    Totana PV Solar Plant

    Customer need

    Maximize the performance and reliability of the solar plant

    ABB response

    ABB delivers the complete solar plant in consortium with a mechanical partner

    ABB applied an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Commissioning Supply: DC cabinets, AC cabinets, unit transformers, switchgears,

    equipment housing, system optimization, control and SCADA.

    Turn key installation, ground & civil works: Inverters, trackers, PV

    mo u es, trans ormers an sw tc gears, ca nets, ous ng, system

    optimization, control, SCADA, security system, cabling, etc

    Partner scope: PV modules.

    Totana PV Plant (Spain)

    Size: 1.045 MWp, fix instalaltion

    Reliable and efficient PV solar plant. Performance Ratio (PR) > 80%

    (normally PR 75%)ABB Scope: EPC

    Year of commissioning: p m ze opera on, con ro an ma n enance o so ar p an sun rac ng,

    system optimization, control and protection, etc.)

    Totana produces 2.2 GWh per year displaces 2200 tons of greenhouse gas

    emissions annuall

    EPC: 2008

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 2

    Client kept the deadline and qualified for Spanish feed-in tariff for solar plant

  • 8/22/2019 ABB PV References

    3/48

    La Robla PV Solar Plant

    Customer need

    Maximize the performance and reliability of the solar plant

    ABB response

    ABB delivers the complete solar plant in consortium with a solar manufacturer

    ABB applied an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Commissioning

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters trackers PV

    La Robla PV Plant (Spain)

    Size: 20.2 MWp, 1-axis tracking

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    Partner scope: PV modules.

    La Robla PV Plant (Spain)

    Size: 13.3 MWp, 1 Axis tracker

    Customer: GA Solar

    ABB Scope: EPC

    Customer benefit

    Reliable and efficient PV solar plant. Performance Ratio (PR) > 80%

    O timized o eration control and maintenance of PV solar lant sun trackin

    ABB Scope: EPC

    Year of commissioning:

    EPC: 2010system optimization, control and protection, etc.)

    La Robla produces 22.6 GWh per year displaces 11,500 tons of greenhouse

    gas emissions annually

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 3

    Client kept the deadline and qualified for Spanish feed-in tariff for solar plant

  • 8/22/2019 ABB PV References

    4/48

    Golf PV Solar Plant

    Customer need

    Maximize the performance and reliability of the solar plant

    ABB response

    ABB delivers the complete solar plant in consortium with a solar manufacturer

    ABB applied an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Commissioning

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters trackers PV

    La Robla PV Plant (Spain)

    Size: 20.2 MWp, 1-axis tracking

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    Partner scope: PV modules.

    Golf PV Plant (Spain)

    Size: 5.5 MWp, 1 Axis tracker

    Customer: GA Solar

    ABB Scope: EPC

    Customer benefit

    Reliable and efficient PV solar plant. Performance Ratio (PR) > 80%

    O timized o eration control and maintenance of PV solar lant sun trackin

    ABB Scope: BOS

    Year of commissioning:

    EPC: 2010system optimization, control and protection, etc.)

    Client kept the deadline and qualified for Spanish feed-in tariff for solar plant EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 4

  • 8/22/2019 ABB PV References

    5/48

    Aprilia 1 PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers a complete electrical solution to the EPC contractor

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: inverter centers, DC & AC cabinets, transformers, switchgears,

    cabling, equipment housing, protection equipment, MV connection line.

    Installation: inverter centers, DC & AC cabinets, transformers,switch ears cablin e ui ment housin rotection e ui ment MV

    Aprilia 1 PV Plant (Italy)

    Size: 9.7 MWp, fix installation

    connection line, PV modules electrical connection

    ABB Scope: eBoP

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 5

  • 8/22/2019 ABB PV References

    6/48

    Sapeu PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete solar plant in consortium with a solar manufacturer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters structures PV

    Sapeu PV Plant (Italy)

    Size: 3.9 MWp, fix installation

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: BOS

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 6

  • 8/22/2019 ABB PV References

    7/48

    Monreale PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete solar plant in consortium with a solar manufacturer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters structures PV

    Monreale PV Plant (Italy)

    Size: 3.27 MWp, fix installation

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: BOS

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 7

  • 8/22/2019 ABB PV References

    8/48

    Francofonte PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete solar plant in consortium with a solar manufacturer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters structures PV

    Francofonte PV Plant (Italy)

    Size: 2.5 MWp, fix installation

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: BOS

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 8

  • 8/22/2019 ABB PV References

    9/48

    Duccotto PV Solar Plant

    Customer need

    First class automation and electrical systems

    Fix and 2 axis Plant

    Polycrystalline, Monocrystalline & Thin Film panels.

