018
06/30/2018
06/30/2018
06/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCKENNA, JOHNNA
FROST, SHELLEY
FROST, SHELLEY
FROST, SHELLEY
MCKENNA, JOHNNA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Grants
Systems
Site Visits
Site Visits
SOPs (Standard Operating Procedures)
10
20
65
15
2
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FROST, SHELLEY
PELHAM, ANCEL
SKARINKA, RICHARD
SKARINKA, RICHARD
29456
29570
29545
29569
29453
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 161 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
ENGINEERING/SURVEY/OPERATIONS (Current)
Div/Bur:
Program:
Engineering Reviews (Current)
Lead and Copper Program (Current)
Operations (Current)
Private Well Strategy (Current)
Activity:
Activity:
Activity:
Activity:
OCCTR approvals and other metrics
Activities supporting implementation of private well strategy ESS-PP&A.
Description:
Description:
Description:
10/01/2010
10/01/2010
11/01/2000
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Large system approvals for modifications / upgrades / expansions
SFY 2018 New small water system approvals
SFY 2019 New small water system approvals
Optimum Corrosion Control Reports
Operator Certification Program Implementation Report to EPA
Answer Inquiries From Private Well Owners
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Design review preliminary plans, eng reports, plans and specs for large water system improvements to addressinfractructure upgrades and meet water quality standards.
Review reports, plans and specifications, etc. for NEW community and non-community small public water systems. Projecttypes C,E,F. Includes exist system Registrations.
Review reports, plans and specifications, etc. for NEW community and non-community small public water systems. Projecttypes C,E,F. Includes exist system Registrations.
Number of OCCTR approvals - correspondence tracking CZ request code
Certification letter from EPA regarding op cert program in NH
Logged inquiries to DWGB Technical StaffH_ESS\Programs\Private Well InquiriesSee also Be Well Informed measures tracking under Planning, Protection
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
07/01/2017
07/01/2018
07/01/2017
10/01/2017
10/01/2017
09/30/2019
06/30/2018
06/30/2019
06/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SKARINKA, RICHARD
FROST, SHELLEY
FROST, SHELLEY
KLEVENS, CYNTHIA
PELHAM, ANCEL
FROST, SHELLEY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Design Reviews
Systems
Systems
Reports, Final
Reports, Final
Inquiries
40
20
20
20
1
400
Lead Person:
Lead Person:
Lead Person:
KLEVENS, CYNTHIA
SKARINKA, RICHARD
FROST, SHELLEY
29572
29571
29601
29577
29588
29573
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 162 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
ENGINEERING/SURVEY/OPERATIONS (Current)
Div/Bur:
Program:
Private Well Strategy (Current)
State Revolving Fund (SRF) (Current)
Surveys (Current)
Activity:
Activity:
Activity:
Number of small (<500 pop), medium (500-1500 pop) and large (>1000 pop) system sanitary surveys of public water systems. Also siteinvestigations (2I), outreach inspections to Fairs, and Electronic Survey activities.
Description:
Description:
10/01/2010
10/01/2010
Start/End Dates:
Start/End Dates:
thru
thru
Answer Inquiries From Private Well Owners
Annual Intended Use Plan
Monthly payments for public water systems - State Aid Grant Program
SFY 2018 Investigations/Complaints all public water systems
SFY 2019 Investigations/Complaints all public water systsems
Sanitary Surveys for large systems
Sanitary Surveys for large systems
Small system surveys CY 2017
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Logged inquiries to DWGB Technical StaffH_ESS\Programs\Private Well Inquiries
Office and on-site investigations / complaints tracked as "2I" site visits by ESS staff in FY 2015.
Office and on-site investigations / complaints tracked as "2I" site visits by ESS staff in FY 2015.
Complete sanitary surveys and deliver checklist to large community water systems within a month of survey
Complete sanitary surveys and deliver checklist to large community water systems within a month of survey
33% of systems serving up to 1000 population - C, P and N
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2017
07/01/2017
07/01/2018
10/01/2017
10/01/2018
01/01/2017
09/30/2019
09/30/2018
09/30/2018
06/30/2018
06/30/2019
09/30/2018
09/30/2019
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FROST, SHELLEY
MCKENNA, JOHNNA
SKARINKA, RICHARD
FROST, SHELLEY
FROST, SHELLEY
SKARINKA, RICHARD
SKARINKA, RICHARD
FROST, SHELLEY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inquiries
Plans
Percent
Complaints
Complaints
Systems
Surveys
Surveys
400
1
47
50
75
50
50
519
Lead Person:
Lead Person:
MCKENNA, JOHNNA
SKARINKA, RICHARD
29586
29454
29587
29574
29603
29575
29584
27517
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 163 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
ENGINEERING/SURVEY/OPERATIONS (Current)
Div/Bur:
Program:
Surveys (Current)Activity:
Small system surveys CY 2018
Small system surveys CY 2018
Small system surveys CY 2019
Transient surveys CY 2017
Transient surveys CY 2018
Transient surveys CY 2019
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
33% of systems serving up to 1000 population - C, P and N
33% of systems serving up to 1000 population - C, P and N
33% of systems serving up to 1000 population - C, P and N
Additional deliverable requested by EPA for tracking all transients. This deliverable includes surveys also reportedunder Small System surveys.
Additional deliverable requested by EPA for tracking all transients. This deliverable includes surveys also reportedunder Small System surveys.
Additional deliverable requested by EPA for tracking all transients. This deliverable includes surveys also reportedunder Small System surveys.
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
01/01/2018
01/01/2019
01/01/2017
01/01/2018
01/01/2019
12/31/2018
12/31/2018
12/31/2019
12/31/2017
12/31/2018
12/31/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FROST, SHELLEY
FROST, SHELLEY
FROST, SHELLEY
FROST, SHELLEY
FROST, SHELLEY
FROST, SHELLEY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Surveys
Surveys
Surveys
Surveys
Surveys
Surveys
639
600
600
169
193
193
29576
29585
29602
29578
29579
29604
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 164 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
HYDROGEOLOGY/CONSERVATION/WATER USE (Current)
10/01/2010
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Groundwater Permitting (Current)Activity:
Description:10/01/2010Start/End Dates: thru
New Small Community Well Sitings
Bottled Water Source Siting
Close 100% of discovered floordrains and complete all reporting
Close 100% of discovered floordrains and complete all reporting
New Large Community Well Sitings
Number of Groundwater Discharge Permit Submittals Reviewed
Number of Groundwater Discharge Permits Issued
Number of Groundwater Discharge Registrations Reviewed or Issued
Number of Groundwater Discharge Registrations Reviewed or Issued
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Includes new permits and reissuance of permits at end of 5 year permit cycle.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2019
09/30/2019
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ROY, STEPHEN
ROY, STEPHEN
KERNEN, BRANDON
KERNEN, BRANDON
ROY, STEPHEN
ROY, STEPHEN
ROY, STEPHEN
ROY, STEPHEN
ROY, STEPHEN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Approvals
Permits Reviewed
Percent
Percent
Permits Issued
Submittals
Permits Issued
Registrations
Percent
20
1
100
100
6
350
200
100
100
Lead Person: KERNEN, BRANDON
29200
29205
28159
29197
29201
29202
29199
29198
28158
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 165 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
HYDROGEOLOGY/CONSERVATION/WATER USE (Current)
Div/Bur:
Program:
Groundwater Permitting (Current)
Hydrogeology (Current)
PPCP Coordination (Current)
Water Conservation (Current)
Activity:
Activity:
Activity:
Activity:
RSA 485:61; Env-Wq 2101
Description:
Description:
Description:
10/01/2010
09/01/2008
07/12/2002
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Submittals Associated with Proposed Water Withdrawals Reviewed and Responded to
Assess Radiation Exposure at Pump Houses Removing Radionuclides from Drinking Water
Maintain Water Level Monitoring Network
Participate in NEIWPCC Emerging Contaminant Workgroup
Compliance
Field Inspections
Leak Detection Contract
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Includes Large Withdrawals, Bottled Water Withdrawals and Community Water Systems
Track compliance with water conservation. This deliverable will track all enforcement actions although even if related tothe same facility/enforcement case (i.e. warning, NOV, LOD). This is done to accurately track the workload of enforcementactions.
Perform inspections with facilties that have approved water conservation plans. Success may be gauged by the number ofinspections performed.
Execute contract with a professional leak detection firm to complete surveys at community water systems in New Hampshire.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ROY, STEPHEN
KERNEN, BRANDON
KERNEN, BRANDON
KERNEN, BRANDON
HERBOLD, STACEY
HERBOLD, STACEY
HERBOLD, STACEY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Submittals
Sites
Projects
Workgroups
Enforcement Actions
Inspections
Contracts
100
20
1
1
10
15
1
Lead Person:
Lead Person:
Lead Person:
KERNEN, BRANDON
KERNEN, BRANDON
HERBOLD, STACEY
29203
29219
29220
29221
29440
29441
29442
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 166 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
HYDROGEOLOGY/CONSERVATION/WATER USE (Current)
Div/Bur:
Program:
Water Conservation (Current)
Water Use (Current)
Water Well Board (Current)
Activity:
Activity:
Activity:
Formerly "Water Use Registration and Reporting" (09/30/10)RSA 488; Env-Wq 2102
RSA 482-B
Description:
Description:
01/01/2006
01/01/1984
Start/End Dates:
Start/End Dates:
thru
thru
Plans Reviewed
WaterSense
Field Inspections
New Registrations
Water Use Compliance
Water Use Compliance
Inspect New Wells
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Track number of water conservation plans reviewed in accordance with Env-Wq 2101. The number of plans that will bereviewed is unknown. Previous deliverable emphasized "approved" plans, while this deliverable considers the total numberof plans reviewed to more accurately quantify the workload.
Promote the WaterSense program. Track number of outreach activities performed.
Perform field inspections to ensure the requirements of RSA 488 & Env-Wq 2102 are being satisfied. There are currently762 facilieis. In order to achieve a 5 year rotating schedule, 151 facilities should be visited annually.
Pursue facilities that are using in excess of 20,000 gallons / day and are not registered with the program. Success willbe gauged by the number of new registrations received.
Ensure registered water users are complying with the reporting requirements. Requirements include registration, datareporting and measurement accuracy. Success may be partially gauged by the number of enforcement documents that are sentto registered water users.
Ensure registered water users are complying with the reporting requirements. Requirements include registration, datareporting and measurement accuracy. Success may be partially gauged by the number of enforcement documents that are sentto registered water users.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2016
10/02/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
HERBOLD, STACEY
HERBOLD, STACEY
HERBOLD, STACEY
HERBOLD, STACEY
HERBOLD, STACEY
HERBOLD, STACEY
KERNEN, BRANDON
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Plans
Activities
Inspections
Registrations
Violations
Violations
Wells
30
2
50
15
50
15
20
Lead Person:
Lead Person:
HERBOLD, STACEY
KERNEN, BRANDON
29443
29444
29446
29447
28539
29448
28500
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 167 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
HYDROGEOLOGY/CONSERVATION/WATER USE (Current)
Div/Bur:
Program:
Water Well Board (Current)Activity:
Number of Consumer Complaints Regarding Wells and Pumps Addressed
Number of Wells Constructed and Reported to the State
Deliverable:
Deliverable:
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
Vacant
Vacant
Qty/Unit:
Qty/Unit:
Complaints
Wells
10
1200
29222
29223
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 168 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
INFORMATION MANAGEMENT (Current)
Formerly Data Management Activity under PWSS.10/01/1999
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Database Improvements (Current)Activity:
Formerly Data Management B4 09/30/2010Description:10/01/1999Start/End Dates: thru
Complete transition from COGNOS to SSRS
Convert DWGB Access Databases to .Net
Convert DWGB Access Databases to .Net
Convert DWGB Oracle Databases to .Net
Document Management Pilot
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
COGNOS software is being retired, department-wide, by the end of 2017. All reports created and run in COGNOS will need tobe converted to SSRS. Although COGNOS will not be available in 2018, there are over 400 reports to be converted whichwill extend will into 2018.
Extended from ConversionDWGB access databases which link to DWGB Oracle form front ends need to be converted to .Net. This requirement wasaddressed in the business requirements document for the conversion. The Source Water Assessment Program (SWAP) is themost critical as it has federal reporting requirements.1) SWAP2) Grants3) Complaints
Extended from ConversionDWGB access databases which link to DWGB Oracle form front ends need to be converted to .Net. This requirement wasaddressed in the business requirements document for the conversion. The Source Water Assessment Program (SWAP) is themost critical as it has federal reporting requirements.
Extended from 24060 , 27352, and 28210 and now includes a third databaseThere are 3 DWGB database that still need to be converted from Oracle Forms to .Net.Previous plan was to prepare RFB for 2 of the projects, however now the remaining three will be completed as follows: 1.Water Use (Bob Leighton and Pam Kilburn) 2. Water Well Complaints (My License Online or Bob Leighton) 3. Water WellLicensing (My License Online or Bob Leighton)
Develop a pilot for electronic filing DWGB documents and a draft Bureau-wide SOP. Document Management "ITEMS" wasdeveloped as a part of the "WSEB" database conversion.This is a continuation of Deliverable 16013 Extended from 2016 to 2017.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2016
10/01/2018
10/01/2017
10/01/2015
09/30/2018
09/30/2018
09/30/2019
09/30/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DUNBAR, CHRISTOPHER
DUNBAR, CHRISTOPHER
DUNBAR, CHRISTOPHER
DUNBAR, CHRISTOPHER
MURPHY, KAITLIN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Databases
Databases
Databases
Pilot Programs
480
3
3
3
1
Lead Person: DUNBAR, CHRISTOPHER
29491
28376
29452
28375
27351
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 169 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
INFORMATION MANAGEMENT (Current)
Div/Bur:
Program:
Database Improvements (Current)Activity:
Hybrid PWS System to Track Interfacing Applications not in SDWIS PRIME
Implement Digital Document Management System
New Applications Needed to Track New or Revised Rules
SDWIS PRIME Migration and Hybrid PWS Database for Excluded Applications
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Continuation of 24069. SDWIS Prime is the database EPA is building for primacy agencies to use to track, regulate andreport PWS information. DWGB has its own "PWS" database, WSEB/Drinking Water, which has functionality that will not beavailable in SDWIS Prime. These applications, which are dependent on PWS data, and will be referred to the Hybridapplications or Hybrid PWS System.The Hybrid will also bridge required federal data that is not yet available in SDWIS Prime and is under development byDWGB. Includes: DBP (continued-new), Sites and Facilities (continued-new), Complaints (new), Cert Op (conversion), AccLabs (conversion), Water Use, Well Completion, etc.
Transition DWGB staff to using a digital document management system for bureau documents. The transition will include aninitial pilot process and the finalization of a bureau-wide SOP.A continuation of Deliverable 27351.
As a result of new state legislation and federal requirements the following need to be addressed:1.) Youth-Skill Camps, (Tracked on Spreadsheet)2.) Facility (Carry forward 28567)
SDWIS PRIME is the database EPA is building for primacy agencies to use to track, regulate and report PWS information.DWGB has its own "PWS" database, WSEB, which has functionality that will not be available in Next Gen. Theseapplications, which are dependent on PWS data, must be converted to .Net and will be referred to the Hybridapplications.Project considered complete when: CMDP, SDWIS PRIME, and DWGB Hybrid are in Production. **Hybrid specifics are inDeliverable #24069. Steps to acheive the above:a. Submit SOWRFP to EPA for Transition/Data Mirgration Projectb. Site Visit with Vendor/Draft Transition Planc. Become involved with User Acceptance Testing for Prime (Jan 2017)d. Map Data from NH WSEB/Warehouse to SDWISe. Build/Test Data Synchronization EngineEND DATE EXTENDED FROM 09/30/2017 **based on EPA expected rollout date
Description:
Description:
Description:
Description:
10/01/2016
10/01/2017
01/01/2017
10/01/2015
12/31/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DUNBAR, CHRISTOPHER
MURPHY, KAITLIN
DUNBAR, CHRISTOPHER
GREENOUGH, CAROLYN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Databases
Filing System
Tracking Systems
Data Management Systems
10
1
2
3
28567
30437
29455
24067
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 170 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
INFORMATION MANAGEMENT (Current)
Div/Bur:
Program:
Database Improvements (Current)
P&C List Misc. (Current)
Reporting (Current)
Activity:
Activity:
Activity:
Description:
Description:
10/01/2017
10/01/2010
09/30/2019Start/End Dates:
Start/End Dates:
thru
thru
SDWIS PRIME Migration and Hybrid PWS Database for Excluded Applications
nForms Part 2.1
Participate in Program reviews
2017 Annual Compliance Report
2018 Annual Compliance Report
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
SDWIS PRIME is the database EPA is building for primacy agencies to use to track, regulate and report PWS information.DWGB has its own "PWS" database, WSEB, which has functionality that will not be available in Next Gen. Theseapplications, which are dependent on PWS data, must be converted to .Net and will be referred to the Hybridapplications.Project considered complete when: CMDP, SDWIS PRIME, and DWGB Hybrid are in Production. **Hybrid specifics are inDeliverable #24069. Steps to acheive the above:a. Submit SOWRFP to EPA for Transition/Data Mirgration Projectb. Site Visit with Vendor/Draft Transition Planc. Become involved with User Acceptance Testing for Prime (Jan 2017)d. Map Data from NH WSEB/Warehouse to SDWISe. Build/Test Data Synchronization EngineEND DATE EXTENDED FROM 09/30/2017 **based on EPA expected rollout date
Ensure DWGB Web Techs are trained to manage DWGB website content including that described in SOP 112 Website UpdateProcedures, DES Publication Guidelines and Automated Submittal Guidelines. At the direction of management DWGB willidentify 5 appropriate forms to automate, including establishing automated jobs to pull data from electronic formssoftware/dB to program back end databases.This is a continuation of Deliverable 1603, 27350, 28211 and of the executive order to move all business related formsinto online format in 2014 by Sept 2015. (Morphed and extended in 2018).1/2017 - DoIT hired staff to lead this project. Waiting for call to action.7/2017 - two forms already completed within GDP/UIC program
Report to feds and onto DWGB Web Page. Requires coordination with all PWSS programs.
Report to feds and onto DWGB Web Page. Requires coordination with all PWSS programs.
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2017
10/01/2017
10/01/2018
10/01/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
GREENOUGH, CAROLYN
SABBIA, THERESA
PILLSBURY, SARAH
SABBIA, THERESA
SABBIA, THERESA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Data Management Systems
Forms
Audits
Reports, Final
Reports, Final
1
3
2
1
1
Lead Person:
Lead Person:
PILLSBURY, SARAH
DUNBAR, CHRISTOPHER
29126
29543
29582
29475
29965
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 171 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
INFORMATION MANAGEMENT (Current)
Div/Bur:
Program:
Reporting (Current)Activity:
Maintain timely and accurate reporting to SDWIS
Maintain timely and accurate reporting to SDWIS
Deliverable:
Deliverable:
4 quarters of Fed Reporting. Inventory, Actions, Samples.
4 quarters of Fed Reporting. Inventory, Actions, Samples.
Description:
Description:
10/01/2017
10/01/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
SABBIA, THERESA
SABBIA, THERESA
Qty/Unit:
Qty/Unit:
Reporting Cycles
Reporting Cycles
12
4
29479
29498
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 172 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
SOURCE WATER PROTECTION/PLANNING/SECURITY (Current)
Formerly Drinking Water Source Protection (2010) This program includes source water protection, groundwater protection, groundwaterdischarge permitting and underground injection control. Also included are Project WET and ECO Net activities. Note: July 2016 -Activities Primacy and Rules moved to MONENF- Enforcement and Rulemaking program.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 01 05
Funding: State General State Fees Federal EPA Federal Other Grants
Emergency (Current)
Laboratory Accreditation (Current)
Activity:
Activity:
Formerly Emergency Management and Response Activity under OTHER (10/1/2010)
NH ELAP accredits environmental laboratories to the NELAC Standards for WSEB purposes and laboratory needs.
Description:
Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Number of Utilities and Officials trained by DES in preparedness
Number of Utilities and Officials trained by DES in preparedness
Conduct On-Site Assessments of laboratories
Conduct On-Site Assessments of laboratories
Perform 100% of annual accreditation activities
Perform 100% of annual accreditation activities
Primary Accrediting Body for environmental laboratories
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Only training planned is for staff - put in for EPAs P&C list
Only training planned is for staff - put in for EPAs P&C list
Conduct inspections / on-site assessments of laboratories for which NH ELAP is the primary Accrediting Body.
Conduct inspections / on-site assessments of laboratories for which NH ELAP is the primary Accrediting Body.
Includes state lab accreditation activity
Includes state lab accreditation activity
This will include all NH located environmental laboratories wishing to submit compliance data to NHDES. There are alsoseveral out-of-state laboratories that have requested NH ELAP to be their primary AB; these labs are located in NewEngland+.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCKENNA, JOHNNA
MCKENNA, JOHNNA
HALL, GEORGE
HALL, GEORGE
HALL, GEORGE
HALL, GEORGE
HALL, GEORGE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Persons
Persons
Inspections
Inspections
Percent
Percent
Accreditations
5
5
27
27
100
100
46
Lead Person:
Lead Person:
MCKENNA, JOHNNA
HALL, GEORGE
29457
29458
29489
29490
29492
29493
29494
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 173 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
SOURCE WATER PROTECTION/PLANNING/SECURITY (Current)
Div/Bur:
Program:
Laboratory Accreditation (Current)
Planning (Current)
Activity:
Activity:
Description:10/01/2010Start/End Dates: thru
Primary Accrediting Body for environmental laboratories
Secondary Accrediting Body for environmental laboratories
Secondary Accrediting Body for environmental laboratories
Be Well Informed - Entries into the WebTool
Publish and distribute newsletters
Publish and distribute newsletters
Youth education - collaborative and/or information sharing
Youth education - lending materials
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
This will include all NH located environmental laboratories wishing to submit compliance data to NHDES. There are alsoseveral out-of-state laboratories that have requested NH ELAP to be their primary AB; these labs are located in NewEngland+.
This is an estimate. The actual number will be dependent on the need or desire of laboratories outside of NH desiring NHELAP accreditation as a secondary AB.
This is an estimate. The actual number will be dependent on the need or desire of laboratories outside of NH desiring NHELAP accreditation as a secondary AB.
People with lab reports entering results from the online data entry form.
Publish four quarterly issues of a single bureau newsletter.
Publish four quarterly issues of a single bureau newsletter.
Following up 2014 youth ed plan, continue to act as convener of statewide environmental youth education collaborativeand/or clearinghouse of information.
Lending materials such as Enviroscape, groundwater model, Project WET Incredible Journey
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2017
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2019
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
HALL, GEORGE
HALL, GEORGE
HALL, GEORGE
LASKEY-RIGROD, PIERCE
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Accreditations
Accreditations
Accreditations
Entries
Newsletters
Newsletters
Programs
Deliveries
46
52
52
1600
4
4
1
5
Lead Person: SUSCA, PAUL
29495
29496
29497
29605
29146
29546
30410
29547
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 174 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
SOURCE WATER PROTECTION/PLANNING/SECURITY (Current)
Div/Bur:
Program:
Planning (Current)
Source Water Protection (Current)
Activity:
Activity:
Formerly Drinking Water Source and Groundwater Protection (2010)Description:01/01/1988Start/End Dates: thru
Youth education - organize children water festival
Youth education - teacher training
BMP inspections conducted by NHDES staff
Bring additional C systems into substantial implementation of SWP Programs
Bring additional C systems into substantial implementation of SWP Programs
Collect GPS point locations of PWS facilities in the field
Continue to support local implementation and program integration
Continue to support local implementation and program integration
Land use regulations
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Coordinate a childrens water festival in partnership with NH Drinking Water Week Coalition
Continue implementation of Project WET and related teacher training activities, with emphasis on high-qualityprofessional development. Number of contact hours provided to teachers.
Re-take point locations for wells and "entities" that currently have high positional error and take points for newwells/entities without GPS points.
Planning boards or municipal governing bodies will formally consider extending existing groundwater protection districtsto WHPAs or aquifer areas that are not already protected, or formally consider other changes in land use regulations thatwould bring local requirements closer to DES guidance regarding source water protection.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
07/01/2017
10/01/2017
10/01/2017
10/01/2016
10/01/2018
10/01/2017
10/01/2017
10/01/2018
10/01/2017
06/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2020
09/30/2018
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Events
Hours
Inspections
Systems
Systems
Facilities/Companies
Actions
Actions
Towns
1
1200
5
4
4
150
1
1
2
Lead Person: SUSCA, PAUL
29549
29550
29552
26896
29553
29554
29555
29556
29557
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 175 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
SOURCE WATER PROTECTION/PLANNING/SECURITY (Current)
Div/Bur:
Program:
Source Water Protection (Current)Activity:
Land use regulations
Number of Large System Sanitary Surveys coordinated
Number of Large System Sanitary Surveys coordinated
Number of Large System Sanitary Surveys coordinated
Number of PWSs notified of HHW events in their SWPAs
Number of outreach events
Percentage of C and P (non-transient) Delineations completed and in GIS
Provide SWP grants
Support the Salmon Falls Watershed Collaborative
Train local and regional planners in SWP basics
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Planning boards or municipal governing bodies will formally consider extending existing groundwater protection districtsto WHPAs or aquifer areas that are not already protected, or formally consider other changes in land use regulations thatwould bring local requirements closer to DES guidance regarding source water protection.
Provide input to Sanitary Surveyors prior to surveys and perform follow-up as neccesary
Provide input to Sanitary Surveyors prior to surveys and perform follow-up as neccesary
Provide input to Sanitary Surveyors prior to surveys and perform follow-up as neccesary
Notification will be limited to categories such as APT, CON, MHP, which have indicated interest in this program based ona survey conducted July 2012
Other than WET - This includes certified operator training including security and management of PCSs (individual trainingunder another deliverable).
Includes grants to promote source security
Provide workshops for local and regional planners who are new to SWP or need a refresher in the basics
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
01/01/2017
01/01/2018
01/01/2019
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2019
12/31/2017
12/31/2018
12/31/2019
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
SUSCA, PAUL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Towns
Surveys
Surveys
Surveys
Systems
Events
Percent
Grants
Projects
Workshops
2
51
51
51
150
30
99
8
1
3
29558
28214
29559
29560
29561
29562
29563
29564
29565
29566
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 176 of 313
WATER DIVISION DRINKING WATER AND GROUNDWATER
SOURCE WATER PROTECTION/PLANNING/SECURITY (Current)
Div/Bur:
Program:
Source Water Protection (Current)Activity:
Train local inspectors to perform BMP/UIC inspections in SWP areas
Work with PWSs on cyanoHAB monitoring and preparedness
Deliverable:
Deliverable:
This is the PCS management training for certified operators, local health officers, etc. Classroom-only training isincluded in the total.
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
SUSCA, PAUL
SUSCA, PAUL
Qty/Unit:
Qty/Unit:
Inspectors
Programs
15
1
29567
29568
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 177 of 313
WATER DIVISION SUBSURFACE SYSTEMS
SUBSURFACE INDIVIDUAL SEWAGE DISPOSAL SYSTEM PROGRAM (Current)
01/01/1999
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 03 04
Funding: State General State Fees Federal EPA Federal Other Grants
Continuing Education and Outreach (Current)
Data Management (Current)
Design Review: Septic Systems & Subdivisions (Current)
Designer & Installer Permitting (Current)
Activity:
Activity:
Activity:
Activity:
There will be no Deliverables created for 2018.
All Quarterly as of 4/01/05No data available 1/1/2015-12/31/2015
Permits issued to design and/or install ISDS's.
Description:
Description:
Description:
Description:
01/01/2009
07/01/2015
10/01/1999
01/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Educational Seminars
Develop new reporting capabilities through E-Permitting
Permit applications reviewed for septic systems
Permit applications reviewed for subdivisions
Subdivision lots
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Number of Subsurface Continuing Education Seminars approved or conducted, including municipal training.
EXTENDED END DATE FROM 12/31/16. Need to work with Rick Druding (DoIT) for new/improved reporting functionality.
Quarterly as of 4/01/05
Includes total applicationsQuarterly as of 4/01/05
Total number of subdivision lots applied for
Description:
Description:
Description:
Description:
Description:
07/01/2017
10/01/2015
07/01/2017
07/01/2017
07/01/2017
06/30/2018
12/31/2017
06/30/2018
06/30/2018
06/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BUKER, DAWN
Vacant
BUKER, DAWN
BUKER, DAWN
BUKER, DAWN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Seminars
Improvements
Applications, Permit
Applications, Permit
Numbers
35
1
4500
175
450
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BUKER, DAWN
Vacant
BUKER, DAWN
BUKER, DAWN
30415
27700
30417
30419
30421
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 178 of 313
WATER DIVISION SUBSURFACE SYSTEMS
SUBSURFACE INDIVIDUAL SEWAGE DISPOSAL SYSTEM PROGRAM (Current)
Div/Bur:
Program:
Designer & Installer Permitting (Current)
Enforcement Actions: Septic Systems & Subdivisions (Current)
Operational Approval (Current)
Quality Assurance (Current)
Activity:
Activity:
Activity:
Activity:
QuarterlyDescription:
Description:
Description:
10/01/1999
10/01/2012
01/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Process new Designer Permit Applications
Process new Installer Permit Applications
Process new Designer Permit Applications
Process new Installer Permit Applications
Administrative Orders
Letters of Deficiency
Operational Approvals
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
# of operational approvals issed
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
01/01/2018
01/01/2016
01/01/2016
07/01/2017
07/01/2017
07/01/2017
12/31/2019
12/31/2019
12/31/2017
12/31/2017
06/30/2018
06/30/2018
06/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BROWN, DEBRA
BROWN, DEBRA
BROWN, DEBRA
BROWN, DEBRA
Vacant
Vacant
GIORGI, BENJAMIN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Licenses
Licenses
Licenses
Licenses
Administrative Orders
LODs (Letters of Deficiency)
Permits Issued
5
75
5
75
5
9
1800
Lead Person:
Lead Person:
Lead Person:
Vacant
GIORGI, BENJAMIN
BUKER, DAWN
30422
30423
27698
27699
30424
30425
30427
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 179 of 313
WATER DIVISION SUBSURFACE SYSTEMS
SUBSURFACE INDIVIDUAL SEWAGE DISPOSAL SYSTEM PROGRAM (Current)
Div/Bur:
Program:
Quality Assurance (Current)
Records Request (Current)
Rulemaking (Current)
Activity:
Activity:
Activity:
Description:
Description:
10/01/2012
07/01/2014
Start/End Dates:
Start/End Dates:
thru
thru
Annual Review of Subsurface Systems QA Manual
Complete Program QA Self-Audit
Archive Requests
Rule Amendments
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Results of review (list of expected changes to document) and a copy of the QA Manual Signature Page are due to the QAManager EVERY year, even in a reporting release year.
May not be required for CY 2017
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
07/01/2017
01/01/2018
06/30/2018
06/30/2018
06/30/2018
12/31/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BUKER, DAWN
BUKER, DAWN
PAITON, JENNIFER
BUKER, DAWN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Manuals
Self-Assessments
Requests
Amendments
1
1
1200
1
Lead Person:
Lead Person:
PAITON, JENNIFER
Vacant
30435
30429
30413
30434
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 180 of 313
WATER DIVISION WASTEWATER ENGINEERING
CONSTRUCTION MANAGEMENT PROGRAM (Current)
The Construction Management Program's main responsibility is to inspect ongoing SRF and State Aid Grant construction projects to ensurethat they are completed in accordance with the approved plans and specifications. This program is also responsible for inspecting solidwaste landfill closure projects that are funded through the SRF Program.
10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 06 02
Funding: State General State Fees XFederal EPA Federal Other Grants
Inspections (Current)
Technical Assistance and Outreach (Current)
Technical Work Products-Bidability/Constructability reviews (Current)
Technical Work Products-Change Orders (Current)
Activity:
Activity:
Activity:
Activity:
Conducting field inspection of all funded projects during and upon completion of construction
Providing construction engineering advice to all applicable parties
Perform bidability/constructability reviews on all funded projects
Description:
Description:
Description:
Description:
10/01/1999
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Conduct inspections of funded prjts during & upon completion of construction
Conduct inspections of funded prjts during & upon completion of construction
On-site construction engineering advice to state and federally funded facilities
On-site construction engineering advice to state and federally funded facilities
Perform bidability/constructability reviews
Perform bidability/constructability reviews
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Conduct interim and final inspections
Conduct interim and final inspections
Visit all the state and federally-funded construction sites and provide technical assistance as needed
Visit all the state and federally-funded construction sites and provide technical assistance as needed
Perform bidability/constructability review of plans and specifications for all funded projects
Perform bidability/constructability review of plans and specifications for all funded projects
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DUDLEY, DANIEL
DUDLEY, DANIEL
DUDLEY, DANIEL
DUDLEY, DANIEL
DUDLEY, DANIEL
DUDLEY, DANIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Inspections
Meetings
Meetings
Reviews
Reviews
15
15
200
200
20
20
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DUDLEY, DANIEL
DUDLEY, DANIEL
DUDLEY, DANIEL
29273
29274
29275
29276
29277
29278
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 181 of 313
WATER DIVISION WASTEWATER ENGINEERING
CONSTRUCTION MANAGEMENT PROGRAM (Current)
Div/Bur:
Program:
Technical Work Products-Change Orders (Current)
Technical Work Products-meetings and bid openings (Current)
Activity:
Activity:
Process all construction change orders
Attend pre-construction, pre-bid, construction meetings, and bid openings;Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Process all change orders
Process all change orders
Attend pre-construction and pre-bid openings meetings
Attend pre-construction and pre-bid openings meetings
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DUDLEY, DANIEL
DUDLEY, DANIEL
DUDLEY, DANIEL
DUDLEY, DANIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Change Orders
Change Orders
Meetings
Meetings
50
50
25
25
Lead Person:
DUDLEY, DANIEL
DUDLEY, DANIEL
29279
29280
29281
29431
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 182 of 313
WATER DIVISION WASTEWATER ENGINEERING
DESIGN REVIEW PROGRAM (Current)
This program has the responsibility of reviewing plans and specifications for all public and private wastewater collection systems anddomestic sewage treatment systems. It also reviews and issues permits for major new users of municipal treatment plants, assists smallcommunities with wastewater treatment needs and prepares environmental assessments for projects that are funded by the SRF.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 06 01
Funding: State General State Fees XFederal EPA Federal Other Grants
Permits/Approvals (Current)
Technical Assistance and Outreach (Current)
Activity:
Activity:
Review and approve plans and specifications for wastewater projects;Description:
Description:
10/01/1999Start/End Dates: thru
Process all requests for a discharge permit
Process all requests for a discharge permit
Review and approve all engineering contracts for funded projects
Review and approve all engineering contracts for funded projects
Review and comment on all projects
Review and comment on all projects
Review and grant approvals for engineer prequalifications
Review and grant approvals for engineer prequalifications
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Process all requests for a wastewater discharge into a municipal sewer system
Process all requests for a wastewater discharge into a municipal sewer system
Includes plans/specificaitons, sewer connection requests and reports
Includes plans/specificaitons, sewer connection requests and reports
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
GREENE, DENNIS
GREENE, DENNIS
WOOD, TRACY
WOOD, TRACY
GREENE, DENNIS
GREENE, DENNIS
WOOD, TRACY
WOOD, TRACY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Approvals
Approvals
Contracts
Contracts
Projects
Projects
Approvals
Approvals
100
100
50
50
150
150
58
58
Lead Person:
Lead Person:
GREENE, DENNIS
29282
29283
29284
29285
29286
29287
29288
29289
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 183 of 313
WATER DIVISION WASTEWATER ENGINEERING
DESIGN REVIEW PROGRAM (Current)
Div/Bur:
Program:
Technical Assistance and Outreach (Current)
Technical Work Products-Annual sewer rate surveys (Current)
Activity:
Activity:
Review Sewer Use Ordinances, User Charge Systems, and Intermunicipal Agreements used to ensure legal authority for operating andmaintaining POTWs
Prepare and mail out annual 106 sewer rate surveys to municipalitiesDescription:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Assist municipalities in development / management of sewer use ordinances
Assist municipalities in development / management of sewer use ordinances
Promote energy efficiency in the water and wastewater sector
Promote energy efficiency in the water and wastewater sector
Compute and publish results of sewer rate survey
Compute and publish results of sewer rate survey
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Assist municipalities in development and/or management of sewer use ordinances, user charge systems and intermunicipalagreements (Kathi does't do this. Alex does something beyond what is required in his commitments for the IPP, and wecount his work as fulfilling Kathi's commitment too.)
Assist municipalities in development and/or management of sewer use ordinances, user charge systems and intermunicipalagreements (Kathi doesn't do this. Alex does something beyond what is required in his commitments for the IPP, and wecount his work as fulfilling Kathi' commitment too.)
Assist municipalities to promote energy efficiency, onsite renewable energy generation and asset management programdevelopment for their wastewater infrastructure. Stategies include: implementation of new energy-related design criteria;promotion of SRF loan principal forgiveness programs for energy audits and asset management programs; education andoutreach at workshops; and technical assistance relative to energy efficient upgrades for pump stations and WWTFs andrelative to asset management programs.
Assist municipalities to promote energy efficiency, onsite renewable energy generation and asset management programdevelopment for their wastewater infrastructure. Stategies include: implementation of new energy-related design criteria;promotion of SRF loan principal forgiveness programs for energy audits and asset management programs; education andoutreach at workshops; and technical assistance relative to energy efficient upgrades for pump stations and WWTFs andrelative to asset management programs.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BOURRET, KATHLEEN
BOURRET, KATHLEEN
RIVARD, SHARON
RIVARD, SHARON
BOURRET, KATHLEEN
BOURRET, KATHLEEN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Documents
Documents
Activities
Activities
Reports, Final
Reports, Final
2
2
32
32
1
1
Lead Person:
MALCOLM, BETH
MALCOLM, BETH
29290
29291
29292
29293
29294
29295
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 184 of 313
WATER DIVISION WASTEWATER ENGINEERING
DESIGN REVIEW PROGRAM (Current)
Div/Bur:
Program:
Technical Work Products-Annual sewer rate surveys (Current)
Technical Work Products-Authorization to bid (Current)
Technical Work Products-Environmental Assessments (Current)
Technical Work Products-Requests for funding eligibility (Current)
Activity:
Activity:
Activity:
Activity:
Provide authorization to bid for all funded projects
Prepare Environmental Assessments for all SRF loans
Process requests for funding eligibility;
Description:
Description:
Description:
10/10/1999
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Mail sewer rate surveys
Mail sewer rate surveys
Provide authorization to bid for all funded projects
Provide authorization to bid for all funded projects
Prepare Environmental Assessments for all SRF Loans
Prepare Environmental Assessments for all SRF Loans
Process all requests for funding eligibility
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Mail to all municipalities with POTWs each year
Mail to all municipalities with POTWs each year
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BOURRET, KATHLEEN
BOURRET, KATHLEEN
GREENE, DENNIS
GREENE, DENNIS
BOURRET, KATHLEEN
BOURRET, KATHLEEN
GREENE, DENNIS
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Mailings
Mailings
Letters
Letters
Assessments
Assessments
Requests
1
1
12
12
10
10
20
Lead Person:
Lead Person:
Lead Person:
GREENE, DENNIS
MALCOLM, BETH
GREENE, DENNIS
29296
29297
29346
29348
29349
29351
29352
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 185 of 313
WATER DIVISION WASTEWATER ENGINEERING
DESIGN REVIEW PROGRAM (Current)
Div/Bur:
Program:
Technical Work Products-Requests for funding eligibility (Current)Activity:
Process all requests for funding eligibilityDeliverable:
Description:
10/01/2018 09/30/2019Start/End Dates: thruLead Person: GREENE, DENNIS
Qty/Unit: Requests20
29353
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 186 of 313
WATER DIVISION WASTEWATER ENGINEERING
INDUSTRIAL PRETREATMENT PROGRAM (Current)
This Program is responsible for preventing the discharge of any industrial wastewater into a municipal sewer system which would impactthe successful operation of the wastewater treatment facility, create a health problem to personnel involved in the collection andtreatment of the wastewater, adversely impact the sludge generated from the treatment process, and cause the treatment facility toviolate its state/federal permit. To accomplish this goal, all industries which are proposing to discharge to a municipal wastewatertreatment facility are required to get an indirect discharge permit from the municipality. These permits must be reviewed and approvedbefore the municipality can issue the permit. The Program works closely with the municipality to ensure that they have the authority toissue appropriate permits to the industry.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 06 05
Funding: State General XState Fees XFederal EPA Federal Other Grants
Inspections (Current)
Permits/Approvals (Current)
Activity:
Activity:
Assist EPA with Pretreatment Audit Inspections and Pretreatment Compliance Inspections; Conduct Pretreatment compliance Inspections
Process all Industrial Discharge Permit Applications
Description:
Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Assist EPA with Pretreatment Audit Inspections
Assist EPA with Pretreatment Audit Inspections
Conduct Industrial Pretreatment Inspections
Conduct Industrial Pretreatment Inspections
Conduct PCIs at POTWs without EPA approved Pretreatment program
Conduct PCIs at POTWs without EPA approved Pretreatment program
Process all Industrial Discharge Permit Requests
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
One pretreatment audit and two PCIs (of those communities required to have a pretreament program)
One pretreatment audit and two PCIs (of those communities required to have a pretreament program)
Conduct inspections of industrial facilities which discharge to a municipal sewer
Conduct inspections of industrial facilities which discharge to a municipal sewer
Conduct Pretreatment Compliance Inspections at POTWs without an EPA approved pretreatment program
Conduct Pretreatment Compliance Inspections at POTWs without an EPA approved pretreatment program
Process all Industrial Discharge Permit applications
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Inspections
Inspections
Inspections
Inspections
Inspections
Applications, Permit
3
3
15
15
6
6
20
Lead Person:
Lead Person:
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
29354
29355
29357
29358
29359
29360
29361
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 187 of 313
WATER DIVISION WASTEWATER ENGINEERING
INDUSTRIAL PRETREATMENT PROGRAM (Current)
Div/Bur:
Program:
Permits/Approvals (Current)
Technical Assistance (Current)
Activity:
Activity:
Respond to questions concerning the State and Federal Pretreatment ProgramsDescription:10/01/1999Start/End Dates: thru
Process all Industrial Discharge Permit Requests
Process Tax Exemptions
Process Tax Exemptions
Respond to all questions concerning pretreatment
Respond to all questions concerning pretreatment
Review and comment on pretreatment sections of municipal sewer Use Ordinance
Review and comment on pretreatment sections of municipal sewer Use Ordinance
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Process all Industrial Discharge Permit applications
Number of hours spent responding to municipalities and the public concerning the State and federal Pretreatment Programs
Number of hours spent responding to municipalities and the public concerning the State and federal Pretreatment Programs
Alex goes beyond review and comment on just the pretreatment sections of municipal SUOs, therefore, when that is thecase, Alex's work is also counted in Kathi's deliverable, in design review, to assist municipalities indevelopment/management of SUOs.
