AMETI 1 About AMETI The Auckland Manukau Eastern Transport Initiative (AMETI) is a group of transport projects for the eastern suburbs. The aim is to give people living in the area transport choices by improving public transport, walking and cycling facilities and reducing traffic congestion. Other major aims are to unlock the economic potential of the area and to promote good urban design. The need Severe congestion in the area is holding back the huge potential for economic growth in the area – there are a number of sites ripe for redevelopment if key transport links are improved. There is potential for 40,000 new jobs in the area. Public transport use is very low, less than four cent of all journeys, because it isn’t a realistic travel choice people have to drive. The population is also expected to grow by 20-25,000 during the next 20 years, further increasing pressure on the transport system. The plans AMETI will see a major focus on public transport improvements, including a busway with high frequency services that will eventually run between Botany, Pakuranga and Panmure Getting more people onto public transport will free up roads for freight and business traffic. A number of roading improvements will ensure roads work effectively Local journeys and public transport will be focused on the Panmure Bridge route The Waipuna Bridge and south eastern highway will become the primary route for through traffic to Auckland central and freight/ business traffic

Upload: others

Post on 24-Jan-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • AMETI

    1

    About AMETI

    The Auckland Manukau Eastern Transport Initiative (AMETI) is a group of transport projects for the eastern suburbs. The aim is to give people living in the area transport choices by improving public transport, walking and cycling facilities and reducing traffic congestion.

    Other major aims are to unlock the economic potential of the area and to promote good urban design.

    The need

    Severe congestion in the area is holding back the huge potential for economic growth in the area – there are a number of sites ripe for redevelopment if key transport links are improved. There is potential for 40,000 new jobs in the area.

    Public transport use is very low, less than four cent of all journeys, because it isn’t a realistic travel choice people have to drive.

    The population is also expected to grow by 20-25,000 during the next 20 years, further increasing pressure on the transport system.

    The plans

    • AMETI will see a major focus on public transport improvements, including a busway with high frequency services that will eventually run between Botany, Pakuranga and Panmure

    • Getting more people onto public transport will free up roads for freight and business traffic. A number of roading improvements will ensure roads work effectively

    • Local journeys and public transport will be focused on the Panmure Bridge route

    • The Waipuna Bridge and south eastern highway will become the primary route for through traffic to Auckland central and freight/business traffic

  • AMETI

    2

    • To inform on the next steps

    • Designation of footprints for work

    • Proposals for new AMETI road

    • Updated plans for bus and rail station

    • Explain the construction timeline for works

    What you said at the last open day: What was covered in the last open day on Saturday 16th October:

    Rapid Transit Network proposal along Ellerslie Panmure Highway and Lagoon Drive

    There was support for the proposal and for developing functional public transport options

    Why are we here today?

    Revised Panmure intersection including the bus/rail station and traffic movements through the intersection

    • To consult on proposals around Van Damm’s Lagoon and mitigation concepts

    • Give an update on progress and changes since last open day on Saturday 16th October 2010 including busway proposals and Panmure Bridge

    • To listen to your comments

    What has been done since then? Main Changes

    Proposed extension of AMETI link road to Triangle Road, with northbound link from William Harvey Place

    Proposed replacement of footbridge across rail between Ireland Road and WHP with wider longer bridge spanning new road with disabled accessibility

    Proposed “green wall” planting alongside Panmure Rail station western platform

    Developed Design for Phase 1

    • Assessment of Environmental Effects on Phases 1 and 1a

    • Improvements in and around Panmure Station

    • Proposed landscaping plans for the new road alignment and around the new bus/rail station

    Completed preliminary design of interchange

    Confirmed the layout of the intersection and addressed traffic movement questions

    What has been done:

    Mostly positive feedback about the revised Panmure intersection and the benefits for pedestrians and cyclists but still some questions about traffic movements around greater Panmure, especially from the north east.

