acquisition process model 1.0 perform air force acquisition · co st ap b ilyan life cycle...

509
Governing Enabling Core Acquisition Process Model 1.0 Perform Air Force Acquisition Oversight (Review and Approve) Develop Requirements and Preliminary Design Acquire (Develop and Operate) Program and Budget (PPBE) Technology Concept Technology Need Program Action Strategic Direction Strategic Direction POM/PBD Conduct “Program” Management Tasks Strategic Direction Click Here for the Defense Acquisition Framework View 22 May 17 Version 7.1 Click here to view the FAQ Definitized Agreement (Contract) Operational System Budget Reallocations Preliminary Design Note: Each input/output in the APM is hyperlinked to all other occurrences in the model. PEO View IMP Program Revisions Program Revisions ADM ADM Program Reporting Program Reporting Programmatic Data Programmatic Data Programmatic Data Programmatic Data Programmatic Data Acquisition Strategy Capability Document Capability Document AFLCMC Standard Processes Templates Enterprise Metrics

Upload: others

Post on 09-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.0 Perform Air Force Acquisition

Oversight (Review

and Approve)

Develop

Requirements and

Preliminary

Design

Acquire (Develop and

Operate)

Program and

Budget (PPBE)

Technology Concept

Technology Need

Program ActionStrategic

Direction

Strategic

Direction

POM/PBD

Conduct “Program”

Management Tasks

Strategic

Direction

Click Here for the Defense

Acquisition Framework View

22 May 17 Version 7.1

Click here to view

the FAQ

Definitized

Agreement

(Contract)

Operational

System

Budget

Reallocations

Preliminary

Design

Note: Each input/output in the APM is

hyperlinked to all other occurrences in

the model.

PEO View

IMP

Program

RevisionsProgram

Revisions

ADM

ADM

Program

Reporting

Program

Reporting

Programmatic

Data

Programmatic

Data

Programmatic

Data

Programmatic

Data

Programmatic

Data

Acquisition

Strategy

Capability Document

Capability Document

AFLCMC

Standard

ProcessesTemplates

Enterprise

Metrics

Page 2: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

MaterielSolutionAnalysis

Operations andSupport

Production and Deployment

Engineering and Manufacturing Development

TechnologyMaturation and Risk

Reduction

A CB

FRP

Decision

Review

Materiel

Development

Decision

Portfolio Reviews

Program Reviews

Technical Reviews AFRB

AFROC

Develop

Detailed Design

Development

Planning

ASP

Termination

Source Selection

Manage Risk

Conduct Process

Improvement

LCM PlanningAoAs

UON QRC New Start

Planning Programming Budgeting Execution

POM

Reprogramming

Program

AuthorizationCongressional

PBR Obligations &

Expenditures

Manufacturing

Readiness

CPD

Systems

Engineering

Developmental

Test

Operational

Test

Fielding

Manage Business

Activities

Manage

Resources

Manage Technical

Activities

Conduct Standard

Reporting

ID

Technology

Mature

TechnologyTransition

Technology

Conduct

Development

RFP Release

Review

ICDCDD

PHASE

BASED

PROCESSES

PPBE

PROCESSES

RECURRING

PROCESSES

RAPID

ACQUISITION

PROCESSES

LRIP

Full Rate

Production

System Mods

Retire/Dispose

Pre-MDDActivities

AFLCMC

Standard

Processes

Acquisition Process Model

PEO View

Note: Program Integration provides the AF with consistent

insightful and synchronized recommendations, improved

data reporting and analysis, and maximized utilization of

resources. The objective is to strengthen decision-making

across AF Acquisition leadership.

Return Home

Page 3: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Actual Template Locations in the APM

Air Force DAB

Readiness

Functional

Checklist

Example 1

Air Force

Configuration

Steering Board

Air Force New

Start

Congressional

Notification

Business Rules

DoD Reliability

Growth Curve

Air Force Review

Board MDD

Template

Air Force PEO/

BES Physical

Configuration

Audit Checklist

DoD Acquisition

Strategy Template

DoD Test and

Evaluation Master

Plan

Acquisition Process Model

Templates

Air Force DAB

Readiness

Functional

Checklist

Example 2

Air Force

Integrated

Baseline Review

Process Guide

Air Force Materiel

Command

Analysis of

Alternatives

Handbook

Air Force PEO/

BES Alternative

System Review

Checklist

Air Force PEO/

BES Critical

Design Review

Checklist

Air Force PEO/

BES Functional

Configuration

Audit Checklist

Air Force PEO/

BES Preliminary

Design Review

Checklist

Air Force PEO/

BES System

Functional Review

Checklist

Air Force PEO/

BES System

Requirements

Review Checklist

Air Force Review

Board Milestone B

Template

DD Form 250

Material

Inspection and

Receiving Report

Air Force Review

Board Milestone A

Template

DoD Integrated

Program

Management

Report

DoD Life Cycle

Sustainment Plan

Outline

DoD Memo on

Document

Streamlining –

Program

Protection Plan

DoD SD Form 106

DoD Issuances

Program

Coordination

Record

DoD SD Form 818

Comments Matrix

for DoD Issuances

DoD Systems

Engineering Plan

Outline

SAF/AQR

Program Office

Technical Review

Report

Air Force

Acquisition

Strategy Panel

Air Force DAB

Readiness

Functional

Checklist

Example 1

Air Force

Configuration

Steering Board

Air Force New

Start

Congressional

Notification

Business Rules

DoD Reliability

Growth Curve

Air Force Review

Board MDD

Template

Air Force PEO/

BES Physical

Configuration

Audit Checklist

DoD Acquisition

Strategy Template

DoD Test and

Evaluation Master

Plan

Air Force DAB

Readiness

Functional

Checklist

Example 2

Air Force

Integrated

Baseline Review

Process Guide

Air Force Materiel

Command

Analysis of

Alternatives

Handbook

Air Force PEO/

BES Alternative

System Review

Checklist

Air Force PEO/

BES Critical

Design Review

Checklist

Air Force PEO/

BES Functional

Configuration

Audit Checklist

Air Force PEO/

BES Preliminary

Design Review

Checklist

Air Force PEO/

BES System

Functional Review

Checklist

Air Force PEO/

BES System

Requirements

Review Checklist

Air Force Review

Board Milestone B

Template

DD Form 250

Material

Inspection and

Receiving Report

Air Force Review

Board Milestone A

Template

DoD Integrated

Program

Management

Report

DoD Life Cycle

Sustainment Plan

Outline

DoD Memo on

Document

Streamlining –

Program

Protection Plan

DoD SD Form 106

DoD Issuances

Program

Coordination

Record

DoD SD Form 818

Comments Matrix

for DoD Issuances

DoD Systems

Engineering Plan

Outline

SAF/AQR

Program Office

Technical Review

Report

DD Form 1222

Requests For and

Results of Tests

DD Form 1222

Requests For and

Results of Tests

Air Force

Transition

Support Plan

Air Force

Transition

Support Plan

Air Force Review

Board Milestone C

Template

Air Force Review

Board Milestone C

Template

MP 5301.9001(f)

Business

Clearance

Approval

MP 5301.9001(f)

Business

Clearance

Approval

Return Home

Air Force Life

Cycle Mission

Data Plan

Air Force Life

Cycle Mission

Data Plan

AoA Final Report

AoA Study Plan

AoA Final Report

AoA Study Plan

Air Force Review

Board

Development RFP

Template

Air Force Review

Board

Development RFP

Template

Air Force MS C

Report

Air Force 2366b

Report

Air Force

Acquisition

Strategy Panel

Air Force Dev RFP

ADM

Air Force MDD

ADM

Air Force MS A

ADM

Air Force MS B

ADM

Air Force MS C

ADM

Air Force MS B

Report

Air Force MS A

Report

Air Force 2366a

Report

Air Force MS C

Report

Air Force MS B

Report

Air Force MS A

Report

Air Force MS C

ADM

Air Force MS A

ADM

Air Force MS B

ADM

Air Force MDD

ADM

Air Force DEV

RFP ADM

Air Force 2366a

Report

Air Force 2366b

Report

Page 4: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Product Support Business Case

Analysis

Pre-Milestone A Product Support

(Multiple Locations)

LDTO Designation

Program Sufficiency Review

Logistics Health Assessment

Development PlanningContract Award Sole Source

Contract Award (Multiple

Locations)Configuration Control

Develop Program

ScheduleEngineering Data Management

Engineering Technical

Assistance RequestsILCM Policy Review

Financial Funds Flow and Funds

Control

Intelligence Supportability

Analysis

Intelligence Sensitivity

Determination

OT&E Readiness Certification

Program Transition

Unit Self-Assessment Program

Risk and Issue Management

Should Cost InitiativesDevelop and Manage Standard

Processes

CAM Weapon System

Sustainment Requirements

Acquisition Process Model

AFLCMC Standard Processes

Annual Program Office Cost

EstimateAcq Strategy-RFP (Multiple

Locations)

PEO View

Supportability Assessment for

Organic Requirements

Reprogramming Requests

(Process Guide)

Spring Program Review

(Process Guide)

Return Home

Packaging Handling Storage and

Transportation

Cost Capability Analysis

Life Cycle Sustainment Plan

Page 5: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

Enterprise Metrics – ACAT I Programs

MaterielSolutionAnalysis

Operations andSupport

Production and Deployment

Engineering and Manufacturing Development

Technology Maturation and Risk Reduction

A CB

Materiel Development

Decision

Note: The metrics listed above are based on FY16 Q3 Air

Force Acquisition Quarterly Performance Assessment

(Issued August 2016)

Initial

Operational

Capability

(IOC)

Full-Rate

Production

(FRP)

Decision

Full

Operational

Capability

(FOC)

MSB to MSC Average Estimate 79

months

MSB to IOC Average Estimate 92 months

MSB to FRP Average Estimate 120 months

MSC to IOC Average Estimate 26

months

MSC to FRP Average

Estimate 33 months

Return Home

Page 6: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

Defense Acquisition Management System Models

Return Home

MODEL 1

HARDWARE INTENSIVE PROGRAM

MODEL 2

DEFENSE UNIQUE SOFTWARE

INTENSIVE PROGRAM

MODEL 3

INCREMENTALLY FIELDED SOFTWARE

INTENSIVE PROGRAM

MODEL 4

ACCELERATED ACQUISITION

PROGRAM

MODEL 5

HYBRID - HARDWARE DOMINANT

PROGRAM

MODEL 6

HYBRID - SOFTWARE DOMINANT

PROGRAM

Page 7: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Engineering and Manufacturing Development

Acquisition Process Model

Defense Acquisition System Model 1: Hardware Intensive Program

Go Up 1 Level

A CB

Initial

Operational

Capability

(IOC)

MaterielSolutionAnalysis

Operations andSupport

Production and Deployment

TechnologyMaturation & Risk

Reduction

Full-Rate

Production

(FRP)

Decision

Sustainment

Materiel

Development

Decision

Materiel

Development

Decision

Legend

Decision

Milestone Review

Disposal

Capability

Development

Document (CDD)

Validation

Development

Request for

Proposals (RFP)

Release DecisionFull

Operational

Capability

(FOC)

Low Rate Initial

Production (LRIP) OT&E

Page 8: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

MaterielSolutionAnalysis

Operations andSupport

DeploymentEngineering and Manufacturing Development

TechnologyMaturation & Risk

Reduction

A CB

IOCFull Deployment

(FD)

Materiel

Development

Decision

Materiel

Development

Decision

Build 0.1

Build 1.1

Build 1.3Build 1.4

Build 1.5

Build 1.2

Build 2.1

Limited

Deployment

Builds

CDD

Validation

Development

RFP Release

Decision

Full-Rate

Deployment

Decision

(FDD)

Integration

Acquisition Process Model

Defense Acquisition System Model 2: Software Intensive Program

Legend

Decision

Milestone Review

Go Up 1 Level

Sustainment DisposalOT&ERisk Reduction

Page 9: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

MaterielSolutionAnalysis

Operations andSupport

Production and Deployment

Development and FieldingRisk Reduction

A B

IOC

Full

Deployment

(FD)

Materiel

Development

Decision

Materiel

Development

Decision

CDD

Validation

Development

RFP Release

Decision

Full

Deployment

Decision

(FDD)

Operations andSupport

Production and Deployment

Development and Fielding

B

Development

RFP Release

Decision IOC FDFDD

Operations andSupport

Production and Deployment

Development and Fielding

B

FDD

Limited

Deployment

Decisions

Limited

Deployment

Decisions

Limited

Deployment

Decisions

IOC FD

Development RFP

Release Decision

Acquisition Process Model

Defense Acquisition System Model 3: Incrementally Fielded Software Program

Legend

Decision

Milestone Review

Go Up 1 Level

Sustainment

Disposal

OT&ERisk Reduction Build

Build 1

Build 2

Build 0 Build n

Build 2.1

Build 2.2Build 2.n

Build n.1

Build n.2Build n.n

Risk Reduction

Increment 2

Risk Reduction

Increment N

SustainmentOT&E

SustainmentOT&E

Service Development and

Delivery Process (SDDP)

Defense Business System

(DBS)

Page 10: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Materiel Solution Analysis

Concurrent ProductionAnd Deployment

Concurrent Technology Maturation, Risk Reduction, and Development

A/B C

IOC FOC

Preliminary

Design

Review

Preliminary

Design

Review

Sustainment

Operations andSupport

Disposal

Materiel

Development

Decision

Materiel

Development

Decision

Acquisition Process Model

Defense Acquisition System Model 4: Accelerated Acquisition Program

Legend

Decision

Milestone Review

Go Up 1 Level

OT&E

Page 11: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

MaterielSolutionAnalysis

Operations andSupport

Production and Deployment

Engineering and Manufacturing Development

TechnologyMaturation & Risk

Reduction

A CB

IOC FOC

Acquisition Process Model

Hybrid Acquisition Programs (Hardware Dominant) View

Materiel

Development

Decision

Materiel

Development

Decision

Build 0.1

Build 1.1

Build 1.3Build 1.4

Build 1.5

Build 1.2

Build 2.1

Build 3.1Build 3.2

LRIP

Builds

CDD

Validation

Development

RFP Release

Decision FRP

Integration

Legend

Decision

Milestone Review

Go Up 1 Level

Sustainment DisposalOT&ELRIPRisk Reduction

Page 12: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

MaterielSolutionAnalysis

Operations andSupport

Production and Deployment

Engineering and Manufacturing Development

TechnologyMaturation & Risk

Reduction

A CB

IOC

FD

Acquisition Process Model

Hybrid Acquisition Programs (Software Dominant) View

Materiel

Development

Decision

Materiel

Development

Decision

Build 1.0.1

Build 1.1.1

Build 1.1.3

Build 1.1.2

Build 1. 2

Build 1.3.1Build 1.3.2

Limited

Deployment (LD)

Builds

FDD

Integration

Operations andSupport

Production and Deployment

Engineering and Manufacturing Development

Build 2.1.1Build 2.1.2

Build 2.3.1Build 2.3.2

Builds

IntegrationBuild 2.1.3

B

Development

RFP Release

Decision

C

Legend

Decision

Milestone Review

Go Up 1 Level

SustainmentOT&E

CDD

Validation

Development

RFP Release

Decision

Build 2.2

IOC

FDFDD

Risk Reduction

Limited

Deployment (LD) SustainmentOT&ERisk Reduction

TechnologyMaturation & Risk

Reduction

Increment 2

Page 13: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1 Oversight (Review and Approve)

Go Up 1 Level

Execute

Acquisition

Management

Integration

Click Here for the Program

Reviews Integrated Flow

1.1.2 Portfolio Reviews

1.1.3 Lifecycle

Reviews & Decisions

1.1.1 Program Reviews

1.1.4 Technical

Reviews

Standard Review Process

FWD

Acquisition

Policy

Request for

Information

Note 1 from the Chief Process Officer: The Under Secretary of Defense for AT&L has

provided four key enduring acquisition principles. The first of these principles is “Think”. Program

managers should tailor the program according to the specific needs of that program. The rote

checking the blocks in a checklist or simply following each and every step of a process is the

antithesis of Mr Kendall's challenge to Program Managers. Use this Model as a model. If your

program's situation warrants a waiver from the checklist or process, seek that waiver from your

milestone decision authority. CTRL-Click here to access an active link to Mr. Kendall’s thoughts.

Integrated Plan

& RoadmapProgrammatic

Data

Note 2: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Page 14: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1 Oversight (Review and Approve) – Standard Review Process

Go Up 1 Level

Determine the

Type of Oversight

Action Identify

Prerequisites for

Oversight ActionPrepare for

Oversight

Action

Conduct

Oversight

Action

Document and

Monitor Oversight

Action

Type of

Oversight Action

Oversight

Action

Checklist

Program Action

Needed

Information

Note: The above process is the standard process used for the various reviews. The specific program, portfolio, lifecycle, and technical reviews vary based on specific inputs, specific outputs, and the process

owners/performers.

Program

Status

Program

Reporting

Programmatic

Data

Page 15: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.1 Program Reviews

Go Up 1 Level

FWD

PEO View

Go

ve

rnin

gE

na

blin

gAcquisition Process Model

1.1.1 Program Reviews

Go Up 1 Level

FWD

PEO View

Specific Program

1.1.1.7 Manage Will

Cost/Should Cost

1.1.1.1 Investment

Budget Review (IBR) /

Spring Program Review

(SPR)

1.1.1.2 Configuration

Steering Board (CSB)

1.1.1.8 Post-IOC

Sustainment Review

Non-Specific Program

1.1.1.3 Integrated

Lifecycle Management

Executive Forum (ILCM

EF)

1.1.1.5 Performance

Assessment & Root

Cause Analysis

(PARCA)

1.1.1.9 Independent

Review

Page 16: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.1.1 Investment Budget Review / Spring Program Review

Go Up 1 Level

Identify

Prerequisites for

IBR / SPR

Prepare for IBR /

SPR

Conduct IBR /

SPR

Document and

Monitor IBR / SPR

Action

Program Action

Conduct Spring

Program ReviewReview

Results

FWD

Program

Review

Action

ChecklistNeeded

Information

Program

Status

Program

Reporting

Programmatic

Data

Programmatic

Data

Page 17: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.1.1.5 Conduct Spring Program Review

Go Up 1 Level

Prepare for

Spring Program

Reviews

(SPR)

Review

Programs at

Centers

Meeting

Logistics

Conduct

Post-Review

Activities

Action

Item

Status

Trigger:

November

Town

Hall

Brief

Review

Results

SPR Action

Items

Page 18: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.1.1.5.1 Prepare for Spring Program Reviews (SPR)

Go Up 1 Level

Notify

PEO

Identify

Programs

Contact

PEOs/

Directories

Communicate

Information

Provide

Templates, Official

Program List, and

Agenda

Coordinate

Meet-me

Numbers

FWD

Note: This process is based on the

AFLCMC Process Guide for Spring

Program Reviews.

Upload

SPR

Briefings

Initial

Schedule

Call

Letter

Program

List for

Review

Meeting

Logistics

Briefing

Requirements

SPR

Briefings

Agenda

SPR

Information

AFLCMC

Standard

Processes

Trigger:

November

Page 19: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.1.1.5.2 Review Programs at Centers

Go Up 1 Level

Awareness

of Town Hall

Brief Topics

Deliver

Town Hall

BriefingProvide

Requested

DataDetermine

Budget &

Execution

Decisions

Develop

Review

Summary

Response

to Data

Request

Budget

Decisions

Consolidated

ActionsExecution

Decisions

Town

Hall

Brief

BACK FWD

Page 20: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.1.1.5.2.1 Deliver Town Hall Brief

Go Up 1 Level

Draft

Town Hall

Brief

Develop

Draft Town

Hall Brief Review

Draft Town

Hall

Briefing

Approve

Town Hall

Briefing

Provide

Info Copy

to SAF/

FMBI

Proposed

Town Hall

Brief

SAF/FMBI

Info Copy of

Town Hall

Brief

Call

Letter

Topics/

Suggestions

Town

Hall

Brief

Town

Hall

Brief

Page 21: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.1.1.5.3 Conduct Post-Review Activities

Go Up 1 Level

Execute

Pulls/ Adds Review

Programs at

Centers

Adjusted

Obligations

Issue Program

Authorization

(PA)Document

Paybacks

List of

Bills for

Top Down

Brief

Completed

Reviews

Consolidated

Actions

Consolidated

Actions

BACK

Program

Authorization

Page 22: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.1.2 Configuration Steering Board (CSB)

Identify Prerequisites

for CSB (Configuration

Steering Board)

Review

Prepare for CSB

Review

Conduct CSB

Review

Document and

Monitor CSB

Action

Go Up 1 Level

BACK FWD

Program Action

Conduct CSB

Oversight

Secretariat

Activity

CSB Results

Program

Status

Program

Reporting

Program

Reporting

Revised CSB

Charts

Draft

CSB Charts

Programmatic

Data

Programmatic

Data

NOTE 1: Mr. Kendall Issued a

memo on 9 Nov 13 providing

additional guidance regarding

CSB activity. Please CTRL-

Click to access an active link

to the memorandum.

Conduct

Quarterly

Leadership

Forums

Leadership Program DirectionRecent and Pending

Near-Term Decision

NOTE 2: Ms. Costello Issued

a memo on 18 Mar 16

providing additional guidance

regarding CSB activity.

Please CTRL-Click to access

an active link to the

memorandum.

Page 23: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.1.2.5 Conduct CSB Oversight Secretariat Activity

Go Up 1 Level

Request CSB

Meeting

Meeting

Date

Send CSB

Meeting

Invitations

Submit and

Distribute CSB

Charts

Meeting

Invite

Consolidate

Input and

Provide BBP

Chair the CSB

Meeting

Bullet Background Paper

Staff Minutes Minutes from

the CSB

Program

Reporting

CSB Results

Revised CSB Charts

Draft

CSB ChartsProgrammatic

Data

AFLCMC

Standard

Processes

Page 24: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.1.3 Integrated Lifecycle Management Executive Forum

Identify

Prerequisites for

ILCM EF

(Integrated

Lifecycle

Management

Executive Forum)

Review

Prepare for

ILCM EF Review

Conduct ILCM

EF Review

Document and

Monitor ILCM EF

Action

Go Up 1 Level

BACK FWD

Program Action

Serve as

ILCM EF

Secretariat

ILCM EF

Inputs

ILCM EF

Results

ILCM EF

Action

Items

Program

Review

Action

Checklist Needed

Information

Program

Status

Program

Reporting

Programmatic

Data

Page 25: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.1.5 Performance Assessment & Root Cause Analysis (PARCA)

Conduct

Performance

Assessment Conduct Root

Cause Analysis

for MDAPsIssue PARCA

GuidancePARCA

Guidance

Root

Cause(s)

Note: This includes reviews conducted after Nunn-McCurdy breaches. BACK FWD

Performance

Assessment

Programmatic

Data

Page 26: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.1.7 Manage Will Cost/Should Cost

Go Up 1 Level

Conduct SAE

Program

ReviewShould-Cost

Execution

Status

Develop

Should-Cost

Estimate or

Waiver

Request

Should-Cost

Execution

Status

Consolidate

of Savings &

Review of

Requests for

Release

Funds

Determination

Consolidated Savings &

Requests for Release

Conduct SAE

Fund

Request

Review

(pilots)

Conduct

Review of

Requests

Requests for

Funds Release

Determine

Use for

Consolidated

Savings

Conduct

Efficiency

Tracking

Process

Achieve

Should-Cost

Initiatives

Submit Out

of Cycle

Request for

Fund

Release

Should-Cost

FY Estimate

Requests for

Funds Release

Approved

Should-Cost

InitiativesTracked/

Achieved

/Validated

Efficiency

Tracked

Efficiencies

Issue

Program

Authority

Issue Budget

Authority

Consolidated

Saving

Recommendations

Fund Release

Approval

Issued Program

Authority

Update Will-

Cost &

Should-Cost

Estimates

Revised POM

Position

BACK

Program

Execution

Information

Will Cost

Estimate

Will Cost

Estimate

Note: CTRL-Click here to access an active link to the 22 April 11 OSD Memorandum on Implementation of Will

Cost and Should Cost.

FWD

Program

Authorization

Budget

Authorization

Page 27: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.1.8 Post-IOC Sustainment Review

Go

ve

rnin

gE

na

blin

gC

ore

Identify

Required

Documentation

Prepare for

Post-IOC

Sustainment

Review

Conduct Post-

IOC

Sustainment

Review

Review

Recommendations

Post-IOC

Sustainment

Briefing Package

Compiled

Data for

Post-IOC

Sustainment

Review

Go Up 1 Level

BACK

Program

Status

Life Cycle

Cost Estimate

LCSP

Programmatic

Data

FWD

Page 28: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.1.9 Independent Reviews

Go

ve

rnin

gE

na

blin

gC

ore

Identify

Programs/

Activities for

Review

Prepare for

Independent

Reviews

Conduct

Independent

Reviews

Review

Recommendations

Independent Review

Briefing Package

List of

Programs /

Activities

For Review

Go Up 1 Level

BACK

Program

Status

Programmatic

Data

Page 29: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.2 Portfolio Reviews

1.1.2.2 Budget

Execution

Review

1.1.2.1 PEO / SAE

1.1.2.3 ASR

Go Up 1 Level

BACK FWD

Perform

Portfolio

Analysis

Conduct SAF/AQ

Portfolio

Management

AQ Spend

Plan Request

ADM

Funding

Profile

1.1.2.5 Capability

Portfolio Review

SOW

MAJCOM

Requirements ABIDES Data ADM Compliance

Assessment

Finalized

Budget PBR Analysis

PBR ResultsPOM Analysis

POM Results

RMD

PEO View

Definitized

Agreement

Page 30: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.2.1 PEO Reviews

Identify

Prerequisites for

PEO SAE Review

Prepare for PEO

SAE Review Conduct PEO

SAE ReviewDocument &

Monitor PEO SAE

Review Action

Final

Read Ahead

Package

Go Up 1 Level

FWD

E-Mail

to POCsFormal Position/

Closed Action

Item(s)

Meeting

Logistics

Program

List

SAE Program

Information

Request

Action Items

Program

Reporting

Programmatic

Data

Page 31: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.2.1.1 PEO Review – Identify Prerequisites for PEO SAE Reviews

Communicate

the Need for

Review

Modify List

of ProgramsList of

Programs

Go Up 1 Level

Notification

of

Review

Coordinate

Meeting

Logistics

(VTC Only)

Invitee

List

FWD

Meeting

Logistics

Program

ListSAE Program

Information

Request

Program

Reporting

Programmatic

Data

Page 32: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.2.1.2 PEO Review – Prepare for PEO SAE Review

Go Up 1 Level

Notify the

Appropriate

Program PersonnelNotification

of Review

Develop

Final

BriefingPre-Brief with

SAE & Deputy

Final

Briefing Final

Read Ahead

Package

Notify POCs

of Availability

of Final

Briefing

Prepare

Read-

Aheads &

Upload to

SMART

Read

AheadsFinal

Briefing

BACK

E-Mail

to POCs

Program

List

FWD

Page 33: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.2.1.2.2 Develop Final Briefing

Develop Draft

Briefing

Provide

Pre-Brief

Draft

Briefing

Updated

Content in

SMART

Notification

Of Review

Go Up 1 Level

Conduct

Dry-Run with

PEO

Final

Briefing

Source: Oversight Command and Control Focus Area

June 2006

Ms. Janet Hassan, Team Lead

Recommended

Changes

Page 34: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.2.1.4 PEO Review – Document & Monitor PEO-SAE Review Action

Develop &

Track

Action Item

List Respond

Directly to

Action Items

& Taskers

Action

Item

List

OPR

Response

Go Up 1 Level

Coordinate

Responses

to Review

POC

Formal Position/

Closed Action

Item(s)

Action Items

BACK

Page 35: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.2.2 Budget Execution Review

Identify

Prerequisites for

Budget Execution

ReviewPrepare for

Budget

Execution

Review

Conduct

Budget

Execution

ReviewDocument and

Monitor Budget

Execution Review

Action

Budget

Execution

Review

Action

Checklist

Go Up 1 Level

BACK FWD

Program Action

Needed

Information

Program

Status

Program

Reporting

Programmatic

Data

Page 36: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.2.3 Acquisition Sustainment Review

Identify

Prerequisites for

ASR

Prepare for ASR Conduct ASR

Document and

Monitor ASR

Action

Portfolio

Review

Action

Checklist

Go Up 1 Level

FWDBACK

Program Action

Needed

Information

Program

Status

Program

Reporting

Programmatic

Data

Page 37: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.2.5 Capability Portfolio Review

Prepare

Capability

Portfolio

Assessment

Prioritize

Operational

Capability

Requirements

Capability

Portfolio

Assessment

Prioritized

Operational

Capability

Requirements

Go Up 1 Level

BACK

Capability

Investment

Information

FWD

Page 38: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.2.6 Conduct SAF/AQ Portfolio Management

Go Up 1 Level

Administer Budget

Process

Conduct SAF/AQ

Source Selections

AQ Spend

Plan Request

Definitized

AgreementSOW

MAJCOM

Requirements

Finalized

Budget

BACK FWD

Page 39: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.2.6.1 Administer Budget Process

Go Up 1 Level

Gather

RequirementsAnalyze

Requirements

Trigger: Request

AQ Spend Plan

Consolidated

Requirements

Coordinate

Requirements

for Review/

Negotiation

Accepted/

Validated

Requirements

Distribute

Finalized

Requirements

Approved

Requirements

Package

Conduct/

Evaluate

Quarterly

Review

Approved

Requirements

Package

Requirements

Package

AssessmentPerform Initial

DistributionClose Out

SAF/AQ

Budget

Initial

Distribution

AQ Spend

Plan Request

MAJCOM

Requirements

Finalized

Budget

FWD

Page 40: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reAcquisition Process Model

1.1.2.6.2 Conduct SAF/AQ Source Selections

Go Up 1 Level

Go

ve

rnin

gE

na

blin

g

Issue RFP

Conduct

Source

Selection

Award

Contract

USAF SDO

Determination

Contracting

Source

RFP

Evaluation

Results

Trigger: PM

Submits SOW

Ascertain SDO

Determination

Determine Best

Source for

Contract (GSA /

NDOD)

Candidate

Sources

Definitized

Agreement

SOW

BACK

Page 41: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.2.7 Perform Portfolio Analysis

Go Up 1 Level

Analyze

Portfolio for

ADM

Compliance

Perform

Post-POM

Analysis

POM

COA

Briefing

to AQ/AQX

Perform

Post-PBR

Analysis

Identify

RMD

Impacts

RMD

Summary

Identified

Programmatic

Impacts

POM

COA

Briefing

to USD AT&LPBR

COA

Briefing

to AQ/AQX

PBR

COA

Briefing

to USD AT&L

BACK

ADM Compliance

Assessment

PBR Results

PBR Results

PBR Results

ADM

Funding

Profile

Page 42: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.1.3 Lifecycle Reviews

Go Up 1 Level

1.1.3.13

Terminate Acquisition

Effort

1.1.3.9

MS A

AFRB

1.1.3.3

ASP 1.1.3.10

MS B

AFRB

1.1.3.12

FRP

AFRB

A

1.1.3.4

C

1.1.3.6

B

1.1.3.5

1.1.3.8 FRP

Decision

Review

1.1.3.11

MS C

AFRB

1.1.3.2

AFROC

1.1.3.1

DAB

BACK FWD

1.1.3.14

Dev. RFP

Release

MaterielSolutionAnalysis

Operations andSupport

Production and Deployment

Engineering and Manufacturing Development

Technology Maturation and Risk Reduction

1.1.3.7 MDD

1.1.3.3

ASP

1.1.3.1

DAB

1.1.3.3

ASP

1.1.3.1

DAB

1.1.3.3

ASP

1.1.3.1

DAB

Note from the Chief Process Officer:

The Dev RFP Release ASP is combined

with an AFRB. (AFI 63-101/20-101,

Section 4.8.1)

1.1.3.2

AFROC

1.1.3.2

AFROC

1.1.3.16

DBC

1.1.3.16

DBC

1.1.3.16

DBC1.1.3.16

DBC

1.1.3.17

Dev.

RFP

AFRB

Page 43: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.3.1 Defense Acquisition Board (DAB)

Go

ve

rnin

gE

na

blin

gC

ore

Conduct

Formal DAB

Prepare for

DAB

Determine

Next

Steps

Go Up 1 Level

Decision to

Proceed

DRM Results

DRM Results

OIPT ReportProgram

Concerns

Candidate

SolutionsShould Cost

Targets & Progress

ADM

Programmatic

Data

Page 44: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.3.1.1 Defense Acquisition Board (DAB): Prepare for DAB

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Conduct DAB

Planning

Meeting (DPM)

Conduct OIPT

Conduct DAB

Readiness

Meeting (DRM)

New Information

Requirements

Potential

Issues

Outstanding

Issues

FWD

DRM Results OIPT ReportProgram

Concerns

Candidate

Solutions

Readiness

Checklist

Approve

OIPT

Review

OIPT

Approval

Intent to

Conduct OIPT

Should Cost

Targets & ProgressProgrammatic

Data

Programmatic

Data

Note: As stated in Section 5.a.4.g of DoDI 5000.02, DAB review preparation will be streamlined and efficient. Staff members will be provided with the data needed to support the review in accordance with scheduled submission

dates established throughout this instruction. They will work to minimize the overhead burden placed on the DoD Components, PEOs, program managers, and their staffs. Staff reviews will focus on the substance of the program’s

content: affordability, requirements reasonableness, technical risk reduction, contracting strategy, schedule realism, testing provisions, funding adequacy, and future decision criteria. Reviewers will inform the DAB chairperson and

MDA, the OIPT leader, and the Military Service concerned of potential DAB issues. The MDA will prioritize key cost, schedule and performance issues to be addressed at the DAB. The Military Service concerned will address administrative or advisory comments. Similar procedures will be used for DoD Component-level reviews.

Page 45: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.3.1.1.3 Review at Senior Level

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Develop Final

Decision

Package

Schedule

AFPEO Review

Conduct

AFPEO

Review

Draft Final

Decision Package

Meeting

Date

FIG Approved

Decision Package

AFPEO Review

Issues/Recommendations

Note: The above process is also performed in preparation for the Milestone A AFRB, the Milestone B

AFRB, the Milestone C AFRB, and the Full Rate Production AFRB. The only difference in these

processes are the specific inputs and outputs at the various decision points.

Approved Final

Decision Package

OIPT Report

Readiness

Checklist

Page 46: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.3.1.3 Defense Acquisition Board (DAB): Conduct Formal DAB

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore Present OIPT

ResultsDAB Read Ahead Open DAB

Issues

Identify &

Resolve DAB

Level

Issues

Resolved DAB

Issues

Coordinate

DAB InputsConcerns on

DAB Issues

Required

Documentation

Open Action

Items

Exit Criteria

Checklist

Ceritifed

Exit Criteria

Issue ADM

BACK

Decision to

Proceed

OIPT Report

Should Cost

Targets & Progress

ADM

Page 47: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.2 Perform AFROC (Capability Documents)

Go Up 1 Level

Conduct

Requirements

Strategy

Review

Conduct

Strategy

Development

and HPT

Preparation

Resolve

Comments

Conduct

Validation

and

Approval

Obtain

Internal

Approval/

Endorsement

Capability

Document

For Approval

JROC

Approved

Capability

Document

Scenario: Develop ICD Scenario: Develop CPDScenario: Develop CDD

Initiate

JCIDS

Staffing

Inputs Vary Based

on the Capability

Documents

Perform

Gatekeeper

Activities

Conduct

JROC/JCB

Tripwire

Process

Revised

Capability

Document

Certification /

Endorsement

Memo

Certification /

Endorsement

Memo

JCIDS

Documents

JCIDS

Process

Metrics

Request

for RSR

PEO View

Note: The following KPPs are mandatory in

requirements documents per JCIDS Manual:

Force Protection KPP, System Survivability KPP,

Sustainment KPP, Net-Ready KPP, Training KPP

and Energy KPP.

The following KSAs are mandatory in AF

requirements documents: the Flight Simulator

KSA

Approved

Requirements

Strategy

Sponsor

Engagement

Note: All processes feed the Gatekeeper Activities

process

Prepare

Document by

High

Performance

Team

Conduct Initial

Document

Review

Capability Document

Draft Capability Document

Capability Document

Draft Capability Document

Page 48: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.2.1 Conduct Requirements Strategy Review (RSR)

Request

Requirements

Strategy

Review

Review/

Coordinate for

Requirements

Strategy Review

Submit RSR

Request

Package

Document

A5R Approval

RSR

Package

RSR

Logistics

Approved RSR

RSR

Briefing

RSR Approval

Memo

Schedule

Requirements

Strategy

Review

Approved RSR

Package

Archive

Artifacts to

IRSS

Updated

IRSS

Requirements

Documentation

Request

for RSR

FWD

Page 49: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.2.7 Conduct Deliberate Staffing Process

Go Up 1 Level

Identify Lead

Functional

Capability

Board

Conduct

Functional

Capability

Board Initial

Staffing

Approve

JCIDS

Document

Provide Validation

Recommendation

FCB Assessment

of JCIDS

DocumentLead

FCB

JROC

Approved

JCIDS

Document

Obtain FCB

Validation

Conduct

Joint

Capability

Board

FCB Validated

JCIDS

Document

JCB

Recommendation

Validation on

JCIDS

Document

Note: Inputs Vary

Based on the

Capability

Documents

FWD

FCB Validation

Recommendation

JCIDS

Documents Comments on

JCIDS

Document

Adjudicate

Comments

Sponsor

Adjudicated

Comments on

JCIDS

Document

BACK

Note: Staffing Process outlined in AFI 10-601

Chapter 5 is consistent with JCIDS Manual

Enclosure F CTRL-Click to access a link to AFI 10-

601

Page 50: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.2.8 Perform Gatekeeper Activities

Conduct Initial Review of

Incoming Documents

Reviewed

JCIDS

Documents

Rejection

Notice

Identify Lead FCB and

Supporting FCBs

Lead

FCB

Supporting

FCB

Assign Joint Staffing

DesignatorJoint Staffing

Designator

Identify Joint Staff

EndorsementsJoint Staff

Endorsements

Assign POC to Oversee

the DocumentDocument

POC

Initiate Staffing of the

DocumentStaffing

Notifications

Manage Gatekeeping and

Staffing Metrics

JCIDS

Documents

JCIDS

Metrics

Go Up 1 Level

Note: Inputs Vary

Based on the

Capability

Documents

BACK FWD

Page 51: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.2.9 Conduct JROC/JCB Tripwire Process

Initiate

Tripwire

Review

Assess the

Need to

Adjust KPPs

Revalidate

JCIDS

Document

JCIDS

Document

Sponsor

Notification

Approved

JCIDS

Document

Address

Waiver

Request

Approved

Waiver

BACK

JCIDS

Documents

Tripwire

Waiver

Revise the

JCIDS

Document

Denied

Waiver Revised

JCIDS

Document

Go Up 1 Level

Note: Inputs Vary

Based on the

Capability

Documents

Programmatic

Data

Page 52: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.3 Acquisition Strategy Panel (ASP)

Develop

Acquisition

Strategy

Prepare for

ASP

Conduct ASP

Document &

Monitor ASP

Action Items

SAE Request

ASP

Requirements

Conduct ASP

Oversight

Secretariat

ActivityProgram Direction

Requirements Docs

Informal Docs

Funding Source

SEP

BACK FWD

EMA

PEO View

Action ItemsClosed Action Items

Programmatic

Data

Programmatic

Data

Programmatic

DataDraft Acq Strategy

Refined

Acq Strategy

Approved Acq Strategy

Approved Acq

Strategy

SAE/PEO Approved

Acq Strategy

TEMP

Page 53: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.3 Acquisition Strategy Panel (ASP) – Center Level

Conduct Initial

Acquisition

Strategy

Meeting /

Early Strategy

& Issue

Session

Prepare for

ASP

Conduct ASP

Document &

Monitor ASP

Action Items

SAE Request

Initial

Market

Analysis

BACK FWD

Initial

Requirements

Approve

Acquisition

Strategy

ASP

Minutes

Funding

Program

Highlights

Action Items

Closed Action Items

Develop Acquisition

Strategy

Draft Acq

StrategyRefined Acq

Strategy

Accepted Acq

Strategy

Approved

Acq

Strategy

Page 54: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.3.2 Prepare for ASP

Conduct Pre-

ASP MIRT

Review

FWD

Conduct OSD

Peer Review

Conduct Pre-

ASP Meeting *MIRT

FindingsPeer Review

Findings

Note: The purpose of the

Pre-ASP is to target one

level below the ASP Chair.

This may occur at multiple

levels and also may occur

prior to the OSD Peer

Review

Note: This is an AFMC

Standard Process. It is

included in this model in

advance of Streamlining and

Redesign

Refined

Acq Strategy

Refined

Acq Strategy

Refined

Acq StrategyRefined

Acq Strategy

Page 55: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.3.3 Conduct ASP

BACK FWD

Conduct Other

Contracting Acquisition

ASP *

Conduct Below and/or

Delegated AFPEO/DAO/

ALC Commander ASP

Conduct AFPEO/DAO

ASP

Conduct

SAE ASP

Delegate

ASP

Authority

Request for

ASP

Delegation

Approved

ASP

Delegation

Conduct AFPEO/DAO

Services Acquisitions

ASP *

* Note: The model does

not currently address

Services processes.