Alex goes beyond review and comment on just the pretreatment sections of municipal SUO's, therefore, when that is thecase, Alex's work is also counted in Kathi's deliverable, in design review, to assist municipalities indevelopment/management of SUOs.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
RASTORGUYEFF, ALEXIS
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Applications, Permit
Plans
Plans
Hours
Hours
Ordinances
Ordinances
20
1
1
500
500
4
4
Lead Person: RASTORGUYEFF, ALEXIS
29362
29363
29364
29365
29366
29368
29370
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 188 of 313
WATER DIVISION WASTEWATER ENGINEERING
NPDES COMPLIANCE PROGRAM (Current)
The NPDES Compliance Program is responsible for ensuring that all facilities which discharge to a surface water are operated andmaintained in such a way as to comply with their permit limits and not cause a violation of the State's Surface Water QualityRegulations.
10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 06 05
Funding: State General XState Fees XFederal EPA Federal Other Grants
Complaint Investigation (Current)
Enforcement (Current)
NPDES Inspections (Current)
Activity:
Activity:
Activity:
Activity:
Investigate all complaints relating to "point" sources discharging into the state's surface waters
Develop an Enforcement Policy; Develop a priority list of facilities needing enforcement; Take appropriate enforcement action on allapplicable facilities;
Perform compliance inspections on NPDES wastewater treatment facilities
Description:
Description:
Description:
10/01/1999
10/01/1999
07/01/2001
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Investigate all "point" source related-complaints
Investigate all "point" source related-complaints
Take appropriate enforcement action on all "point" source dischargers
Take appropriate enforcement action on all "point" source dischargers
Perform compliance inspections on wastewater treatment facilities
Perform compliance inspections on wastewater treatment facilities
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Take appropriate enforcement action on all "point" source dischargers in non-compliance with applicable state and federalregulations(NOFs, LODs, AFCs, and Orders)
Take appropriate enforcement action on all "point" source dischargers in non-compliance with applicable state and federalregulations(NOFs, LODs, AFCs, and Orders)
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
PTAK, TERESA
PTAK, TERESA
PTAK, TERESA
PTAK, TERESA
PTAK, TERESA
PTAK, TERESA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Complaints
Complaints
Enforcement Actions
Enforcement Actions
Inspections
Inspections
20
20
10
10
74
92
Lead Person:
Lead Person:
Lead Person:
PTAK, TERESA
PTAK, TERESA
PTAK, TERESA
29372
29373
29374
29375
29376
29378
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 189 of 313
WATER DIVISION WASTEWATER ENGINEERING
NPDES COMPLIANCE PROGRAM (Current)
Div/Bur:
Program:
Quality Assurance System Self-Audit (Current)
Technical Assistance and Outreach (Current)
Activity:
Activity:
Complete the Self Audit annually
Provide technical assistance to all dischargers on questions concerning their federal and state discharge permit
Description:
Description:
01/01/2007
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Annual Self-Audit
Annual Self-Audit
Number of hours spent on providing technical assistance
Number of hours spent on providing technical assistance
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Conducted by Thom Croteau.
Conducted by Thom Croteau.
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LESIEUR, NANCY
LESIEUR, NANCY
PTAK, TERESA
PTAK, TERESA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Self-Assessments
Self-Assessments
Hours
Hours
1
1
100
100
Lead Person:
Lead Person:
PTAK, TERESA
PTAK, TERESA
29380
29381
29383
29384
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 190 of 313
WATER DIVISION WASTEWATER ENGINEERING
NPDES PERMIT PROGRAM (Current)
As the State has not been delegated the federal permit program, called the National Pollutant Discharge Elimination System (NPDES), EPAis responsible for developing and issuing NPDES permits for any facility which discharges pollutants to a surface water. However, beforeEPA can issue the permit, the state has to certify that this permit does not violate any state rule or regulation. To accomplish this,staff review the federally drafted permit, and work closely with EPA to make any necessary changes to the permit before it is issued.Once this permit is issued, it is adopted as a state permit.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 06 05
Funding: State General XState Fees XFederal EPA Federal Other Grants
Permits/Approvals (Current)
Technical Assistance and Outreach (Current)
Activity:
Activity:
Process EPAs requests for certification;Description:10/01/1999Start/End Dates: thru
DES will review and assist in the reissuance of priority permits
DES will review and assist in the reissuance of priority permits
Draft NPDES permits
Draft NPDES permits
Participate in quarterly coordination and planning calls or meetings on the status of issuing NPDES
Participate in quarterly coordination and planning calls or meetings on the status of issuing NPDES
Process EPAs requests for Certification
Process EPAs requests for Certification
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
DES will review and assist in the reissuance of 2 priority permits (PSNH Merrimack Station-Bow, Rochester WWTF)
DES will review and assist in the reissuance of 2 priority permits (PSNH Merrimack Station-Bow, Rochester WWTF)
DES will draft/rework 3 NPDES permits that are awaiting renewal and deliver to EPA
DES will draft/rework 3 NPDES permits that are awaiting renewal and deliver to EPA
Process all of EPAs request for state certification of all NPDES permits
Process all of EPAs request for state certification of all NPDES permits
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ANDREWS, JEFFREY
ANDREWS, JEFFREY
SPANOS, STERGIOS
SPANOS, STERGIOS
FORBES, EUGENE
FORBES, EUGENE
SPANOS, STERGIOS
SPANOS, STERGIOS
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Permits Reviewed
Permits Reviewed
Permits Reviewed
Permits Reviewed
Meetings
Meetings
Certifications
Certifications
2
2
3
3
4
4
10
10
Lead Person: SPANOS, STERGIOS
29385
29386
29387
29388
29389
29390
29391
29392
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 191 of 313
WATER DIVISION WASTEWATER ENGINEERING
NPDES PERMIT PROGRAM (Current)
Div/Bur:
Program:
Technical Assistance and Outreach (Current)Activity:
Respond to all questions concerning NPDES issues, such as stormwater, modeling, ...Description:10/01/1999Start/End Dates: thru
Assist EPA with conferences and meetings
Assist EPA with conferences and meetings
Provide technical assistance
Provide technical assistance
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Assist EPA with conferences and meetings relative to stormwater. For FY11 this includes assisting EPA in the developmentof the Phase II Stormwater MS4 General Permit.
Assist EPA with conferences and meetings relative to stormwater. For FY11 this includes assisting EPA in the developmentof the Phase II Stormwater MS4 General Permit.
Number of hours spent on providing technical assistance for questions concerning the NPDES program
Number of hours spent on providing technical assistance for questions concerning the NPDES program
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ANDREWS, JEFFREY
ANDREWS, JEFFREY
ANDREWS, JEFFREY
ANDREWS, JEFFREY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Workshops
Workshops
Hours
Hours
2
2
240
240
Lead Person: ANDREWS, JEFFREY
29393
29394
29395
29396
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 192 of 313
WATER DIVISION WASTEWATER ENGINEERING
OPERATIONS PROGRAM (Current)
The Operations Program is responsible for the training and certification of the over 480 wastewater treatment plant operators in thestate. The program has a comprehensive Wastewater Operator Training Program, offering 30-35 classes each year, most of which are held atthe training center located on the grounds of the State-run Winnipesaukee River Basin water pollution control facility in Franklin. Inaddition, this Program gets involved with keeping an eye on the 100 plus publicly owned wastewater systems in the state, and whenrequested, offer troubleshooting and problem solving assistance. The principal aim of this program is to prevent wastewater treatmentsystems from going out of compliance by becoming aware of problems early and assisting the operator in solving them. In this way, we cankeep formal enforcement to a minimum.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 06 04
Funding: State General XState Fees XFederal EPA Federal Other Grants
Inspections (Current)
Technical Assistance and Outreach (Current)
Activity:
Activity:
Perform reconnaissance inspections at POTWS
Provide on-site technical assistance to POTWS; provide public education seminars; Respopnd to requests for technical assistance frommunicipalities;
Description:
Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Perform reconnaissance inspections at all POTW
Perform reconnaissance inspections at all POTW
Provide Technical Assistance
Provide Technical Assistance
Public education/outreach endeavors
Public education/outreach endeavors
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Number of hours spent on providing technical assistance on operation of WWT systems.
Number of hours spent on providing technical assistance on operation of WWT systems.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
KESSLER, KENNETH
KESSLER, KENNETH
KESSLER, KENNETH
KESSLER, KENNETH
KESSLER, KENNETH
KESSLER, KENNETH
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Inspections
Hours
Hours
Seminars
Seminars
90
90
1200
1200
2
2
Lead Person:
Lead Person:
KESSLER, KENNETH
KESSLER, KENNETH
29397
29398
29399
29400
29401
29402
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 193 of 313
WATER DIVISION WASTEWATER ENGINEERING
OPERATIONS PROGRAM (Current)
Div/Bur:
Program:
Technical Assistance and Outreach (Current)
Training and Certification (Current)
Activity:
Activity:
Conduct certification exams; Process requests for certification renewal; Conduct or sponsor wastewater-related coursesDescription:10/01/1999Start/End Dates: thru
Review O&M manuals, engineering reports, and other O&M related reports
Review O&M manuals, engineering reports, and other O&M related reports
Conduct 2 certification exams
Conduct wastewater operator training courses
Conduct wastewater operator training courses
Process all applications for operator certification/recertification
Process all applications for operator certification/recertification
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Respond to all requests for technical assistance from municipalities for reviewing O&M reports, engineering reports andother correspondence concerning the operation and maintenance of POTWS
Respond to all requests for technical assistance from municipalities for reviewing O&M reports, engineering reports andother correspondence concerning the operation and maintenance of POTWS
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
KESSLER, KENNETH
KESSLER, KENNETH
KESSLER, KENNETH
KESSLER, KENNETH
KESSLER, KENNETH
KESSLER, KENNETH
KESSLER, KENNETH
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Hours
Hours
Exams
Courses
Courses
Applications, Certification
Applications, Certification
500
500
2
35
35
240
240
Lead Person: KESSLER, KENNETH
29403
29404
29405
29411
29412
29414
29439
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 194 of 313
WATER DIVISION WASTEWATER ENGINEERING
RESIDUALS MANAGEMENT PROGRAM (Current)
The Residuals Management Program is responsible for the management of the residuals of the wastewater treatment process and for thematerial removed from home septic tanks. The Program regulates the processing, transportation, and disposal/reuse of sludge andbiosolids to ensure this material is utilized or disposed in an environmentally sound manner. Whenever possible, recycling through theregulated beneficial use of biosolids for land application, or composting for nutrient value and soil conditioning, is promoted.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 06 06
XFunding: State General XState Fees Federal EPA Federal Other Grants
Enforcement (Current)
Complaint Investigation (Current)
Data Management (Current)
Activity:
Activity:
Activity:
Take appropriate enforcement action on all sludge and septage sites and facilities and all sludge and septage haulers in non-compliancewith all applicable federal and State rules and regulations pertaining to sludge or septage
Investigate all sludge or septage related complaints
Complete Access Database; Review and track the management of all sludge and septage activities in the State
Description:
Description:
Description:
10/01/1999
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Take appropriate enforcement action
Take appropriate enforcement action
Investigate all sludge or septage related complaints
Investigate all sludge or septage related complaints
Review and track management of sludge and septage
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Take appropriate enforcement action on all sludge and septage sites and facilities, and all sludge and septage haulersin non-compliance with all applicable federal and State rules and regulations pertaining to sludge or septage
Take appropriate enforcement action on all sludge and septage sites and facilities, and all sludge and septage haulersin non-compliance with all applicable federal and State rules and regulations pertaining to sludge or septage
Review all annual notifications, soil testing, and annual reports for septage and sludge facilities for septage andsludge sites and facilities and update the septage and sludge database accordingly
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
GORDON, III, RAYMOND
GORDON, III, RAYMOND
GORDON, III, RAYMOND
GORDON, III, RAYMOND
GORDON, III, RAYMOND
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Enforcement Actions
Enforcement Actions
Complaints
Complaints
Reviews
1
1
1
1
35
Lead Person:
Lead Person:
Lead Person:
GORDON, III, RAYMOND
GORDON, III, RAYMOND
GORDON, III, RAYMOND
29459
29460
29461
29462
29463
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 195 of 313
WATER DIVISION WASTEWATER ENGINEERING
RESIDUALS MANAGEMENT PROGRAM (Current)
Div/Bur:
Program:
Data Management (Current)
Inspections (Current)
Legislation (Current)
Permits/Approvals (Current)
Activity:
Activity:
Activity:
Activity:
Conduct inspections on sludge and septage sites and facilities; Conduct inspections on sludge and septage hauling vehicles
Testify on all sludge and septage-related bills
Process applications for Sludge Quality Certifications, Septage or Sludge Hauler Permits, and requests for Septage or Sludge facility orsite permit; Process requests for waivers; Process Septage Holding Tank PbN or Transfer/Storage Tank Permit Applications.
Description:
Description:
Description:
10/01/1999
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Review and track management of sludge and septage
Inspect Septage and sludge facilities, land application sites and hauling vehicles
Inspect Septage and sludge facilities, land application sites and hauling vehicles
Testify on all proposed sludge and septage-related bills
Testify on all proposed sludge and septage-related bills
Process requests for waivers.
Process requests for waivers.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Review all annual notifications, soil testing, and annual reports for septage and sludge facilities for septage andsludge sites and facilities and update the septage and sludge database accordingly
For Septage or Sludge facility or site permits.
For Septage or Sludge facility or site permits.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
GORDON, III, RAYMOND
GORDON, III, RAYMOND
GORDON, III, RAYMOND
GORDON, III, RAYMOND
GORDON, III, RAYMOND
HOUSTON, JUDITH
HOUSTON, JUDITH
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reviews
Inspections
Inspections
Letters
Letters
Applications, Permit
Applications, Permit
35
30
30
1
1
4
4
Lead Person:
Lead Person:
Lead Person:
GORDON, III, RAYMOND
GORDON, III, RAYMOND
HOUSTON, JUDITH
29464
29465
29466
29467
29468
29469
29470
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 196 of 313
WATER DIVISION WASTEWATER ENGINEERING
RESIDUALS MANAGEMENT PROGRAM (Current)
Div/Bur:
Program:
Permits/Approvals (Current)Activity:
Process Septage Holding Tank PbN or Storage/Transfer Tank Permit Applications
Process Septage Holding Tank PbN or Storage/Transfer Tank Permit Applications
Process Septage or Sludge facility or site permit applications.
Process Septage or Sludge facility or site permit applications.
Process all Septage EQ Certification Applications
Process all Septage EQ Certification Applications
Process all Sludge Quality Certification Applications
Process all Sludge Quality Certification Applications
Process all Sludge and Septage Hauler Permits
Process all Sludge and Septage Hauler Permits
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Sludge Permits and Septage Hauler Permits are good for two years. 500 permits are anticipated one year, and 10 permitsare anticipated the next. Qtr #1, 10/30/2017-12/31/2017:
Sludge Permits and Septage Hauler Permits are good or two years. 500 permits are anticipated one year, and 10 permits areanticipated the next.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
HOUSTON, JUDITH
HOUSTON, JUDITH
HOUSTON, JUDITH
HOUSTON, JUDITH
HOUSTON, JUDITH
HOUSTON, JUDITH
LEMAY, HEIDI
LEMAY, HEIDI
SWEATT, TIMOTHY
SWEATT, TIMOTHY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Applications, Permit
Applications, Permit
Applications, Permit
Applications, Permit
Certifications
Certifications
Certifications
Certifications
Permits Issued
Permits Issued
1
1
10
10
1
1
5
5
10
500
29471
29472
29473
29474
29476
29477
29478
29480
29481
29482
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 197 of 313
WATER DIVISION WASTEWATER ENGINEERING
RESIDUALS MANAGEMENT PROGRAM (Current)
Div/Bur:
Program:
QAPP Self-Audit (Current)
Sampling (Current)
Technical Assistance and Outreach (Current)
Activity:
Activity:
Activity:
Perform annual self-audit of existing QAPP's.
Complete the Sludge Quality Sampling Program, including preparation and submittal of Annual Legislative Report by 11/1/17.
Respond to all requests for technical assistance relating to questions concerning sludge or septage; review and process pre-applicationsfor HB 207 monies
Description:
Description:
Description:
11/01/2005
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Complete Annual Quality Assurance System Program Self-Audit
Complete Annual Quality Assurance System Program Self-Audit
Complete sluldge quality certification sampling program
Complete sluldge quality certification sampling program
Respond to tech assist requests on septage and sludge-related questions
Respond to tech assist requests on septage and sludge-related questions
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Using $10,000 authorized. Contracts with Absolute Resource Inc.In-state SQC sites annual sludge quality sampling performed.
Using $10,000 authorized. Contracts with Absolute Resource Inc.In-state SQC sites annual sludge quality sampling performed.
Number of hours spent responding to communities and the public on the beneficial use and disposal of sludge and septage
Number of hours spent responding to communities and the public on the beneficial use and disposal of sludge and septage
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
HOUSTON, JUDITH
HOUSTON, JUDITH
GORDON, III, RAYMOND
GORDON, III, RAYMOND
LEMAY, HEIDI
LEMAY, HEIDI
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Self-Assessments
Self-Assessments
Sampling Rounds
Sampling Rounds
Hours
Hours
1
1
16
16
100
100
Lead Person:
Lead Person:
Lead Person:
HOUSTON, JUDITH
GORDON, III, RAYMOND
GORDON, III, RAYMOND
29483
29484
29485
29486
29487
29488
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 198 of 313
WATER DIVISION WASTEWATER ENGINEERING
STATE AID GRANT PROGRAM (Current)
The State Aid Grant Program administers the state aid grant and bond guarantee programs for the construction of municipal wastewatertreatment facilities.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 06 03
XFunding: State General XState Fees Federal EPA Federal Other Grants
Technical Work Products-grant payments (Current)
Technical Work Products-letters of authorization (Current)
Activity:
Activity:
Process State Aid grant payments
Process letters authorizing the award of construction contracts
Description:
Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Process all State Aid Grant payments
Process all State Aid Grant payments
Process letters authorizing the award of construction
Process letters authorizing the award of construction
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MALCOLM, BETH
MALCOLM, BETH
FENNO, DANIEL
FENNO, DANIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Payments
Payments
Letters
Letters
100
100
10
10
Lead Person:
Lead Person:
MALCOLM, BETH
MALCOLM, BETH
29415
29416
29417
29419
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 199 of 313
WATER DIVISION WASTEWATER ENGINEERING
STATE REVOLVING FUND LOAN PROGRAM (Current)
The State Revolving Fund(SRF) administers the loan funds for the construction of municipal wastewater treatment facilities and municipallandfill closure projects10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 06 03
Funding: State General State Fees XFederal EPA Federal Other Grants
Technical Work Products-Annual Report (Current)
Technical Work Products-Intended Use Plan (Current)
Technical Work Products-Loan Agreements (Current)
Technical Work Products-Loan Disbursements (Current)
Activity:
Activity:
Activity:
Activity:
Develop an annual report for the SRF Program detailing how much and to whom the monies were obligated
Develop an Intended Use Plan detailing how DES proposes to allocate the SRF funds
Process original and supplemental loan agreements for the SRF Program
Process all loan disbursements relating to the SRF Program
Description:
Description:
Description:
Description:
10/01/1999
10/01/1999
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Develop an annual report for the SFR Program
Develop an annual report for the SFR Program
Develop an Intended Use Plan for the SRF Program
Develop an Intended Use Plan for the SRF Program
Process all loan agreements for the SRF Program
Process all loan agreements for the SRF Program
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Develop an annual report for the SRF Program detailing how much and to whom the monies were obligated
Develop an annual report for the SRF Program detailing how much and to whom the monies were obligated
Process original and supplemental loan agreements for the SRF Program
Process original and supplemental loan agreements for the SRF Program
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FENNO, DANIEL
FENNO, DANIEL
FENNO, DANIEL
FENNO, DANIEL
FENNO, DANIEL
FENNO, DANIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Reports, Final
Plans
Plans
Agreements
Agreements
1
1
1
1
20
20
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FENNO, DANIEL
FENNO, DANIEL
FENNO, DANIEL
FENNO, DANIEL
29420
29421
29422
29423
29424
29425
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 200 of 313
WATER DIVISION WASTEWATER ENGINEERING
STATE REVOLVING FUND LOAN PROGRAM (Current)
Div/Bur:
Program:
Technical Work Products-Loan Disbursements (Current)
Technical Work Products-SRF Applications (Current)
Activity:
Activity:
Process all requests for SRF FundsDescription:10/01/1999Start/End Dates: thru
Process all loan disbursements
Process all loan disbursements
Process SRF Applications
Process SRF Applications
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Process all loan disbursements relating to the SRF Program
Process all loan disbursements relating to the SRF Program
Process all requests for SRF funds
Process all requests for SRF funds
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BOURRET, KATHLEEN
BOURRET, KATHLEEN
FENNO, DANIEL
FENNO, DANIEL
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Disbursements
Disbursements
Applications
Applications
125
125
20
20
Lead Person: FENNO, DANIEL
29426
29427
29428
29429
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 201 of 313
WATER DIVISION WATERSHED MANAGEMENT
305(B) AND 303(D) REPORTS AND WATER QUALITY ASSESSMENTS (Current)
Section 305(b) of the federal Clean Water Act (CWA) requires each state to submit a full report every two years (even numberd years) tothe USEPA and the US Congress with updates submitted to EPA in odd numbered years. Section 303(d) of the CWA requires States to developand submit lists of impaired waters to EPA for approval.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees Federal EPA Federal Other Grants
A1: Gather Data for SWQAs (Current)
A2: Update CALM (Current)
A3: Test latest ADB; Develop Reports (Current)
A4: Update GIS/NHD coverage for SWQAs (Current)
Activity:
Activity:
Activity:
Activity:
FY14 EPA P&C #64: This activity includes tasks associated with gathering data for 305(b)/303(d) Surface Water Quality Assessments(SWQAs).
FY18 EPA P&C #26: FY14 EPA P&C #64: The first Consolidated Assessment and Listing Methodology (CALM) was developed in FY02 for theOctober 1, 2002 submission. Although the CALM is quite descriptive, it is a document that should be periodically reviewed to keep itcurrent with the latest in assessment methods and guidance. This activity includes deliverables designed to improve the CALM and 305(b)/303(d) Surface Water Quality Assessments (SWQAs) in the future.
FY14 EPA P&C #64: This activity includes work associated with loading new versions of the ADB on DES computers, training staff in itsuse, and testing it to see if it compatible with the website, maps,and reports created in the previous cycle and creating new ORACLEreports for 305b/303d reporting purposes if necessary.
FY14 EPA P&C #64: This acitivity includes updating and maintaining GIS/ NHD coverage for305(b)/303(d) Surface Water Quality Assessments(SWQAs). Deliverables every other year.
Description:
Description:
Description:
Description:
10/01/2003
10/01/2002
10/01/2003
10/01/2003
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
A1-1: Gather Data - FY18 SWQA
A2-1: Update CALM for FY18 SWQA
A3-1: ADB Training - FY18 SWQA
Deliverable:
Deliverable:
Deliverable:
END DATE EXTENDED FROM [12/31/2017]: Completing 2014: Includes gathering data from all availiable sources of surfacewater quality data which might be of use in 305(b)/303(d) Surface Water Quality Assessments (SWQAs).
FY18 PPA P&C #26: END DATE EXTENDED FROM [3/31/2018]: Completing 2014: Work includes soliciting comments on the latestversion of the CALM, revising the CALM as necessary, redistributing the CALM for internal review, and finalizing the CALMfor use in 305(b)/303(d) Surface Water Quality Assessments (SWQAs).
This task includes loading the program on DES computers, and training (retraining) staff in the use of EPAs ADB andNHDESs SADB for the 2018 assessment cycle.
Description:
Description:
Description:
01/01/2017
10/01/2016
09/01/2017
08/31/2018
05/31/2018
04/01/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Data Sets
Updates
Training Sessions
1
1
1
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
27264
27265
29159
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 202 of 313
WATER DIVISION WATERSHED MANAGEMENT
305(B) AND 303(D) REPORTS AND WATER QUALITY ASSESSMENTS (Current)
Div/Bur:
Program:
A4: Update GIS/NHD coverage for SWQAs (Current)
A5: Assessments, ADB Updates for SWQAs (Current)
A6: Prepare Draft 305b/303d SWQA Text (Current)
A7: Public Notice Draft 305b/303d (Current)
A8:Prepare FINAL 305(b)/303(d) SWQA (Current)
Activity:
Activity:
Activity:
Activity:
Activity:
FY14 EPA P&C #64: This activity includes assessing surface waters using the Supplemental ADB, and inputting assessment results into theADB for 305(b)/303(d) Surface Water Quality Assessments (SWQAs).
FY14 EPA P&C #64: Section 305(b) of the Clean Water Act requires submittal of information in addition to that included in the ADB(i.e., economic/benefit analysis, wetlands status, etc.). This activity includes tasks to address these additional requirements
FY14 EPA P&C #64: This activity includes tasks involved with issuing the DRAFT 305(b)/303(d) SWQA for public comment
FY18 EPA P&C #25: FY15 EPA P&C #59 & 59a: FY14 EPA P&C #64: FY12 EPA P&C #73: FY10 EPA P&C #76. This acitivity includes all workassociated with preparation of the final 305(b)/303(d) Surface Water Quality Assessment (SWQA).
Description:
Description:
Description:
Description:
10/01/2003
10/01/2003
11/01/2003
01/15/2004
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
A4-1: Update AU NHD Indexing - FY18 SWQA
A5-1: Update waters in ADB - FY18 SWQA
A6-1: Prepare draft 305(b)/303(d) SWQA - FY18 SWQA
A6-2: Update Website - FY18 SWQA
A8-1: Respond to EPA comments - FY18 SWQA
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
END DATE EXTENDED FROM [4/01/2018]: Completing 2014: Tasks include creation of new AUs and indexing to NHD as necessaryfor 305(b)/303(d) Surface Water Quality Assessment (SWQA).
END DATE EXTENDED FROM [04/01/2018]: Completing 2014: Assess data for waterbodies for use support using available dataand the CALM protocol and update the SADB & ADB for the 2018 305(b)/303(d) SWQA.
END DATE EXTENDED FROM [04/01/2018]: Completing 2014: Prepare required 2018 305b/303 text per EPA guidance and CWArequirements. Examples include the economic/benefit analysis, wetlands assessment, etc.
END DATE EXTENDED FROM [02/15/2018]: Completing 2014: Update Website - FY18 SWQA
END DATE EXTENDED FROM [06/30/2018]: Completing 2014: This task includes all efforts associated with addressing EPAcomments on the 2018 DRAFT 305(b)/303(d) Surface Water Quality Assessment (SWQA). This includes all time spent inmeetings, conference calls,emails, responses to their comments, etc.
Description:
Description:
Description:
Description:
Description:
07/01/2017
10/01/2017
10/01/2017
01/01/2018
04/01/2018
06/01/2018
12/31/2018
10/01/2018
05/15/2018
10/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
WOOD, MATTHEW
Vacant
WOOD, MATTHEW
WOOD, MATTHEW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Updates
Updates
Drafts
Web Sites
Responses
1
1
1
1
1
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
27267
27269
26848
27277
27280
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 203 of 313
WATER DIVISION WATERSHED MANAGEMENT
305(B) AND 303(D) REPORTS AND WATER QUALITY ASSESSMENTS (Current)
Div/Bur:
Program:
A8:Prepare FINAL 305(b)/303(d) SWQA (Current)
D1: ADB Supplemental Database (Current)
J1: Comprehensive Monitoring Strategy (Current)
Activity:
Activity:
Activity:
FY14 EPA P&C #64: FY12 EPA P&C #73: FY08 EPA P&C # 72: 106#1 To make the ADB more useful and comprehensive in terms of documentingdata used for assessments, additional tables and columns must be created and attached to the existing database.
FY14 EPA P&C #60: A comprehensive monitoring strategy is needed to implement the assessment methodology for all waterbodies, and will
Description:
Description:
06/01/2003Start/End Dates: thru
A8-2: Respond to public comment- FY18 SWQA
A8-3: Finalize GIS/NHD/SADB/ATTAINS/CALM for FY18 SWQA
A8-4: Update Website for FINAL FY16 SWQA.
A8-4: Update Website for FINAL FY18 SWQA.
A8-5: Submit FINAL FY16 305(b)/303(d) SWQA to EPA
A8-5: Submit FINAL FY18 305(b)/303(d) SWQA to EPA
D1: Create, test and update Supplemental ADB for 2018 cycle.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
END DATE EXTENDED FROM [04/01/2018]: Completing 2014: This task includes all time spent preparing a response to publiccomment on the 2018 DRAFT 305(b)/303(d) Surface Water Quality Assessment (SWQA).
END DATE EXTENDED FROM [04/01/2018]: Completing 2014: This task includes final revisions to the GIS/NHD coverage, the ADBand the CALM for the 2018 FINAL 305(b)/303(d) SWQA.
END DATE EXTENDED FROM [12/31/2016]: Completing 2014: This task includes updating the DES website (lists, documents andmaps) to include the 2016 FINAL 305(b)/303(d) Surface Water Quality Assessment (SWQA) results.
END DATE EXTENDED FROM [04/01/2018]: Completing 2014: This task includes updating the DES website (lists, documents andmaps) to include the 2018 FINAL 305(b)/303(d) Surface Water Quality Assessment (SWQA) results.
END DATE EXTENDED FROM [12/31/2016]: Completing 2014: FY16 P&C#25. END DATE EXTENDED FROM [7/31/2016]This task includessubmission of 2016 FINAL 305(b)/303(d) files, documents, and lists to EPA. This includes submission of the 303(d) listand response to public comments. FY18 P&C# 25: Submit narrative 2016 305(b) report 60 days following 2016 303(d) approvalby EPA.
END DATE EXTENDED FROM [06/01/2018]: Completing 2014: This task includes submission of 2018 FINAL 305(b)/303(d) files,documents, and lists to EPA. This includes submission of the 303(d) list and response to public comments. FY18 P&C# 25:Submit narrative 2018 305(b) report 60 days following 2018 303(d) approval by EPA.
END DATE EXTENDED FROM [02/01/2018]: Completing 2014: "Create, test, and update an Enhanced Supplemental AssessmentDatabase (SADB) for use in automating 305(b) assessments for 2018." This entails making corrections to the existing ADBand adding additional functionalities and comparisons in order for the 2018 automated assessment to be more efficient andaccurate.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
02/15/2018
01/01/2018
03/01/2016
01/01/2018
03/15/2016
01/01/2018
07/01/2017
10/31/2018
10/31/2018
10/31/2017
11/30/2018
12/31/2017
02/01/2019
04/01/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Responses
Updates
Web Sites
Web Sites
Documents
Documents
Programs
1
1
1
1
1
1
1
Lead Person: WOOD, MATTHEW
27279
27281
25339
27282
25340
27283
27284
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 204 of 313
WATER DIVISION WATERSHED MANAGEMENT
305(B) AND 303(D) REPORTS AND WATER QUALITY ASSESSMENTS (Current)
Div/Bur:
Program:
J1: Comprehensive Monitoring Strategy (Current)
P1: Lakes Probabilistic Monitoring (Current)
P2: Flowing Waters Probabilistic Monitoring (Current)
P3: Coastal Probabilistic Monitoring (Current)
Activity:
Activity:
Activity:
Activity:
serve as a foundation for the annual sampling workplans by DES, volunteers, and othe organizations. The strategy will iimplement ourwatershed approach. (Note this was tracked in FY02 as deliverable under the Activity "Prepare 2002 305(b0 Report (Current)". It wasswitched to an activity in FY03 because it is a major workproduct. P&C 16/17 obj. 2.2 #20
FY12 EPA P&C #68 & #72. FY11 EPA P&C #87 . This activity includes state-wide probabilistic montioring programs for 305b-303d reporting.No monitoring activity for FY14 or FY15. FFY16/17 EPA P&C #20 & 21, 24 (water obj 2.2).
FY 14 EPA P&C #59; FY13 EPA P&C # 65. FY12 EPA P&C #68 & #72 ; FY11 EPA P&C #87. Relates to EPA 2009 P&C list # 113 and 106supplemental funding plan. 16/16 P&C obj. 2.2 #20, 21, 24
Description:
Description:
Description:
07/01/2002
10/01/2006
10/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Data analysis
Monitoring at national sites
Statewide Intensificaiton
2013/14 National Rivers and Streams Assessment-State Intensification
2018/19 National Rivers and Streams Assessment
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Complete data analysis necessary to determine lake conditions. Analyses are dependent on the availability of data fromEPA.
Complete monitoring at up to 15 randomly assigned national sites per EPA. National site monitoring may require two fieldseasons (2017 & 2018).
WMB will complete sampling at 35 additional sites in order to make a full assessment of NH lake conditions.
END DATE EXTENDED. Covers additional assigned probability based sampling events for 2014-2016.Target = 30 sites with 4 revisits for a total of 34 events.2016-2017: Data Analysis, Planning for 2018
Probability based sampling events for 2018-2019.Target = 20 sites with 4 revisits for a total of 24 events.
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2016
10/01/2017
10/01/2016
10/01/2017
09/30/2019
09/30/2018
09/30/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NEILS, DAVID
NEILS, DAVID
NEILS, DAVID
CHAPMAN, ANDREW
CHAPMAN, ANDREW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Analyses
Sites
Sites
Analyses
Projects
1
15
35
1
1
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NEILS, DAVID
NEILS, DAVID
NEILS, DAVID
28883
28880
28882
27369
30137
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 205 of 313
WATER DIVISION WATERSHED MANAGEMENT
305(B) AND 303(D) REPORTS AND WATER QUALITY ASSESSMENTS (Current)
Div/Bur:
Program:
P3: Coastal Probabilistic Monitoring (Current)
P4: Wetlands Probabilistic Monitoring (Current)
X: Regional Meeting/Conferences - SWQAs (Current)
Y: Technical Assistance - SWQAs (Current)
Activity:
Activity:
Activity:
Activity:
10/28/15 - There will be no deliverables for this Activity until the next NCA which is in 2020.
9/13/13 - No monitoring in FY14 but is expected to resume in FY15. FY12 EPA P&C #68 & #72 FY11 EPA P&C #87. Prior to FFY 09 seeNational Coastal Assessment Activity under Tidal Water Quality Monitoring Program
8/13/14- No monitoring activity expected in FY14 or FY15- next NWCA is 2016. FY12 EPA P&C #72. Participation in the 2011 NationalWetland Condition Assessment and completion of a state level probablistic assessment of wetlands. 16/17 EPA P&C Obj 2.2, #20, 24
FY18 P&C# 25: Participation in regional / national meetings, conferences, conference calls and workgroups related to 305(b)/303(d)surface water quailty assessment (SWQA) issues. Examples include meetings and conference calls with NEIWPCC TMDL workgroups and ACWAconference calls.
This acitivity includes all time spent attending meetings, making presentations, participating in conference calls, and responding toinquiries regarding general 305(b)/303(d) issues. Examples include attendance on the NEIWPCC 305(b)/303(d) workgroups.
Description:
Description:
Description:
10/01/2008
10/01/2008
10/01/2006
10/01/2003
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
X-1: 305(b)/303(d) Workgroups - SWQA
X-1: 305(b)/303(d) Workgroups - SWQA
Y-1: Presentations - SWQA
Y-1: Presentations - SWQA
Y-2: Respond to Inquiries - SWQA
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Participation in 305(b0/303(d) Workgroups such as NEIWPCC and EPA.
Participation in 305(b0/303(d) Workgroups such as NEIWPCC and EPA.
This deliverable includes all presentations related to SWQAs not covered under any other program.
This deliverable includes all presentations related to SWQAs not covered under any other program.
This deliverable includes all time spent responding to inquiries that require some data compliation regarding305(b)/303(d) Surface Water Quality Assessments. The total number of inquires is estimated and can vary significantly inany given year. The total has been reduced in recent years as more tools have been placed on the web.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
WOOD, MATTHEW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Meetings
Presentations
Presentations
Inquiries
1
1
1
1
20
Lead Person:
Lead Person:
Lead Person:
EDWARDSON, KENNETH
WALSH, EDWARD
WOOD, MATTHEW
WOOD, MATTHEW
29161
29162
29163
29164
29165
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 206 of 313
WATER DIVISION WATERSHED MANAGEMENT
305(B) AND 303(D) REPORTS AND WATER QUALITY ASSESSMENTS (Current)
Div/Bur:
Program:
Y: Technical Assistance - SWQAs (Current)Activity:
Y-2: Respond to Inquiries - SWQADeliverable:
This deliverable includes all time spent responding to inquiries that require some data compliation regarding305(b)/303(d) Surface Water Quality Assessments. The total number of inquires is estimated and can vary significantly inany given year. The total has been reduced in recent years as more tools have been placed on the web.
Description:
10/01/2018 09/30/2019Start/End Dates: thruLead Person: WOOD, MATTHEW
Qty/Unit: Inquiries20
29166
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 207 of 313
WATER DIVISION WATERSHED MANAGEMENT
AMBIENT RIVER MONITORING (TREND/SYNOPTIC MONITORING) (Current)
Collect physicochemical and bacteriological data from rivers, streams, and brooks to determine compliance with surface water qualitystandards.10/01/2001
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees Federal EPA Federal Other Grants
Complaints (Current)
Program Administration (Current)
Technical Assistance (Current)
Water Sampling Preparation (Current)
Activity:
Activity:
Activity:
Activity:
Receive, document, and investigate river related water quality complaints
Includes proposal writing, grant preparation, MTRS workplan development, discussions with funding agency (e.g., EPA, NOAA, NHEP, etc.),state budget preparation and monitoring, grant budget preparation and monitoring, grant reporting, reading scientific literature,evaluating staff, etc.
Receive and process public requests for river water quality data/information. This includes requests from the general public,consultants, real estate agents, and state and federal agencies. Technical assistance also provided to DES or outside entities regardingsurface water quality science and monitoring.
Multiple tasks associated with water sampling, prior to onset of sampling season: (1) hire summer interns; (2) order supplies andequipment; and (3) Repair, maintain, test equipment.
Description:
Description:
Description:
Description:
10/01/2001
10/01/2006
10/01/2003
01/01/2003
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
River Complaints Received (FY 18)
Hire and Train Interns (FY 18)
Technical Assistances Provided (FY18)
Equipment Inventory (FY18)
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Tracks number of river/stream complaints received including documentations, follow-up correspondence, data input to EMD,and site visits.
Typically hire two 3 month summer ARMP interns. Deliverable includes selection of candiate for interview and finalselection of candidates to hire
Includes non-regulatory assistance to government entities, non-profits, NGOs, public, etc. Technical assistance isprovided via site visits, telephone calls, and email. [Number of assistances is based on the number of requestsreceived.]
All ARMP and complaints equipment is inspected and tested prior to the summer sampling season and at the completion ofthat years sampling. Equipment inventory spreadsheet is maintained and updated annually.
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Complaints
Interns
Assistances Provided
Inventories
20
2
30
2
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
29970
29971
29972
29973
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 208 of 313
WATER DIVISION WATERSHED MANAGEMENT
AMBIENT RIVER MONITORING (TREND/SYNOPTIC MONITORING) (Current)
Div/Bur:
Program:
Water Sampling Preparation (Current)
Water Sampling, Analysis, and Data Handling (Current)
Activity:
Activity:
Definition of all aspects of the Ambient River Monitoring Program, including QAPP development/revision; workplans; training; datacollection; field audits, verification/validation of data; data entry; data entry QC; QA/QC self-audit.
