abc waters programme

5
1 ABC Waters Programme ABC Waters Programme The programme involves the transformation of our concrete drains, canals and reservoirs into beautiful, vibrant and flowing streams, rivers and lakes. Projects are divided into 3 Catchments in Singapore: Western, Central and Eastern. A total of 6 projects will be introduced in 2008.

Upload: isolde

Post on 09-Feb-2016

36 views

Category:

Documents


0 download

DESCRIPTION

ABC Waters Programme. The programme involves the transformation of our concrete drains, canals and reservoirs into beautiful, vibrant and flowing streams, rivers and lakes. Projects are divided into 3 Catchments in Singapore: Western, Central and Eastern. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ABC Waters Programme

1

ABC Waters ProgrammeABC Waters ProgrammeThe programme involves the transformation of our concrete drains, canals and reservoirs into beautiful, vibrant and flowing streams, rivers and lakes.

Projects are divided into 3 Catchments in Singapore: Western, Central and Eastern.

A total of 6 projects will be introduced in 2008.

Page 2: ABC Waters Programme

2

ABC Waters ProgrammeABC Waters Programme

Projects for Implementation in 2008

Western Watershed Catchment Manager:Black & Veatch – 2 Projects

Central Watershed Catchment Manager:C H2M Hill – 2 Projects

Eastern Watershed Catchment Manager:CPG Consultants – 2 Projects

Page 3: ABC Waters Programme

3

Western Catchment - Pandan ReservoirWestern Catchment - Pandan Reservoir

Main Features

- Amenities Centre

- Open carpark

- Viewing deck with water features

- Fishing decks

- Pavilions

- Remote Control Boating Platform

Expected Tender Calling Date : May 2008

BCA workhead: CW01/CW02

Page 4: ABC Waters Programme

4

Central Catchment - Sg Kallang - Bishan ParkSg Kallang - Bishan Park

Expected Tender Calling Date - 4th Quarter 2008

Main Features

- Drain improvement

- Feature bridges

- Landscape

- Water features

- Pavilions

Page 5: ABC Waters Programme

5

Eastern Catchment - Lower Seletar ReservoirEastern Catchment - Lower Seletar Reservoir

Expected Tender Calling Date : Apr 08

BCA Workhead: CW01/CW02

Family Bay

- Performance Stage/Water Stage

- Water Play Area

- Viewing Gallery

- Heritage Bridge with Viewing Deck

- Open Carpark

Rowers’ Bay

- Entrance Plaza

- Footpath/Walkway

- Bridge crossing