accelerated port lands: port lands 101 (mar 31)

Upload: torontoist

Post on 14-Apr-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    1/29

    Port Lands 101

    Christopher DunnWaterfront Secretariat, City of Toronto

    Brenda WebsterWaterfront Toronto

    March 31, 2012

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    2/29

    Overview

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    3/29

    AreaComparison

    Rail Corridor

    Queen Street

    College St.

    YongeSt..

    University

    Ave.

    King St.

    JarvisSt..

    Dundas St.

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    4/29

    PortLandsHistory

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    5/29

    PortLandsHistory

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    6/29

    PortLandsHistory

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    7/29

    PortLandsHistory

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    8/29

    PortLandsHistory

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    9/29

    PortLands-Today

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    10/29

    PlanningHistory

    1999

    UNLOCKING THE

    PORT LANDS

    2005

    PORTLANDS

    IMPLEMENTATION STRATEGY

    2010

    LOWER DON LANDS

    PLAN

    CENTRAL WATERFRONT

    SECONDARY PLAN

    2003

    WATERFRONT COMMUNITY

    IMPROVEMENT PLAN

    2008

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    11/29

    PlanningHistoryUnlockingTorontosPort

    Lands(1999)

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    12/29

    PlanningHistoryCentralWaterfront

    SecondaryPlan(2003)

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    13/29

    PlanningHistoryPortLandsImplementaJon

    Plan,DraM(2005)

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    14/29

    PlanningHistoryWaterfrontCIP(2008)

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    15/29

    PlanningHistoryLowerDonLands(2010)

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    16/29

    RelatedAcJvitytothePortLands

    West Don Lands

    East Bayfront

    South of EasternTTC LRV

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    17/29

    EastBayfront

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    18/29

    WestDonLands:QuickFacts

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    19/29

    SouthofEastern:QuickFacts

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    20/29

    TorontoWaterWaterfrontSanitaryServicing

    asterPlan

    PurposeistodevelopacomprehensiveWaterfrontSanitaryServicingasterPlan,toservicecurrent,plannedandfuturedevelopmentsalongTorontoswaterfrontto2031.

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    21/29

    PortLandsReality,Constraintsand

    OpportuniJes

    ExisJngindustrialandemploymentacJvity saltstockpileandconcretebatching hydrotransformerandwastetransferstaJon

    Industrialpastandbrownfieldstatus soilandgroundwatercontaminaJonneedstobeaddressed relocaJon/undergroundingofhydrotransmissionline

    NeedtoaccommodateconJnuedportuses costlyliMbridgesrequiredovertheshipchannel dockwallandmooring

    Lackofinfrastructure transit,water,uJliJes

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    22/29

    PortLandsReality,Constraintsand

    OpportuniJes

    ThePortLandsisaparJcularlychallengingsitetodevelop,

    becauseit:

    lieswithinafloodzone needsextensiveenvironmentalremediaJon

    poorgroundcondiJonsforbuilding lacksdevelopment-enablinginfrastructure;exisJngroadsand

    servicesareoldand/orinadequatetosupportmoreintense

    development

    ispoorlyJedintotheCitysroad,transit,andwastewatercollecJonnetworks

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    23/29

    PortLandsReality,Constraintsand

    OpportuniJesFloodProtecJon

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    24/29

    PortLandsReality,Constraintsand

    OpportuniJes

    ThePortLandsareanopportunitybecause:

    Itisastrategicwaterfrontlandassetlocatedincloseproximitytodowntown.

    Themajorityofthelandsisinpublicownership.

    ThereisanopportunityforaquickandefficienttransitconnecJontoUnionStaJon,akeyregionaltransithub.

    ThereareexisJngrecreaJonspacesthatcanbeexpandedandbuiltupon.

    Thereisanemergingcreateindustriescentre(Pinewood)thatcanactasacatalystforemploymentgrowth.

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    25/29

    Reality,ConstraintsandOpportuniJes

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    26/29

    Whyarewedoingthiswork?

    OnSeptember21st,2011,CityCouncilunanimouslyendorsedaprotocolforCitystaff,WaterfrontTorontoandTRCAwith

    inputfromTPLCtodevelopmentabusiness/implementaJon

    planforthePortLandsandreviewopJonsfortheDonouth

    EA.

    StafffromtheagenciesconvenedworkinggroupsinOctober2011withtheassistanceofspecializedconsultants,to

    completethiswork.

    PublicconsultaJonwasaconsideredakeycomponentofthiswork.ASACandLUACwascreatedtoadvisestaffandthe

    consultantsonthefindingoftheprojectasitmovesforward.

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    27/29

    NextSteps

    EndofApril,2012ConsultantscompletetheirdraMreporttotheCity,WaterfrontTorontoandTRCA.

    AddiJonalconsultaJonexpectedneartheendofApril.Thiswillfocusonthefinalresultsoftheconsultantwork.

    une12th,2012CitystaffreporttotheExecuJveCommieewithrecommendaJons.

    uly11&12th,2012CityCouncilconsidersstaffreport. October28,2012DonouthEAPauseexpires.

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    28/29

    Floodprotec+on,naturaliza+onandgreenspaceainTradingFloor

    Businessanalysis:economics,marketandfinancingSideTradingFloor

    PortLands101ainfloorStudio

    DevelopmentplanningandphasingThirdFloor,PayWaRoom

  • 8/2/2019 Accelerated Port Lands: Port Lands 101 (Mar 31)

    29/29

    HAVEYOURSAY

    Publicfeedbackworkshops:Tuesday,April36:30to9:30atSt.LawrenceHall

    or

    Wednesday,April46:30to9:30attheHarbour

    CastleWes+n

    Online:www.portlandsconsulta+on.ca