Note: This is an AFMC

Standard Process. It is

included in this model in

advance of Streamlining and

Redesign

Action ItemsRefined

Acq Strategy

Accepted

Acq Strategy

Page 56: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.3.4 Document & Monitor ASP Action Items

Document ASP

Meeting

Develop Inputs

to Other ASP

Related

DocumentsLife Cycle Management

Plan Input

Acquisition Strategy

Report Input

Note: This is an AFMC

Standard Process. It is

included in this model in

advance of Streamlining and

Redesign

ASP

Minutes

BACK FWD

Action Items Closed Action Items

Page 57: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.3.5 Conduct ASP Oversight Secretariat Activity

Go Up 1 Level

Request ASP

Meeting

Meeting

Date

Send ASP

Meeting

Invitations

Submit and

Distribute ASP

Charts

Meeting

Invite

Consolidate

Input and

Provide BBP

Chair the ASP

Meeting

Bullet Background Paper

Staff Minutes Minutes from

the ASP

Funding Source

Informal Docs

Program Direction

Requirements Docs

EMA

Draft Acq

Strategy

SAE/PEO

Approved

Acq Strategy

Revised Acq Strategy

Page 58: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.4 Milestone A Review

Go Up 1 Level

Identify

Prerequisites for

MS A Approval

Prepare for MS

A Review

Conduct MS A

Review

MS A

Checklist

MS A

Documentation

Conduct

Section 2366a

Certification

MS A

Documentation

BACK FWD

Review

Acquisition

Strategy for RFP

Release

MDA

Requirements

Section 2366a

Written Determination

PEO View

Affordability

Goals

DoDI 5000.02

Information

Requirements Milestone A

ADM

Programmatic

Data

Acquisition

Strategy

Approved Acq

Strategy

Note 1: The MDA is strongly

encouraged to tailor the

reporting requirements

consistent with Enclosure 1,

Table 2 of the DoDI 5000.02

Note 2: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Request to

Tailor/Waive

Information

Requirements

Milestone A

Report

Page 59: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.5 Milestone B Review

Go Up 1 Level

Identify

Prerequisites for

MS B Approval

Prepare for MS

B Review

Conduct MS B

Review

MS B

Checklist

MS B

Documentation

Conduct

Section 2366b

Certification

MS B

Documentation

BACK FWD

MDA

Requirements

Section 2366b

Certification

and Determination

PEO View

Affordability

Caps

DoDI 5000.02

Information

Requirements Milestone B

ADM

Programmatic

Data

Note 1: The MDA is strongly

encouraged to tailor the

reporting requirements

consistent with Enclosure 1,

Table 2 of the DoDI 5000.02

Note 2: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Request to

Tailor/Waive

Information

Requirements

Milestone B

Report

Page 60: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.6 Milestone C Review

Go Up 1 Level

Identify

Prerequisites for

MS C Approval

Prepare for MS

C Review

Conduct MS C

Review

MS C

ChecklistMS C

Documentation

BACK FWD

Review

Acquisition

Strategy for

P&D RFP

Release

RFP

Approval

RFP

MDA

Requirements

PEO View

DoDI 5000.02

Information

Requirements Milestone C

ADM

Programmatic

Data

Review

Limited

Deployment

Plans for MAIS

Program

Deployment

Approved

Deployment

Plans

Note 1: The MDA is strongly

encouraged to tailor the

reporting requirements

consistent with Enclosure 1,

Table 2 of the DoDI 5000.02

Note 2: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Request to

Tailor/Waive

Information

Requirements

MS C

Report

Page 61: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore Schedule

MDD

Develop

MDD

Package

Conduct MDDMDD

Approval

Conduct MDD

After Action

Duties

Acquisition Process Model

1.1.3.7 Materiel Development Decision

Go Up 1 Level

FWD

AML

Entry

MDD

Checklist

MDD

Package

PEO View

Affordability

GoalsMDA

Requirements

DoDI 5000.02

Information

Requirements

MDD ADM

Note 1: The MDA is strongly

encouraged to tailor the

reporting requirements

consistent with Enclosure 1,

Table 2 of the DoDI 5000.02

AFLCMC

Standard

Processes

Note 3: The AFLCMC specific process

for Development Planning provides

input for some MDD actions. CTRL-

Click here to access an active link to this

process.

Note 2: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Request to

Tailor/Waive

Information

Requirements

Page 62: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.7.2 Develop MDD Package

Go Up 1 Level

Develop Draft

MDD Package

Refine and

Coordinate MDD

Package

Collect Inputs

for MDD

Package

Draft

AoA Study

Guidance

CCTD

MDD

Data

Acq Phase

Entrance

Criteria

FWD

MDD

Checklist

MDD

Package

Draft MDD

Package

ICD

Page 63: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.7.3 Conduct MDD

Go Up 1 Level

Present MDD

Package and

Related Data

Approve MDD

Package

Designate Lead

Acquisition

Organization

Make Decision

to Begin MSA

(or other Acq

Phase)

MDD

Approval

BACK FWD

MDD

Package

MDD

Package

MDD

Data

Page 64: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.7.4 Conduct MDD After Action Duties

Go Up 1 Level

Draft and Staff

ADMDistribute ADM

and AoA Study

Guidance

Add Potential

Acquisition

Program to

APML

AoA Study

Guidance

BACK

MDD

Approval

MDD

Approval

AML

Entry

MDD ADM

MDD ADM

Affordability

Goals

MDD ADM

Page 65: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.8 Full Rate Production Decision

Identify

Prerequisites for

Full Rate

Production

Decision Prepare for Full

Rate Production

Decision

Conduct Full

Rate

Production

Decision

Full Rate

Production

Decision

FRP

ChecklistFRP

Documentation

Go Up 1 Level

BACK FWD

MDA

Requirements

PEO View

DoDI 5000.02

Information

Requirements

Programmatic

Data

Note 1: The MDA is strongly

encouraged to tailor the

reporting requirements

consistent with Enclosure 1,

Table 2 of the DoDI 5000.02

Note 2: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Request to

Tailor/Waive

Information

Requirements

Page 66: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gAcquisition Process Model

1.1.3.9 Milestone A AFRB

Go Up 1 Level

Go

ve

rnin

gC

ore

Develop Draft

MS A PackageRefine MS A

Package

Through

Review/

Coordination Conduct MS A

Review

Draft MS A

Package

Resolve

Issues/

Actions

FWD

Conduct AFRB

Oversight

Secretariat

Activity

Funding Source

Informal Docs

Program Direction

Requirements Docs

MDA

Requirements

EMA

IIPT Action Officer

Issues/ Recommendations

Issues/

Actions

WIPT Issues/ Recommendations

PEO View

DoDI 5000.02

Information

Requirements

Approved

MS Package

Approved/

Signed ADM

Unapproved

ADM

Milestone A

ADM

Milestone A

ADM

Programmatic

Data

Programmatic

Data

MS A Report

Final MS A

Package

Page 67: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.9.5 Conduct AFRB Oversight Secretariat Activity

Go Up 1 Level

Request AFRB

Meeting

Send AFRB

Meeting

Invitations

Submit and

Distribute AFRB

Charts

Consolidate

Input and

Provide BBP

Chair the AFRB

Meeting

Approved

MS Package

Bullet Background Paper

Staff Minutes Minutes from

the AFRB

BACK

Program

Reporting

Meeting

Date

Meeting

Invite

Draft

MS Package

Final Milestone A ADM/

MS Package

Draft Milestone

A ADM

Approved/

Signed ADM

Programmatic

Data

Page 68: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.3.10 Milestone B AFRB

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Develop Draft

MS B PackageRefine MS B

Package

Through

Review/

Coordination Conduct MS B

Review

Draft MS B

Package

Final MS B

Package

Resolve

Issues/

Actions

BACK FWD

Conduct AFRB

Oversight

Secretariat

Activity

Funding Source

Informal Docs

Program Direction

Requirements Docs

MDA

Requirements

EMA

IIPT Action Officer

Issues/ Recommendations

Issues/

Actions

WIPT Issues/ Recommendations

DoDI 5000.02

Information

Requirements

Approved

MS Package

Milestone B

ADM

Milestone B

ADMUnapproved

ADM

Approved/

Signed ADM

Programmatic

Data

Programmatic

Data

MS B Report

Page 69: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.10.5 Conduct AFRB Oversight Secretariat Activity

Go Up 1 Level

Request AFRB

Meeting

Send AFRB

Meeting

Invitations

Submit and

Distribute AFRB

Charts

Consolidate

Input and

Provide BBP

Chair the AFRB

MeetingStaff Minutes

BACK

Program

Reporting

Meeting

Date

Meeting

Invite

Draft

MS Package

Final Milestone B ADM/

MS Package

Bullet Background Paper

Approved

MS Package

Minutes from

the AFRB

Draft Milestone

B ADM

Approved/

Signed ADM

Programmatic

Data

Page 70: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.3.11 Milestone C AFRB

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Develop Draft

MS C PackageRefine MS C

Package

Through

Review/

CoordinationConduct MS C

Review

Resolve

Issues/

Actions

BACK FWD

Conduct AFRB

Oversight

Secretariat

Activity

Funding Source

Informal Docs

Program Direction

Requirements Docs

MDA

Requirements

EMA

IIPT Action Officer

Issues/ Recommendations

Issues/

Actions

WIPT Issues/ Recommendations

DoDI 5000.02

Information

Requirements

Approved

MS Package

Unapproved

ADM

Approved/

Signed ADM

Programmatic

Data

Programmatic

Data

Draft MS C

Package

Final MS C

Package

Milestone C

ADM

Milestone C

ADM

MS C

Report

Page 71: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.11.5 Conduct AFRB Oversight Secretariat Activity

Go Up 1 Level

Request AFRB

Meeting

Send AFRB

Meeting

Invitations

Submit and

Distribute AFRB

Charts

Consolidate

Input and

Provide BBP

Chair the AFRB

MeetingStaff Minutes

BACK

Program

Reporting

Meeting

Date

Meeting

Invite

Draft

MS Package

Final Milestone C ADM/

MS Package

Bullet Background Paper

Approved

MS Package

Minutes from

the AFRB

Draft Milestone

C ADM

Approved/

Signed

Milestone C

ADM

Programmatic

Data

Page 72: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.3.12 Full Rate Production DR AFRB

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Develop Draft

FRP DR

Package

Refine FRP DR

Package

Through

Review/

CoordinationConduct FRP

DR Review

Draft FRP DR

Package

Final FRP DR

Package

Resolve

Issues/

Actions

BACK FWD

Conduct AFRB

Oversight

Secretariat

Activity

Funding Source

Informal Docs

Program Direction

Requirements Docs

MDA

Requirements

EMA

IIPT Action Officer

Issues/ Recommendations

Issues/

Actions

WIPT Issues/ Recommendations

Approved/

Signed ADM

Unapproved

ADM

DoDI 5000.02

Information

Requirements

Approved

MS Package

Programmatic

Data

Programmatic

Data

ADM

ADM

Page 73: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.12.5 Conduct AFRB Oversight Secretariat Activity

Go Up 1 Level

Request AFRB

MeetingMeeting

Date

Send AFRB

Meeting

Invitations

Submit and

Distribute AFRB

Charts

Meeting

Invite

Draft

MS Package Consolidate

Input and

Provide BBP

Chair the AFRB

Meeting

Program

Reporting

Staff Minutes

BACK

Approved/

Signed ADM

Final ADM/

MS Package

Bullet Background Paper

Approved

MS PackageMinutes from

the AFRB

Draft ADM

Programmatic

Data

Page 74: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.13 Terminate Acquisition Effort

Notify HCA and

Sr. Procurement

Executive of

Program

Termination

Go Up 1 Level

Develop

Termination Plan

Approve

Termination

Strategy

Leadership

Decision

Change in Threat

Draft Termination

Plan

Contractor

Performance

Withdrawal of

Funding

Termination

Plan

Approve

Program

Termination

BACK

Execute

Termination Plan

Contract

Status

Funding

Summary

* Link to Gen Wolfenbarger Memo

on Program Termination Procedures

PEO View

Termination – Acquisition

Decision Memorandum (T-ADM)

Termination – Acquisition

Decision Memorandum (T-ADM)

Page 75: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.13.3 Develop Termination Plan

Plan for

Termination –

Operational

Capability/

Requirement

Go Up 1 Level

Plan for Termination

– Technology

Plan for Termination

– Facilities /

Hardware / Software

Program Security

Plan for

Termination -

Personnel

Plan for

Termination -

Contracts

Termination –

Acquisition

Decision

Memorandum (T-ADM) Plan for

Termination -

Budget

Draft Termination

Plan

Note: CTRL-Click to access an

Active Link to Mr. Kendall’s 7 Oct

2014 Memo on DAU’s Smart

Shutdown Guidebook”.

Page 76: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.14 Conduct Development RFP Release Review

Go Up 1 Level

Identify

Prerequisites for

Development

RFP Release

Review Approval

Conduct

Development

RFP Release

Review

MDA

Requirements

Development RFP

Release

Checklist

Development RFP

Release

Documentation

Approved

Development RFP

Release

Documentation

Authorize

Final

RFP Release

RFP

Approval

PEO View

DoDI 5000.02

Information

Requirements

RFP

Affordability

Caps

BACK FWD

Programmatic

DataDev RFP

ADM

Cost-Type

Production

Contract

Certification

Prepare for

Development

RFP Release

Review

Finalize RFP

to Incorporate

Comments

Approved

Development RFP

Release

Documentation

Final Copy of

the Draft RFP

Substantive Issues

Page 77: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.3.16 Defense Business Council (DBC)

Go Up 1 Level

Prepare for DBC Conduct DBCDBC Certification Approval

Memorandum

Approved

Problem Statement

Certified Investment

Certification Requests

DBC Documentation

Page 78: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.3.17 Development RFP AFRB

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Develop Draft

Development

RFP Package

Refine

Development

RFP Package

Through

Review/

CoordinationConduct

Development

RFP Review

Draft Dev. RFP

Package

Final Dev. RFP

Package

Resolve

Issues/

Actions

BACK

Conduct AFRB

Oversight

Secretariat

Activity

Funding Source

Informal Docs

Program Direction

Requirements Docs

MDA

Requirements

EMA

IIPT Action Officer

Issues/ Recommendations

Issues/

Actions

WIPT Issues/ Recommendations

DoDI 5000.02

Information

Requirements

Approved

MS Package

ADM

ADMUnapproved

ADM

Approved/

Signed ADM

Programmatic

Data

Programmatic

Data

Note from the Chief Process Officer:

The Dev RFP Release ASP is combined

with this AFRB.

Page 79: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.3.17.5 Conduct AFRB Oversight Secretariat Activity

Go Up 1 Level

Request AFRB

Meeting

Send AFRB

Meeting

Invitations

Submit and

Distribute AFRB

Charts

Consolidate

Input and

Provide BBP

Chair the AFRB

MeetingStaff Minutes

Program

Reporting

Meeting

Date

Meeting

Invite

Draft

MS Package

Final ADM/

MS Package

Bullet Background Paper

Approved

MS Package

Minutes from

the AFRB

Draft ADM

Approved/

Signed ADM

Programmatic

Data

Note from the Chief Process Officer:

The Dev RFP Release ASP is combined

with this AFRB.

Page 80: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

ore

Acquisition Process Model

1.1.4 Technical Reviews

Go Up 1 Level

BACK FWD

1.1.4.3 Production

Readiness Review

1.1.4.2 Critical Design

Review

1.1.4.1 Preliminary

Design Review

1.1.4.4 Test Readiness

Review1.1.4.5 System

Functional Review

1.1.4.6 System

Requirements Review

1.1.4.7 Manufacturing Readiness Assessment

1.1.4.8 Functional

Configuration Audit

1.1.4.9 Physical

Configuration Audit

1.1.4.10 Alternative

Systems Review

1.1.4.11 System

Verification Review

1.1.4.12 In-Service

Review

1.1.4.14 Integrated Baseline Review

MaterielSolutionAnalysis

Operations andSupport

Production and Deployment

Engineering and Manufacturing Development

Technology Maturation and Risk Reduction

A CB

Materiel Development

Decision

PEO View

1.1.4.15 Risk Management Framework

1.1.4.17 Independent Logistics Assessment

1.1.4.18 External Technical Assessments

1.1.4.19 Logistics Health Assessment

Note 1: Prior to SAF/AQR-chaired reviews of a program,

representatives of the PEO or PM for the program and the

Center-level engineering office supporting the program

provide SAF/AQR with their assessments of the program's

technical status. (AFI 63-101/20-101, Section 5.1.6.2)

1.1.4.20 Program Sufficiency Review

Note 2: Program Sufficiency

Review is an AFLCMC

Standard Process.

Page 81: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.4.1 Preliminary Design Review (PDR)

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore Identify PDR

Prerequisites

Prepare for

PDR

Post-PDR

Assessment

PDR

Documentation Conduct

PDR

Develop

Post-PDR

Assessment

Address

Unresolved

Issues

PDR Documentation

FWD

Draft CDD

SEP

TEMP

Program Schedule

Resolved Issue

Updated Program

Schedule

Unresolved Issue

CARDUpdated

CARD

IMP

IMS

Interface Control

Document

LCSP

Allocated Baseline

PDR Risk

Assessment

Checklist

Prepare

Observations and

Recommendations

Technical

Review

Report

Page 82: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.2 Critical Design Review (CDR) (1.4.1.1.3)

Go Up 1 Level

Identify CDR

Prerequisites

Prepare for

CDR

CDR

Documentation Conduct

CDR

Develop

Post-CDR

Assessment

Address

Unresolved

Issues

BACK FWD

Achievement of

Allocated Baseline

CDD

Draft CPD

SEP

Detailed

Design

Interface Control

Document

Resolved Issue

Updated Program

Schedule

Unresolved Issue

CARDUpdated

CARD

LCSP

TEMP

LCSP

Initial

Product

Baseline

Post-CDR

Assessment

CDR Risk

Assessment

Checklist

Prepare

Observations and

Recommendations

Technical

Review

Report

Page 83: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.3 Production Readiness Review (PRR)

Go Up 1 Level

Prepare for

PRR

Production

System

Updates

PRR

Documentation

Conduct

PRR

Address

Identified

Risks

System Product

Baseline

Quality Management System

Production Planning Aspects

Production Cost Model

Manufacturing and Quality

Risk Assessment

Completed PRR Risk

Assessment Checklist

Process TriggersEMD Phase

- Upcoming Technical Review

P&D Phase

- EMD Manufacturing or Material Design Changes

- Production Phase Manufacturing Or Material

Design Changes

- Production Start-Up

- Production Re-Start After Significant Shutdown

- Production Start-Up With New Contractor

- Manufacturing Site RelocationBACK FWD

Manufacturing Processes

Program Schedule

Staffing Plan Prepare

Observations and

RecommendationsTechnical Review Report

Page 84: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.4 Test Readiness Review (TRR)

Go Up 1 Level

Prepare for

TRR TRR

Decision

Package Conduct

TRR

Address

Identified

Issues

Test Objectives

Test Methods

And Procedures

Scope of Test

Safety Issues

User Needs

System Under Review

Completed TRR Risk

Assessment Checklist

Cost/ Schedule Effectiveness

Risk

Development Maturity

Preliminary Test

Evaluation Results

Functional Test

Evaluation Results

Pre-qualification Test

Evaluation Results

Approved Baseline Results

For Planned Tests

Acceptable

Risk Levels

Approved Baseline Results

For Planned Tests

Acceptable

Risk Levels

BACK FWD

Completed

& Approved

Test Plans

Completed

& Approved

Test PlansTest Plans

Required

Test Resources

Required

Test Resources

Issue

Page 85: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.5 System Functional Review (SFR)

Go Up 1 Level

Prepare for

SFR

Established System

Functional baselineSFR

Review

Package

Conduct

SFR

Address

Identified

Risks

System Functional

Baseline

System Performance

Requirements

Lower-Level Performance

Requirements

Design and

Development Plans

Requirements

Assessment

System Level

Maintenance Plan

BACK FWD

CDD

SEP

CARD

Updated

CARD

Interface Control

Document

Program Schedule

Updated Program

Schedule

Cost Estimate

Staffing Plan

Completed SFR Risk

Assessment Checklist

Budget

Post-SFR Report

Prepare

Observations and

Recommendations

Technical Review Report

Page 86: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.6 System Requirements Review (SRR)

Go Up 1 Level

Prepare for

SRR

Approved System

Performance Specification

SRR

Review

PackageConduct

SRR

Address

Identified

Risks

Technical

Risk

Assessment

Preliminary Allocation

Of System

Requirements

Preliminary Identification

Of All Software Components

Comprehensive Risk

Assessment for EMD

BACK FWD

ICD

Approved

SEP

SEP

CARD

Program Schedule

Cost Estimate

Staffing Plan

LCSP

Approved

LCSP

System Performance

Specifications

Completed SRR Risk

Assessment Checklist

Budget

Draft CDD

Prepare

Observations and

Recommendations

Technical Review Report

Page 87: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.7 Manufacturing Readiness Assessment (MRA)

Go Up 1 Level

BACK FWD

Prepare MRA

Report

Conduct

Assessment of

Manufacturing

Readiness

Set Agenda

for Site Visits

Request

Contractors

to Perform

Self-

Assessment

MRA

Approach

Determine

Taxonomy

and Schedule

of MRA

Defined

Component,

System

And

Subsystem

Level

of Interest

MRA Report

Determine

Assessment

Scope

MRA Objective

Orientation

Package

Form &

Orient

Assessment

Team

And Orient

the

Contractors

Familiarized

Personnel

Self-

Assessment

Agenda

Draft

MRA

Schedule

Self-

Assessment

Defined

Component,

System

And

Subsystem

Level

of Interest

Defined

Component,

System,

And

Subsystem

ProcessDraft

Assessment

Report

Page 88: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.4.7.6 Conduct the Assessment of Manufacturing Readiness

Go Up 1 Level

Complete the

Assessment

Conduct

Assessment

Review the Self

Assessment

Identified Areas

For Deep Dives

Self

Assessment

Identified

Risks

Draft

Assessment

Report

Defined

Component,

System,

And

Subsystem

Process

Reviewed Self

Assessment

Page 89: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.8 Functional Configuration Audit (FCA)

Go Up 1 Level

Prepare for

FCA

Performance Gaps

FCA

Decision

PackageConduct

FCA

Reconcile

Performance

Gaps

LRIP Recommendation

LRIP Recommendation

BACK FWD

Test/ Analysis Data

System Performance

Specifications

Functional Configuration

Audit Checklist

Prepare

Observations and

Recommendations

Technical Review Report

Page 90: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.4.9 Physical Configuration Audit (PCA)

Go Up 1 Level

Prepare for

PCA Conduct

PCA

Reconcile

Design Gaps

Accepted Design and

Manufacturing Documentation

BACK

Accepted Design and

Manufacturing Documentation

Training

FWD

Manufacturing Processes

Production Articles

Technical

Data

Package

Design Documentation

Measurement and

Test Equipment

PCA

Decision

Package

Design Gaps

Quality Control System

Completed PCA Risk

Assessment Checklist

Prepare

Observations and

Recommendations

Technical Review Report

Page 91: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.10 Alternative Systems Review (ASR)

Go Up 1 Level

Prepare for

ASR

ASR

Review

Package

Conduct

ASR

BACK FWD

Trade Study Results Document

and Monitor

Action

Items

Software Concept

Assessment

Plan for Technology

Phase

Draft Systems

Requirements Documents

Alternative Materiel

Solutions

Initial Plan for

EM&D Phase

AoA

ICD

Cost Estimate

Risk

Assessment

Resolved

Action

Items

ASR Checklist

Action Items

Prepare

Observations and

Recommendations

Technical

Review

Report

Page 92: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.4.11 System Verification Review (SVR)

Go Up 1 Level

Prepare for

SVR

SVR

Review

Package

Conduct

SVR

Document

and Monitor

Action

ItemsDraft CPD

Final Product

Performance.

BACK FWD

SVR Checklist SVR Checklist

CDD

Resolved Action Items

Action Items

Prepare

Observations and

RecommendationsTechnical Review Report

Page 93: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.4.12 In-Service Review (ISR)

Go Up 1 Level

Prepare for

ISR

ISR

Review

Package

Conduct

ISRSystem Problem

Reports

BACK FWD

Document

and Monitor

Action

Items

System Hazard

Risk Assessment

Operational

Readiness

Assessment

Current

System

Problem

Status

System and Sub-System

Documentation

Resolved Action Items

Action Items

Programmatic

Data

Page 94: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.4.14 Conduct Integrated Baseline Review (IBR)

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Tailor the RFP

for IBR

Conduct IBR

Process

Introduction

and Planning

Evaluate

Artifact Quality

and Assess

Data

Integration

Address IBR

Action Items

IBR

Templates

Artifact List

Data

Integration

Proof

Statements

IBR

Action

Tracker

Resolved IBR

Action Items

Prepare IBR

Exit Briefing

and Follow-up

Conduct

Control

Account

Manager and

Business

Office

Discussions

IBR

Artifacts

Conduct

Readiness

Review

IBR

Leadership

Approval

IBR

Exit

Briefing

Establish IBR

Roles &

Responsibilities

RFP Language

for the IBR

IBR Roles &

Responsibilities

RFP

RFP

IBR

Schedule

Contractor

Management

Processes

BACK

IBR

Scorecard

FWD

Programmatic

Data

Programmatic

Data

Page 95: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.4.15 Risk Management Framework

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Categorize

System

Select

Security

Controls

Monitor

Security

Controls

Assess

Security

Controls

Implement

Security

Controls

System

Information

BACK

PPP

Authorize

System

Approved

Security Plan Security

Assessment

Plan

Security

Authorization

PackageUpdated Security

Plan

Security Status

Report

Initial Security

Plan

Documented

Control

Implementation

Security

Assessment

Report

FWD

Note: Consistent with Chapter 7 of

AFI 17-101, all IT will transition to RMF

IAW DoDI 8510.01.

Approved

Continuous

Monitoring

Strategy

Page 96: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.4.15.1 Categorize System

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Categorize the

System

Initiate the

Security Plan

Assign

Personnel to

Risk

Management

Framework

Roles (RMF)

Register

System in

EITDR

FWD

PPP

System

Information

Initial Security

PlanSystem Categorization

System

Registration

System Categorization

System

Information

Initial Security

Plan

(System Description)

Initial Security

Plan

(System Description)

Page 97: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.4.15.2 Select Security Controls

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Select

Common

Control

Identification

Identify

Security

Control

Baseline and

Overlay

Selection

Review and

Approve

Security Plan

and

Continuous

Monitoring

Strategy

Develop

System-Level

Continuous

Monitoring

Strategy

BACK FWD

Approved

Continuous

Monitoring

Strategy

Approved Security

Plan

Initial Security

Plan

Common Controls

Security Control

Baseline

System-Level

Continuous

Monitoring

Strategy

Overlays

Page 98: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.4.15.3 Implement Security Controls

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore Implement

Control

Solutions

Document

Security

Control

Implementation

BACK FWD

Approved Security

Plan

System Specifications

Documented

Control

Implementation

Approved

Continuous

Monitoring

Strategy

Page 99: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.4.15.4 Assess Security Controls

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Develop and

Approve

Security

Assessment

Plan

Assess

Security

Controls

BACK

Prepare

Security

Assessment

Report (SAR)

Conduct Initial

Remediation

Actions

FWD

Security Assessment

Plan

Security Control Assessment

Non-Compliant Security Controls

Security Assessment

Plan

Documented

Control

Implementation

Security

Assessment

Report

Security

Assessment

Report

Page 100: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.4.15.5 Authorize System

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Prepare the

POA&M

Submit

Security

Authorization

Package

BACK

Conduct Final

Risk

Determination

Determine

Authorization

Decision

FWD

Authorization Decision

Security Assessment

Plan

POA&M

Final Risk

Determination

Security

Authorization

Package

Security

Authorization

Package

Security

Assessment

Report

Page 101: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.1.4.15.6 Monitor Security Controls

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Determine

Impact of

Changes to the

System and

Environment

Assess

Selected

Controls

Annually

BACK

Conduct

Remediation

Updated

Security

Plan, SAR

and POA&M

Report

Security

Status to

AO

Review

Reported

Status

Implement

System

Decommissioning

Strategy

Security

Authorization

Package

Updated Security

Plan

Security Status

Report

Security Posture

Report

Annual Security Controls

Report

New Vulnerabilities/Risks

Updated Security

PlanSecurity Status

Report

Security Posture

Report

Security Posture

Report

Security Posture

Report

Updated POA&M

Updated Security

Plan

Reassessment

Recommendations

Risk Review

Page 102: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.17 Independent Logistics Assessment

Conduct

Logistics

Assessment

Assess & Report

Logistics

Assessment

Results

Plan & Organize

Logistics

Assessment

Go Up 1 Level

Program

Documentation

Integrated

Product Support

Assessment

BACK

Resolve

Logistics

Assessment

Deficiencies

Logistics

Assessment

Schedule

Draft

Deficiencies &

Recommendations

Status Reports

Logistics

Assessment

Close Out

Memo

Documentation

Request List

Results from

Systems

Engineering

Reviews

Logistics

Assessment

Report

Product Support

Certification

Letter

Note: Enclosure 6, Section 5.b of DoDI 5000.02 requires an independent logistics assessment for all ACAT I and II programs prior to key acquisition decision points. CTRL-

Click here to access an active link to the instruction. FWD

Page 103: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.17.1 Plan & Organize Logistics Assessment

Conduct Pre-

Assessment

Meeting

Announce

Logistics

Assessment

Select Team

Members

Go Up 1 Level

Logistics

Assessment

Team

Members Tailored

Documentation

Request List

FWD

Deliver

Documentation

Logistics

Assessment

Roles &

Responsibilities

Official

Logistics

Assessment

Announcement

Documentation

Request List

Program

Documentation

Logistics

Assessment

Schedule

Results from

Systems

Engineering

Reviews

Page 104: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.17.2 Conduct Logistics Assessment

Review

Requirements &

Capabilities

Review

Logistics

Documentation

& Planning

Conduct

Opening Meeting

Go Up 1 Level

BACK

Write and

Compile

Deficiencies

Logistics

Assessment

Roles &

Responsibilities

Review

Contractual

Documentation

Review

Integrated

Master Schedule

and Integrated

Master Plan

Integrated

Product Support

Assessment

Draft

Deficiencies

Draft

Recommendations

Program

Documentation

Logistics

Assessment

Schedule

Program

Documentation

Results from

Systems

Engineering

Reviews

Page 105: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.18 External Technical Assessment

Conduct External

Technical

Assessment

Report Results

of External

Technical

Assessment

Plan and

Organize

External

Technical

Assessment

Go Up 1 Level

BACK

Draft

ResultsProgrammatic

Data

External

Technical

Assessment

Results

Program

Documentation

External

Technical

Assessment

Schedule

FWD

Page 106: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.19 Logistics Health Assessment

Go Up 1 Level

Note: This is an AFLCMC

Standard Process.

AFLCMC

Standard

Processes

BACK

Identify AML

Programs to

Complete

LHA

Perform &

Submit

Initial LHA

Use LHA

Data for

Multiple

Reviews

Roll up and

Analyze

Product

Support Metric

Data

Present LHA

Metric to

AFLCMC

S&P Board

Perform LHA

Update

Perform Trend

Analysis

Updated LHA

Identified

Programs Initial LHA

Reviewed LHA

Mitigation Issues/PlansQuarterly PS Health

Roll

LHA Feedback

Completed and Approved

LHA in SMART

Updated LHA

Completed LHA

AML

Programmatic

Data

Recommendations to Leadership

FWD

Approve

LHA

Review

LHA

Complete

Compliance

Decision

Model

Request for LHA

Page 107: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.20 Program Sufficiency Review

Support from

Technical SMEs

Conduct

Assessments

and Cost

Analysis

Initiate the PSR

and

Corresponding

Planning

Go Up 1 Level

BACK

SME Support

PSR Trigger

Event

Risk Assessment

And Cost Analysis

PSR Process

Overview

Note: This is an AFLCMC

Standard Process.

Provide PSR

Results

AFLCMC

Standard

Processes

PSR Process

Overview

PSR Official

Record

SME Support

Page 108: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.20.1 Initiate the PSR and Corresponding Planning

Conduct Kick-Off

Meeting

Gain Tools

Access

Request Tool

Owner and

Technical SME

Support

Go Up 1 Level

PSR OverviewPSR Trigger

EventTools Access

Request for

Support

Note: This is an AFLCMC

Standard Process.

Take Tool

TrainingTool Training

FWD

PSR Overview

Page 109: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.20.2 Conduct Assessments and Cost Analysis

Review

Assessment

Results

Consolidate

Risks From All

Assessments

and Other Risk

Identification

Methods

Conduct

Integrated

Assessments

Go Up 1 Level

Assessment

Results Outbrief Consolidated PSR

Risk

Integrated

Assessments

Note: This is an AFLCMC

Standard Process.

Conduct Risk

Workshop

Risk Workshop

Results

FWDBACK

Conduct Cost

Estimate Review

for the

Acquisition

Program

Risk

Assessment

And Cost

Analysis

PSR Process

Overview

Page 110: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.4.20.3 Provide PSR Results

Prepare Minutes

and Executive

Summary

Obtain PEO

Approval

Outbrief PSR

Go Up 1 Level

Minutes and

Executive Summary

Approved Minutes

And Executive Summary

Outbrief

Note: This is an AFLCMC

Standard Process.

Document

Minutes and

Executive

Summary

BACK

Risk

Assessment

And Cost

Analysis

PSR Official

Record

Action Items

Draft Minutes

Page 111: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5 Execute Acquisition Management Integration

Manage

Acquisition

Oversight

Integration

Manage

Acquisition

Policy

Conduct Other

Acquisition

Statutory

Responsibilities

Go Up 1 Level

Manage the

Acquisition

Program Master

List

Acquisition

Reporting

Acquisition

Professional

Development

Program

Guidance

BACK

Congressional

/ Federal

Inquiry

Conduct IT

Portfolio

Management

Migration Plan (IT Roadmap)

Portfolio Selection Criteria

Certification and

Accreditation

Portfolio Selection Criteria

Unfunded Requirements List

Performance Evaluation

Lessons Learned, Insights, and Metrics

Acquisition

Policy

AF Strategic

Plan

Revised

AML

Request for

Information

Annual Investment Strategy

Validated and Decomposed Capability

Need into Requirements

Capability Need

Statement

Domain Performance

Goals

Domain Performance Goals

Funded

Requirement Notice

Human Capital

Strategic PlanIntegrated Plan

& Roadmap

Changes in Law

Changes in

DoD Policy

Performance

Appraisals

Report of

Contractor

Activity

Response to

Congressional /

Federal Inquiry

Updated SMART

Program Record

Solution

Solution Performance Reports

Unfunded Requirements

List

Conduct Program

Assignment

Notification of

Potential

Program

PEO

Assignment

AFMC/AFSPC

Input

Programmatic

Data

Programmatic

Data

Programmatic

Data

Program

Manager

Assignment

Manage Scientific

and Technical

Information

Provide

Departmental

Standardization

Leadership

DSP

Policies

AF Standardization

Policies &

Procedures

Standardization

Issues

Approved

Defense

Standards

IML

AML

Manage

Acquisition Key

Leadership

PositionsWaiver

Request

KLP

Needs

KLP Assignments

Distributed

Waiver

Approval

Scientific and

Technical

Information

Distributed

Scientific and

Technical

Information

Page 112: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.1 Manage Acquisition Oversight Integration

Manage

Capabilities

Based

Acquisition

Conduct

Periodic / Ad

Hoc

Reporting

Provide Acquisition

Operational Support

Go Up 1 Level

Defense Acquisition

Executive Summary

Unit Cost Report

Program Deviation

Report

Support

Acquisition

Security

Initiative

Acquisition

Security

Roadmap from

Program

Manager’s

Perspective

High Level

Policy

Address

Miscellaneous IT

Acquisition

Integration

Taskings

Support

ResultsRequest for

Support

Conduct

Strategic

Alignment

Activity

Conduct Institutional

Performance AssessmentAnnual

Assessment

Identify IT

Capabilities

& Needs

Performance Evaluation

Lessons Learned,

Insights, and Metrics

Capability Opportunity

End User Inputs

Acquisition Improvement Plan (AIP)

AF & OSD Direction

Capability Opportunity

Request for

Information

Validated and Decomposed Capability

Need into Requirements

Capability Need

Statement

Current State

Business Process

Domain Master Plan

Domain Strategy

Enterprise Data

Law

Metrics Action

Items

Integrated Plan

& Roadmap

Research Organization

Reports

Strategic

Plan

Unfunded Requirements List

FWD

Operational Documents

Processed

Operational

Documents

Programmatic

Data

Programmatic

Data

Programmatic

Data

SAR

Page 113: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.1.2 Provide Acquisition Operational Support

Go Up 1 Level

Conduct

Analysis of

Manpower PB23Manpower

Change Request

AF Strategic Plan

UMD

Provide AQ

Operational

Support

Telecommunications

IT Equipment and Service Request

Telecommunication Requirements

Security Requirements

Records Mgmt Info

Publications and Forms Request

Operating Instruction Request

Travel Authorization

Maintenance Request

Costing Data

Occupant Emergency Plan (OEP)

Computer Equipment,

Software & Maintenance

Approved Requirements

Approved Invoices

Crisis Action Team (CAT)

Fire & Safety Guidance

OPSEC Guidance

PB Approved DD 2249

POM

Review HASC/

SASC/HAC/

SAC

Proposals

QFR

Air Force

Responses to

IFR/QFR

IFR

FWD

Page 114: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.1.2.1 Analysis of Manpower

Go Up 1 Level

Address

Organization

Change

Request

Updated UMD

External OCRProvide

Manpower

Projections for

AQ Enterprise

AQ Sr. Leadership Guidance

AFCS Guidance

OSD Guidance

Address

Manpower

Change

Request

Customer

RequestUpdated UMD

Prepare Sr.

Leadership for

OSD

Discussions

AF Position

on Manpower Issues

PB23

PB23

RMD

Internal OCR

FWD

Perform

SAFTAS

Contract

Management

SAFTAS

Contract

SAFTAS

Actions

Senior Steering

Board Inputs

Page 115: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.5.1.2.2 AQ Operational Support

Go Up 1 Level

Manage

Security

Approved DD 2249

Quarterly

Security data call

JPAS

Provide

Infrastructure

Acquisition

Infrastructure Request

Goods/Services Purchased

Provide

Information

Management

Approved DD 577DD 577

FOIA Privacy Act

Conduct

Emergency

Actions

Provide evacuation Plans

Provide AQ CAT resources

Provide Guidance

For AQ CAT desk

Approved Building

Access request

VAR

Annual Security Report

Approved Security Docs

DD 2249

Physical Security

Requirements

Request to SAF/AAF

Form 9 Action

Mandatory

Declassification

Reviews

Information

Management

Guidance

Response to taskers / Questions

Crisis Action Team (CAT)

Emergency Occupant

Plan (EOP)

Travel Authorization

UMD

BACK

Provide

Support for

AF Contract

Services

Congressional Direction

on Services

Congressional Inquiries

FPDS & CRIS data pulls

MAJCOM inputs

PB15

FFRDC Disposition

Contractor FTE Projections

Service contract

Projections

Service contractor inventory

Address

Special

Projects

Request for

Special ProjectSpecial

Projects

Track

EfficienciesEfficiency

ReportsFPDS & CRIS

Page 116: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.1.2.2.5 Provide Support for AF Contract Services

Go Up 1 Level

Provide

Service

Contract

Inventory

Inventory Report

FPDS & CRIS

Provide

Service

Contract

Budgeting

Services

Budget Documentation

PB32

OP32

Provide

Advisory &

Assistance

Services

ManagementAFAA Findings

Provide

FFRDC

Management

Annual Reporting

RequirementsAppropriation Bill

DoD FFRDC Mgmt PlanComprehensive Reviews

Management Plans

PB15

A&AS Contract

Budget DocumentationCongressional Direction

on Services

Page 117: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.1.4 Strategic Alignment Activity

Go Up 1 Level

Develop AQ

Excellence

Communication

Plan

Communicate

AQ Excellence

PlanAQ Excellence

Comm Plan

Gather

Audience

Feedback

Congressional

Questions

AF/PAX Comm

Plan

AQ Excellence

Messages

Audience Feedback

Previously Closed

Messages

CPI Outcomes

AF & OSD Direction

Develop

Strategic

Goals

Develop

Strategic

Objectives

Develop

Strategic

Targets

Assess

Performance

to Strat Plan

Draft

Strat Plan

Draft

Strat PlanCongressional

Strategic Direction

Approved

Strat PlanDraft

Strat PlanApprove

Strat Plan

AF & OSD Direction

Performance

Assessment

Strategic

Plan

Enterprise Data

BACK FWD

Programmatic

Data

Page 118: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.1.5 Conduct Institutional Performance Assessment

Go Up 1 Level

Collect

Enterprise Data

Perform

Enterprise

Performance

Assessments

Distribute

Results to

Acquisition

Leadership

(PEO’s & SAE)

AQ RequestsMetrics

Data Trends

AQ RequestsData Call

Draft Performance Assessment Final Performance

Assessment Report

Respond to Ad

Hoc

Performance

Assessment

Request

Organizational DirectionPerformance

Assessment Report

Enterprise Data

BACK FWD

Page 119: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.1.6 Identify IT Capabilities and Needs

Go Up 1 Level

Conduct Proactive

Research

Domain Inputs (AFMC, AFRL, etc)

Functional Partner Discussions

Vendor Discussions

Industry Partner Discussions

Review Capability

Needs

Domain Roadmap Update

Domain Transformation Plan Inputs

Off Budget Cycle Capability Needs

Infrastructure Change

Capability Review

Rough Cut

Desired State

Solution Architecture

Acquisition Improvement Plan (AIP)

Capability Opportunity

Capability Opportunity

Domain Transformation Plan Inputs

Performance Evaluation

Lessons Learned,

Insights, and Metrics

Performance Evaluation

Lessons Learned,

Insights, and Metrics

Validated and Decomposed

Capability Need into Requirements

Capability Need Statement

Current State

Business Process

Domain Master Plan

Domain Strategy

Research Organization Reports

Unfunded Requirements List

Solution Development

Lessons Learned and Insights

BACK

Page 120: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.2 Manage Acquisition Policy

Develop and

Implement

Acquisition

Policy

Monitor

Acquisition

Policy

Compliance

Go Up 1 Level

Recommendations for

Policy Changes

Compliance to Policy

BACK FWD

Acquisition

Policy

Changes in Law

Changes in

DoD Policy

Programmatic

Data

Programmatic

Data

Page 121: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.2.1 Develop and Implement Acquisition Policy

Go Up 1 Level

Provide

Acquisition

Policy Related

Communication

Develop

Acquisition

Policy

Acquisition

Policy

Fact Page

Higher Level

Policy

Prior

Policy

Policy

Feedback

Acquisition

Policy

Communication

Acquisition

PolicyLaw

Page 122: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

oreAcquisition Process Model

1.1.5.2.1.1 Develop Acquisition Policy

Go

ve

rnin

g

Review

Higher Level

Changes

Support

Policy Related

Working

Groups

Go Up 1 Level

Develop Air

Force

Acquisition

Policy

Draft

Policy

Inputs

Draft

Policy

Inputs

Review

Implemented

Policy

Higher Level

Policy

CPI Inputs

Lessons

Learned

Field

Feedback Policy

Feedback

Policy

SuggestionsDraft

Policy

Inputs

Fact of

Life Changes

Audits

Prior

Policy

Law

FWD

Acquisition

Policy

Acquisition

Policy

Coordinate

Policy at

AFLCMCCoordinated

Policy

Package

NOTE: The final process in the

Core swimlane is part of an

AFLCMC Standard Process.

AFLCMC

Position

AFLCMC

Standard

Processes

Page 123: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

oreAcquisition Process Model

1.1.5.2.1.1.1 Review Higher Level Changes

Go

ve

rnin

g

Review

Relevant

Issuances

Provide

Response as

Part of Formal

Coordination

Go Up 1 Level

Resolve

Nonconcurrences

Recoordinate

on Issuances

Higher Level

Policy

Prior

Policy

Law

Draft

Policy

Inputs

SD Form

106

SD Form

818

Nonconcur

Resolution

Page 124: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

oreAcquisition Process Model

1.1.5.2.1.1.4 Coordinate Policy at AFLCMC

Go

ve

rnin

g

Go Up 1 Level

Acquisition

Policy

Receive and

Assign Policy

Review

Tasking

Assigned Policy

Review Review Policy

Tasking and

Manage

Coordination

Policy

Tasking

Request

Formal Policy

Review

Formal Policy

Review

Request

Assess Policy

Impact and

Identify Gaps

Between Policy

and

Implementation

Policy Gaps

Consolidate,

Compile, and

Deconflict

Responses

Policy

Review

Responses Build Policy

Package and

Check for S&P

Board

Oversight

Policy Package

Coordinate

Package

Coordinated

Policy

Package

AFLCMC

Position

NOTE: The above is part of an

AFLCMC Standard Process.

