ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia

Upload: others

Post on 20-Jan-2021

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

ACPS New South Wales February MeetingFebruary 15, 2012 – New South Wales, Australia

Page 2: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Peabody Energy Australia Wilpinjong CHPP Expansion Project

Challenges and Successes

Page 3: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Safety Contact

Page 4: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Meeting Agenda

Page 5: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Project Introduction

Page 6: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Project Introduction – Production Objectives

Page 7: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Project Introduction – FEED and Contract Strategy

Page 8: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Project Introduction – Process Objectives

Page 9: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Process Design – Coal Handling Plant

Page 10: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Coal Handling Plant – Objectives

Page 11: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Coal Handling Plant – Process Flow Diagram

Page 12: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Coal Handling Plant – Process Flow Diagram – Raw Coal Handling

New ROM

Bin

CV-104

Raw Coal

Conveyor

New Sizing

Station

New Raw

Coal

Stacking

Conveyor

Existing

Radial

Stacker

Page 13: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Coal Handling Plant – Process Flow Diagram – Product Handling

Clean Coal Stacker CV-606Clean Coal Stacker CV-606

CV-605 Drive TowerCV-605 Drive Tower

New Reclaim Conveyor CV-802 connects to existing TLO

New Reclaim Conveyor CV-802 connects to existing TLO

Page 14: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Coal Handling Plant – Interface Point Challenges

New Stationary Tripper installed on existing Product Conveyor diverts washed coal to new Product Stockpile

New Stationary Tripper installed on existing Product Conveyor diverts washed coal to new Product Stockpile

New Conveyor CV-605New Conveyor CV-605

Existing Product Stacker CV-602Existing Product Stacker CV-602

Existing Product Conveyor CV-601Existing Product Conveyor CV-601

New Tripper HeadNew Tripper Head

Page 15: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Process Design – Coal Preparation Plant

CPP Expansion under construction (September 2011)

Page 16: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Coal Preparation Plant – Process Objectives

New

Spirals

Circuit

Expansion

Page 17: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Coal Preparation Plant – Major Process Decisions

Page 18: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Coal Preparation Plant – Process Flow Diagram

Page 19: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Coal Preparation Plant – Other Process Considerations

Field modify existing thickener with external launder to increase capacity

Field modify existing thickener with external launder to increase capacity

New higher capacity and re-designed centerwellNew higher capacity and re-designed centerwell

Page 20: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Coal Preparation Plant – Other Process Considerations

New D&R screens with large fixed sieve panelsNew D&R screens with large fixed sieve panels

Page 21: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Commissioning Performance

First train loading operations from new product stockpile (November 2011)

Page 22: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Commissioning Performance – Key Results

Page 23: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Commissioning Performance – Key Results

99

95

90

80

70

60

50

40

30

20

15

108

6

4

2

1

0.01 0.1 1 10 100

% P

ass

ing

Size (mm)

Rosin Rammler

Nominal Plant Feed

Coarsest Plant Feed

Finest Plant Feed

Initial Sizing

After Wet Tumble

Plant performance test sample aligned with nominal design size distribution

Plant performance test sample aligned with nominal design size distribution

Wet tumble of plant feed was within finest design envelope limits

Wet tumble of plant feed was within finest design envelope limits

Page 24: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Commissioning Performance – Coarse DMC Performance

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30

Par

titi

on

Nu

mb

er

(To

Pro

du

ct)

Specific Gravity

Coarse Dense Medium Cyclone (Plus 14 mm)

Actual

Guaranteed (Whitten)

Actual (Whitten)

Page 25: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Commissioning Performance – Fine DMC Performance

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30

Pa

rtit

ion

Nu

mb

er

(To

Pro

du

ct)

Specific Gravity

Fine Dense Medium Cyclone (14 mm x 4 mm)

Actual

Guaranteed (Whitten)

Actual (Whitten)

Page 26: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Commissioning Performance – Fine DMC Performance

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30

Pa

rtit

ion

Nu

mb

er

(To

Pro

du

ct)

Specific Gravity

Fine Dense Medium Cyclone (4 mm x 1 mm)

Actual

Guaranteed (Whitten)

Actual (Whitten)

Page 27: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Commissioning Performance – Spirals Performance

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30

Pa

rtit

ion

Nu

mb

er

(To

Pro

du

ct)

Specific Gravity

Spirals (1.0 mm x 0.10 mm)

Actual

Guaranteed (Whitten)

Actual (Whitten)

Page 28: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Project Implementation – Other Capital Cost Considerations

Reclaim CV-202 from new Raw Coal stockpile onto existing Plant Feed Conveyor CV-201

Page 29: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Project Implementation – Other Capital Cost Considerations

Page 30: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Capital Cost Considerations – Imported Fabrication

Pre-assembly of new ROM bin in Tianjin before blasting and painting

Pre-assembly of new ROM bin in Tianjin before blasting and painting

Page 31: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Capital Cost Considerations – Lower Cost Engineering

Relocated sample system as part of new fixed tripper assembly on CV-601

Relocated sample system as part of new fixed tripper assembly on CV-601

Page 32: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Lessons Learned

CPP addition after enclosure November 2011

New CPP addition in September 2011

Page 33: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Lessons Learned – Procurement and Fabrication

New CPP addition in September 2011

Page 34: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Lessons Learned – Process Design and Engineering

New CPP addition in September 2011

Page 35: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Lessons Learned – Change Management

Page 36: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

Conclusion

The Wilpinjong expansion project proved to be a successful cooperation between Peabody and Ausenco Taggart having met the Owner’s objectives for Safety performance, Process guarantees, Completion Schedule, and Capital costs.

Completed CPP Expansion with new CV-605 in the foreground (December 2011)

Page 37: ACPS New South Wales February Meeting · 2018. 3. 20. · ACPS New South Wales February Meeting February 15, 2012 – New South Wales, Australia. Peabody Energy Australia Wilpinjong

ACPS New South Wales February MeetingFebruary 15, 2012 – New South Wales, Australia