Description:
10/01/2002Start/End Dates: thru
Intern Orientation and Training (FY18)
Sampling and Analysis Plan (FY18)
Update of SOPs,, Datasheets and ARMP Manual (FY 18)
Datalogger Deployments/Datasets (FY18)
Field Audits of Interns (FY18)
Import Data Set to EMD (FY18)
QA Systems Program Self-Audit (FY18)
Water Sampling (FY18)
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide orientation and training sessions for summer ARMP interns. Training sessions inlcudes use of handheld meters,use of dataloggers, EMD training, Limonology Lab training, and complaint investigation training.
Develop 2018 sampling and analysis plan for sample collection consistent with QAPP, SOPs, and Comprehensive MonitoringStrategy, including water quality parameter and sampling station selection.
Revise/update/create SOPs, as necessary and incorporate revisions in 2018 ARMP Manual
Processing includes deployment of dataloggers, post deployment QA/QC of datalogger and data, and import into the EMD.Includes multiparameter datalogger deployments and water temperature loggers.
Accompany ARMP interns to ensure appropriate sample collection procedures, field instrumentation use, data documentation,field safety, etc.
Input 2017 water quality data to EMD. The number of entries is contingent on actual number of stations sampled andparameters analyzed. The completed data set is defined as data set following QC checks and evaluation relative tomeasurement performance criteria in approved ARMP QAPP.
Prepare ARM/TREND self-audit for 2017 sampling season, which includes, but not limited to, documentation of programobjectives, QAPP inconsistencies, and data limitations.
Collect 2018 water quality data from stations throughout New Hampshire: 40 fixed, long-term stations, 8 synoptic rotatingbasin statoins and other stations as determined by the annual SAP or as needs arise.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Interns
Plans
Plans
Data Sets
Audits
Entries
Audits
Site Visits
2
1
1
60
2
2200
1
200
Lead Person: WALSH, EDWARD
29974
29975
29976
29977
29978
29979
29980
29981
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 209 of 313
WATER DIVISION WATERSHED MANAGEMENT
BEACH INSPECTIONS (Current)
Inspect and sample for bacterial quality approximately 16 coastal beaches and 163 freshwater beaches during the summer recreationalseason. Coastal beaches are sampled weekly or every other week; freshwater beaches monthly. Beach owners are notified of violations andsigns to post are provided.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees XFederal EPA Federal Other Grants
Develop and Administer a Risk-Based Beach Evaluation and Classification Process (Current)
Lakewide Cyanobacteria Investigations (Current)
Activity:
Activity:
Develop the process to rank coastal beaches into Tier I, II & III status for sampling purposes.
Response to potential cyanobacteria blooms on waterbodies without beaches or that do not occur at beaches.
Description:
Description:
10/01/2003
10/01/2017
Start/End Dates:
Start/End Dates:
thru
thru
BEACH Act Performance Criterion 1: Risk-based beach evaluation and classification process
BEACH Act Performance Criterion 1: Risk-based beach evaluation and classification process
BEACH Act Performance Criterion 2: Tiered monitoring plan
BEACH Act Performance Criterion 2: Tiered monitoring plan
Complete microscopic analyses
Complete microscopic analyses
Cyanotoxin analysis
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Review and Revise the Tiered Monitoring Plan annually to reflect program changes. The process will be based on risk-based evaluation and classification of NH coastal beaches.
Review and Revise the Tiered Monitoring Plan annually to reflect program changes. The process will be based on risk-based evaluation and classification of NH coastal beaches.
Apply risk-based evaluations to 50% of coastal beaches on a yearly basis before summer sampling begins. The revisedstrategy (Aug. 2017) allows for each beach to be evaluated every other year. DN
Apply risk-based evaluations to 50% of coastal beaches on a yearly basis before summer sampling begins. The revisedstrategy (Aug. 2017) allows for each beach to be evaluated every other year. DN
Identification and density estimates of non-beach cyanobacteria samples
Identification and density estimates of non-beach cyanobacteria samples
ELISA tests to estimate the presence/absence and concentrations of cyanotoxins
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Processes
Processes
Evaluations
Evaluations
Samples
Samples
Tests
1
1
8
8
100
100
100
Lead Person:
Lead Person:
MCQUAID, AMANDA
MCQUAID, AMANDA
30046
30047
30048
30049
30068
30069
30070
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 210 of 313
WATER DIVISION WATERSHED MANAGEMENT
BEACH INSPECTIONS (Current)
Div/Bur:
Program:
Lakewide Cyanobacteria Investigations (Current)
Operate the coastal beach program (Current)
Activity:
Activity:
EPA P&C #72 -- The NH response to the BEACH Act Performance Criteria were approved by EPA in 2016 and guide the NH beach monitoringprogram to remain eligible for future Beach grant monies. The coastal beach program consists of sixteen beaches located along NH'smarine coast.
Description:
10/01/1999Start/End Dates: thru
Cyanotoxin analysis
Public notification of non-beach cyanobacteria blooms
Public notification of non-beach cyanobacteria blooms
BEACH Act Performance Criterion 3: Methods and assessment procedures for Coastal Beach Sampling
BEACH Act Performance Criterion 3: Methods and assessment procedures for Coastal Beach Sampling
BEACH Act Performance Criterion 4: Monitoring report submission
BEACH Act Performance Criterion 4: Monitoring report submission
Performance criterion 8: Notification Report Submission
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
ELISA tests to estimate the presence/absence and concentrations of cyanotoxins
Phone calls, emails, web updates, twitter, press releases to inform public and public officials of unsafe bathingconditions due to cyanobacteria blooms.
Phone calls, emails, web updates, twitter, press releases to inform public and public officials of unsafe bathingconditions due to cyanobacteria blooms.
Inspect and monitor coastal public beaches on a weekly or bi-weekly basis during the swim season.
Inspect and monitor coastal public beaches on a weekly or bi-weekly basis during the swim season.
Develop a mechanism to collect and report monitoring data in timely reports. They must report their monitoring data toEPA at least annually. Notification data is submitted at least yearly by NH DES Data management section staff.
Develop a mechanism to collect and report monitoring data in timely reports. They must report their monitoring data toEPA at least annually. Notification data is submitted at least yearly by NH DES Data management section staff.
Report to EPA the actions they have taken to notify the public when water quality standards are exceeded. Notificationdata is submitted at least yearly by NH DES Data management section staff.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
01/01/2019
10/01/2017
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
12/31/2018
12/31/2019
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Tests
Notices
Notices
Inspections
Inspections
Data Submitted
Data Submitted
Reporting Requirements
100
15
15
250
250
1
1
1
Lead Person: MCQUAID, AMANDA
30071
30072
30073
30050
30051
29796
29870
29798
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 211 of 313
WATER DIVISION WATERSHED MANAGEMENT
BEACH INSPECTIONS (Current)
Div/Bur:
Program:
Operate the coastal beach program (Current)
Operate the freshwater beach program (Current)
Public Notification and Risk Management (Current)
Activity:
Activity:
Activity:
All freshwater public beaches throughout the state.
EPA P&C #72 : Increase public education and awareness of the Beach Program and program activities. Encourage public comment on programactivities. Develop new means to increase program outreach activities.
Description:
Description:
10/01/1999
10/01/2002
Start/End Dates:
Start/End Dates:
thru
thru
Performance criterion 8: Notification Report Submission
Monitor Public beaches for cyanobacteria scums and issue advisories if confirmed
Monitor Public beaches for cyanobacteria scums and issue advisories if confirmed
Sample Freshwater Beaches
Sample Freshwater Beaches
BEACH Act Criterion 11: Public Evaluation of Program
BEACH Act Criterion 11: Public Evaluation of Program
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Report to EPA the actions they have taken to notify the public when water quality standards are exceeded. Notificationdata is submitted at least yearly by NH DES Data management section staff.
Monitor all public bathing beaches for cyanobacteria scums and post advisories if potential toxic producing cyanobacteriaare present.
Monitor all public bathing beaches for cyanobacteria scums and post advisories if potential toxic producing cyanobacteriaare present.
Inspect and sample for bacterial quality approximately 163 freshwater beaches (3 samples per beach) on a monthly basisduring the summer recreational season. Inform beach owners of violations and provide signs to post.
Inspect and sample for bacterial quality approximately 163 freshwater beaches (3 samples per beach) on a monthly basisduring the summer recreational season. Inform beach owners of violations and provide signs to post.
A notification shall be give to the public of the most recent tiered assessment of coastal beaches. The public will havean opportunity to give comment on the program. The comment period should occur from January to the end of March yearly.
A notification shall be give to the public of the most recent tiered assessment of coastal beaches. The public will havean opportunity to give comment on the program. The comment period should occur from January to the end of March yearly.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2019
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
12/31/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COFRIN, MELANIE
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reporting Requirements
Inspections
Inspections
Inspections
Inspections
Public Comment Periods
Public Comment Periods
1
25
25
375
375
1
1
Lead Person:
Lead Person:
MCQUAID, AMANDA
MCQUAID, AMANDA
29871
30052
30053
30054
30055
30056
30057
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 212 of 313
WATER DIVISION WATERSHED MANAGEMENT
BEACH INSPECTIONS (Current)
Div/Bur:
Program:
Public Notification and Risk Management (Current)
Submit Reports to EPA (Current)
Activity:
Activity:
Submit reports on the progress of Beach workplan activities.Description:10/01/2002Start/End Dates: thru
BEACH Act Criterion 6: Public notification and risk management plan
BEACH Act Criterion 6: Public notification and risk management plan
BEACH Act Performance Criterion 7: Actions to notify the public
BEACH Act Performance Criterion 7: Actions to notify the public
Produce Annual Reports
Produce Annual Reports
Quarterly Grant Update
Quarterly Grant Update
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Review and Revise Public Notification and Risk Communication Plan Annually to reflect Beach Program changes.
Review and Revise Public Notification and Risk Communication Plan Annually to reflect Beach Program changes.
Review, revise, and update website quarterly. Check for dead links and other issues. Generate possible improvements tonotify public of issues at beaches.
Review, revise, and update website quarterly. Check for dead links and other issues. Generate possible improvements tonotify public of issues at beaches.
Produce and submit annual performance report on program activities. Historically, this has been due April 1.
Produce and submit annual performance report on program activities. Historically, this has been due April 1.
Programmatic Condition #2 for yearly grant. Quarterly program updates can be in the form of meetings or telephoneconversations.
Programmatic Condition #2 for yearly grant. Quarterly program updates can be in the form of meetings or telephoneconversations.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
MCQUAID, AMANDA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reviews
Reviews
Reviews
Reviews
Reports, Final
Reports, Final
Updates
Updates
1
1
4
4
1
1
4
4
Lead Person: MCQUAID, AMANDA
30058
30059
30060
30061
30062
30063
30064
30065
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 213 of 313
WATER DIVISION WATERSHED MANAGEMENT
BEACH INSPECTIONS (Current)
Div/Bur:
Program:
Submit Reports to EPA (Current)Activity:
Submit MBE/WBE Quarterly reports
Submit MBE/WBE Quarterly reports
Deliverable:
Deliverable:
Produce and submit quarterly reports to EPA ([email protected]) on the procurements from Minority & Women BusinessEnterprises outlined in the grant workplans. 1 reports per year needed. Yearly report submitted after Sept 30 for allopen grants.
Produce and submit quarterly reports to EPA ([email protected]) on the procurements from Minority & Women BusinessEnterprises outlined in the grant workplans. 1 reports per year needed. Yearly report submitted after Sept 30 for allopen grants.
Description:
Description:
10/01/2017
10/01/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
MCQUAID, AMANDA
MCQUAID, AMANDA
Qty/Unit:
Qty/Unit:
Reporting Cycles
Reporting Cycles
1
1
30066
30067
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 214 of 313
WATER DIVISION WATERSHED MANAGEMENT
BIOMONITORING (Current)
Collect and interpret biological data, primarily from wadable streams. Information is used to determine surface water quality violations,for enforcement, and towards establishing statewide numeric biological criteria.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees XFederal EPA Federal Other Grants
Biological Monitoring (Current)
Equipment maintenance and supply ordering (Current)
Lakes Biocriteria Development (Current)
NPDES permit biological evaluations (Current)
Participate in regional biomonitoring program development efforts (Current)
Activity:
Activity:
Activity:
Activity:
Activity:
Projects related to the collection of data to monitor the condition of aquatic communities. A majority of standard monitoring activitieswill be suspended in 2008-09 in order to complete a probabilistic assessment of flowing waters. See 305b/303d program for details
The program utilizes a variety of equipment that must be maintained and replaced regularly
No work being done with lakes biocriteria in 2016/17. EPA 2009 P&C list #80. EPA 2011 P & C #138. No Deliverables in 2010, 2011, 2012due to limited staff support. 2013 EPA P & C # 68. 2014 EPA P&C list # 62, 66. FFY2016/17 EPA P&C #28 (water obj 2.2)
Review, evaluate and recommend action on biological monitoring programs for NPDES permits.
EPA P&C LIST FY2012 #71: NE biomonitoring programs are continually working to advance biological assessment techniques. 2014 EPA P&Clist # 62. 2015 EPA P&C list #23 (Goal 2, Water). P&C obj 2.2 #23.
Description:
Description:
Description:
Description:
Description:
10/01/2006
10/01/2004
12/01/2006
10/01/2015
10/01/2004
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Biological Monitoring for purposes of aquatic life use determination
Field Equipment Inspection / Maintenance
Order supplies required for laboratory and field operations
NPDES permits, reeview and evaluate biological monitoring programs
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Trend and Synoptic sampling for assessment purposes, index refinement, calibration, and WQS development. Includes annualsite slection for Synoptic sites and collection of macroinvertebrates and/ or fish at 28 Trend stations and 8-10 Synopticstations on an annual basis.
A variety of equipment requires regular inspection and maintenance
Participate on technical advisory committees, review annual monitoring reports, and evaluate and recommend changes tobiological monitoring programs for Seabrook Station, Vermont Yankee, Merrimack Station and other thermal dischargepermits or other NPDES permits requiring biological monitoring, as needed. Unit is reviews but also includes meetings.
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CHAPMAN, ANDREW
CHAPMAN, ANDREW
CHAPMAN, ANDREW
CHAPMAN, ANDREW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Projects
Inspections
Orders
Reviews
2
20
20
2
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CHAPMAN, ANDREW
CHAPMAN, ANDREW
NEILS, DAVID
CHAPMAN, ANDREW
30138
30143
30145
30144
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 215 of 313
WATER DIVISION WATERSHED MANAGEMENT
BIOMONITORING (Current)
Div/Bur:
Program:
Participate in regional biomonitoring program development efforts (Current)
Program Administration (Current)
Quality Assurance (Current)
Special Studies (Current)
Wadeable Streams Biocriteria Development (Current)
Activity:
Activity:
Activity:
Activity:
Activity:
MTRS, timesheets, IOIs, contracts, staffing, budgets, bureau coordination
The Biomonitoring Program will prepare, update, and adhere to a QAPP that will reflect current activities.
Projects undertaken that are outside the normal program activities. Usually designed to develop or improve program operations. May nothave deliverables every year.
1st to 4th order streams. P&C 16 obj 2.2 # 29. P&C 17 obj 2.2 # 28
Description:
Description:
Description:
Description:
10/01/2005
09/01/2001
10/01/2006
10/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
EPA P&C, Regional meetings, conference calls, etc.
Staffing, Biomonitoring Interns
Biomonitoring Program QAPP, Annual Update
Warmwater Fish index of biological integrity
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Used as a placeholder for unplanned meetings, conference calls. Quantity is only an estimate. 2015 EPA P&C list, Goal 2(Water), # 23.
Relates to the hiring and management of Biomonitoring Interns.
QAQC: Biomonitoring QAPP merged with Ambient River Monitoring QAPP in 2014. Update Biomonitoring Component of new QAPPannually. Site Code BIOMO01120
END DATE EXTENDED; FY2013 EPA P&C list #69. FY11 EPA P&C list #91; FY10 EPA supplemental monitoring grant; Dataextraction and analysis; Relates to #80 on EPA FY 2009 P&C list. Also on EPA 106 supplemental funding plan. 2013 EPAP&C list #68. 2014 and 15 EPA P&C list # 66. 2016 P&C Obj 2.2, #29. 2017 P&C Obj 2.2, #28.
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2014
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CHAPMAN, ANDREW
CHAPMAN, ANDREW
CHAPMAN, ANDREW
CHAPMAN, ANDREW
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Persons
Updates
Analyses
10
2
1
1
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NEILS, DAVID
CHAPMAN, ANDREW
CHAPMAN, ANDREW
NELSON, KIRSTEN
CHAPMAN, ANDREW
30146
30147
30148
26447
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 216 of 313
WATER DIVISION WATERSHED MANAGEMENT
CLEAN VESSEL ACT AND BOAT INSPECTIONS RSA 487:1-14 (Current)
Funding is provided through U.S. Fish and Wildlife Services to help reduce pollution from boat sewage discharges. This helps protectpublic health and limits nutrient discharges into surface water bodies.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees Federal EPA Federal Other X Grants
Boat inspections (Current)
Coastal CVA (Current)
Activity:
Activity:
Monitor vessel compliance with coastal and inland No Discharge Area regulations.
As stated in grant proposals
Description:
Description:
10/01/1999
10/01/2006
Start/End Dates:
Start/End Dates:
thru
thru
Coastal boat inspections
Coastal boat inspections
Coastal boat inspections
Inland boat inspections
Inland boat inspections
Inland boat inspections
Coastal pumpout boat operation
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Cooperative effort with Coast Guard Auxiliary and Power Squadron. Safety inspection includes NDA discussion ofregulations.
Cooperative effort with Coast Guard Auxiliary and Power Squadron. Safety inspection includes NDA discussion ofregulations.
Cooperative effort with Coast Guard Auxiliary and Power Squadron. Safety inspection includes NDA discussion ofregulations.
Conduct inspections of recreational boat plumbing for compliance with inland No Discharge regulations. Issue decals andmaintain database of inspected vessels.
Conduct inspections of recreational boat plumbing for compliance with inland No Discharge regulations. Issue decals andmaintain database of inspected vessels.
Conduct inspections of recreational boat plumbing for compliance with inland No Discharge regulations. Issue decals andmaintain database of inspected vessels.
Reimburse contractor for staff and other expenses; cover costs for seasonal operation and maintenance needs of vessel
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
01/01/2019
01/01/2017
01/01/2018
01/01/2019
01/01/2017
12/31/2017
12/31/2018
12/31/2019
12/31/2017
12/31/2018
12/31/2019
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Inspections
Inspections
Inspections
Inspections
Inspections
Invoices
300
300
300
80
80
80
15
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
28615
29799
29873
28616
29800
29874
28618
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 217 of 313
WATER DIVISION WATERSHED MANAGEMENT
CLEAN VESSEL ACT AND BOAT INSPECTIONS RSA 487:1-14 (Current)
Div/Bur:
Program:
Coastal CVA (Current)
Coastal No Discharge Area Implementation (Current)
Activity:
Activity:
2016/17 P&C #71, FY 14 P&C #110, 2012 EPAPPA # 118; 2011 EPAPPA #118; 2009 EPAPPA #111; 2008 EPAPPA #109; 2007 EPA P&C #93Description:10/01/2005Start/End Dates: thru
Coastal pumpout boat operation
Coastal pumpout boat operation
Inspect Pumpout/Dump Stations
Operation and Maintenance Funding
Operation and Maintenance Funding
Operation and Maintenance Funding
Replace one coastal pumpout station
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Reimburse contractor for staff and other expenses; cover costs for seasonal operation and maintenance needs of vessel
Reimburse contractor for staff and other expenses; cover costs for seasonal operation and maintenance needs of vessel
Date changed from 12/31/17 to 12/31/18
Reimburse qualifying/participating coastal marinas for annual operation and maintenance costs up to set grant amount
Reimburse qualifying/participating coastal marinas for annual operation and maintenance costs up to set grant amount
Reimburse qualifying/participating coastal marinas for annual operation and maintenance costs up to set grant amount
Deliverable includes either replacement or new installation. Initial efforts put toward new facility at Harbour PlaceMarina. Then a focus to install pumpout facility at Fisherman's Pier, Portsmouth NH or Pepperell Cove. Now working onrepair to Hampton River Marina. EXTENDED DATE FROM 09/30/2009 TO 09/30/2010 ON 07/29/2009; EXTENDED DATE FROM 09/30/2010TO 09/30/2011 ON 08/12/2010; EXTENDED DATE FROM 9/30/2011 TO 9/30/2012 ON 09/06/2011;EXTENDED DATE FROM 9/30/2012 TO9/30/2013 ON 8/01/2012; EXTENDED DATE FROM 9/30/2013 TO 9/30/2015 ON 01/08/2014. Extended date to 9/30/2016 on 7/30/2015.Extended date to 12/31/2017 on 8/22/2016. Extended end date to 12/31/18.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
01/01/2019
10/01/2016
07/01/2016
01/01/2018
01/01/2019
10/01/2006
12/31/2018
12/31/2019
12/31/2018
12/31/2017
12/31/2018
12/31/2019
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Invoices
Invoices
Inspections
Marinas
Marinas
Marinas
Stations
15
15
5
2
2
2
1
Lead Person: NEILS, DAVID
29802
29875
28619
28620
29804
29876
14820
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 218 of 313
WATER DIVISION WATERSHED MANAGEMENT
CLEAN VESSEL ACT AND BOAT INSPECTIONS RSA 487:1-14 (Current)
Div/Bur:
Program:
Coastal No Discharge Area Implementation (Current)Activity:
Enforcement - coordinate slip rental and mooring site agreements
Enforcement - coordinate slip rental and mooring site agreements
Enforcement - coordinate slip rental and mooring site agreements
Enforcement - establish an enforcement program
Enforcement - establish an enforcement program
Enforcement - establish an enforcement program
Public Education - Conduct informational meetings for boaters
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2016/17 P&C #71, 2012 EPAPPA # 118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 Encourage provisions within agreement to dismiss violators from slip/mooring and require pumpouts for liveaboards. Dateextended to from 9/30/2017 to 12/31/2017 on 8/22/2016 to change the date range to a calendar year.
2016/17 P&C #71, 2012 EPAPPA # 118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 Encourage provisions within agreement to dismiss violators from slip/mooring and require pumpouts for liveaboards. Dateextended to from 9/30/2017 to 12/31/2017 on 8/22/2016 to change the date range to a calendar year.
2016/17 P&C #71, 2012 EPAPPA # 118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 Encourage provisions within agreement to dismiss violators from slip/mooring and require pumpouts for liveaboards. Dateextended to from 9/30/2017 to 12/31/2017 on 8/22/2016 to change the date range to a calendar year.
2016/17 P&C #71, 2012 EPAPPA #118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 Monitor no discharge area regulations through potential bacteria and dye analysis, revise state legislation, andcoordinate with the DES Shellfish Program, Coast Guard and other agencies. Date extended to from 9/30/2017 to 12/31/2017on 8/22/2016 to change the date range to a calendar year.
2016/17 P&C #71, 2012 EPAPPA #118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 Monitor no discharge area regulations through potential bacteria and dye analysis, revise state legislation, andcoordinate with the DES Shellfish Program, Coast Guard and other agencies.
2016/17 P&C #71, 2012 EPAPPA #118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 Monitor no discharge area regulations through potential bacteria and dye analysis, revise state legislation, andcoordinate with the DES Shellfish Program, Coast Guard and other agencies.
2016/17 P&C #71, 2012 EPAPPA # 118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 Annual site visit at marinas (discuss NDA); distribute outreach material.Date extended to from 9/30/2017 to 12/31/2017 on 8/22/2016 to change the date range to a calendar year.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2016
01/01/2018
01/01/2019
10/01/2016
01/01/2018
01/01/2019
10/01/2016
12/31/2017
12/31/2018
12/31/2019
12/31/2017
12/31/2018
12/31/2019
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Activities
Actions
Actions
Programs
Programs
Programs
Outreach Activities
3
4
4
1
1
1
5
27040
29806
29877
27041
29808
29878
27042
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 219 of 313
WATER DIVISION WATERSHED MANAGEMENT
CLEAN VESSEL ACT AND BOAT INSPECTIONS RSA 487:1-14 (Current)
Div/Bur:
Program:
Coastal No Discharge Area Implementation (Current)
Inland CVA (Current)
Activity:
Activity:
As stated in grant proposalsDescription:10/01/2006Start/End Dates: thru
Public Education - Conduct informational meetings for boaters
Public Education - Conduct informational meetings for boaters
Public Education - boat inspectors to identify boat plumbing discharge
Public Education - boat inspectors to identify boat plumbing discharge
Public Education - boat inspectors to identify boat plumbing discharge
Public Education - outreach materials
Public Education - peer based education
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2016/17 P&C #71, 2012 EPAPPA # 118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 Annual site visit at marinas (discuss NDA); distribute outreach material.
2016/17 P&C #71, 2012 EPAPPA # 118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 Annual site visit at marinas (discuss NDA); distribute outreach material.
2016/17 P&C #71, FY 2014 P&C #110, 2012 EPAPPA # 118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA#93 provide outreach material and support for Power Squadron, Coast Guard Auxiliary, and other interested groups.Date extended to from 9/30/2017 to 12/31/2017 on 8/22/2016 to change the date range to a calendar year.
2016/17 P&C #71, FY 2014 P&C #110, 2012 EPAPPA # 118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA#93 provide outreach material and support for Power Squadron, Coast Guard Auxiliary, and other interested groups.
2016/17 P&C #71, FY 2014 P&C #110, 2012 EPAPPA # 118; 2011 EPAPPA # 118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA#93 provide outreach material and support for Power Squadron, Coast Guard Auxiliary, and other interested groups.
2016/17 P&C #71, 2012 EPAPPA # 118; 2011 EPAPPA #118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 outreach todiscuss No Discharge Areas including brochures, websites, signs and posters, etc. Collaborate with non-profit groups andother intestested parties as available. Date extended to from 9/30/2017 to 12/31/2017 on 8/22/2016 to change the daterange to a calendar year.
2016/17 P&C #71, Fy14 P&C #110, 2012 EPAPPA #118; 2011 EPAPPA #118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93collaboration with non-profit groups and other interested parties;Date extended to from 9/30/2017 to 12/31/2017 on 8/22/2016 to change the date range to a calendar year.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
01/01/2019
10/01/2016
01/01/2018
01/01/2019
10/01/2016
10/01/2016
12/31/2018
12/31/2019
12/31/2017
12/31/2018
12/31/2019
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Outreach Activities
Outreach Activities
Activities
Activities
Activities
Activities
Activities
5
5
2
2
2
10
4
Lead Person: COFRIN, MELANIE
29809
29879
27043
29810
29880
27044
27046
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 220 of 313
WATER DIVISION WATERSHED MANAGEMENT
CLEAN VESSEL ACT AND BOAT INSPECTIONS RSA 487:1-14 (Current)
Div/Bur:
Program:
Inland CVA (Current)
Legislation (Current)
Program Administration (Current)
Activity:
Activity:
Activity:
Moved one deliverable to Program Administration for 2018.Description:
Description:
10/01/2006
10/01/2005
12/31/2017Start/End Dates:
Start/End Dates:
thru
thru
Inspect Pumpout/Dump Stations
Operation and Maintenance Funding
Operation and Maintenance Funding
Operation and Maintenance Funding
Replace/Install an inland pumpout facility
Replace/Install an inland pumpout facility
Monitor, prepare and/or revise legislation as it relates to vessel sewage discharge
Attend workshops, conferences, and classes
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Annual Site visit. date extended to 12/31/18
Reimburse qualifying inland marinas for operation and maintenance costs up to $1500
Reimburse qualifying inland marinas for operation and maintenance costs up to $1500
Reimburse qualifying inland marinas for operation and maintenance costs up to $1500
As requested. Updated end date from 9/30/2015 to 9/30/2017 on 10/12/2015.
New deliverable as of 1/1/2017, previous ended prior to end date.
Deliverable references both coastal and inland No Discharge Area and related sewage discharge laws.
To keep up on current CVA related information and further education about new ideas, implementation of CVA regulations,etc.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
07/01/2016
01/01/2018
01/01/2019
10/01/2014
01/01/2017
10/01/2016
10/01/2016
12/31/2018
12/31/2017
12/31/2018
12/31/2019
12/31/2017
12/31/2018
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Grants
Grants
Grants
Stations
Stations
Legislation
Events
15
4
4
4
1
1
1
1
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
28625
28623
29813
29881
25281
28624
28626
28627
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 221 of 313
WATER DIVISION WATERSHED MANAGEMENT
CLEAN VESSEL ACT AND BOAT INSPECTIONS RSA 487:1-14 (Current)
Div/Bur:
Program:
Program Administration (Current)Activity:
Attend workshops, conferences, and classes
Attend workshops, conferences, and classes
Monitor, prepare and/or revise legislation as it relates to vessel sewage discharge
Monitor, prepare and/or revise legislation as it relates to vessel sewage discharge
Prepare and manage budgets, contracts and grant agreements
Prepare and manage grant agreements
Prepare and manage grant agreements
Prepare federal grant application and reports
Prepare federal grant application and reports
Prepare grant awards and reports
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
To keep up on current CVA related information and further education about new ideas, implementation of CVA regulations,etc.
To keep up on current CVA related information and further education about new ideas, implementation of CVA regulations,etc.
To keep aware and engaged with current legislation related to vessel sewage discharge.
To keep aware and engaged with current legislation related to vessel sewage discharge.
Deliverable includes internal and G&C requests.
Deliverable includes internal and G&C requests.
Deliverable includes internal and G&C requests.
Deliverable includes interim and final federal grant reports as well as initial application for grant.
Deliverable includes interim and final federal grant reports as well as initial application for grant.
Deliverable includes interim and final federal grant reports as well as initial application for grants.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
01/01/2019
01/01/2018
01/01/2019
10/01/2016
01/01/2018
01/01/2019
01/01/2018
01/01/2019
10/01/2016
12/31/2018
12/31/2019
12/31/2018
12/31/2019
12/31/2017
12/31/2018
12/31/2019
12/31/2018
12/31/2019
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Events
Events
Legislation
Legislation
Activities
Activities
Activities
Reports, Final
Reports, Final
Reports, Final
1
1
1
1
10
10
10
2
2
2
29815
29882
29816
29883
28628
29817
29884
29818
29885
28629
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 222 of 313
WATER DIVISION WATERSHED MANAGEMENT
CLEAN VESSEL ACT AND BOAT INSPECTIONS RSA 487:1-14 (Current)
Div/Bur:
Program:
Program Administration (Current)Activity:
Provide Educational and Technical Outreach to Marinas and Boat Owners
Provide Educational and Technical Outreach to Marinas and Boat Owners
Provide Educational and Technical Outreach to Marinas and Boat Owners
Deliverable:
Deliverable:
Deliverable:
Includes education on CVA regulations, best practices, and what the CVA program can offer to assist marinas and otherboating organizations.
Includes education on CVA regulations, best practices, and what the CVA program can offer to assist marinas and otherboating organizations as well as NDA regulations. Combined with 2016/17 P&C #71, 2012 EPAPPA # 118; 2011 EPAPPA #118;2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 outreach to discuss No Discharge Areas including brochures, websites,signs and posters, etc. Collaborate with non-profit groups and other intestested parties as available. Combined with2016/17 P&C #71, Fy14 P&C #110, 2012 EPAPPA #118; 2011 EPAPPA #118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93(interested parties collaboration).
Includes education on CVA regulations, best practices, and what the CVA program can offer to assist marinas and otherboating organizations as well as NDA regulations. Combined with 2016/17 P&C #71, 2012 EPAPPA # 118; 2011 EPAPPA #118;2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93 outreach to discuss No Discharge Areas including brochures, websites,signs and posters, etc. Collaborate with non-profit groups and other intestested parties as available. Combined with2016/17 P&C #71, Fy14 P&C #110, 2012 EPAPPA #118; 2011 EPAPPA #118; 2009 EPAPPA #111; 2008 P & C #109; 2007 EPAPPA #93(interested parties collaboration).
Description:
Description:
Description:
10/01/2016
01/01/2018
01/01/2019
12/31/2017
12/31/2018
12/31/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Activities
Activities
Activities
10
10
10
28630
29814
29886
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 223 of 313
WATER DIVISION WATERSHED MANAGEMENT
COASTAL PROGRAM (Current)
NHCP gained federal approval in 1982 under the provisions of the Coastal Zone Management Act. In January 2004, the official coastalzone boundary was expanded from a narrow band along the coast and Great Bay to now incorporate all 17 coastal communities in theirentirety. NHCP provides technical assistance and grants to the seventeen coastal communities, non-profit organizations, state agencies,public school districts, and research institutions. Major programs include habitat restoration, competitive grants, coastal non-pointpollution control program, federal consistency review, technical assistance and outreach/education. NHCP is networked with other stateagencies which help enforce the program's 16 coastal policies and conduct reviews of projects in the NH coastal zone -- severalenforcement positions are funded within other bureaus within DES.07/01/2004
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other X Grants
Coastal Restoration Program (Current)
Communications (Current)
Coordination Activities (Current)
Activity:
Activity:
Activity:
The purpose of the restoration program is to restore degraded coastal watershed habitats.
NHCP's marketing and communications strategy will introduce and reiterate NHCP'smission. The message will focus on NHCP as a regional coordinator, project catalyst, andinformation resource.
The New Hampshire Coastal program is involved in many national and regional projects and organizations that are attempting to improvecoastal zone management. New Hampshire's participation in these efforts is important to the long-term improvement of our coasts.
Description:
Description:
Description:
10/01/2004
10/01/2005
10/01/2010
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Coastal Restoration Program
Maintain coastal program website.
Manage the Coastal Programs internal and external media relations efforts.
Coastal States Organization
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Salt Marsh and River Restoration Project Planning and Implementation. The staff will work with communities to implementrestoration projects. Also, administer various NOAA and other Federal grants for restoration projects. A report will bepresented which outlines the progress on the various restoration projects underway.
Post new content. Develop content and ensure grammatical accuracy, clarity, completeness and editorial conformity toestablished DES guidelines for new webpages. Utilize the website as a marketing tool by making frequent updates,including posting new events, RFPs, and other announcements under the "Hot Topics" listing on the homepage.
Seek to place stories on the Coastal Programs activities and coastal watershed environmental issues in media outlets.Seek out collaboration with our partners to announce newsworthy topics. Research and write content for media materials.
NHCP participates in CSO which serves as a liason with NOAA, other federal agencies and congress on behlaf of state CZMprograms.
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2019
09/30/2019
09/30/2019
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LUCEY, KEVIN
COLETTI, CATHERINE
COLETTI, CATHERINE
COUTURE, STEVEN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Projects
Web Site Postings
Press releases
Meetings
4
40
8
8
Lead Person:
Lead Person:
Lead Person:
LUCEY, KEVIN
COLETTI, CATHERINE
COUTURE, STEVEN
29519
29522
29523
29526
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 224 of 313
WATER DIVISION WATERSHED MANAGEMENT
COASTAL PROGRAM (Current)
Div/Bur:
Program:
Coordination Activities (Current)
Enhancement Grants Program (Current)
Federal Consistency and Policy (Current)
Activity:
Activity:
Activity:
Section 309 of the Coastal Zone Management Act (CZMA), establishes a voluntary coastal zone enhancement grants program to encourageState Coastal Management Programs (CMPs) to develop program changes in one or more of nine enhancement areas.nine enhancement areas.
Staff will conduct reviews of and coordinate appropriate oversight by other state agencies for: direct federal agency activities, federallicenses and permits, and federal financial assistance/intergovernmental review affecting NH coastal resources. Staff will input programamendments and routine program changes to reflect new/amended legislation and regulations and ensure that NHCP policies are appropriate.
Description:
Description:
10/01/2010
10/01/2004
Start/End Dates:
Start/End Dates:
thru
thru
Gulf of Maine Council
Northeast Regional Ocean Council
Ocean Planning
Piscataquog Regional Estuaries Partnership
NH Coastal Adaptation Workgroup
Section 309 program administration and implementation
Dredge material management
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
NHCP staff participate in the GOMC.
Staff will participate in NROC committee and full NROC meetings.
The Coastal Program will support regional ocean planning efforts through participation in the Northeast Regional PlanningBody (RPB). NHCP staff will provide assistance to Commissioner Burack in his role as an RPB member, and participate in anumber of work groups established to help meet the goals identified by the RPB.
Participate on Piscataqua Region Estuaries Partnership Management Comittee and coordinate with UNH to supportimplementation of Piscataqua Region Estuaries CCMP
Participate in planning and facilitation of the NH Coastal Adaptation Workgroup efforts.
Staff will administer and implement the 2016 Assessement and report on any problems or new issues with regards to 309tasks in the priority enhancement areas.
Participate on State Dredging Team to coordinate with NH Fish and Game, Pease Development Authority-Division of Ports andHarbors and other relevant state and federal agencies that regulate dredging and dredged material management in NewHampshire coastal waters. (CO-6)
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2019
09/30/2019
09/30/2019
09/30/2019
09/30/2019
09/30/2019
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COUTURE, STEVEN
WILLIAMS, CHRISTIAN
WILLIAMS, CHRISTIAN
COUTURE, STEVEN
HOWARD, KIRSTEN
COUTURE, STEVEN
WILLIAMS, CHRISTIAN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Meetings
Meetings
Meetings
Meetings
Reporting Cycles
Meetings
8
16
8
12
20
2
3
Lead Person:
Lead Person:
COUTURE, STEVEN
WILLIAMS, CHRISTIAN
29527
29528
29529
29530
29531
29532
29533
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 225 of 313
WATER DIVISION WATERSHED MANAGEMENT
COASTAL PROGRAM (Current)
Div/Bur:
Program:
Federal Consistency and Policy (Current)
Grants Management (Current)
Permitting and Enforcement (Current)
Program Administration (Current)
Activity:
Activity:
Activity:
Activity:
Develop and manage projects funded under the competitive and technical assistance grants
Staff will track permitting and enforcement activities by wetlands bureau inspectors and report to NOAA every six months the number ofpermits issued, enforcement activities conducted and inspections performed by the four inspectors
Overall management and administration of the NOAA grant to the NHCP. Includes management of office operations; staffing management;MOA's; assessing other programs and funds to implement the NHCP; and 312 program reviews.
Description:
Description:
Description:
10/01/2006
10/01/2010
10/01/2004
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Federal Consistency Decisions
New England Regional Dredge Team
Potential Dredged Material Disposal Site
Evaluate Proposals for Funding
Semi-annual Reports to NOAA on permitting and enforcement activities
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Staff will conduct reviews of and coordinate appropriate oversight by other state agencies for: direct federal agencyactivities, federal licenses and permits, and federal financial assistance/intergovernmental review affecting NH coastalresources.
Participate on New England Regional Dredging Team Technical Workgroup (aka Sudbury Group) to coordinate with otherfederal and state agencies on planning and regulatory activities associated with dredging and dredged material managementin New England.
Work with EPA and Corps to conduct environmental studies in support of a potential dredged material dispsal site to servethe Hampshire and southern Maine region.
As appropriate, use state administrative rules to guide scoring of grants. Communicate with grantees. Write andadminister grants awarded in this cycle and open grants from previous cycles.
Over the two year reporting period, four semi-annual reports will be submitted to NOAA, each listing the number ofinspections performed, permits issued and enforcement actions taken by the four wetlands inspectors in the coastalwatershed during the preceding six-months
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2019
09/30/2019
09/30/2019
09/30/2019
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WILLIAMS, CHRISTIAN
WILLIAMS, CHRISTIAN
WILLIAMS, CHRISTIAN
COLETTI, CATHERINE
COLETTI, CATHERINE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Decisions
Meetings
Meetings
Applications, Grants
Reporting Cycles
40
2
4
20
4
Lead Person:
Lead Person:
Lead Person:
COLETTI, CATHERINE
COLETTI, CATHERINE
COUTURE, STEVEN
29534
29535
29536
29538
29537
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 226 of 313
WATER DIVISION WATERSHED MANAGEMENT
COASTAL PROGRAM (Current)
Div/Bur:
Program:
Program Administration (Current)Activity:
CSO-OCRM Performance Measures Report
Annual application for funding to NOAA
Semi-annual reports to NOAA
Deliverable:
Deliverable:
Deliverable:
Develop annual CSO-OCRM Performance Measures Report.
Prepare and submit unified 306/309/310 funding application to NOAA. Includes state budgets, tracking funds, and otherfinancial issues.
Complete semi-annual reports to NOAA
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
09/30/2019
09/30/2019
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
COLETTI, CATHERINE
COUTURE, STEVEN
COLETTI, CATHERINE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Applications, Grants
Reporting Cycles
2
2
4
29539
29540
29541
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 227 of 313
WATER DIVISION WATERSHED MANAGEMENT
EXOTIC AQUATIC PLANT CONTROL RSA 487:16-29 (Current)
Control existing exotic aquatic plant infestations (primarily milfoil) and prevent new infestations through education, monitoring,research, and treatment. For example, the program trains volunteer "weed watchers" and provides grants for controls such as herbicideapplication, for "lake hosts" to inspect boats and educate the public at public boat access sites, and grants for exotics controlresearch.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
XFunding: State General State Fees Federal EPA Federal Other Grants
Milfoil Genetics Research (Current)
Administer Milfoil Grants Program (Current)
Aquatic Nuisance Species Management Plan (Current)
Conduct field sampling and monitoring activities for exotics on surface waters of New Hampshire (Current)
Activity:
Activity:
Activity:
Activity:
Collect plant samples in the field, process them in the Limnology Center, and work with identified milfoil genetecits to perform DNAanalyses on unidentifiable milfoil specimens as needed.