Request Input

to Proposed

Policy

Acquisition

Policy

VIPT

Request

Page 125: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

oreAcquisition Process Model

1.1.5.2.1.2 Provide Acquisition Policy Related Communication

Go

ve

rnin

g

Go Up 1 Level

Communicate

Acquisition

Policy Changes

Represent

Acquisition at

Various Forums

Acquisition

Policy Fact

Page

Acquisition

Policy

Communication

BACK

Acquisition

Policy

Acquisition

Policy

Page 126: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3 Conduct Other Acquisition Statutory Responsibilities

Manage Audit

and Oversight

of Contractor

Activity

Manage

Congressional

and Federal

Inquiry

Go Up 1 Level

Manage

Acquisition

Workforce

Acquisition

Professional

Development

Program

Guidance

BACK FWD

Coordinate

Audits

Acquisition

Audit

Findings

Audit

RequestsConduct

Information

Asset

Management/

Architecture

Acquisition Improvement Plan (AIP)

Business Case Analysis Certification and

Accreditation

Congressional

/ Federal

Inquiry

Capability Need Statement

Current State

Business Process

Human Capital

Strategic Plan

Performance

Appraisals

Report of

Contractor

Activity

Response to

Congressional /

Federal Inquiry

Solution

Desired State Solution Concept

Solution Development

Lessons Learned and Insights

Transition State

Solution Concept

Programmatic

Data

Programmatic

Data

Programmatic

Data

Provide

Congressional

Notifications

Programmatic

Data

Competitive Prototyping Waiver

Conducting DT&E

Without an Approved TEMP

Core Logistics

Commercial Item Exception

Critical Cost Breach

MAIS Cancellation or

Significant Reduction In Scope

MDA Waiver of PDR

Before Milestone B

Post Milestone A

Certification Program Deviations

Preservation and Storage Of Unique

Production Tooling Waiver

Significant Cost Breach

Conduct

Defense

Production Act

Management

Title III Program

Information

DD Form 691

BIS-999

Foreign Acquisition

Transaction

DPAS Decision

Foreign Acquisition

Recommendation

Title III Program

Status

Provide Acquisition

Product Support

Oversight

Programmatic

Data

Product Support

Oversight

Page 127: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.1 Manage Congressional and Federal Inquiry

Go Up 1 Level

Note: This is an AFMC

Standard Process. It is

included in this model in

advance of Streamlining and

Redesign

Conduct Indirect

Congressional Inquiry (Single

PEO CSF Response)

Conduct Indirect

Congressional Inquiry

(Mutliple CSF Response)

Conduct Personal

Congressional Inquiries

Process (Direct from

Congressman)

Conduct Personal

Congressional Inquiries

Process (Direct from AFPC)

Congressional

InquiryResponse to

Congressional /

Federal Inquiry

FWD

Page 128: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.1.1 Conduct Indirect Congressional Inquiry (Single PEO/CSF Response)

Go Up 1 Level

Notify Center

CA of

Congressional

Request

Forward the

Congressional

Inquiry

Congressional

Request

Contact SAF/

AQ with

Inquiry

Forwarded

Inquiry

Task Center

with Official LL

Request

Develop Tasks

for PEO/CSFOfficial

LL Request

SOCCER Task

Provide

Congressional

Inquiry to

Center

Develop

Tasks

for PEO/CSF

Provides

BBP to

Answer

Inquiry

SOCCER

Task

Prepare

Response for

JA Review (If

Required)

Bullet

Background

Paper

Prepare

Response

for Final

Approval

Review &

Coordinate

Response

Draft

Congressional

Inquiry

Response

Draft Congressional

Inquiry Response

Judge

Advocate

Comments

Conduct

PEO

(Center CC)

Approval

Provide

Response

to AFMC/LL

Provide

Final

Response

to SAF/AQ

PEO

Approved

Final

Response

Final

Response

Draft PEO

Final

Response

Final

Response

Assigned

Inquiry

Direct

Congressional

Inquiry

Forwarded

Inquiry

FWD

Note: This is an AFMC

Standard Process. It is

included in this model in

advance of Streamlining and

Redesign

Congressional

Inquiry

Page 129: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.1.2 Conduct Indirect Congressional Inquiry (Multiple CSF Consolidated Response)

Go Up 1 Level

Receive

Inquiry in

Center

Congressional

Workflow Box

Provide

Inquiry

Response

Draft

Congressional

Inquiry

Response

Prepare Final

Response for

Center CC

Approval

Coordinate

SSS for Final

Approval

(If Required)

Staff Summary Sheet (SSS)

Review and

Sign Final

Response

Final

Response

Provide

Congressional

Inquiry to

Center

Assigned

Inquiry

Assigned

Inquiry

Develop

Tasks

for PEO/CSF

SOCCER

Task

Consolidate

responses /

prepare for JA

Review (if

necessary)

Review &

Coordinate

Response

Draft Consolidated

Congressional

Inquiry Response

Judge

Advocate

Comments

Prepare

Response

for

Approval

Draft Consolidated

Congressional

Inquiry Response

Draft PEO

Final

Response

Draft PEO

Final

Response

Provide

Response

to AFMC/LL

Provide

Final

Response

to SAF/AQ

CC

Approved

Final

Response

Final

Response

Final

Response

BACK FWD

Note: This is an AFMC

Standard Process. It is

included in this model in

advance of Streamlining and

Redesign

Congressional

Inquiry

Page 130: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.1.3 Conduct Personal Congressional Inquiries (Direct from Congressman)

Go Up 1 Level

Forward

Congressional

Inquiry to 88

ABW/IG

Develop

Tasks

for Org

Provides

Answer to

Inquiry

Inquiry

Task

Draft Congressional

Inquiry Response

Staff

Response

through CC

office

Provide

Response to

Congressman’s

Office

Provide

Response to

Constituent

Approved

Final

Response

Final

Response

Assigned

Inquiry

Provide

Courtesy Copy

of Inquiry

Assigned

Inquiry

Assigned

Inquiry

Final

Response

Provide

Copy to

Center CA &

SAF/LL

Final

ResponseFinal

Response

BACK FWD

Note: This is an AFMC

Standard Process. It is

included in this model in

advance of Streamlining and

Redesign

Congressional

Inquiry

Page 131: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.1.4 Conduct Personal Congressional Inquiries (Direct from AFPC)

Go Up 1 Level

Forward

Congressional

Inquiry to 88

ABW/IG

Develop

Tasks

for Org

Provides

Answer to

Inquiry

Inquiry

Task

Draft Congressional

Inquiry Response

Staff

Response

through CC

office

Provide

Response to

AFPC/IG

Provide

Response to

SAF/LL

Approved

Final

Response

Final

Response

Assigned

Inquiry

Provide

Courtesy Copy

of Inquiry

Assigned

Inquiry

Assigned

Inquiry

Final

Response

Provide

Copy to

Center CA

Final

ResponseFinal

Response

BACK

Note: This is an AFMC

Standard Process. It is

included in this model in

advance of Streamlining and

Redesign

Congressional

Inquiry

Page 132: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.3 Manage Audit and Oversight of Contractor Activity

Manage

Business

Intelligence

Go Up 1 Level

Industry

Information

Program

Information

Vendor

List

Industry

Supplied

Information

Request for

Business

Intelligence

Information

Business

Intelligence

Analysis

BACK FWD

Page 133: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.5.3.3.1 Manage Business Intelligence

Go Up 1 Level

Provide

Business

Intelligence

Reporting

Conduct

Business

Intelligence

Analysis

Enhance

Business

Intelligence

Mindset

Periodic

Business

Intelligence

Reports

Industry

Information

Program

Information

Vendor

List

Business

Intelligence

Awareness

Request

For

Business

Intelligence

Insights

Identified

Need for

Business

Intelligence

Mindset

Provide

AQXE

Awareness

Ad Hoc

Business

Intelligence

Reports

Industry

Supplied

Information

AQXE

Awareness

Information

Request for

Industry

Information

Request for

Business

Intelligence

Information

Request

For

Awareness

Training

Provide

Corporate

Meeting

SupportMeeting List

Business Intelligence

Meeting Outcomes/Actions

Requested

Information

Identified Need for AQXE Awareness

Business

Intelligence

Analysis

Business

Intelligence

Analysis

Page 134: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.3.1.1 Conduct Business Intelligence Analysis

Go Up 1 Level

Maintain

Information

Supplier

Agreements

Acquire &

Manage

Business

Intelligence

Information

Conduct

Business

Intelligence

Detail

Analysis

Business

Intelligence

Information

Coordinate

Industry

Relationships

Industry Supplied

Information

Business

Intelligence

Information Needs

Business

Intelligence

Information Needs

Industry Supplied

Information

Industry

Information

Program

Information

Request for

Business

Intelligence

Information

Vendor

ListBusiness

Intelligence

Analysis

FWD

Page 135: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.3.1.2 Provide Business Intelligence Reporting

Go Up 1 Level

Identify

Standard

Reporting

Needs

Develop

Standard

Reports

Capture

Reporting

FeedbackAd Hoc

Reporting

Requirements

Recommendations

for Report

Changes Analyze

Request for

Information

Develop Ad

Hoc Reports

Standard

Reporting

Requirements

Ad Hoc

Industrial

Base

Reports

Periodic

Industrial

Base

Reports

Report

Feedback

Identified Need for AQXE Awareness

Identified

Need for

Business Intelligence

Mindset

Request for

Industry

Information

BACK FWD

Business

Intelligence

Analysis

Page 136: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.3.1.3 Enhance Business Intelligence Mindset

Go Up 1 Level

Identify

Business

Intelligence

Mindset Need

Deliver

Workshop

Specific

Business

Intelligence

CriteriaWorkshop

Feedback

Address

Request for

Business

Intelligence

Insights

Develop

Relevant

Materials

Business

Intelligence

Materials

Specific

Business

Intelligence

Criteria

Identified

Need for

Business

Intelligence

Mindset

Request

For

Business

Intelligence

Insights

BACK FWD

Page 137: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.3.1.4 Provide AQXE Awareness

Go Up 1 Level

Identify

Corporate

Awareness

OpportunityDeliver AQXE

Awareness

Information

Specific

Awareness

Criteria

Address

Request for

AQXE

Awareness

Develop

Relevant

MaterialsRequest for

Awareness

Training

AQXE

Awareness

Information

AQXE

Awareness

Information

Specific

Awareness

Criteria

Identified Need for AQXE

Awareness

Business

Intelligence

Analysis AQXE

Awareness

Information

BACK

Business

Intelligence

Analysis

Page 138: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.4 Coordinate Audits

Go Up 1 Level

Coordinate

AFAA

Audits

Coordinate

GAO

Audits

Serve as POC

for Acquisition

Policy Audits

GAO

Audit

Request

Findings

from AFAA

Audit

Findings

from GAO

Audit

Acquisition

PolicyFindings

from Acquisition

Policy Audit

AFAA

Audit

Request

Acquisition

Policy Audit

Request

BACK FWD

Programmatic

Data

Programmatic

Data

Page 139: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.5.3.5 Conduct Information Asset Management/Architecture

Go Up 1 Level

Lead Solution

Concept

DevelopmentRough Cut Desired

State Solution

Solution Vocabulary – Enterprise Data Model Update

Solution Specific Roadmap

Designated Sources of

Reference / Source of Record

Support NDAA

Certification

Process BPR Assertion

Business System

InformationAQXS Certification Position

Update Future

State Vision

and Master

Plan

Current State Architecture

Statement of Work for

Individual capabilities within

the next budget cycle

Solution Vocabulary –

Enterprise Data Model update

Solution Specific Roadmap

Develop and

Maintain

Current State

Architecture

Current State Architecture

Solution Vocabulary –

Enterprise Data model Update

Develop Solution

Domain Transformation Plan

Architectural Vision

Solution Specific Roadmap

Transition State Solution Architecture

Acquisition Improvement Plan (AIP)

Business Case Analysis

Business Case Analysis

Certification and

Accreditation

Desired State Solution Concept

Domain Roadmap UpdateInfrastructure Change

Transition State

Solution Concept

Transition State Solution Concept

Validated and Decomposed

Capability Need

into Requirements

Capability Need Statement

Current State

Business Process

Domain Master Plan

Domain Strategy

Funded Requirement Notice

Solution

Corrective Action

Desired State Solution Concept

Desired State Solution Concept

High Level Desired

State Architecture

Solution Development

Lessons Learned and Insights

Transition State

Solution Concept

BACK FWD

Support

Management

of Air Force

Architecture

AFDP Issues, Courses

Of Action, or

Challenges

AFDP Meeting Agenda

And Read-Aheads

AFEC Meeting Agenda

And Read-Aheads

AFEC Issues, Courses

Of Action, or

Challenges

Page 140: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.5.3.5.1 Support Management of Air Force Architecture

Go Up 1 Level

Support AF

Architecture

Executive

Committee

AFDP Issues, Courses

Of Action, or

Challenges

AFDP Meeting Agenda

And Read-Aheads

Support AF Data

PanelAFEC Meeting Agenda

Or Read-Aheads

AFEC Issues, Courses

Of Action, or

Challenges

Support DoD IT

Service

Management

IT Service Management

Policies and Conformance

Requirements

Air Force IT Service

Management Policies and

Conformance Requirements

Page 141: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.3.6 Provide Acquisition Product Support Oversight

Conduct

Enterprise

Oversight

Pertaining to

Product Support

Represent AF

Product Support

Enterprise

Equities in

Governance

Forums

Conduct

Oversight of

Partnerships

Related to Depot

Operations

Go Up 1 Level

Ensure Title 10

Section 2464

Compliance

Conduct

Oversight of AF

Depots

Product Support

Oversight

Ensure Title 10

Section 2466

Compliance

Programmatic

Data

Provide Product

Support to

Congress, OSD,

and Other

Services

Provide

Program

Oversight and

Guidance for

Product Support

Ensure Title 10

Section 2476

Compliance

Page 142: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.1.5.4 Manage Acquisition Program Master List

Add Effort to

the AML

Coordinate

Program

Information

with SMART

Go Up 1 Level

Process

Updates /

Changes

Remove

Effort from

the AML

Request to add Effort

Request to remove Effort

BACK FWD

Updated SMART

Program Record

Programmatic

Data

Request for

Exemptions

Exemptions

Revised

AML

Revised

AML

IML

Review and

Approve

Exemptions

Maintain IML

AML

AML

AML

Page 143: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.5 Conduct IT Portfolio Management

Go Up 1 Level

Analyze IT

Portfolio

Controlled Existing Portfolio

Other Guidance

(Congressional, Federal, OSD, AF, etc.)

Baseline Analysis

Select Desired

IT Portfolio

Control IT

PortfolioFISMA Compliance

NDAA Compliance

Evaluate IT

Portfolio

Performance

AQXS Shop Performance

Report

Support IT

Program

Management

Capability &

Product

Requirements

& Money

CCA Compliance

Certification and

Accreditation

Migration Plan (IT Roadmap)

Portfolio Selection Criteria

Portfolio Selection Criteria

Performance Evaluation

Lessons Learned,

Insights, and Metrics

BACK

AF Strategic

Plan

Annual Investment StrategyValidated and Decomposed Capability

Need into Requirements

Capability Need

Statement

Domain Performance

Goals

Domain Performance

Goals

Solution

Solution Performance

Reports

Unfunded Requirements List

Corrective Action

High Level Desired

State Architecture

FWD

List of selected Initiatives

Page 144: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.5.5 Support IT Program Management

Go Up 1 Level

Transform Investment Strategy

into Funded Requirements

(PPBE – “Corporate Process”)

Statement of Work for

Individual capabilities within

the next budget cycleAnnual Investment Strategy

Funded

Requirement Notice

Unfunded Requirements List

Transformation Plan

Capability &

Product

Requirements

& Money

Strategic Direction

RRB Overarching

Strategy

Enterprise Architecture

Page 145: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.1.5.6 Conduct Program Assignment

Go Up 1 Level

BACK

Assign PEOAssign Program

Manager

Stand Up

Program Office

Stand Up Joint

Program Office

PEO

Assignment

Program

Manager

Assignment

Program

Office

Established

Joint

Program

Office

Established

Notification of

Potential

Program

Program

Manager

Assignment

AFMC/AFSPC

Input

FWD

Page 146: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.5.7 Provide Departmental Standardization Leadership

Go Up 1 Level

BACK

Serve as Air

Force

Standardization

Executive

Serve as Air

Force

Standardization

Officer

DSP

Policies

AF Standardization

Policies &

Procedures

Standardization

Issues

Approved

Defense

Standards

DSP

Policies

DSP Implementation

FWD

Page 147: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.5.8 Manage Acquisition Key Leadership Positions

Go Up 1 Level

BACK

Military KLP

Assignment

Civilian KLP

Assignment

Nominated

KLP Candidates

KLP Waiver

Tenure

Agreement

Qualified KLP

Candidates

Identify Qualified

KLP Candidates

Nominate KLP

Candidates

Develop Tenure

Agreement

Conduct Military

KLP Assignment

Process

Conduct Civilian

KLP Assignment

Process

Approve KLP

Candidates

Request KLP

Waiver

Approve Waiver

Note: A waiver can be

input to any of the Core

processes.

Waiver

Request

KLP

Needs

KLP Assignments

Distributed Waiver

Approval

Tenure

Agreement

Page 148: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.1.5.9 Manage Scientific and Technical Information

Go Up 1 Level

BACK

Document

Scientific and

Technical

Information

(STINFO)

Manage

Distribution of

STINFO

Disseminate and

Withhold STINFO

Scientific and

Technical

Information

Documented

Research

Work in Progress

Distribution

Statement

SF 298

Distributed

Scientific and

Technical

Information

Unclassified

Scientific and

Technical

Information

Page 149: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2 Program and Budget (PPBE)

Conduct

Budgeting

Conduct

Programming

Conduct

Financial

Execution

Go Up 1 Level

Fiscal

Guidance

R-DOCS

Conduct

PlanningPrevious Guidance

BACK FWD

Fiscal

Guidance

R-DOCS

POM

Budget

Reallocations

Joint

Programming

Guidance

Joint

Programming

Guidance

Warfighter

Shortfalls and

Priorities

Defense

Planning

Guidance

Resource

Management

Decision

(RMD)

IMP

Budget

Programmatic

Data

Programmatic

Data

Page 150: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.1 Conduct Planning

Analyze

Warfighter

Shortfalls and

Priorities

Develop

Chairman’s

Program

Recommendation

Develop the Joint

Programming

Guidance

Go Up 1 Level

Priority of

Joint Requirements

Alternatives

FWD

Chairman’s Program

Recommendation

Joint

Programming

Guidance

Warfighter

Shortfalls and

Priorities

PEO View

Prepare S&T

Planning

Documents

Defense Planning

Guidance

Previous Guidance

Warfighter

Shortfalls and

Priorities

S&T Strategy

S&T Plan

CFMPs

CCTs

Assess SP3

Products

Defense

Planning

Guidance

Conduct Strategic

Planning

SP3 Assessment

Previous Guidance

Previous

Chairman’s Program

Recommendation

Defense

Planning Guidance

Resource

Allocation Plan

Strategic

Master Plan

Strategic Planning

Guidance

CFSP PCPs

Air Force

Strategy

APPG

APPG

Page 151: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.1.1 Conduct Strategic Planning

Conduct Air

Force Strategy

Development and

Implementation

Go Up 1 Level

FWD

Conduct Air Force

Strategic

Planning

Source Documents

Wargaming Results

Implementation

References PPG

Documents

For ReviewGovernance

Page 152: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.1.1.1 Conduct Air Force Strategy Development and Implementation

Go Up 1 Level

Maintain the

AFSEA

Maintain the AF

FOC

Maintain the Air

Force Strategy

Maintain the Air

Force SMP

AFSEA

AFSEA

Source Documents

AF FOC

AF FOC

AF Strategy

AF Strategy

AF SMP

FWD

Maintain Force

Development

ConceptsConduct Strategy

Implementation

Provide

Wargaming

Support

Force Development Concepts

Force Development Concepts

Implementation

Wargaming Results

AF SMP

AF Strategy

AF SMP

Page 153: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.1.1.2 Conduct Air Force Strategic Planning

Go Up 1 Level

Develop

Strategic

Planning

Baseline

Develop Strategic

Planning

Guidance

Develop 10 Year

Plan

Develop Strategic

Priorities List

BACK

Strategic Planning Baseline

References

Strategic Planning Guidance

10 Year Plan

Strategic

Prioritized List

Select Planning

Choices & Offsets

Create 30 Year

Plan

Create Plan to

Program

Guidance

Planning Choices

30 Year Plan

PPG

Provide

GovernanceDocuments

For ReviewGovernance

Page 154: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.1.3 Analyze Warfighter Shortfalls and Priorities

Analyze National Military

Strategy (NMS)

Go Up 1 Level

Analyze Chairman’s Risk

Assessment (CRA)

BACK FWD

Alternatives

Priority of

Joint Requirements

Warfighter

Shortfalls and

Priorities

Analyze Global Force

Management (GFM)

Analyze Chairman’s Program

Recommendation (CPR)

Analyze Joint Intelligence

Estimate (JIE), Joint Strategic

Assessment (JSA), and Joint

Strategy Review (JSR)

Analyze Chairman’s Program

Assessment (CPA)

Analyze Chairman’s

Comprehensive Joint

Assessment (CJA)

Analyze Joint Combat

Capabilities Assessment

(JCCA)

Analyze Joint Concept

Development (JCD)

Analyze Joint Logistics

Estimate (JLE)

Analyze Operational

Availability Studies (OA)

Analyze Joint Personnel

Estimate (JPE)

Analyze Chairman’s

Readiness Systems (CRS)Analyze Joint Strategic

Capabilities Plan (JSCP)

Page 155: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.1.6 Prepare S&T Planning Documents

Go Up 1 Level

Develop S&T

Strategy

Develop S&T Plan

Develop CFMPs

Identify CCTs

BACK

S&T

Strategy

S&T Strategy

Defense Planning

Guidance

Previous Guidance

Warfighter

Shortfalls and

Priorities

S&T Plan

S&T Plan

CFMPs

CFMPs

CCTs

Page 156: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2.2 Conduct Programming

Prepare for POM

Development

Prepare POM

Submission

Go Up 1 Level

Conduct AFCS

Deliberations

BACK FWD

Fiscal

Guidance

POMJoint

Programming

Guidance

PPI

Prior Years PB

Program

Guidance

PEO View

Conduct

Logistics

Requirements

Determination

Process

Programmatic

Data

Published

Requirements

Air Force

Strategic

Master Plan

Resource

Allocation Plan

APPG

Page 157: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.2.2.1 Prepare for POM Development

Kick off the

POM

Process

Conduct

MAJCOM

Programmer’s

Conference

Go Up 1 Level

POM

Schedule / Expectations Sr. Leader

Guidance

Approve APPG/

PPI

&

Prepare

Database

Draft POM Prepartation

Instruction (PPI)

FWD

Conduct

PEM

Activities

PEM Briefs

Fiscal

Guidance

Prior Year

POM

PPI

PPI

Resource

Allocation Plan

APPG

APPG

APPG

Page 158: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Go Up 1 Level

Review & Validate

Program vs. POM

Validate

Programs vs.

Governances

Identify &

Prioritize

Initiatives,

Disconnects,

Offsets, & Issues

Conduct PEM

Parades

Validate/

Prioritize

Program Content

& Issues

Support PPB&E

Process

Support

Program

Advocacy

PEM Parade

Briefing

Briefing

Templates

Validated

Program

Content

Disconnects

Initiatives

Offsets

Prioritized

List of

IDOs

Candidate

Issues

AQX

Recommendations

Corporate Structure

Guidance

Acquisition Process Model

1.2.2.1.4 Conduct PEM Activities

Resolved IssueProgram

Elements

Program Content

And Issues

Develop Risk

StrategyElevated Issue

Issue

Page 159: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2.2.1.4.1 Review and Validate Program vs. POM

Go Up 1 Level

Gather FYDP

Requirements

Review/ Analyze

Current Program

Content vs.

Stakeholder

Requirements

Validate Program

Content

Baseline

Stakeholder

Requirements

ABIDES

Information

Current

Performance

Achievements

Business

Case

Briefing

Templates

Disconnects

Fiscal

Guidance

Offsets

PEM Parade

Briefing

Validated

Program

Content

POM

Expenditures

Obligations

FWD

Way

Forward

Page 160: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2.2.1.4.2 Validate Programs vs. Governances

Go Up 1 Level

Analyze

Program

Elements

Resolve Issue

No Issue

Elevate Issue

Review/

Analyze

Program for

Governance

Impacts

Validate

Program

Content IAW

Governances

Resolved Issue

Resolved Issue

Elevated Issue

Program

Elements

Program

Elements

BACK FWD

Issue

Issue

Issue

Page 161: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2.2.1.4.3 Identify & Prioritize Initiatives, Disconnects, Offsets, & Issues

Go Up 1 Level

Reassess

Initiatives,

Disconnects, &

Offsets

Search for Offsets

Prioritize IDOs

Identified

Offsets

Assessment of

Initiatives,

Disconnects,

& Offsets

Disconnects

Initiatives

Offsets

Prioritized

List of

IDOs

BACK FWD

Page 162: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gAcquisition Process Model

1.2.2.1.4.4 Validate/ Prioritize Program Content & Issues

Go Up 1 Level

Co

re

Develop

Background

Papers on

Candidate

Issues

Develop

Recommendations

Revise

Background

Papers

Recommendations

Background

Papers

Finalized

Background

Papers

Present to SAF/

AQXAQX

Recommendations

Candidate

Issues

BACK FWD

Page 163: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

g

Go Up 1 Level

Compose

Issue/ Outline

Papers

Review with

OSD

Write Issue

Papers R-Docs

OSD

GuidanceIssue/Outline Papers

Draft PEM

Parade

Briefing

Prepare PEM

Parade

Briefing

Conduct PEM

Parade Pre-

Brief

Conduct PEM

Parade

Briefing

Revised PEM

Parade

Briefing

Input into

J-Books

Acquisition Process Model

1.2.2.1.4.6 Conduct PEM Parades

R-DOCS

BACK

Request

Issue

Corporate Structure

Guidance

Page 164: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

g

Create / Validate

Justification

Document

Go Up 1 Level

Review

Financial Data

in IDECS

Cross Reference

Financial Data in

ABIDES (Update

if necessary)

Produce R-

Doc(s)

Review R-

Doc(s)

Submit R-

Docs for

Inclusion into

J-Books

Request

Justification

Document

Data Export

Updated

ABIDES

Record

R-Doc(s)Approved

R-Doc(s)

Input into

J-Books

Acquisition Process Model

1.2.2.1.4.6.3 Write Issue Papers R Docs

OSD

Guidance

Page 165: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.2.2 Conduct AFCS Deliberations

Conduct PEM

Parades

Conduct Air

Force Group

Deliberation

Address

Options

Go Up 1 Level

Approve by

SECAF/

CSAF

Conduct Air

Force Board

Deliberation

Hold Air

Force Council

Review

Recommendation

to SECAF/CSAF

BACK FWD

Conduct

Investment

Inflation

Adjustment

Develop

Options

FM Guidance

Program Accounting

Prior Year

Budget Position POM

Options

Revised

Inflation

Factor

Guidelines

Adjusted

Portfolio

PPI PPI PPIPPI

PPI

Baseline

Extension

Options

Program

Guidance

Zero-Balance

Transfer

Options

APPG APPG APPG APPG APPG

APPG

Note: Section A2.2.3.4 of HAFMD1-56

calls out the AF Capability Development

Working Group.

Page 166: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.2.2.4 Conduct Air Force Board Deliberation

Prepare for

the BES

Conduct BES

and PB

Exercises

Prepare for

PB

Go Up 1 Level

Program

Guidance

Program

Guidance

PPI PPI

FWD

APPG APPG

Page 167: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2.2.2.7 Develop Options

Go Up 1 Level

Develop

Baseline

Extension

Options

(Round 0)

Baseline

Extension

Options

Develop

Zero-

Balance

Transfer

Options

(Round 1)

PEM Briefs

Develop

POM

Options

(Round 2)

Develop

SPR

Payback

Options

AQXP Spreadsheet

with Programs and

Funding Adjustments

SPR

Payback

Options

FM Guidance

FM Guidance

FM Guidance

PEM Briefs

POM

Options

Prior Year

Budget Position

Prior Year

Budget Position

Prior Year

Budget Position

Program Accounting

Program Accounting

Zero-Balance

Transfer

Options

Annual Planning

& Programming

Guidance

Annual Planning

& Programming

Guidance

BACK FWD

Page 168: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.2.2.7.1 Develop Baseline Extension Options (Round 0)

Go Up 1 Level

Develop

Initial

Baseline

Extension

Options

Initial

Baseline

Extension

Options

Brief

GroupGroup

Feedback

FM Guidance

Prior Year

Budget Position

FWD

Page 169: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.2.2.7.2 Develop Zero-Balance Transfer Options (Round 1)

Go Up 1 Level

Develop

Zero-

Balance

Transfer

Options

Initial

Zero-Balance

Transfer

Options

Brief

A8PE

Incorporate

Feedback

Zero-Balance

Transfer

Options

w/ Feedback

FM Guidance

A8PE

FeedbackPEM Briefs

Prior Year

Budget Position

Program Accounting

Annual Planning

& Programming

Guidance

BACK FWD

Page 170: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.2.2.7.3 Develop POM Options (Round 2)

Go Up 1 Level

Develop

Initial POM

Options

Initial

POM

Options

Brief

Group

Incorporate

Group

Feedback

Brief

Board

Incorporate

Board

Feedback

Incorporate

Council

Feedback

Brief

Council

POM

Options

w/ Group

Feedback

Board

Feedback

POM

Options

w/ Group

Feedback

Board

Feedback

FM Guidance

Group

Feedback

PEM Briefs

POM

Options

Prior Year

Budget Position

Program Accounting

Annual Planning

& Programming

Guidance

Core Function Lead

Integrator Inputs

BACK

Page 171: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2.2.2.8 Conduct Investment Inflation Adjustment

Go Up 1 Level

Conduct

Data Call

for FFP

ContractsFFP

Contract

Data Call

Provide

List of FFP

Contracts

List of

FFP

Contracts

Apply

Revised

Inflation

Factor

Adjusted

Portfolio

Revised

Inflation

Factor

Guidelines

BACK

Page 172: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.2.3 Prepare POM Submission

Execute FM

Program

Guidance

Build

Justification

Books &

Submittal Docs

Enter & Lock

ABIDES

Go Up 1 Level

Transmit to

OSD to Support

Congressional

Budget

Hearings

Program &

Justification

Book

Guidance

Program &

Justification

Book

Guidance

Force and

Financial Plan

(F&FP)

POM

BACK

Program

Guidance

Develop

Blue Books PBR

Blue

Book

PBR Results

POM

Blue

Book

POM Results

PEO View

FWD

Page 173: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.2.3.5 Develop Blue Books

Go Up 1 Level

Develop

POM Blue

Book

Develop

PBR Blue

Books

PBR

Blue

Book

PBR Results

POM

Blue

Book

POM Results

Page 174: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2.2.4 Conduct Logistics Requirements Determination Process

Prepare

Requirements

Requirements

Collaboration

and QC-2

Go Up 1 Level

Define

Requirements

QC-1

BACK

Validate

Requirements

Prioritize

Requirements

Publish

Requirements

Validated

Requirements

Final RequirementsInitial

Requirements

Prioritized Requirements

Programmatic

Data

Draft Requirements

Published

Requirements

Note: AFLCMC has a

Standard Process for CAM

Weapon Systems that is

similar to this process. The

process Prepare CAM

Weapon System

Requirements contains the

AFLCMC Standard Process.

Prepare CAM

Weapon System

Requirements

Programmatic

Data

Final Weapon

System Sustainment

Requirements

Page 175: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.2.4.1 Prepare CAM Weapon System Requirements

Go Up 1 Level

Note: This is an AFLCMC

Standard Process. This

Standard Process is

equivalent to the six step

LRDP flow from AFMAN 63-

143

WSS Requirements

Initial

Requirements

Requirements

In CAFDEx

Final Requirements

AFLCMC

Standard

Processes

Conduct Pre-

Collaboration

Establish and

Collaborate

Requirements

Monitor

CAFDEx Input

Conduct

Decision-Meet

Suspense

Validate

Requirements

Prioritize

Requirements

Publish in

CAFDEx

Publish

Requirements

in POM

Conduct Data

Call for Total

Force WSS

Requirements

Programmatic

Data

Final Weapon

System Sustainment

Requirements

Suspense Met

Validated

Requirements

Prioritized Requirements

Requirements

Published

In CAFDEx

Page 176: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3 Conduct Budgeting

Develop

Investment

Budget

Complete Initial

Budget

Go Up 1 Level

Develop

Operating

Budget

Operating Budget

Finalize Budget

Submission

BACK FWD

Fiscal

Guidance

Fiscal

Guidance

POM

POM

Joint

Programming

Guidance

Justification

Books

Initial

J-Book

Investment

Budget

Draft PBR

Prior Years PB

President’s

Budget

Prior Years PB

Resource

Management

Decision

(RMD)

PEO View

Air Force

Strategic

Master Plan

Air Force

Strategic

Master Plan

Page 177: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gG

ov

ern

ing

Co

re

Gather Program

Execution

Information

Review &

Approve

Adjustments

Acquisition Process Model

1.2.3.1 Develop Investment Budget

Go Up 1 Level

Prepare

Adjustment

Suggestions

FWD

Support

Congressional

Actions

Congressional

Inputs Posture

Briefs

POM

DefenseStaffer Days

Congressional

Deliberations

POMInvestment

Budget

Joint

Programming

Guidance

Prior Years PB

President’s

Budget

Funding

Adjustment

Program

Execution

Information

Hearings

Fiscal

Guidance

Page 178: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.1.4 Support Congressional Actions

Go Up 1 Level

Support

Congressional

ReviewsPOM Defense

Develop Mark

Summary

ReportSASC

Inputs

HASC

Inputs

Mark

Summary

Report

Provide

Congressional

Inquiry

Response

Provide SNaP

Data on Test &

Evaluation PB SNaP

Data

Response

PB SNaP Data

Request from

CAPE

POM/BES

SNaP Data

Request from

CAPE

Congressional

Inquiry

Response

Congressional

Inputs

Congressional

Inquiry

POM/BES

SNaP Data

Response

Posture

Briefs

Staffer Days

Congressional

Deliberations

President’s

Budget

President’s

Budget

Hearings

PEO View

Page 179: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.1.4.1 Support Congressional Reviews

Go Up 1 Level

Review

Support

Requirements

Inquiries

Needs

AssessmentConduct

Data Call

Initial

Position

Data

Call

Response

Support

RequestsData

Call

Develop

Position

Vet

Position

Provide

ResponseAF

Response

AF Position

FWD

President’s

Budget

Page 180: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.1.4.2 Develop Mark Summary Report

Go Up 1 Level

Review Inputs

for

Programmatic

Impacts

(Marks)Marks

Summarize

Marks

Mark

Summary

Report

HASC

Inputs

SASC

Inputs

BACK FWD

President’s

Budget

Page 181: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.1.4.3 Provide Congressional Inquiry Response

Go Up 1 Level

Gather Data

Analyze Data

Programmatic

Data

AnalysisDevelop

Response

Support

Congressional

Reporting

SAF/AQ

Posture

Briefs

Congressional

Inputs

Congressional

Inquiry

Congressional

Inquiry

Response

Hearings

Congressional

Deliberations BACK FWD

Programmatic

Data

Page 182: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.1.4.4 Provide SNaP Data on Test & Evaluation

Go Up 1 Level

Conduct POM/

BES SNaP

Data Update

Conduct

President’s

Budget (PB)

SNaP Data

Update

PB SNaP

Data

Response

PB SNaP Data

Request from

CAPE

POM/BES

SNaP Data

Request from

CAPE

POM/BES

SNaP Data

Response

BACK

Page 183: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.1.4.4.1 Conduct POM/BES SNaP Data Update

Go Up 1 Level

Send SNaP

Update Data

Call

Corrected

SNaP Data

SNaP

Data

Call

CSO

SNaP Data

Updates Analyze CSO

SNaP Data

UpdatesCAPE

Criteria

POM/BES

SNaP Data

Response

Submit POM/

BES SNaP

Data

Provide

Acknowledgement

of POM/BES SNaP

Data Response

Acknowledgement

Letter

FWD

POM/BES

SNaP Data

Request from

CAPE

Page 184: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.1.4.4.2 Conduct PB SNaP Data Update

Go Up 1 Level

Send SNaP

Update Data

Call

Analyze CSO

SNaP Data

Updates

Submit PB

SNaP Data

Provide

Acknowledgement

of PB SNaP Data

ResponseCAPE

Criteria

Corrected

SNaP Data

SNaP

Data

Call

Acknowledgement

Letter

BACK

PB SNaP Data

Request from

CAPE

CSO

SNaP Data

Updates PB SNaP

Data

Response

Page 185: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.2 Develop Operating Budget

Revise Personnel

Costs

Go Up 1 Level

Revise Flying

Hour Costs

Operating Budget

Adjustments

Operating Budget

Adjustments

Create Revised

Operating BudgetOperating Budget

BACK FWD

Support

Congressional

Actions

Congressional

Inputs

Fiscal

Guidance

Fiscal

Guidance

POM

Defense

Posture

Briefs

Staffer Days

Congressional

Deliberations

POM

POM

Prior Years PB

Prior Years PB

President’s

Budget

Hearings

Page 186: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Identify Offsets

to Match Fiscal

Guidance

Acquisition Process Model

1.2.3.3 Complete Initial Budget

Go Up 1 Level

Prepare Initial

PBR

BACK FWD

Support

OSD

Program

Budget

Review

(PBR)

Process

PBR

Zero-Based

Transfer

Options

PBR

Options

FM Guidance

FM Guidance

PEM Briefs

Prior Year

Budget Position

Program Accounting

POM

Joint

Programming

Guidance

Draft Initial

Service Cost

Position

Initial J-Book

Draft PBR

Prior Years PB

Program

Execution

Information

Operating Budget

Investment

Budget

APPG

Page 187: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.3.3 Support PBR Process

Go Up 1 Level

Develop

PBR Zero-

Balance

Transfer

Options

(Round 1)

Develop

PBR

Options

(Round 2)

FM Guidance

FM Guidance

PBR

Options

PBR

Zero-Based

Transfer

Options

PEM Briefs

Prior Year

Budget Position

Prior Year

Budget Position

Program Accounting

Program Accounting

Annual Planning

& Programming

Guidance

Annual Planning

& Programming

GuidancePEM Briefs

PEO View

Page 188: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.3.3.1 Develop PBR Zero-Balance Transfer Options (Round 1)

Go Up 1 Level

Develop

Zero-

Balance

Transfer

Options

Brief

A8PE

Incorporate

Feedback

FM Guidance

A8PE

Feedback

Initial

Zero-Balance

Transfer

Options

PEM Briefs

Prior Year

Budget Position

Program Accounting

Zero-Balance

Transfer

Options

w/Feedback

Annual Planning

& Programming

Guidance

FWD

Page 189: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.3.3.2 Develop PBR Options (Round 2)

Go Up 1 Level

Develop

Initial PBR

Options

Initial

PBR

Options

Brief

Group

Incorporate

Group

Feedback

Brief

Board

Incorporate

Board

Feedback

Incorporate

Council

Feedback

Brief

Council

PBR

Options

w/ Group

Feedback

PBR

Options

w/ Board

FeedbackCore Function Lead

Integrator Inputs

Board

Feedback

Council

Feedback

FM Guidance

Group

Feedback

PBR

Options

PEM Briefs

Prior Year

Budget Position

Program Accounting

Annual Planning

& Programming

Guidance

BACK

Page 190: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Address OSD

Staffer

Questions Budget

Clarifications

Acquisition Process Model

1.2.3.4 Finalize Budget Submission

Go Up 1 Level

Draft Resource

Management

Decision (RMD)

Respond to

Draft RMD

Air Force

RMD Response

Resource

Management

Decision

(RMD)

Prepare

President’s

Budget

Inputs

BACK

Develop

Justification

Books

PBR

Justification

BookABIDES Data

Initial J-Book

PB

Justification

Book

Draft PBR

President’s

Budget

PB

Justification

Book

Issue RMD

Note: The Program Budget

Decision referenced in AFI 16-501

and the PPBE Reference Guide has

been superseded by the Resource

Management Decision.

Page 191: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.4.5 Develop Justification Books

Go Up 1 Level

Build PBR

Justification

Book

POM Position

Trigger:

ABIDES Lock

(Jul)

Budget Position

Weapon System Codes

Budget Program

Activity Codes

FY $s

FY Quantities

Build PB

Justification

Book

Final POM Position with

Congressional Inputs

Trigger:

ABIDES Lock

(Jan)

Appropriations

Appropriations

Budget Position

FY $s

PB

Justification

Book

PBR

Justification

Book

Weapon System Codes

Program

Elements Program

Elements

Budget Program

Activity Codes

FY Quantities

Page 192: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.4.5.1 Build PBR Justification Book

Go Up 1 Level

Provide

Call Letter

&

Guidance

for PBR

PBR

Justification

Book

Trigger:

ABIDES Lock

(Jul)

Perform

Field

Training

for PBR

Schedule

System/

Functional

TrainingTraining

Materials

Load PBR

Data into

IDECS

PBR

J-Book

DataCreate PBR

J-BooksDeliver

PBR J-

Books to

SAF/FM

FM Receives

PBR

Justification

Book

Appropriations

Budget Position

PBR Call Letter

FY $s

FY Quantities

PBR Guidance

POM Position

POM Position

Weapon System Codes

Program

Elements

FWD

Budget Program

Activity Codes

Page 193: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.3.4.5.2 Build PB Justification Book

Go Up 1 Level

Trigger:

ABIDES Lock

(Jan)

Provide

Call Letter

&

Guidance

for PB

Load PB

Data into

IDECS

PB

J-Book

DataCreate PB

J-Books Deliver PB

J-Books to

SAF/FM

FM Receives

PB

Justification

Book

Appropriations

Budget Position

PB Call Letter

Final POM Position with

Congressional Inputs

Final POM Position with

Congressional Inputs

FY $s

FY Quantities

PB Guidance

PB

Justification

Book

Weapon System Codes

Program

Elements

BACK

Perform

Field

Training

for PB

Schedule

System/

Functional

TrainingTraining

Materials

Budget Program

Activity Codes

Page 194: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4 Conduct Financial Execution

Conduct Funds

Distribution

Monitor

Financial

Execution

Go Up 1 Level

Prior Year

Budget Authority

Conduct

Reprogramming

Activities

BACK

Congressional

General

Reductions

Expenditures

Funding

AdjustmentFunds Status

ObligationsWithhold Factors

PEO View

Program

Authorization

Budget

AuthorizationBudget Authorization

Page 195: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.2.4.1 Conduct Funds Distribution

Determine

Reductions &

Withholds

Distribute

Program

Authorization /

Budget

Authorization

Go Up 1 Level

Funds

Withheld

FWD

Prior Year

Budget

Authority

Distribute

Funds

Appropriation

Action

IDECS Budget

Export

Appropriation Bill

Congressional

General

Reductions

Congressional

Marks

Withhold

Factors

PB

Request

Reprogram

FundsReprogramming

Request

DD1415-1

Package

1415-3

Package

Revised Budget

Program

Authorization

Program

Authorization

Program

Authorization

Budget

Authorization

Budget

Authorization

Page 196: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.2.4.1.2 Distribute Program Authorization / Budget Authorization

Go Up 1 Level

FWD

Develop

Program

Authorization

(PA)

Develop

Budget

Authorization

(BA)

Prepare BA

Document for

Release to the

Center

Validate and

Enter Budget

Targets into

Systems

BA Documents Budget TargetsRevised BudgetProgram

Authorization

Budget

Authorization

Note: The final process

above is an AFLCMC

Standard Process.

