abc bid data - nh.gov - the official web site of new ... · project: completion date: july 28, 2017...

12
From Vally Rd north approx. 3 miles Pavement rehabilitation and drainage work $0.00 Amount: Awarded To: Coos LOCATION: Director of Project Development Certified by: DATE BIDS OPEN: June 22, 2016, 2:00 SCOPE OF WORK: Award Date: PROJECT: July 28, 2017 COMPLETION DATE: DIXVILLE-COLEBROOK NON-FEDERAL FED. PROJECT NUMBER: STATE PROJECT NUMBER: 40518 ABC Bid Data NON-FEDERAL 40518 DIXVILLE-COLEBROOK Contractor Bid Amount Summary of Bidders Rank A.B EXCAVATING INC 653 MAIN STREET, LANCASTER NH 03584 $2,305,586.01 A COLEMAN ALVIN J & SON INC 9 NH ROUTE 113, CONWAY NH 03818-9505 $2,480,167.00 B WINTERSET, INC. 128 WINTERSET DRIVE, PO BOX 968, LYNDONVILLE VT 05851-0968 $2,856,924.00 C Page 1 of 12 Tuesday, July 05, 2016

Upload: ngothuy

Post on 31-Mar-2018

218 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

From Vally Rd north approx. 3 miles Pavement rehabilitation and drainage work $0.00 Amount:

Awarded To:

Coos LOCATION:

Director of Project Development Certified by:

DATE BIDS OPEN: June 22, 2016, 2:00 SCOPE OF WORK:

Award Date:

PROJECT:

July 28, 2017 COMPLETION DATE:

DIXVILLE-COLEBROOK

NON-FEDERAL FED. PROJECT NUMBER: STATE PROJECT NUMBER: 40518

ABC Bid Data

NON-FEDERAL 40518 DIXVILLE-COLEBROOK

Contractor Bid Amount

Summary of Bidders

Rank

A.B EXCAVATING INC 653 MAIN STREET, LANCASTER NH 03584

$2,305,586.01 A

COLEMAN ALVIN J & SON INC 9 NH ROUTE 113, CONWAY NH 03818-9505

$2,480,167.00 B

WINTERSET, INC. 128 WINTERSET DRIVE, PO BOX 968, LYNDONVILLE VT 05851-0968

$2,856,924.00 C

Page 1 of 12 Tuesday, July 05, 2016

Page 2: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

Item No.