Solicit Grants/Proposals and award grants based on objective review process as funds allow
Coordinate activities associated with drafting and finalizing a statewide Aquatic Nuisance Species Management Plan following guidelinesestablished through the US Fish and Wildlife Services.
Conduct field visits and site inspections to determine the presence/absence of exotic aquatic organisms (primarily plants), performmapping activities, water sampling activities as needed, as perform a site assessment for tracking and remediation purposes.
Description:
Description:
Description:
Description:
09/30/2001
09/01/2004
01/01/2005
07/01/2001
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Solicit requests and proposals for funding and evaluate projects and award grants
Draft Statewide ANS Management Plan
Conduct regular inspections of aquarium and outdoor garden centers that sell live aquatic plants
Perform field investigations of exotic aquatic plant complaints
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Send out notification of available grant funds, solicit proposals/projects, review applications/proposals, award grants,and establish contracts/agreements for granting of funds.
End date extended from 12/31/2016; End date Extended from 12/31/2015
Using a summer intern, conduct a round of inspections to determine if pet stores or aquarium dealers are sellingprohibited exotic plants. Work with Department of Ag to keep track of nurseries with aquatic plants. Issue fines asappropriate.
Respond to exotic aquatic plant complaints by obtaining voucher specimens and/or conducting site inspections to determinethe presence/absence and/or extent of aquatic plant infestations.
Description:
Description:
Description:
Description:
05/01/2017
12/01/2014
10/01/2017
10/01/2017
04/30/2018
12/31/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Grants
Plans
Inspections
Inspections
20
1
75
15
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
30098
26463
30099
30100
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 228 of 313
WATER DIVISION WATERSHED MANAGEMENT
EXOTIC AQUATIC PLANT CONTROL RSA 487:16-29 (Current)
Div/Bur:
Program:
Conduct field sampling and monitoring activities for exotics on surface waters of New Hampshire (Current)
Develop GIS maps of exotic plants infestations using GPS units (Current)
Education and Outreach (Current)
Exotic Species Site Identification and Tracking (Current)
Lake-Specific Long Term Exotic Plant Management Plans (Current)
Legislation and Rulemaking (Current)
Activity:
Activity:
Activity:
Activity:
Activity:
Activity:
Collect field data, download data, and prepare GIS maps of exotic species information.
Perform exotic species education and outreach activities, includes regular reporting.
Track and monitor existing exotic species infestations.
Develop a Long-Term Management Plan for each waterbody with exotic aquatic plant growth by collecting and processing field data on thesubject waterbody, evaluating control options, and tailoring a plant to suit the specific and individual needs of each waterbody.
Description:
Description:
Description:
Description:
Description:
06/01/2001
10/01/2001
09/30/1999
07/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Perform regular sampling and monitoring activities on infested waterbodies
Develop ArcView maps of statewide milfoil and other exotic plant infestations
Conduct Weedwatcher Training Sessions
Prepare annual Grant Fund Report
Draft or Amend Management Plans
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
During the growing season, perform regular field sampling and monitoring activities to document the presence/absenceand/or extent of exotic aquatic plant infestations.
Develop and Update as Necessary
Submit an annual report, beginning January 1, 2004, to the speaker of the house, president of the senate, and thegovernor and council which shall inlcude, but not be limited to, a description of prevention and research projects fundedby the milfoil and other exotic aquatic plants prevention program and the extent of aid to municipalities or subdivisionsof the state, non-profit corporations, and research institutions.
Work with lake association residents, state agencies, and aquatic plant managers to gather data to prepare a managementplan for each waterbody with exotic aquatic plants. Upon completions of draft Each plan is routed to Fish and Game forreview.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
05/31/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
05/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Maps
Training Sessions
Reports, Final
Plans, Management
75
3
20
1
70
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
30101
30102
30103
30104
30105
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 229 of 313
WATER DIVISION WATERSHED MANAGEMENT
EXOTIC AQUATIC PLANT CONTROL RSA 487:16-29 (Current)
Div/Bur:
Program:
Legislation and Rulemaking (Current)
Perform Exotic Plant Control Activities (Current)
Program administration/budgets (Current)
Review Pesticide Permits (Current)
State and regional invasives species groups (Current)
Activity:
Activity:
Activity:
Activity:
Activity:
Review exotic species legislation and regulations and amend as needed.
Perform SCUBA diving for hand-pulling activities or diver-assisted suction harvesting activities, installation of benthic barriers, largescale harvesting, and herbicide applications to manage existing infestations of exotic aquatic plants.
administrative & budget work associated with the exotics program
Review pesticide permit applications for aquatics, watershed setback and mosquito/blackfly control projects.
Participate in meetings and activities related to promoting awareness, research, and management of exotic aquatic plants in the northeastregion and in New Hampshire.
Description:
Description:
Description:
Description:
10/01/2002
06/01/2001
10/01/2006
10/01/2012
07/01/2001
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Work on law/rule amendments as need arises
Control milfoil growths by hand pulling or bottom barriers
Process matching grant requests and contracts
administration/budgets
Review pesticide permit applications
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
small growths of milfoil are best controlled by hand pulling, using SCUBA if necessary, or by laying down a bottombarrier.
Process matching grant requests and 100% contracts for exotic plant control, including G&C and Commissioner approvalrequests
letter code monthly budget printouts & associated work including planning & administration
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Rules
Sites
Grants
Accounts
Permits Reviewed
1
5
30
1
175
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
SMAGULA, AMY
30106
30107
30108
30110
30111
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 230 of 313
WATER DIVISION WATERSHED MANAGEMENT
EXOTIC AQUATIC PLANT CONTROL RSA 487:16-29 (Current)
Div/Bur:
Program:
State and regional invasives species groups (Current)Activity:
Work on programs, give presentations, assist with conference planning, formulate exotic species listDeliverable:
Work on whatever activities arise that various groups need assistance with, that DES participates in through the Exoticspecies program.
Description:
10/01/2017 09/30/2018Start/End Dates: thruLead Person: SMAGULA, AMY
Qty/Unit: Activities1
30112
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 231 of 313
WATER DIVISION WATERSHED MANAGEMENT
INSTREAM FLOW PROTECTION RSA 483:9-C (Current)
Implement the instream flow protection provisions of RSA 483, including adoption and implementation of administrative rules10/01/1999
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees XFederal EPA Federal Other Grants
Lamprey River Instream Flow Pilot (Current)
401 Water Quality Reviews for quantity issues (Current)
B1 Implement and administer Instream Flow Rules and legislation (Current)
Activity:
Activity:
Activity:
FY08 EPA P&C # 79 P&C #66 Protected Instream Flow Study and Water Management Plan for the Lamprey River
OldEPA P&C 66 Develop Water Management Plans for each Designated Reach based on results of the Protected Instream Flow Studies andnegotiations with AWUs and ADOs with advice and input from each river's Technical and Advisory Committees and from public hearings.Anticipates funding from state legislature after July 1 2003.
Provide technical reviews for flow quantity issues under CWA Section 401 Water Quality Certification process
Once rules are adopted, implement and administer the rules
Description:
Description:
Description:
07/01/2003
09/01/2008
07/01/2001
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Coordinate annually with affected parties
Implement Lamprey Water Management Plan
Pawtuckaway Release Tests 2013-2018
Twice annually meetings with PLIA
401 Water Quality Certification Reviews
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Annually contact each affected party to ensure knowledge of the existence of a plan, continuity of contact person,compliance with management actions during the previous year, and receive reactions to plan operations. Active dammanagement and all water user contacts.
Coordinate with dam owners and water users to conduct water management actions both as a routine coordination and forplan-required specific management events.
Conduct two release tests under the Performance Partnership Agreement with Pawtuckaway Lake Improvement Association(9/25/13).
Meet twice a year for informational meetings under a four year Partnership Agreement signed September 2013. EndsSeptember 30, 2017.
Technical support for flow-related WQCs.
Description:
Description:
Description:
Description:
Description:
10/01/2017
04/01/2017
10/01/2013
10/01/2016
07/01/2017
09/30/2018
03/31/2018
03/31/2018
12/31/2017
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inspections
Activities
Tests
Meetings
Reviews
7
1
2
2
2
Lead Person:
Lead Person:
Lead Person:
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
29763
29056
25096
28203
30097
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 232 of 313
WATER DIVISION WATERSHED MANAGEMENT
INSTREAM FLOW PROTECTION RSA 483:9-C (Current)
Div/Bur:
Program:
B1 Implement and administer Instream Flow Rules and legislation (Current)
Develop new ISF rules that apply to all Designated Rivers (Current)
Activity:
Activity:
Description: thru
Develop a plan for monitoring the effects of the applied Water Management Plans (DES Goals: 2.2)
Develop flows at ungaged locations
Flow Management Policy for State-owned Dams
Identify locations for permanent gages
Instream Flow Outreach Presentations
New Instream Flow Rules
Recommend a Capital Budget Request for stream gaging
Statewide Target Fish Community
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Identify assessment measures and define assessment methods for measuring changes in the protected entity communitiesresulting from the application of management for maintaining protected flows. Generate a report describing the keyindicators and methods of assessment for evaluating whether we are successfully meeting instream flow program goals andfor identifying negative impacts.Extended from 6/30/12 to 6/30/13; to 6/13/14; to 3/31/15; to 3/31/16;
Develop and prove a process for defining a daily stream flow record of at least 30 recent years that accuratelyrepresents stream flow a locations on Designated Rivers.
Coordinate with other Agencies with ownership or operational interest in dam management to define policy that willinclude instream flow maintenance as one of the considerations for impoundment management. END DATE EXTENDED FROM09/30/02 . End date extended from 12/31/08. from 6/30/11 to 6/30/13. Extended to 2014 - CWI 20130925. Extended to20150930. Extended to 20170630. Extended to 20181231.
Identify highes priority locations for additional stream gages to support management under the Instream Flow Program. Uselist of locations to support a Capital Budget Request.
Prepare and present information to support the development and implementation of Instream Flow concepts.
only after the adoption and implementation for the Lamprey and Souhegan rivers and completion of the hearings and reportsrequired under section 3, III(b) and (c) of this act, but not before December 1,2013. Extended to 6/30/16. Extended to20170331. Extended to 9/30/17. Extended to 3/31/19.
Provide documentation supporting a request for construction of stream gages to support the Instream Flow Program on otherDesignated Rivers.
Develop Target Fish Community data for all Designated Rivers to be used as both a target for the existing population andas input into a habitat model for assessing protected instream flows.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2011
04/01/2016
10/01/2001
10/01/2017
07/01/2017
04/01/2013
10/01/2017
04/01/2016
12/31/2018
03/31/2018
12/31/2018
06/30/2018
06/30/2018
03/31/2019
03/31/2018
03/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Methods
Policy
Locations
Presentations
Rules
Requests
Analyses
1
1
1
8
6
1
1
31
Lead Person:
22019
28208
3676
29764
29663
22036
29765
28209
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 233 of 313
WATER DIVISION WATERSHED MANAGEMENT
INSTREAM FLOW PROTECTION RSA 483:9-C (Current)
Div/Bur:
Program:
Develop new ISF rules that apply to all Designated Rivers (Current)
Souhegan River Instream Flow Pilot (Current)
Activity:
Activity:
Write new rules, based on changes to the enabling legislation and changes being made in 2016 (2017?), that apply to all of the DRs of thestate and incorporate the lessons learned during the ISF Pilot Program. (Extended from 3/31/17 to 12/31/17) (Extended from 12/31/17 to12/31/18.)
FY08 EPA P&C # 79 P&C #66 Protected Instream Flow Study and Water Management Plan for the Souhegan River
OldEPA P&C 66 Develop Water Management Plans for each Designated Reach based on results of the Protected Instream Flow Studies andnegotiations with AWUs and ADOs with advice and input from each river's Technical and Advisory Committees and from public hearings.Anticipates funding from state legislature after July 1 2003.
Description:
01/01/2016
07/01/2003
12/31/2018Start/End Dates:
Start/End Dates: thru
Develop draft Instream Flow Rules
4 Define feasilbility and effectiveness of dam management
Approve Dam Management Plans with Affected Dam Owners and interested parties
Approve Water Use Plans with Affected Water Users
Coordinate annually with affected parties
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Apply legislative changes and lessons from the Pilot, in coordination with the Rivers Management Advisory Committee andthe Lakes Management Advisory Committee, to develop a new set of draft ISF rules. (Extended end date from 3/31/17 to12/31/17 after developing schedule.) (Extended from 12/31/17 to 12/31/17 in August after delays in legal opinions rerule definitions and incorporation by reference.)
Assess the practicalities of and conditions for revising dam management for maintaining instream flow.Extended from 9/30/14-9/30/16Extend from 9/30/13 to 9/30/14End date extended to 9/30/10; 9/30/2011; 03/31/2012; 3/31/13; 9/30/13End date extended from to 3/31/09, extended to 12/31/09End date extended from 9/30/06 to 3/31/08.End date extended from 3/31/06 to 9/30/06.
Develop schedule and operations plan and get acceptance of plans from interested parties and from Dam Owners. Extendedto 9/30/18, Extended to 9/30/16. Extended to 9/30/14. Extended to 9/30/18.
Describe plans and get acceptance for completion and completion date. Extended to 12/31/16. Extended to 12/31/14.Extended to 12/31/17. Extended to 12/31/18.
Annually contact each affected party to ensure knowledge of the existence of a plan, continuity of contact person,compliance with management actions during the previous year, and receive reactions to plan operations. Active dammanagement and all water user contacts.
Description:
Description:
Description:
Description:
Description:
01/01/2016
01/01/2006
09/01/2013
09/01/2013
10/01/2017
12/31/2018
09/30/2020
09/30/2018
12/31/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
IVES, C. WAYNE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Rules
Assessments
Approvals
Approvals
Inspections
1
17
4
17
20
Lead Person:
IVES, C. WAYNE
IVES, C. WAYNE
28022
7757
24931
24930
29747
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 234 of 313
WATER DIVISION WATERSHED MANAGEMENT
INSTREAM FLOW PROTECTION RSA 483:9-C (Current)
Div/Bur:
Program:
Souhegan River Instream Flow Pilot (Current)
W Legislation and Rules (Current)
Activity:
Activity:
Legislative activity on bills, work with sponsors, work on DES-initiated legislation, work on rules. May not have deliverables everyyear.
Description:
08/23/2006Start/End Dates: thru
Develop a relief pulse release notification plan
Implement Souhegan Water Management Plan
Instream flow rules
Deliverable:
Deliverable:
Deliverable:
Develop a plan to notify interested parties of an impending release under the Instream Flow Program. Extended to12/31/16. Extended to 12/31/14. Extended to 3/31/18 (no funding until 6/2017.)
Coordinate with dam owners and water users to conduct water management actions both as a routine coordination and forrequired specific management events.
Finish pre-rule making outreach process. Begin formal rulemaking. Monitor legislation.
Description:
Description:
Description:
10/01/2013
07/01/2016
10/01/2017
03/31/2018
12/31/2017
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
IVES, C. WAYNE
IVES, C. WAYNE
DIERS, THEODORE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Plans
Activities
Rules
1
1
1
Lead Person: DIERS, THEODORE
25179
28207
30096
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 235 of 313
WATER DIVISION WATERSHED MANAGEMENT
LAKES AND RIVERS MANAGEMENT AND PROTECTION PROGRAM (Current)
In 2011, the NH General Court eliminated the FT Lakes Coordinator position and the FT Watershed Planner position thereby reducing thestaff of the Lakes and Rivers Management and Protection Programs from 3 FT and .5 PT staff to 1FT and .5 PT staff. As a result of thesefunding and staff reductions, the Lakes and Rivers Programs are now administered by the 1 FT Program Coordinator and the .5 PT WatershedPlanner effective July 1, 2011.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 07 02
Funding: State General State Fees Federal EPA Federal Other Grants
Legislation and Rules (Current)
Comprehensive Lake Inventory (Current)
Activity:
Activity:
Each Legislative session new bills or amendments to existing bills are introduced and considered by the legislature. The RiversCoordinator serves as the agency's primary staff person to review, track, and testify where necessary on such bills. The RiversCoordinator administers Env-Wq 1800 and updates the rules as needed.
A comprehensive inventory for the state's lakes and their watersheds was developed in 2000. The inventory was tested on 3 lakes in 2000. The inventory needs to be revised annually and applied to all lakes and ponds across the State.
Description:
Description:
10/01/2001
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Draft testimony for river and lake related legislation
LAC Legislative Update
Legislative testimony and participation
Make amendments to RSA 483-A and develop and adopt rules under RSA 483-A:7 II
Revise Env-Wq 1800
Develop a database of Comprehensive Lake Inventory (CLI) conducted to date
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide legislative updates to Local Advisory Committees (LAC) on a weekly basis during the legislative session.
Program staff may testify or particpate in legislative activities relevant to river and lake management and policy.
Revise rules if necessary to be consistent with RSA 483.
To date, several CLIs have been completed, either partially or in total, however this has not been recorded.NOTE: This Deliverable will only be completed IF staff and time resources permit.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SALES, TRACIE
BLACK, KATHRYN
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Letters
Updates
Activities
Updates
Rules
Databases
5
24
2
1
1
1
Lead Person:
Lead Person:
SALES, TRACIE
SALES, TRACIE
29265
29298
29299
29301
29302
29303
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 236 of 313
WATER DIVISION WATERSHED MANAGEMENT
LAKES AND RIVERS MANAGEMENT AND PROTECTION PROGRAM (Current)
Div/Bur:
Program:
Comprehensive Lake Inventory (Current)
Guidelines for Coordinated Lake Management and Shoreland Protection Plans (Current)
Lake Management and Shoreland Protection (and Watershed) Plans (Current)
Activity:
Activity:
Activity:
Per the Lakes Program statute (RSA 483A:7), the Program must develop and publish this document which will provide municipalities, lakeassociations, and other organizations with guidance to develop and execute a lake management plan.
Using the Comprehensive Lake Inventory and the Guidelines document work with organizations/associations to develop and implementlake/watershed plans for all lakes/ponds in the state.
Description:
Description:
06/01/1998
10/01/2008
Start/End Dates:
Start/End Dates:
thru
thru
Make amendments and edits to the Comprehensive Lake Inventory (CLI)
Make the Comprehensive Lake Inventory (CLI) web interactive
Provide assistance regarding the CLI
Make amendments or edits to the Guidelines document
Provide assistance regarding the use of the Guidelines document
Develop proposals for lake and watershed management plan implementation
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
As lake management issues change, the CLI should be amended or modified to be sure that these issues are captured,recorded (and scored, if necessary) so this information can be included in a future management plan.
ON HOLD FOR 2018 As more organizations use the CLI, having the ability to input the data and information directly into acomputer database will allow for better review and confirmation of data and information accuracy; as well as for futurereview and reference.NOTE: This Deliverable will only be completed IF staff and time resources permit.
As the CLI is a tool for lake stewards, the Lakes Program shall provide assistance to lake associations, towns and otherorganizations to conduct and/or complete a CLI for a specific lake.
As lake and watershed management issues change, the Guidelines document should be updated or revised to reflect thesechanges and to be sure that the document remains current and applicable.
As requested, work with lake stakeholders regarding the use of the Guidelines document.
Working with appropriate DES staff and other stakeholder groups, develop and submit proposals for funding andimplementation of management plans or portions thereof.
NOTE: This Deliverable will on be completed IF staff and time resources permit.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Amendments
Web Sites
Inventories
Amendments
Activities
Proposals
1
0
1
1
1
1
Lead Person:
Lead Person:
SALES, TRACIE
SALES, TRACIE
29304
29305
29306
29307
29308
29309
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 237 of 313
WATER DIVISION WATERSHED MANAGEMENT
LAKES AND RIVERS MANAGEMENT AND PROTECTION PROGRAM (Current)
Div/Bur:
Program:
Lake Management and Shoreland Protection (and Watershed) Plans (Current)
Lakes Management Criteria and Recommendations (Current)
Local River Management Advisory Committee Support (Current)
Activity:
Activity:
Activity:
According to RSA 483-A:5 I.: The lakes coordinator, in consultation with the advisory committee, with cooperation and assistance fromeach of the relevant divisions and bureaus within the department of environmental services, shall prepare every 10 years state levelmanagement recommendations for consideration by state agencies in their decision-making regarding lakes management and protection. Theoverall intent of the Lakes Management Criteria for NH State Agencies is to coordinate the state management of New Hampshire's lakes toaddress water quality, potential sources of pollution, wildlife habitat, flood protection and water supply, public access, andrecreational uses.
There are 18 LACs associated with the RMPP. The members of the LACs are nominated by the river corridor municipalities and appointed byNHDES. LACs associated with the RMPP consisting of volunteer citizens with an interest in river management issues. The LACs requireguidance and assistance with developing projects, interpreting data, and understanding state and federal regulations.
Description:
Description:
10/01/2010
10/01/2002
Start/End Dates:
Start/End Dates:
thru
thru
Provide assistance regarding the development and implementation of plans
Finalize the Lakes Management Criteria Recommendations
Implement the Lakes Management Criteria Recommendations
Administer Protected River Sign Program
Attend LAC meetings Upon Request
Host LAC Workshop
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Working with local and other groups, develop or review lake or watershed management plans using the Guidelines documentor EPA guidelines. NOTE: This Deliverable will on be completed IF staff and time resources permit.
ON HOLD IN 2018 DUE TO LIMITED STAFF RESOURCES- In cooperation with DES programs affecting lakes, developedrecommendations regarding DES and state agency actions pertaining to lake management. Assist the LMAC with thedevelopment of recommendations regarding state agency actions pertaining to lake management.
ON HOLD FOR 2018 DUE TO LACK OF RECOMMENDATIONS- Working with the LMAC, DES and other state agencies, implement therecommendations.
Protected River Signs are available for purchase and installation upon approval by local officials and DOT. Installationforms will be reviewed and signs ordered upon approval and availability of funding.
LACs often request DES updates and general technical assistance. The RMPP staff will respond to these requests as neededand appropriate.
Develop and host an annual or biennial LAC Workshop in cooperation with NH Rivers Council.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
BLACK, KATHRYN
SALES, TRACIE
SALES, TRACIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Plans
Documents
Recommendations/Suggestions Implemented
Signs
Meetings
Workshops
1
0
0
2
4
1
Lead Person:
Lead Person:
SALES, TRACIE
SALES, TRACIE
29310
29311
29312
29313
29314
29315
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 238 of 313
WATER DIVISION WATERSHED MANAGEMENT
LAKES AND RIVERS MANAGEMENT AND PROTECTION PROGRAM (Current)
Div/Bur:
Program:
Local River Management Advisory Committee Support (Current)
Permit Review and Comment (Current)
Activity:
Activity:
RSA 483 provides an opportunity to review and comment on applications for permits, certificates, or licenses within the designated rivercorridor.
Description:
10/01/2001Start/End Dates: thru
Issue requests for LAC recruitment letters
Maintain LAC blog and other LAC online resources
Process municipal nominations for LACs
Provide Technical Assistance to LACs
Provide guidance regarding permit review and commenting to the LACs
Provide membership update to the LACs
Revise appointment letter SOP
Notify LACs of Permitting activities within the designated corridors
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
RMPP staff will issue nomination solicitation letters to designated river communities lacking representation.
The LAC member nominations received by NHDES will be processed according to RMPP standard procedures, which includereview of the nominee questionnaire, appointment letters, and contact information data entry.
Staff shall provide support to LACs in the administration of their duties and shall respond to LAC requests forassistance.
Having conducted a LEAN event regarding the LAC permit review and commenting process, staff will provide the LACs with aflowchart of the permit reivew process, a chart indicating the permit timeframes and LAC comment due dates, and achecklist for permit commenting. Staff will the provide guidance to the LACs regarding the application andimplementation of these documents and will continue to work with DES permitting staff to improve the process.
On an annual basis RMPP staff will provide the LACs with a membership updates.
The appointment letter SOP will be reviewed annually and revised as necessary to reflect any necessary changes.
On a weekly basis RMPP staff will send an email to the LACs that includes all notifications received for permittingactivities within the deignated river corridors.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BLACK, KATHRYN
BLACK, KATHRYN
BLACK, KATHRYN
SALES, TRACIE
SALES, TRACIE
BLACK, KATHRYN
BLACK, KATHRYN
BLACK, KATHRYN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Letters
Updates
Letters
Assistances Provided
Assistances Provided
Updates
Revisions
Notifications
16
10
35
12
4
18
2
52
Lead Person: SALES, TRACIE
29316
29317
29318
29319
29320
29321
29322
29323
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 239 of 313
WATER DIVISION WATERSHED MANAGEMENT
LAKES AND RIVERS MANAGEMENT AND PROTECTION PROGRAM (Current)
Div/Bur:
Program:
Permit Review and Comment (Current)
Program Administration (Current)
Activity:
Activity:
Program staff will develop grant proposals, budgets and workplans to further the implementation of RSA 483 and 483-A.Description:07/01/2006Start/End Dates: thru
RMPP staff comments and reviews
Administer FY2018-19 CT River Valley Resource Comm/CRJC Grant Agreement
Develop a Watershed Approach for Lakes and Rivers Management and Protection Program
Develop and administer FY 18/19 Rivers & Lakes Programs Budgets
Develop and implement FY 2018/2019 Program Work Plan
Maintain and update Program Standard Operating Procedures (SOPs)
Prepare and submit the LMPP Biennial Report to the General Court
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
RMPP staff will review and comment on select permit and State Revolving Fund applications.
DES is responsible for providing state funding to the CRVRC. This 2 year contract of $60,000 ($30,000 per year) allowsCRVRC to pay the CT River Joint Commissions (CRJC) for management and administrative services.
Working in cooperation with the RMAC, LMAC, other DES programs as well as river and lake stakeholder groups, review theexisting RMPP and LMPP to determine how the programs could more effectively implement a watershed approach and reduce theadministrative burden of LACs. Compose proposed legislation for submittal to the General Court.
Given the limited budget of the Rivers and Lakes Programs, the well-defined Program responsisbilities outlined with RSA483 (Rivers) and RSA 483-A (Lakes) and the limited program staff, the primary focus of the program work plan is tomaintain and implement the requirements in the statutes.
Given the administrative responsibililities of the Programs (and the RMPP in particular) it is important to develop,update and maintain SOPs so the Programs function more efficiently.
According to RSA 483-A:6 VI, the LMAC must prepare and submit a biennial report to the General Court every two years."The advisory committee shall advise the commissioner and lakes coordinator in carrying out the purposes of this chapterand shall report biennially to the commissioner, the state agencies represented on the advisory committee, the houseresources, recreation and development committee, and the senate energy, environment and economic development committeeregarding the activities carried out for the purposes of this chapter."
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
07/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BLACK, KATHRYN
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
BLACK, KATHRYN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reviews
Contracts
Programs
Budgets
Workplans
SOPs (Standard Operating Procedures)
Reports, Final
12
1
1
1
1
2
1
Lead Person: SALES, TRACIE
29324
29325
29326
29327
29328
29329
29330
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 240 of 313
WATER DIVISION WATERSHED MANAGEMENT
LAKES AND RIVERS MANAGEMENT AND PROTECTION PROGRAM (Current)
Div/Bur:
Program:
Program Administration (Current)
Public Education and Outreach Programs and Information Development (Current)
Public Waters Access Advisory Board and Other Access Opportunities (Current)
Activity:
Activity:
Activity:
The RMPP and LMPP serves to educate and provide information to the general public so that informed river and lake managment decisions canbe made by local communities and appropriate stakeholder groups.
Coordinate with the Public Waters Access Advisory Board of the NH Dept. of Fish and Game. Assist internal and external organizationsregarding public access to our waterbodies.
Description:
Description:
10/01/2001
01/01/2004
Start/End Dates:
Start/End Dates:
thru
thru
Prepare and submit the RMPP Biennial Report to the General Court
Attend River, Lake & Watershed events with Lakes and Rivers Programs display
Maintain and update the LMPP Website and the LMAC Blog
Update LMPP Factsheets
Update RMPP Fact Sheets
Update RMPP Website and RMAC Blog
PWAAB annual report
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
According to RSA 483:8 VI , the RMAC must prepare and submit a biennial report to the General Court every two years. "Theadvisory committee shall report biennially and advise the commissioner, rivers coordinator, state agencies, and thegeneral court in implementing the purposes of this chapter."
These sites are critical education and communication tools used by the Program to reach the LMAC and members of thepublic.
Maintain and update LMPP fact sheets and outreach materials as needed.
Maintain and Update RMPP fact sheets as needed.
These sites are critical education and communication tools used by the Program to reach the RMAC and members of thepublic.
Coordinate DES section of the PWAAB annual report.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BLACK, KATHRYN
SALES, TRACIE
BLACK, KATHRYN
BLACK, KATHRYN
BLACK, KATHRYN
BLACK, KATHRYN
BLACK, KATHRYN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Events
Updates
Fact Sheets
Fact Sheets
Updates
Reports, Drafts
1
2
35
1
3
50
1
Lead Person:
Lead Person:
SALES, TRACIE
SALES, TRACIE
29331
29332
29333
29334
29335
29337
29338
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 241 of 313
WATER DIVISION WATERSHED MANAGEMENT
LAKES AND RIVERS MANAGEMENT AND PROTECTION PROGRAM (Current)
Div/Bur:
Program:
Public Waters Access Advisory Board and Other Access Opportunities (Current)
RMAC and LMAC Assistance (Current)
River - Lake (Watershed) Policy and Planning (Current)
Activity:
Activity:
Activity:
Effective July 2011, the LMAC will meet as needed, probably quarterly. The purpose of the committee is to provide quidance to the LakesManagement and Protection Program and to the Department regarding lake, shoreland and watershed issues from the variety of state agenciesand interest groups that are represented on the committee.
Effective July 2011, the RMAC will meet as needed, probably quarterly. The purpose of the committee is to provide guidance, discuss andconsider river-related managment issues rivers throughout NH. The committee serves to provide a broad range of viewpoints from variousinterest groups and assists the Department in making river managment decisions.
The Program Coordinator is responsible for assisting in the development of river, lake and watershed policy relevant to the RMPP and theLMPP. This entails coordinating internal efforts or particpating in ad hoc committees.
Description:
Description:
03/25/1992
10/01/2003
Start/End Dates:
Start/End Dates:
thru
thru
Technical Assistance to PWAAB
Coordinate review of state waterfront property disposals per RSA 483 and 483-A
Develop and distribute RMAC and LMAC letters and correspondence.
LMAC and RMAC meeting support
Provide staff support to the LMAC and RMAC
Provide the LMAC and RMAC with legislative updates.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide support to PWAAB as requested. Attend PWAAB meetings as needed.
Working in cooperation with the LMAC and RMAC to determine appropriate recommendations regarding state surplus landspertaining to lakes and rivers. Serve as agency liaison between RMAC, LMAC, CORD, and state agencies for state propertydisposals that are subject to RSA 483 and 483-A and the procedures adopted by the LMAC and the RMAC.
Program staff will develop and distribute letters on behalf of the LMAC and the RMAC.
The LMAC and RMAC usually meet quarterly and often conduct 1 lake (and 1 river) visit per year. Develop, distribute andpost agendas meeting information; maintain the meeting minutes.
In addition to the administration and facilitation of the LMAC and RMAC meetings, the Program staff provide assistance tothe committee to address river and lake-related issues of concern to the committees.
During the legislative session, Program staff will provide the LMAC and RMAC with weekly legislative updates.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SALES, TRACIE
BLACK, KATHRYN
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
BLACK, KATHRYN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Assistances Provided
Properties
Letters
Meetings
Assistances Provided
Updates
2
8
8
8
6
26
Lead Person:
Lead Person:
SALES, TRACIE
SALES, TRACIE
29339
29340
29341
29342
29343
29344
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 242 of 313
WATER DIVISION WATERSHED MANAGEMENT
LAKES AND RIVERS MANAGEMENT AND PROTECTION PROGRAM (Current)
Div/Bur:
Program:
River - Lake (Watershed) Policy and Planning (Current)
River Management Plans Development and Implementation (Current)
River Nominations and Designations (Current)
Technical Assistance - Outreach, Education and Information Development (Current)
Activity:
Activity:
Activity:
Activity:
For each designated river there is an associated river corridor management plan that has either been completed or is under development.
A major element of the RMPP is the nomination and designation of rivers into the Program.
A major component of the Lakes and Rivers Programs is to provide assistance to and/or cooperate with agencies, organizations, citizens,and government regarding lake related issues.
Description:
Description:
Description:
10/01/2001
07/01/2014
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Administrative Rule Comment and Development
Review and comment on the draft management plans prepared by the LACs
Assist LACs with grant proposals to support management plan implementation
Management Plan Development & Implementation Status
Attend River Nomination meetings upon request
Provide Technical Assistance for River Nominations
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The Program Coordinator often comments on administrative rules being considered by NHDES. Due to staff reductions, time may not permit the Program staff to review and comment on proposed rules.
Review and prepare comments for draft management plans as needed.
Assist designated river local advisory committees and other partners with identifying and developing grant proposals tosupport management plan implementation.
RMPP staff will maintain LAC river corridor management plans on the LAC blog and report on their development andimplementation status annually to the RMAC.
RMPP staff will participate in meetings and conference calls held to support the development of river nominations fordesignation under RSA 483.
When requested, RMPP staff will provide assistance to an RPC and/or river nominating committee to develop and submit ariver nomination for designation under RSA 483.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/20/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Comments
Reviews
Assistances Provided
Updates
Meetings
Assistances Provided
1
1
1
1
2
2
Lead Person:
Lead Person:
Lead Person:
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
29345
29347
29350
29356
29367
29369
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 243 of 313
WATER DIVISION WATERSHED MANAGEMENT
LAKES AND RIVERS MANAGEMENT AND PROTECTION PROGRAM (Current)
Div/Bur:
Program:
Technical Assistance - Outreach, Education and Information Development (Current)Activity:
Provide assistance to other DES divisions and/or bureaus
Provide technical assistance to federal, state and local agencies
Provide technical assistance to the public
Deliverable:
Deliverable:
Deliverable:
This includes reviewing proposed administrative rules and applications; making presentations and/or helping coordinateworkshops/conferences; and providing technical assistance within DES.
Includes reviewing and commenting on proposed mooring applications (and providing this information to NH Marine PatrolBureau).
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
SALES, TRACIE
SALES, TRACIE
SALES, TRACIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Assistances Provided
Assistances Provided
Assistances Provided
4
4
50
29371
29377
29382
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 244 of 313
WATER DIVISION WATERSHED MANAGEMENT
LIMNOLOGY CENTER (Current)
To provide quality chemical and biological analyses for freshwater, microscopic analyses, mercury in fish analyses, cyanotoxin analysesand bathing facility data. To provide laboratory and field equipment maintenance and to provide boat, marine engine and triler repairs.To maintain a reputable technical assisstance progam.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
XFunding: State General State Fees Federal EPA Federal Other Grants
Acid Trend Monitoring (Current)
Complaint investigations (Current)
Activity:
Activity:
Conduct trend monitoring on wet preciptation and on selected lakes and ponds for acid rain related parameters, keep abreast of the acidrain literature and participate in acid rain control activities.
Record, investigate and resolve lake and watershed related complaints.
Description:
Description:
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Conduct chemical analysis for acid rain monitoring
Conduct chemical analysis for acid rain monitoring
monitor wet deposition for acid rain parameters
monitor wet deposition for acid rain parameters
New Water Quality Complaint Investigations
New Water Quality Complaint Investigations
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The total number of chemical analyses run for the various deliverables listed under the acid rain trend program activityis tracked here. Acid outlet ponds (20) sampled twice a year plus remote pond samples are collected through NHF&G byhelicopter and number of lakes sampled is dependent on F&G.
The total number of chemical analyses run for the various deliverables listed under the acid rain trend program activityis tracked here. Acid outlet ponds (20) sampled twice a year plus remote pond samples are collected through NHF&G byhelicopter and number of lakes sampled is dependent on F&G.
collect wet precipitation on an event basis at the DES offices in Concord (guage on roof) and analyze for pH, sulfate,nitrate and total phosphorus.
collect wet precipitation on an event basis at the DES offices in Concord (guage on roof) and analyze for pH, sulfate,nitrate and total phosphorus.
Conduct approximately 10 complaint investigations on an annual basis. Some complaints are completed following oneinspection, while others may result in enforcement action and require additional follow-up. Does not inlcude complaintsor inquiries resolved over the phone or email.
Conduct approximately 10 complaint investigations on an annual basis. Some complaints are completed following oneinspection, while others may result in enforcement action and require additional follow-up. Does not inlcude complaintsor inquiries resolved over the phone or email.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
01/01/2017
01/01/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
12/31/2018
12/31/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
HENDERSON, JR., WALTER
HENDERSON, JR., WALTER
HENDERSON, JR., WALTER
HENDERSON, JR., WALTER
LIVINGSTON, ROBERT
LIVINGSTON, ROBERT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Samples
Samples
Events
Events
Complaints
Complaints
50
50
25
25
20
20
Lead Person:
Lead Person:
HENDERSON, JR., WALTER
LIVINGSTON, ROBERT
30074
30075
30076
30077
30078
30079
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 245 of 313
WATER DIVISION WATERSHED MANAGEMENT
LIMNOLOGY CENTER (Current)
Div/Bur:
Program:
Equipment maintenance and ordering (Current)
Lake Trophic Survey Program (Current)
Limnology Center Laboratory Operations (Current)
Activity:
Activity:
Activity:
The ordering and maintenance of field and laboratory equipment, including inspection and maintenance of vehicles, snowmobiles and boats,motors and trailers.
Conduct comprehensive physical, chemical and biological monitoring on approximately 8-10 new lakes each year, revisiting them for twoconsecutive years for selected sampling activities.
Provide laboratory analyses, quality assurance and quality control reports.
Description:
Description:
Description:
10/01/1999
10/01/1999
10/01/1999
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Maintenance and repair of boats, vehicles and equipment
Maintenance and repair of boats, vehicles and equipment
Complete field work
Complete field work
Select lakes
Select lakes
Prepare and Submit final QA/QC Report
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Sample 30 lakes as part of lake trophic survey program
Sample 30 lakes as part of lake trophic survey program
Select lakes for upcoming sampling season
Select lakes for upcoming sampling season
The Limnology Center QA/QC Report provides a year end summary of all program activities, inspections, sample resultsgenerated through the Limnology Center.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ASHLEY, SCOTT
ASHLEY, SCOTT
ASHLEY, SCOTT
ASHLEY, SCOTT
ASHLEY, SCOTT
ASHLEY, SCOTT
ASHLEY, SCOTT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Percent
Percent
Lakes
Lakes
Lakes
Lakes
Reports, Final
100
100
30
30
10
10
1
Lead Person:
Lead Person:
Lead Person:
ASHLEY, SCOTT
ASHLEY, SCOTT
ASHLEY, SCOTT
30041
30080
30039
30081
30040
30082
30083
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 246 of 313
WATER DIVISION WATERSHED MANAGEMENT
LIMNOLOGY CENTER (Current)
Div/Bur:
Program:
Limnology Center Laboratory Operations (Current)
Operate mercury in fish & other biota program for DES (Current)
Program administration (Current)
Activity:
Activity:
Activity:
Administer all aspects of a mercury in fish & biota monitoring program.
program administration including budgets and personnel related to the Limnology activities
Description:
Description:
10/01/1999
10/01/2006
Start/End Dates:
Start/End Dates:
thru
thru
Prepare and Submit final QA/QC Report
Analyze approximately 100 fish for total mercury concentration
Analyze approximately 100 fish for total mercury concentration
Finalize summary report for Hg in fish tissue
Budgets
Budgets
Complete staff reviews
Complete staff reviews
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The Limnology Center QA/QC Report provides a year end summary of all program activities, inspections, sample resultsgenerated through the Limnology Center.
DES Limnology Center now has a mercury analyzer and will conduct its own analyses of fish mercury.
DES Limnology Center now has a mercury analyzer and will conduct its own analyses of fish mercury.
END DATE EXTENDED FROM 3/31/2017TO 12/31/2017. A report that summarizes 25 years of fish data
Complete and update budgets for various Biology Section related programs
Complete and update budgets for various Biology Section related programs
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2019
09/30/2018
09/30/2019
12/31/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ASHLEY, SCOTT
HENDERSON, JR., WALTER
HENDERSON, JR., WALTER
NEILS, DAVID
NEILS, DAVID
NEILS, DAVID
NEILS, DAVID
NEILS, DAVID
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Analyses
Analyses
Reports, Final
Budgets
Budgets
Reviews
Reviews
1
100
100
1
4
4
8
8
Lead Person:
Lead Person:
ASHLEY, SCOTT
NEILS, DAVID
30084
30042
30085
30086
30087
30088
30089
30090
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 247 of 313
WATER DIVISION WATERSHED MANAGEMENT
LIMNOLOGY CENTER (Current)
Div/Bur:
Program:
Program administration (Current)
Special Lake Studies (Current)
Activity:
Activity:
Lake assessments other than acid rain and trophicsurveys. May not have deliverables every year. THIS TASK ON ON HOLD FOR 2012. Task onhold for FFY2015.
