academic portfolio

28
PORTFOLIO

Upload: scott-davis

Post on 30-Mar-2016

212 views

Category:

Documents


0 download

DESCRIPTION

A collection of design work

TRANSCRIPT

PORTFOLIO

S C O T T J O H N D A V I S

B A C H E L O R S O F F I N E A R T _ C A L P O LY P O M O N AM A S T E R S O F A R C H I T E C T U R E _ S C I A R C

5 6 2 - 7 1 5 - 1 5 3 5 S J D 3 7 S T E R @ G M A I L . C O M

C O N T E N T S

01

0522 172114 17210605

1418 22

21 10 18 1410

1417 1320 2414

24 21

13

10

05 0518 06

22

2422

10

22

13

182414 24

0605 21

05

17 06

02

1306 180905

22 231417 22

14050509

05

24

1006 101318 05

23

10 10 06

23 23

21

2209

2218 22

1717 18

03

SCHEMATIC DESIGN

04

LAND

BED CLOSET

BATH

KITCHENN

DININGG

LIVING

A A’

0 10’

MECH

B’

B

HELIOTROPEHOUSE DESIGN GENERATED THROUGH THE

USE OF TRACKING PHOTOVOLTAIC ARRAYS.

05

N

1/16 SCALETHIRD FLOOR PLAN

RADICAL FUTURESRADICAL FUTURES

ATRIUMATRIUM

AUDITORIUMAUDITORIUM

A'A

EMERGING TECHNOLOGIESEMERGING TECHNOLOGIES

EXHIBIT PREPEXHIBIT PREP

HISTORY OF ENERGYHISTORY OF ENERGY

A' A

1/16 SCALE

+4'0"

+36'0"

SECTION NORTH FACE LONG

+4'0"

+36'0"

MUSEUM OF ENERGYA CENTER FOCUSED ON EXPOSING PAST PRESENT AND FUTURE

CONCERNS SURROUNDING THE WORLD OF ENERGY PRODUCTION

AND USE. FRACTURED SLAB SPANNING THREE PIERS.

FASHION/TEXTILE TECHNOLOGY INSTITUTE THIS SCHOOL EXTENDS THE CITY LANDSCAPE UP AND OVER THE

BUILDING PROVIDING SPACE FOR PUBLIC AKIN TO THE STEPS OF

MUSEUMS AND CATHEDRALS. INTERIOR PROGRAM FOLDS UP

AND DOWN CREATING DEPRESSIONS THAT DEFINE SPACES.

LOFTA TRANSPORTABLE SOLAR POWERED HOUSE DESIGNED FOR

A CO-OP BASED APPROACH TO MICRO ENERGY PRODUCTION

AND USE. “LOFT” IS DESIGNED TO CONNECT RESIDENTS

TO A SERIES OF ENERGY PRODUCTION AND SUSTAIN

ABLY MINDED PRACTICES IN A MODERN, LOW IMPACT

DEVELOPMENT.

06

DESIGN DEVELOPMENT07

08

FACADE GEOMETRY RATIONALIZATION OF OFFICE TOWER

DD SECTION OF OFFICE TOWER

CRANING SEQUENCE DIAGRAM09

20'0"

20'0"

20'0"

20'0"

20'0"

20'0"

20'0"

20'0"

20'0"

20'0"

20'0"20' by 20' constant grid interval20' by 20' constant grid interval20' by 20' constant grid interval20' by 20' constant grid interval20' by 20' constant grid interval20' by 20' constant grid interval20' by 20' constant grid interval

20'-0"

16'0"

16'-9"

15'3"

9'-10"

7'9"

5'3"

8'-11"

8'11"

12'3"

3'7"16'-10"

18'7"18'-4"

16'8"

17'0"

5'10"

8'-9"

1'-10"

1'-0"

8'-0"

18'-6"

5'9"

3'0"

15'10"

3'2"

19'-4"

4'6"

9'3"

19'6"

2'-0"

4'3"15'-1"

4'-10"

2'6"

9'-9"

10'7"

7'-1"

9'7"17'11"

3'-10"

10'-9"

11'-7"

9"6'-2"

6'-7"17'0"

1'1"

6'-7"

14'10"7'11"

16'-9"

14'-5"

19'-11"

2'4"

16'8"

20'0"20'0"

20'0"

LEVEL 14 ELEVATION 205'6" LEVEL 13 ELEVATION 190' 6" LEVEL 12 ELEVATION 175' 6" LEVEL 11 ELEVATION 156' 0" LEVEL 10 ELEVATION 138' 6" LEVEL 9 ELEVATION 116' 6" LEVEL 8 ELEVATION 95' 6"