Quantity

Unit

Total

Unit Price

Unit Price

Total

Total

Unit Price

PS&E A.B EXCAVATING INC 653 MAIN STREET

LANCASTER, NH 03584 COLEMAN ALVIN J & SON INC 9 NH ROUTE 113

CONWAY, NH 03818-9505 Description

Items

201.101 A CLEARING AND GRUBBING $38,025.00 $65,250.00 $4,000.00 $18,000.00 $8,450.00 4.500 $14,500.00

202.7 LF REMOVAL OF GUARDRAIL $4,400.00 $6,000.00 $1.00 $4,000.00 $1.10 4,000.000 $1.50

203.3 CY UNCLASSIFIED EXCAVATION $198,800.00 $156,200.00 $15.94 $113,174.00 $28.00 7,100.000 $22.00

203.55551 U GUARDRAIL 25' EAGRT PLATFORM ALTERNATE $3,320.00 $4,000.00 $665.00 $2,660.00 $830.00 4.000 $1,000.00

203.55552

U

GUARDRAIL EAGRT OFFSET PLATFORM ALTERNATE, TL 2 $2,490.00

$3,000.00

$735.00

$2,205.00

$830.00

3.000

$1,000.00

203.601 CY EMBANKMENT-IN-PLACE $26,460.00 $14,700.00 $6.77 $14,217.00 $12.60 2,100.000 $7.00

206.1 CY COMMON STRUCTURE EXCAVATION $24,500.00 $29,400.00 $13.80 $19,320.00 $17.50 1,400.000 $21.00

206.19 CY COMMON STRUCTURE EXCAVATION EXPLORATORY $2,570.00 $2,000.00 $18.70 $935.00 $51.40 50.000 $40.00

206.2 CY ROCK STRUCTURE EXCAVATION $84,000.00 $168,000.00 $21.70 $91,140.00 $20.00 4,200.000 $40.00

209.1 CY GRANULAR BACKFILL $3,850.00 $2,500.00 $17.49 $1,749.00 $38.50 100.000 $25.00

214. U FINE GRADING $8,550.00 $35,000.00 $73,631.76 $73,631.76 $8,550.00 1.000 $35,000.00

223.2 SY SLOPE STABILIZATION BY SOIL NAILING $369,000.00 $360,000.00 $607.58 $364,548.00 $615.00 600.000 $600.00

304.301 CY CRUSHED GRAVEL $254,200.00 $205,000.00 $19.79 $162,278.00 $31.00 8,200.000 $25.00

304.35 CY CRUSHED GRAVEL FOR DRIVES $12,635.00 $15,750.00 $18.69 $6,541.50 $36.10 350.000 $45.00

403.11 TON HOT BITUMINOUS PAVEMENT, MACHINE METHOD $104,545.00 $101,500.00 $94.00 $95,410.00 $103.00 1,015.000 $100.00

403.12 TON HOT BITUMINOUS PAVEMENT, HAND METHOD $9,075.00 $6,875.00 $150.00 $8,250.00 $165.00 55.000 $125.00

403.6 LF PAVEMENT JOINT ADHESIVE $2,200.00 $625.00 $0.80 $2,000.00 $0.88 2,500.000 $0.25

403.99 TON TEMPORARY BITUMINOUS PAVEMENT $6,600.00 $3,400.00 $90.00 $4,500.00 $132.00 50.000 $68.00

410.22 GAL ASPHALT EMULSION FOR TACK COAT $4,400.00 $3,200.00 $5.00 $4,000.00 $5.50 800.000 $4.00

417. SY COLD PLANING BITUMINOUS SURFACES $11,000.00 $800.00 $25.00 $10,000.00 $27.50 400.000 $2.00

418.32 GAL EMULSIFIED ASPHALT FOR COLD PAVEMENT $37,275.00 $42,600.00 $1.60 $34,080.00 $1.75 21,300.000 $2.00

418.41 TON PLANT MIXED RECYCLED ASPHALT PAVEMENT $92,400.00 $84,000.00 $30.00 $84,000.00 $33.00 2,800.000 $30.00

418.42

CY

PLANT MIXED RECYCLED ASPHALT PAVEMENT, HAND METHOD $15,440.00

$4,000.00

$175.00

$14,000.00

$193.00

80.000

$50.00

503.101 U WATER DIVERSION STRUCTURE $4,200.00 $2,500.00 $2,035.31 $2,035.31 $4,200.00 1.000 $2,500.00

503.102 U WATER DIVERSION STRUCTURE $4,200.00 $5,000.00 $20,833.30 $20,833.30 $4,200.00 1.000 $5,000.00

503.103 U WATER DIVERSION STRUCTURE $4,200.00 $2,500.00 $3,000.00 $3,000.00 $4,200.00 1.000 $2,500.00

520.1201 CY CONCRETE CLASS A, ABOVE FOOTINGS $4,980.00 $3,000.00 $850.00 $2,550.00 $1,660.00 3.000 $1,000.00

534.3 GAL WATER REPELLENT (SILANE/SILOXANE) $200.00 $250.00 $100.00 $200.00 $100.00 2.000 $125.00

538.201

SY

BARRIER MEMBRANE, PEEL AND STICK - VERTICAL SURFACES $532.00

$200.00

$100.00

$400.00

$133.00

4.000

$50.00

544.01 LB REINFORCING STEEL $1,475.00 $3,000.00 $4.00 $2,000.00 $2.95 500.000 $6.00

570.401 CY MORTAR RUBBLE MASONRY $31,600.00 $35,000.00 $425.00 $21,250.00 $632.00 50.000 $700.00

585.2 CY STONE FILL, CLASS B $140,980.00 $95,000.00 $42.57 $161,766.00 $37.10 3,800.000 $25.00

585.3 CY STONE FILL, CLASS C $131,600.00 $100,000.00 $44.52 $178,080.00 $32.90 4,000.000 $25.00

593.421 SY GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN $35,000.00 $35,000.00 $1.97 $34,475.00 $2.00 17,500.000 $2.00

603.0001 LF VIDEO INSPECTION $3,630.00 $1,100.00 $1.86 $2,046.00 $3.30 1,100.000 $1.00

603.14412

LF

12” POLYMER COATED CORRUGATED STEEL PIPE, 0.109” THICK $5,888.00

$4,000.00

$38.39

$3,071.20

$73.60

80.000

$50.00

603.14415

LF

15" ” POLYMER COATED CORRUGATED STEEL PIPE, 0.109” THICK $14,310.00

$12,600.00

$42.47

$7,644.60

$79.50

180.000

$70.00

603.14672

LF

72" POLYMER COATED CORRUGATED STEEL PIPE, 0.138” THICK $32,000.00

$40,000.00

$639.37

$51,149.60

$400.00

80.000

$500.00

603.34112 EA 12" STEEL END SECTIONS $3,530.00 $2,000.00 $114.78 $1,147.80 $353.00 10.000 $200.00

603.34115 EA 15" STEEL END SECTIONS $3,420.00 $2,025.00 $127.93 $1,151.37 $380.00 9.000 $225.00

603.82112 LF 12" PE PIPE (TYPE C) $21,744.00 $16,200.00 $27.10 $9,756.00 $60.40 360.000 $45.00

Page 2 of 12 Tuesday, July 05, 2016

Page 3: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

Item No.

Quantity

Unit

Total

Unit Price

Unit Price

Total

Total

Unit Price

PS&E A.B EXCAVATING INC 653 MAIN STREET

LANCASTER, NH 03584 COLEMAN ALVIN J & SON INC 9 NH ROUTE 113

CONWAY, NH 03818-9505 Description

603.82115 LF 15" PE PIPE (TYPE C) $31,500.00 $25,000.00 $29.03 $14,515.00 $63.00 500.000 $50.00

603.82124 LF 24" PE PIPE (TYPE C) $9,600.00 $6,000.00 $39.16 $3,916.00 $96.00 100.000 $60.00

604.2941 U SPECIAL DROP INLET TYPE G, 4 FT DIAMETER $7,340.00 $5,000.00 $1,537.82 $3,075.64 $3,670.00 2.000 $2,500.00

605.5129

LF

12" PERF. CORR. POLYETHYLENE PIPE UNDERDRAIN - MODIFIED $20,605.00

$32,500.00

$26.30

$17,095.00

$31.70

650.000

$50.00

605.79 EA UNDERDRAIN FLUSHING BASINS $1,401.00 $1,050.00 $479.31 $1,437.93 $467.00 3.000 $350.00

606.01588

EA

FURNISH STEEL POSTS (NU-GUARD-31), 7'-6" WITH HARDWARE $3,025.00

$3,000.00

$55.00

$2,750.00

$60.50

50.000

$60.00

606.1255

U

BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT, TL 2) (STEEL POST) $7,440.00