Description:
10/01/2003Start/End Dates: thru
Track expenses
Track expenses
Deliverable:
Deliverable:
track JCLC related purchases
track JCLC related purchases
Description:
Description:
10/01/2017
10/01/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
NEILS, DAVID
NEILS, DAVID
Qty/Unit:
Qty/Unit:
Tracking Systems
Tracking Systems
1
1
Lead Person: NEILS, DAVID
30091
30092
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 248 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE 319 PROJECT IMPLEMENTATION (Current)
EPA's Nonpoint Source Program and Grants Guidelines for States and Territories beginning FFY 2014 require that 50 Percent of Total § 319Funding be for Watershed Project Implementation to implement watershed projects guided by WBPs. Projects may implement acceptablealternative plans to a WBP.These guidelines further require that watershed project funds go toward restoring impaired waters through the implementation of WBPs oracceptable alternative plans. Activities necessary to implement WBPs or acceptable alternative plans for watersheds containing one ormore impaired waters are considered restoration activities. Where a state has an updated NPS management program that identifiesprotection of unimpaired/high quality waters11 as a priority and describes its process for identifying such waters, there is flexibilityto use a limited amount of watershed project funds for activities to protect identified waters following consultation with EPA through §319 grant work plan negotiations. The proportion of watershed project funds allocated to protecting high quality waters could varydepending on the relative priority of restoration and protection activities in the state's NPS management program and the array ofprojects ready for § 319 funding and implementation in that particular year.
10/01/2010
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees XFederal EPA Federal Other Grants
BMP Follow-up and Tracking for 319 Projects (Current)Activity:
FFY 2014 combined deliverables from WSREST and WSPROT Programs. Complete office and field work associated with tracking and reporting onthe post implementation phases of BMPs constructed through 319 funded projects. Tracking is designed to verify that BMPs are maintainedin a condition which indicates that they continue to function as designed.
Description:
10/01/2013Start/End Dates: thru
BMP Maintenance Guide
BMP Tracking Data Activities
BMP Tracking Data Activities
Deliverable:
Deliverable:
Deliverable:
Develop formal BMP Maintenance Guide to support follow-up maintenance for 319 or SRF funded BMPs to improve performanceand life expectancy
Complete file updates to catalog existing data; complete file research of previous site visit information and/or BMPdesigns; perform follow up contact with grantees or BMP owners to request maintenance or repair as needed; perform BMPtracking database development and maintenance; continue to research BMP tracking work completed by other organizations;continue development of BMP tracking methodologies to improve process; provide outreach to grantees and otherstakeholders regarding BMP maintenance and performance results from our tracking activities; complete tracking ofstructural and non-structural BMPs as recommended in completed watershed based plans by requesting information fromgrantees and project managers and updating Watershed Plan Implementation Tracking spreadsheets at least annually.
Complete file updates to catalog existing data; complete file research of previous site visit information and/or BMPdesigns; perform follow up contact with grantees or BMP owners to request maintenance or repair as needed; perform BMPtracking database development and maintenance; continue to research BMP tracking work completed by other organizations;continue development of BMP tracking methodologies to improve process; provide outreach to grantees and otherstakeholders regarding BMP maintenance and performance results from our tracking activities; complete tracking ofstructural and non-structural BMPs as recommended in completed watershed based plans by requesting information fromgrantees and project managers and updating Watershed Plan Implementation Tracking spreadsheets at least annually.
Description:
Description:
Description:
01/01/2015
10/01/2017
10/01/2018
12/31/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
ZINK, KATHERINE
ZINK, KATHERINE
ZINK, KATHERINE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Guidebooks
Percent
Percent
1
100
100
Lead Person: ZINK, KATHERINE
28199
29646
29647
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 249 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE 319 PROJECT IMPLEMENTATION (Current)
Div/Bur:
Program:
BMP Follow-up and Tracking for 319 Projects (Current)
Implementation of 319 Watershed Projects (Current)
Activity:
Activity:
Manage projects funded with 319 Project funds that implement watershed-based plans meeting EPA's criteria for WBPs.Description:10/01/2010Start/End Dates: thru
BMP Tracking Site Visits
BMP Tracking Site Visits
PTAPP - Phase 2 Implementation
Black Brook Restoration - GOMC Protocols Reporting
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Travel to completed BMP implementation sites and complete site inspections and data collection to be used in the postimplementation tracking of constructed BMPs. Site visit work includes: planning routes and traveling to BMP sites;completing a visual inspection of various types of BMPs comparing existing condition to originalcondition/specifications; completing field sheets documenting results of field visits; taking measurements and photos todocument the existing condition; making a determination of any potential repairs or maintenance requests to be made;continue development of BMP site visit methodologies to improve process.
Travel to completed BMP implementation sites and complete site inspections and data collection to be used in the postimplementation tracking of constructed BMPs. Site visit work includes: planning routes and traveling to BMP sites;completing a visual inspection of various types of BMPs comparing existing condition to originalcondition/specifications; completing field sheets documenting results of field visits; taking measurements and photos todocument the existing condition; making a determination of any potential repairs or maintenance requests to be made;continue development of BMP site visit methodologies to improve process.
This project implements measures to track and quantify nitrogen load reductions in Great Bay as described in GBNPSS andthe 2010 Analysis of Nitrogen Loading Reductions for WWTF in and NPS Sources in the Great Bay Watershed. Through thisproject, a regional pollutant tracking system will be developed to track and quantify load reductions acheived throughvarious NPS implementation activities. (Funding sources: $112,496 from SRF; $10,000 from 2016 319)
This work continues from R-06-M-02 that included the removal of the Maxwell Pond Dam on Black Brook in Manchester andresulted in the restoration of fish passage and natural flow regimes through a previously impaired impoundment. GOMCprotocols have been implemented in the project area to document baseline conditions pre-dam removal and to document post-dam removal stream evolution, biological, chemical, and physical responses to dam removal. Results will continue tomonitor the positive impacts of this EPA Success Story on Black Brook and the aquatic and terrestrial communities withinit. Initially, monitoring was intended to be carried out at the 1 year, 3 year, and 5 year intervals. However, S.Landrywill continue to coordinate the following tasks on an annual basis through 2020 and then make a decision as to whether ornot further assessments are required:1)VRAP protocols (coordinated with the volunteers from the MUPRP)2)Photos taken at monumented locations each spring, summer, and fall 3)Fish populations (species presence and abundance) with assistance from NH Fish & Game4)Invertebrate population assessments 5)Particle size analyses at 10 monumented cross-sections throughout project area6)Vegetation community surveys - at least one survey completed prior to 2020 if personnel with identification experienceare available to participate7)Cross Sections and Longitudinal Profiles will be collected if personnel are available to assist.
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
03/01/2016
01/01/2015
09/30/2018
09/30/2019
12/31/2018
12/31/2020
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ZINK, KATHERINE
ZINK, KATHERINE
SOULE, SALLY
LANDRY, STEPHEN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Site Visits
Site Visits
Management Tools
Reports, Final
30
30
4
1
Lead Person: LANDRY, STEPHEN
29649
29650
28085
25731
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 250 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE 319 PROJECT IMPLEMENTATION (Current)
Div/Bur:
Program:
Implementation of 319 Watershed Projects (Current)Activity:
HI-14-M-02 Wentworth and Crescent Lake Watershed Restoration Plan Implementation - BMPs Phase II
Project # TBD Implementation of the Willow Brook Watershed Plan Phase 3
Provide Outreach and Education Assistance to 319 Grantees
RI-13-M-03 McQuesten Brook Watershed Restoration Phase I - Dam Removals
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The Town of Wolfeboro and the Lake Wentworth Watershed Association are taking the lead on another phase of watershedrestoration plan implementation by constructing several more BMPs in the watershed. The BMPs have been identified in thewatershed-based plan and will result in additional pollutant removal from these two lakes. Jeff Marcoux is the DESproject manager and will work with the project team closely during all phases of implementation. Jeff will review allwork products generated, payment requests, match documentation, procurements, and semi-annual progress reports.
The city of Rochester will install BMPs to reduce pollutant loading in the Willow Brook watershed. Project success willbe measured through quanitifcation of pollutant load reduction acheived through BMP implementation and ongoing VRAPmonitoring.
Respond to 319 grantees for assistance with outreach and education components of their 319 implementation projectsthrough meetings, phone calls, e-mails, products, networking etc. Responses include but are not limited to:- Review and editing of draft outreach materials as required in 319 grant contracts.- Identifying additional materials, programs or templates applicable to outreach needs.- Using Community Based Social Marketing, the EPA "Getting in Step" guide, Water Words that Work, or other methods toprovide assistance and facilitation for putting together their outreach and education plans or projects.
END DATE EXTENDED TO 12/31/2017. The NH Rivers Council and their project partners are implementing high priority elementsof their McQuesten Brook Watershed Restoration Plan. This first phase of restoration activity focuses upon the removal ofthree, obsolete dam structures that have interrupted natural stream function and created McQuesten Pond out of animpoundment on McQuesten Brook. It is anticipated that completion of this project will lead to another NPS Success Storyfor NH. S.Landry will be involved in the completion of the following Tasks:Tasks 1 and 2 (Develop and advertise RFQ and hire consultant)Tasks 3 and 4 (Review and approve SSPP and QAPP)Tasks 5 through 8 (Review draft RPR Form)Tasks 11 through 15 (Provide assistance to consultant to complete field topo and sediment surveys within project areas)Tasks 16 through 19 (Review sediment management plan and intitial conceptual plans)Tasks 23 through 30 (review and approve 75 percent and final plans. Particpate in the process to prepare documentationfor the CLOMR if needed and the Wetlands Permit Application)Tasks 31 through 33 (work with project team to plan and participate in all project meetings)Tasks 34 through 37 (Coordinate implementation of GOMC protocols before and after dam removals)Tasks 38 through 40 (lead a team or teams during watershed cleanup events every year through 2015)Tasks 45 through 51 (review, comment, and ultimately approve semi-annual progress reports)Task 52 (review, comment, and ultimately approve the final report for the project)
Description:
Description:
Description:
Description:
04/01/2014
01/01/2018
10/01/2017
04/17/2013
12/31/2017
09/30/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MARCOUX, JEFFREY
SOULE, SALLY
MCMILLAN, BARBARA
LANDRY, STEPHEN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Installations
Assistances Provided
Restorations
4
4
3
25740
27425
30113
24924
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 251 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE 319 PROJECT IMPLEMENTATION (Current)
Div/Bur:
Program:
Implementation of 319 Watershed Projects (Current)Activity:
RI-14-C-09 Great Bay Managment Plan Implementation: PRB Septic System
RI-14-M-08 Gunstock Brook Watershed Restoration - Mass failure/bank erosion site
RI-15-C-01 UNHSC Municipal Bioretention Program Phase 2 (Biopalooza)
RI-15-C-02 Parsons Creek Watershed Plan Implementation Phase 2
RI-15-C-12 Implementation of the Willow Brook Watershed Plan Phase 3
RI-15-M-03 Rust Pond, Wolfeboro - Watershed Rest Plan Imp Phase 2: Sites 1, 3, and 4
RI-15-M-04The Meredith, Paugus, and Saunders Bay Implementation Project - Phase I (Weirs Beach BMPs)
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Work with RCCD and local partners to design, install and monitor 2 permeable reactive barrier septic systems to reducenitrogen loading to Great Bay.
The Belknap County Conservation District (BCCD) is implementing a phase of the Meredith, Paugus, Sanders Bay watershedplan by addressing a high priority erosion site on Gunstock Brook immediately upstream of a critical stream crossing. S.Landry is the DES project manager and will review RFQs, serve on the consultant selection team, process payment requests,match documentation, procurements, semi-annual project reports, attend public and team meetings and support the BCCDstaff with project managment throughout the life of the project.
Install BMPs in Brentwood and Durham to address stormwater runoff and fertilizer reducion. Conduct outreach tocommunicate results. Quantify pollutant load reductions acheived by BMPs.
The Town of Rye will install 2 -4 BMPs to treat stormwater runoff, develop a septic system ordinance for the watershed,conduct a septic assessment to identify septic sites for cost share replacement, and conduct cost share septicreplacements for at least 3 systems. Project sucess will be monitoring through BMP load reduciton quantification and on-going monitoring.
The city of Rochester will install BMPs to reduce pollutant loading in the Willow Brook watershed. Project success willbe measured through quanitifcation of pollutant load reduction acheived through BMP implementation and ongoing VRAPmonitoring.
The goal of this project is to implement specific BMPs identified in the Rust Pond Watershed Restoration Plan (2012) toachieve the sediment and nutrient reduction goals identified for three BMP installation sites. Three BMPs will beinstalled under this phase of implementation for a combined reduction in Total Suspended Solids of 1.67 tons/year. S.Landry is the DES Project Manager and will work with the Town of Wolfeboro and the Rust Pond Association to process thegrant agreement, payment requests, match and procurement documents, particpate on the consulting firm selection team andassist with the bid process for construction contracts. S. Landry will ensure that all reporting is completed asspecified in the grant agreement.
The City of Laconia is planning to implement some of the priority action items identified in the MPSB watershed-basedplan completed by the Winnipesaukee Watershed Association. These structural and non-structural BMPs will be implementedthroughout the Weirs Beach subwatershed to address sources of phosphorus and bacteria. S. Landry will be the DES projectmanager and work with the City of Laconia to process the Grant Agreement, select consulting firm(s), review and approvecontracts, SSPP documents, outreach documents, payment, match, and procurement packages submitted to DES.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2014
06/30/2014
01/01/2015
01/01/2015
01/01/2015
01/01/2015
01/01/2015
12/30/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SOULE, SALLY
MARCOUX, JEFFREY
SOULE, SALLY
SOULE, SALLY
SOULE, SALLY
MARCOUX, JEFFREY
MARCOUX, JEFFREY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
BMPs (Best Management Practices)
Restorations
BMPs (Best Management Practices)
BMPs (Best Management Practices)
BMPs (Best Management Practices)
Installations
Installations
4
1
4
4
4
3
2
25673
25739
26536
26538
26539
26531
26530
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 252 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE 319 PROJECT IMPLEMENTATION (Current)
Div/Bur:
Program:
Implementation of 319 Watershed Projects (Current)Activity:
RI-15-M-05 Baboosic Lake watershed restoration plan implementation phase 3: Site #14 Carter Road
RI-15-M-09 Cobbetts Pond Restoration Plan Implementation Phase III - Summer Street BMPs
RI-15-M-10 McQuesten Brook Watershed Restoration Plan Phase IV - Culvert Construction and Removal
RI-15-S-08 Province Lake Watershed Plan Impelementation Phase 1
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Baboosic Lake is a 221.9 acre natural lake with a 1,536-acre watershed situated on the Amherst/Merrimack town line. The2008 Watershed Plan noted that "constant water quality monitoring for the past 25 plus years reveals a continuingdeterioration in water quality and clarity." Additionally, Baboosic Lake has experienced a disturbing trend of algae andcyanobacteria blooms. The Baboosic Lake Association (BLA) applied for grant funds from DES to remediate sites that werecontributing pollution loading to the lake. In 2011 and 2012 the BLA, in conjunction with its project partners, completed14 of the 17 priority sites identified in the watershed plan.More recent data suggest the decreasing water quality trend has stabilized, and phosphorous samples suggest a 1.2 ppbdecrease in seasonal average phosphorous in the lake. However, Baboosic Lake still fails to meet state water qualitystandards. Additional phosphorous reduction efforts will be necessary to reach the 2008 Plan's in-lake phosphorousconcentration goal, and to remove Baboosic Lake from the State's impaired waters list. To progress toward this goal, theBLA wishes to target another high load phosphorous site identified in the watershed plan.
Activities completed in support of this project will provide technical, organizational, and procedural assistance to thegrantee to help ensure successful completion of the project including: assistance with payment requests and match reviewand processing; assistance with documenting BMP implementations; reviewing and contributing to development of outreachmaterials; assistance with developing quality assurance documents and completing pollutant load reduction calculationsand reporting; providing input, and orchestration of DES response, to technical questions (water quality, sampling, BMPselection/design, etc.) as needed; assistance with producing interim and final reports to meet DES/EPA requirements.
The goal of this phase of implementation of the Cobbetts Pond Watershed Restoration Plan is to reduce pollutant loadingto Cobbetts Pond by installing stormwater BMPs and additional drainage infrastructure in the Summer Street areasubwatershed. The CPIA and the Breezy Gale Village District will help manage construction, provide matching funds andvolunteers, and will maintain the area BMPs once the project is completed. S. Landry is the DES project manager and hewill be responsible for approving all deliverables, serving on the project steering committee, approving all paymentrequests and match documentation, and assist the CPIA with project administration and reporting.
Project partners involved with this fourth phase of restoration activities in the McQuesten Brook watershed envision afull daylighted section of McQuesten Brook where the Wathen Road stream crossing used to exist and an AOP friendly, open-bottom, 15-foot wide box culvert at the Eastman Avenue stream crossing in place of the 36-inch culvert that previouslyimpounded McQuesten Brook. Completion of the two stream crossing projects will restore 1,950 of stream channel and allowfor AOP between the upstream end of the I-293 culvert and South Main Street. Project partners are confident that projectwill restore designated uses within NHRIV700060803-16 after the culverts have been replaced in tandem with the concurrentdam removal projects upstream of these locations. S. Landry is the DES Project Manager and will be reponsible forreviewing all consrtuction-ready designs, processing SSPP documents, payment requests, and match documents for theduration of the project. S. Landry will also serve on the project technical committee and lead environmental assessmentactivities in the watershed.
BMPs will be installed to reduce stormwater runoff from residential properties, municipal, and state roads. Septicsystems will be assessed for loading risk and candidate systems for cost share replacement will be identified. A pump outprogram will be implemented for at risk systems. Outreach will be conducted to watershed stakeholders. BMPs will beimplemented at the golf course. Ongoing VLAP monitoring will be conducted to measure success. Load reductions will bequantified.
Description:
Description:
Description:
Description:
06/30/2014
01/01/2015
01/01/2015
01/01/2015
12/31/2017
12/31/2017
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MARCOUX, JEFFREY
LANDRY, STEPHEN
LANDRY, STEPHEN
SOULE, SALLY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
BMPs (Best Management Practices)
Installations
Restorations
BMPs (Best Management Practices)
3
2
2
6
26024
26529
26528
26540
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 253 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE 319 PROJECT IMPLEMENTATION (Current)
Div/Bur:
Program:
Implementation of 319 Watershed Projects (Current)Activity:
RI-16-CT-04 Pearly Lake Watershed Restoration Plan Implementation Phase 1 BMPs
RI-16-M-02 Newfound Lake Watershed Plan Implementation Phase 3
RI-16-M-03 Pleasant Lake Watershed Plan Implementation Phase 1
RI-16-S-01 Province Lake Implementation Phase 2
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Pearly Pond is a 191-acre lake in Rindge, NH. Most of the watershed for Pearly Pond is undeveloped, though FranklinPierce University, and 52 residences are located near the lake. Pearly Lake beach has been closed to swimming on severaloccasions because of cyanobacteria blooms, attributed to excessive phosphorus. Much of the phosphorus exists in thesediments, as a result of past permitted wastewater discharges. Additional sources of phosphorus may include Canadageese, septic systems, and nonpoint source pollution from fertilizer, erosion, roads and other sources. The lake iscurrently classified by DES as an impaired waterbody, because it does not meet its water quality goals for aquatic lifeand recreational uses. Franklin Pierce, in cooperation with DES and other stakeholders, recently completed a watershedrestoration plan for Pearly Lake. The plan includes detailed recommendations for implementation of best managementpractices (BMPs) that will reduce pollutant loads to the Lake and ultimately result in improved in-lake water quality.
This project will implement several of the BMPs that were recommended in the watershed restoration plan. The BMPs willinclude waterfowl (geese) management and outreach; septic system management and outreach; and, installation of an iron-enhanced sand filter to treat a wetland area that was the former location of a wastewater outfall. Additionally, theproject includes: working with voluntary private landowners to install rain gardens and vegetated buffers; installingerosion control and rain gardens in a Town-owned right-of-way on Kimball Road; semi-annual lakeside trash clean-ups; and,expansion of an existing water quality monitoring program. Success will be verified by water quality monitoring andpollutant load reduction calculations, and will be documented through reporting results to DES.
Implementing various structural Best Management Practices (BMPs) at the Town and residential scale as well asfacilitating design and planning for other structural BMPs. Additional work includes outreach work and non-structuralBMP implementations such as development of model ordinances.
Project includes design permitting and construction of one of the top priority BMPs as identified in the completedwatershed management plan. Work includes road drainage and boat ramp work to reduce nps pollution from the roadway tothe lake.
This work continues from RI-15-S-08 to impelement stormwater BMPs, septic system upgrades, monitoring, and outreach toimprove water quality in Province Lake. The lake is impaired for lake nutrients and cyanobacteria.
Description:
Description:
Description:
Description:
07/13/2016
10/01/2016
10/01/2016
06/01/2016
12/31/2018
12/31/2019
12/31/2018
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MARCOUX, JEFFREY
MARCOUX, JEFFREY
MARCOUX, JEFFREY
SOULE, SALLY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
BMPs (Best Management Practices)
BMPs (Best Management Practices)
BMPs (Best Management Practices)
BMPs (Best Management Practices)
5
5
1
4
28591
28918
28919
28081
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 254 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE 319 PROJECT IMPLEMENTATION (Current)
Div/Bur:
Program:
Implementation of 319 Watershed Projects (Current)Activity:
RI-17-M-08 Wolfeboro Wentworth and Crescent Lake Plan Implementation 3 - : Route 109 roadside and C
RI-17-M-10 Messer Pond Phase I Implementation
RP-15-CT-11 LAKE WARREN WATERSHED MANAGEMENT PLAN DEVELOPMENT AND IMPLEMENTATION PHASE 1
Soak Up the Rain - BMPs
Deliverable:
Deliverable:
Deliverable:
Deliverable:
The Wentworth Watershed Association f/k/a Lake Wentworth Foundation, in conjunction with the Town of Wolfeboro, isproposing watershed management efforts based on recommendations provided in the Lake Wentworth/Crescent Lake WatershedManagement Plan (WMP) that was completed in 2012. Lake Wentworth and Crescent Lake are located in Wolfeboro, NH, and flow into Lake Winnipesaukee via the Smith River. Thewatershed for these lakes is approximately 35.6 square miles of mostly non-developed land, with some small isolated urbanareas and residential homes/summer camps located along shorelines. The WMP identified, evaluated and ranked several stormwater Best Management Practices (BMPs) to address the impacts ofNon-Point Source (NPS) pollution, including sediment and nutrient loadings from the developed portions of the watershed.Phase 2 implementation currently involves work, nearing completion, of high-priority sites on Lake Wentworth and CrescentLake. The Phase 3 project proposes implementation of two of the top five ranked stormwater structural BMPs for LakeWentworth.The Wentworth Watershed Association f/k/a Lake Wentworth Foundation also plans to continue its on-going public educationand outreach efforts utilizing site visits, educational events, presentations, mailings, and website updates to provideeducational information about stormwater runoff, NPS pollution, and how these BMPs will help improve water quality.
Phase 1 focuses on the recommendations in the Plan that target the County Road Brook area (sites 1, 6 and 8). This effortwill be able to leverage on the road maintenance efforts currently underway or planned by the New London DPW. THIS INITIAL PHASE WILL MITIGATE STORMWATER RUNOFF WHERE COUNTY ROAD BROOK CROSSES COUNTY ROAD AS WELL AS INITIATE ANOUTREACH EFFORT TO RESIDENTS TO IMPROVE THE SHORELINE BUFFERS ALONG THE UPPER PORTIONS OFCOUNTY ROAD BROOK AND ITS TRIBUTARIES.
LAKE WARREN SERVES AS AN IMPORTANT RESOURCE FOR RECREATIONAL ACTIVITIES IN THE TOWN OF ALSTEAD. THE LAKE IS LISTED BY DESAS HAVING WATER QUALITY LEVELS WHICH ARE IMPAIRED FOR AQUATIC LIFE USE (DUE TO PH, CHLOROPHYLL-A, AND PHOSPHORUS). THESOUTHWEST REGION PLANNING COMMISSION (SWRPC) AND THE LAKE WARREN ASSOCIATION HAVE BEEN ACTIVE PARTICIPANTS IN SEVERALWATERSHED PLANNING EFFORTS TO IMPROVE LAKE WARREN'S WATER QUALITY. WITH A RECENT SECTION 604(B) FUNDED WATER QUALITYPLANNING GRANT SWRPC CONDUCTED A WATERSHED SURVEY, AN ASSESSMENT OF EXISTING DATA, AND A WATERSHED MODELLING TO IDENTIFYSOURCES OF POLLUTION TO THE LAKE. STORMWATER RUNOFF AND SUBSTANDARD SEPTIC SYSTEMS HAVE BEEN IDENTIFIED AS THE MOSTSIGNIFICANT SOURCES OF POLLUTION IN THE WATERSHED.
THROUGH THIS PROJECT, SWRPC WILL BUILD UPON THE PREVIOUS EFFORTS BY COMPLETING THE REMAINING PLANNING PIECES, ANDCOMPILING ALL OF THE EXISTING WORK INTO ONE COMPREHENSIVE FINAL WATERSHED MANAGEMENT PLAN WHICH MEETS THE USENVIRONMENTAL PROTECTION AGENCY'S REQUIREMENTS FOR WATERSHED PLANS. THE COMPLETED PLAN WILL PROVIDE LOCAL STAKEHOLDERSWITH A PRIORITIZED MENU OF CHOICES WHICH CAN BE IMPLEMENTED TO ACHIEVE THEIR WATER QUALITY GOALS, AND RESULT IN REMOVALOF THE WATER QUALITY IMPAIRMENTS. THIS PROJECT ALSO INCLUDES THE CONSTRUCTION OF TWO DEMONSTRATION BEST MANAGEMENTPRACTICES (BMPS) DESIGNED TO RAISE AWARENESS OF THE STORMWATER PROBLEMS AND SOLUTIONS, AND TO REDUCE STORMWATER RUNOFF ATTWO HIGH PRIORITY LOCATIONS.
BMPs reported here are implementing stormwater BMPs in a watershed with a completed watershed based plan, or itsequivalent, which are not part of an active 319 grant funded project. Projects not implementing watershed based plans arelocated under Watershed Program Management.
Description:
Description:
Description:
Description:
10/01/2017
09/01/2017
05/27/2015
10/01/2017
12/31/2019
06/30/2019
12/31/2017
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MARCOUX, JEFFREY
WASKIN, WENDY
MARCOUX, JEFFREY
LOOSIGIAN, LISA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
BMPs (Best Management Practices)
BMPs (Best Management Practices)
BMPs (Best Management Practices)
BMPs (Best Management Practices)
2
3
3
2
29640
29436
27026
30183
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 255 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE 319 PROJECT IMPLEMENTATION (Current)
Div/Bur:
Program:
Implementation of 319 Watershed Projects (Current)
Quality Assurance for Implementation of Watershed Based Plans (Current)
Activity:
Activity:
FFY 2014 moved from WSPROT and WSREST programs. All 319 projects using or generating environmental data must develop a quality assuranceproject plan (QAPP) or a site specific project plan (SSPP), depending on the project type. All QA documents must be reviewed, managed,and tracked in accordance with the DES Quality Assurance Program and the federal requirements for section 319 funds.
Description:
10/01/2013Start/End Dates: thru
Soak Up the Rain - Outreach, Education & Training
Implementation Project QAPPs
Deliverable:
Deliverable:
Outreach, trainings, and education reported here are conducted in a watershed where an approved watershed based plan orits equivalent exists but where no active 319 grant program is underway. Outreach, training, and education in watershedswithout a watershed based plan are reported under program management.
Provide QAPP (SSPP or other QA documentation) guidance and oversight to grantees completing watershed implementationprojects.
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
LOOSIGIAN, LISA
LANDRY, STEPHEN
Qty/Unit:
Qty/Unit:
Events
QAPPs (Quality Assurance Program Plan)
1
2
Lead Person: LANDRY, STEPHEN
30185
30121
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 256 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
The purpose of this program is to protect and restore the surface waters of the state from nonpoint source pollution. This isaccomplished through technical assistance, funding, project management, outreach, and other support to implement statewide nonpointsource initiatives as well as targeted, watershed-based projects.03/06/2012
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Agricultural NPS Management (Current)
Developed Lands NPS Management (Current)
Activity:
Activity:
Implement priority programmatic milestones addressing agricultural sources identified in the 2014 NPS Management Plan.
Implement priority programmatic milestones addressing developed lands sources identified in the 2014 Nonpoint Source Management Plan.
Description:
Description:
10/01/2013
10/01/2013
Start/End Dates:
Start/End Dates:
thru
thru
Green Equine Program
Green Equine Program
Provide Assistance to increase funding for the Integrated Pest Management Fund
Update Best Management of Wetlands Practices for Agriculture
Update Best Management of Wetlands Practices for Agriculture
Update BMP Manual for Agriculture
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
End date extended from 9/30/15 to 12/31/2017 and deliverable modified. Creating a Green Equine Program was included inthe DRAFT NPS Plan, but was scaled back in the FINAL Plan. Rather than creating a Green Equine Program, the task is todetermine barriers to composting horse manure. Will involve consulation with partners to determine an approach. Work withthe Farm Bureau Equine Committee, the NH Horse Council, and Rockingham County Conservation District, among others.
End date extended from 9/30/15 to 12/31/2017 and deliverable modified. Creating a Green Equine Program was included inthe DRAFT NPS Plan, but was scaled back in the FINAL Plan. Rather than creating a Green Equine Program, the task is todetermine barriers to composting horse manure. Will involve consulation with partners to determine an approach. Work withthe Farm Bureau Equine Committee, the NH Horse Council, and Rockingham County Conservation District, among others.
END DATE EXTENDED FROM 12/31/2016. NPS Program Management Plan Milestone A-3.1 "Seek an increase in either the pesticideregistration fee or the percentage of the fee deposited into the Integrated Pest Management (IPM) fund from 10% to 50%"
Work with DAMF to update 1993 Publication
Work with DAMF to update 1993 Publication
Work with DAMF to include land clearing BMPs, working buffers, and other adjustments determined by partners in update.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2014
01/01/2018
01/01/2015
10/01/2015
01/01/2018
10/01/2015
12/31/2017
12/31/2018
12/31/2017
12/31/2017
12/31/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LANDRY, STEPHEN
LANDRY, STEPHEN
LANDRY, STEPHEN
LANDRY, STEPHEN
LANDRY, STEPHEN
WASKIN, WENDY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Reports, Final
Assistances Provided
Publications
Publications
Manuals
1
1
1
1
1
1
Lead Person:
Lead Person:
LANDRY, STEPHEN
Vacant
25894
30133
26570
26569
30134
26568
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 257 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
Div/Bur:
Program:
Developed Lands NPS Management (Current)Activity:
Alteration of Terrain Rules Changes
Antidegradation Implementation
AoT Maintenance Records Report
AoT Program Redevelopment Rules
Coordinate Activity(s) with Phase II or Other Municipalities
NH Stormwater Manual Update
Participate in Phase II Regional Stormwater Coalitions
Stormwater Utility Outreach
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Determine whether changes are needed to the Alteration of Terrain (AoT) Rules (Env-Wq 1500) for the 2017 rules re-adoption to improve water quality protection and climate change preparedness through AoT permits. Measures include:1)decision on whether the 1-hour or 10-hour storms should be addressed in design criteria to prevent erosion from moreintense, shorter duraction events and 2) decision on the appropriateness of using continuous simulation precipitationmodeling, as opposed to event-based mordeling, to design stormwater practices.
Work with the Land Resources Management Bureau, including the Alteration of Terrain Program and the Shoreland ProtectionProgram to incorporate Antidegradation into program rules.
Request and review maintenance records from completed AoT permitted projects to determine effectiveness of a generaladherence to maintenance conditions.
Work with the AoT Program to draft Re-Development Rules using the Southeast Watershed Allianes 3-phase criteria as amodel.
Coodinate one activity per year with MS4 and other municipalities to meet water quality goals.
Update the New hampshire Stormwater Manual, Volumes 1 - 3 to reflect the new science and understanding of stormwatermanagement, system design, installation, and maintenance, as well as regulatory changed.
Attend, facilitate, and act as liaison for DES at Phase II Regional Meetings. Present at, coordinate, do agendas,minutes, and attendees correspondence for Seacoast and Nashua/Manchester mtgs. Use these venues as an opportunity tostay in touch with municipal efforts to protect high quality waters and to restore impaired waterbodies and to assistwith 319 projects and grantees.
NPS Plan Measure: DL-1.2 - Partner with EPA and municipalities to determine the outreach needs of municipal governmentson the formation and operation of stormawter utilities as enabled by HB 1581. Utlilize results from 2009 319 grantprojects on stormwater utility feasibility studies.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2019
09/30/2019
09/30/2019
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
Vacant
Vacant
MCMILLAN, BARBARA
Vacant
MCMILLAN, BARBARA
MCMILLAN, BARBARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Decisions
Recommendations/Suggestions Implemented
Reports, Final
Rules
Activities
Guidance
Meetings
Efforts
2
1
1
1
1
1
10
1
30177
30176
30175
30174
30114
26512
28317
30116
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 258 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
Div/Bur:
Program:
Developed Lands NPS Management (Current)
Education, Technical Assistance and Outreach (Current)
Activity:
Activity:
Provide outreach to the public regarding watershed assistance programs including following guidelines indicated in the "319 Education andOutreach Plan." Efforts focus on public awareness of nonpoint source pollution, its effects and what can be done, and promoting the NH319 Grant Program.
Description:
10/01/2013Start/End Dates: thru
Update MS4 Coalitions Blog/website
Assist misc DES staff, nonprofit orgs and communities in NPS related outreach or education efforts
Coordinate roundtable and/or tour of 319 projects
Maintain NH Watershed Protection and Restoration Forum Blog
Modify and Update Watershed Assistance Program Webpage
Participate in the DES Website Advisory Board meetings and efforts
Promote 319 Grant RFP through press releases, blog posts, workshop, websites, or display
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Update meeting information, resources and other information on the NH MS4 Regional Stormwater Coalitions (Seacoast,Manchester, Nashua) Blog/webiste.
Respond to reasonable amounts of requests from DES staff, nonprofit organizations, schools and communities to participatein events and trainings, technical assistance, providng and coordinating resources. Could include, but not limited to:Enviroscape and display coordination and demonstrations, Envirothon assistance, resource and document mailings, waterfestivals, Wild NH Festival, school demonstrations, etc.
Coordinate and facilitate roundtable workshop and/or tour of selected 319 sites for past, present, and future grantees,EPA 319 related staff, and appropriate DES staff. This will be a bienniel roundtable and will include planning for thenext year. The tour may just include EPA staff if more applicable. Note: Due to staff shortages, we may have to skip ayear.
Working with Sally Soule, add posts to and update information on the NH Watershed Protection and Restoration Forum Blog.Monitor and accept comments.
Quarterly check and update of the webpage and add new information and documents as needed or requested. Includestormwater page in this also.
NOTE: Deliverable not completed in 2016 due to NHDES loosing the Website Ad Board Chair to another position. Will startup again in 2017. Attend the DES Website Advisory Board monthly meetings and follow-up on tasks associated with WASwebpage updates and changes to promote the WAS programs
Take advantage of at least three markting methods to promote the release of the yearly Watershed Assistance 319 GrantsRFP.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCMILLAN, BARBARA
MCMILLAN, BARBARA
MCMILLAN, BARBARA
MCMILLAN, BARBARA
MCMILLAN, BARBARA
MCMILLAN, BARBARA
MCMILLAN, BARBARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Updates
Efforts
Events
Updates
Updates
Efforts
Methods
12
3
1
20
5
2
2
Lead Person: MCMILLAN, BARBARA
30115
30117
30118
30119
30120
30382
30195
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 259 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
Div/Bur:
Program:
Education, Technical Assistance and Outreach (Current)
GRTS and NPS Data Management (Current)
Activity:
Activity:
FY2014 Activity moved from Watershed Data Management Program. Grants in the database include 319 Base, 319 Incremental, 604(b), REPP, andpossibly others.GRTS is EPAs database that DES is required to populate with grant project information. NPS Grants and GRTS databases are used to trackand report on project related data including, project results, financial management and documentation, load reductions and water qualitygoals, progress toward task completion, etc.
Description:
10/01/2013Start/End Dates: thru
Provide press releases, presentation, website or blog posts, and display content for grant projects
Respond to Inquiries
Stormwater Outreach and Technical Assistance
Grant Projects Entered into GRTS
Grant Projects Entered into GRTS
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Using newsletters, blogs, press releases, presentations, etc., prmote selected grant projects and DES partnerships withgrantees.
Respond to inquiries relating to water quality issues requiring 319 program outreach expertise. Incudes phone callscoming in from constituents and partners. (mostly just do the more time consuming ones. Topics include but are notlimited to: - past, present, and futrue 319 grant activities and resources information and material requests.- other DES staff water quality related questions for referrels.- specific DES or partner project information etc., - state and federal permit information, and- assistance to EPA on DES or NH specific information.
POSITION VACANT 2017 - COPY FORWARD FOR NEW STORMWATER COORDINATOR -UNTIL THEN MOST OUTPUTS TRACKED IN SOAK OR MS4OUTREACH. Provide recommendations, guidance, and technical assistance to DES and organizations outside of DES,municipalities, and the general public on stormwater and stormwater management, including homeowner best managementpractices, e.g. Soak up the Rain, the NH Residential Loading Model, presentations and other requested assistance.
Work with grantees and project managers to obtain modeling results and/or other data necessary to quantify pollutantloads and load reductions resulting from projects. Enter all 319 Incremental and Base dollars and mandatory dataelements into GRTS within 90 days of receipt of the grant, and make updates on an ongoing basis and verify final data foruse by EPA on or before February 15th. Data entry into GRTS requires verifying and entering information provided in newproject applications, and updating that project data and information on an ongoing basis as projects progress.
Work with grantees and project managers to obtain modeling results and/or other data necessary to quantify pollutantloads and load reductions resulting from projects. Enter all 319 Incremental and Base dollars and mandatory dataelements into GRTS within 90 days of receipt of the grant, and make updates on an ongoing basis and verify final data foruse by EPA on or before February 15th. Data entry into GRTS requires verifying and entering information provided in newproject applications, and updating that project data and information on an ongoing basis as projects progress.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MCMILLAN, BARBARA
MCMILLAN, BARBARA
Vacant
ZINK, KATHERINE
ZINK, KATHERINE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Promotional Items
Responses
Assistances Provided
Percent
Percent
2
5
2
100
100
Lead Person: ZINK, KATHERINE
30123
30124
30194
29651
29652
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 260 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
Div/Bur:
Program:
GRTS and NPS Data Management (Current)
Landscape & Turf Management (L) Goal (Current)
NH Nonpoint Source Management Plan Update (Current)
Activity:
Activity:
Activity:
Implement priority programmatic milestones addressing that turf management and landscaping practices to not run off or leach to surfaceor groundwater as identified in the 2014 NPS Management Plan.
Develop/update the NH Nonpoint Source Management Plan (originally published by NHDES in 1999) as needed to meet the EPA requirements andto efficiently and effectively reflect and guide the NHDES Nonpoint Source Management Program.
Description:
Description:
10/01/2014
03/06/2012
Start/End Dates:
Start/End Dates:
thru
thru
Maintain NPS Grants Database
Maintain NPS Grants Database
Identify project and tasks for UNH Sea Grant CE for Landscape and Turf Management Goal
L-2 IPM Toolkit for Tickborne Disease Prevention
Post fertilizer relevant information on the Watershed Managers blog
NPS Management Plan 5-Year Update
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Maintain and update the NPS Grants Database by identifying and verifying project information including load reductions,progress toward achieving goals, major milestones, financial tracking, task completion, etc. The data is necessary foruse in compiling annual reports for EPA and other stakeholders as well as input to GRTS to meet EPA reportingrequirements.
Maintain and update the NPS Grants Database by identifying and verifying project information including load reductions,progress toward achieving goals, major milestones, financial tracking, task completion, etc. The data is necessary foruse in compiling annual reports for EPA and other stakeholders as well as input to GRTS to meet EPA reportingrequirements.
END DATE EXTENDED FROM: 12/31/2016 TO 09/30/2018 - END DATE EXTENDED FROM: 09/30/2016 TO 12/31/2016. Work with UNH SeaGrant Cooperative Extension staff to idenfy project and draft project tasks to work towards meeting one or moremilestones in the draft NH NPS Management Program Plan with 319 program funds.