  • AMETI

    3

    AMETI Panmure TimingConstruction: 2011 - 2014

    Status: Proceeding to final design and consenting

    • AMETI road

    • Mountain Road diversion

    • E-P Highway lifting

    • E-P Highway busway bridge

    • Covered Box for rail and new AMETI road

    • Local road over covered box

    • Replace footbridge over rail between Ireland Road and William Harvey Place

    Construction: 2014 - 2016

    Status: Still at concept stage. Opportunity for feedback will be at a later date

    • Panmure Roundabout replacement

    • Lagoon Drive Bus Priority

    Construction: 2015+

    Status: Still at consent stage. Opportunity for feedback will be at a later date

    • AMETI road extension

    PANMURE BASIN

    MT WELLINGTON

    STONEFIELDS

    PANMURE ROUNDABOUTELLERSLIE-PANMURE HWY

    MT WELLINGTON HWY

    PLEASANT VIEW RD

    QUEENS RD

    CHURCH RD

    LAGOON DRIVE

    IRELAND RD

    WILLIAM HARVEY PL

    PANMURE BRIDGE

    MOUNTAIN RDFRASER RD

    JELLICOE RD

    PILKINGTON RD

    TAINUI RD

    HANNIGAN DRIVE

    HOMESTEAD RD

    COLLEGE RD

    LUNN AVE

    POINT ENGLAND RD

    TRIPOLI RD

  • AMETI

    4

    Changes to Traffic Movements from Jellicoe Road Following Roundabout Replacement

    Existing

    • Currently 38% of southbound Jellicoe Road traffic is destined for Mt Wellington Highway, 18% to Lagoon Drive and 16% to E-P Highway.

    • 11% is destined for Ireland Road (much of this is rat running to Carbine Road).

    • 11% go back up Jellicoe Road, presumably after visiting Panmure town centre.

    Future

    • 45% of current southbound Jellicoe Road traffic will divert to the new AMETI link, including some trips currently using Ireland Road and Lagoon Drive. Traffic headed to E-P Highway will use Mountain Road / Forge Way, or divert elsewhere (eg Lunn Ave).

    • Some of the traffic using Ireland Road (rat run) and Lagoon Drive (to Pakuranga / Botany) is likely to divert to the AMETI Road and Mt Wellington Highway.

    Return via Jellicoe 11%

    Mt Wellington Highway 38%

    Ireland Road 11%

    Lagoon Drive 18%

    Church/Tripoli/ Kings 2%

    Ellerslie - Panmure Highway 16%

    Pilkington Road 4%

    Church/Tripoli/ Kings 2%

    Pilkington Road 4%

    Return via Jellicoe 11%

    Potential future link Mountain Road to Fraser Road

    Lagoon Drive via Queens Road 16%

    Ireland Road 6%

    Ellerslie - Panmure Highway 16%

    Mt Wellington Highway via AMETI Road 45%

  • AMETI

    5

    Designation Outlines

    Realignment of Mountain Road and Ellerslie Panmure Highway (Phase 1a)

    Auckland Transport will submit a Notice of Requirement to Auckland Council in April 2011 of its requirement for a designation in the Auckland City District Plan: Isthmus Section for public works in the vicinity of Mountain Road, Mountwell Crescent, Forge Way, Ellerslie Panmure Highway, and Jellicoe Road.

    Statutory approvals will also be required for:

    • The proposed Park and Ride Facility at 528 536 Ellerslie Panmure Highway (Auckland Transport)

    • The proposed upgrades to Panmure Station (Auckland Transport).

    AMETI Link Road - Mt Wellington Highway to Tainui Road (Phase 1)

    Auckland Transport intend to submit a Notice of Requirement to Auckland Council in August 2011 of its requirement for a designation in the Auckland City District Plan: Isthmus Section for public works for the AMETI Link Road between Mt Wellington Highway (Triangle Road) to Tainui Road.

    Construction of the new road linking Mt Wellington Highway and Morrin Road will remove some through traffic from the town centre and will serve proposed developments to the north of Panmure. Construction is expected to start in 2012.

    This designation will include mitigation proposals to off-set the impact of the proposal on Van Damm’s Lagoon.

    Ellerslie Panmure Highway to Panmure Bridge (Phase 2)

    This next stage is currently at concept stage. Detailed design will begin later this year. Statutory approvals will be sought in 2012.

    Statutory approvals

    There will be an opportunity for the public to make submissions on the project through the NOR process for Phase 1 and 2. Details of the proposal are likely to be advertised in the newspapers, Council publications and online.

    Revised Panmure Interchange

    Proposed Urban Busway

    ELLERSLIE-PANMURE HWY

    VAN DAMM’S LAGOON

    MT WELLINGTON

    MT WELLINGTON HWY

    LAGOON DRIVE

    JELLICOE RD

    TAINUI RD

    Existing Designation

    TRIANGLE RD

  • AMETI

    6

    AMETI Road (North)The proposal is for a new two lane road from Morrin Road in the north to Mt Wellington Highway in the south

    • Long term proposal is to make it four lanes (post 2020)

    • Morrin Road to be widened to four lanes between Fraser and Tainui

    • Improved vehicle access

    • Safe pedestrian and cycle facilities

    • Boulevard style large tree plantings Tainui Road IntersectionFraser Road Intersection

    Planted Median

    Exposed Rock Wall

    Shared Cycle and Footpath

    Boulevard Tree Planting

    Railway

    FRASER ROAD

    Pedestrian Crossing at Intersection

    TAINUI ROAD

    MOUNTAIN ROAD

    Key

    Shrub planting

    Groundcover planting

    Specimen Tree

  • AMETI

    7

    AMETI Road Through Covered Box• Between Mountain Road and Ellerslie-Panmure Highway the new road will be

    covered

    • Another road will be built on top, for local buses and providing access to the station for drop off and taxis