$5,100.00

$2,250.00

$6,750.00

$2,480.00

3.000

$1,700.00

606.12551

U

BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT, TL 2 - 25') (STEEL POST) $8,360.00

$6,800.00

$1,900.00

$7,600.00

$2,090.00

4.000

$1,700.00

606.141 LF BEAM GUARDRAIL (CURVED W/CRT POSTS) $687.50 $625.00 $25.00 $625.00 $27.50 25.000 $25.00

606.15809 LF BEAM GUARDRAIL, 7’-6” STEEL POSTS (NU-GUARD-31) $118,400.00 $128,000.00 $17.85 $114,240.00 $18.50 6,400.000 $20.00

606.181

U

31" W-BEAM GUARDRAIL LONG SPAN (12.5') (STEEL POST) $2,640.00

$2,500.00

$2,400.00

$2,400.00

$2,640.00

1.000

$2,500.00

606.84 U ANCHOR FOR CURVED GUARDRAIL W/CRT POSTS $1,320.00 $1,200.00 $1,200.00 $1,200.00 $1,320.00 1.000 $1,200.00

615.033 U REMOVING TRAFFIC SIGN, TYPE C $1,030.00 $50.00 $20.00 $100.00 $206.00 5.000 $10.00

619.1 U MAINTENANCE OF TRAFFIC $7,150.00 $10,000.00 $5,256.00 $5,256.00 $7,150.00 1.000 $10,000.00

621.2 EA RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR $528.00 $480.00 $4.00 $480.00 $4.40 120.000 $4.00

621.31 EA SINGLE DELINEATOR WITH POST $15,660.00 $12,600.00 $39.50 $14,220.00 $43.50 360.000 $35.00

621.32 EA DOUBLE DELINEATOR WITH POST $247.50 $200.00 $45.00 $225.00 $49.50 5.000 $40.00

622.1 EA STEEL WITNESS MARKERS $3,256.00 $2,400.00 $37.00 $2,960.00 $40.70 80.000 $30.00

628.2 LF SAWED BITUMINOUS PAVEMENT $222.00 $100.00 $3.00 $120.00 $5.55 40.000 $2.50

641. CY LOAM $558.00 $500.00 $30.00 $300.00 $55.80 10.000 $50.00

645.3 TON EROSION STONE $16,060.00 $13,750.00 $29.85 $16,417.50 $29.20 550.000 $25.00

645.42

SY

TEMPORARY SLOPE STABILIZATION TYPE B (WILDLIFE FRIENDLY) $1,470.00

$900.00

$1.49

$894.00

$2.45

600.000

$1.50

645.44

SY

TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) $4,230.00

$3,150.00

$1.42

$2,556.00

$2.35

1,800.000

$1.75

645.51 EA HAY BALES FOR TEMPORARY EROSION CONTROL $1,420.00 $1,000.00 $10.00 $1,000.00 $14.20 100.000 $10.00

645.512 LF COMPOST SOCK FOR PERIMETER BERM $27,750.00 $22,200.00 $4.34 $24,087.00 $5.00 5,550.000 $4.00

645.531 LF SILT FENCE $13,320.00 $13,875.00 $4.93 $27,361.50 $2.40 5,550.000 $2.50

645.611 LB BONDED FIBER MATRIX (BFM) $23,800.00 $34,000.00 $1.38 $23,460.00 $1.40 17,000.000 $2.00

645.7 U STORM WATER POLLUTION PREVENTION PLAN $4,950.00 $3,000.00 $3,000.00 $3,000.00 $4,950.00 1.000 $3,000.00

645.71

HR

MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS $8,800.00

$6,500.00

$200.20

$20,020.00

$88.00

100.000

$65.00

646.2 A TURF ESTABLISHMENT WITHOUT MULCH $7,238.00 $9,400.00 $1,500.00 $7,050.00 $1,540.00 4.700 $2,000.00

646.3 A TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS $2,090.00 $2,500.00 $2,895.00 $2,895.00 $2,090.00 1.000 $2,500.00

647.1 CY HUMUS $55,800.00 $40,000.00 $15.29 $30,580.00 $27.90 2,000.000 $20.00

647.16 CY HUMUS, 6" DEEP $27,900.00 $25,000.00 $15.68 $15,680.00 $27.90 1,000.000 $25.00

670.91 U REMOVE AND RELOCATE BAR-GATE $1,230.00 $8,000.00 $1,500.00 $1,500.00 $1,230.00 1.000 $8,000.00

670.95 LF TEMPORARY SAFETY FENCE $1,095.00 $1,200.00 $0.53 $159.00 $3.65 300.000 $4.00

692. U MOBILIZATION $200,000.00 $150,000.00 $201,465.00 $201,465.00 $200,000.00 1.000 $150,000.00

698.13 MON FIELD OFFICE TYPE C $22,820.00 $21,000.00 $2,500.00 $35,000.00 $1,630.00 14.000 $1,500.00

699.