Through an MOA with DHHS and DAMF develop an IPM toolkit for grades K-8 in order to protect public health and theenvironment
Provide updates relevant to information and projects related to fetilizer and landscaping practices that do not degradwater quality
The NPS Management Program is updated every five years to reflect program changes and success toward meeting NPS Programgoals. The completed NPS Program update for years 2020 - 2024 is approved by EPA prior to October 1, 2019.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
01/01/2017
09/01/2016
10/01/2017
10/01/2017
09/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ZINK, KATHERINE
ZINK, KATHERINE
MCMILLAN, BARBARA
WASKIN, WENDY
MCMILLAN, BARBARA
Vacant
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Percent
Percent
Contracts
Toolkits
Postings
Plans, Management
100
100
1
1
1
1
Lead Person:
Lead Person:
MCMILLAN, BARBARA
Vacant
29653
29654
30125
28096
30126
26511
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 261 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
Div/Bur:
Program:
NH Nonpoint Source Management Plan Update (Current)
NPS Investigations (Current)
NPS Partnerships and Coordination (Current)
Activity:
Activity:
Activity:
Formerly Watershed Investigations Program
Regional and national NPS meetings present opportunities to collaborate with state and federal partners. Collaboration with intrastatepartners occurs through interagency committees and development and implementation of memoranda of agreement.
Description:
Description:
10/01/2013
10/01/2013
Start/End Dates:
Start/End Dates:
thru
thru
NPS Plan Progress Evaluation
NPS Priority Area Biennial Update
New Complaints Investigated
Shellfish Program followup Investigations
Attend NROC quarterly mtgs and additional project planning mtgs
Attend Regional and National NPS Meeting
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Internal evaluations. Review and evaluate progress toward completing annual milestones and plan objectives at the end ofeach calendar year included in the NPS Plan. See also Section 319 Grants Management and Results Reporting for annualprogress report submitted to EPA.
Work with the DES Water Quality Section to update the priority restoration and protection lists used to prioritize thework of the NPS program as a result of biennial updates to NHs Surface Water Quality Assessment Data. Surface WaterQuality Reports are completed every two years by DES Water Quality Section and submitted to EPA for approval.
Snow dumping and miscellaneous NPS complaints are occassionally investigated by Watershed Assistance Section staff.Activities will be reported on the Water Quality Section complaint database and/or referred to the appropriate DESenforcement personnel.
The Shellfish program finds bacterial WQ violations in shellfish waters, they forward the WQ violation for investigationto find the source of pollution, Watershed surveys and sampling are conducted to find the source along with working withmuniciple officials to track down and eliminate the sources.
NROC (Natural Resource Outreach Coalition) Working collaboratively with the NHEP, UNH Cooperative Extension, NH CoastalProgram, Great Bay National Estuary Research Reserve and Regional Planning Commissions and others to provide educationand technical assistance to communities in the Seacoast watershed on Natural Resource Based Planning to better managegrowth and protect important natural resources.
State NPS Coordinators are expected to attend the annual NEIWPCC NPS Meeting, held in the states on a rotating basis eachApril or May. EPA also requires attendance at national meetings when scheduled.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2014
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
12/31/2019
09/30/2019
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
LIVINGSTON, ROBERT
LIVINGSTON, ROBERT
MCMILLAN, BARBARA
LANDRY, STEPHEN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Evaluations
Updates
Investigations
Investigations
Meetings
Meetings
5
1
6
6
4
2
Lead Person:
Lead Person:
LIVINGSTON, ROBERT
LANDRY, STEPHEN
25598
30182
30156
30157
30127
30135
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 262 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
Div/Bur:
Program:
NPS Partnerships and Coordination (Current)
New Hampshire NPS Program Management Plan Implementation (Current)
Quality Assurance for NPS Program at DES (Current)
Salt Applicators Certification Program (Current)
Activity:
Activity:
Activity:
Activity:
Use the Nonpoint Source Program and Grants Guidelines for States and Territories released on April 12, 2013, to identify eligibleactivities, program priorities, programmatic conditions, and reporting requirements. At least 50% of 319 funding will be used forwatershed-based planning (WBP) implementation. States will target 319 funding toward restoration of priority segments, water bodies orwatersheds, and protection of documented high priority healthy and threatened waters.
FFY 2014 moved from WSPROT and WSREST programs. All 319 projects using or generating environmental data must develop a quality assuranceproject plan (QAPP) or a site specific project plan (SSPP), depending on the project type. All QA documents must be reviewed, managed,and tracked in accordance with the DES Quality Assurance Program and the federal requirements for section 319 funds.
Facilitate and track new salt applications. Prepare individual salt applicator certificates as necessary. Keep electronic and papercopies. Assist with theapplication process.
Description:
Description:
Description:
10/01/2017
10/01/2013
11/01/2013
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
TMDL Vision Collaboration
Work with Piscataqua Estuaries Region Partnership (PREP) to implement PREP Watershed Plan
Submit one nine-element plan to U.S. EPA Region I for review each year.
Annual Quality Assurance System Self-Audit
Quantify Salt Loading for Private Parking Lots
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Align priority watersheds with the TMDL program. Collaboration should include 1) TMDL program uses the watershed prioritylist to identify priority watersheds for TMDL development and 2) Watersheds with TMDLs are priorities for watershed basedplan development. Measure of success includes an updated list of TMDL priority watersheds and a list of priorityWatershed Based Plan areas.
Partner with PREP on stormwater outreach and education plan to address Nitrogen loading to Great Bay. Efforts mayinclude but are not limited to: - Particpating in information sharing and coordination venues.- Providing information and lessons learned from successful 319 projects.- Identifying additional projects, partners, and resources, for 319 grants.
The NHDES NPS Program will submit one, nine-element, watershed-based plan to the U.S. EPA Region I for review each yearand all alternative watershed-based plans will be submitted to Region I for review and approval.
Complete Audit Form and Memo
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2018
04/01/2017
07/01/2017
09/30/2018
09/30/2018
09/30/2019
10/01/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LANDRY, STEPHEN
MCMILLAN, BARBARA
LANDRY, STEPHEN
LANDRY, STEPHEN
Vacant
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Lists
Assistances Provided
Plans, Management
Self-Assessments
Reports, Final
2
1
1
1
1
Lead Person:
Lead Person:
Lead Person:
LANDRY, STEPHEN
LANDRY, STEPHEN
Vacant
30136
30128
30131
30184
28868
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 263 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
Div/Bur:
Program:
Salt Applicators Certification Program (Current)
Section 319 Grants Management and Results Reporting (Current)
Activity:
Activity:
Includes annual progress reports on grants and annual program report.Description:10/01/2013Start/End Dates: thru
Quantify Salt Loading for Private Parking Lots
Reporting Reminders Sent to Salt Applicators
Salt Applicator Certifications Processed
319 Categorical Grant Application
Accounting Review
Annual Grant Progress Report to EPA
Develop and submit EPA Success Stories
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
This tracks new certifications issued along with re-certifications processed by the annual epiration date for allcertificates of June30th.
Prepare Section 319 categorical grant application and amendments. 2-year for FY18 and FY19
Review and reconcile expense reports and balances for 7602A and 2035 accounts. Minimum Quarterly reviews.
In accordiance with 40 CFR 31.40 and 319 Grant Agreement Terms and Conditions submit an annual progress report to EPAcovering work status and identifying any problems if applicable. There will be one consolidated report due at the end ofthe first quarter of the FFY, unless the current grant conditions have a different deadline.
Success Stories: Submit success stories for waterbodies that have been fully or partially delisted in previous years,and/or that show improvement in water quality or demonstrate ecological restoration (WQ-10). To do this, identify waterbodies that were recently partially or fully delisted or that demonstrate water quality or habitat improvement, andinvestigate whether local, state, federal or private NPS mitigation occurred that might make these waterbodies acandidate for a NPS Success Story. Using EPAs guidance (http://water.epa.gov/polwaste/nps/success319/info.cfm#cat1 ),prepare and submit to EPA a success story for all candidate water bodies by June 1st. Seehttp://water.epa.gov/polwaste/nps/success319/ for examples of success stories and other information.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
10/01/2017
07/01/2017
07/01/2017
10/01/2017
10/01/2017
10/01/2017
12/31/2018
09/30/2018
06/30/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Vacant
Vacant
Vacant
WASKIN, WENDY
WASKIN, WENDY
WASKIN, WENDY
ZINK, KATHERINE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Reminders
Certifications
Applications, Grants
Reviews
Reports, Final
Success Stories
1
2
100
3
8
1
1
Lead Person: WASKIN, WENDY
30192
30193
30197
28820
29432
29433
29655
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 264 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
Div/Bur:
Program:
Section 319 Grants Management and Results Reporting (Current)
Section 319 Outside Grants Proposal Development, Awards and Closeout (Current)
Activity:
Activity:
Work with municipalities, NGOs, watershed and lake associations, River Local Advisory Committees, other state agencies, and stakeholdergroups to conceptualize, scope out, and draft watershed protection and restoration planning and implementation project proposals forconsideration by DES. Technical assistance is provided by Watershed Supervisors throughout the pre-proposal and full proposal process.
Description:
10/01/2012Start/End Dates: thru
Develop and submit EPA Success Stories
Identify Potential Candidates for EPA Success Stories
Nonpoint Source Management Annual Report-2016
Nonpoint Source Management Annual Report-2017
Submit Annual MBE WBE reports for Open Grants
Close Out 319 Sub-Recipient Grants/Contracts
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Success Stories: Submit success stories for waterbodies that have been fully or partially delisted in previous years,and/or that show improvement in water quality or demonstrate ecological restoration (WQ-10). To do this, identify waterbodies that were recently partially or fully delisted or that demonstrate water quality or habitat improvement, andinvestigate whether local, state, federal or private NPS mitigation occurred that might make these waterbodies acandidate for a NPS Success Story. Using EPAs guidance (http://water.epa.gov/polwaste/nps/success319/info.cfm#cat1 ),prepare and submit to EPA a success story for all candidate water bodies by June 1st. Seehttp://water.epa.gov/polwaste/nps/success319/ for examples of success stories and other information.
Develop process to review in-progress and recently completed projects to determine potential candidates for EPA SuccessStories.
END DATE EXTENDED FROM 6/1/2017. Utilizing information from the NPS Management Plan, Grants Database, Success Stories,GRTS, and other sources, create an annual Nonpoint Source Program Report. The Program Report will provide a summary ofprogress in meeting the milestones identified in NHs Nonpoint Source Management Program Plan.
Utilizing information from the NPS Management Plan, Grants Database, Success Stories, GRTS, and other sources, create anannual Nonpoint Source Program Report. The Program Report will provide a summary of progress in meeting the milestonesidentified in NHs Nonpoint Source Management Program Plan.
Track the project expiration dates for each grant and notify grantees four months in advance that their grants are due toexpire. Assist grantees with required reporting. Properly close out completed projects and expiring grants by makingsure all deliverables have been submitted, including proper financial and match documentation, load reductiondocumentation, and electronic copies of all deliverables. Maintain all information in the NPS database and update GRTSwith project close-out information. Forward outstanding products to the DES WAS Outreach coordinator for potentialdevelopment as web site success stories. Catalog final reports in hard copy and electronic form.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
01/01/2015
10/01/2016
10/01/2017
10/01/2017
10/01/2017
09/30/2019
12/31/2019
10/31/2017
09/30/2018
12/31/2017
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ZINK, KATHERINE
ZINK, KATHERINE
WASKIN, WENDY
WASKIN, WENDY
WASKIN, WENDY
ZINK, KATHERINE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Success Stories
Processes
Reports, Final
Reports, Final
Reports, Final
Contracts
1
1
1
1
5
10
Lead Person: LANDRY, STEPHEN
29656
28201
27117
29434
29435
29657
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 265 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
Div/Bur:
Program:
Section 319 Outside Grants Proposal Development, Awards and Closeout (Current)
Soak up the Rain NH (Current)
Activity:
Activity:
Close Out 319 Sub-Recipient Grants/Contracts
Develop FFY 17 Grant Projects for Androscoggin and Saco Watersheds
Develop FFY 17 Grant Projects for Androscoggin and Saco Watersheds
Develop FFY 18 Grant Projects for Merrimack and Connecticut Watersheds
Develop FFY 18 Project for Coastal Watershed
Develop and Issue Request for Proposals (RFP)
Draft Grant Agreements for Selected Proposals
Draft Grant Agreements for Selected Proposals
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Track the project expiration dates for each grant and notify grantees four months in advance that their grants are due toexpire. Assist grantees with required reporting. Properly close out completed projects and expiring grants by makingsure all deliverables have been submitted, including proper financial and match documentation, load reductiondocumentation, and electronic copies of all deliverables. Maintain all information in the NPS database and update GRTSwith project close-out information. Forward outstanding products to the DES WAS Outreach coordinator for potentialdevelopment as web site success stories. Catalog final reports in hard copy and electronic form.
Work with eligible grant recipients in the Androscoggin and Saco Watersheds (or other watersheds as necessary) toconceptualize, scope out, and draft pre- and full proposals for consideration by DES for Section 319 funding. Outputswill measure both pre- and full proposal submittals.
Work with eligible grant recipients in the Androscoggin and Saco Watersheds (or other watersheds as necessary) toconceptualize, scope out, and draft pre- and full proposals for consideration by DES for Section 319 funding. Outputswill measure both pre- and full proposal submittals.
Work with eligible grant recipients throughout Merrimack and Connecticut River watersheds to conceptualize, scope out,and draft pre-proposals and/or full proposals for consideration by DES for Section 319 funding. Outputs will measure bothpre and full proposal submittals.
Work with eligilbe grant recipients in the coastal watershed to conceptualize, scope out and draft pre- and/or fullproposals for consideration by DES for Section 319 funding. Outputs will measure both pre- and full proposal submittals.
A Request for Pre-Proposals (RFP) is developed in the spring of each year, issued in the early summer with pre-proposalsdue in late summer. Full Proposals are typically due in the late fall for Section 319 NPS funding consideration.
Draft grant agreements. Work with grantees to have agreements signed and accepted by the States review and approvalprocess.
Draft grant agreements. Work with grantees to have agreements signed and accepted by the States review and approvalprocess.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2018
10/01/2017
10/01/2018
01/01/2017
01/01/2017
10/01/2017
10/01/2017
10/01/2018
09/30/2019
09/30/2018
09/30/2019
12/31/2017
12/31/2017
09/30/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
ZINK, KATHERINE
ZINK, KATHERINE
ZINK, KATHERINE
MARCOUX, JEFFREY
SOULE, SALLY
LANDRY, STEPHEN
ZINK, KATHERINE
ZINK, KATHERINE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Contracts
Proposals
Proposals
Proposals
Proposals
RFPs (Requests for Proposals)
Contracts
Contracts
10
1
1
2
2
1
10
10
29658
29659
29660
27306
27547
30139
29661
29662
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 266 of 313
WATER DIVISION WATERSHED MANAGEMENT
NONPOINT SOURCE PROGRAM MANAGEMENT (Current)
Div/Bur:
Program:
Soak up the Rain NH (Current)Activity:
The purpose of Soak up the Rain NH is to achieve voluntary reductions in stormwater runoff volume and pollution from private propertiesin NH through a coordinated, statewide stormwater outreach and local capacity building campaign. This program will develop and coordinatestormwater outreach messaging and materials and provide support for local capacity, including training opportunities and web resources.
Description:
07/01/2012Start/End Dates: thru
HI-14-CT-11 Coordinate Soak Up the Rain Silver Lake
SOAK BMP Inspection/Maintenance
SOAK Installations Not Reported Elsewhere
SOAK Site Assessments
Soak Up the Rain Local Partnerships
Soak Up the Rain Outreach, Education & Training
Soak Up the Rain Resources and Website Management
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
No copy forward - project should be done by Dec 2017. END DATE EXTENDED FROM 12/30/2016. Ammendment reduced BMP quantityfrom 10 to 7. Work with the Silver Lake Land Trust, the Monadnock Conservancy, and other partners to build capacitywithin the Silver Lake watershed to increase awareness of residential stormwater issues and implement the SOAK SilverLake program
Complete inspections and necessary maintenance of SOAK installations. Inspections should be done during the fall andagain in the spring, following the installation.
DES staff assist in the installation of Soak up the Rain Best Management Practices (BMPs) for demonstration sites orother sites not covered by an approved watershed based management plan. The goal is to reduce stormwater runoff andpollution on residential and small commercial sites.
Complete site assessments (DES as lead or providing assistance to local groups) to determine the suitability of a sitefor a SOAK installation project. This includes initial onsite screening as well as design assessments.
Work with local organizations and other partners to expand the SOAK program into communities that do not currentlyparticipate. Obtain commitment from local organizations to manage a local SOAK program.
Outreach, education and training events in watersheds where no approved watershed based plan exists to promote Soak Upthe Rain best practices and to build local capacity to assess sties, design and install small-scale stormwater bestmanagement practices.
Maintain, update, and develop website and new outreach materials as needed to keep the program resources current. Programmaterials, website, and Facebook page will be updated as needed. Target: weekly Facebook posts and quarterly review ofmaterials and website.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2013
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
12/31/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LOOSIGIAN, LISA
LIVINGSTON, ROBERT
LIVINGSTON, ROBERT
LIVINGSTON, ROBERT
LOOSIGIAN, LISA
LOOSIGIAN, LISA
LOOSIGIAN, LISA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Installations
Inspections
BMPs (Best Management Practices)
Site Visits
Partnerships
Events
Updates
7
4
1
5
1
2
60
Lead Person: Vacant
25604
30150
30153
30154
30190
30187
30191
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 267 of 313
WATER DIVISION WATERSHED MANAGEMENT
OTHER FUNDED NONPOINT SOURCE PROJECTS AND ACTIVITIES (Current)
Will include leveraged funding for NPS activities. May be supported by 319 funded staff related to general program work.07/01/2013
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
604(b) Water Quality Planning Grants (Current)Activity:
About $60,000 is available annually for regional water quality planning projects. Issue an annual RFP to solicit projects that meetClean Water Act guidelines for these funds. Prior to FY14 under NPSMGT Program.
Description:
10/01/2013Start/End Dates: thru
Develop and Track 2016-2017 Projects
Develop and Track 2018-2019 Projects
Select 2018-2019 Projects for 604(b) funding
W-16-C-03 Powwow Watershed Planning and Capacity Building
W-16-CT-01 Develop Watershed Management Plan for Spofford Lake
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Issue a biennial RFP to the 9 regional planning agencies and the Connecticut River Joint Commissions for water qualityplanning services as described in Section 604(b) of the Clean Water Act. RFP is issued in summer of even-numbered yearswith projects selected in fall of even-numbered years.
Issue a biennial RFP to the 9 regional planning agencies and the Connecticut River Joint Commissions for water qualityplanning services as described in Section 604(b) of the Clean Water Act. RFP is issued in summer of even-numbered yearswith projects selected in fall of even-numbered years.
Issue biennial, Request for Letters of Intent (LOIs) to the 9 regional planning agencies and the Connecticut River JointCommissions for water quality planning services as described in Section 604(b) of the Clean Water Act. The Request forLOIs is issued in the summer of even-numbered years with projects selected in the fall of that same, even-numbered year.
Build capacity in the watershed for developing and implementing a watershed based plan: identify NPS hot spots, evaluateseptic system risk, build project advisory team through community outreach and education
Work with the Southwest Region Planning Commission to develop a nine element "a through i" watershed management plan forSpofford Lake.
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
10/01/2016
04/05/2017
04/19/2017
12/31/2017
09/30/2019
12/31/2018
12/31/2018
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
LANDRY, STEPHEN
LANDRY, STEPHEN
LANDRY, STEPHEN
SOULE, SALLY
MARCOUX, JEFFREY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Grants
Grants
Grants
Plans
Plans
3
2
2
3
1
Lead Person: LANDRY, STEPHEN
27247
30172
28411
29065
29064
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 268 of 313
WATER DIVISION WATERSHED MANAGEMENT
OTHER FUNDED NONPOINT SOURCE PROJECTS AND ACTIVITIES (Current)
Div/Bur:
Program:
604(b) Water Quality Planning Grants (Current)
Implement chloride TMDLs in 4 impaired watersheds in the I-93 corridor (Current)
State Revolving Loan Funds (SRF) for NPS Projects (Current)
Activity:
Activity:
Activity:
(07/01/2013 moved from Watershed Restoration program) In 2007 DES completed draft chloride TMDLs in four watersheds in the I-93 corridor: Beaver Brook, Policy Brook, Dinsmore Brook, and the North Tributary to Canobie Lake. While we are awaiting EPA approval of the TMDLs, aSalt Reduction Work Group has been formed to develop implementation plans to bring the impaired waters into compliance with water qualitystandards.
In 2009 the SRF program started allowing stormwater projects to be eligible for loan funds. Prior to FY'14 Activity was under WSREST.
Description:
Description:
10/01/2008
10/01/2013
Start/End Dates:
Start/End Dates:
thru
thru
W-16-M-02 Development of a Septic System Assessment Model
Outreach for the UNH Green SnowPro Program
Stormwater State Revolving Loan Funds Awarded
Stormwater State Revolving Loan Funds Promotion
Technical Assistance Preconstruction, Contracts, Construction Monitoring and Completion Confirmation
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Work with the Lakes Region Planning Commission to create a replicable Septic System Improvement model which will providecommunities with a toolbox of options to address nutrient loading from aging or failing septic systems. Nutrient loadingfrom aging or failing septic systems has been identified by the State of NH and local communities as a nonpoint source ofpollution contributing to water quality impairments. The purpose of this replicable planning model is to prepare thecommunity for applying the use of municipal health regulations or ordinances plus financial incentives for the purpose ofupgrading/replacing or installing individual and community septic systems as a cost effective practice that helps protectand improve water quality.
The project will focus on Moultonborough Bay Inlet for the template model, working with the Town of Moultonborough, NH,as Moultonborough Bay Inlet has documented water quality impairments. The Inlet has historically exhibited the highestlevels of in-lake total phosphorus (TP) of the eight sub-basins which comprise Lake Winnipesaukee.
Manage Green SnowPro Facebook page, update NHDES Green SnowPro website and listing of Certified Applicators, and overseeUNH T2 website and other promototion of classes, and utilize other outreach methods to increase awareness andparticpation in the UNH Green SnowPro Program with muncipal and private winter maintenance contractors.
Review, rank and select stormwater SRF projects to meet stormwater allocation.
Work with DES Wastewater Engineering staff to create and promote Stormwater SRF pre-applications.
Attend project preconstruction meetings, bid openings and final bids, contract signing, onsite monitoring ofconstruction, change order coordination of contracts and completion confirmation
Description:
Description:
Description:
Description:
Description:
04/06/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
12/31/2018
09/30/2019
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
MARCOUX, JEFFREY
Vacant
MCMILLAN, BARBARA
MCMILLAN, BARBARA
LIVINGSTON, ROBERT
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Plans
Methods
Lists
Promotional Items
Assistances Provided
1
2
1
3
2
Lead Person:
Lead Person:
LANDRY, STEPHEN
LANDRY, STEPHEN
29063
30201
30129
30130
30155
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 269 of 313
WATER DIVISION WATERSHED MANAGEMENT
OTHER FUNDED NONPOINT SOURCE PROJECTS AND ACTIVITIES (Current)
Div/Bur:
Program:
State Revolving Loan Funds (SRF) for NPS Projects (Current)
Suncook River Infrastructure Protectection Project (Current)
Activity:
Activity:
July 2013 moved from WSREST/Stream and River Morphology ProjectsDescription:10/01/2011Start/End Dates: thru
Technical Assistance for NPS SRF Loan Applications
Suncook River and Leighton Brook Construction Project
Deliverable:
Deliverable:
Make municipalities and watershed organizations aware that stormwater projects are now eligible for assistance throughthe SRF loan program. Provide assistance to the SRF program in reviewing and administering NPS SRF loan applications. Atleast $2 million annual in SRF loans available for stormwater and NPS projects.
DES is the lead agency on the bidding and construction phase of the Suncook River and Leighton Brook InfrastructureProtection Projects. DOT has committed $900,000 to the project and DES is responsible for securing the remaining $1.75million for construction on the Suncook River. Funding is secured for Leighton Brook and Inter-fluve Inc. has finalizedall designs, secured permits, and will prepare bid documents and faciliate the bid process. Inter-fluve personnel willalso serve as construction supervisors at both sites. S. Landry is the DES lead for the project and responsible forapproving the DES contract with the construction firm, routing through the G&C approval process, and ensuring that permitconditions are being met in the field. Steve is also respnsible for verying that all deliverables have been completedprior to payments being issued by the State of New Hampshire.
Description:
Description:
10/01/2017
01/01/2015
09/30/2018
12/31/2020
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
ZINK, KATHERINE
LANDRY, STEPHEN
Qty/Unit:
Qty/Unit:
Loans
Projects
1
2
Lead Person: LANDRY, STEPHEN
28415
25266
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 270 of 313
WATER DIVISION WATERSHED MANAGEMENT
PERMIT EVALUATIONS (Current)
Evaluate and recommend action on pesticide permits; provide technical assistance and review monitoring results for NPDES thermaldischarges; administer the 401 Water Quality Certification (WQC) program which includes developing rules, processing applications,issuing 401 WQCs and technical assistance; provide technical assistance for the development of Groundwater Discharge Permits and waterwithdrawal requests that may impact surface waters; provide technical assistance for the development of NPDES permits includingindividual permits for WWTFs and general remediation permits; provide technical assistance for the NPDES General Stormwater Permits (MS4and CGP) including review of pollutant loading analyses; and provide technical assistance for Alteration of Terrain Permits (i.e., SiteSpecific Permits).
10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees Federal EPA Federal Other Grants
401 Certification Implementation (Current)
401 Certification Processing (Current)
Activity:
Activity:
Review the products prescribed in the conditions of any issued 401 Water Quality Certifications. These products include, but are notlimited to environmental monitoring data and reports.
Review 401 Certification applications, provide technical assistance to applicants, and write 401 Certifications or 401 Certificationdenials, based on whether the proposed activity will meet surface water quality standards. The number of 401 Certification applicationsreviewed and issued/denied depends on number of complete applications received. Includes time spent on updating the 401 Certificationweb page and 401 GIS coverage relative to the 401 Certification issued.
Description:
Description:
10/01/2001
10/01/2001
Start/End Dates:
Start/End Dates:
thru
thru
401Imp: Review data and reports required per conditions of 401 Water Quality Certifications.
401Proc 401 Application Reviews
401Proc 401 WQCs Issued FFY18
401Proc 401 WQCs Issued FFY19
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Follow-up on 401 Certifications that include conditions, such as for water quality monitoring plans, BMP maintenanceplans, operations plans, etc. [Note: Outputs may represent multiple reviews of the same topic. For example, if a 401Certification contains a provision for a water quality monitoring plan, the plan may be reviewed several times over oneor two FY Quarters before being approved. Thus, a separate review will be counted each time a plan is reviewed.
Review 401 Certification and non 401 certification applications and request additional information necessary to completethe application and support DES decision on 401 Certification or non 401 certification issuance or denial. Thisincludes technical assistance provided to applicants relative to information needs to support the application.
FY18 and FY19 EPA P&C Item 29. This deliverable tracks the number of 401 water quality certifications (WQCs) and non401 certifications per RSA 485-A:12,IV (including modifications to WQCs).
FY18 and FY19 EPA P&C Item 29. This deliverable tracks the number of 401 water quality certifications (WQCs) and non401 certifications per RSA 485-A:12,IV (including modifications to WQCs).
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COMSTOCK, W. GREGG
COMSTOCK, W. GREGG
Vacant
Vacant
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reviews
Applications
Certifications
Certifications
5
5
2
2
Lead Person:
Lead Person:
COMSTOCK, W. GREGG
COMSTOCK, W. GREGG
29208
30394
30383
30393
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 271 of 313
WATER DIVISION WATERSHED MANAGEMENT
PERMIT EVALUATIONS (Current)
Div/Bur:
Program:
401 Certification Processing (Current)
LIHI - Low Impact Hydro Institute Certifications (Current)
NPDES WWTF Permit Reviews (Current)
Activity:
Activity:
Activity:
Processing of applications for LIHI certication of hydroelectric faciliites.
Review NPDES WWTF permits for compliance with water quality standards and assist with development of methods to determine effluentlimits. Number of permits is contingent upon the number of draft permits issued by the EPA and the Permits Section of the DESWastewater Engineering Bureau.
Description:
Description:
10/01/2013
10/01/2001
Start/End Dates:
Start/End Dates:
thru
thru
401Proc Review of Projects Not Requiring 401 Certification
LIHI Low Impact Hdyro Inst Reviews (FY 18)
NPDESWWTF: Permit Reviews
Deliverable:
Deliverable:
Deliverable:
Review of projects that dont require issuance of a 401 Certification because of policy, and/or because conditionsnecessary to protect water quality are included in another enforceable permit such as an Alteration of Terrain orWetlands Permit.
Processing of applications for LIHI certication of hydroelectric faciliites. Review includes providing monitoringrecommendations, site visits, processing of laboratory samples, assistance with dataloggers, processing of water qualiltydata, and recommendation to LIHI on potential certification
Provide general technical assistance such as review of draft NPDES permits issued for WWTFs
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
COMSTOCK, W. GREGG
WALSH, EDWARD
COMSTOCK, W. GREGG
Qty/Unit:
Qty/Unit:
Qty/Unit:
Projects
Reviews
Assistances Provided
10
5
3
Lead Person:
Lead Person:
WALSH, EDWARD
COMSTOCK, W. GREGG
30384
29992
30391
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 272 of 313
WATER DIVISION WATERSHED MANAGEMENT
POOL AND SPA INSPECTIONS RSA 485-A:26 (Current)
The Public Bathing Facility ("PBF") program reviews design applications and issues permits for all PBFs, including swimming pools, spas,wading pools, therapy pools, and special recreation pools. The PBF program also conducts an extensive inspection program. Theinspection program is designed to help establishments such as hotels, motels, water parks, camopgrounds, health clubs, schools,municipalities, and condominiums comply with applicable PBF requirements, so as to protect the health and safety of the patrons that useNew Hampshire's PBFs. The PBF program offers technical assistance on an as-needed basis to the public, pool installers, municipalities,owners, and operators.01/01/1996
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
XFunding: State General XState Fees Federal EPA Federal Other Grants
Complaints (Current)
Education and Outreach (Current)
Enforcement (Current)
Activity:
Activity:
Activity:
The PBF program investigates complaints received from the general public, heath officers, or other town officials.
Fact sheets, white pages, web page development or presentations given to deceminate important information relating to the PBP Program
Enforcement actions are initiated if Public Bathing Facilities are not in compliance with Env-Wq 1100 and or if they continue to not bein compliance.
Description:
Description:
Description:
10/01/1996
10/01/2001
10/01/1996
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
EXISTING COMPLAINTS CLOSED
NEW COMPLAINTS INVESTIGATED
Annual Newsletter
Pool Website Development
Administrative Fines
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Identify all existing complaints that have been closed
Identify new complaints that have been investigated
Annual newsletter to all pool operators and pool builders
Enhance website contentEnd date extended from end date 9/30/2010
An establishment is issued an administrative fine for violations with RSA 485-A:26 and/or Env-Wq 1100.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Resolutions
Investigations
Newsletters
Web Pages
Notifications
10
10
1
1
1
Lead Person:
Lead Person:
Lead Person:
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
29500
29502
29503
29504
29505
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 273 of 313
WATER DIVISION WATERSHED MANAGEMENT
POOL AND SPA INSPECTIONS RSA 485-A:26 (Current)
Div/Bur:
Program:
Enforcement (Current)
Inspections and Design Review (Current)
NEW LEGISLATION (Current)
Activity:
Activity:
Activity:
The PBF program inspects public pools and spas for compliance with Env-Ws 1100. We cover the entire state with the excption ofManchester, Nashua, Merrimack. These 3 cities have their own inspection program. The indoor pools and spas are inspected once a year.The outdoor pools and spas are inspected atleast every 3 years. Review design for new or renovated swimming pools and spas and issuepermits.
Activity related to proposed legislation
Description:
Description:
10/01/1996
11/01/2016
Start/End Dates:
Start/End Dates:
thru
thru
Administrative Order
Letters of Deficiency
Notice of Decficiency
Design Review and Permit Issuance
Inspections
Pre-Opening Inspections
Retest Inspections
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
An Administrative Order is issued if violations of RSA 485-A:26 and/or Env-Wq 1100 continue to exits.
Letter of Deficienciy is a legal document outlining violations of Env-Wq 1100 found during an inspection of facilities byDES staff and is signed by Limnology Director. The letter is CCd to the Legal unit, and appropriate code officials.
A Notice of Deficiency is a carbon copy inspection report that outlines deficiencys noticed in an inspection. The pooloperator and DES inspector both sign the inspection report.
Review designs for new or renovated swimming pools and spas and issue permits.
Routine inspections for compliance. All indoor pools and spas are inspected annually. Outdoor pools and spas areinspected at least every 3 years.
Pre-Opening Inspection of construction compliance prior to public use.
Pools and Spas that have had bacterial violations are retested.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Administrative Orders
LODs (Letters of Deficiency)
NODs (Notices of Deficiency)
Permits Issued
Inspections
Inspections
Inspections
1
20
100
25
500
25
15
Lead Person:
Lead Person:
WILSON, RICHARD
WILSON, RICHARD
29506
29507
29508
29509
29510
29511
29512
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 274 of 313
WATER DIVISION WATERSHED MANAGEMENT
POOL AND SPA INSPECTIONS RSA 485-A:26 (Current)
Div/Bur:
Program:
NEW LEGISLATION (Current)
Program Development (Current)
Rukemaking Env-Wq 1100 (Current)
TECHNICAL ASSISTANCE (Current)
Activity:
Activity:
Activity:
Activity:
Development of a QA Manual including standard operating procedures for inspections, analysis, data management, and enforcement.
Provide technical assistance, ad-hoc program inquires to pool the pool industry
Description:
Description:
Description:
12/01/2002
10/01/2013
10/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Attend Legislative Hearings
Bill Becomes Law
Draft Legislative Testimony Letter
Complete Annual Quality Assurance System Program Self-Audit
QA Manual Revision
Rulemaking Env-Wq 1100
General Technical
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
This bill would create a dedicated fund for the pool program and establish annual licensing fees
Revision of SOPs
Subsequent rulemaking and Re-adoption of Env-Wq 1100
phone calls, email or other correspondace inquiring about technical aspects of pool construction, operation,troubleshooting and application of Env-Wq 1100.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
07/01/2017
07/01/2017
07/01/2017
10/01/2017
10/01/2017
03/31/2014
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
01/01/2024
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Hearings
Bills
Letters
Self-Assessments
QA/QCs (Quality Assurance/Quality Control)
Rules
Responses
5
1
1
1
1
1
200
Lead Person:
Lead Person:
Lead Person:
WILSON, RICHARD
WILSON, RICHARD
WILSON, RICHARD
29513
29514
29515
29517
29518
26019
29520
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 275 of 313
WATER DIVISION WATERSHED MANAGEMENT
POOL AND SPA INSPECTIONS RSA 485-A:26 (Current)
Div/Bur:
Program:
TECHNICAL ASSISTANCE (Current)Activity:
PresentationsDeliverable:
Presentations to pool operators or health officals regarding pool program rules and related safety issues.Description:
10/01/2017 09/30/2018Start/End Dates: thruLead Person: WILSON, RICHARD
Qty/Unit: Presentations10
29521
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 276 of 313
WATER DIVISION WATERSHED MANAGEMENT
SHELLFISH (Current)
The Shellfish Program ensures that the state's shellfish are safe for consumption by those who enjoy harvesting these public resourcesthrough regular bacterial monitoring of approximately 75 stations in shellfish growing waters, performing sanitary surveys and periodicupdates of shellfish growing waters, conducting weekly monitoring for Paralytic Shellfish Poisoning toxin, and other activities.08/12/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees XFederal EPA Federal Other X Grants
Ambient Shellfish Water Monitoring Program (Current)
Aquaculture Management (Current)
Activity:
Activity:
Ambient Water Monitoring. Collect water samples for fecal coliform analysis from all shellfish growing waters to maintain an updatedwater quality database and annually assess the accuracy of shellfish growing area classifications.
Manage aquaculture development and harvesting activities by evaluating requests to harvest and conducting other activities to manage thesiting of new aquaculture operations.
Description:
Description:
01/01/2001
07/01/2012
Start/End Dates:
Start/End Dates:
thru
thru
2017 Ambient Water Samples Collected
2017 Emergency Closure Water Samples Collected
2017 Post-Rainfall Sampling for Conditionally Approved Areas
2018 Ambient Water Samples Collected
2018 Emergency Closure Water Samples Collected
2018 Post-Rainfall Sampling for Conditionally Approved Areas
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2017 ambient program water sample collection and analysis.
2017 emergency closures sampling of shellfish growing areas (wastewater treatment plant upsets, severe rainfall events,etc.) to determine when shellfish growing areas may be safely reopened for harvesting.
2017 post-rainfall monitoring program sample collection and analysis, designed to determine if closures followingspecific rainfall events are warranted.
2018 ambient program water sample collection and analysis.
2018 emergency closures sampling of shellfish growing areas (wastewater treatment plant upsets, severe rainfall events,etc.) to determine when shellfish growing areas may be safely reopened for harvesting.
2018 post-rainfall monitoring program sample collection and analysis, designed to determine if closures followingspecific rainfall events are warranted.
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2017
01/01/2017
01/01/2018
01/01/2018
01/01/2018
12/31/2017
12/31/2017
12/31/2017
12/31/2018
12/31/2018
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Sampling Rounds
Sampling Rounds
Sampling Rounds
Sampling Rounds
Sampling Rounds
Sampling Rounds
45
5
20
45
5
20
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
28707
28708
28709
30206
30207
30208
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 277 of 313
WATER DIVISION WATERSHED MANAGEMENT
SHELLFISH (Current)
Div/Bur:
Program:
Aquaculture Management (Current)
FDA 12-Year Repeat Sanitary Surveys (Current)
FDA Annual Evaluations of Shellfish Management Areas (Current)
Activity:
Activity:
Activity:
Per NSSP requirements, conduct new sanitary surveys on shellfish management areas every 12 years.
FDA Annual Evaluations: Compilation of data and relevant information collected over the past year, in order to evaluate the currentclassification and status of a Shellfish Management Area.
Description:
Description:
12/01/2011
10/01/2006
Start/End Dates:
Start/End Dates:
thru
thru
2017 Evaluations of Aquaculture Harvest Requests
2018 Evaluations of Aquaculture Harvest Requests
Bellamy River Sanitary Survey
Great Bay Sanitary Survey
Great Bay Sanitary Survey
Little Bay Sanitary Survey
2016 Atlantic Coast Annual Evaluation
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Track the number of 2017 requests from aquaculturists to harvest
Track the number of 2018 requests from aquaculturists to harvest
Conduct a new sanitary survey for the Bellamy River Shellfish Management Area.
Conduct a new sanitary survey for the Great Bay Shellfish Management Area. EXTENDED END DATE FROM 9/30/15 TO 12/31/16.NOTE THIS REPORT IS NOT DUE TO FDA UNTIL END OF 2016. EXTEND END DATE FROM 12/31/2016 TO 9/30/2017 TO FINISH WRITTENREPORT. extend again from 9/30/2017 to 12/31/2017
Conduct a new sanitary survey for the Great Bay Shellfish Management Area. EXTEND END DATE FROM 9/30/2017 TO 12/31/2017
Conduct a new sanitary survey for the Little Bay Shellfish Management Area
2016 Atlantic Coast Annual Evaluation - Compile data and information for calendar year 2015 to write a report forsubmission to FDA
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
01/01/2018
12/01/2013
10/01/2015
01/01/2018
01/01/2017
12/31/2017
12/31/2018
12/31/2018
12/31/2017
12/31/2017
12/31/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Evaluations
Evaluations
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
250
325
1
1
1
1
1
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
28710
30209
30222
24289
27876
30221
28714
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 278 of 313
WATER DIVISION WATERSHED MANAGEMENT
SHELLFISH (Current)
Div/Bur:
Program:
FDA Annual Evaluations of Shellfish Management Areas (Current)
FDA Program Evaluation and Training (Current)
FDA Triennial Evaluations of Shellfish Management Areas (Current)
Activity:
Activity:
Activity:
FDA Program Evaluation Meetings and field work\site visits dedicated to FDA's annual evaluation of the Shellfish Program and training onupdated procedures.
Description:
10/01/2006Start/End Dates: thru
2016 Bellamy River Annual Evaluation
2016 Hampton/Seabrook Harbor Annual Evaluation
2016 Little Bay Annual Evaluation
2016 Oyster River Annual Evaluation
2017 Atlantic Coast Annual Evaluation
2017 Great Bay Annual Evaluation
2017 Hampton/Seabrook Harbor Annual Evaluation
2018 FDA Evaluation and Training
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2016 Bellamy River Annual Evaluation - Compile data and information for calendar year 2016 to write a report forsubmission to FDA
2016 Hampton/Seabrook Harbor Annual Evaluation - Compile data and information for calendar year 2016 to write a reportfor submission to FDA
2016 Little Bay Annual Evaluation - Compile data and information for calendar year 2016 to write a report for submissionto FDA
2016 Oyster River Annual Evaluation - Compile data and information for calendar year 2016 to write a report forsubmission to FDA.
