Aberjona River Flood Mi1ga1on Program Project 6 – Skillings Field Culvert Includes supplemental 7foot by 15foot box culvert and surface floodway Es<mated Cost ~$7.8 Million Final design and permiFng s<ll required Project to be bid in Fall 2015 to align with high school project

Upload: others

Post on 11-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Aberjona)River)Flood)Mi1ga1on)Program)) Project)6 ... · Aberjona)River)Flood)Mi1ga1on)Program)) Project)6)– Skillings)Field)Culvert)! Includes)supplemental))7/footby) 15/footbox)culvertand)surface)

Aberjona  River  Flood  Mi1ga1on  Program    Project  6  –  Skillings  Field  Culvert  

§  Includes  supplemental    7-­‐foot  by  15-­‐foot  box  culvert  and  surface  floodway  

§  Es<mated  Cost  ~$7.8  Million  §  Final  design  and  permiFng  s<ll  

required  §  Project  to  be  bid  in  Fall  2015  to  

align  with  high  school  project  

Page 2: Aberjona)River)Flood)Mi1ga1on)Program)) Project)6 ... · Aberjona)River)Flood)Mi1ga1on)Program)) Project)6)– Skillings)Field)Culvert)! Includes)supplemental))7/footby) 15/footbox)culvertand)surface)

Oil  and/or  Hazardous  Material  (OHM)  at  Skillings  field  

§  Elevated  levels  of  soil  contaminants,  par<cularly  metals  such  as  lead  and  zinc  are  present  at  depth  and  require  mi<ga<on  to  meet  regulatory  requirements.  

§  Proposed  mi<ga<on  entails  capping  implemented  with  an  Ac<vity  and  Use  Limita<on  (AUL)  which  is  a  deed  restric<on.  –  Limited  spot  excava<on  may  also  be  

needed  to  further  address  risk.    

§  VHB  has  been  reviewing  risk  reduc<on  approaches  with  MassDEP  

 

Page 3: Aberjona)River)Flood)Mi1ga1on)Program)) Project)6 ... · Aberjona)River)Flood)Mi1ga1on)Program)) Project)6)– Skillings)Field)Culvert)! Includes)supplemental))7/footby) 15/footbox)culvertand)surface)

Oil  and/or  Hazardous  Material  (OHM)  at  Skillings  field  

§  MassDEP  preliminary  approved  a  cap  consis<ng  of  2-­‐foot  clean  fill  cover  with  a  boZom  marker  layer  and  sewn  geotex<le  in  vegetated  areas.  

§  Vegetated  Cap  covers  ~7.2  Acres,  requiring  disposal  of  ~23,000  Cubic  Yards  of  material  

§  Es<mated  cost  ~$4.2  Million  

Page 4: Aberjona)River)Flood)Mi1ga1on)Program)) Project)6 ... · Aberjona)River)Flood)Mi1ga1on)Program)) Project)6)– Skillings)Field)Culvert)! Includes)supplemental))7/footby) 15/footbox)culvertand)surface)

Skillings  Field  Improvements  

§  High  school  renova<ons  include  new  parking  and  turf  baseball  field  

§  Gale  Associates  has  performed  a  schema<c  layout  and  pre-­‐design  cost  es<mate  for  a  synthe<c  baseball  field  with  a  combined    mul<purpose  synthe<c  field  

§  Es<mated  cost  ~$2.75  Million  –  Synthe<c  Fields    -­‐    $1.8  Million  –  Ligh<ng  -­‐  $0.8  Million  –  Bleachers  -­‐  $0.15  Million  

Page 5: Aberjona)River)Flood)Mi1ga1on)Program)) Project)6 ... · Aberjona)River)Flood)Mi1ga1on)Program)) Project)6)– Skillings)Field)Culvert)! Includes)supplemental))7/footby) 15/footbox)culvertand)surface)

Cost  Summary  

§  Completed  Separately  –  Project  6                                                    -­‐      $7,800,000  –  Remedia<on                                      -­‐      $4,200,000  –  Field  Improvements  

•  Synthe<c  Fields    -­‐    $1,800,000  •  Ligh<ng                                -­‐  $        800,000  •  Bleachers                          -­‐  $        150,000  

–  Total                                                                  -­‐  $14,750,000  

§  If  combined  all  together  with  HS  Project  –  Project  6                                                    -­‐      $7,100,000  –  Remedia<on                                      -­‐      $4,000,000  –  Field  Improvements  

•  Synthe<c  Fields    -­‐    $1,650,000  •  Ligh<ng                                -­‐  $        800,000  •  Bleachers                          -­‐  $        150,000  

–  Total                                                                  -­‐  $13,700,000  

§  Poten1al  $1  Million  Cost  Savings