$

MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $5,000.00

$5,000.00

$1.00

$5,000.00

$1.00

5,000.000

$1.00

1006.22 $ SPECIAL WORK - SOIL TESTING $10,000.00 $10,000.00 $1.00 $10,000.00 $1.00 10,000.000 $1.00

1008.11

$

ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $10,000.00

$10,000.00

$1.00

$10,000.00

$1.00

10,000.000

$1.00

1010.15 $ FUEL ADJUSTMENT $20,000.00 $20,000.00 $1.00 $20,000.00 $1.00 20,000.000 $1.00

Page 3 of 12 Tuesday, July 05, 2016

Page 4: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

Item No.

Quantity

Unit

Total

Unit Price

Unit Price

Total

Total

Unit Price

PS&E A.B EXCAVATING INC 653 MAIN STREET

LANCASTER, NH 03584 COLEMAN ALVIN J & SON INC 9 NH ROUTE 113

CONWAY, NH 03818-9505 Description

1010.2 $ ASPHALT CEMENT ADJUSTMENT $10,000.00 $10,000.00 $1.00 $10,000.00 $1.00 10,000.000 $1.00

1010.21 $ ASPHALT CEMENT ADJUSTMENT FOR EMULSION $5,000.00 $5,000.00 $1.00 $5,000.00 $1.00 5,000.000 $1.00

Totals: $2,331,755.00 $2,305,586.01 $2,480,167.00

Page 4 of 12 Tuesday, July 05, 2016

Page 5: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

Item No.