2017 Atlantic Coast Annual Evaluation - Compile data and information for calendar year 2017 to write a report forsubmission to FDA
2017 Great Bay Annual Evaluation - Compile data and information for calendar year 2017 to write a report for submissionto FDA
2017 Hampton/Seabrook Harbor Annual Evaluation - Compile data and information for calendar year 2017 to write a reportfor submission to FDA
2018 annual FDA evaluation (PEER) and training of Shellfish Program staff
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2017
01/01/2017
01/01/2017
01/01/2018
01/01/2018
01/01/2018
01/01/2018
12/31/2017
12/31/2017
12/31/2017
12/31/2017
12/31/2018
12/31/2018
12/31/2018
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Reports, Final
Meetings
1
1
1
1
1
1
1
2
Lead Person: NASH, WILLIAM
28711
28715
28713
28712
30210
30211
30212
30223
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 279 of 313
WATER DIVISION WATERSHED MANAGEMENT
SHELLFISH (Current)
Div/Bur:
Program:
FDA Triennial Evaluations of Shellfish Management Areas (Current)
Marina and Mooring Field Investigations (Current)
Outreach and Education to Shellfish Harvesters and the Public (Current)
Activity:
Activity:
Activity:
FDA Triennial Evaluations: Compilation of data and relevant information collected over the past three years, in order to evaluate thecurrent classification and status of a Shellfish Management Area.
Marina and Mooring Field investigation (boat counts, GPS work, or boat inspections) within Shellfish Management Areas.
Harvester Outreach including responding to calls, preparing fact sheets, updating the program website, and giving presentations.
Description:
Description:
Description:
10/01/2006
10/01/2006
01/01/2005
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
2014-2016 Little Harbor Triennial Evaluation
2015-2017 Oyster River Triennial Evaluation
2018 Surveys of Marinas and Mooring Fields
2017 Clam Hotline and Coastal Atlas Updates
2017 Shellfish website updates
2018 Clam Hotline and Coastal Atlas Updates
2018 Shellfish website updates
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2014-2016 Little Harbor Triennial Evaluation - Compile data and information for calendar years 2014-2016 to write areport for submission to FDA. NOTE: Because Little Harbor is closed for harvest due to Portsmouth WWTF high virus load,this report will be limited to an update of water quality statisitics. Other aspects of a typical triennial review willnot be included in this report.
2015-2017 Oyster River Triennial Evaluation - Compile data and information for calendar years 2015-2017 to write a reportfor submission to FDA.
2018 Investigations of Marinas & Mooring Fields - Boat and mooring counts, occupancy surveys, and related documentationof boating areas near shellfish growing waters
2017 weekly Clam Hotline Updates to F&G, weekly updates to the Coastal Atlas
2017 Website updates. review links, update documents, provide additional information
2018 weekly Clam Hotline Updates to F&G, weekly updates to the Coastal Atlas
2018 Website updates. review links, update documents, provide additional information
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
01/01/2018
01/01/2017
01/01/2017
01/01/2018
01/01/2018
12/31/2017
12/31/2018
12/31/2018
12/31/2017
12/31/2017
12/31/2018
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Reports, Final
Surveys
Updates
Updates
Updates
Updates
1
1
25
54
2
54
1
Lead Person:
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
28717
30213
30224
28719
28720
30214
30215
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 280 of 313
WATER DIVISION WATERSHED MANAGEMENT
SHELLFISH (Current)
Div/Bur:
Program:
Paralytic Shellfish Poisoning Monitoring Program (Current)
Phytoplankton Monitoring Program (Current)
Pollution Source Investigations (Current)
QAPP Administration for the Shellfish Program (Current)
Activity:
Activity:
Activity:
Activity:
PSP Sampling: shellfish tissue samples on at least a weekly basis from April to October to test for the presence of Paralytic ShellfishPoisoning toxin.
Phytoplankton Monitoring. Collect weekly seawater samples, at least February-November, and estimate poplulations of various HarmfulAlgal Bloom species.
Pollution Source Investigations: The preparation (datasheet generation, map making, etc.) in order to conduct investigations,investigation of a property to determine presence of absence of a pollution source, or the investigation of a documented potential sourceof pollution.
QAPP document review and work performed to adhear to the guidelines stipulated in the three Shellfish Program QAPPs.
Description:
Description:
Description:
Description:
04/01/2000
01/01/2018
10/01/2006
10/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
2017 PSP Samples Collected
2018 PSP Samples Collected
2018 Phytoplankton Monitoring Program
2018 Pollution Source Investigations
2017 Thermometer Calibration
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
2017 PSP monitoring program sample collection and data management.
2018 PSP monitoring program sample collection and data management.
In calendar year 2018 Collect weekly seawater samples, February-November, to estimate populations of various HarmfulAlgal Bloom species. For this deliverable, one "sample round" is comprised of all samples collected within a week.
2018 Pollution Source Investigations - Investigation and/or sampling of potential and actual sources of pollution,documented in the eight FDA Annual and Triennial Evaluation reports.
Thermometer Calibration - Calibration of the Shellfish Program and Watershed Assistance Section (Pease Office)thermometers.
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
01/01/2018
01/01/2018
01/01/2017
12/31/2017
12/31/2018
12/31/2018
12/31/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Samples
Samples
Sampling Rounds
Inspections
Evaluations
50
50
40
25
4
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
28721
30216
30217
30225
28724
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 281 of 313
WATER DIVISION WATERSHED MANAGEMENT
SHELLFISH (Current)
Div/Bur:
Program:
QAPP Administration for the Shellfish Program (Current)
Response to WWTF Upsets and other Pollution Events in Shellfish Waters (Current)
Revise Classifications to Shellfish Growing Areas (Current)
Shellfish Program Administration (Current)
Activity:
Activity:
Activity:
Activity:
WWTF Upsets and Emergency Response: Respond to and evaluate incidents that may warrant closure of shellfish waters, including WWTFupsets, unusually heavy rainfall, oil spills, and other events.
Conduct activities to explore whether or not reclassifications of classified shellfish growing areas is appropriate.
Shellfish Program Administration: budget planning and management, workplan development, discussions with federal agencies, contract andMOA development, G&C or fiscal committee requests, etc.
Description:
Description:
Description:
01/01/2005
07/01/2007
10/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
2018 Thermometer Calibration
2018-2019 Annual Review of QAPPs
2017 Incidents for Evaluation
2018 Incidents for Evaluation
Classification Revisions for 2017
Classification Revisions for 2018
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Thermometer Calibration - Calibration of the Shellfish Program and Watershed Assistance Section (Pease Office)thermometers.
Annual Review of QAPPs - Review of the PSP, WQ, and Sanitary Survey QAPPs for the annual DES self-audits. Note that selfaudits for shellfish program will not be required for 2018 but will be required in 2019.
Prepare Memos for all 2017 WWTF calls, reports of oil spills, weather events, etc, that were evaluated to determine ifshellfish closures were necessary.
Prepare Memos for all 2018 WWTF calls, reports of oil spills, weather events, etc, that were evaluated to determine ifshellfish closures were necessary.
Revise shellfish classifications as needed.
Revise shellfish classifications as needed.
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
01/01/2018
01/01/2017
01/01/2018
01/01/2017
01/01/2018
12/31/2018
12/31/2019
12/31/2017
12/31/2018
12/31/2017
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Evaluations
Self-Assessments
Memos
Memos
Revisions
Revisions
4
3
80
80
1
1
Lead Person:
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
30227
30226
28725
30218
28726
30219
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 282 of 313
WATER DIVISION WATERSHED MANAGEMENT
SHELLFISH (Current)
Div/Bur:
Program:
Shellfish Program Administration (Current)
Vibrio Monitoring Program (Current)
Activity:
Activity:
Vibrio Monitoring. Collect shellfish samples for Vibrio paraheamolyticus analysis from selected shellfish growing waters to assess riskfor Vp illness outbreaks, establish baseline conditions, and evaluate specific management strategies for minimizing outbreaks.
Description:
05/01/2014Start/End Dates: thru
2018 workplan development
2017 Oyster Tissue Sampling Program
2018 Oyster Tissue Sampling Program
Deliverable:
Deliverable:
Deliverable:
Develop 2018 workplan.
Sample oyster tissue for Vibrio parahaemolyticus per the 2017 Monitoring Plan
Sample oyster tissue for Vibrio parahaemolyticus per the 2018 Monitoring Plan
Description:
Description:
Description:
01/01/2018
01/01/2017
01/01/2018
12/31/2018
12/31/2017
12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
NASH, WILLIAM
NASH, WILLIAM
NASH, WILLIAM
Qty/Unit:
Qty/Unit:
Qty/Unit:
Workplans
Sampling Rounds
Sampling Rounds
1
12
15
Lead Person: NASH, WILLIAM
30228
28728
30220
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 283 of 313
WATER DIVISION WATERSHED MANAGEMENT
TIDAL WATER QUALITY MONITORING (Current)
Water quality monitoring activities associated with tidal waters (excluding activities associated with the shellfish program)10/01/1999
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees XFederal EPA Federal Other Grants
Piscataqua Region Estuaries Partnership (Current)Activity:
FY14 EPA P&C #113, 114FY12 EPA P&C #123FY11 EPA P&C #151, 152, 1532007 PPA PRIORITY 116, 118 AND UNH MOA OBLIGATION. Projects completed under contract to the NH Estuaries Project to implement the Comprehensive Conservation andManagement Plan for the estuaries. In 2009 name changed from New Hampshire Estuaries Project to PREP.
Description:
01/01/2001Start/End Dates: thru
PREP 2018.A - Technical Program Assistance
PREP 2018.B - PREP Monitoring Plan Implementation
Deliverable:
Deliverable:
Environmental Data Analysis and Quality AssuranceGIS AnalysesReview of Technical Reports
Prepare coastal monitoring data for indicatorsParticipate in coordination meetings for preparation of monitoring budget and workplan for 2018
Description:
Description:
07/31/2017
07/31/2017
06/30/2018
06/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
Vacant
Vacant
Qty/Unit:
Qty/Unit:
Reviews
Meetings
3
10
Lead Person: EDWARDSON, KENNETH
29194
29195
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 284 of 313
WATER DIVISION WATERSHED MANAGEMENT
TMDL STUDIES (Current)
A Total Maximum Daily Load (TMDL) study specifies the maximum amount of pollutant that a waterbody can receive and still meet waterquality standards and allocates pollutant loadings among point and nonpoint pollutant sources. Section 303(d) of the Clean Water Act(CWA) requires states to periodically develop a list of impaired waters (i.e., the "303(d) list"). A TMDL study must be done for allwaters on the 303(d) List. that are impaired by pollutants. This program includes all activities associated with the devlopment ofTMDLs.10/01/2003
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees XFederal EPA Federal Other Grants
Assist MS4 Communities - TMDL (Current)
I-93 Chloride TMDLs (Current)
LI Sound TMDL - CT River N Reduction (Current)
Activity:
Activity:
Activity:
FY15 EPA P&C #68 and #70. Assist MS4 Communities as it relates to TMDLs
FY08 EPA P&C # 104 and 106: Policy Bk and Tribs, Dinsmore Bk, N. Trib to Canobie Lake, Beaver Bk have been listed as impaired forchlorides. The primary source of chlorides is believed to be road salt and water softeners. This Activity includes devlopment ofchloride TMDLs for these surface waters. See Also Watershed Restoration/Implement chloride TMDLs in 4 impaired watersheds in the I-93corridor
FY 18/19 EPA P&C 34FY16 and 17 EPA P&C #35 FY15 EPA P&C #68FY14 EPA P&C #74FY12 EPA P&C #82, FY11 EPA P&C # 120FY10 EPA P&C # 111: Connecticut and New York have completed a TMDL to address low dissolved oxygen in Long Island Sound. Part of therecommended solution is to reduce nitrogen in the Connecticut River which implies that nutrient reductions may be necessary from MA, VTand NH. EPA/NEIWPCC are coordinating efforts to help determine what the load reductions should be. The USGS SPARROW model may be usedfor this purpose.
Description:
Description:
Description:
04/01/2013
01/01/2005
10/01/2002
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Provide Technical Assistance to MS4 Communities (FY 18/19)
I93.20 - TMDL Implementation Monitoring Reports SFY17
I93.20 - TMDL Implementation Monitoring Reports SFY18
LISTMDL:Technical Assistance FY18
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide technical assistance to MS4 Communities as it relates to TMDLs. This includes attending meetings, conferencecalls, reviewing reports and data, providing GIS or monitoring assistance, etc.
Review data and prepare a QA Audit and Data Report.
Review data and prepare a QA Audit and Data Report.
Includes participation in conference calls, meetings, review of documents related to the CT River Nitrogen Study which ispart of the LI Sound TMDL. Number of technical assistances is estimated and is variable from year to year.
Description:
Description:
Description:
Description:
10/01/2017
04/01/2017
04/01/2018
10/01/2017
09/30/2019
03/31/2018
03/31/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
COMSTOCK, W. GREGG
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Assistances Provided
Reports, Final
Reports, Final
Assistances Provided
5
1
1
5
Lead Person:
Lead Person:
Lead Person:
FOSS, MARGARET
FOSS, MARGARET
COMSTOCK, W. GREGG
30149
30152
30158
30159
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 285 of 313
WATER DIVISION WATERSHED MANAGEMENT
TMDL STUDIES (Current)
Div/Bur:
Program:
LI Sound TMDL - CT River N Reduction (Current)
Merrimack /Pemigewasett R TMDL - ACOE (Current)
NH 10 Year TMDL Vision Strategy (Current)
Phillips Pond Phosphorous TMDL (Current)
Activity:
Activity:
Activity:
Activity:
FY18/19 EPA P&C 34FY16 EPA P&C 35FY15 EPA P&C #68FY14 EPA P&C #72 and #74FY12 EPA P&C #82, FY11 EPA P&C # 120The 2004 305(b)/303(d) surface water quality assessment indicated dissolved oxygen violations along the Merrmack and Pemigewasett Rivers. Data also indicates rising levels of phosphorus and algae in the downstream sections. A TMDL for dissolved oxygen is necessary todetermine load allocations for point source and nonpoint sources as well as permit limits for NPDES permittees. It is expected that DESwill partner with the ACOE to conduct a DO/Nutrient TMDL for the river. This work would be an extension of the Merrimack RiverAssessment Study which focused on bacteria for the CSO communities but did address other parameters as well.
FY18/19 EPA P&C # 35,36, 37 and 38FY17 EPA P&C # 35 and 36FY16 EPA P&C #36, #37 and #38FY 15 EPA P&C # 70FY14 EPA P&C #74, #76Development of the New Hampshire TMDL 10 Year Vision Strategy Report. The "10 Year Vision" is the short hand title for EPAs Long-TermVision for Assessment, Restoration, and Protectoin under the Clean Water Act Section 303(d) Program.
FY18 EPA P&C #34
Description:
Description:
Description:
10/01/2004
09/30/2013
04/01/2017 12/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
LISTMDL:Technical Assistance FY19
ACOEMerTMDL8: Predictive Model Results
FY17: Submit Partial Credit Information for WQ-27 Waters by 10/31/17
FY17: Update WQ-27,28 Waters in ATTAINS during Fall 2017 Open Season
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Includes participation in conference calls, meetings, review of documents related to the CT River Nitrogen Study which ispart of the LI Sound TMDL. Number of technical assistances is estimated and is variable from year to year.
End Date Extended From 9/30/2017. END DATE EXTENDED FROM 6/30/14. END DATE EXTENDED FROM 9/30/12. Task 8: ReviewPredictive Modeling report (75% for draft, 25% for final). The report will include results of sensitivity runs andalternative analyses outlined in Task 4.
EPA P&C # 39: If the State chooses to pursue partial credit for progress on WQ-27 priority TMDLs, priority TMDLalternatives, and priority Protection Plans, then notify EPA R1 of milestones achieved (planning, developing) for entryinto ATTAINS by 10/31/17.
FY17 EPA P&C #38: Circa fall 2016, if needed, and following public and EPA review of WQ-27 priority waters, submitelectronic data to EPA duirng the FY17 open season in ATTAINS to accommodate any essential revisions to 303(d) Visionpriorities (WQ-27) and other planned activities (WQ-28). This will be the FY17 list of WQ-27,28 waters.
Description:
Description:
Description:
Description:
10/01/2018
01/01/2008
07/31/2017
09/01/2017
09/30/2019
09/30/2019
10/31/2017
10/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COMSTOCK, W. GREGG
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Assistances Provided
Reports, Final
Submittals
Updates
5
1
1
1
Lead Person:
Lead Person:
COMSTOCK, W. GREGG
FOSS, MARGARET
30173
16039
27602
27599
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 286 of 313
WATER DIVISION WATERSHED MANAGEMENT
TMDL STUDIES (Current)
Div/Bur:
Program:
Phillips Pond Phosphorous TMDL (Current)
Regional Meetings/Conferences - TMDL (Current)
Salmon Falls TMDL (Current)
Activity:
Activity:
Activity:
FY18/19 EPA P&C #40FY16 and FY17 EPA P&C #40FY15 EPA P&C #70FY14 EPA P&C #74FY13 EPA P&C #76. FY12 EPA P&C #84; FY11 EPA P&C #122; FY10 EPA P&C 113; FY09 EPA P&C # 108: FY08 EPA P&C # 105. EPA P&C#89Participation in regional/ national meetings, conferences, conference calls, and workgroups related to TMDLs. Examples include meetingsand conference calls with NEIWPCC TMDL workgroups, the Region 1/State TMDL Innovations Workgroup and ASWIPCA conference calls.
FY18/19 EPA P&C # 34FY17 EPA P&C #34. FY16 EPA P&C #65. FY15 EPA P&C #68. FY14 EPA P&C #74. Salmon Falls TMDL revision activities including monitoring,data and report review, meetings and conference calls.
Description:
Description:
10/01/2006
06/01/2013
Start/End Dates:
Start/End Dates:
thru
thru
2. Collect Data on Phillips Pond to support model deveolpment
3. Prepare draft TMDL for Phillips Pond
4. Issue draft TMDL for Phillips Poind for Public Comment
5. Submit Final TMDL for Phillips Pond to EPA
TMDL Workgroup Meetings, Innovation Efforts and Conference Calls FY18
TMDL Workgroup Meetings, Innovation Efforts and Conference Calls FY19
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Collect data needed for model development
Develop draft TMDL for Phillips Pond
Issue draft TMDL for Phillips Poind for Public Comment
Participate in the NEIWPCC TMDL Workgroup meetings/conference calls and Region 1/State TMDL Innovations efforts toimprove environmental effectiveness of the TMDL program.
Participate in the NEIWPCC TMDL Workgroup meetings/conference calls and Region 1/State TMDL Innovations efforts toimprove environmental effectiveness of the TMDL program.
Description:
Description:
Description:
Description:
Description:
Description:
04/01/2017
09/01/2017
06/01/2018
07/15/2018
10/01/2017
10/01/2018
12/31/2017
06/01/2018
07/15/2018
09/01/2018
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Sampling Rounds
Reports, Drafts
Public Comment Periods
Reports, Final
Meetings
Meetings
2
1
1
1
7
5
Lead Person:
Lead Person:
Lead Person:
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
29942
29943
30188
30189
28666
30178
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 287 of 313
WATER DIVISION WATERSHED MANAGEMENT
TMDL STUDIES (Current)
Div/Bur:
Program:
Salmon Falls TMDL (Current)
Y Technical Assistance - TMDL (Current)
Z Program Administration - TMDL (Current)
Activity:
Activity:
Activity:
FY18 EPA P&C #34 and 40FY17 EPA P&C #34FY15 EPA P&C #68 and #70FY14 EPA P&C #72 and #74FY12 EPA P&C #84This activity includes responses to public information requests, general ad-hoc guidance requests from other programs and agencies,Right-to-Know requests, outreach efforts, time spent keeping current on program related issues, and making presentations.
FY18 EPA P&C #34 -38 and 40FY15 EPA P&C #68, #70FY14 EPA P&C #74FY12 EPA P&C #84This activity includes tasks such as proposal writing, grant preparation, grant reporting, MTRS workplan development, budget preparation,and G&C requests.
Description:
Description:
10/01/2006
10/01/2006
Start/End Dates:
Start/End Dates:
thru
thru
Provide Technical Assistance
Provide Technical Assistance
Y-2: Technical Assistance, Responses to General Inquiries - TMDL
Y-2: Technical Assistance, Responses to General Inquiries - TMDL
Complete Annual Quality Assurance System Program Self-Audit
Complete Annual Quality Assurance System Program Self-Audit
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Provide Technical Assistance for the Salmon Falls TMDL Revision Activities including monitoring, data and report review,meetings and conference calls.
Provide Technical Assistance for the Salmon Falls TMDL Revision Activities including monitoring, data and report review,meetings and conference calls.
Includes responding to general TMDL inquiries that are not addressed under other programs.
Includes responding to general TMDL inquiries that are not addressed under other programs.
Complete Annual Quality Assurance System Program Self-Audit
Complete Annual Quality Assurance System Program Self-Audit
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
FOSS, MARGARET
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Assistances Provided
Assistances Provided
Inquiries
Inquiries
Self-Assessments
Self-Assessments
2
2
10
10
1
1
Lead Person:
Lead Person:
FOSS, MARGARET
FOSS, MARGARET
30179
30180
30160
30163
30161
30162
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 288 of 313
WATER DIVISION WATERSHED MANAGEMENT
VOLUNTEER LAKE ASSESSMENT PROGRAM RSA 487:31-33 (Current)
This is a lake monitoring and assessment and an educational outreach program between DES biologists and volunteer monitors from lakeassociations and other entities. DES provides training, equipment, analyses, assessment and annual report and the volunteers providemonitoring, minimal funding for analyses and watch dog capability at lakes.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
XFunding: State General State Fees Federal EPA Federal Other Grants
Assessment (Current)
Outreach (Current)
Activity:
Activity:
Each year, an individualized annual report is written for each lake monitored through VLAP. Each individual lake annual report presentswater quality sampling from the most recent sampling season and compares the most recent water quality data to the data collected sincethe lake joined VLAP. Observations concerning water quality trends are discussed. Receommendations for additional sampling andwatershed management activities are presented when necessary. DN - Supplemental 106 monitoring funds actitivity. Site code: VLAP00293.
One of the main objectives of VLAP is to educate the public about reponsible watershed and lake management. VLAP produces and distributesan annual newletter, individual lake annual reports, and conducts educational programs and workshops to educate the public.
Description:
Description:
10/01/2001
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Individual VLAP Reports
Regional VLAP Reports
Annual Individual Reports posted on the DES Web Site
Annual Workshop
Educational Programs
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
A new reporting process was initiated to provide and annual two-page individual lake summary/report to each participatingVLAP lake. The individual reports will include a general informational page including lake morphological information,impairment information, watershed map, and land use summary. The second page will inlcude VLAP data, historical trendanalyses and graphics and overall observations and recommendations based on VLAP data.
A new reporting process was developed to produce seven comprehensive regional reports to analyze data trends andstatistics on a regional basis. These reports compile and report information from multiple monitoring programs pertinentto each region as well as include detailed data analyses, water quality summaries and trends for VLAP lakes. Thesereports will be completed once every five years. They were recently completed in 2015.
After the regional and individual lake reports have been finalized (typically by the end of April) the reports will beconverted to pdf and will be posted on the VLAP website (ideally by the beginning of June).
Hold an annual workshops to educate and update training for volunteer monitors. A water quality sampling refreshercourse is conducted and two or three additional talks related to watershed management and water quality issues of specialinterest to volunteer monitors are presented.
Provide, upon request, educational programs related to water quality sampling. Edcuational programs are providedthroughout the state for elementary, middle school, and high school students.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
STEINER, SARA
STEINER, SARA
STEINER, SARA
STEINER, SARA
STEINER, SARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Reports, Final
Postings
Workshops
Outreach Activities
175
0
175
1
1
Lead Person:
Lead Person:
STEINER, SARA
STEINER, SARA
30275
30276
30277
30278
30279
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 289 of 313
WATER DIVISION WATERSHED MANAGEMENT
VOLUNTEER LAKE ASSESSMENT PROGRAM RSA 487:31-33 (Current)
Div/Bur:
Program:
Outreach (Current)
Quality Assurance (Current)
VLAP Sampling (Current)
Activity:
Activity:
Activity:
All operations of the VLAP program adhere to the DES Quality Management Plan and also follows an EPA approved Quality Assurance ProjectPlan. This ensures that all data collected and all results reported through VLAP are of documented quality and are representative.
DES Biologists train volunteer moniors how to sample to quality of lakes and their associated tributaries. Lake deep spots are typicallysampled for conductivity, turbidity, pH, acid neutralizing capacity, chlorophyll, total phosphrous, and transparency. Lake nearshoreareas and tributaries are typcially sampled for conductivity, turbidity, pH, and total phosphorus. Some lakes and tributaries are alsosampled for E.coli and chloride. DN - Supplemental 106 monitoring funds actitivity. Site code: VLAP00291.
Description:
Description:
11/01/2001
10/01/1999
Start/End Dates:
Start/End Dates:
thru
thru
Lake Association Meetings
Monthly Newsletter "The Sampler"
Complete Quality Assurance System Program Self-Audit
Review and Revise the Generic VLAP Quality Assurance Project Plan (QAPP)
Annual Volunteer Training and Sampling
VLAP Water Quality Sample Results Generated
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Attend annual lake association meetings to discuss VLAP water quality and provide recommendations on managementactivities in the watershed that may improve water quality.
Publish a monthly E-newsletter which is sent to approximately 700 email recipients signed up for the newsletter. Thenewsletter includes information regarding VLAP and other relevant programs dealing with lake and pond managment such asexotic species, and provides up to date information about watershed management and water quality issues of specialinterest to volunteer monitors.
This program assessment summarizes the successes, problems, and solutions implemented to correct problems that occurduring the year. These audits are not required less frequently as requested by the QA team.
Review the VLAP QAPP annually and revise as necessary. Submit it EPA and major revisions for a courtesy review andapproval.
A DES Biologist will sample the approximately 80 lakes in VLAP once each summer with the volunteer monitors and willprovide a refresher training for proper sampling techniques. Volunteer monitors will be rated on their samplingperformance. The Limnology Center and Satellite labs will provide sampling equipment and laboratory capability to allowthe volunteer monitors to sample at other times during the summer on their own. During this sampling, volunteers willcomplete a self-audit form to ensure they are following the proper sampling procedures.
The total number of water quality results generated by VLAP. This number includes the number of sample analyses at tehNHDES Limnology Center in Concord and the state chemistry lab. In addition, this number includes the number of samplesanalyzed at the VLAP satellite labs (Colby Sawyer Lake Sunapee Satellite lab in New London)
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
STEINER, SARA
STEINER, SARA
STEINER, SARA
STEINER, SARA
STEINER, SARA
STEINER, SARA
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Newsletters
Self-Assessments
QAPPs (Quality Assurance Program Plan)
Site Visits
Analyses
4
12
1
1
125
14000
Lead Person:
Lead Person:
STEINER, SARA
STEINER, SARA
30280
30281
30282
30283
30284
30285
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 290 of 313
WATER DIVISION WATERSHED MANAGEMENT
VOLUNTEER RIVER ASSESSMENT PROGRAM RSA 483:38 (Current)
VRAP supports watershed organizations in their river monitoring efforts. VRAP provides monitoring training, equipment loans, and annualreports on volunteer collected water quality data. Volunteers contrubute their time and effort to accomplish monitoring goals developedby NHDES and watershed organizations, and occasionally secure funding for water quality analyses. VRAP relies on local watershedknowledge and the proximity of volunteers to rivers and streams statewide.01/02/1998
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees Federal EPA Federal Other Grants
Data Management (Current)
Program Management (Current)
Sampling and Analysis (Current)
Activity:
Activity:
Activity:
Water quality data are collected by volunteers and submitted to DES for QA/QC checks and incorporation into State water qualityassessments. Data are summarized and compiled for development of annual reports and/or status reports. DN - Supplemental 106 monitoringfunds activity. Site Code: VRAP1240.
Tasks pertaining to the day to day management of the VRAP program including but not limited to communication with the public, DES staff,and other agencies, VRAP reporting and development, webpage maintenance, meeting with the public and NHDES staff.
Description:
Description:
Description:
10/01/2002
10/01/2002
Start/End Dates:
Start/End Dates:
thru
thru
QA/QC Program Self Audit (FY18)
VRAP Water Quality Data to EMD (FY17)
VRAP Water Quality Data to EMD (FY18)
Annual Review of SOPs (FY18)
Hire and Train Intern (FY18)
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Prepare VRAP selfaudit, which includes but not limited to documentation of program objectives, QAPP inconsistancies, anddata limitations. Self-audit for FY 17 will be based on the data collected during the 2017 sampling season.
Input data collected by all volunteer groups into EMD. A Record is equivalent of sampling one station for oneparameter. Final nuimber based on number of VRAP groups and sampling plans developed by individual VRAP groups. All datais QA/QCd and checked against the VRAP QAPP to determine data usebale for assessment purposes.
Input data collected by all volunteer groups into EMD. A Record is equivalent of sampling one station for oneparameter. Final nuimber based on number of VRAP groups and sampling plans developed by individual VRAP groups. All datais QA/QCd and checked against the VRAP QAPP to determine data usebale for assessment purposes.
In preparation for the 2018 sampling season VRAP staff view all SOPs and protocols used by volunteers and/or VRAP staff.Improvemnt and changes will be made to clairfy procedures for the volunteers and to insue that all QAPP requirements areaddressed.
Hire and train VRAP intern for 2018 sampling season.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2016
10/01/2017
10/01/2017
10/01/2017
09/30/2018
12/31/2017
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Audits
Entries
Entries
Updates
Interns
1
7500
7000
1
1
Lead Person:
Lead Person:
Lead Person:
WALSH, EDWARD
WALSH, EDWARD
29982
28517
29983
29984
29985
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 291 of 313
WATER DIVISION WATERSHED MANAGEMENT
VOLUNTEER RIVER ASSESSMENT PROGRAM RSA 483:38 (Current)
Div/Bur:
Program:
Sampling and Analysis (Current)
Technical Assistance and Outreach (Current)
Activity:
Activity:
Includes all aspects of supporting a water quality monitoring program conducted by the general public throughout the State of NewHampshire. Sampling and analysis generally occurs from late spring through early fall, and includes, but is not limited to: maintainingvolunteer monitoring schedules, responding to volunteer needs and requests, maintaining equipment, and conducting additional volunteertraining sessions. DN - Supplemental 106 monitoring funds activity. Site Code: VRAP1239.
Provide assistance with public education to other agencies and organizations, and participate in annual programs such as the NHEnvirothon. Distribute interpretive materials for public education to schools, watershed organizations, concerned citizens, etc.Examples to include VRAP overview, water quality monitoring guidance and data, and the importance of water resources.
Description:
10/01/2002
10/01/2002
Start/End Dates:
Start/End Dates:
thru
thru
Annual Equipment Inventory and Maintenance (FY18)
VRAP Groups - Sampling and Analysis Plans and Laboratory Budgets (FY18)
VRAP Staff Site Visits/Field Audits (FY18)
Water Quality Samples Collected by VRAP Volunteers (FY17)
Water Quality Samples Collected by VRAP Volunteers (FY18)
Annual VRAP Water Quality Reports (FY18)
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
This includes inventory and inspection of equipment and kits prior to distribution to VRAP groups, mainteance ofequipment during sampling season, changing of reagents and supplies in kit, and inspection of kits at the end of thesampling season.Receive, inspect, and redistribute meters, as necessary, during the sampling season. Mainetance andinspection based on manufacturs directions and VRAP QA/QC procedures. Quanity of based on maintaining 12 VRAP kits.
This reflects the estimated number of active VRAP groups for the 2018 sampling season. Each group will be contacted byVRAP staff regarding sampling plans, laboratory analysis needs, datalogger requests, and other special needs. Unitchanged to reflect the number of active VRAP groups.
Site visits to investigate potential problems, , provide technical assistance, verify station locations, and provideother misc. assistance. Audits of volunteers ensure appropriate sample collection, equipment use, and data documentation.Number of audits is based on projected number of VRAP groups participating. If time is a constraint audits will betargeted at new goups and those in need of specific help.
A measurement represnts a VRAP group measuring a single parameters. Includes both field measurements and laboratoryanalytes. Sampling for 2017 season.
A measurement represnts a VRAP group measuring a single parameters. Includes both field measurements and laboratoryanalytes. Sampling for 2018 season.
Prepare and distribute annual water quality reports for each VRAP group based on 2016 sampling season. Format of reportdependent on staff resources. Data reports will also be completed. Activity includes posting reports on NHDES webpage.
Description:
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2016
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
12/31/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
WALSH, EDWARD
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Inventories
Groups
Site Visits
Measurements
Measurements
Reports, Final
2
32
20
7500
7000
30
Lead Person:
WALSH, EDWARD
WALSH, EDWARD
29986
29987
29988
28523
29989
29990
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 292 of 313
WATER DIVISION WATERSHED MANAGEMENT
VOLUNTEER RIVER ASSESSMENT PROGRAM RSA 483:38 (Current)
Div/Bur:
Program:
Technical Assistance and Outreach (Current)Activity:
Training Sessions for Volunteers (FY18)Deliverable:
Conduct training sessions for volunteers in the proper use of equipment, field sampling procedures, field safety, anddata documentation.
Description:
10/01/2017 09/30/2018Start/End Dates: thruLead Person: WALSH, EDWARD
Qty/Unit: Training Sessions2
29991
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 293 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATER QUALITY STANDARDS (Current)
Water quality standards determine the baseline quality that all surface waters of the State must meet in order to protect their intendeduses. They are the yardstick for identifying where water quality violations exist and for determining the effectiveness of regulatorypollution control and prevention programs. Federal regulations require States to review surface water qualtiy standards at least onceevery three years and to revise them as necessary. This program includes the review, revision, development and interpretations of waterquality standards.10/01/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees Federal EPA Federal Other Grants
604(b) Grant Administration (Current)
Anti-degradation (Current)
Review, Revise, and Develop Temperature Standards for Aquatic Life Use support (Current)
WQS: Legislation and Rules (Current)
Activity:
Activity:
Activity:
Activity:
Includes preparation of grant application and administration
Continue development of anit-degradation process through the WQSAC. Not a priority for WQSAC in 2015. Will be addressed at a laterdate. ON HOLD.
2014 EPA P&C #68. 2013 EPA P&C #70; FY12 EPA P&C #78, FY11 EPA P&C #93, FY10 EPA P&C #84:Review, revise, and develop the Water Quality Standards for water temperature to include numeric criteria for water temperature eventsthat will result in adequate support for aquatic life. This activity addresses an EPA comment in the 2000 triennial review of waterquality standards. 2012/13 supplemental monitoring funds activity, site code WQSTN01808. FFY16/17 EPA P&C list #30 (water obj. 2.2)
FY16 and 17 EPA P&C # 32. This activity describes formal rulemaking proceedings undertaken by DES after the technical review by theWQSAC is complete. Formal rulemaking for the water quality standards are not necessarily needed evey year. Therefore, there may be yearswithout a deliverable for this activity.
FY12 - no rulemaking anticiplated.
FY10 EPA P&C #85:
Description:
Description:
Description:
Description:
10/01/2009
10/01/2006
10/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
604(b) Grant Application FY17
Data collection
Data collection
Data collection
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Preparation and annual submittal of 604(b) grant application to EPA
Collect data at up to 40 site annually. P&C 2.2 # 31
Collect data at up to 40 site annually. P&C FFY 2018??
Collect data at up to 40 site annually. P&C FFY 2019??
Description:
Description:
Description:
Description:
10/01/2017
09/30/2016
10/02/2017
10/01/2018
09/30/2018
10/01/2017
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COMSTOCK, W. GREGG
NEILS, DAVID
NEILS, DAVID
NEILS, DAVID
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Grants
Sites
Sites
Sites
1
40
40
40
Lead Person:
Lead Person:
Lead Person:
COMSTOCK, W. GREGG
DIERS, THEODORE
NEILS, DAVID
29204
28890
30093
30094
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 294 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATER QUALITY STANDARDS (Current)
Div/Bur:
Program:
WQS: Legislation and Rules (Current)
WQS: Numeric nutrient standards (Current)
WQS: Regional Meetings/Conferences (Current)
Activity:
Activity:
Activity:
For FFY 07 this activity will focus on the readoption of surface water quality rules that sunset in fall 2007. Changes related to (1)hardness, (2) flow-based permits, (3) TP for lakes and (4) the use of the Biotic Ligand model will possibly be included in the re-adoption proposal
Fy16 and 17 EPA P&C # 33 and 34. FY14 EPA P&C #70. FY13 EPA P&C #72. FY12 EPA P&C #80,81. FY11 EPA P&C #95: "Work with EPA tofacilitate adoption of numeric phosphorus and nitrogen criteria for lakes/ponds/impoundments, rivers/streams, and estuaries at theearliest possible time. (WQ-1a, 1b)" FY10 EPA P&C # 86: FY09 EPA P&C # 84: FY08 EPA P&C # 82: 2007 PPA Priority # 69: "Continue to develop nutrient criteria in accordancewith the Nutrient Criteria Development and Adoption Plan."
FY16 and 17 EPA P&C # 33. Participation in regional/ national meetings, calls, workgroups and conferences. Examples include meetingsand conference calls with NEIWPCC WQS workgroup, the EPA Nutrient RTAG workgroup, ASWIPCA conference calls, etc.
Description:
Description:
10/01/2006
10/01/2001
10/01/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
WQS: Env-Wq 1700 Revisions FY18
WQS: Env-Wq 1700 Revisions FY19
FY18 Progress Report on Numeric Nutrient Criteria
FY19 Progress Report on Numeric Nutrient Criteria
Deliverable:
Deliverable:
Deliverable:
Deliverable:
FY18 EPA P&C # 31: Work includes preparation of Initial Proposal (IP) for revisions proposed to surface water qualityregulations (Env-Wq 1700), public hearing on the IP, preparation of a final proposal, JLCAR hearing, final certifiedrules and submittal to EPA for approval.
FY19 EPA P&C # 31: Work includes preparation of Initial Proposal (IP) for revisions proposed to surface water qualityregulations (Env-Wq 1700), public hearing on the IP, preparation of a final proposal, JLCAR hearing, final certifiedrules and submittal to EPA for approval.
FY18 EPA P&C #32 and 33 Provide any necessary schedule updates and progress report on nutrient criteria development toEPA annually, by December 31st. The schedule and progress report shall address the development, proposal and adoption ofnumeric water quality standards for total phosphorus and total nitrogen for lakes/ponds/impoundments; rivers/streams; andestuaries. (WQ-01)
FY19 EPA P&C #32 and 33. Provide any necessary schedule updates and progress report on nutrient criteria development toEPA annually, by December 31st. The schedule and progress report shall address the development, proposal and adoption ofnumeric water quality standards for total phosphorus and total nitrogen for lakes/ponds/impoundments; rivers/streams; andestuaries. (WQ-01)
Description:
Description:
Description:
Description:
01/01/2017
10/01/2018
10/01/2017
10/01/2018
09/30/2018
09/30/2019
09/30/2018
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COMSTOCK, W. GREGG
COMSTOCK, W. GREGG
COMSTOCK, W. GREGG
COMSTOCK, W. GREGG
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Rules
Rules
Reports, Final
Reports, Final
1
1
1
1
Lead Person:
Lead Person:
Lead Person:
DIERS, THEODORE
DIERS, THEODORE
COMSTOCK, W. GREGG
30387
30388
30385
30386
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 295 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATER QUALITY STANDARDS (Current)
Div/Bur:
Program:
WQS: Regional Meetings/Conferences (Current)
WQS: Technical Assistance (Current)
WQS: Water Quality Standards Advisory Committee (Current)
Activity:
Activity:
Activity:
Technical assistance regarding water quality standards that isn't already covered under any other programs. Includes education andoutreach and WQS presentations.
FY16 and 17 EPA P&C #32 and 33FY14 EPA P&C #69FY13 EPA P&C # 71FY12 EPA P&C #79. FY09 EPA P&C # 83: Direct the operation of the committee, providing adminstrative support.FY11 EPA P&C # 94: "Continue ongoing WQS review, and adopt revisions as appropriate, including temperature provisions as discussedabove."FY12 EPA P&C #79: "Continue ongoing WQS review, and adopt revisions as appropriate, including temperature provisions as discussed above."
Description:
Description:
10/01/2006
10/01/2001
Start/End Dates:
Start/End Dates:
thru
thru
WQS:WQS Workgroups FY18
WQS:WQS Workgroups FY19
WQS - Provide Technical Assistance FY18
Deliverable:
Deliverable:
Deliverable:
Participation in the NEIWPCC WQS Workgroup meetings and conference calls as well as EPA Nutrient RTAG workgroups. [Note-conference calls count as meetings].(FY18, 19 EPA P&C # 32. "Work with EPA to facilitate adoption of numeric phosphorus and nitrogen criteria forlakes/ponds/impoundments, rivers/streams, and estuaries at the earliest possible time.")
Participation in the NEIWPCC WQS Workgroup meetings and conference calls as well as EPA Nutrient RTAG workgroups. [Note-conference calls count as meetings].(FY18, 19 EPA P&C # 32. "Work with EPA to facilitate adoption of numeric phosphorus and nitrogen criteria forlakes/ponds/impoundments, rivers/streams, and estuaries at the earliest possible time.")
Provide technical assistance for issues related to water quality standards.
