accountability in climate change initiatives – kerbside co 2 monitoring

12
Accountability in climate change initiatives – kerbside CO 2 monitoring Ben Barratt, King’s College London APRIL Greenhouse Gas Group December 2009

Upload: terry

Post on 11-Feb-2016

52 views

Category:

Documents


0 download

DESCRIPTION

Accountability in climate change initiatives – kerbside CO 2 monitoring . Ben Barratt, King’s College London APRIL Greenhouse Gas Group December 2009. Aims of the presentation. The problem – why do we need kerbside CO 2 monitoring?: Emissions model validation Accountability A solution - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Accountability in climate change initiatives – kerbside CO 2  monitoring

Accountability in climate change initiatives –

kerbside CO2 monitoring

Ben Barratt, King’s College LondonAPRIL Greenhouse Gas Group

December 2009

Page 2: Accountability in climate change initiatives – kerbside CO 2  monitoring

Aims of the presentation• The problem – why do we need kerbside CO2 monitoring?:

− Emissions model validation− Accountability

• A solution− Kerbside monitoring trial− A CO2 monitoring network for London

• The way forward:− Analysis methods− Funding− Integration / co-ordination

2

Page 3: Accountability in climate change initiatives – kerbside CO 2  monitoring

1. Model Validation• Detailed LAEI used for CO2 emissions scenario testing for TfL.

• Modelling toolkit to produce high resolution (2x2m) output.

3

• Validation with monitoring data essential part of process.

• Mapped CO2 outputs

possible, but not robust without measurement validation.

Page 4: Accountability in climate change initiatives – kerbside CO 2  monitoring

1. Model Validation

4

• Decreases in NOX, NO2 and PM10 predicted by NAEI and LAEI

have halted (common across Europe).

• CO2 emissions predictions may also be wrong.

0

50

100

150

200

250

300

350

400

450

500

0

200

400

600

800

1000

1200

1996

1998

2000

2002

2004

2006

2008

2010

NO

x ob

serv

atio

ns, p

pb

NO

xem

issi

ons,

kto

nnes

/yr

UK Urban Road Transport NOx emissions

NAEI

Observations,ppb

Page 5: Accountability in climate change initiatives – kerbside CO 2  monitoring

2. Accountability

5

• Isolation and quantification of affects of transport initiatives (GG and non-GG) on London’s CO2 concentrations.

• Increasingly advanced analysis techniques used to separate influencing factors.

• Relies on high quality monitoring data at a range of comparable monitoring sites, including ‘control’ sites.

• Monitoring must be in place well before intervention.

Page 6: Accountability in climate change initiatives – kerbside CO 2  monitoring

2. Accountability

6

• How strong is the traffic signal?

Page 7: Accountability in climate change initiatives – kerbside CO 2  monitoring

2. Accountability

7

• How strong is the traffic signal? > 200 ppb NOx

Page 8: Accountability in climate change initiatives – kerbside CO 2  monitoring

2. Accountability

8

• Local sources of CO2 have to be isolated from non-local.

370

390

410

430

450

470

490

510

530

550

26/03/2009 12:00

27/03/2009 12:00

28/03/2009 12:00

29/03/2009 12:00

30/03/2009 12:00

31/03/2009 12:00

01/04/2009 12:00

02/04/2009 12:00

15 m

inut

e m

ean

CO2

conc

entr

ation

/ pp

m

Rural (Silwood Park) Central London kerbside

Page 9: Accountability in climate change initiatives – kerbside CO 2  monitoring

3. An urban CO2 monitoring network

9

• A proposed network of ground-level fixed permanent CO2

monitors.• Monitors co-located with existing comprehensive pollution

monitoring sites, including met and classified traffic data.• Primarily roadside, but also urban background and rural.• Instrumentation must be affordable, reliable (>90% annual

data capture), stable, responsive.• Operated to defined QA/QC standards – temporally and

spatially comparable.

Page 10: Accountability in climate change initiatives – kerbside CO 2  monitoring

3. Kerbside analyser trial

10

Model Technique Deployment period ‘Valid’ data capture (%)

Monitor Labs 9820

IR Absn. 7 months 90.3

API 360 IR Absn. 8 weeks 80.6Synspec GC 7 weeks 98.5Licor 820 IR 4 months 47.6

Page 11: Accountability in climate change initiatives – kerbside CO 2  monitoring

4. The way forward

11

• Funding− Has to be long term− TfL, Defra− Clearflo− Marylebone Road KCL-funded permanent Li-cor

• Transferral and application of analysis methods.• Co-ordination with other measurements (tower, flux etc).

Page 12: Accountability in climate change initiatives – kerbside CO 2  monitoring

12