Quantity

Unit

Total

Unit Price

Unit Price

Total

Total

Unit Price

PS&E WINTERSET, INC. 128 WINTERSET DRIVE

LYNDONVILLE, VT 05851-0968 Description

Items

201.101 A CLEARING AND GRUBBING $65,250.00 $21,000.00 $94,500.00 4.500 $14,500.00

202.7 LF REMOVAL OF GUARDRAIL $6,000.00 $2.50 $10,000.00 4,000.000 $1.50

203.3 CY UNCLASSIFIED EXCAVATION $156,200.00 $30.50 $216,550.00 7,100.000 $22.00

203.55551 U GUARDRAIL 25' EAGRT PLATFORM ALTERNATE $4,000.00 $700.00 $2,800.00 4.000 $1,000.00

203.55552

U

GUARDRAIL EAGRT OFFSET PLATFORM ALTERNATE, TL 2 $3,000.00

$660.00

$1,980.00

3.000

$1,000.00

203.601 CY EMBANKMENT-IN-PLACE $14,700.00 $3.00 $6,300.00 2,100.000 $7.00

206.1 CY COMMON STRUCTURE EXCAVATION $29,400.00 $10.00 $14,000.00 1,400.000 $21.00

206.19 CY COMMON STRUCTURE EXCAVATION EXPLORATORY $2,000.00 $50.00 $2,500.00 50.000 $40.00

206.2 CY ROCK STRUCTURE EXCAVATION $168,000.00 $10.00 $42,000.00 4,200.000 $40.00

209.1 CY GRANULAR BACKFILL $2,500.00 $22.00 $2,200.00 100.000 $25.00

214. U FINE GRADING $35,000.00 $25,000.00 $25,000.00 1.000 $35,000.00

223.2 SY SLOPE STABILIZATION BY SOIL NAILING $360,000.00 $540.00 $324,000.00 600.000 $600.00

304.301 CY CRUSHED GRAVEL $205,000.00 $45.00 $369,000.00 8,200.000 $25.00

304.35 CY CRUSHED GRAVEL FOR DRIVES $15,750.00 $55.00 $19,250.00 350.000 $45.00

403.11 TON HOT BITUMINOUS PAVEMENT, MACHINE METHOD $101,500.00 $110.00 $111,650.00 1,015.000 $100.00

403.12 TON HOT BITUMINOUS PAVEMENT, HAND METHOD $6,875.00 $150.00 $8,250.00 55.000 $125.00

403.6 LF PAVEMENT JOINT ADHESIVE $625.00 $0.80 $2,000.00 2,500.000 $0.25

403.99 TON TEMPORARY BITUMINOUS PAVEMENT $3,400.00 $124.00 $6,200.00 50.000 $68.00

410.22 GAL ASPHALT EMULSION FOR TACK COAT $3,200.00 $5.00 $4,000.00 800.000 $4.00

417. SY COLD PLANING BITUMINOUS SURFACES $800.00 $26.00 $10,400.00 400.000 $2.00

418.32 GAL EMULSIFIED ASPHALT FOR COLD PAVEMENT $42,600.00 $1.60 $34,080.00 21,300.000 $2.00

418.41 TON PLANT MIXED RECYCLED ASPHALT PAVEMENT $84,000.00 $36.00 $100,800.00 2,800.000 $30.00

418.42

CY

PLANT MIXED RECYCLED ASPHALT PAVEMENT, HAND METHOD $4,000.00

$183.00

$14,640.00

80.000

$50.00

503.101 U WATER DIVERSION STRUCTURE $2,500.00 $2,500.00 $2,500.00 1.000 $2,500.00

503.102 U WATER DIVERSION STRUCTURE $5,000.00 $30,000.00 $30,000.00 1.000 $5,000.00

503.103 U WATER DIVERSION STRUCTURE $2,500.00 $2,500.00 $2,500.00 1.000 $2,500.00

520.1201 CY CONCRETE CLASS A, ABOVE FOOTINGS $3,000.00 $1,400.00 $4,200.00 3.000 $1,000.00

534.3 GAL WATER REPELLENT (SILANE/SILOXANE) $250.00 $94.00 $188.00 2.000 $125.00

538.201

SY

BARRIER MEMBRANE, PEEL AND STICK - VERTICAL SURFACES $200.00

$125.00

$500.00

4.000

$50.00

544.01 LB REINFORCING STEEL $3,000.00 $4.00 $2,000.00 500.000 $6.00

570.401 CY MORTAR RUBBLE MASONRY $35,000.00 $485.00 $24,250.00 50.000 $700.00

585.2 CY STONE FILL, CLASS B $95,000.00 $48.00 $182,400.00 3,800.000 $25.00

585.3 CY STONE FILL, CLASS C $100,000.00 $55.00 $220,000.00 4,000.000 $25.00

593.421 SY GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN $35,000.00 $2.00 $35,000.00 17,500.000 $2.00

603.0001 LF VIDEO INSPECTION $1,100.00 $2.00 $2,200.00 1,100.000 $1.00

603.14412

LF

12” POLYMER COATED CORRUGATED STEEL PIPE, 0.109” THICK $4,000.00

$67.00

$5,360.00

80.000

$50.00

603.14415

LF

15" ” POLYMER COATED CORRUGATED STEEL PIPE, 0.109” THICK $12,600.00

$69.00

$12,420.00

180.000

$70.00

603.14672

LF

72" POLYMER COATED CORRUGATED STEEL PIPE, 0.138” THICK $40,000.00

$833.00

$66,640.00

80.000

$500.00

603.34112 EA 12" STEEL END SECTIONS $2,000.00 $200.00 $2,000.00 10.000 $200.00

603.34115 EA 15" STEEL END SECTIONS $2,025.00 $214.00 $1,926.00 9.000 $225.00

603.82112 LF 12" PE PIPE (TYPE C) $16,200.00 $67.00 $24,120.00 360.000 $45.00

Page 5 of 12 Tuesday, July 05, 2016

Page 6: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

Item No.

Quantity

Unit

Total

Unit Price

Unit Price

Total

Total

Unit Price

PS&E WINTERSET, INC. 128 WINTERSET DRIVE

LYNDONVILLE, VT 05851-0968 Description

603.82115 LF 15" PE PIPE (TYPE C) $25,000.00 $70.00 $35,000.00 500.000 $50.00

603.82124 LF 24" PE PIPE (TYPE C) $6,000.00 $88.00 $8,800.00 100.000 $60.00

604.2941 U SPECIAL DROP INLET TYPE G, 4 FT DIAMETER $5,000.00 $3,250.00 $6,500.00 2.000 $2,500.00

605.5129

LF

12" PERF. CORR. POLYETHYLENE PIPE UNDERDRAIN - MODIFIED $32,500.00

$37.00

$24,050.00

650.000

$50.00

605.79 EA UNDERDRAIN FLUSHING BASINS $1,050.00 $500.00 $1,500.00 3.000 $350.00

606.01588

EA

FURNISH STEEL POSTS (NU-GUARD-31), 7'-6" WITH HARDWARE $3,000.00

$68.00

$3,400.00

50.000

$60.00

606.1255

U

BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT, TL 2) (STEEL POST) $5,100.00

$2,100.00

$6,300.00

3.000

$1,700.00

606.12551

U

BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT, TL 2 - 25') (STEEL POST) $6,800.00

