acarp roadway development workshop

20
Introduction of Continuous Miner Monitoring at Clarence Colliery ACARP Roadway Development Workshop Introduction of Continuous Miner Monitoring at Clarence

Upload: linnea

Post on 14-Jan-2016

39 views

Category:

Documents


0 download

DESCRIPTION

ACARP Roadway Development Workshop. Introduction of Continuous Miner Monitoring at Clarence. Clarence Colliery Background. Introduction Productivity Improvement Measures CM Monitoring. Mining since 1981 Various Mining Methods Currently doing partial pillar extraction. Introduction - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence

Page 2: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Clarence Colliery Background

Introduction

Productivity

Improvement Measures

CM

Monitoring

• Mining since 1981• Various Mining Methods• Currently doing partial pillar extraction

Page 3: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Productivity Improvement Measures

Introduction

Productivity

Improvement Measures

CM

Monitoring

Recent Productivity Improvement Measures

• Leadership Development • Revised Panel Layouts• Infrastructure Upgrades

Current Focus• Improved Planning/Control Systems

Future Initiatives• Equipment upgrades (SC’s, FCT, FEL’s)• Services moves

Page 4: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Leadership Development

• Leadership definition at Clarence• Influencing Direction• Communication • Understanding Yourself and Your Impact• Motivation, Creativity & Teamwork• Managing Individual & Team Effectiveness

Introduction

Productivity Improvement

Measures

CMMonitoring

Page 5: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Revised Panel Layouts

Introduction

Productivity

Improvement Measures

CM

Monitoring

Page 6: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Infrastructure Upgrades

• Conveyors• Electrical distribution• Roadways concreted in mains

Introduction

Productivity Improvement

Measures

CMMonitoring

Page 7: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Continuous Miner Monitoring

Introduction

Productivity Improvement

Measures

CMMonitoring

Page 8: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Continuous Miner Monitoring

Introduction

Productivity Improvement

Measures

CMMonitoring

Page 9: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Implementation of CM Monitoring at Clarence Colliery

Introduction

Productivity Improvement

Measures

CMMonitoring

Key Stages of JSRP Implementation

1. Verification • Raw Data• Reports

2. Customisation• Parameter Setting• Re-verify Results

3. Communication• Target Crews• Operator Survey • Dispel Anxiety

4. System Management • FEP Downloads• Report Generation

5. Data Analysis• Daily Reports• Weekly Reports• Monthly Reports• Trends

6. Process Improvements• Feedback• Ownership

Page 10: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Introduction

Productivity Improvement

Measures

CMMonitoring

Verification• Raw Data

– Collected each secondCutter Head Position

Cutter Motor Current

Conveyor Motor Current

Implementation of CM Monitoring at Clarence Colliery

Page 11: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Introduction

Productivity Improvement

Measures

CMMonitoring

VerificationRaw Data

– Check by underground time study

12 9:44:38 9:45:10 32     0    

      0 9:45:10 9:46:01 51    

      0     0 9:46:00 9:47:00

      0     0 9:47:00 9:47:46

Floor sump, plus shear up and sump

Wait for car with power to cutter motors

Switch off cutter motors

Actual Recorded TimesActual Recorded Comments

Implementation of CM Monitoring at Clarence Colliery

Page 12: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Introduction

Productivity Improvement

Measures

CMMonitoring

Verification

Reports

Most data verifiable except Cutting Statistics

Shuttle Car Count +/- 2%

Some error in Relocation Statistics

OUTCOMERaw Data AccurateData Analysis needs Refinement

OUTCOMERaw Data AccurateData Analysis needs Refinement

Implementation of CM Monitoring at Clarence Colliery

Page 13: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Introduction

Productivity Improvement

Measures

CMMonitoring

Customised Report Structure• Car Loading Time • Other Production Time• Total Production Time• Non Production Process Time• Relocation Time• Idle Time – Pump On • Total Operating Time• Operator Logged Downtime• Power Outage Time • Idle Time – Pump Off

Only report on what is Meaningful and VerifiableEnsure reported values are clearly defined

Reports

Implementation of CM Monitoring at Clarence Colliery

Page 14: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Introduction

Productivity Improvement

Measures

CMMonitoring

Implementation of CM Monitoring at Clarence Colliery

Page 15: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Introduction

Productivity Improvement

Measures

CMMonitoring

Engineering Reports

• Shift, Weekly

& Monthly Reports• Comprehensive Motor

Running time, Voltage

and Current Data• 34 Trip Parameters

Implementation of CM Monitoring at Clarence Colliery

Page 16: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Introduction

Productivity Improvement

Measures

CMMonitoring

Implementation of CM Monitoring at Clarence Colliery

Operator Reports can now be generated

Weekly & Monthly adjusted to give a weighted shift average report

Kevin Rudd

Page 17: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Introduction

Productivity Improvement

Measures

CMMonitoring

CommunicationSelect Crew for Verification Work

Receptive to Change and new Technology

Competitive and safely striving for Improvement

Implementation of CM Monitoring at Clarence Colliery

Provide Panel Crews with copies of the reports

Assists to maintain Trust

Collected on Night ShiftCovers the previous three Shifts

System ManagementFEP Downloads

Page 18: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Introduction

Productivity Improvement

Measures

CMMonitoring

Data Analysis

Implementation of CM Monitoring at Clarence Colliery

Page 19: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Average Cutting minutes Per Shift Per Day - Clarence JM5221Target is 180 min

90109

94

49

128107

53

89112

89

0

20

40

60

80

100

120

140

160

180

200

Mon 2 Feb Tue 3 Feb Wed 4 Feb Thu 5 Feb Fri 6 Feb

Min

ute

s

Night Shift Day Shift Afternoon Shift Ave Day Shift Ave Aft Shift Target

Night Shift Day Shift Afternoon Shift Ave All Shifts TotalAve Last Month 0 83 131 107 214Ave Last Week 0 94 90 92 184

Low Oil Low Oil (2 times), Power out, Main fans off on O/Temp

CM cable SC319 & SC15

Only 1 SC

Page 20: ACARP Roadway Development Workshop

Introduction of Continuous Miner Monitoring at Clarence Colliery

Productivity Improvement Measures at Clarence Colliery

Introduction

Productivity Improvement

Measures

CM Monitoring

Conclusion