Page 197: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.2.4.1.2.1 Develop Program Authority (PA)

Go Up 1 Level

FWD

Validate

with PB

Position

(PILE)

Corrections

Add

Congressional

Marks to PB

Plus Marks Coordinate

with CDs

Adjust

Data

Appropriations

CD

Feedback

Issue

Program

Authorization

Corrected

Appropriation

Appropriation Bill

Appropriation

Action

Congressional

Marks

IDECS Budget

Export

PB

Request

Program

Authorization

Page 198: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.2.4.1.2.4 Validate and Enter Budget Targets into Systems

Go Up 1 Level

BACK

Determine PEO

to Execute

Funds

Balanced

EOM Position

Create and

Release AFM

Target

Allowance

Identify Out-of-

Balance

Conditions

Target Load Sheet

Validate Funds

Breakout

Prepare Target

Load in CCAR

Resolve

Out-Of-

Balance

Conditions

Enter Targets

in General

Accounting

and Finance

System (GAFS)

Prepare Target

Load for Other

Service

Locations

Funds Breakout

Out-of-Balance

Conditions

AFM Target Allowance

Target Load Sheet

AFM Target Allowance

Note: This is an AFLCMC

Standard Process.

BA Documents

Budget Targets

BA Documents

AFLCMC

Standard

Processes

Page 199: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.1.3 Reprogram Funds

Go Up 1 Level

Perform Internal

Reprogramming

Perform Prior

Approval

Reprogramming

Perform Below

Threshold

Reprogramming

Draft 1415-3

Package

OSD

Received

1415-3

Package

Draft 1415-1

Package

3011$

BTR Memo

3080$

BTR Memo

Congress

Received

DD1415-1

Package

PEO View

FWDBACK

Program

Authorization

Page 200: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.1.3.1 Perform Internal Reprogramming

Go Up 1 Level

Review

Programmatic

Aspects for

Executability Executability

Assessment Conduct

Secondary

Review

Conduct SAF/

AQXE Review

and Approval

Conduct SAF/

AQX Review

and Approval

Refined

1415-3

Package

Refined

1415-3

Package

Distribute to

SAF/FM

Approved

1415-3

Package

FM Received

1415-3

Package Distribute to

OSD

Draft 1415-3

Package

Draft 1415-3

Package

OSD

Received

1415-3

Package

FWD

Page 201: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2.4.1.3.2 Perform Prior Approval Reprogramming

Go Up 1 Level

Review

Programmatic

Aspects for

Executability Conduct

Secondary

Review Conduct SAF/

AQXE Review

and Approval Conduct SAF/

AQX Review

and Approval

Refined

1415-1

PackageRefined

1415-1

Package

Distribute to

SAF/FM FM Received

1415-1

PackageDistribute to

OSD OSD

Received

1415-1

PackageSubmit to

Congress

Executability

Assessment

Draft 1415-1

Package

Draft 1415-1

Package

Congress

Received

DD1415-1

Package

BACK FWD

Action Items

Page 202: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2.4.1.3.3 Perform Below Threshold Reprogramming

Go Up 1 Level

Assess Request

for Executability3080$

BTR Memo

Request

Assessment

Prepare BTR

Package

Review BTR

Package for

Approval

Issue Program

Authorization

(PA)

Hard Copy

BTR w/

Snowflake

BTR

Package

3011$

BTR Memo

BACK

Program

Authorization

Page 203: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.1.3.3.4 Issue Program Authorization (PA)

Go Up 1 Level

Validate

Available 3010,

3020, 3600

Funds

3010

Request

3020

Request

Available

Funds

3600

Request

3011

Request

3080

Request

Validate

Available 3011,

3080 Funds

Available

Funds

Draft & Validate

PA

Draft, Validate, &

Approve PA

Approve PAValidated

Program

Authorization

Program

Authorization

Program

Authorization

Page 204: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.1.4 Distribute Funds

Go Up 1 Level

Perform

Initial

Distribution

Conduct

SBIR

Congressional

MarksCongressional

Mandated

Reductions

Initial

Distribution

Results

SBIR

Withholds

Appropriation Bill

Appropriation

Action

IDECS Budget

Export

PB

Request

PB

Request

PEO View

BACK

Program

Authorization

Program

Authorization

Page 205: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.1.4.1 Perform Initial Distribution

Go Up 1 Level

Validate

with PB

Position

(PILE)

Corrections

Add

Congressional

Marks to PB

Plus Marks Coordinate

with CDs

Adjust

Data

Appropriations

CD

Feedback

Issue

Program

Authorization

Corrected

Appropriation

Appropriation Bill

Appropriation

Action

Congressional

Marks

IDECS Budget

Export

PB

Request

FWD

Program

Authorization

Page 206: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.1.4.2 Conduct SBIR

Go Up 1 Level

Factor in

Adjustments

Remaining

Balance

Proposed

Adjustments

Validate with

CDs

Validated

Adjustments

Issue Program

Authorization

Congressional

Mandated

Reductions

Initial

Distribution

Results

PB

Request

SBIR

Withholds

BACK

Program

Authorization

Page 207: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.2.4.2 Monitor Financial Execution

Track Monthly

Obligations &

Expenditures

Identify

Shortfall /

Excess Funds

O/E Report

Go Up 1 Level

BACK FWD

Create

Omnibus

Position

Execute Top

Down Bill

Process

Approved

List of

Sources &

RequirementsSPR Pays

FM Request

For Omnibus

Sources

Funds

Executed

Funds Status

Top Down

Bill Pays

Other Risks

Must Pays

Program Expenditure

Execution

Program Obligation

Execution

Review MDAP

Obligation

Rates

Program

Obligation

Actions

Underobligated

MDAPs

Note: CTRL-Click here to access an active link to a memo from Mr. Hale and

Mr. Kendall regarding obligation rate tenets.

PEO View

Program

Authorization

Budget

Authorization

Page 208: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.2.3 Create Omnibus Position

Go Up 1 Level

Gather

Sources &

Requirements

Develop Draft

List of

Sources &

Requirements

Sources

Draft List

Of Sources &

Requirements Coordinate/

Finalize

Sources &

Requirements

Requirements

Trigger:

Mid-April

Approved

List of

Sources &

Requirements

FM Request

For Omnibus

Sources

FWD

Page 209: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.2.4 Execute Top Down Bill Process

Go Up 1 Level

Build Top

Down Bill

Pay

Briefing

Coordinate

Top Down

Bill Pay

Briefing

Draft Top

Down Bill

Pay Briefing

Top Down

Bill Pay

Briefing Brief

CSAF/

SecAFApproved

Top Down

Bill Pays

Conduct

Sourcing

Activities

Execute

Payment

via 1415 or

BTR

Process

Approved

Top Down

Bill Pays

Funds

Executed

Must Pays

Other Risks

SPR Pays

Top Down

Bill Pays

BACK

Page 210: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.3 Conduct Reprogramming Activities

Conduct Above

Threshold Action

Go Up 1 Level

Conduct Below

Threshold Action

BACK

Review and

Coordinate

Program

BaselinesProposed

Program

Structure

Acquisition

Program

Baseline

Funding

AdjustmentFunds Status

Funds Status

Provide

GEV for

GFE Data

Data

RequestGEV/ GFE

Data Package

Program

Authorization

Program

Authorization

Program

Authorization

Budget

Authorization

Budget

Authorization

Budget

Authorization

APB

Page 211: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.3.2 Conduct Below Threshold Action

Go Up 1 Level

Data Call for

Unfunded

Requirements

Unfunded

Requirements

Potential

Funding

Sources

Validate

Source

Sourcing

Approval

Document

Source

Funding

Lines

Coordinate

Realignment /

Reprogramming

Documents

Complete

Necessary

Documentation

Issue Updated

Program

Authorization

Issue Updated

Budget

Authorization /

Allocation

Issue Budget

Authorization

Document

Reprogramming

Documentation

Realign Funds

Between

Program Offices

Funds

Status

Program

Authorization

FWD

Program

Authorization

Program

Authorization

Program

Authorization

Budget

Authorization

Budget

Authorization

Budget

Authorization

Budget

Authorization

Monitor

Execution of

Program

Funds

Determine if

Request is a

BTR

Informational

Notification

Obtain PEO

Approval for

Sources

Realignment /

Reprogramming

Document

AFLCMC

Standard

Processes

Page 212: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.2.4.3.3 Review and Coordinate Program Baselines

Go Up 1 Level

Develop

Recommendations

to APB

Task

Proposed

APB to SAF/

AQ CD

Organization

Review/ Sign

Proposed APB

Prepare/ Task

Coordination/

Signature Package

PEO

Endorsed

APB

APB

Coordination/

Signature

Package

Prepare/ Sign

Proposed APBPM

Endorsed

APB

Proposed

APB

Review/

Recommend

Coordination on

Proposed APB

APB

Recommendations

Proposed

Program

Structure

Acquisition

Program

Baseline

APB

BACK FWD

Page 213: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.2.4.3.4 Provide General Equipment Valuation/Government Furnished

Equipment DataGo Up 1 Level

Conduct Data

Call to Program

Offices

Provide Requested

Data

Forward Data to SAF/

A4L

GEV/ GFE

Data

Data

Request

GEV/ GFE

Data Package

Data

Call

BACK

Page 214: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3 Develop Requirements and Preliminary Design

Technology

Development Develop Preliminary

Design

Go Up 1 Level

Address

Accelerated

Capability

Needs

Technology Concept

Technology Need

DD1415-1

Preliminary

Design

Broader Set of

Technology Options

Operational and

Supportable

Technology

Urgent Need

Request

Warfighter

Shortfall / Need

LON

BACK FWD

Note 1 from the Chief Process Officer: The Under Secretary of Defense for AT&L has

provided four key enduring acquisition principles. The first of these principles is “Think”. Program

managers should tailor the program according to the specific needs of that program. The rote

checking the blocks in a checklist or simply following each and every step of a process is the

antithesis of Mr Kendall's challenge to Program Managers. Use this Model as a model. If your

program's situation warrants a waiver from the checklist or process, seek that waiver from your

milestone decision authority. CTRL-Click here to access an active link to Mr. Kendall’s thoughts.

MS A ADM

Acquisition

Strategy

Acquisition

Strategy

Capability Document

Note 2: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Page 215: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.3.1 Technology Development

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Identify and

Prioritize

Technology

Needs Mature

Technology

Transition

Technology

FWD

Technology Concept

Technology Need

Broader Set of

Technology Options

Demonstrated

Technology

Prioritized Need

Operational and

Supportable

Technology

Other

Technology

Applications

TRL 3/ 4/ 5

Technology

Page 216: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.3.1.1 Identify and Prioritize Technology Needs

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Define

Technology

Needs

Prioritize

Technology

Needs

Insert

Technology

Push

Comprehensive

List of

Technology

Needs

FWD

Technology Concept

Technology Need

Review &

Validate

Technology

Efforts

Prioritized

Requirements

AFROC

Memorandum

Broader Set of

Technology Options

Prioritized Need

Technology Concept

Conduct Joint

Candidate

Technology

Demonstration

JCTD

Outcome

JCTD

Approval

PEO View

Identify Flagship

Capability

Concepts

Identify

Advanced

Technology

Demonstrations

Technology Concept

Technology Concept

FCC

ATD

Technology Need

Technology Need

Page 217: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.1.1.3 Conduct Joint Candidate Technology Demonstration

Identify

Emerging

Technology(s)

Go Up 1 Level

Develop and

Approve

Implementation

Directive

Approve

JCTD

Emerging

Technology(s)

Candidate

Emerging

Technology

Demonstrate

JCTD

Implementation

Directive

JCTD

Outcome

Develop JCTD

Plan

Candidate

Emerging

Technology

JCTD

Management

Plan

JCTD

Approval

Demonstrated

Technology

Page 218: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.3.1.2 Mature Technology

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Receive

Strategic

DirectionFormulate

Technology

Development

ApproachDevelop/ Refine

Technology

Technology

Maturation

Approach

Performance

Targets

BACK FWD

Demonstrated

Technology

Prioritized Need

Other

Technology Applications

Refined

Technology

TRL 3/ 4/ 5

Technology

PEO View

Page 219: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.3.1.3 Transition Technology

Go

ve

rnin

gE

na

blin

gC

ore

Establish an IPT

Formulate

Technology

Development &

Transition

Strategy

(TDTS)

Develop

Information to

Assess

Technology

Readiness

(Conduct TRA)

Coordinate and

Update TDTS

Go Up 1 Level

Transition

Technology

Commit &

Approve

Technology

IPT

TDTS

Technology

Assessment

Updated TDTS

TRL/ MRL 6

Approval

BACK

Demonstrated

Technology

Operational and

Supportable

Technology

Other

Technology

Applications

Refined

Technology

TRL 3/ 4/ 5

Technology

PEO View

Technology

Transition

Plan

Page 220: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.1.3.3 Develop Information to Assess Technology

Go Up 1 Level

Establish a

TRA Plan

and

Schedule

Collect

Evidence of

Maturity Assess

Technology

Maturity

TRA

Plan

Technology

Maturity

Information

Form a SME

Team

Identify

Technologies

To Be

Assessed

TRA Need

Identified

Formed

SME Team

List of

CTEs

TRA Report

Page 221: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.1.3.3.3 Identify Technologies To Be Assessed

Go Up 1 Level

Prepare Initial

List of Critical

Technology

Elements (CTE)

Initial

List of

CTEs

Recommend

Changes to

the List of

Critical

Technologies

List of

CTEs

FWD

TRA Need

Identified

Formed

SME Team

Page 222: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.1.3.3.5 Assess Technology Maturity

Go Up 1 Level

Gather SME

Technology

Assessments

Prepare,

Coordinate, &

Submit the TRA

Report

TRA

Findings

Conduct

ASD(R&E)

Review and

Evaluation

BACK

TRA

Memorandum

Technology

Maturity

Information

TRA Report

TRA Report

Page 223: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2 Develop Preliminary Design

Perform

Capabilities-Based

Assessment and

Follow-on Actions

Generate Materiel

Concepts

(Conduct

Development

Planning)

Conduct

Materiel

Solution

Analysis

(Analysis of

Alternatives)

Refine

Preferred

System

Concept

Go Up 1 Level

Develop

Acquisition

Strategy

Draft DCR

Develop Life

Cycle

Management

Plan

BACK FWD

AoA Study

Guidance

COA

A B

Develop Life

Cycle

Sustainment

Plan

Prioritized Need

Top Down

Direction

Revision of

System

Engineering

Processes

Draft CDD

ICDICD

LCMP

Preliminary

DesignBroader Set of

Technology Options

Warfighter

Shortfall / Need

Preferred

System

Concept

MDD

LCSP

PEO View

Requirements

Traceability

Matrix

Operational and

Supportable Technology

Operational and

Supportable Technology

MS A ADM

LCSP

Strategic Outline

Conduct

Systems

Engineering

Assessment

Note 5: Consistent with the 24 Apr 13

Implementation Directive for Better Buying

Power 2.0, Defense Exportability must be

considered in the acquisition process. Such

considerations must be incorporated in

acquisition planning efforts. CTRL-Click

here to access an active link to the

Implementation Directive (in the Details

section on the left)..

Note 1: The following websites provide valuable information for product

support activities. The DoD Integrated Product Support Implementation

Roadmap has links to over 2500 knowledge items (such as policy,

references, and continuous learning modules). The Roadmap identifies

activities and outputs for the twelve integrated product support (IPS)

elements over the total life cycle. DoD has also established a Product

Support Manager website that provides links to a variety of relevant

documents. Finally, the Air Force has developed the Contract Sustainment

Support Guide to provide best practices for contractor logistics support.

CTRL-Click here to access an active link to each of the above.

FCC

ATD

JCTD

Programmatic

Data

Acquisition

Strategy

Acquisition

StrategyProblem

Statement

Capability Document

Capability

Document

Note 2: This enabling process

is based on the AFMC/EN and

SMC/EN sponsored SEAM

Guide.

Conduct

Capability

Gap

AssessmentJROCM

IPL

Lessons

Learned

JUON /

JEON

CNGB Issues

Non-CGA

Issues

Conduct

Cost

Capability

Analysis

Capability

Gap

CCA Final

Report

Conduct Air Force

Capability

Development

Note 3: The Conduct Air Force

Capability Development

process provides direction to

and is informed by the Pre-

Milestone A processes on this

page.

SMP

OSD

Direction

AF Strategy

AFSEA

JROCM

Prioritized Gap List

Note 4: Enclosure 14, Sections

4 and 7 of DoDI 5000.02 provide

a list of actions that RDT&E

Organizations/Program

Managers should take relative

to Cybersecurity. CTRL-Click

here to access an active link to

the instruction.Assign

Program

Manager

Programmatic

DataProgram Management

Agreement

Page 224: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.1 Perform Capabilities-Based Assessment

Go Up 1 Level

Draft

DCR

FWD

Develop

DOTmLPF-P

Change

Recommendation

Develop Initial

Capabilities

Document (ICD)

Maintain List

of Ongoing

and

Forecasted

CBAs

Defined

Capability

Need

List of CBAs

ICD

Note 1: An AFLCMC specific process

exists to provide product support

considerations to the CBA and ICD.

CTRL-Click here to access an active

link to this process.

Develop CBA

Study Plan

Conduct CBA

and Develop

CBA Final

Report

Approved CBA

Study Plan

CBA Final

Report

Defined

Capability

Need

AFLCMC

Standard

Processes

BACK

Prioritized Need

Warfighter

Shortfall / Need

CBA Final

Report

Study Team

Initiate CBA

Study & Issue

Study Guidance

Study Initiation Notice

Prioritized Need

Warfighter

Shortfall / Need

Study Team

Page 225: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.1.4 Develop ICD (Capability Documents)

Go Up 1 Level

Draft

ICD

AF

Approved

ICD

JROC

Approved

ICD

Revised

ICD

PEO View

Note: The following KPPs are mandatory in

requirements documents per JCIDS Manual:

Force Protection KPP, System Survivability KPP,

Sustainment KPP, Net-Ready KPP, Training KPP

and Energy KPP.

The following KSAs are mandatory in AF

requirements documents: the Flight Simulator

KSA

FWD

Conduct

Requirements

Strategy

Review

Conduct

Strategy

Development

and HPT

Preparation

Resolve

Comments

Conduct

Validation

and

Approval

Obtain

Internal

Approval/

Endorsement

Initiate

JCIDS

Staffing

Perform

Gatekeeper

Activities

Conduct

JROC/JCB

Tripwire

Process

Certification /

Endorsement

Memo

Certification /

Endorsement

Memo

JCIDS

Documents

JCIDS

Process

Metrics

Request

for RSR

Approved

Requirements

Strategy

Sponsor

Engagement

Note: All processes feed the Gatekeeper Activities

process

Prepare

Document by

High

Performance

Team

Conduct Initial

ICD Review

Capability Document

Revised

ICD

Draft

ICD

Page 226: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Acquisition Process Model

1.3.2.1.4.2 Conduct Requirements Strategy Review (RSR)

Go

ve

rnin

gE

na

blin

gC

ore

Request

Requirements

Strategy

Review

Review/

Coordinate for

Requirements

Strategy Review

Submit RSR

Request

Package

Document

A5R ApprovalApproved RSR

RSR Approval

Memo

Approved RSR

Package

Archive

Artifacts to

IRSS

Request

for RSR

Updated

IRSS

RSR

Briefing

RSR

Package

Requirements

Documentation

Page 227: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Acquisition Process Model

1.3.2.1.5 Conduct Capability Gap Analysis

Go

ve

rnin

gE

na

blin

gC

ore

Conduct DP

Lead Center

Assignment

Process

Develop

Proposal and

Prioritize DP

Effort

Conduct

Capability

Portfolio

Analysis

Support

Document

Development

Capability

Gap/Shortfall

Defined

Capability

Need Back

DP Lead Center

Assignment

DP Proposal

Capability Development

Roadmaps

DP Request

Funded DP Efforts

AFLCMC

Standard

Processes

Note: These processes are

part of the AFLCMC standard

processes for Development

Planning. CTRL-Click to view

the AFLCMC Process.

Page 228: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.2 Generate Materiel Concepts (Conduct Development Planning)

Develop

Potential

ConceptsQuantify

Capability

Needs

Perform

Characterization

of Candidate

Solutions Sets

Conduct

Programmatic

AnalysisDevelop

AoA Study

Guidance

Capability

Baseline

Go Up 1 Level

BACK FWD

Draft

ICD

AoA Study

Guidance

Candidate

Solutions for Further

Development

CCTD

Approved

CCTD

Review and

Validate DP

Efforts

AFROC

Memorandum

Broader Set of

Technology Options

Approved

Candidate

Solutions

for Further

Development

Approved

Candidate

Solutions

for Further

Development

Approved Set of

Candidate

Solutions

PEO View

FCC

ATD

JCTD

Prepare

AoA Study

PlanAoA Study Plan

Approved

AoA Study

Guidance

Approve AF

AoA Study

Guidance

MDD

Approved

Requirements

Strategy

AFLCMC

Standard

Processes

Note: The AFLCMC specific process

for Development Planning intersects

the Prepare AoA Study Plan. CTRL-

Click here to access an active link to

the AFLCMC process.

Approved Set of

Candidate

Solutions

Page 229: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gC

ore

En

ab

lin

gAcquisition Process Model

1.3.2.2.1 Develop Potential Concepts

Conduct

Capability

Decomposition

and Analysis

Conduct

Requirements/

Characteristics

Exploration and

Synthesis

Conduct Trade

Space and

Exploratory

Analysis

Go Up 1 Level

Obtain

Organization

Authorization to

Proceed

Concept Development

Team

Team Expectations

Team Resources Initial Requirements

Baseline

Potential Concept

Solutions

Conduct

Candidate

Solutions Review

High Level

Op. Concept

(OV-1)

NOTE 1: At each approval step, one of

three actions occurs:

1) Advance to the next step

2) Return to prior steps for rework

3) Archive the proposal due to immature

technology

Prioritized Candidate

Solutions

Final

CCTD

Initial

CCTD

Updated

CCTD

Capability

Shortfall

Broader Set of

Technology Options

Prioritized Need Approved

Candidate

Solutions

for Further

Development

Identify CCTD

Product

Support

Considerations

CCTD Product

Support Considerations

CCTD Product

Support Considerations

CCTD Product

Support Considerations

Draft Initial

Product

Support

Strategy

CCTD Product

Support Considerations

Initial

CCTD

NOTE 2: The enabling processes

are part of AFLCMC Standard

Processes.

FWD

Initial Product

Support Strategy

AFLCMC

Standard

Processes

NOTE 3: Process 1.6 (Perform

Concept Exploration and

Refinement), of the AFLCMC

Standard Processes is contained

within the Core Processes.

Develop

Security

Guidance

DP ProposalDP Security

Guidance

Page 230: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gC

ore

En

ab

lin

gAcquisition Process Model

1.3.2.2.3 Perform Candidate Solutions Sets Characterization

Develop Initial

Architecture

Conduct Initial

Concept Review

Perform System

Characterization

Go Up 1 Level

Concept

Action

Initial System

Views

Architecture

Conduct

Concept

Characterization

Review

Perform Key

Subsystem

Characterization

Initial Key SoS

Interfaces

Initial Key System

Definitions

System Views

Architecture

Key

Engineering

Analyses

NOTE 1: At each approval step, one of three

actions occurs:

1) Advance to the next step

2) Return to prior steps for rework

3) Archive the proposal due to immature

technology

FWDBACK

Updated

CCTD

Updated

CCTD

Updated

CCTD

Updated

CCTD

Approved

Candidate

Solutions

for Further

Development

Approved

Candidate

Solutions

for Further

Development

Identify CCTD

Product

Support

Considerations

CCTD Product

Support Considerations

CCTD Product

Support ConsiderationsUpdated

CCTD

NOTE 2: The enabling

process is part of an AFLCMC

Standard Process.

AFLCMC

Standard

Processes

Page 231: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gC

ore

En

ab

lin

gAcquisition Process Model

1.3.2.2.4 Conduct Programmatic Analysis

Conduct Cost /

Effectiveness /

Risk Analyses

Conduct

Requirements

Verification

Conduct Final

Concepts Review

Go Up 1 Level

Military Utility Analysis

Report

Approved Set of

Concept Solutions

Approve

Concept

Develop Verified

Affordability &

Schedule

Assumptions

Analytical

Results

Top Level

Development

Plan Schedule

NOTE 1: At each approval step, one of three

actions occurs:

1) Advance to the next step

2) Return to prior steps for rework

3) Archive the proposal due to immature

technology

BACK

Approved

CCTD

Approved

CCTD

Final

CCTD

Final

CCTD

CCTD

Cost Estimate

Approved

Candidate

Solutions

for Further

Development

Approved Set of

Candidate

Solutions

(with supporting

analytical basis)

Finalize Product

Support Strategy

NOTE 2: The enabling

process is part of an AFLCMC

Standard Process.

Final Product

Support Strategy

Initial Product

Support Strategy

Draft Framework for

Acquisition Strategy

AFLCMC

Standard

Processes

FWD

Page 232: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.2.6 Develop AoA Study Guidance

Go Up 1 Level

BACK FWD

AoA Study

Guidance

Approved

CCTD

Approved Set of

Candidate

Solutions

Conduct WIPT

Introductions

and Overview

Conduct AoA

Training

Define the

Purpose and

Scope of the

AoA

Identify the

Capability Gaps

Describe the

Baseline

Capability and

Alternatives

Develop

Specific

Questions to be

Answered

Develop the Key

Ground Rules,

Constraints, and

Assumptions

Develop the

Analysis

Methodology

Develop the

Administrative

Guidance

Conduct Wrap-

Up, Action Item

Review, and

Adjourn the

WIPT

Organized

WIPT

Trained WIPT

Purpose and

Scope of the AoA

Capability Gaps

Defined Baseline

Capability and

Alternatives

Questions

Ground Rules,

Constraints,

And Assumptions

Analysis

Methodology

Administrative

Guidance

Page 233: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.2.8 Prepare AoA Study Plan

Go Up 1 Level

BACK

AoA Study

Guidance

MDD

Approved

Requirements

Strategy

AoA Study Plan

Conduct WIPT

Introductions

and Overview

Conduct AoA

Training

Conduct

Overview of the

Study Plan

Development

Approach

Develop

Chapter 1

(Introduction)

Conduct

Overview of the

Baseline

Capability and

Potential

Alternatives

Develop

Chapter 2

(Alternatives)

Develop

Chapter 3

(Effectiveness

Analysis)

Develop

Chapter 4 (Cost

Analysis)

Develop

Chapter 5 (Risk

Assessment)

Review and

Revise Chapters

1-5

Organized

WIPT

Trained WIPT

Study Plan

Overview

Chapter 1

Defined Baseline

Capability and

Alternatives

Chapter 2

Chapter 3

Chapter 4

Chapter 5

Develop

Chapter 6

(Alternative

Comparison and

Cost Capability

Analysis)

Develop

Chapter 7

(Organization

and

Management)

Review and

Revise Chapters

1-7

Create Plan to

Develop

Appendices

Create

Technical

Editing and

Document

Staffing Plan

Conduct Wrap-

Up, Action Item

Review, and

Adjourn the

WIPT

Chapters 1-5

Finalized

Chapter 6

Chapter 7

Chapters 1-7

Finalized

Development

Plan for

Appendices

Technical Editing

And Document

Staffing Plan

Page 234: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.2.2.8.10 Conduct Effectiveness, Cost, and Risk Analyses

Refine Initial

Concept

Conduct

Effectiveness

Analysis

Effectiveness

Analysis

Go Up 1 Level

AoA Study Plan

ICD

MDD

AoA

Parameters

Candidate

Alternatives

Cost

Analysis

Conduct Cost

AnalysisConduct Risk

Analysis

Concept Assessment

Note The Refine Initial Concept

process occurs concurrent with

the other 3 processes. As such, it

both provides and receives input

from all 3 processes.

Risk

Analysis

Sustainability

Risk Analysis

Conduct

Sustainability

Performance

Analysis

Conduct

Sustainability

Cost Analysis

Conduct

Sustainability

Risk Analysis

Sustainability

Performance

Analysis

Sustainability

Cost Analysis

Candidate

Alternatives

Candidate

Alternatives

AoA

Parameters

Sustainability

Performance

Analysis

Sustainability

Cost Analysis

Sustainability

Risk Analysis

Page 235: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.3 Conduct Materiel Solution Analysis (Analysis of Alternatives)

Prepare for

the AoAConduct AoA Identify Preferred

System Concept /

Course of Action

Alternative

Comparison

MatrixCOA

Go Up 1 Level

BACK FWD

AoA Study Plan

ICD

Broader Set of

Technology Options

MDD

Preferred

System

Concept

AoA

Parameters

Approved Set of

Candidate

Solutions

Prepare Fully

Burdened Cost

of Energy

Estimate

Fully Burdened

Cost of Energy

Estimate

Prepare

AoA Final

Report

PEO View

Risk

Analysis

RAM-C Report

LCSP

Strategic Outline

Provide

Milestone A

Product

Support

Considerations

Milestone A

Product Support

NOTE 1: The final enabling process is

part of an AFLCMC Standard Process.

Recommended

Courses

of Action

Approved Set of

Candidate

Solutions

Approve

AoA Final

Report

Approved AoA

Final Report

Prepare

Concept of

Operations/

Operational

Mode

Summary/

Mission Profile

Recommended

Courses

of Action

CONOPS/

OMS/MP

Conduct Early

Systems

Engineering

Analysis

Recommended

Courses of Action

Assessment

of Technical

Risk

Acquisition

Strategy

Draft CDD

Establish Program

Office & Prepare for

Next PhaseAoA Study Plan

Approved Set of

Candidate

Solutions

Program Office

NOTE 2: The HSI perspective during the AoA is

to evaluate alternative solutions to determine the

alternative that maximizes human performance,

minimizes HSI-related costs and supports safe

and effective operations, maintenance, and

support functions. The Seven HSI domains

recognized by DoD are Human Factors

Engineering, Personnel, Habitability, Manpower,

Training, Safety and Occupational Health, And

Force Protection and Survivability.

Conduct

Post-AoA

Review

Assessment

Report

AoA Final

Report

AoA Final

Report

NOTE 3: Section 3.3.5 of AFI 14-111

describes various Working Groups that

can support intelligence inputs to an

AOA. CTRL-Click here to access an

active link to the AFI.

Page 236: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.3.7 Prepare AoA Final Report

Go Up 1 LevelPEO

View

Capture the

Results of

the Analysis

Validate

Final Report

Alternative

Comparison

Matrix

Recommended

Courses of Action

Coordinate

Final Report

with

Stakeholders

Draft Final

Report

Coordinated

Final

Report

AoA Final

Report

FWD

Page 237: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.3.9 Provide Milestone A Product Support Considerations

Go Up 1 Level

Refine CCTD

Product

Support

Considerations

Finalize

Product

Support Input

to Milestone A

Documents

Provide Product

Support SME

Inputs and

Assessments

Refined CCTD

SME Inputs and

Assessments

Milestone A

Product Support

BACK

NOTE: This process is part of

an AFLCMC Standard Process.

Approved Set of

Candidate

Solutions

Draft Milestone

A Documents

AFLCMC

Standard

Processes

Page 238: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.2.3.9.1 Refine CCTD Product Support Considerations

Go Up 1 LevelPEO

View

Refine

Tradespace

Characterization

PS

Considerations

Refine

Implementation

Analysis PS

Considerations

Refine Candidate

Solution Set

Characterization

PS

Considerations

Tradespace

Characterization

Considerations

Candidate Solution

Set Considerations

Implementation Analysis

Considerations Refine Risk

Assessment PS

Considerations

Risk Assessment

Considerations

Assess

DOTMLPF

Solution(s) for

PS Implications

Provide PS

CCTD Concept

Conclusions

PS Implications

Refined CCTD

FWD

NOTE: This process is part of

an AFLCMC Standard Process.

Approved Set of

Candidate

Solutions

Page 239: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.2.3.9.3 Finalize Product Support Milestone A Documents

Go Up 1 LevelPEO

View

Finalize Item

Unique

Identification

Plan

Finalize

Initial Life

Cycle

Sustainment

Plan

Finalize

Technical Data

Rights Strategy

Item Unique

Identification

Plan

Technical Data Rights

Strategy

Initial Life Cycle

Sustainment Plan

Finalize

DSOR

Planning Core

Applicability

BACK

SME Inputs and

Assessments

DSOR Core

Plan

NOTE: This process is part of

an AFLCMC Standard Process.

SME Inputs and

Assessments

SME Inputs and

Assessments

SME Inputs and

Assessments

Page 240: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.4 Refine Preferred System Concept

Manage,

Analyze, and

Validate

Requirements

Develop Capability

Development

Document (CDD)

Create Test and

Evaluation Master

Plan (TEMP)

Go Up 1 Level

BACK FWD

COARequirements

Traceability

Matrix

Preferred

System

Concept

Develop System

Performance

Specifications

COA

System

Performance

SpecificationsPreferred

System

Concept

Verification Plans

for Test Scripts

Requirements

Traceability

Matrix

Reliability Growth Curves

Address Life-Cycle

ConsiderationPreferred

System

Concept

Life-Cycle Considerations

Acquisition

Strategy

Acquisition

Strategy

Acquisition

Strategy

TEMP

Capability Document

Draft CDD

Draft CDD

Draft CDD

Page 241: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.4.2 Develop CDD (Capability Documents)

Go Up 1 Level

AF Approved

CDD

JROC Approved

CDD

Revised

CDD

CDD

PEO View

Note: The following KPPs are mandatory in

requirements documents per JCIDS Manual:

Force Protection KPP, System Survivability KPP,

Sustainment KPP, Net-Ready KPP, Training KPP

and Energy KPP.

The following KSAs are mandatory in AF

requirements documents: the Flight Simulator

KSA

Draft CDD

Conduct

Requirements

Strategy

Review

Conduct

Strategy

Development

and HPT

Preparation

Resolve

Comments

Conduct

Validation

and

Approval

Obtain

Internal

Approval/

Endorsement

Initiate

JCIDS

Staffing

Perform

Gatekeeper

Activities

Conduct

JROC/JCB

Tripwire

Process

Certification /

Endorsement

Memo

Certification /

Endorsement

Memo

JCIDS

Documents

JCIDS

Process

Metrics

Request

for RSR

Approved

Requirements

Strategy

Sponsor

Engagement

Note: All processes feed the Gatekeeper Activities

process

Prepare

Document by

High

Performance

Team

Conduct Initial

CDD Review

Revised

CDD

Draft CDD

Page 242: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Acquisition Process Model

1.3.2.4.2.2 Conduct Requirements Strategy Review (RSR)

Go

ve

rnin

gE

na

blin

gC

ore

Request

Requirements

Strategy

Review

Review/

Coordinate for

Requirements

Strategy Review

Document

A5R Approval

RSR Approval

Memo

Schedule

Requirements

Strategy

Review

Archive

Artifacts to

IRSS

Updated

IRSS

Request

for RSR

RSR

Briefing

RSR

Logistics

RSR

Package

Requirements

Documentation

Approved RSRApproved RSR

Package

Submit RSR

Request

Package

Page 243: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.2.5 Develop Acquisition Strategy

Conduct Tradeoff

Analysis

Determine

Appropriate

Technologies

for System

Demonstrate Critical

Technologies on

Representative

Prototypes

Prepare for

Preliminary

Design

Review

Go Up 1 Level

PDR

Report

Perform

Mission

AssignmentSPML

BACK

System Requirements

Document

Mission

Assignment

Approval

Preliminary

Design

MIRT Critical

Decision Point

Information

Updated

Contract File

Informed

SSA

Conduct

Critical

Decision Point

1a MIRT (Pre-

ASP)

Systems

Engineering

Tradeoff

Analysis

Requirements

Traceability

Matrix

Requirements

Traceability

Matrix

Allocated Baseline

Finalize

Acquisition

Strategy

Allocated Baseline

Prepare Preliminary

Design & Release

Schedule

Requirements

Traceability

Matrix

System

Performance

Specifications

Preliminary Design

& Release Schedule

MS A ADM

Draft Acq

Plan

Draft Acq

Plan

Conduct Market

ResearchMarket Research

Develop Draft

Acquisition Plan

Note 1: An AFLCMC specific process

exists to describe the Acquisition

Strategy Process. This AFLCMC

process is contained within the Air

Force Process depicted here CTRL-

Click here to access an active link to

this process.

System Performance

Specification

Life-Cycle Considerations

Acquisition

StrategyRevised Draft

Acquisition Strategy

Draft Acq

Strategy

Draft Acq

Strategy

Capability Document

Capability Document

Capability Document

Capability

Document

AFLCMC

Standard

Processes

Note 2: Conduct Market Research and

Develop Draft Acquisition Plan are

predecessors to the 1.4.4.1 processes.

Utilize

Electronic

Coordination

Tool

Uploaded

Acquisition

Strategy

Revised Draft

Acquisition Strategy

FWD

Page 244: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.3.2.5.4 Preliminary Design Review (PDR)

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore Identify PDR

Prerequisites

Prepare for

PDR

PDR

Documentation Conduct

PDR

Develop

Post-PDR

Assessment

Address

Unresolved

Issues

PDR

Documentation

SEP

Program Schedule

Resolved Issue

Updated Program

Schedule

Unresolved Issue

CARD Updated

CARD

Interface Control

Document

LCSPPost-PDR

Assessment

Allocated

Baseline

PDR Risk

Assessment

Checklist

IMP

IMS

FWD

TEMP

Draft CDD

Prepare

Observations and

Recommendations

Technical

Review

Report

Page 245: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.5.5 Perform Mission Assignment (MA)

Go Up 1 Level

Conduct Mission

Assignment

Coordination

(HQ AFMC &

Center XP)

Mission

Assignment

Notfication

Issue

Formal

Mission

Assignment Letter

Conduct Mission

Assignment

Coordination

(Center XP and

Directorates)

Coordinate

Mission

Assignment with

Potential

Gaining

Directorates

Receive AFMC

Mission

Assignment Letter

Mission Assignment

Coordination

Mission Assignment

Coordination

Mission Assignment

Letter

Mission

Assignment

Roles

Coordinate

Mission

Assignment with

XP

XP

Coordination

Coordinate

Mission

Assignment

with Center

Leadership

Update MA

Library &

Notify Center

Owner of

Acq Master

List

Assign

Product

Support

Integrator

(PSI)

Inform

Directorate of

PSM/PSI

Assignment

Receive

Product

Support

Integrator

Assignment

Letter

Initiate

Mission

Assignment

Resourcing

Actions

Directorate

Coordination

Assigned

Product Support Integrator

Updated

AssignmentUpdated

Assignment

Mission

Assignment

Approval

Mission

Assignment

Documentation

Mission Assignment

Letter

Note: This is an AFMC

Standard Process. It is

included in this model in

advance of Streamlining and

Redesign

Assign Product

Support Manager

(PSM)

Assigned

Product Support

Manager

Note: This process was

modified IAW Section 1.4.1.4.2

of AFI 63-101/20-101.FWDBACK

Page 246: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model1.3.2.5.6 Conduct Critical Decision Point (CDP) 1a (Pre-ASP)

Multi-Functional Independent Review Team (MIRT)

Go Up 1 Level

Evaluate

CDP 1a

Information

Provide

Immediate

Feedback to

Source

Selection/

Procurement

Team

Understanding

of MIRT

Findings

MIRT

Assessment

Provide

Assessment

of CDP 1a

Disposition/

Adjudicate

CommentsMIRT Findings

Incorporate

MIRT

Assessment

into Contract

File

Updated

Contract File

Provide

Feedback to

Source

Selection

Authority

(SSA)

Dispositioned/

Adjudicated

Comments

Informed

SSA

Dispositioned/

Adjudicated

Comments

MIRT Critical

Decision Point

Information

BACK FWD

Page 247: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.5.8 Utilize Electronic Coordination Tool

Go Up 1 Level

Create

Package

Assign

Reviewers

Reviewers Draft Document

Release

Package to

PM

Upload and

Initiate

Package

Draft Document

Gather Initial

Comments

Draft Document with Comments

Review and

Update

Package

Revised

Document

Draft Document

BACK

Upload

Package to

AIR

DAE-

Approved

Document

Document

Initiation

Gather

Comments

and Sign

Package

Final Document

Note: Currently used for only

the Acquisition Strategy, this

process can apply to any

milestone information

requirement.

Page 248: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.2.6 Conduct Capability Gap Assessment

Review and Brief

JCB

Go Up 1 Level

Synthesize

Capability

Gaps

Stratify

Capability

Gaps

Capability

Gap

Conduct JROC

Briefing JROCM

Recommendations

To JROC

List of

Capability

Gaps

FWD

IPL

Lessons

Learned

JUON /

JEON

CNGB Issues

Non-CGA

Issues

Page 249: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.7 Conduct Cost Capability Analysis

Develop

Measures

Go Up 1 Level

Identify

Problem and

Scope

Analysis

Create Value

Hierarchy

Approved

Analysis

Plan

Document

Develop

Value

Functions

Value

Function

Evaluation

Measures

Value

Hierarchy

BACK

Develop

Aggregation

Method

Identify

Alternatives

Estimate Cost of

Alternatives

Compute the

Capability of

Alternatives

Generate Outputs

and Display

Products

Analyze Sensitivity

Record Analysis

and Present

Findings

List of

Alternatives

Note: This Process is repeated

multiple times in the lifecycle of

a program

Sensitivity

Analysis

Life Cycle

Cost

Estimate

Capability of

Alternatives

AFLCMC

Standard

Processes

Capability

Gap

Capability

Gap

Trained

Facilitator

CCA Final

Report

Cost

Capability

Curve

Capability

Alternatives

Weighted

Objectives

Value

Hierarchy

FWD

Page 250: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.7.1 Identify Problem and Scope Analysis

Identify Team

Players and

Stakeholders

Go Up 1 Level

Develop

Problem

Statement

Define Scope

and Context

Capability

Gap

Tailor CCA

Process

Tailored

Process

Analysis

Plan

Coordinate Plans

with Decision

Authority

Approved

Analysis

Plan

Document

AFLCMC

Standard

Processes

Problem

Statement

Documented

Scope

Team

Resources

Note: This is an AFLCMC

Standard Process.

FWD

Objective

Statement

Page 251: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.2.7.2 Create Value Hierarchy

Construct Value

Hierarchy

Go Up 1 Level

Identify what

the

Stakeholders

Value

Decompose

High-Level

Tasks into

Subtasks or

Objectives

Mission

Subtasks

AFLCMC

Standard

Processes

Mission

TasksValue

Hierarchy

Capability

Gap

Note: This is an AFLCMC

Standard Process. FWDBACK

Approved

Analysis

Plan

Document

Page 252: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.2.7.4 Develop Value Function

Go Up 1 LevelAFLCMC

Standard

Processes

Elicit

Preferences

from

Stakeholders/

Users

Construct

Value

Functions

Evaluation

Measures

Function

Construction

Data

Value

Function

Note: This is an AFLCMC

Standard Process. FWDBACK

Page 253: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.7.5 Develop Aggregation Method

Go Up 1 LevelAFLCMC

Standard

Processes

Select

Aggregation

Method

Obtain

Stakeholder

Preferences

Selected

Weighting

Method

Value

Hierarchy

Determine

Aggregation

FunctionTrained

Facilitator

Stakeholder

Preferences

Weighted

Objectives

Note: This is an AFLCMC

Standard Process. FWDBACK

Value

Function

Page 254: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.2.7.6 Identify Alternatives

Go Up 1 LevelAFLCMC

Standard

Processes

Identify

Baseline

Configurations

Characterize

Tradespace

As-is

Features

Identify other

Alternatives

from Baseline

List of

Alternatives

Tradespace

Characterization

Note: This is an AFLCMC

Standard Process. BACK FWD

Value

Hierarchy

Note: This is a “or” process.

