active coordination

12
European cooperation Network on Energy Transition in Electricity Fernando García Martínez GAS NATURAL FENOSA SESSION 3: SMART GRIDS CHALLENGES: THE VISION OF THE ENERGY SECTOR WORKSHOP “DEFINING SMART GRIDS: CONDITIONS FOR SUCCESSFUL IMPLEMENTATION” Barcelona, 9th February 2017

Category:

Technology


0 download

TRANSCRIPT

European cooperation Network on Energy Transition in Electricity

Fernando García Martínez

GAS NATURAL FENOSA

SESSION 3:

SMART GRIDS CHALLENGES: THE VISION OF THE ENERGY SECTOR

WORKSHOP

“DEFINING SMART GRIDS: CONDITIONS FOR SUCCESSFUL IMPLEMENTATION”

Barcelona, 9th February 2017

• Context

• Flexibility & Efficiency

• Grid Operator

• GNF Experience

• Sharing vision & knowledge

20% 2020

40% 2030

60% 2040

>80% 2050

Long term: decarbonised energy system in 2050

Near future

Drivers

Winter package

Efficiency Flexibility

Set plan (action 4)

CO2 emission reduction (1990 base)

Andreea Strachinescu 16/09/2016

Andreea Strachinescu 16/09/2016

• Grid interconnection

P2GDirect useFuel CellCHP

Waste TreatmentPlants: biomethane

• Challenge: Efficiency

• Active customers: automation as a previous step for massive participation. But:

• Lack of interoperability in connected home market (very fragmented market)

• Technology adoption difficulties by customers.

• Challenges: Interoperability, technology adoption

• Grid automation to grid digitalization

• DSO 4.0

• Challenge: sensors+ICTs, market models

Co

st v

s B

enef

it

Quantity

• New services

• Grid operator role

OVIRED. Virtual microgrid

operator

BigDataAT: 220kV grid.

http://etip-snet.eu

http://www.futured.es

• Platforms (EU and National/Regional levels)

Thanks for your attention