$2,100.00

$8,400.00

4.000

$1,700.00

606.141 LF BEAM GUARDRAIL (CURVED W/CRT POSTS) $625.00 $23.00 $575.00 25.000 $25.00

606.15809 LF BEAM GUARDRAIL, 7’-6” STEEL POSTS (NU-GUARD-31) $128,000.00 $19.00 $121,600.00 6,400.000 $20.00

606.181

U

31" W-BEAM GUARDRAIL LONG SPAN (12.5') (STEEL POST) $2,500.00

$2,900.00

$2,900.00

1.000

$2,500.00

606.84 U ANCHOR FOR CURVED GUARDRAIL W/CRT POSTS $1,200.00 $1,575.00 $1,575.00 1.000 $1,200.00

615.033 U REMOVING TRAFFIC SIGN, TYPE C $50.00 $49.00 $245.00 5.000 $10.00

619.1 U MAINTENANCE OF TRAFFIC $10,000.00 $10,000.00 $10,000.00 1.000 $10,000.00

621.2 EA RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR $480.00 $5.00 $600.00 120.000 $4.00

621.31 EA SINGLE DELINEATOR WITH POST $12,600.00 $37.00 $13,320.00 360.000 $35.00

621.32 EA DOUBLE DELINEATOR WITH POST $200.00 $42.00 $210.00 5.000 $40.00

622.1 EA STEEL WITNESS MARKERS $2,400.00 $29.00 $2,320.00 80.000 $30.00

628.2 LF SAWED BITUMINOUS PAVEMENT $100.00 $3.00 $120.00 40.000 $2.50

641. CY LOAM $500.00 $55.00 $550.00 10.000 $50.00

645.3 TON EROSION STONE $13,750.00 $75.00 $41,250.00 550.000 $25.00

645.42

SY

TEMPORARY SLOPE STABILIZATION TYPE B (WILDLIFE FRIENDLY) $900.00

$2.25

$1,350.00

600.000

$1.50

645.44

SY

TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) $3,150.00

$2.25

$4,050.00

1,800.000

$1.75

645.51 EA HAY BALES FOR TEMPORARY EROSION CONTROL $1,000.00 $3.00 $300.00 100.000 $10.00

645.512 LF COMPOST SOCK FOR PERIMETER BERM $22,200.00 $3.00 $16,650.00 5,550.000 $4.00

645.531 LF SILT FENCE $13,875.00 $2.50 $13,875.00 5,550.000 $2.50

645.611 LB BONDED FIBER MATRIX (BFM) $34,000.00 $1.50 $25,500.00 17,000.000 $2.00

645.7 U STORM WATER POLLUTION PREVENTION PLAN $3,000.00 $7,000.00 $7,000.00 1.000 $3,000.00

645.71

HR

MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS $6,500.00

$50.00

$5,000.00

100.000

$65.00

646.2 A TURF ESTABLISHMENT WITHOUT MULCH $9,400.00 $2,400.00 $11,280.00 4.700 $2,000.00

646.3 A TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS $2,500.00 $4,600.00 $4,600.00 1.000 $2,500.00

647.1 CY HUMUS $40,000.00 $20.00 $40,000.00 2,000.000 $20.00

647.16 CY HUMUS, 6" DEEP $25,000.00 $30.00 $30,000.00 1,000.000 $25.00

670.91 U REMOVE AND RELOCATE BAR-GATE $8,000.00 $2,200.00 $2,200.00 1.000 $8,000.00

670.95 LF TEMPORARY SAFETY FENCE $1,200.00 $4.00 $1,200.00 300.000 $4.00

692. U MOBILIZATION $150,000.00 $289,000.00 $289,000.00 1.000 $150,000.00

698.13 MON FIELD OFFICE TYPE C $21,000.00 $1,100.00 $15,400.00 14.000 $1,500.00

699.

$

MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $5,000.00

$1.00

$5,000.00

5,000.000

$1.00

1006.22 $ SPECIAL WORK - SOIL TESTING $10,000.00 $1.00 $10,000.00 10,000.000 $1.00

1008.11

$

ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $10,000.00

$1.00

$10,000.00

10,000.000

$1.00

1010.15 $ FUEL ADJUSTMENT $20,000.00 $1.00 $20,000.00 20,000.000 $1.00

Page 6 of 12 Tuesday, July 05, 2016

Page 7: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

Item No.

Quantity

Unit

Total

Unit Price

Unit Price

Total

Total

Unit Price

PS&E WINTERSET, INC. 128 WINTERSET DRIVE

LYNDONVILLE, VT 05851-0968 SICARD INC, J P 234 GLOVER ROAD BARTON, VT 05822

Description

1010.2 $ ASPHALT CEMENT ADJUSTMENT $10,000.00 $1.00 $10,000.00 10,000.000 $1.00

1010.21 $ ASPHALT CEMENT ADJUSTMENT FOR EMULSION $5,000.00 $1.00 $5,000.00 5,000.000 $1.00

Totals: $2,331,755.00 $2,856,924.00

Page 7 of 12 Tuesday, July 05, 2016

Page 8: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

PS&E Comparison

NON-FEDERAL 40518 DIXVILLE-COLEBROOK

A-PS&E

Difference Description Unit Quantity Unit Price

A-Bidder

Total Unit Price PS&E

Total Item No.

Items

201.101 CLEARING AND GRUBBING A 4.500 $18,000.00 $14,500.00 $65,250.00 ($47,250.00) $4,000.00

202.7 REMOVAL OF GUARDRAIL LF 4,000.000 $4,000.00 $1.50 $6,000.00 ($2,000.00) $1.00

203.3 UNCLASSIFIED EXCAVATION CY 7,100.000 $113,174.00 $22.00 $156,200.00 ($43,026.00) $15.94

203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 4.000 $2,660.00 $1,000.00 $4,000.00 ($1,340.00) $665.00

203.55552

GUARDRAIL EAGRT OFFSET PLATFORM ALTERNATE, TL 2

U

3.000

$2,205.00

$1,000.00

$3,000.00

($795.00)

$735.00

203.601 EMBANKMENT-IN-PLACE CY 2,100.000 $14,217.00 $7.00 $14,700.00 ($483.00) $6.77

206.1 COMMON STRUCTURE EXCAVATION CY 1,400.000 $19,320.00 $21.00 $29,400.00 ($10,080.00) $13.80

206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50.000 $935.00 $40.00 $2,000.00 ($1,065.00) $18.70

206.2 ROCK STRUCTURE EXCAVATION CY 4,200.000 $91,140.00 $40.00 $168,000.00 ($76,860.00) $21.70

209.1 GRANULAR BACKFILL CY 100.000 $1,749.00 $25.00 $2,500.00 ($751.00) $17.49

214. FINE GRADING U 1.000 $73,631.76 $35,000.00 $35,000.00 $38,631.76 $73,631.76

223.2 SLOPE STABILIZATION BY SOIL NAILING SY 600.000 $364,548.00 $600.00 $360,000.00 $4,548.00 $607.58

304.301 CRUSHED GRAVEL CY 8,200.000 $162,278.00 $25.00 $205,000.00 ($42,722.00) $19.79

304.35 CRUSHED GRAVEL FOR DRIVES CY 350.000 $6,541.50 $45.00 $15,750.00 ($9,208.50) $18.69

403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 1,015.000 $95,410.00 $100.00 $101,500.00 ($6,090.00) $94.00