You will either Identify

Baseline Configuration or

Characterize Tradespace

Weighted

Objectives

Weighted

Objectives

Value

Hierarchy

Page 255: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.2.7.7 Estimate the Cost of Each Alternatives

Go Up 1 LevelAFLCMC

Standard

Processes

Estimate the

Cost of the

Baseline

Alternative

Estimate the

Cost of the

Remaining

Alternatives,

or Excursions

Alternative 0

Life Cycle

Cost Estimate

Alternative 1-N

Life Cycle

Cost Estimate

List of

Alternatives

Note: This is an AFLCMC

Standard Process. FWDBACK

List of

Alternatives

Page 256: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.7.8 Compute the Capability of Each Alternative

Go Up 1 LevelAFLCMC

Standard

Processes

Obtain

Performance

Data for

Lowest-level

Measures

Enter

Performance

Data into

Value

Hierarchy

Assessment

of Lowest

Level

Objectives

Value

Hierarchy

Note: This is an AFLCMC

Standard Process.BACK FWD

List of

Alternatives

Capability

of Alternatives

Page 257: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.7.9 Generate Outputs and Display Products

Go Up 1 LevelAFLCMC

Standard

Processes

Graph

Alternatives

Identify the

Efficient

Frontier

Cost Capability

Chart

Capability of

Alternatives

Life Cycle

Cost Estimate

Cost Capability

Curve

Identify Deltas

from Frontier

Note: This is an AFLCMC

Standard Process. BACK FWD

Capability

Alternatives

Page 258: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.2.7.10 Analyze Sensitivity

Go Up 1 LevelAFLCMC

Standard

Processes

Coordinate

Outputs with

Stakeholders

Perform

Sensitivity

Analysis

New

Weights

Sensitivity

Analysis

Note: This is an AFLCMC

Standard Process.BACK FWD

Cost

Capability

Curve

Capability

Alternatives

Page 259: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.7.11 Record Analysis and Present Findings

Go Up 1 LevelAFLCMC

Standard

Processes

Draft CCA

Final Report

Present

Analysis

Findings

Draft

CCA

Report

CCA Final

Report

BACKNote: This is an AFLCMC

Standard Process.

Sensitivity

Analysis

Page 260: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.8 Develop Life Cycle Sustainment Plan

Go Up 1 LevelAFLCMC

Standard

Processes

Determine

Requirement

for LCSP

Develop Draft

LCSP

Program LCSP

Requirements

DeterminationDraft LCSP

Note: This is an AFLCMC

Standard Process. BACK

AFLCMC

Decision

Tree

Review Draft

LCSP

Adjudicate

CRM and

Update LCSP

Submit LCSP

for PO

Functional &

PM Review/

Coordination

Staff LCSP

Send LCSP &

CRM for

Coordination

Adjudicate

and Update

LCSP

Send LCSP

with CRM to

AFMC/A4 for

Sustainment

Command

Coordination

Request Final

MDA Approval

Consolidated

LCSP CRM

Adjudicated CRM

PO Functional

Review/Coordination

PEO Signed LCSP

Consolidated

LCSP CRM

Adjudicated and

Updated LCSP

Updated LCSP

MIDA Approved

LCSP

Draft LCSP

Page 261: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.2.9 Conduct Air Force Capability Development

Go Up 1 Level

Provide AF

Guidance and

Strategy

Assess Current

Capabilities &

Interdependencies

Against Strategy

Strategic VectorsCapability Gaps

Identify &

Prioritize

Capabilities

Gaps &

Opportunities

Nominate AF

Strategic

Focus Areas

Select AF

Strategic

Focus Areas

Conduct

Development

Planning and

Experimentation

Develop &

Approve CDP

& CDR

Conduct CDC

& AF Senior

Leader Review

Develop

Strategic

Planning

Choices

Link 30-Year

Plan with

Strategic

Planning

Choices

AF Strategic Focus Areas

ECCT Charter

ECCT Products

CDP

Senior Leader Review Summaries Planning Choices Resource Allocation Plan

SMP

OSD

Direction

AF Strategy

AFSEA

JROCM

Prioritized Gap List

Assess 30-

Year Plan

Against

Strategy

Capability Development Roadmap

ECCT Documentation

HAF FeedbackCapability Development Areas

FWDBACK

Page 262: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.3 Address Accelerated Capability Needs

Go Up 1 Level

Conduct

Warfighter Urgent

Operational Needs

(UON)

Perform New

Start

Perform Quick

Reaction

Capability

Process

Fielded

Assets

BACK

Direct Quick

Reaction

Capability /

Urgent

Operational

Need Process

QRC

Integration

& Resourcing

UON/JUON

Integration

& Resourcing

Assets

UON/JUON

Note 2: As described in CJCSI

3170.01I and the JCIDS

Manual, “Emergent Operational

Needs” are processed similarly

to “Urgent Operational Needs”

DD1415-1

Urgent Need

Request

Lead and Facilitate

Response

to UONs

Validated UON

Urgent Need

RequestUON Prioritization

UON Assessment

LON

Track UON/

JUON/JEON

Monthly

Stmts MAJCOM

Reports

UON/JUON/JEON

Status

UON COA

Note 1: The two core

processes implement DoDI

5000.02, Enclosure 13 (Urgent

Capability Acquisition).

Validated UON

Page 263: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.3.1 Conduct Warfighter Urgent Operational Needs

Go Up 1 Level

Receive

Warfighter Urgent

Operational Need

(UON) Request

Assess and

Validate UON

Processed

Request

Load UON

Request into

IRSS database

Develop UON

Course of

Action UON COA

FWDNote: As described in CJCSI

3170.01I and the JCIDS

Manual,, “Emergent Operational

Needs” are processed similarly

to “Urgent Operational Needs”

Present to

AFROC &

Notify

Requestor

Non-Validated

UON Request

UON

Notification

CCD

Urgent Need

Request

PEO View

Validated UON

Page 264: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.3.1.3 Develop COA

Go Up 1 Level

Develop COA

Alternatives

Address

Normal

Capability

Channels

Define

Non-Materiel

Solution

(DOTMLPF)

COA

Alternatives

COA

Alternatives

COA

UON

COA

Page 265: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.3.2 Perform Quick Reaction Capability (QRC) Process

Go Up 1 Level

Select

COA

Develop and

Approve

Acquisition

Approach

Execute

COA

Perform

Disposition

Analysis

Fielded

Assets

Update IRSS

SMART w/ UON/

QRC Information

QRC

UON/QRC

Status BACK FWD

COA

Fielded

System

PEO View

UON

UON COA

QRC ADM

Development

QRC ADM

Page 266: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.3.2.2 Develop and Approve Acquisition Approach

Go Up 1 Level

Refine

COA

Approve Urgent

Need Acq

Strategy and

Program Baseline

Issue

ADM

Refined

COA

Approved

Acq Strategy

QRC ADM

Development

QRC ADM

COA

Approved

Acq Program

Baseline

FWD

Page 267: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.3.2.3 Execute COA

Go Up 1 Level

Develop/Test

QRC

Conduct

Initial Fielding

Assess Fielded

Capability for

Suitability &

Effectiveness

Adjust Solution

for EvaluationDeveloped/Tested

System

Fielded QRC

System

Assessed

QRC

System

Adjusted QRC System

BACK FWD

Fielded

SystemQRC ADM

Capabilities

& Limitations

Report

Conduct Post-

Fielding

Assessment

Post - Fielded

Assessment

Conduct

P&D

Milestone

Review

Production

QRC ADM

Production

Documentation

Page 268: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.3.3.2.4 Perform Disposition Analysis

Go Up 1 Level

Field Remaining

Assets to Theatre

Transition to

Enduring

Program

Sustain In-

Theatre

Assets Only

Conduct

Demilitarization

& Disposal

In-Theatre

Assets

Bridge

Strategy

Conduct

CTRCTM

Fielded

Assets

BACK

Fielded

System

Demilitarized

Asset

Page 269: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.3.3.3 Conduct New Start Notification Process

Go Up 1 Level

Format New Start

Notification Package

for Coordination Coordinate and

Approve New

Start

Notification

PackageNew Start

Notification Package

Draft New Start

Notification Package

Sign and Deliver

New Start

Notification

Package / Letter of

Notification (LON)

Note: PM Responsibilities outlined in AFI 63-101/20-101 Section 3.19 BACK

DD1415-1

CCD

LON

PEO View

Page 270: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.3.3.6 Lead and Facilitate Response to UONs

Go Up 1 Level

BACK

CCD

Urgent Need

Request

UON

Assessment

Prioritize and

Direct Actions to

Meet Urgent

Requirements

Evaluate & Monitor

Warfighter

Requirements

Monitor

Actions

Adjudicate

UON

ConcernsUON

Prioritization

UON

Action

Urgent Need

Request

Warfighter SIG

Action on Urgent Need

Request

CCD

CCD Fulfillment

Issues

Decision on

CCD Fulfillment

Issues

Note: The Warfighter SIG may establish DoD-level task forces, as

required, to focus DoD efforts to resolve UONs or address capability

surprises within specified capability domains.

Page 271: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4 Acquire (Develop and Operate)

Go Up 1 Level

BACK FWD

Program

Production

Contract

Management

Program

Development

System

Sustainment

Test and

Evaluation

CDD

CPD

Definitized

Agreement

Definitized

Agreement

OT

Reports

Managed

Test

Data

Demonstrated

System

Developmental Test Article

Fielded System

Manufacturing Processes

Operational

System

Operational

Test Article

Preliminary

Design

Support Plan

LCSP

Note 1 from the Chief Process Officer: The Under Secretary of Defense for AT&L has

provided four key enduring acquisition principles. The first of these principles is “Think”. Program

managers should tailor the program according to the specific needs of that program. The rote

checking the blocks in a checklist or simply following each and every step of a process is the

antithesis of Mr Kendall's challenge to Program Managers. Use this Model as a model. If your

program's situation warrants a waiver from the checklist or process, seek that waiver from your

milestone decision authority. CTRL-Click here to access an active link to Mr. Kendall’s thoughts.

ADM

Acquisition

Strategy

Acquisition

Strategy

Acquisition

Strategy

Capability DocumentCapability Document

Note 2: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Page 272: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.1 Program Development

Develop Detailed

Design

Evaluate and

Demonstrate the

System

Demonstrate

Manufacturing

Readiness

Go Up 1 Level

Develop

Capability

Production

Document (CPD)

FWD

DSOR Decision

CDD

CPDDemonstrated

SystemDemonstrated

SystemDetailed

Design

Manufacturing

Processes

Manufacturing Processes

PEO View

Definitized

Agreement

Note 1: The following websites provide valuable information for product

support activities. The DoD Integrated Product Support Implementation

Roadmap has links to over 2500 knowledge items (such as policy,

references, and continuous learning modules). The Roadmap identifies

activities and outputs for the twelve integrated product support (IPS)

elements over the total life cycle. DoD has also established a Product

Support Manager website that provides links to a variety of relevant

documents. Finally, the Air Force has developed the Contract Sustainment

Support Guide to provide best practices for contractor logistics support.

CTRL-Click here to access an active link to each of the above.

Programmatic

Data

Acquisition

Strategy

Create Lead System

Integrator Exception

Certification

Acquisition

Strategy

Definitized

Agreement

Lead System

Integrator

Exception

Certification

Note 2: This enabling

process is based on the

AFMC/EN and SMC/EN

sponsored SEAM Guide.

Revision of

System

Engineering

Processes

Conduct

Systems

Engineering

Assessment

Programmatic

Data

Software Sustainment

Processess

Note 3: Enclosure 14, Sections 4 and 7 of DoDI

5000.02 provide a list of actions that RDT&E

Organizations/Program Managers should take

relative to Cybersecurity. CTRL-Click here to

access an active link to the instruction.

Page 273: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Refine

System

Design

Address

CDR

Acquisition Process Model

1.4.1.1 Develop Detailed Design

Go Up 1 Level

Finalize

Detailed

Design

Definitized

Agreement

Detailed

Design

Detailed

Design

Preliminary

Design

Preliminary

Manufacturing Plan

Initial Product

Baseline

Prototype

Refined System

Design

FWD

PEO View

Post-CDR

Assessment

Acquisition

Strategy

Page 274: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Finalize “Build-

To”

Documentation

for Components

Establish

Detailed

Design

Compatibility

among

Configuration

Items

Acquisition Process Model

1.4.1.1.1 Refine System Design

Go Up 1 Level

Initial Sub

System and

Component

Specs

System

Specifications

Perform

Supportability

Analysis

Design

Compatibility

Assessment

Develop

Detailed

Design

Supportability

Analysis

Iterative Process that occurs

throughout the EMD Phase

FWD

CDD

CDD

Definitized

Agreement

Preliminary

Design

Preliminary

Design

Prototype

Refined

System

Design

Interface Control

Document

Programmatic

Data

Acquisition

Strategy

Acquisition

Strategy

Page 275: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.1.1.2 Finalize Detailed Design

Go Up 1 Level

Complete

Detailed

Design as

Draft Product

Baseline

Ensure System

Configuration

Meets Design

Requirements

Integrate

System and

Sub System

Components

Initial Sub System and

Component Specs

Final Sub System

and Component

Specifications

Finalize Sub

System /

Component

SpecificationsInitial Sub System &

Component Specs

Develop CDR

Risk

Assessment

Checklist

CDR Risk

Assessment

Checklist

BACK FWD

Detailed

Design

Manufacturing

Plan

Preliminary

Design

Production

Representative

Article

Interface Control

Document

Programmatic

Data

Page 276: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.1.1.2.4 Develop CDR Risk Assessment Checklist

Go Up 1 Level

Identify and

Assess

System

Integration

Risks

System Integration

Risks

Identify and

Assess Design

Risks

Design

Risks

Identify and

Assess

Manufacturing

Risks

Manufacturing

Risks

Finalize

CDR Risk

Assessment

Checklist

CDR Risk

Assessment

Checklist

Preliminary

Design

Preliminary

Design

Preliminary

Design

Programmatic

Data

Programmatic

Data

Programmatic

Data

Page 277: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.1.1.3 Address Critical Design Review (CDR) (1.1.4.2)

Go Up 1 Level

Identify CDR

Prerequisites

Prepare for

CDR

CDR

Documentation Conduct

CDR

Develop

Post-CDR

Assessment

Address

Unresolved

Issues

BACK

Achievement of

Allocated Baseline

CDD

Post-CDR

Assessment

Draft CPD

SEP

Detailed

Design

Initial

Product

Baseline

Interface Control

Document

Resolved Issue

Updated Program

Schedule

Unresolved Issue

CARD

Updated

CARD

LCSP

Updated

LCSPCDR Risk

Assessment

Checklist

TEMP

Prepare

Observations and

Recommendations

Technical

Review

Report

Page 278: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.1.2 Evaluate and Demonstrate the System

Modify

Design based

on Test

Results Demonstrate

the System

Address

Functional

Configuration

AuditTest Analysis

Modified Design

Go Up 1 Level

Initial Production

Baseline

BACK FWD

Perform

Depot Source

of Repair

Analysis

DSOR Decision

Demonstrated

System

Demonstrated

System

Detailed

Design

Production

Representative

Article

System and Sub-System

Documentation

System and Sub-System

Documentation

Failure Reporting

and Corrective

Action System

Conduct Depot

Maintenance

Strategic Planning

Programmatic

Data

Depot Maintenance

Strategy

Page 279: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model1.4.1.2.1 Modify Design Based on Test Results

Go Up 1 Level

Review Test

Data

Modify

Detailed

Design

Modified Prototype/

Article

Modify

Prototype /

Production

Rep Article

Validate

Deficiency from

DT Activities

Validated

Deficiencies

FWD

Modified

Detailed

Design

Performance GapsTest/ Analysis Data

System Performance

Specifications

Failure Reporting and

Corrective Action System

Page 280: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.1.2.2 Address Functional Configuration Audit (FCA)

Go Up 1 Level

Prepare for

FCA FCA

Decision

Package

Conduct

FCA

Reconcile

Performance

Gaps at FCA

BACK FWD

Performance Gaps

Test/ Analysis Data

Initial Production

Baseline

System Performance

Specifications

Functional Configuration

Audit Checklist

LRIP Recommendation

Page 281: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model1.4.1.2.3 Demonstrate the System

Go Up 1 Level

Reconcile

Performance

Gaps

Modify

System

Design

Perform

Final System

Level Tests

Development

Test

Activities

BACK

Demonstrated

SystemProduction

Representative

ArticleSystem and Sub-System

Documentation

System

Performance

DataPerformance Gaps

Page 282: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.1.3 Demonstrate Manufacturing Readiness

Demonstrate

Sub System

Manufacturing

Capability

Demonstrate

Capability of

Critical

Processes

Conduct

Production

Readiness

Review

Demonstrate

System

Manufacturing

Capability

Demonstrated

Sub System

Manufacturing

Capability

Demonstrated

System

Manufacturing

Capability

Demonstrated

Capability

of Critical

Processes

Go Up 1 Level

BACK FWD

Demonstrated

SystemManufacturing

ProcessesSystem and Sub-System

Documentation

PEO View

Software Sustainment

Processess

Page 283: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.1.4 Develop Capability Production Document (CPD)Go Up 1 Level

JROC

Approved

CPD

BACK

Draft

CPD

AF

Approved

CPD

Revised

CPD

JROC

Approved

CPD

PEO View

Note: The following KPPs are mandatory in

requirements documents per JCIDS Manual:

Force Protection KPP, System Survivability KPP,

Sustainment KPP, Net-Ready KPP, Training KPP

and Energy KPP.

The following KSAs are mandatory in AF

requirements documents: the Flight Simulator

KSA

Conduct

Requirements

Strategy

Review

Conduct

Strategy

Development

and HPT

Preparation

Resolve

Comments

Conduct

Validation

and

Approval

Obtain

Internal

Approval/

Endorsement

Initiate

JCIDS

Staffing

Perform

Gatekeeper

Activities

Conduct

JROC/JCB

Tripwire

Process

Certification /

Endorsement

Memo

Certification /

Endorsement

Memo

JCIDS

Documents

JCIDS

Process

Metrics

Request

for RSR

Approved

Requirements

Strategy

Sponsor

Engagement

Note: All processes feed the Gatekeeper Activities

process

Prepare

Document by

High

Performance

Team

Conduct Initial

Document

Review

Revised

CPD

Draft

CPD

Page 284: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.1.4.2 Conduct Requirements Strategy Review (RSR)

Request

Requirements

Strategy

Review

Review/

Coordinate for

Requirements

Strategy Review

Document

A5R Approval

RSR

Package

RSR

Logistics

Approved RSR

RSR

Briefing

RSR Approval

Memo

Schedule

Requirements

Strategy

Review

Approved RSR

Package

Archive

Artifacts to

IRSS

Updated

IRSS

Requirements

Documentation

Request

for RSR Submit RSR

Request

Package

Page 285: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.2 Program Production

Conduct Full Rate

Production

Field the

System

Go Up 1 Level

Perform

LRIP

Perform PIR

(Post

Implementation

Review)

Annual CFO Report

BACK FWD

Capability

Shortfall

Draft

CPD

Articles / Assets

DD250

(Includes Supportability Items)

Fielded SystemFielding

Plan

FOT&E ResultsAmended LCMP

Manufacturing

Processes

Mission Readiness

Report

Operationally

Representative

System

Program

Adjustments

Support Plan

User MAJCOM

Surveys

War Game

Results

PEO View

Product Support

Package

Note 1: The following websites provide valuable information for product

support activities. The DoD Integrated Product Support Implementation

Roadmap has links to over 2500 knowledge items (such as policy,

references, and continuous learning modules). The Roadmap identifies

activities and outputs for the twelve integrated product support (IPS)

elements over the total life cycle. DoD has also established a Product

Support Manager website that provides links to a variety of relevant

documents. Finally, the Air Force has developed the Contract Sustainment

Support Guide to provide best practices for contractor logistics support.

CTRL-Click here to access an active link to each of the above.

Revision of

System

Engineering

Processes

Conduct

Systems

Engineering

Assessment

Programmatic

Data

Note 2: This enabling

process is based on the

AFMC/EN and SMC/EN

sponsored SEAM Guide.

Note 3: Enclosure 14, Sections 4 and 7 of

DoDI 5000.02 provide a list of actions that

RDT&E Organizations/Program Managers

should take relative to Cybersecurity.

CTRL-Click here to access an active link to

the instruction.

Page 286: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

oreAcquisition Process Model

1.4.2.1 Perform Low Rate Initial Production

Go Up 1 Level

Monitor

Production

System

Accept

Production

Assets

Go

ve

rnin

g

Perform OT

Perform

LFT&E

Modify

Configuration

to Correct

Deficiencies

Updated

Configuration

Updated

Configuration

Perform

First Article

Testing

Address

Physical

Configuration

Audit

Develop

Reports to

Congress

Accepted Design

and Manufacturing

Documentation

CPD

CPD

DD250

Definitized

Agreement

Definitized

Agreement

LFT&E DRs

OT DRs

DOT&E Report on

Initial Operational

Test and Evaluation

DD Form 1222

LFT&E

Report

LRIP Assets

Manufacturing

Processes

Operationally

Representative

System

Production Articles

Production

Articles

Production Assets

Production Assets

Validated

Production

Baseline

FWD

PEO View

Definitized

Agreement

Page 287: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gC

ore

En

ab

lin

gAcquisition Process Model

1.4.2.1.2 Perform First Article Testing (FAT)

Go Up 1 Level

Identify First

Article Test

Requirement

Develop FAT

Surveillance

Strategy

Perform

FAT

CLIN / CDRL

FAT Surveillance

Strategy

FAT Surveillance

Notify PCO of any

Nonconformities

and Prepare

Report

FWD

DD Form 1222

LRIP Assets

Definitized

Agreement

Page 288: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

ore

Acquisition Process Model

1.4.2.1.3 Accept Production Assets

Go Up 1 Level

Complete

and Submit

Form

DD250

Go

ve

rnin

g

Prepare

and Deliver

Production

Articles

DD250

DD Form 1222

Production Articles

Production Articles

Production Assets

Validated

Production

Baseline

Validated

Production

Baseline

BACK FWD

Definitized

Agreement

Page 289: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model1.4.2.1.7 Address Physical Configuration Audit (PCA)

Go Up 1 Level

Prepare for

PCA Conduct

PCA

Reconcile

Design Gaps

Accepted Design and

Manufacturing Documentation

BACK

Accepted Design and

Manufacturing Documentation

Training

Manufacturing Processes

Production Articles

Technical

Data

Package

Design Documentation

Measurement and

Test Equipment

PCA

Decision

Package

Design Gaps

Quality Control System

Completed PCA Risk

Assessment Checklist

Page 290: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gC

ore

En

ab

lin

gAcquisition Process Model

1.4.2.2 Conduct Full Rate Production

Go Up 1 Level

Monitor

Production

System

Refine

Design

Accept the

Articles / Assets

and Associated

Supportability

Items

Change

Requests

Production

Acceptance

Criteria

Refined Design

Conduct

FRP

Decision

Articles / Assets

DD250

(Includes Supportability Items)Operationally

Representative

System

Operationally

Representative

System

MDA

Requirements

BACK FWD

PEO View

Definitized

AgreementADM

Product Support

Package

DoDI 5000.02

Information

Requirements

Page 291: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.2.3 Field the System

Select Site

Go Up 1 Level

Modify Site

Perform

System

Beddown

Conduct Unit

Training

Conduct

Activation

DecisionApprove Site

Improved

Site

System

Beddown

Unit

Readiness

Site Activation

Approval

Posture

Product

Support

Elements

Support Elements

Realign

Program

Support

Elements

BACK FWD

Beddown

Request

Candidate

Site

Decision

to Deploy

Operational

System

Resources

Needed

Site

Approval

Support Plan

Support Plan

PEO View

Page 292: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.2.3.1 Select Site

Identify

System

Fielding

Requirements

Go Up 1 Level

Coordinate

and

Approve

Survey

Requests

Conduct

Site Survey

Request

Unit

Beddown

Site

Requirements

SCN

Site

Requirements

Report

Request Site

Survey

Site

Survey Request

Site Survey Approval

FWD

Beddown

Request

Candidate

Site

Decision

to Deploy

Page 293: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.4.2.3.1.3 Coordinate and Approve Survey Requests

Evaluate

Site Survey

Requests

Go Up 1 Level

Notify

Requesting

Agency of

Decision

Issue

Survey

Control

Number

(SCN)

SCN

Site

Survey Request

Site Survey ApprovalSurvey Request

Evaluation

Site

Survey Notification

Approve Site

Survey

Request

Site Survey

Decision

FWD

Page 294: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.2.3.1.4 Conduct Site Survey

Activate

SATAF

Site

Requirements

Report

Go Up 1 Level

Assess

Environmental

Impact

Assess Site

Develop Site

Requirements

Report

Approval to

Survey Site Authorization

For

Environmental

Impact

Assessment

Facility

Assessment

Infrastructure

Assessment

Conduct

Follow On

Survey(s)

BACK FWD

Manning

Assessment

Environmental

Impact

Assessment

MWR

Assessment

Page 295: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.2.3.1.4.3 Assess Site

Assess

Installation/

Facility

Go Up 1 Level

Assess

Infrastructure

Assess

Morale,

Welfare, and

Recreation

Assess

Manning

MWR

Assessment

Manning

Assessment

Note: Follow on Surveys at the same location do not require Air Staff

coordination and approval, per AFI 10-503 Section 2.7

Environmental

Impact

Assessment

Environmental

Impact

Assessment

Environmental

Impact

Assessment

Environmental

Impact

Assessment

Facility

Assessment

Infrastructure

Assessment

Page 296: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.2.3.1.5 Request Unit Beddown

Prepare

Beddown

Proposal

Go Up 1 Level

Prepare

Signed AF

Form 813

Receive Concurrence

with Beddown

Request (Host

Location / MAJCOM)

Site

Requirements

Report

AF Form 813Beddown

Concurrence

BACK

Beddown

Request

Candidate

Site

Page 297: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.2.3.2 Approve Site

Approve Intra

MAJCOM Beddown

Request

Go Up 1 Level

Approve

Beddown

Initiate

Support

Agreement

Approve Inter

MAJCOM Beddown

Request

Approve Non USAF

Beddown Request

Approve Private

Organization Beddown

Request

Approve Beddown

Request on Non-USAF

Real Property

Support

Agreement

Beddown

ApprovalBeddown

Request

Candidate

Site

Site

Approval

BACK FWD

Page 298: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.2.3.3 Modify Site

Identify

Facility &

Construction

Needs

Uncertified

Facility

Go Up 1 Level

Identify

Manpower

Needs

Design

Facility &

Infrastructure

Request

MILCON

Perform

Construction

Certify

Facility

Facility &

Construction

Needs

Manpower

Needs

Proposed

Facility &

Infrastructure

Design

Construction

Funding

Certified

Facility

BACK FWD

Site

Approval

Site

Approval

Page 299: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.2.3.3.2 Identify Manpower Needs

Identify

Military

Manning

Go Up 1 Level

Identify

Non-Military

Manning

Military

Manning

Needs

Non-Military

Manning

Needs

Site

Approval

Site

Approval

Page 300: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gC

ore

En

ab

lin

gAcquisition Process Model

1.4.2.3.4 Realign Program

Go Up 1 Level

Resolve

Transition

Related Issues

Determine

Transition

Requirements

and Timeline

Execute

Transition

Support Plan

Program

Transition

Requirements

Prepare

Transition

Support Plan

Approve

Transition

Support PlanTransition

Support

Plan

Approved

Transition

Support

Plan

BACK

Resources

Needed

Support Plan

System and Sub-System

Documentation

Resolved IssueIssue

Transition Support Plan Status

AFLCMC

Standard

Processes

Note: Incorporated

references to the AFLCMC

Standard Process (Program

Transition).

Page 301: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.2.4 Perform Post Implementation Review (PIR)

Develop PIR

Plan

Go Up 1 Level

Evaluate

Sustainment

Capability

Status

Evaluate

Shortfalls due

to Mission

Realities

PIR Plan

Document

PIR

Compare

Actual

Results with

Established

Goals

Sustainment Capability Status

PIR Plan

PIR Plan

Potential Capability Shortfall(s)

Program PerformanceAnnual CFO ReportCapability

Shortfall

FOT&E Results

Amended LCMPMission Readiness

Report

Program

AdjustmentsUser MAJCOM

Surveys

War Game

Results

BACK

Page 302: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.3 System Sustainment

Execute &

Monitor Support

Plan

Conduct System

Modification

Go Up 1 Level

Retire / Dispose

SystemMigration Plan

BACK FWD

Revision &

Assessment of

System

Engineering

Processes

Fielded System Operational

System

Operational

System

Dispositioned

SystemProduct

Support Strategy

Request to

Retire System

LCSP

PEO View

Note 1: The following websites provide valuable information for product

support activities. The DoD Integrated Product Support Implementation

Roadmap has links to over 2500 knowledge items (such as policy,

references, and continuous learning modules). The Roadmap identifies

activities and outputs for the twelve integrated product support (IPS)

elements over the total life cycle. DoD has also established a Product

Support Manager website that provides links to a variety of relevant

documents. Finally, the Air Force has developed the Contract Sustainment

Support Guide to provide best practices for contractor logistics support.

CTRL-Click here to access an active link to each of the above.

Product

Support Strategy

Product

Support Strategy

Conduct

Systems

Engineering

Assessment

Note 2: The Conduct

Systems Engineering

Assessment process is

based on the AFMC/EN

and SMC/EN sponsored

SEAM Guide.

Note 3: Enclosure 14, Sections

4 and 7 of DoDI 5000.02 provide

a list of actions that RDT&E

Organizations/Program

Managers should take relative

to Cybersecurity. CTRL-Click

here to access an active link to

the instruction.

Page 303: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.1 Execute & Monitor Support Plan

Execute Maintenance Activities

Execute Supply Activities

Go Up 1 Level

Address Other ILS Elements

Monitor Support Plan

FWD

DSOR Decision

Fielded SystemOperational

System

Service Use &

Supply Chain Data

System

Changes

Sustainment

Metrics

LCSP

Note 1: The following websites provide valuable information for product

support activities. The DoD Integrated Product Support Implementation

Roadmap has links to over 2500 knowledge items (such as policy,

references, and continuous learning modules). The Roadmap identifies

activities and outputs for the twelve integrated product support (IPS)

elements over the total life cycle. DoD has also established a Product

Support Manager website that provides links to a variety of relevant

documents. Finally, the Air Force has developed the Contract Sustainment

Support Guide to provide best practices for contractor logistics support.

CTRL-Click here to access an active link to each of the above.

Product

Support Strategy

Changes

Product

Support Strategy

Page 304: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.1.1 Execute Maintenance Activities

Go Up 1 Level

Gather

Maintenance

Data

Implement

DSOR Decision

Assess DSOR

DecisionMaintained

System

Maintenance

DataRevised

DSOR Decision

FWD

DSOR Decision

Fielded System

Operational

System

LCSP

Product

Support Strategy

Address

Engineering

Technical

Assistance

Requests

Engineering

Assistance NeedETAR Package

Conduct

Supportability

Assessment for

Organic

Requirements

Organic

Requirements

Brief to Program

Manager

Page 305: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.3.1.1.4 Address Engineering Technical Assistance Requests (ETAR)

Go Up 1 Level

Note: This is an AFLCMC

Standard Process.

Assistance Request

Form

Reviewed ETAR

AFLCMC

Standard

Processes

Engineering

Assistance Need

ETAR Package

Initiate ETAR

Review and

Validate ETAR

Review and

Assign ETAR

Develop

Disposition/

Work Instruction

Review

Disposition/

Work Instruction

Acknowledge

and Accept

ETAR Package

Assigned ETAR

Disposition/Work

Instruction

Approved Work Package

FWD

Page 306: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.1.1.5 Conduct Supportability Assessment for Organic Requirements

Go Up 1 Level

Note: This is an AFLCMC

Standard Process.

Organic Requirements

Orgranic Requirements

Assessed

AFLCMC

Standard

Processes

Risk Mitigation

Supportability Determined

Mitigation Strategy

Initial Risk Mitigation

BACK

Identify Organic

Requirements

Assess Organic

Modification

Requirements

Determine

Supportability

Recommend

Mitigation

Strategy

Develop

Mitigation

Assign Risk

Report Status

Quad 1 Monthly

Performance

Review

Organic

Requirements

Brief to Program

Manager

Page 307: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.1.2 Execute Supply Activities

Go Up 1 Level

Monitor Spares

Utilization

Acquire Full

Supply Support

CapabilityAddress

Diminishing

Manufacturing

Sources /

Material

Shortages

System with

Supply

Support

Supply

Data

Manage Follow-

on Supply

Requirements

BACK FWD

Fielded SystemOperational

System

LCSP

Revised Product

Support Strategy

Product

Support Strategy

Page 308: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

ore

Acquisition Process Model

1.4.3.1.3 Address Other Integrated Logistics Support (ILS) Elements

Execute Test /

Support

Equipment

Activities

Go Up 1 Level

Execute

Technical Data

Management

Activities

Execute

Manpower &

Personnel

Activities

Execute

Training &

Training Supp.

Activities

Execute

Facilities &

Infrastructure

Activities

Execute PHS&T

Activities

Execute Design

Interface

Activities

Execute Comp.

Res. &

Software Supp.

Activities

Fielded SystemOperational

System

Service Use &

Supply Chain Data

System

Changes

Go

ve

rnin

g

BACK FWD

Sustainment

Metrics

Execute

Sustaining

Engineering

Activities

Execute

Product

Support

Management

Product

Support Strategy

Changes

Product

Support Strategy

Page 309: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

ore

Acquisition Process Model

1.4.3.1.3.1 Execute PHS&T Activities

Go Up 1 Level

Provide PHS&T

Data and FormsReceive PHS&T

Data

Go

ve

rnin

g

AFLCMC

Standard

Processes

Enter PHS&T

Data into

Government

Systems

Draft

Contractual

DocumentsPHS&T

Data

Approved

PHS&T

Data

PHS&T

Data

PHS&T

Requirements

Submit PHS&T

DataContractual

Documents

Contractual

Documents

Note: This is an AFLCMC

Standard Process. Steps 1.1-

1.3 and 1.5-1.9 of this process

are reflected within 1.4.4

Contract Management

Page 310: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.1.4 Monitor Support Plan

Go Up 1 Level

Analyze Data to

Determine Root

Cause of

Problem

Monitor &

Collect Service

Use Data

Determine

System Risk /

Hazard

Probability &

Severity

Develop

Corrective

Action

Integrate & Test

Corrective

Action

Assess Risk of

Improved

System

Implement &

Field Corrective

Action

System

Service

Data

Supportability

Root Cause

Supportability

Root Cause

Risk

Assessment

Supportability

Corrective Action

Tested

Supportability

Corrective Action

System Risk

Assessment

BACK

Service Use &

Supply

Chain Data

System

Changes

Sustainment

Metrics

Product

Support Strategy

Product

Support Strategy

Changes

Page 311: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.4.3.2 Conduct System Modification

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Develop

Modification

Proposal

Field/Install

the

Modification

Document

the

Modification

Report and

Monitor

Modification

Status

Close out the

Modification

Modified

Weapon

System

Configuration

Control

Documentation

Note 1: The enabling

process receives

information from all of

the core processes. For

display purposes, we

have not shown these

inputs.BACK FWD

Modification

Program

Status

Modification

Modification

Proposal

Validated

RequirementTechnical

Data

Package

PEO View

Page 312: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.4.3.2.1 Develop Modification Proposal

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Develop

Modification

Proposal &

Obtain

Organization

Validation

Obtain Using

Command

and Lead

Command

Validation

Determine

Technical

Requirements &

Solution

Certify

Modification

Proposal

Validated

Modification

Proposal

Initial Mod

Technical

Evaluation

Modification

Implementation

Strategy

Modification

Cost

Estimate

Form 1067

Part IV

FWD

Draft Modification

Proposal

Modification

Proposal

Validated

Requirement

Page 313: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

ore

Go

ve

rnin

gAcquisition Process Model

1.4.3.2.3 Field/Install the Modification

Go Up 1 Level

Coordinate

Modification

Installation

Activities

Approve

Modification

Install

Modification

Installation

Documents

Report and

Monitor

Modification

Status

BACK

Modified

Weapon

System

Modification

TCTO

Technical

Data

Package

Modification

Program

Status

Modification

Installation

Documents

Page 314: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.3 Conduct Systems Engineering Assessment

Conduct SEAM

Planning

Go Up 1 Level

Conduct SEAM

Self Assessment

Conduct SEAM

Validation

Address Results

and Feedback

BACK FWD

Note: This process is based

on the AFMC/EN and SMC/EN

sponsored SEAM Guide.

Assessment of

System

Engineering

Processes Revision of

System

Engineering

Processes

Fielded System

Parameters for

SEAM

SEAM

Recommendations

SEAM Self

Assessment

Report

Standard

SEAM

Reports

PEO View

Programmatic

Data

Product

Support Strategy

Page 315: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.3.1 Conduct SEAM Planning

Initiate Self

Assessment

Request for

System

Engineering

Assessment

Go Up 1 Level

Identify Roles &

Responsibilities

SEAM

Team

Plan the Overall

Assessment

Effort

Provide SEAM

Leadership

Training

Provide SEAM

Self-Assessment

Training

Trained

SEAM

Team

Archived SEAM

Assessment

FWD

Note: This process is based

on the AFMC/EN and SMC/EN

sponsored SEAM Guide.

Fielded System

Parameters for

SEAM

Product

Support Strategy

Page 316: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.3.2 Conduct SEAM Self Assessment

Tailor

the

SEAM Tailored

SEAM

Go Up 1 Level

Assess and

Grade Each

Practice

Report

Results to

Leadership

Provide Self

Assessment

Assistance

SEAM

Assistance

SEAM

Questions

Obtain

Latest

Version

of SEAM

Current

AF SEAM

Revised

AF SEAM

SEAM Self

Assessment

BACK FWD

Note: This process is based

on the AFMC/EN and SMC/EN

sponsored SEAM Guide.

Parameters for

SEAM

SEAM Self

Assessment

Report

Page 317: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.3.3 Conduct SEAM Validation

Secure Team

Members

Go Up 1 Level

Review Self

AssessmentSEAM

Questions

Conduct

Interviews &

Research

SEAM

Interview

Data

Provide SEAM

Self-Assessment

Training

Prepare

Independent

Validation of SEAM

SEAM

Assessment

Team

Trained

SEAM

Assessment

Team

BACK FWD

Note: This process is based

on the AFMC/EN and SMC/EN

sponsored SEAM Guide.

Assessment of

System

Engineering

Processes

SEAM

Recommendations

SEAM Self

Assessment

Report

Page 318: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.3.4 Address Results and Feedback

Go Up 1 Level

Identify Process

Improvement

Opportunities

Capture

Lessons

Learned

Systems

Engineering

Lessons

Learned

Database

Revised

AF SEAM

BACK

Note: This process is based

on the AFMC/EN and SMC/EN

sponsored SEAM Guide.

Assessment of

System

Engineering

Processes Revision of

System

Engineering

Processes

SEAM

Recommendations

Standard

SEAM

Reports

Page 319: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.4 Retire / Dispose System

Conduct

Demilitarization

Activities

Conduct

Reclamation

Activities

Go Up 1 Level

Address Other

Disposal

Options

Request for

Donation or Loan

BACK

Migration Plan

Migration Plan

Migration Plan

Fielded System

Fielded System

Demilitarized

Asset

Dispositioned

System

Programmed

Save List

Request to

Retire System

Request to

Retire System

PEO View

Page 320: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.4.1 Conduct Demilitarization Activities

Assign DEMIL

Code

Go Up 1 Level

Asset

Directed to

Fulfill

Requirements

Asset

for

Demilitarization

Document the

Demilitarization

Declassify

Materiel

Documented Asset

for

Demilitarization

Declassified

Asset

Accomplish

Demilitarization

Process

Request for

Waiver

Request for

Demil Waiver

Waiver

Approval

Waiver

Disapproval

Migration Plan

Fielded System

Demilitarized

Asset

Request to

Retire System

FWD

Page 321: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.4.2 Conduct Reclamation Activities

Establish

Reclamation

Project

Go Up 1 Level

Reclamation

Request

End Items for

Reclamation

Return

Reclaimed Items

Manage Save

List

Reclamation

Requirements

Candidates

BACK FWD

Migration Plan

Fielded System

Programmed

Save List

Request to

Retire System

Page 322: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.3.4.3 Address Other Disposal Options

Comply with

Disposal

Guidance

Address

Precious Metal

Recovery

Program

Go Up 1 Level

Conduct

Donation / Loan

Request for

Donation or Loan

BACK

Migration Plan

Migration Plan

Migration Plan

Demilitarized

Asset

Demilitarized

Asset

Demilitarized

Asset without

Precious

Metal

Dispositioned

System

Programmed

Save List

Programmed

Save List

Address

Spacecraft and

Orbital Launch

Vehicle

Components

Migration Plan

Demilitarized

Asset

Programmed

Save List

Processed

Demilitarized

Asset

Page 323: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4 Contract Management

Conduct Pre

Source

Selection

Activities

Conduct Source

Selection

Evaluation

Process Select Source

Go Up 1 Level

BACK FWD

Definitized

Agreement

RFP

Reviewed

Proposals

Solicitation

SSET/SSAC

Recommendation

Note 1: CTRL-Click to access an

Active Link to Mr. Kendall’s 21 Aug

2014 Memo on Actions to Improve

DoD Competition. The guidelines

he mentions in the memo are also

available as an Active Link.

PEO View

Acquisition

Strategy

Capability Document

Conduct

Contract Award

Sole Source

Contract

AwardRFP

AFLCMC

Standard

Processes

Note 2: The Conduct

Contract Award Sole

Source process is an

AFLCMC Standard

Process

Page 324: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.1 Conduct Pre Source Selection Activities

Develop

Source

Selection

Documents

Develop

Request for

Proposal

Go Up 1 Level

Stand Up Source

Selection Teams

Source

Selection Team

Resources

Maintain Source

Selection

Information

Source Selection

File

Conduct

Critical

Decision

Point 1b

MIRT

Release Request

for Proposal

Conduct

Business

ClearanceApproved

Business

Clearance

OSD Peer

Review 1

Approval

FWD

Draft RFP

RFP

RFP

Source Selection

Documentation

Source

Selection

Documentation

Source

Selection

Documentation

Approved LCMP

Evaluation

Criteria

Information Requests

Solicitation

Feedback to

the SSA

MIRT Critical

Decision Point

Information

Updated

Contract File

Conduct

Critical

Decision

Point 1 OSD

Peer Review

Note: An AFLCMC specific process

exists to describe the RFP Process.

This AFLCMC process is contained

within the Air Force Process depicted

here CTRL-Click here to access an

active link to this process.

Acquisition

Strategy

Acquisition

Strategy

AFLCMC

Standard

Processes

Request for

Business

Clearance

Page 325: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.1.1 Develop Source Selection Documents

Develop Draft

Source

Selection PlanApprove Source

Selection Plan

(SSP)

Go Up 1 Level

FWD

Draft

Source

Selection

Plan

Source

Selection

Documentation

Model

Contract

Note: An AFLCMC specific process

exists to describe the RFP Process.

