Document TitleSecurity Level:

AIRTEL WCDMA Project RNC Acceptance TestRNC Name

Circle Name

RNC Site Name/Address

RNC: Node Level Test Cases

RNC Node Level Test Cases

1Hardware Checks

1.1Material verification as per Packaging List(Pass (Fail (NA

1.2Cabinet/Frame not damaged (Pass (Fail (NA

1.3RNC internal & eternal cabling, connectors , ports etc. to be checked for any damage / loose connections(Pass (Fail (NA

1.4Proper Earthing for all elements (as per BoQ)(Pass (Fail (NA

1.5Cabinet/Frame locations and all cable routing agree with floor plan(Pass (Fail (NA

1.6Physical Installation of RNC e.g. Grouting, alignment etc.(Pass (Fail (NA

1.7Ensure proper connection / termination of power cables, PCM/OPT/ETH cables(Pass (Fail (NA

1.8Proper Labeling of DDF / ODF / PDF / PCM cables & ports(Pass (Fail (NA

2Power on Test

2.1DC Voltage in permissible range(Pass (Fail (NA

2.2RNC boards power on status check(Pass (Fail (NA

2.3All the cooling fans are operational(Pass (Fail (NA

2.4Hardware configuration as per BOQ(Pass (Fail (NA

3Consistency Checks

3.1DC power redundancy check(Pass (Fail (NA

3.2Redundancy test for all applicable cards(Pass (Fail (NA

3.3Manual RNC restart(Pass (Fail (NA

3.4Self diagnostics test for all elements /modules / cards in RNC(Pass (Fail (NA

3.5Data Consistency Check(Pass (Fail (NA

3.6RNC data backup & restore check(Pass (Fail (NA

4Alarm Test

4.1Fault handing / Alarms reporting to OMC(Pass (Fail (NA

4.2External / Utility / Visual / Audio alarms and extending the same to OMC as per BOQ(Pass (Fail (NA

5Software Checks

5.1Software configuration as per BOQ.(Pass (Fail (NA

5.2Query License(Pass (Fail (NA

5.3Query Operation Logs(Pass (Fail (NA

5.4Processor & DSP Query(Pass (Fail (NA

5.5E1/OPT/ATM/IP port status query(Pass (Fail (NA

5.6Blocking a Cell(Pass (Fail (NA

5.7Unblocking a Cell(Pass (Fail (NA

5.8Deletion of a cell(Pass (Fail (NA

5.9Reconfiguration of a Cell(Pass (Fail (NA

5.10Interface Tracing(Pass (Fail (NA

5.11Single User Tracing(Pass (Fail (NA

5.12Protocol Tracing(Pass (Fail (NA

6Service Test

6.1AMR Speech Service(Pass (Fail (NA

6.2CS Transparent Data Service(Pass (Fail (NA

6.3PS BE Service(Pass (Fail (NA

6.4PS BE Service Setup on HS-DSCH(Pass (Fail (NA

6.5Combined Service Bearing(Pass (Fail (NA

6.6HSDPA Service(Pass (Fail (NA

6.7Soft handover test(Pass (Fail (NA

6.8Softer handover test(Pass (Fail (NA

6.9AMR Speech Service Encryption(Pass (Fail (NA

6.10PS Service Encryption(Pass (Fail (NA

6.11SMS Service(Pass (Fail (NA

6.12Integrity Protection(Pass (Fail (NA

7Documentation

7.1All the engineering manuals (hard or electronic copy) provided (as per BoQ)(Pass (Fail (NA

7.2Site folder containing all the relevant site information to be submitted(Pass (Fail (NA

Punch Point List:

Sr. No.ItemDate ClosedName / Signature of authorized person

All tests completed without any punch list YES NO

Final Sign-Off Sheet

RNC Name

Circle Name

RNC Site Name/Address

Huawei Representative

Name:_____________________

Signature:__________________

Designation:______________________

Contact No.:_____________________

E-Mail :__________________

Place:______________________Customer Representative

Name:_____________________

Signature:__________________

Designation:______________________

Contact No:_____________________

E-Mail:__________________

Place:______________________

DATE \@ "yyyy-MM-dd" 2010-08-19

HUAWEI ConfidentialPagePAGE1, Total NUMPAGES \* Arabic \* MERGEFORMAT 3