Page 8 of 12 Tuesday, July 05, 2016

Page 9: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 55.000 $8,250.00 $125.00 $6,875.00 $1,375.00 $150.00

403.6 PAVEMENT JOINT ADHESIVE LF 2,500.000 $2,000.00 $0.25 $625.00 $1,375.00 $0.80

403.99 TEMPORARY BITUMINOUS PAVEMENT TON 50.000 $4,500.00 $68.00 $3,400.00 $1,100.00 $90.00

410.22 ASPHALT EMULSION FOR TACK COAT GAL 800.000 $4,000.00 $4.00 $3,200.00 $800.00 $5.00

417. COLD PLANING BITUMINOUS SURFACES SY 400.000 $10,000.00 $2.00 $800.00 $9,200.00 $25.00

418.32 EMULSIFIED ASPHALT FOR COLD PAVEMENT GAL 21,300.000 $34,080.00 $2.00 $42,600.00 ($8,520.00) $1.60

418.41 PLANT MIXED RECYCLED ASPHALT PAVEMENT TON 2,800.000 $84,000.00 $30.00 $84,000.00 $0.00 $30.00

418.42

PLANT MIXED RECYCLED ASPHALT PAVEMENT, HAND METHOD

CY

80.000

$14,000.00

$50.00

$4,000.00

$10,000.00

$175.00

503.101 WATER DIVERSION STRUCTURE U 1.000 $2,035.31 $2,500.00 $2,500.00 ($464.69) $2,035.31

503.102 WATER DIVERSION STRUCTURE U 1.000 $20,833.30 $5,000.00 $5,000.00 $15,833.30 $20,833.30

503.103 WATER DIVERSION STRUCTURE U 1.000 $3,000.00 $2,500.00 $2,500.00 $500.00 $3,000.00

520.1201 CONCRETE CLASS A, ABOVE FOOTINGS CY 3.000 $2,550.00 $1,000.00 $3,000.00 ($450.00) $850.00

534.3 WATER REPELLENT (SILANE/SILOXANE) GAL 2.000 $200.00 $125.00 $250.00 ($50.00) $100.00

538.201

BARRIER MEMBRANE, PEEL AND STICK - VERTICAL SURFACES

SY

4.000

$400.00

$50.00

$200.00

$200.00

$100.00

544.01 REINFORCING STEEL LB 500.000 $2,000.00 $6.00 $3,000.00 ($1,000.00) $4.00

570.401 MORTAR RUBBLE MASONRY CY 50.000 $21,250.00 $700.00 $35,000.00 ($13,750.00) $425.00

585.2 STONE FILL, CLASS B CY 3,800.000 $161,766.00 $25.00 $95,000.00 $66,766.00 $42.57

585.3 STONE FILL, CLASS C CY 4,000.000 $178,080.00 $25.00 $100,000.00 $78,080.00 $44.52

593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 17,500.000 $34,475.00 $2.00 $35,000.00 ($525.00) $1.97

603.0001 VIDEO INSPECTION LF 1,100.000 $2,046.00 $1.00 $1,100.00 $946.00 $1.86

603.14412

12” POLYMER COATED CORRUGATED STEEL PIPE, 0.109” THICK

LF

80.000

$3,071.20

$50.00

$4,000.00

($928.80)

$38.39

603.14415

15" ” POLYMER COATED CORRUGATED STEEL PIPE, 0.109” THICK

LF

180.000

$7,644.60

$70.00

$12,600.00

($4,955.40)

$42.47

Page 9 of 12 Tuesday, July 05, 2016

Page 10: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

603.14672

72" POLYMER COATED CORRUGATED STEEL PIPE, 0.138” THICK

LF

80.000

$51,149.60

$500.00

$40,000.00

$11,149.60

$639.37

603.34112 12" STEEL END SECTIONS EA 10.000 $1,147.80 $200.00 $2,000.00 ($852.20) $114.78

603.34115 15" STEEL END SECTIONS EA 9.000 $1,151.37 $225.00 $2,025.00 ($873.63) $127.93

603.82112 12" PE PIPE (TYPE C) LF 360.000 $9,756.00 $45.00 $16,200.00 ($6,444.00) $27.10

603.82115 15" PE PIPE (TYPE C) LF 500.000 $14,515.00 $50.00 $25,000.00 ($10,485.00) $29.03

603.82124 24" PE PIPE (TYPE C) LF 100.000 $3,916.00 $60.00 $6,000.00 ($2,084.00) $39.16

604.2941 SPECIAL DROP INLET TYPE G, 4 FT DIAMETER U 2.000 $3,075.64 $2,500.00 $5,000.00 ($1,924.36) $1,537.82

605.5129

12" PERF. CORR. POLYETHYLENE PIPE UNDERDRAIN - MODIFIED

LF

650.000

$17,095.00

$50.00

$32,500.00

($15,405.00)

$26.30

605.79 UNDERDRAIN FLUSHING BASINS EA 3.000 $1,437.93 $350.00 $1,050.00 $387.93 $479.31

606.01588

FURNISH STEEL POSTS (NU-GUARD-31), 7'-6" WITH HARDWARE

EA

50.000

$2,750.00

$60.00

$3,000.00

($250.00)

$55.00

606.1255

BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT, TL 2) (STEEL POST)

U

3.000

$6,750.00

$1,700.00

$5,100.00

$1,650.00

$2,250.00

606.12551

BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT, TL 2 - 25') (STEEL POST)