    • Mountwell Crescent will be realigned to connect with the new road

    Cross Section Intial Scheme 2012-2014

    Full AMETI Scheme (Post 2020)

    Short Term Parking & Taxis

    Mountwell Crescent Connection

    Local Bus Road & Stops

    Panmure Rail Station

    Cross Section Area

    Roundabout Replacement Design to be confirmed in

    Phase 2

    Mountain Road Realignment

    Jellicoe Road

    Rapid Transit Network Road and

    Station

    General Traffic and Cycle Lanes

    New AMETI Road

    Replacement of Ellerslie - Panmure

    Highway Bridge

  • AMETI

    8

    AMETI Road (South)• New road extended to meet Mt Wellington Highway near Triangle

    Road

    • Initial two lane scheme has limited impact on Van Damm’s Lagoon

    • Footbridge between Ireland Road and William Harvey Place to be replaced with wider longer bridge with disabled access ramps

    • Left turn from William Harvey Place onto the new road provided

    ELLERSLIE-PANMURE HWY

    MT WELLINGTON HWY

    WILLIAM HARVEY PL

    Shared Cycle and Footpath

    Boulevard Tree Planting

    RailwayImproved Footbridge

    New Feature Tree Planting

    New Wetland Feature

    Van Damm’s Lagoon

    Key

    Shrub planting

    Groundcover planting

    Grass

    Specimen Tree

  • AMETI

    9

    Panmure InterchangeUpdated intersection/bus/rail station plan showing pedestrian connections

    • Pedestrian connections around the station will be improved

    • Interchange between buses and rail will be enhanced

    • Development of the proposed Transit Orientated Development (TOD) will be enabled

    Mountwell Crescent Connection

    Local Bus Road & Stops

    Forge Way

    Roundabout Replacement Design to be confirmed in

    Phase 2

    Mountain Road Realignment

    Jellicoe Road

    Rapid Transit Network Road and

    Station

    General Traffic and Cycle Lanes

    Short Term Parking &

    Taxis

    New AMETI Road

    Replacement of Ellerslie - Panmure

    Highway Bridge

    Pedestrian Link

    Key

    Street Connections

    Mt Wellington/Town Centre pedestrian linkage

    Building blocks from Auckland Council masterplan

  • AMETI

    10

    Ellerslie - Panmure Highway

    A. Western Abutment Section

    B. Section Over Rail Corridor

    Mountain Road Realignment

    Mountwell Crescent Connection

    Local Bus Road & Stops

    Forge Way

    Cross Section A

    Cross Section B

    New AMETI road

    ELLERSLIE - PANMURE HIGHWAY

    General Traffic and Cycle Lanes

    Bus Only Road

    Bus Shelters

  • AMETI

    11

    Public Transport Network

    GLEN INNESST JOHNS

    PANMURE

    PAKURANGA TOWN CENTRE

    MT WELLINGTON

    ELLERSLIE

    REMUERA

    BURSWOOD

    BOTANY TOWN CENTRE

    BOTANY DOWNS

    GREE

    N LA

    NE EA

    ST

    ASC

    OT

    AVE

    ABBOTS WAY

    PILK

    ING

    TON

    RO

    AD

    ELLERSLI

    E-PANMURE

    HIGHWAY

    ST JOHNS ROAD

    PENROSE ROAD

    MT

    WEL

    LIN

    GTO

    N H

    IGH

    WAY

    SOU

    THER

    N M

    OTO

    RWAY

    LUNN AVE

    PAKURAN

    GA

    ROAD

    TI RAKAU DRIVE

    CHAP

    EL R

    OAD

    BOTA

    NY

    RO

    AD

    RIDG

    E RO

    AD

    PAKURA

    NGA R

    OAD

    FARM COVE

    MERTON ROAD

    GRO

    SSA

    MER

    DR

    IVE

    HIGHLAND PARK

    SYLVIA PARK

    Existing Rapid Transit Network (RTN) Rail

    Proposed Rapid Transit Network (RTN) Bus

    Quality Transit Network (QTN) Bus

    Major Interchange

    KEY

  • AMETI

    12

    Phase 2: On Going Urban Busway Investigation

    To accommodate the urban busway, access arrangements to a number of properties will need to be modified. The project team are currently identifying issues and preparing options for discussion with land owners.

    Panmure Bridge

    The team are assessing options to widen Panmure Bridge to generate continuous busway priority between Panmure and Pakuranga.

    Alternative access arrangements for these properties

    Access mitigation for Domain Road

    Roundabout replacement design

    to be confirmed

    Key

    Proposed Bus Station locations