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2017
09/30/2018
09/30/2019
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
COMSTOCK, W. GREGG
COMSTOCK, W. GREGG
COMSTOCK, W. GREGG
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Meetings
Assistances Provided
1
1
3
Lead Person:
Lead Person:
COMSTOCK, W. GREGG
DIERS, THEODORE
30389
30390
30392
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 296 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATERSHED BASED PLAN DEVELOPMENT (Current)
Created for FY14 Work Plan. The development of watershed-based plans that address non-point source pollution is a critical piece of thestate's Nonpoint Source Management Program. Starting in FFY 2014 A select portion of 319 funding will be used for the development ofwatershed plans which include 9 elements identified in EPA's Handbook for "Developing Watershed Plans to Restore and Protect our Waters."Projects funded in prior fiscal years and still open as of 10/01/13 have been moved here as well.01/01/2010
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Projects to Develop 319 Watershed Based Plans (Current)Activity:
Manage projects to develop watershed-based plans in accordance with EPA's criteria for WBPs. Projects moved from Watershed Protection andWatershed Restoration
Description:
01/01/2011Start/End Dates: thru
14-306-18 Development of a Watershed Plan for the Winnicut River
HP-15-S-07 Ossipee Lake Watershed Plan Phase 2 : Ossipee lake Shoreline and Lovell R.
RP-14-M-04 Moultonborough Inlet Watershed Restoration Plan (LWWA)
Deliverable:
Deliverable:
Deliverable:
Project will develop an a - i plan for the Winnicut River watershed. Restoration managment tools will be developedincluding: Local capacity, tecnical analysis of water quality, and final recommendations for restoration. ($75k offunding from CZM; $10K from 319)
This is the second subwatershed to be addressed in this phased approach to developing a watershed management plan for theOssipee Lake watershed. This plan will provide stakeholders with a coordinated approach to protect and restore thesewater resources and guide projected development. It will establish quantitative water quality goals for phosphorus andsediment in Ossipee Lake and for chloride in sub-watersheds where monitoring has shown likely impairments. Through theanalysis of existing data as well as additional research, GMCG will determine the likely causes of high Phosphorus andsuggest recommendations to mitigate this. A Watershed Management Plan will be drafted that will address the Phosphorusincreases across the Ossipee Shoreline and Lovell River Watersheds.
Activities completed in support of this project will provide technical, organizational, and procedural assistance to thegrantee to help ensure successful completion of the project including: assistance with payment requests and match reviewand processing; assistance with documenting BMP implementations; reviewing and contributing to development of outreachmaterials; assistance with developing quality assurance documents and completing pollutant load reduction calculationsand reporting; providing input, and orchestration of DES response, to technical questions (water quality, sampling, BMPselection/design, etc.) as needed; assistance with producing interim and final reports to meet DES/EPA requirements.
END DATE EXTENDED FROM 12/31/2016. The Lake Winnipesaukee Watershed Association (LWWA) secured Section 319 funding todevelop a watershed restoration plan for Moultonborough Inlet on Lake Winnipesaukee. Moultonborough Inlet (MBI) has someof the lowest quality water in the Lake Winnipesaukee Assessment Unit and a restoration plan will be devleoped to targetNPS sources for implementation practices. S. Landry is the DES project manager and will be responsible for serving onproject committees, reviewing all deliverables in draft form as prepared by the consultant, approving all press releases,fact sheets, and other education and outreach pieces, attend and speak at public and project partner meetings as needed,review and approve all payment requests, match forms, and procurement documents, and ensure that all project deliverablesfulfill the objectives outlined in the Grant Agreement between DES and LWWA.
Description:
Description:
Description:
03/04/2016
06/30/2014
04/30/2014
12/30/2017
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
SOULE, SALLY
MARCOUX, JEFFREY
MARCOUX, JEFFREY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Management Tools
Plans
Plans
3
1
1
Lead Person: LANDRY, STEPHEN
28083
26022
25737
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 297 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATERSHED BASED PLAN DEVELOPMENT (Current)
Div/Bur:
Program:
Projects to Develop 319 Watershed Based Plans (Current)Activity:
RP-15-CT-11 Lake Warren Watershed Plan Development and Implementation Phase 1
RP-17-CT-07 Lake Sunapee Protective Assoc Sunapee Watershed Plan Update
RP-17-M-03 Antrim Gregg Lake Watershed Management Plan Development
Deliverable:
Deliverable:
Deliverable:
Lake Warren is listed as impaired for Aquatic Life Use (pH, chlorophyll-a, and phosphorus). The Southwest Region PlanningCommission and the Lake Warren Association have been active participants in multiple watershed planning efforts toimprove water quality to Lake Warren through a recent NHDES 604b grant and have conducted a watershed survey, anassessment of data, and a model to identify sources of pollution to the Lake. Stormwater runoff and septic systems havebeen identified as the main sources of pollution.
The project team will continue the work supported in past efforts through the Lake Warren Watershed Management PlanDevelopment and Implementation Project, Phase I by completing the requirements of an approved watershed-based plan. Thisproject also includes tasks to implement two demonstration projects by installing best management practices aimed atreducing stormwater runoff at two locations. The desired outcome of this project is to complete a watershed planoutlining actions for phosphorus reduction in the Lake, reduce the overall input of sediment and phosphorus to the Lake,and raise public awareness for future phases of this project.
Activities completed in support of this project will provide technical, organizational, and procedural assistance to thegrantee to help ensure successful completion of the project including: assistance with payment requests and match reviewand processing; assistance with documenting BMP implementations; reviewing and contributing to development of outreachmaterials; assistance with developing quality assurance documents and completing pollutant load reduction calculationsand reporting; providing input, and orchestration of DES response, to technical questions (water quality, sampling, BMPselection/design, etc.) as needed; assistance with producing interim and final reports to meet DES/EPA requirements.
The Lake Sunapee watershed straddles Merrimack and Sullivan counties in central western New Hampshire. The nearly 50square mile watershed includes portions of 6 towns (Sunapee, Newbury, New London, Springfield, Sutton, Goshen) and 10other lakes and ponds. Lake Sunapee and several other watershed lakes are water supply sources and they are majorrecreational resources and regional economic engines. Several water bodies in the watershed have been designated by NHDES as high priority for protection, restoration, or asimpaired. Sediment, nutrients and stormwater contaminants such as chlorides are the major water quality concerns. Streambank erosion adds to the sediment loads which degrade water quality as well as aquatic species and their habitats.Development pressure along with increases in impervious surface and climatic change have exacerbated these impacts.Nutrient and sediment loading are also responsible for the increasing occurrence of cyanobacterial blooms. The updatedmanagement plan will provide specific water quality goals, better identified contaminant sources, recommended improvementmeasures (structural and non-structural) and a more detailed and organized framework for future efforts to achievereduced nutrient, sediment and contaminant loading.
Gregg Lake hosts Antrim's popular public swimming beach and boat launch, a community of seasonal and year-round homes anda thriving youth camp. The tranquil warm-water fishery attracts anglers and wildlife, including nesting loons, and natureenthusiasts paddle the wooded shoreline and marshes. The Gregg Lake watershed contains some of the "Highest Ranked(Wildlife) Habitat" in New Hampshire (NH Fish and Game). However, elevated phosphorus and chlorophyll-a and low dissolvedoxygen levels put Gregg Lake in the "Slightly Bad" category for water quality and threaten the lake's capacity to supportwildlife. Fortunately, Gregg Lake also ranks high in "Recovery Potential" (NHDES). The requested funds will supportdevelopment of a watershed management plan to lower phosphorus and chlorophyll-a levels and reverse the decline in waterquality. Two lake associations and the town already actively support mitigation through Lake Host, Weed Watch and VLAPwater testing programs. A written plan will guide a coalition of stakeholders, including the Antrim Parks and RecreationCommission, Conservation Commission and Highway Department, lake associations, property owners and recreational lakeusers, to identify pollution sources and set specific long-term goals for reducing pollutant loads and restoring GreggLake to its highest potential wildlife and recreation uses.
Description:
Description:
Description:
06/30/2014
10/01/2017
10/01/2017
12/31/2017
12/31/2019
12/31/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
MARCOUX, JEFFREY
MARCOUX, JEFFREY
MARCOUX, JEFFREY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Plans
Plans, Management
Plans, Management
1
1
1
26023
29644
29641
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 298 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATERSHED BASED PLAN DEVELOPMENT (Current)
Div/Bur:
Program:
Projects to Develop 319 Watershed Based Plans (Current)Activity:
RP-17-M-04 Lake Winnipesaukee Assoc Moultonborough Bay Plan Development
RP-17-M-05 Lakes Region Planning Comm. Winnisquam Planning Phase 1
RP-17-M-06 Squam Lakes Watershed Management Plan Development
Deliverable:
Deliverable:
Deliverable:
Lake Winnipesaukee, NHLAK700020110•]02•]19, is currently listed on the 2014 Draft 305(b)/303(d) list of threatened orimpaired waters for primary contact recreation use due to the occurrence of cyanobacteria (source unknown). It isimperative to continue working with communities around the lake in order to identify pollution sources that arecontributing to the impairment. A watershed management plan for the Moultonborough Bay and Winter Harbor subwatershedswill continue the progress in developing a comprehensive Lake Winnipesaukee Watershed Management plan by providingwatershed and water quality analyses that will identify sources of pollutants in the sub•]watershed that are contributingnutrient loadingto the lake.The Moultonborough Bay subwatershed is predominantly forested exhibiting good stream and lake quality. Development of anEPA nine key element watershed management plan for the MB subwatershed will result in the identification of sources ofpollutants and the actions necessary to correct them that will improve existing lake quality, aquatic habitat, and resultin the removal of water bodies from the State•s 305(b)/303(d) list.Representatives from the communities of Moultonborough, Tuftonboro, and Wolfeboro, Lake Winnipesaukee Association, GenevaPoint Center, Bald Peak Colony Club, summer camps, homeowner associations and residents will work together to develop anaction plan of strategies that will protect the value, uses, and beauty of the lake for many generations.
Lake Winnisquam has serious water quality impairments but has a high priority for protection and restoration. Theisolated efforts of the past have had difficulty making any traction toward a regional coordinated management approach.There is an immediate need for better coordination on existing and proposed water quality monitoring efforts, homeownernetworking, RPC/town planning efforts, and public awareness outreach efforts. LRPC will leverage the Black Brook WMP developed in 2012 with only the Town of Sanbornton's involvement, a newly formedhomeowners group, current discussions with NHDES and UNH regarding water quality monitoring coordination, and a newcommitment from landuse boards in the surrounding communities to set the groundwork for an overall planning processthrough 1) building a cohesive network, 2) better informed public awareness and outreach efforts, and 3) developing acoordinated water quality monitoring plan.This organized and coordinated overall planning process will set the groundwork for further watershed management planningand the different kinds of implementation activities that will need local support (including match funding support) tosucceed.
END DATE EXTENDED FROM 12/31/2018. END DATE EXTENDED FROM 9/30/2017. The Squam Lakes Association is Updating their 1991Watershed Plan. Rebecca Hanson, Director of Conservation is taking the lead. Will be working with Plymouth State'sEnvironmental Science and Policy Program. Section 319 funding is not being requested. In 2017 Received 319 grant tocomplete plan
Description:
Description:
Description:
10/01/2017
10/01/2017
01/01/2016
12/31/2019
12/31/2019
03/31/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
MARCOUX, JEFFREY
MARCOUX, JEFFREY
WASKIN, WENDY
Qty/Unit:
Qty/Unit:
Qty/Unit:
Plans, Management
Plans
Plans
1
1
1
29645
29643
28134
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 299 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATERSHED BASED PLAN DEVELOPMENT (Current)
Div/Bur:
Program:
Projects to Develop 319 Watershed Based Plans (Current)
Quality Assurance (Current)
Activity:
Activity:
FFY 2014 Moved from WSPROT and WSREST programs. Then separated into Watershed Based Plan Development and Watershed ProjectImplementation. All 319 projects using or generating environmental data must develop a quality assurance project plan (QAPP) or a sitespecific project plan (SSPP), depending on the project type. All QA documents must be reviewed, managed, and tracked in accordance withthe DES Quality Assurance Program and the federal requirements for section 319 funds.
Description:
10/01/2013Start/End Dates: thru
RP-17-M-09 UMMWA Turkey River Watershed Management Plan Development
Planning Project QAPPS
Deliverable:
Deliverable:
The UMWA believes that the Turkey River watershed, its communities, and partners (Central New Hampshire PlanningCommission, Turkey River Basin Trust) are ideally poised for a holistic, nine-element watershed management process andimplementation of best management practices. The Towns of Bow, Dunbarton, and Hopkinton, and the City of Concord haveshown leadership with land and other conservation efforts. Several are engaged in master planning processes. St. Paul'sSchool has invested in management efforts including addressing flooding and hiring full-time sustainability staff. TheTurkey River Basin Trust boasts a quarter of a century of land and water conservation work. The New Hampshire RiversCouncil's Watershed Steward™ Program will provide resources to homeowners and recognize their good property management toimprove and protect water quality. The Central New Hampshire Regional Planning Commission's (CNHRPC) expertise andcommunity relationships will be invaluable. These partners and others are engaged fully in the proposal to connect peopleand groups in the watershed to improve water quality. The Turkey River Watershed Restoration and Management Plan is theopportunity to maintain high quality resources and restore areas with water quality impairments by connecting towns,cities, businesses, other groups, and individuals to foster a Turkey River watershed community with a lasting legacy.
Provide QAPP, SSPP, or other QA documentation guidance and oversight to grantees completing watershed planning projects.
Description:
Description:
10/01/2017
10/01/2017
12/31/2019
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
MARCOUX, JEFFREY
LANDRY, STEPHEN
Qty/Unit:
Qty/Unit:
Plans, Management
QAPPs (Quality Assurance Program Plan)
1
1
Lead Person: Vacant
29642
30186
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 300 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATERSHED DATA MANAGEMENT (Current)
Development of EMD, shellfish, complaints, beach, SADB, grants, contacts, pools, & boat inspection databases. Responsible for EPArequired reporting (beach notification & monitoring and WQX). Provide GIS and customized query and report services to bureau.12/15/1999
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees Federal EPA Federal Other Grants
Comprehensive water quality database. (Current)Activity:
Water quality monitoring data is currently stored in numerous spreadsheets and databases in various formats. In order to use this datamore effectively, it needs to be in one format and in one application.
Description:
03/01/2001Start/End Dates: thru
Prepare and import various datasets into the EMD.
Prepare, import, review, and approve various datasets into the EMD
Prepare, import, review, and approve various datasets into the EMD
Provide annual upload of physical, chemical, and biological data to WQX
Provide annual upload of physical, chemical, and biological data to WQX
Provide annual upload of physical, chemical, and biological data to WQX.
QA/QC of data in EMD
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Prepare and import various volunteer and outside agency datasets into the EMD. Groups to include Green MountainConservation Group, Souhegan Watershed Association and others to be deteremined. Also includes the review and approval ofuploads to the EMD via the web by site remediation and other consultants.
Prepare and import various volunteer and outside agency datasets into the EMD; assist and help import data for NHDESstaff, and review and approve uploads to the EMD via the web by site remediation, PFAS, GWDP, volunteers, NHDES staff,and other groups.
Prepare and import various volunteer and outside agency datasets into the EMD; assist and help import data for NHDESstaff, and review and approve uploads to the EMD via the web by site remediation, PFAS, GWDP, volunteers, NHDES staff,and other groups.
P&C List # 28 in Water. Update and add new data to WQX yearly.
P&C List # 28 in Water. Update and add new data to WQX yearly.
P&C List # 28 in Water. Update and add new data to WQX yearly.
Data must be continuously reviewed and QA/QCd as well as enhanced to meet emerging data standards and exchanges. Alsothe data must be QA/QCd before incorporation into the Supplemental Assessment Database and before upload to the WaterQuality Exchange (WQX) - the replacement to STORET.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
01/01/2019
01/01/2018
01/01/2019
10/01/2016
10/01/2016
12/31/2017
12/31/2018
12/31/2019
12/31/2018
12/31/2019
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Data Sets
Data Sets
Data Sets
Data Sets
Data Sets
Data Sets
Data Sets
100
100
100
1
1
1
1
Lead Person: DEGLER, JOCELYN
28933
29819
29866
29820
29867
26721
28612
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 301 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATERSHED DATA MANAGEMENT (Current)
Div/Bur:
Program:
Comprehensive water quality database. (Current)
Document Management System (Current)
GIS Development (Current)
Activity:
Activity:
Activity:
Develop a document management system that will keep track of reports, photos, correspondence, etc. and be able to relate documents toparts of the EMD where appropriate. This project will also entail developing a similar system for the Drinking Water and GroundwaterBureau but they will have their own filter and documents will relate to their public water supply database where applicable.
Description:
11/01/2007Start/End Dates: thru
QA/QC of data in EMD
QA/QC of data in EMD
Train new users of the EMD, it's modules, or template use.
Train new users of the EMD, its modules, or template use.
Train new users of the EMD, its modules, or template use.
Update EMD OneStop.
Implement document library.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Use QAQC queries to review and fix data as needed. Data imported from state labs also reviewed for errors and corrected.Also the data must be QA/QCd before incorporation into the Supplemental Assessment Database and before upload to theWater Quality Exchange (WQX) - the replacement to STORET.
Use QAQC queries to review and fix data as needed. Data imported from state labs also reviewed for errors and corrected.Also the data must be QA/QCd before incorporation into the Supplemental Assessment Database and before upload to theWater Quality Exchange (WQX) - the replacement to STORET.
Training on the use of the EMD, complaint/beach/shellfish, and import templates.
Training on the use of the EMD, complaint/beach/shellfish, and import templates.
Training on the use of the EMD, complaint/beach/shellfish, and import templates.
END DATE EXTENDED FROM 12/31/17, 12/31/2015, 12/31/2014, 09/30/2013, 09/30/2012. Update the current EMD OneStop dataretrieval process to be more user friendly, quicker, more reliable, and with more options. Need DoIT resources to be ableto move forward on project - thus the numerous end date changes.
END DATE EXTENDED FROM 12/31/2017, 12/31/2016, 12/31/2015, 09/30/10, 09/30/2012, 12/31/2013 - Find the resources to getthe library forms built, test them, pilot data entry with the staff, develop data entry business rules, and roll outlibrary to public once a sufficient amount of records are available. Project taken over by DoIT in fall of 2010 and thenreturned back to DES in spring 2012. End dates are continually moved out since waiting for DoIT resources to buildapplication.
Project taken over by DoIT in 11/2010.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
01/01/2019
01/01/2017
01/01/2018
01/01/2019
09/01/2010
07/01/2009
12/31/2018
12/31/2019
12/31/2017
12/31/2018
12/31/2019
12/31/2019
12/31/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
COFRIN, MELANIE
DEGLER, JOCELYN
DEGLER, JOCELYN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Actions
Actions
Persons
Persons
Persons
Applications
Data Management Systems
1
1
10
15
15
1
1
Lead Person: DEGLER, JOCELYN
29821
29868
29862
29863
29865
21185
19362
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 302 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATERSHED DATA MANAGEMENT (Current)
Div/Bur:
Program:
GIS Development (Current)
IT Steering Committee, sifter, and other agency wide IT work (Current)
Program Administration (Current)
Technical Assistance (Current)
Activity:
Activity:
Activity:
Activity:
Creating and maintaining coverages, applications, metadata, etc. in support of bureau activities.
Participate in and help lead and direct activities under the DES IT Steering Committee and IT project sifters groups.
This entails work done to manage grants, budgets and workplans relating to data management. Also include personnel management.
This activity includes work such as: software training and technical assistance (except for the EMD), routine updates to databases (suchas the Contacts DB), software/hardware purchasing, interfacing with OIT on data management issues, special IT projects such as FTPdevelopment and web pilot projects, computer inventories, and other similar non-program specific work.
Description:
Description:
Description:
Description:
12/01/2000
04/01/2012
08/08/2006
08/08/2006
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Cartography
Metadata Generation
Provide GIS support to Watershed Programs
Upgrade ArcGIS Software
Participate in IT Project sifter group representing Watershed Management interests.
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Create custom maps for watershed programs for a variety of outreach efforts including display at public meetings and onthe DES website.
Metadata for geospatial data will be created according to accepted protocols for GIS datasets developed and maintained bythe Watershed Bureau.
Provide support for a variety of staff GIS needs, including technical support with GIS software, map generation,geospatial data analysis, GIS file updates, and other GIS support as needed.
Continue to upgrade staff to current ArcGIS software.
Review IT Project tracking system for inaccuracies, empty records etc. and present projects to the committee for review.Work on agency wide projects such as Systems Inventory.
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
10/01/2017
10/01/2017
09/30/2018
09/30/2018
09/30/2018
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SVENDSEN, KRISTEN
SVENDSEN, KRISTEN
SVENDSEN, KRISTEN
SVENDSEN, KRISTEN
DEGLER, JOCELYN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Maps
GIS Coverages
Staff Assisted
Staff Assisted
Meetings
20
4
120
6
4
Lead Person:
Lead Person:
Lead Person:
Lead Person:
SVENDSEN, KRISTEN
DEGLER, JOCELYN
DEGLER, JOCELYN
DEGLER, JOCELYN
29217
29216
29215
29214
29606
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 303 of 313
WATER DIVISION WATERSHED MANAGEMENT
WATERSHED MANAGEMENT ADMINISTRATION (Current)
Watershed Management Bureau activities that are not specific to a particular program.05/09/2001
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 03 04 02
Funding: State General State Fees Federal EPA Federal Other Grants
Legislation and Rules (Current)
Measures Tracking and Reporting System (MTRS) (Current)
NERACOOS Participation (Current)
Professional Development (Current)
Program Administration (Current)
Technical Training Staff (Current)
Time Allocation (Current)
Activity:
Activity:
Activity:
Activity:
Activity:
Activity:
Activity:
Work on legislation and rules that is not program-specific or includes multiple programs
This activity oversees the development and utilization of the MTRS for the Water Division. Includes assistance in developing annual workplans, reports and troubleshooting problems
Staff activities related to participation in boards, committees, etc. in support of the Northeast Regional Association of Coastal andOcean Observing Systems (NERACOOS)
Staff are encouraged to present papers at professional meetings, to participate in Certified Public Manager and Certified PublicSupervisor training, and to pursue degrees and courses relevant to their work.
Administrative and organizational tasks that are not program-specific.
Activities related to training staff -- ON HOLD FOR 2015-2017. Perhaps add as a deliverable under Professional Development.
Activities related to the tracking and reporting of time spent on specific outputs in the work plan.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
08/01/2008
05/01/2001
08/01/2008
10/01/2001
06/01/2001
08/01/2006
10/01/2002
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Provide Technical Assistance to WD Users
Add site codes as requested; Run Time Allocation Reports for WAS and Others
Deliverable:
Deliverable:
Function as the Database Administrator for the Division. Populate tables, troubleshoot, provide training
Run periodic time allocation reports to track time spent on various programs. Add site codes upon request. Provide allstaff reports to WAS supervisor.
Description:
Description:
10/01/2017
10/01/2017
09/30/2018
09/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
WASKIN, WENDY
WASKIN, WENDY
Qty/Unit:
Qty/Unit:
Assistances Provided
Reports, Final
10
20
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DIERS, THEODORE
WASKIN, WENDY
DIERS, THEODORE
DIERS, THEODORE
DIERS, THEODORE
Vacant
WASKIN, WENDY
29437
29438
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 304 of 313
WATER DIVISION WETLANDS
ENHANCE WETLAND MAPPING & ASSESSMENT TOOLS (2017 EPA GRANT) (Current)
Contract to update NWI maps; develop new polygons for streams, and apply the NWI+ classification system and assign LLWW landscape andwetland function information. Develop high value wetland science workgroup to develop criteria based on NHANRS Wetland buffer scienceworkgroup; NHB to evaluate outdated exemplary wetland systems so they can be reliably used; NHB to develop thresholds for wetland systemsof high ecological value using vegetation data; Grant administration10/01/2017 09/30/2019
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru
Funding: State General State Fees Federal EPA Federal Other Grants
Contract to update NWI Maps (Current)
Develop High Value Criteria, map HVW Wetlands & Scope WQ base layer (Current)
Field Verify Maps (Current)
Grant Administration (Current)
Publish NWI Maps (Current)
Activity:
Activity:
Activity:
Activity:
Activity:
Task Code 6310
6325 Create High Value Science Workgroup
Task Code 6315 Field verify draft maps
Task Code 6335
Task Code 6320
Description:
Description:
Description:
Description:
Description:
10/01/2017
10/01/2018
10/01/2018
10/01/2017
08/30/2018
09/30/2019
06/30/2019
09/30/2019
09/30/2019
09/30/2019
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
Draft approved Contract and route through DOJ
Obtain Governor and Council approval for Contract
Work with approved vendor on schedule and quote
Deliverable:
Deliverable:
Deliverable:
Description:
Description:
Description:
10/01/2017
10/01/2017
10/01/2017
12/31/2017
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
TILTON, MARY ANN
TILTON, MARY ANN
TILTON, MARY ANN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Approvals
Approvals
Contracts
1
1
1
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
TILTON, MARY ANN
No one assigned
TILTON, MARY ANN
TILTON, MARY ANN
TILTON, MARY ANN
30484
30485
30483
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 305 of 313
WATER DIVISION WETLANDS
SHORELAND PROTECTION PROGRAM (Current)
The shoreland program has been incorporated into the Wetlands Bureau. The wetlands program now regulates activities in the ProtectedShoreland as defined by RSA-483-B which includes a 250 ft. distance from the reference line(high water elevation) on all tidal and non-tidal rivers, streams, ponds and lakes.Bureau activities include compliance investigations and the evaluation of variance and waiverrequests in addition to education and outreach activities.07/01/1994
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 02
Funding: State General XState Fees Federal EPA Federal Other Grants
Enforcement (Current)
Legislation and Rulemaking (Current)
Outreach and Education (Current)
Permitting (Current)
Activity:
Activity:
Activity:
Activity:
The Wetlands Bureau Enforcement Section is charged with investigating and enforcing complaints of RSA 483-B, the Shoreland Water QualityProtection Act, and its associated administrative rules, Env-Wq 1400 et seq.
Description:
Description:
Description:
Description:
10/01/1999
10/01/1999
10/01/1999
10/01/2004
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
BLECHARCZYK, JEFFREY
FORST, DARLENE
FORST, DARLENE
FORST, DARLENE
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 306 of 313
WATER DIVISION WETLANDS
WETLAND PROGRAM IMPROVEMENTS (2013 GRANTS) (Current)
Implementation of several tasks under two EPA Wetland Program Improvement grants received in 2013.10/01/2013 12/31/2017
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees XFederal EPA Federal Other Grants X
2205-09 FY13 T1 RAM/FQA/Macroinvertebrate monitoring & assessment (Current)
2205-09 FY13 T4 Grant Administration - SC (Current)
Activity:
Activity:
Conduct Planning, QAPP, training, fieldwork, sampling, data processing and analysis
Develop MOA with DRED-NHB, manage project, monitor budget, provide progress reports, conduct QA & project presentation.
Description:
Description:
10/01/2013
10/01/2013
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
thru
thru
Prepare progress reportsDeliverable:
Monitor budget and prepare semi-annual progress reports.Description:
10/01/2013 12/31/2017Start/End Dates: thruLead Person: CRYSTALL, SANDRA
Qty/Unit: Reporting Requirements6
Lead Person:
Lead Person:
CRYSTALL, SANDRA
CRYSTALL, SANDRA
25115
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 307 of 313
WATER DIVISION WETLANDS
WETLAND PROGRAM IMPROVEMENTS (2015 GRANTS) (Current)
Implementation of several tasks under two EPA Wetland Program Development Grants received in 2015.10/01/2015 09/30/2018
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru
Funding: State General State Fees XFederal EPA Federal Other Grants
2205-10 FY16 T1 Wetland monitoring & investigate development of biocriteria thresholds. (Current)
2205-10 FY16 T2 Provide oversight of NHB tasks and deliverables. (Current)
2205-10 FY16 T5 Develop new wetland message and outreach tools (Current)
Activity:
Activity:
Activity:
Conduct wetland sampling and investigate development of biocriteria thesholds. Develop & test aquatic vegetation sampling protocols withMaine.
Provide oversight of NHB tasks and deliverables, and review and comment on draft work products.
Develop new training materials on anticipated new wetlands regulatory processes, importance of wetlands, streams and riparian zones,existing assessment tools, and educational materials. Explore the use of Moodle, webinars, video or other eLearning tools to createoutreach products for Conservation Commissions and other stakeholders.
Description:
Description:
Description:
10/01/2015
10/01/2015
09/01/2016
09/30/2018
04/30/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
C- Conduct analyses of sampling data to identify potential biocriteria threshold
Develop & test aquatic vegetation sampling protocols with Maine.
B- Develop thresholds for interpreting Floristic Quality Assessment (FQA) scores that are specific t
Develop new wetlands message and outreach tools that incorporate new published research and eLearnin
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Report providing analysis of sampling data and identification of potential biocriteria thresholds for aquatic lifesupport.
Research methods to sample aquatic vegetation. Collaborate with Maine on testing sampling protocols. Develop aquaticvegetation sampling protocols to be used by Maine and NH in freshwater fringing and emergent wetlands.
Determine least-impacted reference condition thresholds for FQA indices (mean C) for approximately 15 vegetated wetlandsystem types in NH.1. Review existing relevé (plant plot) data.2. Identify wetland types for which new field surveys need to be conducted.3. Conduct field surveys to collect relevé data for wetland systems lacking useable data.4. Analyze data for FQA indices values.5. Identify thresholds for minimally impacted reference wetlands by type.
1. Review existing materials and issues and seek input to decide on topics to address with new materials.2. Explore the use of Moodle, webinars, video or other eLearning tools to create outreach products for ConservationCommissions and other stakeholders.3. Draft materials in a format suitable for medium being used.4. Create new products.5. Publicize new materials and resources
Description:
Description:
Description:
Description:
08/01/2016
10/01/2016
10/01/2016
09/01/2016
09/30/2018
12/31/2017
04/30/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CRYSTALL, SANDRA
CRYSTALL, SANDRA
CRYSTALL, SANDRA
TILTON, MARY ANN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Reports, Final
Reports, Final
Values
Products
1
1
15
10
Lead Person:
Lead Person:
Lead Person:
CRYSTALL, SANDRA
CRYSTALL, SANDRA
TILTON, MARY ANN
27575
28147
27577
27581
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 308 of 313
WATER DIVISION WETLANDS
WETLAND PROGRAM IMPROVEMENTS (2015 GRANTS) (Current)
Div/Bur:
Program:
2205-10 FY16 T5 Develop new wetland message and outreach tools (Current)
2205-10 FY16 T6 Grant administration and reporting (Current)
2209- 12 T4 Evaluate Surveyed Stream Crossings for AOP & Geomorph parameters (Current)
2209-12 FY16 T2 Re-establish Stream Crossing Technical Workgroup (Current)
2209-12 FY16 T5 Prioritize Culvert Replacement Projects within each watershed (Current)
Activity:
Activity:
Activity:
Activity:
Activity:
Develop MOA with DRED-NHB, manage project, monitor budget, provide progress reports, conduct QA and project presentation.
This taken the form of the New Hampshire State Stream Crossing Steering Team, which is comprised of four agencies (NHDES, NHDOT, NH Fish& Game, and NH HSEM) which is responsible for the collaborative coordination and conductance of stream crossing assessment inititativesand concerns throughout the state.
The purpose of this activity is to use the collected stream crossing data, combined with additional watershed parameters of interest,such as land use/land cover, flood risk history, and identification of local flood risk to refine the prioritization scheme for streamcrossing replacements.
Description:
Description:
Description:
Description:
10/01/2015
06/20/2016
10/01/2015
01/01/2017
09/30/2018
12/31/2017
12/31/2017
12/01/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
Publicize new outreach materials
Meetings of NH State Stream Crossing Steering Team
Deliverable:
Deliverable:
Publicize new wetlands message and outreach tools through DES and stakeholders by providing presentations, pressreleases, etc.
The NH State Stream Crossing Steering Team meets quarterly, or as needed, in order to discuss any and all issues relatedto stream crossing assessments in NH. Decisions regarding the direction of stream crossing assessments are madecollaboratively through discussion at these meetings.
Description:
Description:
11/01/2017
01/01/2016
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
TILTON, MARY ANN
CSIKI, SHANE
Qty/Unit:
Qty/Unit:
Activities
Meetings
5
4
Lead Person:
Lead Person:
Lead Person:
Lead Person:
CRYSTALL, SANDRA
CSIKI, SHANE
CSIKI, SHANE
CSIKI, SHANE
27582
28775
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 309 of 313
WATER DIVISION WETLANDS
WETLANDS PROGRAM (Current)
The Wetlands Bureau regulates dredge, fill, and construction of structures in or adjacent to surface waters, wetlands, sand dunes, and inareas within 100 feet of the highest observable tideline. Bureau activities include permitting, outreach, and compliance in accordancewith the authority of RSA 482-A. The Bureau has worked closely with the US Army Corps of Engineers, and since 1992 nearly all permitsissued by the bureau have become Federal USC Title 33, Chapter 26, Section 1344 (CWA 404) permits under the Corps' NH State ProgrammaticGeneral Permit.07/01/1967
Div/Bur:
Program:
Description:
Start/End Dates: PAUs:thru 03 05 00
XFunding: State General XState Fees XFederal EPA Federal Other X Grants
Data Management (Current)
Enforcement (Current)
Activity:
Activity:
Annual and grant reporting to both the federal goverment and state legislature.
The Enforcement section investigates and enforces violations of RSA 482-A, the New Hampshire wetlands statute, and NH Code of Admin RulesEnv-Wt 100 - 900.
Description:
Description:
10/01/2015
07/01/1986
Start/End Dates:
Start/End Dates:
thru
thru
Calculate Monthly Applications Received, Approved, Denied, and Data Aging for Permitting
Calculate Monthly Complaints Received, Files Closed, Remaining Files, Etc.
Wetlands Calendar Year 2017 Annual Report to EPA
Wetlands FY 2017 Annual Report pursuant to RSA-482A to Legislature
Continue Permit Compliance Inspection Initiative
Continue Permit Compliance Inspection Initiative
Continue with LRM Cross-Training Events
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Calculate monthly applications received (in), applications approved (out), and data aging for permitting.
Calculate monthly complaints received, files closed, open / remaining, inspections, informal and formal actions forcompliance / enforcement.
Report to EPA on Wetlands Bureau activities from 01/01/2017 - 12/31/2018.
This report is required by RSA 482-A and is a summary on the permitting productuvity and account balances for the statefiscal year.
Continue inspecting sites of permitted wetland projects to determine compliance.
Continue inspecting sites of permitted wetland projects to determine compliance.
Continue to provide LRM cross-training events to other LRM staff on compliance / enforcement initiatives and procedures.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2018
01/01/2018
01/01/2018
07/01/2017
01/01/2017
01/01/2018
01/01/2017
12/31/2018
12/31/2018
03/31/2018
06/30/2018
12/31/2017
12/31/2018
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Analyses
Analyses
Reports, Final
Reports, Final
Inspections
Inspections
Training Sessions
12
12
1
1
150
150
2
Lead Person:
Lead Person:
DROCIAK, JENNIFER
DROCIAK, JENNIFER
30021
30022
30020
30019
29028
30014
29029
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 310 of 313
WATER DIVISION WETLANDS
WETLANDS PROGRAM (Current)
Div/Bur:
Program:
Enforcement (Current)Activity:
Coordinate Case Review Team (CRT) Meetings
Coordinate Case Review Team (CRT) Meetings
Coordinate Enforcement Staff Meetings
Coordinate Enforcement Staff Meetings
Partake in Bi-Monthly Attorney General's Office Enforcement Meetings
Partake in Bi-Monthly Attorney Generals Office Enforcement Meetings
Provide LRM Cross-Training Event
Provide Six Outreach Presentations to Stakeholders
Provide Six Outreach Presentations to Stakeholders
Re-Evaluate Compliance Regions and Updae Compliance Region Map
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Coordinate bi-weekly Case Review Team (CRT) Meetings to include administration from Alteration of Terrain, Shoreland,Subsurface, and Wetlands. Track CRT decisions in Excel spreadsheet.
Coordinate bi-weekly Case Review Team (CRT) Meetings to include administration from Alteration of Terrain, Shoreland,Subsurface, and Wetlands. Track CRT decisions in Excel spreadsheet.
Organize quarterly compliance / enforcement staff meetings with Concord and Portsmouth staff.
Organize quarterly compliance / enforcement staff meetings with Concord and Portsmouth staff.
Partake in bi-monthly enforcement meeting with AG's office, update existing cases referred to AGO list.
Partake in bi-monthly enforcement meeting with AGs office, update existing cases referred to AGO list.
Provide LRM cross-training events to other LRM staff on compliance / enforcement initiatives and procedures.
Combined staff effort to provide at least six presentations relative to Wetlands permitting / compliance to municipalofficials, loggers, other state agencies, etc.
Combined staff effort to provide at least six presentations relative to Wetlands permitting / compliance to municipalofficials, loggers, other state agencies, etc.
Re-evaluate compliance regions and update compliance region map as changes necessitate.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
01/01/2017
01/01/2018
01/01/2017
01/01/2018
01/01/2018
01/01/2017
01/01/2018
01/01/2018
12/31/2017
12/31/2018
12/31/2017
12/31/2018
12/30/2017
12/31/2018
12/31/2018
12/31/2017
12/31/2018
03/31/2018
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
ADAMS, COLLIS
ADAMS, COLLIS
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Meetings
Meetings
Meetings
Meetings
Meetings
Meetings
Training Sessions
Presentations
Presentations
Maps
24
24
4
4
6
6
1
6
6
1
29035
30023
29034
30024
29040
30025
30015
29039
30026
30027
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 311 of 313
WATER DIVISION WETLANDS
WETLANDS PROGRAM (Current)
Div/Bur:
Program:
Enforcement (Current)
Mitigation and Restoration (Current)
Permitting Process Improvements (Current)
Rulemaking (Current)
Activity:
Activity:
Activity:
Activity:
Description:
Description:
Description:
07/01/1992
07/01/1967
07/01/1972
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
Update Case Review Team Coordinator and Meeting SOPs
Update LRM Complaint Form
Update Wetlands & Shoreland Compliance Inspection Checklists
Update the LRM Compliance Training Manual
Write Compliance/Enforcement Section of EPA Annual Report
Continue to make improvements identified by LEAN
Continue Wetland Rules Stakeholder Review & Outreach
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
Deliverable:
END DATE CHANGED FROM 03/31/2017 TO 03/31/2018: Update original 2011 Case Review Team Coordinator and Case Review TeamStandard Operating Procedures to reflect changes in procedures and processes over the past five years.
Update LRM Complaint Form if necessary.
Update both the Wetlands and Shoreland Compliance Inspection Checklists to reflect changes made in procedures and data-tracking.
Update the comprehensive LRM Compliance Training Manual to include new policies and procedures, and an updated databasechapter to reflect the transition and use to the new LRMdb.
Write compliance / enforcement section of EPA Annual Report including numbers of complaints received, enforcement actionsissued, administrative fines generated, project updates, etc.
Description:
Description:
Description:
Description:
Description:
Description:
Description:
01/01/2017
01/01/2018
01/01/2018
01/01/2018
01/01/2018
01/01/2017
01/01/2017
03/31/2018
03/31/2018
06/30/2018
03/31/2018
03/31/2018
12/31/2017
12/31/2017
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
Start/End Dates:
thru
thru
thru
thru
thru
thru
thru
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
Lead Person:
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
DROCIAK, JENNIFER
TILTON, MARY ANN
TILTON, MARY ANN
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Qty/Unit:
Procedures
Forms
Checklists
Manuals
Reports, Final
Improvements
Outreach Activities
2
1
2
1
1
3
8
Lead Person:
Lead Person:
Lead Person:
SOMMER, LORI
TILTON, MARY ANN
TILTON, MARY ANN
29036
30028
30016
30017
30018
29027
29026
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 312 of 313
WATER DIVISION WETLANDS
WETLANDS PROGRAM (Current)
Div/Bur:
Program:
Rulemaking (Current)Activity:
Reorganize Wetlands Rules and update for reauthorizationDeliverable:
EXTENDED END FROM 12/31/16. Outreach, Drafting and RulemakingDescription:
10/01/2013 12/31/2017Start/End Dates: thruLead Person: TILTON, MARY ANN
Qty/Unit: Rules1
24802
Report run on:January 5, 2018 NHDES PPA SUBMISSION FOR: (10/01/2017 - 09/30/2019)
Page 313 of 313
WATER DIVISION WINNIPESAUKEE RIVER BASIN
WINNIPESAUKEE RIVER BASIN PROGRAM (Current)
01/01/2000
Div/Bur:
Program:
Description:Start/End Dates: PAUs:thru 03
XFunding: State General XState Fees Federal EPA Federal Other Grants
Septage Handling (Current)Activity:
Description:01/01/2000Start/End Dates: thru
Complete Annual Quality Assurance System Program Self-Audit
Septage received and treated at WRBP Facility
Deliverable:
Deliverable:
Information collected monthly and reported quarterly
Description:
Description:
04/01/2017
07/01/2017
12/31/2017
06/30/2018
Start/End Dates:
Start/End Dates:
thru
thru
Lead Person:
Lead Person:
MCMILLIN, SHARON
MCMILLIN, SHARON
Qty/Unit:
Qty/Unit:
Self-Assessments
Gallons
1
5000000
Lead Person: MCMILLIN, SHARON
28141
29238