This AFLCMC process is contained

within the Air Force Process depicted

here CTRL-Click here to access an

active link to this process.

Acquisition

Strategy

AFLCMC

Standard

Processes

Page 326: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.1.2 Develop Request For Proposal

Develop

Offeror

Instructions

(Section L)

Develop

Contract

Framework

Contract

Framework

Go Up 1 Level

Develop

Evaluation

Criteria

(Section M)Offeror

Instructions

Boilerplate

Language

Initial

Draft

RFP

Evaluation

Criteria

Evaluation

Criteria

BACK FWD

Develop

Draft RFPContractor

Feedback

Conduct

Exchanges w

Contractor

Draft

RFP

Revise the

Draft RFP

Note: An AFLCMC specific process

exists to describe the RFP Process.

This AFLCMC process is contained

within the Air Force Process depicted

here CTRL-Click here to access an

active link to this process.

Acquisition

Strategy

AFLCMC

Standard

Processes

Identify

Contract TypeContract Type

Determine

Evaluation

Approach

Evaluation

Approach Acquisition

Strategy

Acquisition

Strategy

Acquisition

Strategy

Acquisition

Strategy

Page 327: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model1.4.4.1.3 MIRT– Conduct Critical Decision Point (CDP) 1b (RFP Sections L and M)

Multi-Functional Independent Review Team (MIRT)

Go Up 1 Level

Evaluate

CDP 1b

Information

Provide

Immediate

Feedback to

Source

Selection/

Procurement

Team

Provide

Assessment

of CDP 1b

Disposition/

Adjudicate

Comments

Incorporate

MIRT

Assessment

into Contract

File

Provide

Feedback to

Source

Selection

Authority

(SSA)

MIRT Findings

Understanding

of MIRT

Findings

Dispositioned/

Adjudicated

Comments

Dispositioned/

Adjudicated

Comments

Updated

Contract File

Informed

SSA

MIRT Critical

Decision Point

Information

MIRT

Assessment

BACK FWD

Page 328: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.4.1.4 Stand Up Source Selection Teams

Go Up 1 Level

BACK

Identify

Source

Selection

Authority

Source Selection

Authority

Identify

Procuring

Contracting

Officer

Procuring

Contracting

Officer

Identify

Source

Selection

Advisory

Council

SS Advisory

Council

Identify

Source

Selection

Evaluation

Board

SS Evaluation

Board

Source

Selection

Documentation

Source

Selection

Documentation

Source

Selection

Documentation

Source

Selection

Documentation

Page 329: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.2 Conduct Source Selection Evaluation Process

Go Up 1 Level

Conduct Initial

Evaluation

Conduct

Final

Evaluation

Conduct

Discussions

Conduct

Critical

Decision

Point 2a

MIRT

Conduct

Critical

Decision

Point 2c

MIRT

Conduct

Competitive

Range

Briefing

Evaluation

Team

Performance

Assessment (w/o

need for discussions)

Conduct

Contract

Clearance

BACK FWD

RFP

RFP

Source Selection

DocumentationSource Selection

File

Source Selection

File

Assessment of

Source Selection

Compliance

FPR

Briefing

Competitive

Proposals

Competitive

Proposals

Competitive

Range

Briefing

Evaluated

ENs

Initial Evaluation

Results

Evaluation

Criteria

Evaluation

Criteria

Information Requests

Contract

Clearance

Approval

Reviewed

Proposals

SSET/SSAC

Recommendation

Maintain Source

Selection

Information

Conduct

Critical

Decision

Point 3 OSD

Peer Review

OSD Peer

Review 3 Approval

Note: An AFLCMC specific process

exists to describe the Contract Award

Process. This AFLCMC process is

contained within the Air Force Process

depicted here CTRL-Click here to

access an active link to this process.

AFLCMC

Standard

Processes

Prepare to

Receive

Proposals

Address

Evaluation

Notices

Address

Model

Contracts

Approve FPR

Request

Reviewed

Proposals

Proposals

Initial Evaluation

Results

Model Contracts

Contract

Clearance

Approval

FPR

Briefing

Model

Contracts

Approved FPR Request

Initial Evaluation

Results

Page 330: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.2.1 Conduct Initial Evaluation

Go Up 1 Level

Analyze Proposals

Against Evaluation

Factors from

Solicitation

Document

Results to

SSAC or SSA

Determine

Necessity for

Offeror

Discussions

Decision to

Award w/o

Discussions

Evaluation

Team Performance

Assessment

Non-QualifiersSSA

Briefing

FWD

Decision to

Conduct

Discussions

Initial Evaluation

Results

Evaluation

Criteria

Reviewed

Proposals

Page 331: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.2.1.1 Analyze Proposals Against Evaluation Factors from Solicitation

Go Up 1 Level

Conduct Technical

Evaluation

Conduct Past

Performance

Evaluation

Conduct Cost/Price

Evaluation

Compliance

EvaluationPast Performance

Evaluation

Cost/Price

Evaluation

Technical

Evaluation

Conduct

Compliance

Evaluation

Evaluation

Team Performance

Assessment

Evaluation

Criteria

Reviewed

Proposals

Evaluation

Team Performance

Assessment

Evaluation

Criteria

Reviewed

Proposals

Evaluation

Team Performance

Assessment

Evaluation

Criteria

Reviewed

Proposals

Evaluation

Team Performance

Assessment

Evaluation

Criteria

Reviewed

Proposals

Page 332: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model1.4.4.2.2 – Conduct CDP 2a (Pre-Initial Evaluation/Pre-Competitive Range (Award w/o Discussions)/Pre-release

of Interim Ratings) Multi-Functional Independent Review Team (MIRT)

Evaluate

CDP 2a

Information

Provide

Immediate

Feedback to

Source

Selection/

Procurement

Team

Provide

Assessment

of CDP 2a

Disposition/

Adjudicate

Comments

Incorporate

MIRT

Assessment

into Contract

File

Provide

Feedback to

Source

Selection

Authority

(SSA)

MIRT Findings

Understanding

of MIRT

Findings

Dispositioned/

Adjudicated

Comments

Dispositioned/

Adjudicated

Comments

Updated

Contract File

Informed

SSA

MIRT Critical

Decision Point

Information

BACK FWD

MIRT

Assessment

Go Up 1 Level

Page 333: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.2.5 Conduct Discussions

Go Up 1 Level

Distribute

Evaluation

Notices (ENs)

Evaluate

Response

Conduct

Pre-FPR

Activities

Conduct

Contract

Clearance

ENs

EN Response

Un-resolved Issue

Conduct

Critical

Decision

Point 2b

MIRT

Section L

Section MApproved Review

of Discussions

WRT Sections

L & M

OSD Peer

Review 2 Approval

RFP

Source Selection

DocumentationSource Selection

File

FPR

Briefing

Competitive

Range

Briefing

Evaluation

Criteria

Information Requests

Model

Contract

Model

Contract

Resolved Issue

Resolved Issue

FWDBACK

Maintain Source

Selection

Information

Conduct

Critical

Decision

Point 2 OSD

Peer Review

Note: An AFLCMC specific process

exists to describe the Contract Award

Process. This AFLCMC process is

contained within the Air Force Process

depicted here CTRL-Click here to

access an active link to this process.

AFLCMC

Standard

Processes

Source Selection

File

Page 334: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model1.4.4.2.5.3 –Conduct Critical Decision Point (CDP) 2b (Pre-Final Proposal Decision Brief)

Multi-Functional Independent Review Team (MIRT)

Evaluate

CDP 2b

Information

Provide

Immediate

Feedback to

Source

Selection/

Procurement

Team

Provide

Assessment

of CDP 2b

Disposition/

Adjudicate

Comments

Incorporate

MIRT

Assessment

into Contract

File

Provide

Feedback to

Source

Selection

Authority

(SSA)

MIRT Findings

Understanding

of MIRT

Findings

Dispositioned/

Adjudicated

Comments

Dispositioned/

Adjudicated

Comments

Updated

Contract File

Informed

SSA

MIRT Critical

Decision Point

Information

MIRT

Assessment

Go Up 1 Level

Page 335: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.2.6 Conduct Final Evaluation

Go Up 1 Level

Conduct Final

Evaluation Briefing

Evaluate

Final

Revisions

Summarize

Recommendations

for the SSA

Final Evaluation

BriefingProposal Analysis

Report (PAR)Accepted

Proposals

BACK

Conduct and

Document

Comparative

Analysis

Comparative

Analysis

RFP

Source Selection

Documentation

FPR

Briefing

Competitive

Proposals

Evaluation

Criteria

Information Requests

SSET/SSAC

Recommendation

Maintain Source

Selection

Information

Source Selection

File

FWD

Page 336: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model1.4.4.2.7 – Conduct Critical Decision Point (CDP) 2c (Pre-Source Selection Decision Brief)

Multi-Functional Independent Review Team (MIRT)

Evaluate

CDP 2c

Information

Provide

Immediate

Feedback to

Source

Selection/

Procurement

Team

Provide

Assessment

of CDP 2c

Disposition/

Adjudicate

Comments

Incorporate

MIRT

Assessment

into Contract

File

Provide

Feedback to

Source

Selection

Authority

(SSA)

MIRT Findings

Understanding

of MIRT

Findings

Dispositioned/

Adjudicated

Comments

Dispositioned/

Adjudicated

Comments

Updated

Contract File

Informed

SSA

MIRT Critical

Decision Point

Information

BACK

MIRT

Assessment

Go Up 1 Level

Page 337: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.4.4.3 Select Source

Notify

Offerors of

Award

Go Up 1 Level

Award the

Contract

Conduct

DebriefsAward

Notification

Document

Award

Decision

Offeror

Notification

Acceptance of Award

Conduct

Critical

Decision

Point 3a

MIRT

BACK

Accepted

Proposals

Definitized

Agreement

RFP

RFP

Source Selection

Decision Document

Source Selection

Decision Document

Source Selection

Documentation

Source Selection

File

Source Selection

File

Source Selection

File

Assessment of

Air Force

Source Selection

Position

Assessment of

Source Selection

Compliance

Debrief

Request

Debrief

Evaluation

Criteria

Information Requests

Information Requests

SSET/SSAC

Recommendation

Notice to Unsuccessful Offerors

Maintain Source

Selection

Information

1279 Report

To Congress

Note: An AFLCMC specific process

exists to describe the Contract Award

Process. This AFLCMC process is

contained within the Air Force Process

depicted here CTRL-Click here to

access an active link to this process.

AFLCMC

Standard

Processes

Page 338: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model1.4.4.3.4 – Conduct Critical Decision Point (CDP) 3a (Pre-Debrief)

Multi-Functional Independent Review Team (MIRT)

Evaluate

CDP 3a

Information

Provide

Immediate

Feedback to

Source

Selection/

Procurement

Team

Provide

Assessment

of CDP 3a

Disposition/

Adjudicate

Comments

Incorporate

MIRT

Assessment

into Contract

File

Provide

Feedback to

Source

Selection

Authority

(SSA)

MIRT FindingsUnderstanding

of MIRT

Findings

MIRT

Assessment

Dispositioned/

Adjudicated

Comments

Dispositioned/

Adjudicated

Comments

Updated

Contract File

Informed

SSA

MIRT Critical

Decision Point

Information

FWD

Go Up 1 Level

Page 339: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.4.3.5 Conduct Debriefs

Go Up 1 Level

Prepare the

Debrief

Prepare for

DebriefDebrief

Logistics

Conduct

DebriefResponses to

Vendor

Source Selection

File

Assessment of

Air Force

Source Selection

Position

Debrief

Request

Debrief

BACK

Page 340: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.4 Conduct Contract Award Sole Source

Release Request

for Proposal to

Receipt of

Proposal

Conduct

Business

Clearance

Conduct

Negotiations

Go Up 1 Level

Conduct Fact

Finding and

Evaluation

Contract

Award

Conduct Contract

Clearance

Award Contract

Final Government

Position

Negotiated

Contract

Final Government

Position

RFP

AFLCMC

Standard

Processes

ProposalApproved

Business

Clearance

Approved

Business

Clearance

Contract

Page 341: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.4.1 Release Request for Proposal to Receipt of Proposal

Provide Initial

Notice for Audit

Support or Rate

Review

Conduct Proposal

Kick Off Meeting

Prepare and

Submit Proposal

Go Up 1 Level

Provide Initial

Notice for Field

Pricing Support

Understanding

of Proposal

Verify Proposal

for Adequacy

Conduct Walk-

Through Proposal

Request for

Support

Audit Support

Commitment

Procurement Schedule

Proposal

Adequate

Proposal

RFP Package

FWD

RFP

Proposal

Adequacy

Checklist

RFP

Page 342: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.4.2 Conduct Fact Finding and Evaluation

Finalize Field

Pricing and

Audit Support

Conduct Fact

Finding with

Contractor

Evaluate

Contractor

Subcontracting

Plan

Go Up 1 Level

Evaluate

Proposal

Final

Government

Position

Complete Audits/

RR and Final

Technical

Evaluation

Finalize

Government

Position

Initial Government

Position

Contractor Response

Audits

Technical

Evaluation

BACK FWD

Request for

Support

Audit Support

Commitment

ProposalFact Finding

Questions

Subcontracting

Plan

Approved

Subcontracting

Plan

Updated

Proposal

Page 343: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.4.3 Conduct Business Clearance

Prepare Pre-

Preliminary

Price

Negotiation

Memorandum

Coordinate

Business

Clearance

Reviews

Conduct OSD

Peer Review #1

Go Up 1 Level

Government

Position

Prepare

Business

Clearance

Documents

Approve

Business

Clearance

Pre-PNM

Business

Clearance

Documents

Reviewed

Business Clearance

Documents

Reviews of

Business Clearance

BACK FWD

Government

Position

Contract File

Business

Clearance

Documents

Contract File

Approved

Business

Clearance

PNM

Page 344: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.4.4 Conduct Negotiations

Conduct

Negotiations

Certify Negotiated

Agreement is

Current

Go Up 1 Level

Final Government

Position

BACK FWD

Negotiated

Contract

Certificate of

Current Cost/Price

DataApproved

Business

Clearance

Page 345: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.4.5 Conduct Contract Clearance

Prepare

Contract

Clearance

Documents and

File for Final

Review

Coordinate

Contract

Clearance

Reviews

Conduct OSD

Peer Review #2

Go Up 1 Level

Negotiated

Contract

Prepare Price

Negotiation

Memorandum Pre-Award

Clearance

Review and

Approve Contract

Clearance

Conduct EEO Pre-

Award Clearance

Contract Clearance

Documents

PNM

Authority to

Award Contract

Contract File

Review

Contractor

Subcontracting

Plan

Preliminary Price

Negotitation

Certificate of Current

Cost and Pricing Data

Certificate of Current

Cost and Pricing Data

Negotiated

Contract

Reviewed

Contract

Clearance

Documents

Reviews of

Business Clearance

Pre-Award

Clearance Request

BACK FWD

Subcontracting

Plan

Approved

Subcontracting

Plan

Contract

Reviewed

Contract

Clearance

Documents

Page 346: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.4.4.6 Award Contract

Provide Contract

to Contractor for

SignatureContract Award

Go Up 1 Level

Contract

Obtain

Congressional

Approval

1279 Report

To CongressCongressional

Approval

Contractor

Signed ContractContract Signed Contract

BACK

Page 347: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.4.5 Test and Evaluation

Perform

Test

Planning Conduct

Developmental

Testing (DT)

Go Up 1 Level

Manage

Test Data

Conduct

Operational

Testing (OT) OT

Reports

OT Results

OT Results

OUE

Results

OUE

Results

Managed

Test

Data

Managed

Test

Data

Managed

Test

Data

Developmental

Test Article

Developmental Test Article

Deficiency

Reports

DT Results

DT ResultsFDE

Results

FDE

Results

ADM

Acquisition

Strategy

TEMP

TEMP

TEMP

Capability Document

Deficiency

Reports

Manage

Deficiency

Reports

BACK

Deficiency

Reports

Deficiency

Report

Status

Page 348: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.4.5.1 Perform Test Planning

Determine the

Operational

Test

Organization

(OTO)

Go Up 1 Level

Determine the

Lead

Developmental

Test and

Evaluation

Organization

(LDTO)

Develop the

T&E Master

Plan (TEMP)

Develop the

Integrated Test

Concept (ITC)

Stand-Up

Integrated Test

Team (ITT)

Conduct Early T&E Resource Planning

OTO

Plans for

Target and

Instrumented

Munitions

Expenditures

ITC

ITC

Resourcing

Responsibilities

LDTO

Decision

Exercises

Experiments

Foreign

Materiel

Resources

Non-Government

Test Facilities

Government

Test Facilities

TEMP

FWD

ADM

Acquisition

Strategy

TEMP

Capability

Document

Formalized

ITT

Updated

ITT

Charter

Formalized

ITT

Updated

ITT

Charter

Updated

ITT

Charter

Formalized

ITT

Page 349: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.1.1 Stand-Up Integrated Test Team (ITT)

Develop ITT

Charter

Go Up 1 Level

Determine

ITT

Leadership

Determine

Necessary

Subgroups Determine

Operational

MAJCOM

Roles

Determine

ITT

Membership

Conduct

Charter

Updates

ITT

Leadership

Validated

Membership

Subgroups

Involved

MAJCOM

Testers

FWD

ITT

Charter

ADM

Acquisition

Strategy

Capability

Document

Formalized

ITT

Updated

ITT

Charter

Page 350: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.1.2 Determine the Lead Developmental Test and Evaluation

Organization (LDTO)

Identify

Appropriate

LDTO

Organizations

Go Up 1 Level

Select and

Coordinate

Candidate

Organization

as LDTO

Candidate

LDTO

Organizations

LDTO Nomination

Approve LDTO

Recommendation

Coordinate

LDTO

Decision

LDTO

Designation

Memo

BACK FWD

LDTO

Decision

Identify the Chief

Developmental

Tester

Identified Chief

Developmental Tester

Candidates for Chief

Developmental Testers

Updated

ITT

Charter

Note: The first 3 processes

incorporate a AFLCMC

Standard Process.

No-LDTO Option

Formalized

ITT

Updated

ITT

Charter

AFLCMC

Standard

Processes

Page 351: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.1.2.1 Identify Appropriate LDTO Organizations

Go Up 1 Level

FWD

Formalized

ITT

LDTO Option

Note: The above process is

part of an AFLCMC Standard

Process.

Determine if

an LDTO is

Necessary

Draft AFMC

Designation

Form

Obtain

Candidate List

Provide

Candidate

LDTO List

Analyze

Candidate

LDTOs

No-LDTO Option

Staff Package

Analysis of Candidate

LDTO Capabilties Candidate LDTO List

Updated

ITT

Charter

No-LDTO Option

Candidate

LDTO

Organizations

Page 352: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.1.2.2 Select and Coordinate Candidate Organization as LDTO

Go Up 1 Level

BACK

Note: The above process is

part of an AFLCMC Standard

Process.

Select

Candidate

LDTO for PEO

Approval

Draft AFMC LDTO

Designation Form

Coordinate

LDTO

Designation

Form

Forward LDTO

Form to PEOLDTO NominationSelected Organization

Designation Staff

Package

Designation Memo

No-LDTO Option MemoNo-LDTO Option

Candidate

LDTO

Organizations

Page 353: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.1.3 Determine the Operational Test Organization (OTO)

Evaluate

Program

Criteria

Go Up 1 Level

Accept

Assignment

Assign to

AFOTEC

ACAT I, IA, II, all OSD

OT&E Oversight, or MOT&E

and No Previous I/Q/MOT&E

Determine

Assignment of

Testing

Organization

ACAT I, IA, II, all OSD

OT&E Oversight, or MOT&E

and Previous I/Q/MOT&E

ACAT III Non-Oversight or

Non-ACAT Acquisition

Programs

Assignment

Negotiations

BACK FWD

OTO

OTO

Formalized

ITT

Updated

ITT

Charter

Page 354: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.5.1.5 Develop the TEMP

Prepare Draft

TEMP

Go Up 1 Level

Coordinate

TEMP

Conduct Pre-

coordination

on TEMP

Deliver TEMP

CONOPS

Validated On-Line

Life-cycle Threat (VOLT)

Report

BACK FWD

AoA

CDD

OTO

Resourcing

Responsibilities

LDTO

Decision

TEMP

Draft

TEMPSigned

TEMP

Coordinated

TEMP

TEMP

Formalized

ITT

Updated

ITT

Charter

Page 355: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.4.5.1.7 Conduct Early T&E Resource Planning

Go Up 1 Level

Secure T&E

Ranges and

Facilities

Develop

Exercises and

Experiments

Develop Joint

Environment

Considerations

Determine the

Need for Foreign

Materiel

Resources

Develop Plans for

Target and

Instrumented

Munitions

Expenditures

Joint

Environment

Considerations

BACK

Plans for

Target and

Instrumented

Munitions

Expenditures

ITC

ITCITC

ITC

ITC

Exercises

Experiments

Foreign

Materiel

Resources

Non-Government

Test Facilities

Government

Test FacilitiesTEMP

TEMP

TEMP

TEMP

TEMP

Plan for Cyber

Test Resources

ITC

TEMP

Cyber Test

Resources

Page 356: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.2 Conduct Developmental Testing

Review

Formal

Contractual

Documents

Go Up 1 Level

Perform Live Fire

T&E (LFT&E)

Perform

Production

Related Testing

(PRT)

Conduct Early

Operational

Assessment

Perform

Qualification T&E

(QT&E)

Approved

Plans for

“Covered”

Systems

Approved

Plans for

COTS

NDI

GFE

Approved

Plans for

Production

Related

Articles

Create Reports

BACK FWD

Managed

Test

Data

Developmental Test Article

Developmental

Test Article

DT Results

DT Results

EOA

Data

Test Plans

PEO View

Reliability

Growth

Curve

Data

Capability Document

RFP

System Requirements

Document

DT Results Deficiency

Reports

Conduct

Reliability Growth

Planning

Test Plans

Note 1: Testing of Urgent Needs is

included in the 1.3.3.2.3 process.

DT Results

Develop Detailed

Test Plans

Provide DASD

(DT&E) Program

Assessment

DASD (DT&E)

Program Assessment

DT&E Exception

Reporting

Survivability and

Live Fire Testing

Status Report

TEMP

DT Results

SOW

DD Form 254

Note 2: Consistent with Section 5.14 of AFI 99-

103, all aspects of cyber test including

required resources, manpower, and

infrastructure must be planned for and

documented in the TEMP.

Page 357: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.3 Conduct Operational Testing

Execute Operational

Test (OT)

Conduct Operational

Test Readiness

Review (OTRR)

Go Up 1 Level

Conduct Follow-on

Test & Evaluation

(FOT&E)

Create OT Reports

Applicable

Templates

BACK FWD

DRs

DRs

OT

Reports

OT Results

OT Results

OUE

Results

Managed

Test

Data

Authorization of

MAJCOM

Managed

System

Authorization of

Production

Or Production

Representative

Article(s)

Authorization when Formal

QO/ IO/ FOT&E

Not required

Authorization

of COTS

NDI

GFE

FDE

Results

System

Performance

Data

System

Performance

Goals

PEO View

Reliability

Growth

Curve

Data

Note: Multi-Service Operational Test &

Evaluation can be the FOT&E process

provided above when conducted by two or

more Services.

Conduct

Operational

Assessment

OT

Articles

OA

Data

TEMP

TEMP

Page 358: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.3.1 Conduct Operational Test Readiness Review (OTRR)

Conduct Assessment

of Readiness for OT

Go Up 1 Level

Conduct Pre-

Certification Reviews

Negotiate OT Work

Arounds and

Limitations

Prepare Certification

Briefing

Authorize OT

Activities

Meeting

Summarization

Signed

Certification

Memo

FWD

Applicable

Templates

Authorization of

MAJCOM

Managed

System

Authorization of

Production

Or Production

Representative

Article(s)

Authorization when Formal

QO/ IO/ FOT&E

Not required

Authorization

of COTS

NDI

GFE

System

Performance

Data

System

Performance

Goals

TEMP

Conduct Operational

Test & Evaluation

Readiness

Certification

Applicable

Templates

System

Performance

Data

System

Performance

Goals

TEMP

Workaround

Plans

Certification

Memo

Note: Conduct Operational Test &

Evaluation Readiness Certification is an

AFLCMC Standard Process which is

similar to the first four processes in the

Core lane.

Identified

Shortfalls

DT Results

Page 359: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.3.1.1 Conduct Pre-Certification Process

Go Up 1 Level

Review Templates for

Applicability

Compare

Performance and

Resources

Identified

ShortfallsReviewed

Templates

FWD

Applicable

Templates

System

Performance

Data

System

Performance

Goals

TEMP

Page 360: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.4.5.3.1.2 Conduct Assessment of Readiness for OT

Develop Exit Criteria

Go Up 1 Level

Identify Judging

Standards

Address Standard

Shortfalls

Exit

Criteria

Judging

Standards

Identify

Requirements

Deferred

BACK FWD

Action

PlansDraft

Certification

Briefing

Identified

Shortfalls

Page 361: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.3.1.4 Prepare Certification Briefing

Go Up 1 Level

Prepare Final

Certification

Briefing

Brief OT&E

Certification

Official

Final

Certification

Briefing

LDTO DT

Review

BACK

Signed

Certification

Memo

Workaround

Plans

Prepare DT

ReportDT Results

Certification

Memo

Sign and

Release

Certification

Memo

Page 362: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.3.1.5 Conduct Operational Test & Evaluation Readiness Certification

Conduct Kick-Off

Meeting

Go Up 1 Level

Initiate ITT with OT&E

Readiness

Preparation by CDT

or TM

Access Assessment

Tools

Conduct Integrated

Assessments IAW

AFMAN 63-119

Operational Test

Readiness Templates

Meeting

Results

Data Population

Of Tools Briefing/

Review

ITT Meeting

Announcement

Applicable

Templates

SSS PackagePopulated

Tool Results

Various OT&E

Readiness

Assessments

System

Performance

Data

System

Performance

Goals

Note: Incorporated

references to the AFLCMC

Standard Process (OT&E

Readiness Certification).

AFLCMC

Standard

Processes

TEMP

BACK

Draft, Develop, or

Update OT&E

Readiness

Certification Briefing

or Staff Package

Review Readiness

Assessment Results

Conduct Pre-Brief

and Review with

Local CTA

Invite SAT or Other

SME Functionals to

Final Briefing as

Required

Coordinate Local

CTA on Staff Package

as Required

Coordinate T&E OSF

on Staff Package as

Required

Present OT&E

Readiness

Certification Briefing

and Staff Package to

the PEO/MDA

Conduct Certification

Briefing Attended by

Local CTA, CSF, or

SSF

Sign Approval

Memorandum by the

PEO/MDA

Review of

Current Status

Coordination

& Signature

Coordination

& Signature

Advisory

Advisory

Signed Approval

Memorandum

Page 363: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.3.2 Execute Operational Testing

Conduct Force

Development

Evaluation (FDE)

Conduct Initial

Operational Test &

Evaluation (IOT&E)

Conduct Operational

Utility Evaluation

(OUE)

Conduct Final Test

Preparations

Conduct Qualification

Operational Test &

Evaluation (QOT&E)

Go Up 1 Level

Prepared

COTS

NDI

GFE

Prepared Articles when Formal

QO/ IO/ FOT&E

Not required

Prepared

MAJCOM

Managed

System

BACK

DRs

DRs

DRs

DRs

OT Results

OT Results

Authorization of

MAJCOM

Managed

System

Authorization of

Production

Or Production

Representative

Article(s)

Authorization when Formal

QO/ IO/ FOT&E

Not required

Authorization

of COTS

NDI

GFE

Prepared

Production or

Production

Representative

Article

FDE

Results

OUE

Results

Reliability

Growth

Curve

Data

Note: Multi-Service Operational Test &

Evaluation is OT&E (IOT&E, QOT&E,

FOT&E, or FDE) conducted by two or more

Service OTOs for systems acquired by more

than one Service

Page 364: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.4 Manage Test Data

Establish

T&E

Database

Archive T&E

Database

Go Up 1 Level

Archived

T&E Data

Review T&E

Data

Release T&E

Data

Track T&E

Data

BACK

OT Results

OUE

Results

Released

Test

Data

Test

Data

DT Results

EOA

Data

OA

Data

Test

Plans

T&E

Database

Test

Review

Outcomes

FDE

Results

Note: The enabling

processes interact

with all of the Core

processes.

Test

Data

Page 365: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.4.5.5 Manage Deficiency Reports

Go Up 1 Level

Prioritize

Deficiency

Reports

Track and

Close

Deficiency

Reports

Categorize

Deficiency

Reports

BACK

Open

Deficiency

ReportsCategorized

Deficiency

Reports

Deficiency

ReportsDeficiency

Report

Status

Prioritized

Deficiency

Reports

Page 366: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.5 Conduct “Program” Management Tasks

Go Up 1 Level

Co

reG

ov

ern

ing

En

ab

lin

g

Manage

Communication

and Reports

Conduct Life

Cycle Risk

Management

Conduct

Continuous

Process

Improvement

Resource Needs

Conduct Issue

Management

Note 2: Issue Management

applies resources to address and

resolve current problems, while

risk management applies

resources to mitigate future

potential root causes and their

consequences

Program

Metrics

Program

Metrics

BACK

Definitized

Agreement

Definitized

Agreement

Request for

Information

Risk

Assessment

Risk

Management

Results

Program

Status

Program

Status

Cost / Schedule /

Performance Updates

Cost / Schedule /

Performance Updates

Program

Revisions Program

Revisions

Program Budget

Program Budget

Note 1 from the Chief Process Officer: The Under Secretary of Defense for AT&L has

provided four key enduring acquisition principles. The first of these principles is “Think”. Program

managers should tailor the program according to the specific needs of that program. The rote

checking the blocks in a checklist or simply following each and every step of a process is the

antithesis of Mr Kendall's challenge to Program Managers. Use this Model as a model. If your

program's situation warrants a waiver from the checklist or process, seek that waiver from your

milestone decision authority. CTRL-Click here to access an active link to Mr. Kendall’s thoughts.

Program

Reporting

ADM

ADM

Programmatic

Data

Programmatic

Data

Capability Document

Capability Document

Issue

Identified

Note 4: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Note 3: Program

Integration provides the

AF with consistent

insightful and

synchronized

recommendations,

improved data reporting

and analysis, and

maximized utilization of

resources. The objective

is to strengthen decision-

making across AF

Acquisition leadership.

Page 367: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1 Conduct Issue Management

Go Up 1 Level

Manage

Business

Activities

Manage Technical

Activities

Manage

Resources

Resource Needs

FWD

Cost / Schedule /

Performance Updates

Program

Status

Conduct

Issue

Resolution

Program

Metrics

Program

Metrics

Training

Definitized

Agreement

Initiative Results

Issue Resolution &

Recommendations

Program Budget

ADM

Programmatic

Data

Programmatic

Data

Capability Document

Issue

Identified

Note 1: The DoD Risk, Issue, and Opportunity

Management Guide for Defense Acquisition

Programs describes a five-step process for

both issue management (Section 3.6) and

opportunity management (Section 4), each of

which is similar to the Risk Management

process. CTRL-Click to access the guide.

Page 368: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.1 Manage Business Activities

Manage Cost

Issues

Manage

Budget

Manage

Contract

Manage

Business

Documentation

Go Up 1 Level

Contract

Evaluation

Contract

Action

EVM

Analysis

Program

Cost Impacts

Manage

ScheduleSchedule Updates

Perform

Contract

ManagementInvoice

Processed

Invoice

Client/ COTR

Guidance

Analyze

Program

C/S/P/F

Conduct

Performance

Analysis

AQX

Assessment

Request

Identified

Program Issues

Ensure

Policy

Compliance

Conduct

Schedule

Risk

Assessment

Action Items

Critical

Change

Nunn-McCurdy

Breach

Issue

Closed Action Items

APB/MAR

Non-Compliance

Issues

Contractor

Assessment

Contractor

Data

MAR

Book

MAR

Approved

RequestRequest

SRA

Output

IMS

Integrated Program

Management

Report (IPMR)

PEO View

Definitized

Agreement

Program

Status

Cost / Schedule /

Performance Updates

IMP

IMS

Integrated Program

Management

Report (IPMR)

Integrated Program

Management

Report (IPMR)

Integrated Program

Management

Report (IPMR)

Program Budget

Program Budget Revised Budget

Manage

Product

Support

Strategy

Conduct

Legal

Reviews

Legal

Review

Decision

FWD

ADM

Programmatic

Data

Programmatic

Data

Programmatic

Data

Programmatic

Data

Programmatic

Data

Programmatic

Data

Address

International

Acquisition

and

Exportability

International

Acquisition and

Exportability

Considerations

Programmatic

Data

Ensure

Data

Protection

Programmatic

Data

Data

Protection

Records/Plans

Capability Document

Product

Support

Strategy

Page 369: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

oreAcquisition Process Model

1.5.1.1.3 Manage Schedule

Go Up 1 Level

Develop Schedule

PlanBuild Program

Schedule

Manage

Program

Schedule

Go

ve

rnin

g

FWD

Schedule Updates

Programmatic

Data

IMSIMP

Programmatic

Adjustments

PEO/HHQ

Direction

Programmatic

Data

Programmatic

Data

Note: The process above is

an AFLCMC Standard

Process (Develop Program

Schedule).

IMS

AFLCMC

Standard

Processes

Page 370: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

ore

Acquisition Process Model

1.5.1.1.3.1 Develop Schedule Plan

Go Up 1 Level

Set Scheduling

ExpectationsPlan Resources

Determine &

Acquire Tool

Go

ve

rnin

g

FWD

Schedule Updates

Programmatic

DataIMPMultifunctional TeamSchedule

Expectations

Note: The process above is

part of an AFLCMC Standard

Process (Develop Program

Schedule).

Page 371: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

ore

Acquisition Process Model

1.5.1.1.3.2 Build Program Schedule

Go Up 1 Level

Build

Schedule

Analyze

ScheduleSet Baseline

Go

ve

rnin

g

FWDBack

IMSDraft Program

Schedule

Schedule

Confirmation

Schedule Health

Assessment

IMP

Note: The process above is

part of an AFLCMC Standard

Process (Develop Program

Schedule).

Page 372: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

ore

Acquisition Process Model

1.5.1.1.3.3 Manage Program Schedule

Go Up 1 Level

Track Status of

Program

Analyze

Schedule

Variances

Report

Schedule Status

Go

ve

rnin

g

Adjust ProgramSchedule

Status

Programmatic

Adjustments

Updated

Schedule

SME Technical

Assessment

Critical Path

Analysis

Schedule Risk

Assessment

Note: The process above is

part of an AFLCMC Standard

Process (Develop Program

Schedule).BACK

IMS

Revised

IMS

Page 373: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

ore

Acquisition Process Model

1.5.1.1.6 Perform Contract Management

Go Up 1 Level

Conduct PMR /

Contractor

Reviews

Process

Invoices

Process

Vendor /

Contractor

Requests

Perform Daily

Contract

Oversight

Go

ve

rnin

g

FWD

Conduct

Acquisition

Program

Transition

Workshop

Agreement on

Program

Parameters

Request

for

Workshop

Integrated Program

Management

Report (IPMR)

Contractor

Data

Invoice

Request

IssueContractor

Assessment

Processed

Invoice

Approved

Request

Client/ COTR

Guidance

Page 374: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.1.1.6.2 Process Invoices

Go Up 1 Level

Review Invoice

Resolve

Issue(s) with

Invoice Source

Process Invoice

for Payment

Invoice

Issues

Invoice Issue

Resolved

Acceptable

Invoice

FWD

Invoice

Processed

Invoice

Page 375: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.1.1.6.3 Process Vendor / Contractor Requests

Go Up 1 Level

Conduct

Analysis on

Request

Obtain

Guidance from

Client / COTR

Approve and

Execute

Request

Analyzed

Request

If Contract Issue / Require

Additional Information

COTR Guidance

FWDBACK

Request

Approved

Request

Page 376: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.5.1.1.6.4 Perform Daily Contract Oversight

Go Up 1 Level

Formulate

Resolution for

Issue

Contact Vendor /

Contractor for

Issue Resolution

Contact Client /

COTR for

Additional

Guidance

Implement Issue

Resolution

Issue

Resolution

Plan

Vendor / Contractor

ReportIssue

Resolution

BACK

Issue

Client/ COTR

Guidance

Page 377: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.1.8 Conduct Performance Analysis

Go Up 1 Level

Gather Data

Assess/

Analyze

Data

Evaluate

Performance

Data

Develop

RecommendationEarned

Value

Data

Validate

Quality of

Earned Value

Data

Earned

Value

Data

AQX

Assessment

AQX

Assessment

AQX

Assessment

Request

AQX

Assessment

FWDBACK

Integrated Program

Management

Report (IPMR)

Action Items

Page 378: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.1.9 Analyze Program C/S/P/F

Go Up 1 Level

Produce

MAR Book

Conduct

SAE

Monthly

Briefing

Oversee SAE

Monthly

Action Items

Communicated

Issues

Produce

Expiring

Year Funds

Report

Perform

Program

Ad Hoc

Analysis

Update

Enterprise

MetricsDFAS 1002

Charts

DFAS

1002

CSO

Validation

AFM Data

Reports

CRIS Data

Ad Hoc

Report Analysis

Recommendation

Analysis

Summary

Recommended

Funding Pull

Oversee

Budget

Program

Activity

Code

(BPAC)

Creation

BPACBPAC

Request Form

Programmatic

Data

Program

List

FWDBACK

Programmatic

Data

Integrated Program

Management

Report (IPMR)

MAR

MAR

Action Items

MAR

Book

Closed Action Items

Page 379: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.1.10 Ensure Policy Compliance

Go Up 1 Level

Process MAR

Roll-Up

Request (Child

to MAR

Compliance)

Update

J-Books

Verify

MAR

Compliance

Improved

Report

Monitor

APB

Compliance Program

Data from SMART

IDECS

Data

CCaRS

Data

Updated

J-Books Program Office

Request

Concur/

Non-Concur

Resolved

Non-Compliance

Issues

APB/MAR

Non-Compliance

Issues

APB/MAR

Non-Compliance

Issues

FWDBACK

MAR

Programmatic

Data

Page 380: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.1.11 Conduct Schedule Risk Assessment (SRA)

Go Up 1 Level

Establish

SRA

Expectations

Run

Critical

Path

Conduct

Risk

Analysis

Determine

Reporting

Tasks

Produce

SRA

Output

Conduct

Program

Management

Office (PMO)

Follow-Up

Determine

Three Point

Estimates

Risk

Data

Risk

ResourcesSRA Ground

Rules

SRA

Assumptions

Updated

Risk

Register

Risk

Analysis

Outputs

Revised Completion

Dates

Risk

Data

Risk

Resources

Assess/Prepare

Integrated

Master

Schedule (IMS)

Reporting

Tasks

Critical Path

Tasks

Near Critical

Path

Tasks

High Risk

Tasks

Determine

Distribution

Curves

Distribution

Curves

Assessed

IMS

Draft

IMS

Integrated Program

Management

Report (IPMR)

SRA

Output

BACK FWD

Page 381: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Acquisition Process Model

1.5.1.1.11.3 Conduct Integrated Master Schedule (IMS) Assessment Process

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.1.11.3 Conduct Integrated Master Schedule (IMS) Assessment Process

Prepare

Comprehensive

Assessment

Plan/Schedule

Issue

Data

Call

Gather

Data

Conduct

Coordination

Meeting

Document

Assessment

Results

Conduct

Results

Meeting

Perform

Quick Look

Assessment

Update

IMS

Assign

Assessment

Lead

Scope

AssessmentGo-No Go

Decision

Draft

IMS

Reporting

Tasks

Comprehensive

Plan

Data Call

Items

Program

Information

Meeting

Schedule

Action

Items

Assessed

IMS

Quick Look

Assessment

Results

Identified

Assessment

Lead Checklist of

Tasks

Corrective

Action Plan

Prior

Assessment

Documents

Assessment

Results

Integrated Program

Management

Report (IPMR)

Page 382: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.1.12 Manage Product Support Strategy

Form the

Product

Support

Management

IPT

Conduct

Product

Support

Value

Analysis

Baseline

the System

Go Up 1 Level

Identify/

Refine

Performance

Outcomes

Integrate

Warfighter

Requirements

& Support

Determine

Support

Methods

Designate Product

Support

Integrator(s) (PSI)

Establish/

Refine Product

Support

Arrangements

Implement and

Assess

Performance

BACK

Identify Product

Support

Provider(s) (PSP)

Identify/

Refine

Financial

Enablers

Programmatic

DataManage

Product

Support

Business

Case Analysis Product Support

Requirements within

Warfighter Requirements

PSMIPT

Analysis

Recommendation

Product Support

Performance Metrics

BCA

Identified Product Support

AlternativesProduct Support

MethodPSI

PSPFinancial Enablers

PBL Arrangements

Reported

Results

Draft Product

Support

Strategy

Product

Support Strategy

Product

Support Strategy

Page 383: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.1.12.5 Manage Product Support Business Case Analysis

Conduct PS

BCA Kickoff

Collect PS

BCA Data

Go Up 1 Level

Develop

Methodology

and Criteria for

Evaluation

Determine

Requirements

for a PS BCA

Decision

To

Proceed

Note 1: This is an AFLCMC

Standard Process.

