active distribution networks: canadian example projectscanadian

18
Active Distribution Networks: Canadian Example Projects Canadian Example Projects Chad Abbey

Upload: others

Post on 03-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Active Distribution Networks: Canadian Example ProjectsCanadian Example Projects

Chad Abbeyy

OverviewOverview

BackgroundBackgroundActive distribution networks – integration of DER and distribution automationof DER and distribution automationCanadian context

Utility projectsUtility projectsNatural Resources Canada initiativesStandardization activitiesStandardization activitiesSummary

2

Power Systems in CanadaPower Systems in Canada

Electricity – provincial jurisdictionElectricity provincial jurisdictionMix of deregulated and vertically integrated companiesProvincially owned: BC Hydro Sask PowerProvincially owned: BC Hydro, Sask Power, Manitoba Hydro, Hydro-Quebec, NLHCompetitive markets: Alberta, Ontario

Active distribution network driversActive distribution network driversSmart meter initiativesConservationReliabilityAgeing infrastructure – grid modernizationDER – feed-in tariffs e g Standard Offer Program

3

DER feed in tariffs, e.g. Standard Offer Program

Ontario – DER IntegrationOntario DER Integration

4

Canadian Utility ProjectsCanadian Utility Projects

ADA technologies being implementedADA technologies being implementedAMR, AMIFast reconfiguration – S&C IntelliTeam productsFault locating technologiesFault locating technologiesVoltage reduction schemesRemote monitoringPlanned islanding

Initiatives: Ontario Smart Grid Forum, CEATI Taskforce on Smart Grid dedicated spectrumTaskforce on Smart Grid, dedicated spectrum Utility examples: Hydro-Québec, Toronto Hydro, Hydro One, ENMAX, BC Hydro

5

Ontario Smart Grid ForumOntario Smart Grid Forum

ParticipationParticipationLed by IESOUtilities, suppliers, government

ObjectivesObjectivesDevelop a high level vision of Ontario Smart GridEducate industry leaders on drivers, technologies, and opportunitiesopportunitiesIdentify enablers and barriers

OutputsReport on findings and recommendationsWebsite: http://www.theimo.com/imoweb/marketsandprograms/smart grid asp

6t_grid.asp

CEATI Smart Grid Working GroupCEATI Smart Grid Working Group

Centre for Energy Advancement throughCentre for Energy Advancement through Technological Innovation (CEATI) InternationalObjectives

Definition of Smart GridDefinition of Smart GridAction plan for development of the Smart GridIdentify technology gapsS f l t t i f i l t ti f th S t G idSuccessful strategies for implementation of the Smart Grid

StatusInitial teleconference – Aug. 2008Kick-off meeting – Nov. 2008

7

Utilities Telecom Council (UTC) Canada Crequest dedicated CI spectrum

Spearheaded by 5 Canadian utilitiesp yIntelligent grid: energy conservation, station security, distribution automation, real time outage management, new power generation (small distributed facilities).Rural networks requires spectrum with good propagationRural networks requires spectrum with good propagation700 MHz range comes with a premium

Industry Canada proposalConsultation process Gazette Notice SMSE 008 08:Consultation process – Gazette Notice SMSE-008-08: http://www.ic.gc.ca/epic/site/smt-gst.nsf/en/sf08972e.html30 MHz contiguous frequency block in the 1.8 GHz bandrelax the SRSP (Standard Radio System Plans) 301 7 torelax the SRSP (Standard Radio System Plans) 301.7 to accommodate point-to-multipoint topologies

Widely supported by respondents

8

Hydro-Quebec PlanAdvanced Distribution Automation

TechnologiesTechnologies

Advanced Distribution AutomationSource: G. Simard, HQ Distribution

• T • T

gg

•T

•T

Business needs

Improving

DataVoltagesLoad currents

FunctionalitiesVoltage controlOptimised load flow Improving

reliabilityReduce costsEnergy efficiencyCustomer

Load currentsFault currentsTemperatureOperations

Optimised load flowFault locationEquipment failuredetection

9

Customer satisfaction…

pmonitoring Power Quality

evaluation

Hydro OneHydro One

Source: Richard Bertolo,

10

Source: Richard Bertolo, Hydro One Networks

Toronto HydroToronto Hydro

11

Source: Joshua Wong, Toronto Hydro

ENMAX – IntelliTEAM II – A Distributed Control SystemControl System

Team StructureA team consists of a line segmentA team consists of a line segment bounded by intelligent switchesSwitches can belong to one or two teamsA team may have may have from one to eight switches

5 4 6 3 7

gTeams are building blocksInterconnected teams form a self-healing electrical network

11 11 11 11 11

healing electrical network

Source: Dean Craig, ENMAX

12

BC Hydro – Volt/Var Optimizationy p

13

Source: Craig Befus, BC Hydro

NRCan - Grid Integration ProgramNRCan Grid Integration Program

Role of governmental labRole of governmental labAddress technical and regulatory barriers to DG Provide much needed research support to many distribution companiesCoordinate collaboration nationally and internationallyy

Relevant projects (2007 – 2011)Active distribution networksModeling, simulation and validation of DERCommunication and DER standards support

14

Test FacilitiesLow voltage test facility (CETC-V):

Multiple inverters and interconnection testing

120-kVA, 3ph Grid simulator5kW/15kW Solar Simulator

Medium voltage test facility (IREQ-HQ):

SimulatorAdjustable RLC loads

Medium voltage test facility (IREQ-HQ):Distribution automation network testing

A radial 25-kV feeder (20 poles, 370m)300-kW, 600 V, resistive, inductive and motor loads

15

motor loadsPower quality meters

DA / DER Standards DevelopmentDA / DER Standards Development

IEC TC 57 – Extension of IEC 61850IEC TC 57 Extension of IEC 61850WG 17 – object models for DERCommon information models (CIM) for distribution automationautomationInteroperability (near-term), Plug-and-play (long-term)

IEEE 1547 seriesIEEE 1547 2 Application guideIEEE 1547.2 – Application guideIEEE 1547.3 – Communication modelsIEEE P1547.4 – Design and operation of DER IslandsIEEE P1547 6 DG in meshed/spot networksIEEE P1547.6 – DG in meshed/spot networks

16

SummarySummary

Two technology pushesTwo technology pushesDER – policy drivenADA – utility efforts to modernize the grid

I d i t ti d dImproved integration neededSupport utilities in DER integration – pilots and demonstration, regulatory, standardsLeverage information communication technology investments

NRCan project activities: Active distribution Ca p oject act t es ct e d st but onetworks, modeling tools, communications, and support for harmonization of standards

17

Questions ?

Chad Abbey450-652-4811

[email protected]

18