PASSIVE AIR CONDITIONING

POPULATION STUDY FRESNO

OFFICE TOWER PLAN

HAVANA CITY ANALYSISBUILDING SHELL RATIONALIZATION

10

ART & DESIGN11

12

A

B

C

F

H

G

I

J

P

Q

R

S

O

N

T

M

K

L

E

D

MODULAR STAGE and PODtesselated drumsplywood and polypropylene

informal colloquium

module

cluster

assemly diagram

storage

n

DIGITAL RENDERINGCONTE CRAYON AND CHARCOAL

MODULAR STAGEPLYWOOD AND ACRYLIC

CONSTRUCTION

13

650’

650’

650’

670’

670’

670’

670’

670’

670’

740’ 760’

740’

740’

870’

740’

770’

770’

770’

850’

690’

650’ 630’

6

BASIN

BASIN GARDEN PLATFORM

GARDEN PLATFORM

GARDEN PLATFORM

RECREATION PLATEAU

RECREATION PLATEAU

GARDEN PLATFORM

INTERIOR GREENHOUSE

BASIN

DIUM

formal panel exhibition display

CHARCOAL AND GRAPHITE FIGURE DRAWING

14

CHIP 2011

15

16

202

101

201

1/4" = 1'-0"PLANS

4' 8'0 2'

5'-0

3 _ 4"

6'-9

3 _ 4"

2'-11

1 _ 4"

7'-1

1 _ 4"

11'-0" 1'-11"

3'-0"

91 _ 4"

6'-7 1_2 "

5'-9 1_2 "

3'-0"

5'-11"

111_

2"

9'-10"

1'-0"

7'-1

1 _ 2"

3'-6

1 _ 4"

1'-3

3_4 "3'-1

3_4 "2'-8

1_2 "

1'-8"

4'-0

"5'-3

1_4 "

2'-111_2"

21'-4"

18'-6

3 _ 4"

12'-1

01_4 "

3'-0

"

12'-51_

4"

18'-4

3 _ 4"

11'-01_4"

2'-7"

5'-0"

5'-8

3 _ 4"

10'-33_4"

31_2"4"

1. SEE SHEET L-102 FOR DECK DETAILS

1. DIMENSIONS (ON THIS SHEET ONLY) DRAWN TOPARTITION WALLS ARE TO FACE OF STUD.

A1

301

A4

C4

A-213

A

31

A-213

2

1

1

A2

D4A4

C1

A-213

A3

D3

A-211

2

301

BATHROOM

401

DRESSING

402

LAUNDRYROOM

202

KITCHEN

201

101

LIVINGROOM

A-301

A2

A-202

A1

A-202

C1

A-201

C1

A-201

A1

UP

A-301

A2

DECKAREA

102

302

GROOMING

RAMPDOWN

RAMPDOWN

UP

C

DINING

FOF +10'-1 1/4"

FOF +7'-1 1/4"

FOF +5'-1 1/4"

FOF +2'-7"

FOF +1'-7"

FOF +1'-7"

B

501

BED LEVEL

1

FOF

FOF

FO

S

FO

S

FOF +2'-7"

FOF +2'-7"

2

2. SEE SHEET L-103 FOR RAMP DETAILS

EXIT

ENTER

2. THE GRID "B" IS THE LINE OF ROTATION FORROOF.

4R@

71_2 "=

30"

3T@10"=

30"

4R@

71_2 "=

30"

3T@10"=

30"

C.1

FOS

FO

S

FOF

3. THE GRID "C.1" IS THE AXIS OF ROTATION FORCANTILEVER EXTERIOR ENVELOPE.

3. LINE OF OVERHANG CABINETS ABOVE, TYP.

4. LINE OF REMOVABLE CABINETS, TYP.

REF

DW

A-302

C3

A-302

C3

5

5

5. =LINE OF ELEVATION CHANGE, TYP.

3

4

N

1

31 2

FO

SFO

S

FO

S

A

C

B

FOF

FOF

FOF

C.1 FOS

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 03.22.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HOUSE, INFINITE POSSIBILITIES

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

CONSTRUCTION DRAWING SET 03/22/2011

DESIGN DOCUMENTATION SET 11/23/2010

3/29

/201

1 12

:17:

19 A

M

A-111

PLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

05 LU 28

06 16 00.D6

06 11 00.D05

06 11 00.G13

06 16 00

13 31 33

06 16 00.D10

06 11 00.F12

08 14 00

06 16 00

06 16 00.D6

13 31 33

1-1/2" = 1'-0"EAST WALL SECTION

1-1/2" = 1'-0"WEST WALL SECTION

32

0 1/2' 1' 2'0 1/2' 1' 2'

MODULE SPLIT10'-3"

MODULE SPLIT

KITCHEN LEVEL2'-9"

GRADE LEVEL GRADE LEVEL

LIVING ROOM LEVEL2'-0"

10'-3"

T.O.PLYT.O.PLY

05 12 73.L263 / 05 50 00

1.