Previous

PS BCA

MDA Decision

PS BCA

Framework

AoA Input

Develop PS

BCA

Alternatives

and Data

Collection Plan

Draft PS BCA

Briefing and

Final Report

Finalize PS BCA

Recommendation

Approve PS

BCA

Documentation

Selected Evaluation

Criteria, Methodology,

and System

Comparison Approach

Draft

Briefing

Draft

Final

Report

BCA

Guidance

Coordinate PS

BCA Initial

Recommendations

Briefing

Final

Briefing

Final

Report

Way

Forward

Update PS BCA

DocumentationFinal

BriefingUpdated Final Report

Programmatic

Data

Programmatic

Data

Programmatic

Data Programmatic

Data

AFLCMC

Standard

Processes

Product

Support Strategy

Identify PS

BCA Team

Lead &

Assemble PS

BCA Team

Develop

Program’s PS

BCA

Framework

Send PS

BCA

Framework

IOI

Conduct

Methodology

and Criteria

Vector Check

Conduct

PSIC

Analyze PS

BCA Data

Conduct

PSICConduct

PSSB

Finalize PS BCA

Documentation

PS BCA

Team Lead &

Team

PSM Approved

Purpose/Problem

Statement

PSIC Awareness

Validated Evaluation Criteria,

Methodology, and System

Comparison Approach

PSIC Approved

Documents

PS BCA Data

PS BCA Team

Guidance

Recommendation for

PSSB or MDA

PSSB Recommendations

Implementation Plan

Updated LCSP

Updated Program

Files

Page 384: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2 Manage Technical Activities

Manage Systems

Engineering Plan

Go Up 1 Level

BACK FWD

Program

Revisions

PEO View

Program

Status

Conduct Systems

Engineering

Technical

Management

Processes

Conduct Systems

Engineering

Technical

Processes

Conduct Other

Technical

Processes

SEP

Conduct Annual

Systems

Engineering Plan

Review

Revised

SEP

Conduct Systems

Engineering

System of

Systems

Processes

ADM

Programmatic

Data

Programmatic

Data

Approve Systems

Engineering Plan

SEP

Approved SEP

Capability Document

Page 385: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2 Conduct Systems Engineering Technical Management Processes

Go Up 1 Level

FWD

Program

Revisions

Program

Status

Capability Document Conduct

Technical

Planning

Conduct

Decision

Analysis

Conduct

Technical

Assessment

Conduct

Configuration

Management

Conduct

Technical Data

Management

Activities

Conduct Interface

Management

Conduct

Requirements

Management

Conduct

Technical Risk

ManagementProgrammatic

Data

Page 386: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2.1 Conduct Technical Planning

Go Up 1 Level

FWD

Program

Revisions

Program

StatusCapability Document

Define the

Scope

Identify

Constraints and

Risks

Establish Roles

and

Responsibilities

Establish

Schedules and

Costs

Prepare/Update

Planning

Documentation

Scale Systems

Engineering

Processes

Breakdown

Program Scope

Prepare for

Technical

Reviews and

Audits

Identify Areas for

Tailoring

Work

Breakdown

Structure

Inputs

IMP/IMS

Inputs

Programmatic

Data

Page 387: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2.2 Conduct Decision Analysis

Go Up 1 Level

Program

Revisions

Program

Status

Capability Document

Review

RequirementsFrame the

Decision

Identify

Methods

and Tools

Identify

Alternatives

Analyze and

Assess

Alternatives

Synthesize

Results

Develop

Decision

Criteria

Manage

Assumptions

Analyze

Sensitivities

BACK FWD

Develop

Decision

Briefing

Make

Recommendations

Programmatic

Data

Page 388: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2.3 Conduct Technical Assessment

Go Up 1 Level

Program

Revisions

Program

StatusCapability Document Establish

Technical

Planning

Identify

Measures and

Metrics

Conduct

Analyses

Provide

Technical

Readiness

Advice

Obtain Subject

Matter Experts

Conduct

Technical

Assessments

Propose

Changes to

Technical

Approach

Technical

Performance

Measures

BACK FWD

Programmatic

Data

Page 389: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2.4 Conduct Requirements Management

Go Up 1 Level

Program

Revisions

Program

StatusCapability Document

Track ChangesProvide

Traceability

Communicate

Requirements

ChangesRequirements

Traceability

Matrix

BACK FWD

Programmatic

Data

Page 390: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2.5 Conduct Technical Risk Management

Go Up 1 Level

Program

Revisions

Program

StatusCapability Document

Identify

Technical Risk

Analyze

Technical Risk

Implement

Technical Risk

Mitigation

BACK FWD

Plan Technical

Risk Mitigation

Track Technical

Risk

Note: The Technical Risk Management process above is

modeled on the overall Risk Management

process included at 1.5.3 (hyperlinked from

this note).

Programmatic

Data

Page 391: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2.6 Conduct Configuration Management

Go Up 1 Level

Program

Revisions

Program

StatusCapability Document Plan

Configuration

Management

Conduct

Configuration

Identification

Conduct

Configuration

Status

Accounting

BACK FWD

Conduct

Configuration

Control

Conduct

Configuration

Verification and

Audit

Established

System

Functional

Baseline

System

Functional

Baseline

System

Allocated

Baseline

System

Product

Baseline

Configuration

Management

Plan

Programmatic

Data

Page 392: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2.6.3 Conduct Configuration Control

Go Up 1 Level

Note: This is an AFLCMC

Standard Process (formerly

titled Configuration Control

and now titled Change

Control

AFLCMC

Standard

Processes

Validate and

Classify

Change

Request

Prepare and

Formally

Submit CA

Package

Change

Request

Comments/

Recommendations

Evidence of

Completion

Review/Comment

on CA; Provide

Recommendations

Monitor

ImplementationValidated/Classified

Change Request

Authority to

Proceed

Distributed

CA

Present

Changes to

the Board

Page 393: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2.7 Conduct Technical Data Management Activities

Go Up 1 Level

Program

Revisions

Program

StatusCapability DocumentIdentify Data

RequirementsAcquire Data

Store, Maintain,

and Control Data

BACK FWD

Receive, Verify,

and Accept Data

Use and

Exchange Data

Programmatic

Data

Acquire

Computer

Software

Evaluate Data

Rights Strategy

Generate Digital

Product Design

Data

NOTE: It is important to address product data

and software data early in a system’s life cycle in

order to acquire that data cost-effectively and to

enable a lifetime of competitive sustainment and

compliance with public law. AFPAM 63-128,

Section 11.1

Conduct

AFLCMC

Engineering

Data

Management

Engineering DataApproved and Stored

Engineering Data

Address Sharing

of Data,

Information, and

IT Services

Technical

Data

Identified Authoritative

Data Sources

Shared Data/

Information

Page 394: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2.7.9 Conduct AFLCMC Engineering Data Management

Go Up 1 Level

Develop

Intellectual

Property

Strategy

Data

Stakeholders

Note: This is an AFLCMC

Standard Process.

AFLCMC

Standard

Processes

Identify Data

Stakeholders

Identify

Required

Engineering

Data

Notify

Stakeholders of

Requirements

and Schedule

for Data Call

Prepare and

Review

Documents to

Support Data

Call

Develop

CDRLSPrepare RFP

Perform

Contract Award

Process

Conduct

Functional

Configuration

Audit/Physical

Configuration

Audit

Prepare and

Conduct

Guidance

Conference

Submit Final

TDP

Perform Final

TDP Review

Signed

Acceptance of

Delivered Data

Finalize TDP

Develop and

Submit

Technical Data

Package Per

Contract

Requirements

Perform In-

Process

Reviews

Contract Requirements for

Engineering Data

Program

Documents

Completed

Program

Guidance

Conference

Accepted

Technical Data

Package

Accepted

Technical Data

Package

Data Rights

Requirements

Approved and Stored

Engineering Data

Engineering Data

Package

Accepted

Engineering Data

Package

Completed TDP

FWD

IP

Strategy

Data Call Letter

Approved

Data Call Letter

Engineering

Data

Draft SOW

Draft CDRL

Draft PWS

Formal SOW

Formal CDRL

Formal PWS

Contract Requirements

for

Engineering Data

Formal

Contract

Technical

Requirements

FCA

Requirements

Digital Data

File

IP

Strategy

Approved

Data Call Letter

Formal

Contract

Contract

Requirements

FCA/PCA

Decision

Package

Accepted

Technical Data

Package

Technical

Requirements

Technical

Data

Requirements

Page 395: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.1.2.2.7.10 Address Sharing of Data, Information, and IT Services

Go Up 1 Level

Make Data,

Information, and

IT Services

Visible

Make Data,

Information, and

IT Services

Accessible

Make Data,

Information, and

IT Services

Interoperable

Make Data,

Information, and

IT Services

Understandable

Implement Data

and Information

Sharing

Procedures

Implement IT

Services

Procedures

Make Data and

Information

Trustable and IT

Services Secure

Technical

Data

Identified Authoritative

Data Sources

Shared Data/

Information

BACK

Page 396: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.2.8 Conduct Interface Management

Go Up 1 Level

Program

Revisions

Program

Status

Capability Document

Maintain

Interface

Management

Plan

Document

System Interface

Requirements

Assess Interface

Compliance

BACK

Define Interface

Specifications

Monitor

Interfaces

Interface

Management

Plan

Programmatic

Data

Page 397: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.3 Conduct Systems Engineering Technical Processes

Go Up 1 Level

BACK FWD

Program

Revisions

Program

Status

Capability Document Conduct

Stakeholder

Requirements

Definition

Conduct

Requirements

Analysis

Conduct

Architecture

Design

Conduct

VerificationConduct

Validation

Conduct

Transition

Conduct

Implementation

Conduct

IntegrationProgrammatic

Data

Page 398: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.3.1 Conduct Stakeholder Requirements Definition

Go Up 1 Level

Program

Revisions

Program

Status

Capability Document

Elicit

Stakeholder

Capability

Objectives

Define

Stakeholder

Requirements

Programmatic

Data

Analyze and

Maintain

Stakeholder

RequirementsInterface

Management

Plan

FWD

Page 399: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.3.2 Conduct Requirements Analysis

Go Up 1 Level

Program

Revisions

Program

Status

Capability DocumentAnalyze User

Requirements

Translate User

Needs

Programmatic

Data

Develop

Performance

Requirements

FWDBACK

Define System

Functions

Define

Implementation

Constraints

Translate

Performance

Requirements

Page 400: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.3.3 Conduct Architecture Design

Go Up 1 Level

Program

Revisions

Program

StatusCapability Document

Analyze

Physical

Architecture

Analyze

Constraint

Requirements

Programmatic

Data

Identify Physical

Interfaces

FWDBACK

Identify Critical

Attributes

System

Allocated

Baseline

Page 401: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.3.4 Conduct Implementation

Go Up 1 Level

Program

Revisions

Program

StatusCapability Document

Identify Design

ConstraintsDevelop

Prototypes

Programmatic

Data

Analyze Element

Solutions

FWDBACK

Identify

Fabrication and

Quality

Procedures

Obtain Access

to Materials and

Tools

Obtain External

System

Elements

Build System

Elements

Determine

System Elements

Functionality

Document

Fabrication and

Production

Issues

Deliver System

Elements

Page 402: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.3.5 Conduct Integration

Go Up 1 Level

Program

Revisions

Program

StatusCapability Document

Develop

Integration Plan

Assemble

System

Elements

Programmatic

Data

FWDBACK

Integration

Plan

Page 403: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.3.6 Conduct Verification

Go Up 1 Level

Program

Revisions

Program

StatusCapability Document

Verify by

DemonstrationVerify by

Examination

Programmatic

Data

Verify by

Analysis

FWDBACK

Verify by Test

Verified

Production

Representative

Article

Page 404: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.3.7 Conduct Validation

Go Up 1 Level

Program

Revisions

Program

StatusCapability Document

Conduct Early

ValidationConduct Final

Validation

Programmatic

Data

FWDBACK

Validated

System

Page 405: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.3.8 Conduct Transition

Go Up 1 Level

Program

Revisions

Program

StatusCapability Document

Prepare

Transition Plan

Oversee

Execution of

Transition Plan

Programmatic

Data

BACK

Page 406: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6 Conduct Other Technical Processes

Go Up 1 Level

Manage

Program

Protection Plan

(PPP)

Manage

Industrial Base

Constraints

Industrial

Base

Constraints

Note: The 29 Design Considerations listed in Chapter 5 of AFI 63-101/20-101 are as follow: Recorded Aircraft Information; Mission Assurance for Space Programs; Product and System Integrity; Air Force Metrology and Calibration; Accessibility;

Affordability-SE Tradeoff Analysis; Anti-Counterfeiting; Commercial-Off-the-Shelf; Corrosion Prevention and Control; Critical Safety Items; Diminishing Manufacturing Sources & Material Shortages; Disposal and Demilitarization; Environment, Safety,

and Occupational Health; Human Factors Engineering; Insensitive Munitions; Intelligence; Item Unique Identification; Interoperability & Dependency; Open Systems; Operational Energy; Packaging, Handling, Storage and Transportation;

Producibility, Quality & Manufacturing Readiness; Program Protection Planning; Reliability and Maintainability Engineering; Software Engineering; Spectrum Management; Standardization; Supportability; and System Survivability & Susceptibility; BACK FWD

Address

Design

Considerations

Design

Considerations

Address

Spectrum

Management

Spectrum Supportability

DeterminationProgrammatic

Data

Programmatic

Data

Programmatic

Data

Programmatic

Data

Manage

Intellectual

Property

Strategy

Programmatic

Data

Intellectual

Property (IP)

Strategy

Address Intelligence

Life Cycle Mission

Data Plan

Programmatic

Data

Intelligence

Mission

Data

Address

StandardizationProgrammatic

Data

Standardization

Determination

Manage

Waveform

Review

Programmatic

Data Waveform

Assessment

Application

Waveform

Disposition

Memorandum

PPP

Spectrum Supportability

Risk Assessment

Page 407: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6.1 Manage Industrial Base Constraints

Go Up 1 Level

Provide

Feedback and

Updates

Gather Program

Specific Industrial

Base Information

FWD

Conduct

Industrial Base

Assessment

Programmatic

Data

Industrial

Base

Constraints

Industrial Base

Capabilities

Industrial Base

Information

Page 408: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

re

Go Up 1 Level

Acquisition Process Model

1.5.1.2.6.2 Manage Program Protection Plan (PPP)

Monitor

Countermeasure

(CM)

Effectiveness and

Report

Compromises

Identify

Critical

Program

Information

(CPI)

FWD

Identify

Stakeholders

and Conduct

Initial

Analysis

Initial

Analysis

Build and

Coordinate

PPP

Vulnerability

AnalysisCPI and Critical

Components List

Compromises

Develop

Cybersecurity

Strategy

Cybersecurity

Strategy

Manage

Trusted

Systems and

Network

Plans

Trusted Systems

and

Network Plans

Trusted Systems

and

Network Plans

Risk

Mitigation

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gAcquisition Process Model

1.5.1.2.6.2 Manage Program Protection Plan (PPP)

Identify Threats

to CPI and

Critical

Components

Identify CPI and

Critical

Component

Vulnerabilities

Identify

Risks to CPI

and Critical

Components

CPI and Critical

Components List

FWD

Initial

Analysis

Threat

Analysis

Compromises

Programmatic

Data

Note 1: As stated in Section 4.21.6.3 of AFI 63-

101/20-101, the PM shall coordinate with the

AFMC or AFSPC TSN focal point regarding

TSN threat identification, best practices,

processes, techniques and procurement

tools. For more information see DoDI 5200.44

and AFPAM 63-113. CTRL-Click here to

access an active link to these documents.

Note 2: Program Managers

should review the procedures

included in DoDI 8500.01 as

part of Cybersecurity

considerations. CTRL-Click

here to access an active link to

the document.

Manage Anti-

Tamper

Protection for

CPI

Anti-Tamper

Plan

Approved

PPP

Revised

PPP

Page 409: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6.2.2 Identify Critical Program Information (CPI)

CPI and Critical

Components List

Conduct

Criticality

Analysis

Identify

Critical

Components

Identify

Inherited CPI

Review

ASDB

Develop CPI

and Critical

Components

List

Mission Critical Functions

and Components

Draft List of CPI and

Critical Compnents

Initial

Analysis

Page 410: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6.2.7 Manage Trusted Systems and Network Plans

Coordinate

MAJCOM

Request

Coordinate

TSN

Resources

Develop

Requirements

Monitor the

Identification

of Mission

Critical

Functions

Trusted Systems

and

Network Plans

Risk

Mitigation

MAJCOM

Request for

Threat

Analysis

Page 411: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.1.2.6.3 Address Design Considerations

Go Up 1 Level

Address

Accessibility

BACK

Design

Considerations

Address

Affordability

Address

Anticounterfeiting

Address Commercial Off

the Shelf

Address Corrosion

Prevention and

Control

Address Critical

Safety Item

Address

Demilitarization

and Disposal

Address Diminishing

Manufacturing

Sources and Material

Shortages

Address

Environmental, Safety,

and Occupational

Health

Address Human

Factors

Engineering

Address

Insensitive

Munitions

Address

Interoperability

and Dependency

Address Item

Unique

Identification

Address Open

Systems

Architecture

Address

Operational

Energy

Address Packaging,

Handling, Storage,

and Transportation

Address

Producibility, Quality,

and Manufacturing

Address Reliability

and Maintainability

Engineering

Address

Supportability

Address

Survivability &

Susceptibility

Address System

Security

Engineering

FWD

Programmatic

Data

Note: Program Managers are required

to leverage Cloud Computing and to

provide Accessibility of Electronic and

IT consistent with Enclosure 11,

Sections 9 & 14 of DoDI 5000.02

Page 412: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6.4 Address Spectrum Management

Go Up 1 Level

BACK

Submit and

Review DD

Form 1494 and

Releasable DD

Form 1494 Data

Manage

Spectrum

Supportability

Risk

Assessment

Approve and

Sign Guidance

and Notes-to-

Holders

Coordinate

Comments,

Draft Guidance

or Notes-to-

Holders

Obtain

Foreign

DisclosureDD Form 1494

EL CID

File

Initiate

Frequency

Assignment

Request

Host

Nation & COCOM

Comments

Approved DD

Form 1494

Spectrum Supportability

Determination

Draft Guidance

Draft

Note to

Holder

Approved

Guidance

Comments

DD Form 1494

Note to

Holder

Frequency

Assignment

Application

Spectrum Supportability

Determination

Note: The above process is executed for each of the four stages of certification: Conceptual (initial system planning has been completed), Experimental (preliminary system design has been completed), Developmental (major system design has been

completed), and Operational (system development is complete). Source: AFI 17-220, Section 4.5.1.

Programmatic

Data

FWD

Spectrum Supportability

Risk Assessment

Page 413: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6.5 Address Intelligence Life Cycle Mission Data Plan

Go Up 1 Level

BACK

Conduct

Intelligence

Sensitivity

Determination

Conduct

Intelligence

Supportability

Analysis

Programmatic

Data

Note: The first two processes are

further defined by AFLCMC

Standard Processes.

Capability Document

ISD MFR

Conduct

Deficiency

Resolution

Intelligence

Mission

Data

Intelligence

Mission

Data

Plan to

Address

Intelligence

Deficiencies

Conduct

Intelligence

Health

Assessment

Programmatic

Data

IHA

Quad Chart

FWD

Submit

Prioritized Intel

Mission Data

Programmatic

Data

IMD Production

Request

Create LMDPIMD Production

Request

Life Cycle Mission

Data Plan

SIPC Response

Page 414: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6.5.1 Conduct Intelligence Sensitivity Determination

Go Up 1 Level

Provide and

Review

Notification &

Reference

Material

Programmatic

DataISD MFR

FWD

Intelligence Sensitivity

Determination

Conduct

Intelligence

Sensitivity

Determination

Accept Non-

Intelligence

Sensitivity

Determination

Complete

Remaining ISS

Questions

Conduct

Intelligence

Sensitivity Tier

Determination

Conduct Final

Adjudication of

Intelligence

Sensitivity

Determination

Send ISD to PM

to Initiate ISA

and Send to

Supporting AIA

Questions

Answered

Adjudicated

ISD

Notification &

Reference Material

Non-Intelligence

Sensitivity Determination

ISP

Note: This is an AFLCMC

Standard Process.

End Effort

ISD

Capability Document

AFLCMC

Standard

Processes

Page 415: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6.5.2 Conduct Intelligence Supportability Analysis (ISA)

Go Up 1 Level

BACK

Review Intelligence

Sensitivity

Determination

Intel Updates

Note: This is an AFLCMC

Standard Process (also

includes references to

AFPAM 14-111).

Plan ISA

Conduct

Requirements

Analysis of

Efforts Intel

Data

Requirements

Develop a Risk

Assessment

Develop Action

Plan for

Deficiency

Resolution

Implement

Action Plan to

Resolve DIRs

and Document

Estimate Costs

Associated

with Identified

DIRs

Advocate to IC/

Acq/OPS

Community to

Solve DIRs

Integrate Intel

Requirements,

Identify

Deficiencies, and

Mitigate Risk

Continuously

Monitor Threat

Environment

and Program

Activity

Combine All

ISA Data into

“ISA Packet”

Reviewed ISS and

Intelligence Sensitivity Tier Matrix

ISA Plan

Intel Data Needs

Intel

Risk Assessment

Action Plan

Implementation

Documentation

Cost Estimate

Resolution Plan

Approval

Shortfall Status

ISA Packet

ISD MFR

Intelligence

Mission

Data

AFLCMC

Standard

Processes

FWD

Page 416: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6.5.3 Submit Prioritized Intel Mission Data

Go Up 1 Level

Identify IMD

RequirementsProgrammatic

Data

Prioritize IMD

RequirementsIMD

Requirements

BACK

IMD Production

Request

Page 417: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6.6 Address Standardization

Go Up 1 Level

BACK

Address

Defense

Standardization

Programmatic

Data

Address IT

Standard

Compliance

Programmatic

Data

Objectives

Completed

Standardization

Documents

Standardization

Efforts

Resolved

Standardization

Issues

Item

Reduction

Studies

Standard

Compliance

Documentation

FWD

Page 418: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.1.2.6.6.1 Address Defense Standardization

Go Up 1 Level

Address

Objectives of

the Defense

Standardization

Plan

Programmatic

Data

Objectives

Completed

Provide

Document

Management

Activities

Programmatic

Data

Standardization

Documents

Provide Lead

Standardization

Activities

Programmatic

Data

Standardization

Efforts

Provide

Departmental

Standardization

Activities

Programmatic

Data

Resolved

Standardization

Issues

Provide Item

Reduction

Activities

Programmatic

Data

Item

Reduction

Studies

FWD

Page 419: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Go Up 1 Level

BACK

Incorporate IT

StandardsProgrammatic

Data

Standard

Compliance

Documentation

Request Waiver

of IT Standard

Submit

Request for

Waiver to DoD

CIO

Approved

Waiver

Acquisition Process Model

1.5.1.2.6.6.2 Address IT Standard Compliance

Request for

DoD CIO Waiver

Page 420: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.6.7 Manage Waveform Review

Go Up 1 Level

Conduct

Conceptual

Stage of the

Waveform

Programmatic

Data

Stage 1

Disposition

Memorandum

Conduct

Prototype

Stage of the

Waveform

Stage 2

Disposition

Memorandum

Conduct

Operational

Stage of the

Waveform

Interim

Registration

Memorandum

Conduct

Registration

Stage of the

Waveform

BACK

Waveform

Disposition

Memorandum

Prepare

Waveform

Review

Application

Programmatic

Data

Waveform

Assessment

Application Waveform

Assessment

ApplicationWaveform

Assessment

ApplicationWaveform

Assessment

Application

Note: The Waveform Assessment Application is

updated prior to each stage. For the Conceptual

Stage, it should be submitted NLT 45 days before

MSA. For the Prototype Stage, it should be submitted

NLT 45 days before MSB. For the Operational Stage, it

should be submitted NLT 45 days before FRP/FDD.

Page 421: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.2.7 Conduct Systems Engineering System of Systems Processes

Go Up 1 Level

Program

Revisions

Program

Status

Capability Document Translate SoS

Capability

Objectives into

Requirements

Programmatic

Data

Understand

Constituent

Systems and

their

Relationships

Assess SoS

Performance

Against

Capability

Objectives

Develop and

Maintain SoS

Architecture

Assess Impact

of Change on

SoS

Performance

Address SoS

Requirements

and Solution

Options

Orchestrate

Upgrades to SoS

BACK

Page 422: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.1.3 Manage Resources

Manage

Infrastructure

Manage

Manpower

Manage

Facilities

Go Up 1 Level

Infrastructure

Changes

Manpower

Changes

Facility

Changes

Conduct

Materiel

Fielding Materiel

Fielding

PlanBACK FWD

Changes in

User Requirements or Acceptance

Criteria

PEO View

Program Budget

ADM

ADMConduct

Requirements

Certification

Training

RMCT

Certified

Personnel

Expectation

Management

Agreement

UpdatesPersonnel

Needing

RMCT

Capability Document

Capability Document

Page 423: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.3.4 Conduct Materiel Fielding

Go Up 1 Level

Recommended

Materiel Fielding

Actions

Prepare &

Coordinate

Materiel

Fielding Plan

Update Materiel

Fielding Plan

Provide Materiel

Fielding Input to

Decision Review

Brief Material

Fielding Actions

at Decision

Reviews

Approved

Changes to

Materiel Fielding

Plan

Approved Changes to

Materiel Fielding

Plan

Materiel

Fielding

Plan

Materiel

Fielding

Plan

Changes in

User Requirements or

Acceptance

Criteria

ADM

Capability Document

Page 424: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.4 Conduct Issue Resolution

Go Up 1 Level

BACK

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.1.4 Conduct Issue Resolution

Go Up 1 Level

Enable Issue

Resolution

Enable Issue

Related

Training

Identify

Special Issue

Initiative

Training

Recommendations

Initiative

RecommendationsProgram

Metrics

Training

BACK

Initiative Results

Issue Resolution &

Recommendations

Programmatic

Data

Analyze IssuesIssue

Identified

Develop Issue

Corrective

Action Plan

(CAP)

Execute

Corrective

Action Plan

(CAP)

Analysis

Of Root

Cause

Note: The top three

processes are from the

AFLCMC standard processes

for Risk and Issue

Management. CTRL- Click to

view AFLCMC Process

CAP Status

CAP Status

Initiative

Recommendations

CAP

Analysis

Of Root

Cause

AFLCMC

Standard

Processes

Page 425: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2 Manage Communication and Reports

Go Up 1 Level

BACK FWD

Program

Metrics

Request for

Information

Conduct

Standard

Reporting

Conduct Non-

Standard

Reporting

Program

Status

Cost / Schedule /

Performance Updates

Program

Reporting

Program

Reporting

Programmatic

Data

Page 426: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1 Conduct Standard Reporting

Go Up 1 Level

Request

Reclassification of

Acquisition Program

Categorization

Provide Periodic

Reporting of AML

Programs

Monthly Report of

Acquisition Programs

Create Selected

Acquisition Report

Perform Earned

Value ManagementEVM Update

Develop Milestone

InputsMilestone

Inputs

Note 1: The MDA is strongly

encouraged to tailor the

reporting requirements

consistent with Enclosure 1,

Table 2 of the DoDI 5000.02

FWD

SAR

Performance

Measurement

Baseline

Contractor EVM Data

Program

Reclassification

Manage

Program

MetricsProgrammatic

Data

Program

Metrics

PEO View

Program

Status

Program Status

Cost / Schedule /

Performance Updates

Integrated Program Management

Report (IPMR)

Programmatic

Data

Program

Status

Program

Status

Program

Status

Program

Status

Develop Cost

ReportsProgrammatic

Data

Program

Status

Cost Updates

To CSDR

Integrated Program

Management Report

Cost Updates

To VAMOSC

Conduct CFO

Compliance

CFO IT

Compliance

Memo

IT Controls

Note 2: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Page 427: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.1 Request Reclassification of Acquisition Program Categorization

Go Up 1 Level

Submit Request

to Lower

Categorization

Program

Reclassification

Request

Notify Leadership

to Raise

Categorization

Program

Reclassification

Request

Submit Request

to Raise

Categorization

Raise

Categorization

Program

Reclassification

Request

Program

Reclassification

Program

Reclassification

Request

Reclassify

ProgramProgram

Reclassification

Program

Reclassification

Request

FWD

Identify/Define

Reporting

Requirements

for Acq IT

Tools

Change

Request

IT Shortfall

External

Analysis

Need

Internal

Analysis

Need

Program

Status

Program

Status

Program

Status

Page 428: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.2 Provide Periodic Reporting of AML Programs

Go Up 1 Level

Review/

Maintain AML

PEO

Change

Request

Maintain Monthly

Reporting

Information in

SMART

SMART UpdatesProgram

Status

Conduct MAR

Reporting

Monthly

Activity

Report

BACK FWD

AML

Page 429: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.2.1 Review - Maintain AML

Go Up 1 Level

Adjudicate

Change Request

Incorporate Change

Implement Solutions/

Recommendations

Decision to

Incorporate

Decision to

Not Incorporate

Notification of

Disposition

PEO

Change

Request

AML

AML

Page 430: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.3 Create Selected Acquisition Report

Prepare Annual

SAR

Prepare

Quarterly

Exception SAR

Go Up 1 Level

BACK FWD

Manage

OSD

ReportsDAES

Data

MAIS

Reports

Review Requests

Program Breaches

Annual SAR

Quarterly SAR

Defense Acquisition

Executive Summary (DAES)

Programmatic

Data

Programmatic

Data

Programmatic

Data

SAR

MAIS Critical

Change Report

And Certification

Page 431: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.3.3 Manage OSD Reports

Go Up 1 Level

Manage

Selected

Acquisition

Reports

(SAR)Manage

DAES

Report

Manage

MAIS

Reporting

AT&L Memo

PB Funding

Inflation

Indices

Congressional

Findings

OSD Key

Submission

Dates

(Notification)

C/S/P Data

Adjusted

DAES

Data

Develop

Critical

Change

Report

Critical Change

Notification Letter

MAIS

Annual

ReportOSD

Notification

MAIS Critical

Change Report

And CertificationProgram

List

Nunn-McCurdy

Breach

Critical

Change

Defense Acquisition

Executive Summary (DAES)

Reliability

Growth

Curve

Data

SAR

Manage

Unit Cost

Report

SAR

Programmatic

Data

Unit Cost Report

Page 432: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.3.3.1 Manage Selected Acquisition Reports (SAR)

Go Up 1 Level

Notify

PEOs

Coordinate

SAR

Conduct

Final

(Security)

Review

Develop

Instructions

Generate

SAR

Incorporate

SAR

Revisions

Submit

SAR

Conduct

Congress

Review

AQX

Memo

PEO

Instruction

Submit

Findings

Congressional

Findings

Inflation

Indices

PB Funding

AT&L Memo

Revised SAR

Coordinated

SAR

FWD

Nunn-McCurdy

Breach

SAR

SAR

Page 433: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.3.3.2 Manage MAIS Reporting

Go Up 1 Level

FWDBACK

Review

MAIS

Annual

Report

Release

Final

MARS to

OSD

Sign MAR

Transmittal

Letters

Provides

Feedback to

Program

Offices

(Annual)

Adjust Data

(Annual)

Review

with OSD

(Annual)

Submit

Report to

Congress

(Annual)

Updated

MAIS

Report

OSD

Recommendations

Approved

MAIS

Report

Assessment

of MAIS

Program

Data

C/S/P Data

MAIS

Annual

Report

OSD Key

Submission

Dates

(Notification)

MAIS Report Recommendations

Updated

MAIS

Data

Program

List

Critical

Change

Page 434: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.3.3.3 Manage Defense Acquisition Executive Summary (DAES) Report

Go Up 1 Level

Review

Draft DAES

Report

Submit to

OSD

(DAMIR)

Document

Assessments

Review

Recommendations

Adjudicate

Changes

Distribute

Notification

to Offices

(OSD Staff

Review)Monitor

FeedbackAccepted

Changes

Updated

DAES

ReportCoordinated

DAES

Office

Notifications

OSD

Assessments

Adjusted

DAES

Data

Recommended

Changes

BACK

Issue

Defense Acquisition

Executive Summary (DAES)

Reliability Growth

Curve Data

Page 435: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.4 Perform Earned Value Management (EVM)

Conduct

Integrated

Baseline

Reviews (PM)

Analyze

Contractor EVM

Data

Go Up 1 Level

Update

Performance

Measurement

Baseline (PMB)

Update EVMA EVMA

Corrective Action Request

Conduct

EVM

Activities

Administer

DAES

Process

Approved

DAES

Meeting

Minutes

Status

ReportAQX

RequestMAR

DataPoPS

Data

EVM Red

Status Report

EVM Guidance

Performance

Measurement

Baseline

Performance

Measurement

Baseline

Updated PMB

BACK FWD

Contractor

EVM Data

DAES

Selection

Invitation

Program

Status

Program

Status

Cost / Schedule /

Performance Updates

Cost / Schedule /

Performance Updates

Cost / Schedule /

Performance Updates

Integrated Program

Management

Report (IPMR)

NOTE: DoDI 5000.02,

Enclosure 2, Section 6.c

provides an overview of EVM.

Page 436: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.4.5 Administer DAES Process

Go Up 1 Level

DAES

Selection

Invitation

Facilitate/

Coordinate

DAES Meeting

Adjusted

DAES

Data

Approved

DAES

Meeting

Minutes

DAES Guidance

Issues/

Assistance

Needed

FWD

Action Items

Page 437: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.4.5.2 Facilitate - Coordinate DAES Meeting

Go Up 1 Level

Prepare

DAES

Selection

Meeting

Information

Schedule

Pre-Brief Follow-Up on

Action Items

Pre-Brief with

SAF/AQX

Select

Programs

to ReviewConduct

Pre-BriefSupport/

Facilitate

DAES

Meeting

DAES

Read-Ahead

Package Program

Review

Schedule

Pre-Brief

Appointment

DAES

Selection

Invitation

Validate

Meeting

Minutes/

Outputs

Distribute

Minutes

Validated

Meeting

Minutes

Issues/

Assistance

Needed

Adjusted

DAES

Data

Approved

DAES

Meeting

Minutes

AQX

AssessmentDAES Guidance

Action Items

Action Items

Closed Action Items

Reliability

Growth

Curve

Data

Page 438: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.4.6 Conduct EVM Activities

Go Up 1 Level

Provide Program

EVM Reporting

& Analysis

Provide EVM

Guidance/

Recommendations

Lead AF EVM IPT

Implementation

Conduct EVM

Training

Measured

Results

Curriculum Instruction

Inputs from

Field

AQX

Request

EVM Guidance

EVM Red

Status Report

Inputs from

Sr. Leaders

MAR

Data

PoPS

Data

Status

Report

BACK

Page 439: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.5.2.1.4.6.1 Provide Program EVM Reporting & Analysis

Go Up 1 Level

Gather Data

Develop

RecommendationReport

Findings/

Actions

Analyze

DataData

AnalysisPrescribed

Actions

Monitor

Actions

Prescribed

Actions

Action

Status

AQX

Request

Status

Report

FWD

Programmatic

Data

Page 440: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.4.6.2 Provide EVM Guidance/Recommendations

Go Up 1 Level

EVM Red

Status List

EVM

Trend

Analysis

Report to SAF/

AQXE

Develop

Guidance to

Affected

Programs

Produce

Consolidated

EVM Red List

Provide EVM

Assessment

Conduct

Monthly EVM

Trend Analysis

Produce

Charts/

Graphs

EVM

Assessment

EVM

Red Status

Charts/

Graphs

EVM

Red Status

Charts/

Graphs EVM Red

Status Report

MAR

Data

PoPS

Data

EVM Guidance

BACK FWD

Page 441: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.4.6.3 Lead AF EVM IPT Implementation

Go Up 1 Level

Identify

Improvements/

Problems

Inputs from

Sr. LeadersSuggested

Improvement

Suggested

Problem

Conduct IPT

Meeting

Track Results

AF IPT

Implementation

Plan

Industry

EVM

Issue

Provide AF

Position and

Concerns to

DoD/ IndustryConcerns

Participate in AF

IPT

DoD

EVM

Issue

AF Position

on EVM Issues

Inputs from

Field

Measured

Results

BACK FWD

Page 442: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.4.6.3.2 Conduct IPT Meeting

Go Up 1 Level

Clarify/ Assess/

Define

Improvement/

Problem as EVM

Issue Determine IPT

as AF, DoD, or

Industry Specific

EVM

Issues AF IPT

DoD

EVM

Issue

Industry

EVM

Issue

Suggested

Improvement

Suggested

Problem

FWD

Page 443: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.4.6.3.3 Participate in AF IPT

Go Up 1 Level

Provide Taskers

to Subteam(s)

Develop Solutions/

Recommendations

Taskers

Implement Solutions/

Recommendations

List for Sr.

Leaders/

Field

DoD IPT

Results Provide Status

Update to

Leadership

Update

Implementation

Plan

Implementation

Plan

Revisions

Implementation

Plan

Implementation

Plan

EVM Recommendations

BACK FWD

Page 444: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.4.6.3.4 Provide AF Position and Concerns to DoD - Industry

Go Up 1 Level

Analyze DoD/

Industry Specific

Improvement/

Problem

Provide AF

Positions and

Concerns

Coordinated

Position

AF Position on EVM Issues

Concerns

Industry

EVM

Issue

BACK

Page 445: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.4.6.4 Conduct EVM Training

Go Up 1 Level

Review/ Update

Training

Materials as

Required Updated

Training

Schedule

Training

Conduct

Training

Training

Schedule

Curriculum

Instruction

BACK

Page 446: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.5.2.1.5 Develop Milestone Inputs

Go Up 1 Level

Develop Cost

Related

Milestone

Inputs

Funding

Approval

BACK

Review Program

Documentation

Documentation

Feedback for

Compliance

IUID

Implementation

Plan

LCMP

Program

Status

Develop Item

Unique

Identification

(IUID) Plan

Programmatic

Data

FWD

Obtain

Clinger

Cohen

Compliance

System

DocumentationCCA Compliance

Affordability Analysis

Manage

Information

Support Plan

Programmatic

DataISP

Prepare APBProgrammatic

Data APB

Note 1: The MDA is strongly

encouraged to tailor the

reporting requirements

consistent with Enclosure 1,

Table 2 of the DoDI 5000.02

Note 2: The purpose of program tailoring

is to streamline the acquisition program

to the maximum extent possible,

consistent with risk, to provide new

systems to operational commanders as

fast as possible. DoDI 5000.02, Section

5.a.2; AFPAM 63-128, Section 14.1

Page 447: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.5.1 Develop Cost Related Milestone Inputs

Prepare

CARD

Go Up 1 Level

Manage Will

Cost Estimate

Prepare

Affordability

Analysis

Approve Cost

Position

Prepare

Service Cost

Position

Service Cost Position Affordability Analysis

Funding

Approval

Approved Service

Cost Position

Manage

Should Cost

EstimateShould Cost Estimate

Will Cost

Estimate

Will Cost

Estimate

CARD

CARD

Service Cost Position

FWD

Program

Status

Programmatic

Data

Programmatic

Data

Should-Cost Target

Page 448: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.5.1.2 Manage Will Cost Estimate

Go Up 1 Level

Prepare Will-

Cost

Estimate

Develop

Annual

Program

Office

Estimate

POE

Monitor Will-

Cost

Estimate

Present Will-

Cost

Estimate at

Milestone

Review

Develop

ACAT I, II, III

Update**

Will-Cost

Reporting

Should-Cost

Reporting

Should

Cost

Efficiencies

Annual Will Cost & Should

Cost Estimate Update

Conduct

ACAT I, II, III

Annual

Review

Approved Annual

Will Cost

Estimate

** NOTE: This annual update

reporting requirement may be

waived (given appropriate

justification) by the reviewing

organization

Will Cost

Estimate

Milestone

Approved

Will Cost

Estimate

CARD

CARD

FWD

Programmatic

Data

Programmatic

Data

Page 449: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.1.2.1 Develop Annual Program Office Estimate

Conduct

Research,

Collection and

Analysis

Formulate

Estimate

Conduct Formal

Review/

Presentation and

Documentation

Go Up 1 Level

Finalize

DocumentationConduct

Estimate

Planning

Cost

Estimate

Plan

Approved

Documented

Requirements

Approved

Documented

Requirements

Draft Program

Office Estimate

Cost Data

Approved

Draft

Documentation

Approved

Cost

Estimate

Cost

Estimating

Relationships

Note: This is an AFLCMC

Standard Process.

CARD

Approved

Documentation

Programmatic

Data

AFLCMC

Standard

Processes

Page 450: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.1.2.1.1 Conduct Estimate Planning

Review

Requirements

Definition

Rework

Requirements

Definition

Develop

Estimate Plan

Go Up 1 Level

Assign Lead

Analyst and

CIPT

Documented

Requirements

Definition

Approved Documented Requirements Definition

Reworked Requirements

Definition

Finalized

Cost Estimate

Plan

Identification of

Inadequate Requirements

Definition

Note: This is an AFLCMC

Standard Process.

AFLCMC

Standard

Processes

Request for

Resources

Assigned Lead

Analyst and CIPT

FWD

CARD

Programmatic

Data

Page 451: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.1.2.1.2 Conduct Research, Collection, and Analysis

Collect Relevant

Data

Normalize and

Analyze Cost

Data

Go Up 1 Level

Research Data

Availability

Collected and Documented Data

Normalized and

Documented

Cost Data

Note: This is an AFLCMC

Standard Process.

AFLCMC

Standard

Processes

Sources of Data

Determined and Documented

Data

FWDBACK

Approved

Documented Requirements

Definition

Cost

Estimating

Relationships

Page 452: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.1.2.1.3 Formulate Estimate

Develop Cost

Estimate

Develop

Crosschecks

Go Up 1 Level

Finalize

Estimating

Methodologies

Draft Program Office Estimate

Draft Program Office

Estimate with

Crosschecks

Note: This is an AFLCMC

Standard Process.

AFLCMC

Standard

Processes

Finalized Estimating Methodologies

And Tools

FWDBACK

Approved

Documented Requirements

Definition

Normalized and

Documented Data

Approved

Documented Requirements

Definition

Available and

Relevant

Data

Cost

Estimating

Relationships

Page 453: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.1.2.1.4 Conduct Formal Review/Presentation and Documentation

Conduct

Program Office

Review

Conduct

Independent

Assessment of

Estimate and

Documentation

Conduct Annual

Program Office

Cost Estimate

and

Documentation

Review by

Center Cost

Chief or Delegate

Go Up 1 Level

Complete Draft

Briefing and

Documentation

FZC Staff Analyst Assessed Draft

Annual Program Office Estimate

Briefing and Documentation

Approved Draft

Documentation

Program Office Coordinated

Draft Annual Program Office

Estimate Briefing and Documentation

Note: This is an AFLCMC

Standard Process.

AFLCMC

Standard

Processes

FWDBACK

Draft Program

Office Estimate

Draft Annual Program

Office Estimate Briefing

And Documentation

Approved

Cost

Estimate

Page 454: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.1.2.1.5 Finalize Documentation

Complete Final

Edit by Cost

Lead

Obtain FZC’s

Signature and

Distribute

Documentation

Go Up 1 Level

Finalize Cost

Element

Documentation

Finalized Estimate

Documentation

Signed and

Approved Estimate

Documentation

Note: This is an AFLCMC

Standard Process.

AFLCMC

Standard

Processes

Approved Draft

Documentation

BACK

Approved Draft

Documentation

Page 455: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.5.1.4 Prepare Service Cost Position

Go Up 1 Level

Program Office

Cost Estimate

Independent

Cost

Estimate Funding

Approval

Recommendation

Letter

FWD

CARD

Recommended

Service Cost

Position

Draft Service

Cost Position

Conduct CIPT

Kick Off

Meeting

Develop

Program

Office

Estimate

Develop

Independent

Cost Estimate

Develop Non

Advocate

Cost

Assessment

Develop

Service Cost

Position

Conduct AF

CAIG Meeting

Approve and

Document the

Service Cost

Position

Formally

Present the

Service Cost

Position

Preliminary

Schedule

Non Advocate

Cost

Assessment

Service Cost

Position

NOTE: DCAPE is required by statute to state the confidence level

used in establishing the ICE, the rationale for selecting the

confidence level, and ensure that the confidence level provides a

high degree of confidence that the program can be completed

without the need for significant adjustment to program budgets.

Programmatic

Data

Programmatic

Data

Programmatic

Data

Programmatic

Data

CARD

CARD

Page 456: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.5.1.5 Prepare Affordability Analysis

Assess

Projected Annual

Funding

Go Up 1 Level

Assess Unit Cost

Affordability

Conduct Trade-

off AnalysisTrade-off Analysis

Justification for

Unusual funding

growth

BACK

Service Cost Position

Service Cost Position

Service Cost Position

Affordability

Analysis -

Projected Annual

Assessment

Affordability

Analysis -

Unit Cost

Comparison

Page 457: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.1.5.1 Assess Projected Annual Funding

Portray Program

Funding in the

FYDP and

Beyond

Go Up 1 Level

Portray Annual

Funding by

Mission Area

Portray Annual

Funding as a

Percent of DoD

Component Total

Mission Area

Funding

Comparison

Mission Area

Funding by Program

Report

Mission Area

% Funding

Comparison

Portray

Composite

Funding as a

Percent of DoD

Component Total

Mission Area

Composite

% Funding

Comparison

Justification for

Unusual funding

growth

Service Cost Position

Service Cost PositionService Cost Position

Service Cost Position

Page 458: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gG

ov

ern

ing

Co

reAcquisition Process Model

1.5.2.1.5.1.6 Manage Should Cost Estimate

Go Up 1 Level

Develop

Should Cost

EstimatePrevious

Should Cost

Estimates

External Input (FPRA Adjustments,

Contractor O/H SC,

DFARS SC Review, etc.)

