acreage - amazon simple storage servicearticle/... · acreage top-tier unconventional liquids...
TRANSCRIPT
![Page 1: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/1.jpg)
![Page 2: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/2.jpg)
ACREAGE
Top-Tier Unconventional Liquids Reservoirs
North American Resource Plays
Wolfcamp Duvernay Canyon Lime
Eagle Ford (North)
Eagle Ford
(South) Bakken
Depth (FT) 5,800-8,500 8,000-13,000 7,500-9,500 7,500-13,500 6,500-14,500 8,000-10,000
Gross Thickness (FT) 600-1,500 65-225 100-580 60-200 75-300 20-50
Porosity (%) 6-10 4-10 6-10 8-10 8-12 5-7
TOC (%) 2-5 2-7 2-6 2-10 2-12 1-5
Fracability Moderate Moderate Moderate Moderate High Moderate
Gradient (PSI/FT) 0.45-0.60 0.70-0.90 0.55 0.60-0.80 0.6-0.9 0.65-0.7
Liquid Yield (BBL/MMcf) 330 -910 up to 500 1,000 250-2,500 250-2,500 1,000
North American Overview | 28
![Page 3: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/3.jpg)
CANYON LIME Maximizing Recovery and Minimizing Cost
Dominant player in oil play (> 80% liquids)
One proven pay zone with potential for additional zone
300 square miles of 3D seismic
800 locations based on 600’ spacing in 1 zone
Acres 130,000 net
Planned 2015 Rigs 4-5 rigs
Planned 2015 Wells 35 horizontal wells
Inventory ~800 Hz locations
*75 percent of lateral not in zone.
Drilled Drilling 2014 Wells Monitor Well Planned Rigs
Bivins East 41-1H* 30-Day IP: 787 BOE/D Lateral length: 5,500’
Cum Oil: 54,286 BO (7 mo.)
Bivins East 94-1H 30-Day IP: 1,718 BOE/D
Lateral length: 4,472’ Cum Oil: 80,087 BO (6 mo.)
North American Primary Plays | 76
![Page 4: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/4.jpg)
CANYON LIME Type Curve and Economics
Canyon Lime
Month
0
200
400
600
800
1,000
1,200
0 6 12 18 24 30 36 42 48 54 60
BOE/D
Note 1. Type curve assumes 1-mile completed lateral length. Note 2. All well economics assume $80/BBL WTI, $4/MMBTU NYMEX
Drilling Economics D+C Cost $MM $8.5
EUR MBOE 377
30-Day IP Rate (BOE/D) 1,021
% Oil / Gas / NGL 50% / 20% / 30%
WI / NRI 85% / 64%
ROR 63%
BFIT NPV 10, $M $2.4
2015 Planned Wells 35
North American Primary Plays | 77
![Page 5: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/5.jpg)
“THE CAPACITY OF THE INDIVIDUAL IS INFINITE. LIMITATIONS ARE LARGELY OF HABIT, CONVENTION, ACCEPTANCE OF THINGS AS THEY ARE, FEAR OR LACK OF SELF CONFIDENCE.” - RAYMOND PLANK 1964
Canyon Lime drilling at Bivins Ranch.
![Page 6: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/6.jpg)
Maximize NPV and
ROR Geosteering With 3D
Global Supply Chain
Global Database Management
Economic Metrics and Inventory
Ranking Cost Optimization
Stage Level Completions
With 3D
Integrated Team Solutions
Technology Innovations
Technical Discussion and Case Studies | 98
CANYON LIME CASE STUDY
![Page 7: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/7.jpg)
*Only 25% of the lateral completion in the 41-H contacted the primary pay zone.
TYPE LOG
TARGET 1 INTERVAL
TARGET 2 INTERVAL
Paint Ridge Field (Canyon Wash)
Bivins East 41-1H Canyon Lime Discovery Well 30-day IP: 787 BOE/D Cum: 54,286 BO (215 Days) Lateral length*: 5,100’ Bivins East 94-1H
30-day IP: 1,718 BOE/D Cum: 80,087 BO (175 Days) Lateral length: 4,472’
Drilled
Drilling
2014 Wells
Monitor Well
Current Rigs
CANYON LIME CASE STUDY
Technical Discussion and Case Studies | 99
![Page 8: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/8.jpg)
Minimize penetration of drilling hazards identified on 3D seismic data
Experiment with casing design and penetration inclination within “Wash Out” shale hazard zone
Test azimuth to maximize open fracture contact with well bore
Drill a vertical monitor well adjacent to 4 horizontal wells spaced at 1,200 feet
Conduct micro-seismic survey, obtain conventional core and extensive logging suite
Generate multiple well pads for 2014 and 2015 drilling inventory
CANYON LIME CASE STUDY Confirmation and Delineation Strategy
Technical Discussion and Case Studies | 100
![Page 9: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/9.jpg)
Lost Circulation Zones (Pg = 0.361 PSI/FT)
PANHANDLE FIELD Cumulative Production: 1.4 BBO, 8.1 TCF
SW NE
CANYON LIME CASE STUDY Hazard Zones Using 3D Attributes
Technical Discussion and Case Studies | 101
![Page 10: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/10.jpg)
Drilled 6 “new” wells using 3D attributes
No circulation losses occurred
100% within target zone, average lateral length of 6,000 feet
Average spud to TD = 37 days
Average drilling cost savings of $2 MM per well
CANYON LIME CASE STUDY Geosteering with 3D
Technical Discussion and Case Studies | 102
![Page 11: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/11.jpg)
Avg. (4) Hz wells planned without 3D seismic integration
Avg. (6) Horz. Wells Planned Using 3D Seismic Integration
Avg. (5) Vertical wells planned without 3D seismic integration
Bivins Ranch: Depth vs. Days
CANYON LIME CASE STUDY Reducing Drilling Time Using 3D Seismic
Average reduction of 23 days per well.
Technical Discussion and Case Studies | 103
![Page 12: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/12.jpg)
Generated Definitive Attributes
Identified drilling and completions hazards
Identified locations of enhanced system porosity and permeability
Correlated completions diagnostic data with predicted attributes
CANYON LIME CASE STUDY Stage Level Completions Using 3D Seismic
New approach has resulted in a better understanding of the hydrocarbon system.
Technical Discussion and Case Studies | 104
![Page 13: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/13.jpg)
CANYON LIME CASE STUDY Development Strategy and Testing the Hazard
600 Total Locations (100 probable locations within
Hazard Polygon)
Technical Discussion and Case Studies | 105
2014 Wells
2015 Wells
2016+ Wells
Wells in HZD
Pipelines
![Page 14: ACREAGE - Amazon Simple Storage ServiceArticle/... · ACREAGE Top-Tier Unconventional Liquids Reservoirs ... Wells Planned Using 3D Seismic Integration Avg. (5) Vertical wells planned](https://reader033.vdocuments.site/reader033/viewer/2022051601/5acfedf97f8b9ae2138d1c8e/html5/thumbnails/14.jpg)
CANYON LIME CASE STUDY Development Strategy and Testing the Hazard
Technical Discussion and Case Studies | 106
2014 Wells
2015 Wells
2016+ Wells
Wells in HZD
Pipelines
800 Total Locations (100 probable & 200 possible
locations within Hazard Polygon)