DIVISION 07 - THERMAL / MOISTURE

2.

05 LU 28 2X8 HANGER

BATT INSULATION07 21 16.A10

2" ALUMINUM TEE AND ANGLE05 14 13

2" RIGID INSULATION07 21 13.B4

26 31 00

07 21 13.B4

07 21 16.A10

07 2116.A10

05 16 69.K6 2" STEEL PIPE2" STEEL HALF BATTEN PIPE CLAMP05 50 00

05 05 00 ALUMINUM RAILNG

05 14 13

2X4 FRAMING - SOLID WOOD WALLS06 11 00.D05

06 16 00.D6 1/2" PLYWOOD06 16 00 1/2" PLYWOOD - OSB

07 2116.A10

07 2116.A10

06 16 00.D10 5/8" PLYWOOD - UNDERSIDE / ROOF

06 11 00.F12 2X6 FRAMING - FLOOR JOIST

DIVISION 08 - OPENINGSWEST DOOR ENTRY08 14 00

06 11 00.G13 2X8 RAFTERS @ 12" O.C.

TUBE SHAPE05 12 73.L263

CONTINUOUS FLEXIBLE VINYL09 91 23MEMBRANE

DIVISION 09 - FINISHES

VINYL COATED POLYESTER13 31 33MEMBRANE

DIVISION 13 - SPECIAL CONSTRUCTION

PV PANELS26 31 00DIVISION 26 - ELECTRICAL

A4A2

1

2

3

4

5

6

7

8

9

10

11

12

B5

L-103

B4

A-321

F.O

.S

F.O

.S

COMPOSITEDIVISION 06 - WOODS, PLASTICS, AND

DIVISION 05 - METALS

1. MODULE SPLITS OCCUR IN FOUR PLACESREFER TO EACH SPLIT FOR SPECIFIC DETAILS

2. MECHANICAL CRAWL SPACE ABOVE KITCHEN

3. WOOD PANEL SINGLE LIGHT DOOR TYPICAL ATWEST AND EAST DOORS SHEET A-601 FORDOOR SCHEDULE

4. FLOOR LEVEL OF EAST WALL IS CUT AT LOWERLIVING ROOM LEVEL

5. WOOD SPACER TO RAISE CONNECTION POINT

6. 3/16"x10.5" STEEL PTD. SCREW WITH 2 1/8"PTD. WASHERS AND 1 1/4" PTD. SPACER TYP.

7. 1/2" GRADE 8 MOUNTING BOLT

8. 1/2" PTD PLYWOOD DOOR TRIM ASSEMBLY W/ HARDWOOD DRIP

9. 1/16" PLASTIC SHEET BEND TO FORM

10. 1/2" STEEL HANG BRACKET WITH WOOD DOWEL

11. 2X8 FOUNDATION WITH 3/8" BOLT

12. VINYL DRIP BLOCK

SECTIONS INDICATE COMPONENTS OF ACOMPLETE TRANSVERSE SECTION

2. ANNOTATION DENOTES INDIVIDUAL ELEMENTSONLY ONCE YET INDICATES TYP. REPEATEDCONDITIONS IN OTHER AREAS OF THE SECTIONU.O.N.

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 03.22.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HOUSE, INFINITE POSSIBILITIES

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

CONSTRUCTION DRAWING SET 03/22/2011

DESIGN DOCUMENTATION SET 11/23/20103/

29/2

011

12:1

7:39

AM

A-312

WALL SECTION

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

CHIP THE “COMPACT HYPER-INSULATED PROTOTYPE” IS DESIGNED

TO CHALLENGE EVERY ARCHITECTURAL AND ENGINEERING

PRECONCEPTION REGARDING THE NET-ZERO-ENERGY HOME.

CHIP IS THE RESULT OF A 2-YEAR RESEARCH, DESIGN, AND

CONSTRUCTION COLLABORATION BETWEEN

SCIARC AND CALTECH.