U

4.000

$7,600.00

$1,700.00

$6,800.00

$800.00

$1,900.00

606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 25.000 $625.00 $25.00 $625.00 $0.00 $25.00

606.15809 BEAM GUARDRAIL, 7’-6” STEEL POSTS (NU-GUARD-31) LF 6,400.000 $114,240.00 $20.00 $128,000.00 ($13,760.00) $17.85

606.181

31" W-BEAM GUARDRAIL LONG SPAN (12.5') (STEEL POST)

U

1.000

$2,400.00

$2,500.00

$2,500.00

($100.00)

$2,400.00

606.84 ANCHOR FOR CURVED GUARDRAIL W/CRT POSTS U 1.000 $1,200.00 $1,200.00 $1,200.00 $0.00 $1,200.00

615.033 REMOVING TRAFFIC SIGN, TYPE C U 5.000 $100.00 $10.00 $50.00 $50.00 $20.00

619.1 MAINTENANCE OF TRAFFIC U 1.000 $5,256.00 $10,000.00 $10,000.00 ($4,744.00) $5,256.00

621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 120.000 $480.00 $4.00 $480.00 $0.00 $4.00

621.31 SINGLE DELINEATOR WITH POST EA 360.000 $14,220.00 $35.00 $12,600.00 $1,620.00 $39.50

621.32 DOUBLE DELINEATOR WITH POST EA 5.000 $225.00 $40.00 $200.00 $25.00 $45.00

622.1 STEEL WITNESS MARKERS EA 80.000 $2,960.00 $30.00 $2,400.00 $560.00 $37.00

Page 10 of 12 Tuesday, July 05, 2016

Page 11: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

628.2 SAWED BITUMINOUS PAVEMENT LF 40.000 $120.00 $2.50 $100.00 $20.00 $3.00

641. LOAM CY 10.000 $300.00 $50.00 $500.00 ($200.00) $30.00

645.3 EROSION STONE TON 550.000 $16,417.50 $25.00 $13,750.00 $2,667.50 $29.85

645.42

TEMPORARY SLOPE STABILIZATION TYPE B (WILDLIFE FRIENDLY)

SY

600.000

$894.00

$1.50

$900.00

($6.00)

$1.49

645.44

TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY)

SY

1,800.000

$2,556.00

$1.75

$3,150.00

($594.00)

$1.42

645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 100.000 $1,000.00 $10.00 $1,000.00 $0.00 $10.00

645.512 COMPOST SOCK FOR PERIMETER BERM LF 5,550.000 $24,087.00 $4.00 $22,200.00 $1,887.00 $4.34

645.531 SILT FENCE LF 5,550.000 $27,361.50 $2.50 $13,875.00 $13,486.50 $4.93

645.611 BONDED FIBER MATRIX (BFM) LB 17,000.000 $23,460.00 $2.00 $34,000.00 ($10,540.00) $1.38

645.7 STORM WATER POLLUTION PREVENTION PLAN U 1.000 $3,000.00 $3,000.00 $3,000.00 $0.00 $3,000.00

645.71

MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS

HR

100.000

$20,020.00

$65.00

$6,500.00

$13,520.00

$200.20

646.2 TURF ESTABLISHMENT WITHOUT MULCH A 4.700 $7,050.00 $2,000.00 $9,400.00 ($2,350.00) $1,500.00

646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.000 $2,895.00 $2,500.00 $2,500.00 $395.00 $2,895.00

647.1 HUMUS CY 2,000.000 $30,580.00 $20.00 $40,000.00 ($9,420.00) $15.29

647.16 HUMUS, 6" DEEP CY 1,000.000 $15,680.00 $25.00 $25,000.00 ($9,320.00) $15.68

670.91 REMOVE AND RELOCATE BAR-GATE U 1.000 $1,500.00 $8,000.00 $8,000.00 ($6,500.00) $1,500.00

670.95 TEMPORARY SAFETY FENCE LF 300.000 $159.00 $4.00 $1,200.00 ($1,041.00) $0.53

692. MOBILIZATION U 1.000 $201,465.00 $150,000.00 $150,000.00 $51,465.00 $201,465.00

698.13 FIELD OFFICE TYPE C MON 14.000 $35,000.00 $1,500.00 $21,000.00 $14,000.00 $2,500.00

699.

MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $

5,000.000

$5,000.00

$1.00

$5,000.00

$0.00

$1.00

1006.22 SPECIAL WORK - SOIL TESTING $ 10,000.000 $10,000.00 $1.00 $10,000.00 $0.00 $1.00

1008.11

ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $

10,000.000

$10,000.00

$1.00

$10,000.00

$0.00

$1.00

1010.15 FUEL ADJUSTMENT $ 20,000.000 $20,000.00 $1.00 $20,000.00 $0.00 $1.00

Page 11 of 12 Tuesday, July 05, 2016

Page 12: ABC Bid Data - NH.gov - The Official Web Site of New ... · project: completion date: july 28, 2017 dixville-colebrook fed. project number: non-federal state project number: 40518

1010.2 ASPHALT CEMENT ADJUSTMENT $ 10,000.000 $10,000.00 $1.00 $10,000.00 $0.00 $1.00

1010.21 ASPHALT CEMENT ADJUSTMENT FOR EMULSION $ 5,000.000 $5,000.00 $1.00 $5,000.00 $0.00 $1.00

Total: $2,305,586.01 $2,331,755.00 ($26,168.99)

Page 12 of 12 Tuesday, July 05, 2016