Should Cost

Estimate

Approve

Should Cost

Estimate

Approved

Should Cost

Estimate

Monitor

Should Cost

Estimate

Develop

Reports

Annual Should

Cost Report

Conduct

Annual

Reviews

Approved Annual

Should-Cost

Estimates

NOTE 1: The annual update

reporting requirement may be

waived (given appropriate

justification) by the reviewing

organization

Will Cost

Estimate

Should Cost

Initiative

Activity

Approved Should

Cost Waiver

Request

Should-Cost Target

BACK

Manage

Should Cost

Waiver

Requests

PEO Waiver

Package

Will Cost

Estimate

Should-Cost Target

Page 459: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.5.1.6.1 Develop Should Cost Estimate

Go Up 1 Level

Conduct

Bottom Up

Estimate

Identify

Reductions

from Will Cost

Estimate

Develop

Candidate

Inititatives

Prioritize

Initiatives

Develop

Should Cost

Courses of

Action

Should Cost

EstimatePrioritized

Should

Cost

Initiatives

Actionable

Items

List of

Initiatives

Bottom Up

Estimate

FWD

Previous

Should Cost

Estimates

External Input (FPRA Adjustments,

Contractor O/H SC,

DFARS SC Review, etc.)

Will Cost

Estimate

Should-Cost Target

Page 460: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.1.6.6 Monitor Should Cost Estimate

Approved

Should Cost

Estimate

Open Should

Cost InitiativeExecute Should

Cost Initiative

Should

Cost

Initiative

Record

Should

Cost

Initiative

Action

Go Up 1 Level

BACK

Close Should

Cost Initiative

Closed

Should

Cost

InitiativeReinvestment

Recommendation

Note: The AFLCMC Standard

Process for Manage the

Program and Monitor

Initiatives provides additional

detail for Execute Should

Cost Initiative.

Page 461: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.1.6.6.2 Manage the Program and Monitor Initiatives

Evaluate Should

Cost

Applicability

Initiate

Assessment

Follow

Methodology

Should Cost Plan /

Request Waiver

Task List

Specific Targets

For Should Cost

Initiatives

Go Up 1 Level

Develop Should

Cost Initiative

Plan

Execute Should

Cost Initiative

Plan

Report Should

Cost Initiative in

CCaRS

Should Cost

Initiative Plan

Should Cost

Initiative Results

Develop

Reinvestment

Strategy

Should Cost

Initiative Savings

Note: This is an AFLCMC

Standard Process.

Should Cost

Initiatives

Metrics

Should Cost

Implementation

Plan and

Initiatives

AFLCMC

Standard

Processes

Submit

Reinvestment

Strategy

PEO

Reinvestment

Plan

Page 462: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

En

ab

lin

gC

oreAcquisition Process Model

1.5.2.1.5.2 Review Program Documentation

Go

ve

rnin

g

Go Up 1 Level

Review Life

Cycle

Management

Plan

LCMP

Feedback for

Compliance

Review IUID

Implementation

Plan

IUID

Implementation

Plan

Feedback for

Compliance

LCMP

BACK

IUID

Implementation

Plan

FWD

Page 463: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.3 Obtain Clinger Cohen Compliance

Go Up 1 Level

Prepare CCA

Compliance

Report

BACK

Note: DoDI 5000.02 (Enclosure 11

Section 4) requires a Post

Implementation Review (PIR). The

process for performing a PIR is

outlined in 1.4.2.4. Click here to

view.

Acquire CCA

Certification

Draft

CCA Compliance

Report

Schedule and

Present Draft

CCA Compliance

Report

SAF/A6 CIO

Recommendation

System

Documentation

CCA Compliance

FWD

Page 464: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.2.1.5.3.1 Prepare CCA Compliance Report

Go Up 1 Level

Register Mission

Critical and Mission

Essential Systems

(Element 11)

Verify Compliance

with DoD

Information

Enterprise’s

policies and

architecture

(Element 8)

Verify Modular

Contracting and

Incremental

Implemenation has

been used (Element

10)

Verify that No Private

Sector or

Government Source

can Support the

Function (Element 4)

Note: The remaining four elements are depicted

elsewhere in the APM. Element 3 (Redesign the

processes) is in 1.5.4, Element 5 (Conduct an

AoA) is in 1.3.2.3, Element 6 (Conduct an

economic analysis) is in 1.3.2.3.4 & 1.5.2.1.5.1,

and Element 7 (Develop measures and

accountability) is in 1.5.1.1 & 1.5.2.1.

Establish Outcome-

Based Performance

Measures (Element

2)

Determine if

Acquisition

Supports Core

Function (Element 1)

Ensure Cybersecurity

Strategy is Compliant

(Element 9)

Cybersecurity

Strategy

Approved

AS

Approved

AoA

CDD

Approved

AS

DD Form 2875

Draft

CCA Compliance

Report

ICD

ICD

ISP

APB

Page 465: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.5.4 Manage Information Support Plan

Go Up 1 Level

Develop and

Submit ISP

BACK

Draft ISP

Review and

Approve ISPISP

Programmatic

Data

FWD

Page 466: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.5.6 Prepare APB

Go Up 1 Level

BACK

Format and

Prepare the

APB Coordinate the

APB

Draft APB

Approve the

APB

PEO Signed APB

Programmatic

Data

APB

Note: OSD(AT&L) issued

APM preparation and review

guidance for use in the above

process. CTRL-Click here to

access an active link to this

guidance.

Page 467: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.6 Manage Program Metrics

Define the

Metrics Gather the

Metrics

Information Report the

Metrics

Go Up 1 Level

Program

Metric Definitions

Metrics

Reports

Program

Status

Program

Status

Program

Metrics

BACK

Programmatic

DataProgrammatic

Data

Page 468: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.2.1.8 Conduct CFO Compliance

Go Up 1 Level

BACK

Fulfill

Document

Requirements

IT Controls

Review and

Validate

Application

Controls

Compliance Report

Review

Assertion

Package

Assertion Package

CFO IT

Compliance

Memo

Page 469: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

1.5.3 Conduct Life Cycle Risk Management

Go

ve

rnin

gE

na

blin

gC

ore

Manage Risk

Management

Plan

Track Risk

Identify RiskAnalyze Risk

Go Up 1 Level

Mitigate Risk

Root Causes

of Risk Issues

BACK FWD

Conduct

Program

Management

Execution

Activity

Program

Metrics

Training

Program Budget

Initiative Results

Risk Resolution &

Recommendations

Revised Risk

Management

Plan

Risk

Management

Plan

Risk

Management

ResultsRisk

Mitigation

Plan/Updates

Risk

Tracking

Documents

Definitized

Agreement

Cost / Schedule /

Performance Updates

ADM

Programmatic

Data

Programmatic

Data

Capability Document

Note: AFLCMC has a

Standard Process for Risk

Management that is similar to

the process outlined above.

CTRL- Click to view AFLCMC

Process

Issue

Identified

AFLCMC

Standard

Processes

Risk Reporting

Matrix and

Risk Register

Page 470: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.3.1 Manage Risk Management Plan

Develop Risk

Management

Strategy

Go Up 1 Level

Develop Risk

Management

Plan

Revise Risk

Management

Plan

Charter Risk

Management

Board

Risk

Management

Strategy

Risk

Management

Board

Risk

Management

Strategy

FWD

Risk

Management

Plan

Risk

Management

Plan

Risk

Management

Plan

Definitized

Agreement

Program Budget

ADM

Programmatic

Data

Capability Document

Page 471: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.3.2 Track Risk

Communicate

Risk to

Stakeholders

Monitor Risk

Mitigation

Plans

Establish

Management

Indicator System

Go Up 1 Level

Risk

Management

Reporting

Framework

Risk

Management

Reporting

Framework

BACK FWD

Risk

Management

Plan

Revised Risk

Management

Plan

Risk

Tracking

DocumentsProgrammatic

Data

Issue

Identified

Page 472: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.3.3 Identify Risk

Identify SMEs

for Risk

Evaluation

Examine

Program for Risk

Events and

Associated

Causes

Go Up 1 Level

Identified

SMEs

Root Causes

of Risk

Issues

BACK FWD

Categorized

Risks

Develop Risk

StatementRisk

Statement Evaluate RiskRisk

Management

Plan

Page 473: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.3.4 Analyze Risk

Determine

Consequences in

Terms of Cost/

Schedule/

Performance

Impact

Estimate

Probability of

Occurence

Go Up 1 Level

Assigned

Probability

to Risk

Risk

Consequences

Develop Risk

Reporting

Matrix & Risk

Register

Root Causes

of Risk

Issues

BACK FWD

Risk Reporting

Matrix and

Risk Register

Page 474: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.3.5 Plan Risk Mitigation

Evaluate and

Select

Mitigation

Options

Go Up 1 Level

Manage Risk

Burndown

Evaluated

Mitigation

Options

BACK

Risk Reporting

Matrix and

Risk Register

Risk

Management

Results

Page 475: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4 Conduct Continuous Process Improvement (CPI)

Monitor

Processes

Identify

Process Issues

Analyze

Process Issues

Revise &

Implement

Process

Go Up 1 Level

Process

Information

Process for

Improvement

Process

Improvement

Team

Process

Details

Process

Change

Recommendations

Process

Metrics

Process

Revisions

BACK

Process

Metrics

Strategic

Plan

Conduct VE

Value

Engineering

Benefits

Annual Value

Engineering

ReportValue Engineering

Proposals

Contract

Information

Prior Period

Value Engineering

Management Plan

PEO View

Program

Status

Execute Unit

Self-

Assessment

Program

(USAP)

Develop and

Manage

Standard

Processes

MICT

Permissions

Appointment

Letters

Closed Deficiencies

Checklist Change

Recommendations

Feedback to

USAP Managers

Process

Information

Process

Performance

Metrics

New Policy

Process Guides

Approved

Checklists

Conduct Air

Force CPICPI Tools

Manage the APM

Execute

Acquisition CPI

Policies

Memos

CPI

Activities

Lessons

Learned

Leadership

Recommendations

Updates

Active Surveillance

Top Down Direction

StanEval Findings

Ongoing SWOT

Revised Budget

Revised Process

Training Plan

Implementation Plan

Communication Plan

Higher Level Objectives

Published

APM Site

AFLCMC

Process

Directory

Implementation

Recommendations

Performance

Improvement

Initiatives

Certified CPI

Practitioners

CPI Outcomes

SACs

Policy

Changes

Page 476: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.1 Monitor Processes

Review Strategic

Measures &

Progress to Goal

Achievement

Establish

Process

Performance

Baseline

Measure

Processes

Against

Performance

Baseline

Go Up 1 Level

Process

Strategic

Evaluation

Process

Performance

Baseline

FWD

Process

Information

Process

Metrics

Strategic

Plan

Strategic

Plan

Program

Status

Page 477: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.2 Identify Process Issues

Select Process

for Improvement

Establish

Process

Improvement

Team

Go Up 1 Level

BACK FWD

Process for

Improvement

Process

Improvement

TeamProcess

Metrics

Strategic

Plan

Program

Status

Page 478: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.3 Analyze Process Issues

Develop CPI

Project Plan

Conduct Value

Stream

Analysis

Go Up 1 Level

CPI Project

Plan

Value Stream

Analysis

Execute

Applicable

Process

Improvement

Concepts

BACK FWD

Process for

Improvement

Process

Change

Recommendations

Process

Details

Process

Improvement

Team

Page 479: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.4 Revise & Implement Process

Develop Revised

Process

Implement

Revised

Process

Go Up 1 Level

Revised

Process

Track Revised

Process

BACK

Process

Change

Recommendations

Process

Details

Process

Metrics

Process

Metrics

FWD

Page 480: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.5 Conduct VE

Maintain VE Plan

Go Up 1 Level

Value Engineering

Proposals

Value

Engineering

Benefits

Contract

Information

Identify Contract

Opportunities

Manage VE

Proposals

Document VE

Benefits

Provide VE

Resources

Guidance

Prior Period

Value Engineering

Management Plan

Value Engineering

Management Plan

(VEMP)

Value Engineering

Change Proposals

Value Engineering

Opportunities

Value Engineering

Opportunities

Approved

Proposals Approved

Proposals

Training

Award Criteria

Evaluation

Criteria

Annual Value

Engineering

Report

BACK FWD

Page 481: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.6 Execute Unit Self-Assessment Program

Go Up 1 Level

BACK

Execute

Assessment

Conduct Data

Analysis

Resolve

Observations

Identified

Observations

MICT Reports

FWD

Note: This is an AFLCMC

Standard Process.

Appointment

Letters

MICT

Permissions

SACs

Complete/Validated

SACs

Completed

SACs

Closed

Observations

Identified

Observations

AFLCMC

Standard

Processes

USAP

Metrics

Page 482: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.6.1 Execute Assessment

Go Up 1 Level

FWD

Notify USAP

Monitors &

Special Access

Programs to

Begin

Assessment

Select and

Assign SACs

Notify

Assessors to

Begin

Assessment

Notification

Document

Observations

Notify

Validator

Permissions

Provide Special

Access

Programs

updated SACs

Complete

USAP SACs in

MICT

Note: This is an AFLCMC

Standard Process.

Observations

Verify

Assessment

Completion &

Report to

USAP Monitor

Appointment

Letters

MICT

Permissions

SACs

Completed

SACs

Identified

Observations

Concerns

Identified

Observations

SACs

Observations

Page 483: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Co

reG

ov

ern

ing

En

ab

lin

gAcquisition Process Model

1.5.4.6.2 Resolve Observations

Go Up 1 Level

FWDBACK

Conduct Root

Cause Analysis

(RCA) on

Observations

Develop

Corrective

Action Plan

(CAP)

CAP

Execute

Corrective

Action Plan

(CAP)

CAP Action

Items

Analysis of

Observations

Approve CAP

Approved

CAP

Approved

Observation

Closure

Monitor CAP to

ClosureClosed

Observations

Note: This is an AFLCMC

Standard Process.

Completed

SAC

MICT

Closure

Identified

Observations

Page 484: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.6.3 Conduct Data Analysis

Go Up 1 Level

BACK

Report

Assessment

Complete to

USAP Manager

Note: This is an AFLCMC

Standard Process.

Completed

SACs

Identified

Observations

Request

Leadership

Approval

Approve

Assessment

Completion

Report

AssessmentUpdate Metrics

USAP

MetricsAnnual

Self-AssessmentAssesment

Approval

Request

Self-Assessment

Approval

Page 485: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.7 Develop and Manage Standard Processes

Go Up 1 Level

BACK

Develop and

Manage AFLCMC

SP IPGs

Final

Standard Process

Training Plan

Feedback for Process Changes

Note: This is an AFLCMC

Standard Process.

AFLCMC

Standard

Processes

FWD

Publish/Update

APD

Process

Information

Process

Performance

Metrics

New Policy

AFLCMC

Process

Directory

Manage CPI Metrics ReportProcess

Information

Page 486: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.7.1 Develop and Manage AFLCMC SP IPGs

Go Up 1 Level

Submit

Process

Change

Request

Log Change

Request

Conduct

Change

Request

Analysis

Change

Request

Review Change

Request

Create/Update

Applicable

PMM Level

Artifacts

Valid CRPrepare for

S&P Board

Conduct

S&P Board

Post S&P

Board Actions

Submit Final

SP

Execute

Change

Management

Plan

Initiate and

Manage Metrics

Note: This is an AFLCMC

Standard Process.

Process

Information

Process

Performance

Metrics

New Policy

S&P Brief

PMM

Level

ArtifactsComments/

Recommendation

Final

Standard Process

Final

Standard ProcessFormalized Change

Request

Communication

Plan

Training

Plan

Resistance

Management

Plan

Process

Performance

Metrics

S&P Board

Decision

Analysis

Update Change

Request Log Change

Request Log

Updated Change

Request Log

Valid CR

Page 487: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

oreAcquisition Process Model

1.5.4.8 Conduct Air Force CPI

Go Up 1 Level

Provide Practical

Problem Solving

Method Training

Conduct Training

Conduct CPI

Conduct

Certification,

Currency, and

Equivalency

BACK FWD

Conduct

Education

Implementation

Recommendations

Conduct EPIC

Training

Attendee

Trained

CPI

Practitioner

Certified CPI

Practitioners

Process

Re-engineering

Initiatives

CPI Tools CPI Outcomes

Performance

Improvement

Initiatives

Trained

CPI

Practitioner

Training

Attendee

Belt

Candidate

Class

Attendee

Educated

Class

Attendee

Page 488: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.9 Manage the APM

Conduct

Monthly CCB

Meeting

Update APM

Publish Updated

APM

Go Up 1 Level

Review APM

Updates

Conduct

Weekly APM

Meeting

Process

Recommendations

Approved

Recommendations

Published

APM Site

APM

Charts

Notification

Of Changes

Approved

Updates

Updates

Policies

Memos

CPI Activities

Perform

Active

SurveillanceLessons

Learned

LeadershipRecommendations

Approved

Recommendations

Summary

Approved

Recommendations

Adjustments

BACK FWD

Revise Policy to

Reference the

APMApproved

Updates

Policy

Changes

Page 489: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

1.5.4.10 Execute Acquisition CPI

Set Direction &

Goals

Train & Equip

CPI

Practitioners

Implement CPI

Actions &

Monitor Events

Manage Lessons

Learned

Go Up 1 Level

Active

Surveillance

Top Down

Direction

Capture & Report

CPI Activities

StanEval

Findings

Identify CPI

Events

Execute CPI

Events

Prioritize CPI

Events

Ongoing SWOT

Process

Recommendations

Prioritized CPI

Events

CPI Event

Results

CPI Event

Status

Lessons Learned

Gather

Potential

Process

Improvement

Ideas

Direction & Goals

From All Levels

(DoD, AF, AQ,

AQX, AQXP)

Feedback on Belts in Training

Potential

Ideas

Belts in Training

List of

CPI Events

Business Case

Analysis

(with ROI)

Action

Items

Revised Budget

Revised Process

Training Plan

Implementation Plan

Communication Plan

Lessons

Learned

CPI Status &

Results

BACK

Higher

Level

Objectives

Page 490: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

MaterielSolutionAnalysis

Operations andSupport

Production and Deployment

Development and FieldingRisk Reduction

A B

IOC

Full

Deployment

(FD)

Materiel

Development

Decision

Materiel

Development

Decision

CDD

Validation

Development

RFP Release

Decision

Full

Deployment

Decision

(FDD)

Limited

Deployment

Decisions

Acquisition Process Model

3.1 Service Development and Delivery Process (SDDP)

Legend

Decision

Milestone Review

Go Up 1 Level

SustainmentOT&ERisk Reduction Build

Build 1

Build 2

Build 0 Build n

Identify Mission Process to

Deliver DOTMLPF-P Capabilities

Deploy and Operate Materiel Solution and Measure the

Success of the Capability Delivery

Integration, Test and Application Lifecycle Management

Plan and Implement Materiel Solution

Define Materiel Solution and Implementation Plan

Identify DOTMLPF-P Capability

Requirements

Page 491: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

3.1.1 Identify DOTMLPF-P Capability Requirements

Go Up 1 Level

End User Problem

Determine,

Prioritize and

Present

DOTMLPF-P

Capabilities to

Sponsor

List Relevant

LRP

Requirements

Define the

Need/Problem

Statement

Identify

Performance

Measures and

Attributes

Obtain Formal

Review and

Approval to

Proceed

Conduct EA

Analysis

FWD

Need/Problem

Statement LRP

Requirements

DOTMLPF-P

Capabilities

Performance

Measures

Architecture Team

Assessment

PRM Inputs

Performance

AttributesWork Plan

Page 492: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

3.1.2 Identify Mission Process to Deliver DOTMLPF-P Capabilities

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Conduct

Process Re-

engineering

Update Work

Plan

Identify

Mission

Processes

Inform and

Adjudicate

Affected

Processes

Obtain

Approvals and

Validate BPR

Sufficiency

Develop

DOTMLPF-P

Execution

Actions and

Plans

BACK FWD

SDDP Approval

Mission Process

Map Updated

Work Plan

Re-engineered

Mission Process

Other Process

Changes

DOTMLPF-P

Implementation

Plan

PRM Inputs

Work Plan

Page 493: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gC

ore

Acquisition Process Model

3.1.3 Define Materiel Solution and Implementation Plan

Go Up 1 Level

En

ab

lin

g

Perform

Onboarding

Activities

Select Activities

to Build

Materiel

Solution

Implementation

Plan

Design

Contextual

Model

Obtain

Appropriate

Governance

Approvals

Perform

Information

Analysis

Activities

Identify

Project Lead

Prepare

Bounded User

Requirements

for

Implementation

BACK

Bounded User

Requirements

Package

COIProject Lead

Acquisition Approval

Onboarding Plan

Alternate

COAs

Contextual

Model

Validated

Requirements

Compliance Approval

SDDP Approval

Page 494: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Solution Analysis

ATP

Functional

Requirements

ATP

Limited

Deployment

ATPAcquisition

ATP

Acquisition Process Model

3.2 Defense Business System (DBS) Life Cycle Management

Go Up 1 Level

Business Solution Analysis Business System Acquisition, Testing, and Deployment

Business System Functional Requirements and Acquisition Planning

Capability Need Identification

Capability Support

Full

Deployment

ATP

Capability

Support ATP

Page 495: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gE

na

blin

gC

ore

Acquisition Process Model

3.2.1 Capability Need Identification

Go Up 1 Level

Conduct

Solution

Analysis ATP

Define the

Future

Capability

Identify

Capability

Need

FWD

Capability NeedCapability

Requirements

Approved and Aligned

Capability RequirementsDesired End

State

Page 496: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

3.2.2 Business Solution Analysis

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Develop Initial

Implementation

Plan

Identify

Processes to

Adopt

Reengineer

Business

Processes

BACK FWD

Draft

Processes

Adopted

Processes

Implementation

Plan

Conduct

Functional

Requirements

ATP

Functional

Requirements

ATP

Approved and Aligned

Capability Requirements

Page 497: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

3.2.3 Business System Functional Requirements and Acquisition Planning

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore

Develop

Business

System

Acquisition

Strategy

Revise

Implementation

Plan

Develop

Functional

Requirements

Conduct

Acquisition

ATP

BACK FWD

Revised

Implementation

Plan

Business System

Acquisition StrategyFunctional

Requirements

Acquisition

ATP

Functional

Requirements

ATP

Page 498: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Go

ve

rnin

gC

ore

Acquisition Process Model

3.2.4 Business System Acquisition, Testing, and Deployment

Go Up 1 Level

En

ab

lin

g

Provide Test

Results

Develop Design

Specifications

Conduct Fit-

Gap Analysis

Develop

Capability

Support Plan

Conduct Full

Deployment

ATP

Conduct

Limited

Deployment

ATP

Conduct

Capability

Support ATP

BACK

Capability Support

ATPFull Deployment ATP

Limited Deployment ATP

Capability Support PlanTest Results

Design Specifications

Fit-Gap Analysis

Revise

Implementation

Plan

Acquisition

ATP

Revised

Implementation

Plan

FWD

Page 499: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Acquisition Process Model

3.2.5 Capability Support

Go Up 1 Level

Go

ve

rnin

gE

na

blin

gC

ore Develop Tailored

Implementation

Plans

Identify

Functional and

Technical

Opportunities

BACK

Tailored

Implementation

Plan

Functional and Technical

Opportunities

Capability Support

ATP

Page 500: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

From DoD 5000.2 Enclosure 4

Statutory & Regulatory Information and

Milestone Requirements

Acquisition Process Model

Materiel Development Decision (MDD) Statutory and Regulatory

Information Requirements

Return

CTRL-Click here for more report information

Materiel Development

Decision Review of

Regulatory Requirements

(MDAP & MAIS Programs)

ADM

AoA Study Guidance

AoA Study Plan

ICD

FWD

CTRL-Click here to access a link to an Air Staff

Acquisition Document Coordination Matrix

Materiel Development

Decision Review of

Statutory Requirements

(MDAP & MAIS Programs)Market Research

Affordability Analysis

Joint DoD and

DNI Programs

Validated On-Line

Life-cycle Threat (VOLT)

Report

Note: Defense Intelligence

Threat Library (Threat Modules)

is a regulatory requirement with

required update every 2 years.

DIAD 5000.200 and DIAI 5000.002

are reference documents.

Page 501: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Milestone A Review of Statutory

Requirements

(MDAP & MAIS Programs)ICE

Frequency Allocation Application

(DD Form 1494)

Milestone A Review of Statutory

Requirements

(MDAP Programs)

Market Research

From DoD 5000.2 Enclosure 4

Statutory & Regulatory Information and

Milestone Requirements

Milestone A Review of Statutory

Requirements

(MAIS Programs)

Economic Analysis

Acquisition Process Model

Milestone A Statutory and Regulatory Information Requirements

Return

Cooperative Opportunities

FWD

CTRL-Click here for more report information

Milestone A Review of Regulatory

Requirements

(MDAP & MAIS Programs)

ADM

SEP

Replaced System

Sustainment Plan

Request for Proposal

Small Business Innovation

Research/ Small Business

Technology Transfer Program

Technologies

Item Unique Identification

Implementation Plan

BACK

CARD

CTRL-Click here to access a link to an Air Staff

Acquisition Document Coordination Matrix

AoA

CCA Compliance

2366a Written Determination

Benefit Analysis and Determination

Core Logistics Determination/

Core Logistics and

Sustaining Workloads

Estimate

DoD Component Cost Position

Full Funding Certification Memorandum

Industrial Base Capabilities Considerations

Intellectual Property (IP) Strategy

Life Cycle Mission Data Plan

Concept of Operations/Operational Mode

Summary/Mission Profile

Should-Cost Target

Spectrum Supportability Risk Assessment

Validated On-Line Life-cycle

Threat (VOLT) Report

Technology Targeting

Risk Assessment

Termination Liability Estimate

Affordability Analysis

LCSP

Acquisition Strategy

TEMP

Cybersecurity Strategy

CDD

PPP

Exit Criteria

DoD Component Cost Estimate

Joint DoD and

DNI Programs

Acquisition Approach

Business Strategy

Contracting Strategy

Modular Open System Approach

Multi-Year Procurement

Risk Management

Note: Defense Intelligence

Threat Library (Threat Modules)

is a regulatory requirement with

required update every 2 years.

DIAD 5000.200 and DIAI 5000.002

are reference documents.

Page 502: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Dev RFP Review of

Statutory Requirements

(MDAP & MAIS Programs)

Dev RFP Review of Statutory

Requirements

(MDAP Programs)

From DoD 5000.2 Enclosure 4

Statutory & Regulatory Information and

Milestone Requirements

Dev RFP Review of Statutory

Requirements

(MAIS Programs)

Acquisition Process Model

Development RFP Release Decision Point Statutory and Regulatory Information Requirements

Return

LRIP Quantities

TRA

CTRL-Click here for more report information

Dev RFP Review of

Regulatory Requirements

(MDAP & MAIS Programs)

LCSP

Market Research

Exit Criteria

Economic Analysis

AoA

SEP

ADM

Item Unique Identification

Implementation Plan

CTRL-Click here to access a link to an Air Staff

Acquisition Document Coordination Matrix

Bandwidth Requirements Review

Benefit Analysis and Determination

Contract-Type Determination

Cooperative Opportunities

Core Logistics Determination/

Core Logistics and

Sustaining Workloads

Estimate

CARD

Development RFP Release Cost Assessment

Industrial Base Capabilities Considerations

Intellectual Property (IP) Strategy

Life Cycle Mission Data Plan

Concept of Operations/

Operational Mode Summary/Mission Profile

PPP

Request for Proposal

Should-Cost Target

Small Business Innovation Research/ Small Business

Technology Transfer Program Technologies

Termination Liability EstimateAffordability Analysis

TEMP

Cybersecurity Strategy

BACK FWD

CDD

ISP

Validated On-Line Life-cycle

Threat (VOLT) Report

Joint DoD and DNI Programs

APB

Acquisition Approach

Business Strategy

Contracting Strategy

Modular Open System Approach

Multi-Year Procurement

Risk Management

Acquisition Strategy

Note: Defense Intelligence

Threat Library (Threat Modules)

is a regulatory requirement with

required update every 2 years.

DIAD 5000.200 and DIAI 5000.002

are reference documents.

Page 503: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Milestone B Review of

Statutory Requirements

(MDAP & MAIS Programs)

Milestone B Review of Statutory

Requirements

(MDAP Programs)

From DoD 5000.2 Enclosure 4

Statutory & Regulatory Information and

Milestone Requirements

Milestone B Review of Statutory

Requirements

(MAIS Programs)

Acquisition Process Model

Milestone B Statutory and Regulatory Information Requirements

Return

LFT&E Waiver from Full Up System

Level Testing

LRIP Quantities

Replaced System Sustainment Plan

PESHE

CTRL-Click here for more report information

Milestone B Review of

Regulatory Requirements

(MDAP & MAIS Programs)LCSP

DoD Component Cost Estimate

Exit Criteria

Economic Analysis

SEP

ADM

Item Unique Identification Implementation Plan

Frequency Allocation Application

(DD Form 1494)

ICE

BACK FWD

CTRL-Click here to access a link to an Air Staff

Acquisition Document Coordination Matrix

CCA Compliance

2366b Certification and Determination

Bandwidth Requirements Review

Contract-Type Determination

CARD

DoD Component Cost Position

Full Funding Certification Memorandum

Independent Logistics Assessment

Intellectual Property (IP) Strategy

Life Cycle Mission Data Plan

PPP

Should-Cost Target

Small Business Innovation Research/ Small Business

Technology Transfer Program Technologies

Spectrum Supportability Risk Assessment

TRA

Affordability Analysis

TEMP

Cybersecurity Strategy

SAR

ISP

APB

Core Logistics Determination/

Core Logistics and

Sustaining Workloads

Estimate

Joint DoD and DNI Programs

Congressional Notification of MDAP

Subprogram Designation

Waveform Assessment Application

Acquisition Strategy

Acquisition Approach

Business Strategy

Contracting Strategy

Modular Open System Approach

Multi-Year Procurement

Risk Management

2366a Written Determination

Note: Defense Intelligence

Threat Library (Threat Modules)

is a regulatory requirement with

required update every 2 years.

DIAD 5000.200 and DIAI 5000.002

are reference documents.

Page 504: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Milestone C Review of Statutory

Requirements

(MDAP Programs)

From DoD 5000.2 Enclosure 4

Statutory & Regulatory Information and

Milestone Requirements

Return

Industrial Base Capabilities

Considerations

Milestone C Review of

Statutory Requirements

(MDAP & MAIS Programs)

Acquisition Process Model

Milestone C Statutory and Regulatory Information Requirements

Milestone C Review of

Regulatory Requirements

(MDAP & MAIS Programs)

General Equipment Valuation

DoD Component Cost Estimate

Exit Criteria

PESHE

Validated On-Line Life-cycle

Threat (VOLT) Report

SEP

ADM

LCSP

Item Unique Identification

Implementation Plan

CPD

Frequency Allocation Application

(DD Form 1494)

ICE

BACK FWD

CTRL-Click here for more report information

CTRL-Click here to access a link to an Air Staff

Acquisition Document Coordination Matrix

CCA Compliance

2366b Certification and

Determination

Bandwidth Requirements Review

Benefit Analysis and Determination

CDD

Contract-Type Determination

Cooperative Opportunities

Core Logistics Determination/

Core Logistics and

Sustaining Workloads

Estimate

CARD

DoD Component Cost Position

Full Funding Certification Memorandum

Independent Logistics

Assessment

ISP

Intellectual Property (IP) Strategy

Life Cycle Mission Data Plan

Concept of Operations/

Operational Mode Summary/Mission Profile

PPP

Request for Proposal

Should-Cost Target

Small Business Innovation

Research/ Small Business

Technology Transfer Program Technologies TRA

Termination Liability Estimate

Spectrum Supportability Risk Assessment

Affordability Analysis

TEMP

Cybersecurity Strategy

Acquisition Strategy

AoA

Waveform Assessment Application

Congressional Notification of

MDAP Subprogram Designation

Preservation and Storage

of Unique Tooling Plan

Joint DoD and DNI Programs

APB

Acquisition Approach

Business Strategy

Contracting Strategy

Modular Open System Approach

Multi-Year Procurement

Risk Management

2366a Written Determination

Note: Defense Intelligence

Threat Library (Threat Modules)

is a regulatory requirement with

required update every 2 years.

DIAD 5000.200 and DIAI 5000.002

are reference documents.

Page 505: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Full Rate Production DR Review of

Statutory Requirements

(MDAP & MAIS Programs)Full Rate Production DR Review of

Statutory Requirements

(MDAP Programs)

From DoD 5000.2 Enclosure 4

Statutory & Regulatory Information and

Milestone Requirements

Full Rate Production DR Review of

Statutory Requirements

(MAIS Programs)

Acquisition Process Model

Full Rate Production DR Statutory and Regulatory Information Requirements

Return

LFT&E Report

BACK

CTRL-Click here for more report information

Full Rate Production DR Review of

Regulatory Requirements

(MDAP & MAIS Programs)

DoD Component Cost EstimateEconomic Analysis

PESHE

Operational Test Agency Report

General Equipment Valuation

ADM

LCSP

ICE

CTRL-Click here to access a link to an Air Staff

Acquisition Document Coordination Matrix

CCA Compliance

Affordability Analysis

CARD

Cybersecurity Strategy

DoD Component Cost Position

DoD Component Live Fire

Test and Evaluation Report

DOT&E Report on Initial Operational

Test and Evaluation (IOT&E)

Full Funding Certification Memorandum

Independent Logistics

Assessment

Intellectual Property (IP) Strategy

Life Cycle Mission Data Plan

PPP

Request for Proposal

Should-Cost Target

Small Business Innovation

Research/ Small Business

Technology Transfer Program Technologies

Validated On-Line Life-cycle

Threat (VOLT) Report

Termination Liability

Estimate

TEMP

Acquisition Strategy

IT & NSS Interoperability Certification

Congressional Notification

of MDAP

Subprogram Designation

Joint DoD and DNI Programs

APB

Acquisition Approach

Business Strategy

Contracting Strategy

Modular Open System Approach

Multi-Year Procurement

Risk Management

Note: Defense Intelligence

Threat Library (Threat Modules)

is a regulatory requirement with

required update every 2 years.

DIAD 5000.200 and DIAI 5000.002

are reference documents.

Page 506: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Execution

Strategic

Contracts

Cost

Requirements

Technical

AF CAIG

Review

AFRB OIPT

PEO

ASPFIG/FIM

(IIPT)

DCAPE

Review

AFROC

(AoA Study)

DBC

AFROC JROCJCBFCB

ESIS

RSR HPT

MDD MS A

DAB

MIRT

1a

Rq

mts

Co

st

Co

ntr

ac

tsT

ec

hn

ica

lS

tra

teg

ic

Program Reviews (Pre MDD to MS A)

MIRT meets prior to each of the following:

1. Approval of acquisition strategy or acquisition

plan

2. Release of the RFP

3. Conducting discussions or award w/o

discussions

4. Issuance of the Final Proposal Revision Request

5. Source Selection Decision

MIRT

2bOSD Peer

Review 2

Ex

ec

uti

on

IPA (SPACE)

MIRT

2cOSD Peer

Review 3

MIRT

2a

MIRT

1b

Other

Non-Milestone

Related

Reviews

Acq/Sust

Review

SPR/IBR

CSB

Staffer Day

Brief

Audits/

Inspections

PEO

Portfolio

Review

SAE Monthly

Review

Program

Management

Reviews

AFRB (Out of

Cycle)

OSD Peer

Review 1

DBC

ASP

* NOTE 1: Reviews below the

PEO level may be conducted

prior to the ASP or AFRB

* NOTE 1

* NOTE 1

Source

Selection

Final Eval

Source

Selection

Init Eval

Solicitation

Review Board

Source

Selection Plan

DAO Review

DPM DRM

MDA AS/

RFP

Review

FWD

ASR

AFRRGAFGK AFGK

OSD Pre-Award Peer Reviews occur prior to each

of the following:

1. Issuance of solicitation

2. Final Proposal Revision Request

3. Contract Award

PSRNote: PSR is an AFLCMC

Standard Process.

Page 507: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Execution

Strategic

Technical

Contracts

Cost

Requirements

IPA (SPACE)

AF CAIG

Review

AFRB

ASP

OIPT

PEO

ASP

FIG/

FIM

(IIPT)

DCAPE

Review

DBC

AFROCRSR HPT

MS A MS B

DAB

MIRT

1a

IBR

(Baseline)

SFRSRR PDR

Economic

Analysis

ESIS

Rq

mts

Co

st

Co

ntr

ac

tsS

tra

teg

icT

ec

hn

ica

l

Program Reviews (MS A to MS B)

MIRT meets prior to each of the following:

1. Approval of acquisition strategy or acquisition plan

2. Release of the RFP

3. Conducting discussions or award w/o discussions

4. Issuance of the Final Proposal Revision Request

5. Source Selection Decision

OSD Pre-Award Peer Reviews occur prior to each of

the following:

1. Issuance of solicitation

2. Final Proposal Revision Request

3. Contract Award

* Contract Clearance Review (Sole Source) occurs

after MIRT 2 and before OSD Peer Review 3

EITR

IRA

SRA

MRA

PSR

ESOH

TRA

ILA

LHA

Ex

ec

uti

on

MIRT

2bOSD Peer

Review 2

MIRT

2cOSD Peer

Review 3

MIRT

2a

MIRT

1b

Other

Non-Milestone

Related

Reviews

Acq/Sust

Review

SPR/IBR

SEAM

CSB

Staffer Day

Brief

Audits/

Inspections

PEO

Portfolio

Review

SAE Monthly

Review

ILCM

Executive

Forum

DAES

Reviews

Program

Management

Reviews

AFRB (Out of

Cycle)

SSA

Review

IHA

OSD Peer

Review 1

* NOTE 1: Reviews below the

PEO level may be conducted

prior to the ASP or AFRB

* NOTE 1

* NOTE 1

Solicitation

Review Board

Source

Selection Plan

Source

Selection

Init Eval

Source

Selection

Final Eval

DAO Review

Contract Clearance

Review

(Competitive)

*Assumes

Discussion

DPM DRM

Development

RFP Release

IBR

(Baseline)

BACK FWD

AFRRGAFGK AFGK

IBA

JROCJCBFCB

PSR

Note: PSR is an AFLCMC

Standard Process.

Page 508: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

MS B MS C

Program Reviews (MS B to MS C)

Execution

Strategic

Technical

Contracts

Cost

Requirements

AF CAIG

Review

AFRB

ASP

OIPT

PEO

ASP

FIG/

FIM

(IIPT)

DCAPE

Review

DBC

AFROCRSR HPT

DAB

MIRT

1a

Economic

Analysis

ESIS

Rq

mts

Co

st

Co

ntr

ac

tsS

tra

teg

icT

ec

hn

ica

l

MIRT meets prior to each of the following:

1. Approval of acquisition strategy or acquisition plan

2. Release of the RFP

3. Conducting discussions or award w/o discussions

4. Issuance of the Final Proposal Revision Request

5. Source Selection Decision

OSD Pre-Award Peer Reviews occur prior to each of

the following:

1. Issuance of solicitation

2. Final Proposal Revision Request

3. Contract Award

* Contract Clearance Review (Sole Source) occurs

after MIRT 2 and before OSD Peer Review 3

EITR

IRA

SRA

MRA

PSR

ESOH

TRA

ILA

LHA

Ex

ec

uti

on

MIRT

2bOSD Peer

Review 2

MIRT

2cOSD Peer

Review 3

MIRT

2a

MIRT

1b

Other

Non-Milestone

Related

Reviews

Acq/Sust

Review

SPR/IBR

SEAM

CSB

Staffer Day

Brief

Audits/

Inspections

PEO

Portfolio

Review

SAE Monthly

Review

ILCM

Executive

Forum

DAES

Reviews

Program

Management

Reviews

AFRB (Out of

Cycle)

SSA

Review

IHA

OSD Peer

Review 1

CDR TRR FCA SVR PRRPost CDR

AssessmentPost PDR

Assessment

MRR OTRR

* NOTE 1: Reviews below the

PEO level may be conducted

prior to the ASP or AFRB

* NOTE 1* NOTE 1

Solicitation

Review Board

Source

Selection Plan

Source

Selection

Init Eval

Source

Selection

Final Eval

IPA (SPACE)

DAO Review

Contract Clearance

Review

(Competitive)

*Assumes

Discussion

DPM DRM

MDA AS/

RFP

Review

AOTR

AFRRGAFGK AFGK

IBA

JROCJCBFCB

IBR

(Baseline)

PSR

Note: PSR is an AFLCMC

Standard Process.

BACK FWD

Page 509: Acquisition Process Model 1.0 Perform Air Force Acquisition · Co st ap b ilyAn Life Cycle Sustainment Plan. Acquisition Process Model Enterprise Metrics – ACAT I Programs Materiel

Program Reviews (Post MS C)

Execution

Strategic

Technical

Contracts

Cost

Requirements

AF CAIG

Review

AFRB

ASP

OIPT

PEO

ASP

FIG/

FIM

(IIPT)

DCAPE

Review

DBCDAB

MIRT

1a

Economic

Analysis

Rq

mts

Co

st

Co

ntr

ac

tsS

tra

teg

icT

ec

hn

ica

l

MIRT meets prior to each of the following:

1. Approval of acquisition strategy or acquisition plan

2. Release of the RFP

3. Conducting discussions or award w/o discussions

4. Issuance of the Final Proposal Revision Request

5. Source Selection Decision

OSD Pre-Award Peer Reviews occur prior to each of

the following:

1. Issuance of solicitation

2. Final Proposal Revision Request

3. Contract Award

* Contract Clearance Review (Sole Source) occurs

after MIRT 2 and before OSD Peer Review 3

SRA

ESOH

ILA

LHA

Ex

ec

uti

on

MIRT

2bOSD Peer

Review 2

MIRT

2cOSD Peer

Review 3

MIRT

2a

MIRT

1b

Other

Non-Milestone

Related

Reviews

Acq/Sust

Review

SPR/IBR

SEAM

CSB

Staffer Day

Brief

Audits/

Inspections

PEO

Portfolio

Review

SAE Monthly

Review

ILCM

Executive

Forum

DAES

Reviews

Program

Management

Reviews

AFRB (Out of

Cycle)

SSA

Review

IHA

OSD Peer

Review 1

* NOTE 1: Reviews below the

PEO level may be conducted

prior to the ASP or AFRB

* NOTE 1* NOTE 1

Solicitation

Review Board

Source

Selection Plan

Source

Selection

Init Eval

Source

Selection

Final Eval

DAO Review

Contract Clearance

Review

(Competitive)

*Assumes

Discussion

DPM DRM

MDA AS/

RFP

Review

IBAIBR

(Baseline)

MS C

LRP PCA

ISR

BACK

FRP IOC

PIR

RMF

LFT&E IOT&E FOT&E FDE

ICE SCP

FOC