CHIP2011.COM

17

11/2" = 1'-0"NORTH WALL SECTION

11/2" = 1'-0"SOUTH WALL SECTION

0 1' 11/2'

1/2" 0 1' 11/2'

1/2"

T.O ROOF17'-4"

SOLAR ENVELOPE18'-0"

MODULE SPLIT10'-3"

26 31 0005 14 13

07 21 13.B406 16 00.D1006 11 00.G14LU28JOISTHANGER07 21 16.A10

06 18 13.A10

32 05 19.1307 21 13.B4

06 16 00.D6

06 48 13

09 64 1906 16 23

07 21 16 A1006 16 00.D10

06 19 1306 11 00.F1

1% SLOPE ROOF

06 11 00.F2

06 16 2307 21 16.A1006 11 00.G3

LU28

06 11 00.L6LSSU210

05 05 2306 11 00L.606 11 00.G7

08 52 00

06 43 00.C2

26 31 00

05 14 13

05 50 00

05 12 69.K6

06 16 00.D10

LU28

06 11 00.G14

06 18 13.A12

06 05 23.B0

26 31 00

07 21 16.A10

06 18 13.A10

06 16 00.D6

06 16 00.D10

06 16 00.D6

07 21 13.B4

13 31 00.A1

13 31 33

06 16 00.D606 16 2309 64 19

06 11 00.G7

08 35 13.13

06 15 13

LU2807 21 16.A10

06 11 00.G7

05 05 23

06 11 00L.6

05 05 23.A3

06 05 23.B1

08 52 00

07 31 00 CT

MODULE SPLIT10'-3"

A1

FIRST LEVEL1'-9"

A4

DIVISION 07 - Thermal and Moisture

BATT INSULATION07 21 16.A10METAL GRATINGS05 53 00

DIVISION 05 - METALS05 05 00 ALUMINUM RAILNG

SHEET METAL (FALSE PANELS)05 50 00METAL GRATINGS05 53 00

DIVISION 26 - Electrical26 31 00 PV Panels

2" ALMINIUM TEE, 2" ALMINIUM ANGLE05 14 13

2" OR 3" RIGID INSULATION07 21 13.B4

DIVISION 06 - WOODS, PLASTICS,

FRAMING- RAFTERS06 11 00.G14

PLYWOOD- EXTERIOR WALL SHEATING06 16 00.D6PLYWOOD- UNDERSIDE AND06 16 00.D10

EXTERIOR GRADE FINISH PLYWOOD06 48 13

PLYWOOD- EXTERIOR WALL SHEATING06 19 00.D6

4X10 LAMINATE VENEER LUMBER06 18 13.A10

DIVISION 32 - EXTERIOR IMPROVEMENTS32 05 19.13 GEO-TEXTILE GROUND COVER

-06 11 00.F1-06 11 00.F2

-06 19 13

DIVISION 09 - FINISHES

NORTH WINDOW ASSEMBLY08 52 00

-06 16 23

FRAMING-4x8 BEAM06 11 00.L6

2X8 HANGERLU28ADJUSTABLE HANGERLSSU210

05 05 23 1/4" STEEL PLATE

FRAMING- FLOOR JOSITS06 11 00.G7

1-1/2" ROUND RAIL06 43 00.C2

DIVISION 08 - OPENING

FLOORING MATERIALS09 64 19

SOUTH BI-FOLD (4 PANEL) DOOR:08 35 13.13

3/8" 3.5" LAG SCREW06 05 23.B1

3/8" 3.5" LAG SCREW06 15 13

6X10 LAMINATE VENEER LUMBER06 18 13.A12

10" LAG SCREW06 05 23 B0

AND COMPOSITIONS

ROOF SHEATING

Protection

NANAWALL

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 03.22.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HOUSE, INFINITE POSSIBILITIES

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

CONSTRUCTION DRAWING SET 03/22/2011

DESIGN DOCUMENTATION SET 11/23/2010

3/29

/201

1 12

:17:

38 A

M

A-311

WALL SECTIONS

REFERENCE KEYNOTES

18

19

FABRICATION & CONSTRUCTION

20

SOLAR DECATHLON “CHIP”INTERIOR

21

STARBUCKS PERGOLA

VILLA ROTUNDA MASSING DIAGRAM

PRECAST, MODULAR CONCRETE ARCH

GRAD SCHOOL APPLICATION PORTFOLIO

22

MICHAEL MALTZAN COMPETITION ENTRYST. PETERSBURG, FL PIER DESIGN

23

PRIMAL RECLAIMEDFOUND BULLET CASINGSAND COPPER PIPE

WOVEN STEEL CLOTH

MILLED FOAM MASS WITH VACU-FORMED PLASTIC SHELL

PLASTER CASTING

24

S C O T T J O H N D A V I SB A C H E L O R S O F F I N E A R T _ C A L P O LY P O M O N A

M A S T E R S O F A R C H I T E C T U R E _ S C I A R C

5 6 2 - 7 1 5 - 1 5 3 5 S J D 3 7 S T E R @ G M A I L . C O M