    ABB response ABB delivers the complete solar plant in consortium with a solar manufacturer

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    Duccotto PV Plant (Italy)

    Size: 7,7 MWp,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn key installation, ground & civil works: Inverters, structures, PV

    modules transformers and switch ears cabinets housin s stem

    Customer: GA Solar

    ABB Scope: BOS

    optimization, control, SCADA, security system, cabling, etc

    Year of commissioning:

    EPC: 2010

    ABB GroupMay 10, 2012 | Slide 9

    Status: Connected to grid

  • 8/22/2019 ABB PV References

    10/48

    Macchia Rotonda 1 PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers a complete EBOP solution to the customer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Structure, inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line

    Macchia Rotonda 1 PV Plant

    (Italy)

    Size: 3,3 MWp, fix installation

    , , , ,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection

    Customer: BYOMABB Scope: BOS

    Year of commissioning:

    EPC: 2010

    ABB GroupMay 10, 2012 | Slide 10

  • 8/22/2019 ABB PV References

    11/48

    Macchia Rotonda 2 PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers a complete EBOP solution to the customer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Structure, inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line

    Macchia Rotonda 2 PV Plant

    (Italy)

    Size: 3,3 MWp, fix installation

    , , , ,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection

    Customer: BYOMABB Scope: BOS

    Year of commissioning:

    EPC: 2010

    ABB GroupMay 10, 2012 | Slide 11

  • 8/22/2019 ABB PV References

    12/48

    Schinosa PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers a complete EPC

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Panels, structure, inverter centers, DC & AC cabinets,

    transformers, switchgears, cabling, equipment housing, protection

    equipment, MV connection line

    Schinosa PV Plant (Italy)

    Size: 1 MWp, fix installation

    , , , ,

    transformers, switchgears, cabling, equipment housing, protection

    equipment, MV connection line, PV modules electrical connection

    ABB Scope: EPC

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 12

  • 8/22/2019 ABB PV References

    13/48

    Armiento PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers a complete EBOP solution to the customer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Structure, inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line

    Armiento PV Plant (Italy)

    Size: 2 MWp, fix installation

    , , , ,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection

    ABB Scope: BOS

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 13

  • 8/22/2019 ABB PV References

    14/48

    Inicorbaf PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers a complete EBOP solution to the customer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Structure, inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line

    Inicorbaf PV Plant (Italy)

    Size: 3 MWp, fix installation

    , , , ,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection

    ABB Scope: BOS

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 14

  • 8/22/2019 ABB PV References

    15/48

    Iacovangelo PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers a complete EBOP solution to the customer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Structure, inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line

    Iacovangelo PV Plant (Italy)

    Size: 3,5 MWp, fix installation

    , , , ,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection

    ABB Scope: BOS

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 15

  • 8/22/2019 ABB PV References

    16/48

    Furcas PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers a complete EBOP solution to the customer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Structure, inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line

    Furcas PV Plant (Italy)

    Size: 2,54 MWp

    , , , ,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection

    Customer: Amplio Group

    ABB Scope: eBoP

    Year of commissioning:

    EPC: 2010

    ABB GroupMay 10, 2012 | Slide 16

    Status: Connected to grid

  • 8/22/2019 ABB PV References

    17/48

    Pinna PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers a complete EBOP solution to the customer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Structure, inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line

    Pinna PV Plant (Italy)

    Size: 1,8 MWp

    , , , ,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection

    Customer: Amplio Group

    ABB Scope: eBoP

    Year of commissioning:

    EPC: 2010

    ABB GroupMay 10, 2012 | Slide 17

    Status: Connected to grid

  • 8/22/2019 ABB PV References

    18/48

    Cardonita PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete EPC

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Panels, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters structures PV

    Cardonita PV Plant (Italy)

    Size: 3,8 MWp, fix installation

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: EPC

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 18

    S i PV S l Pl

  • 8/22/2019 ABB PV References

    19/48

    Spinasanta PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete EPC

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Panels, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters structures PV

    Spinasanta PV Plant (Italy)

    Size: 6 MWp, fix installation

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: EPC

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 19

    S h t t PV S l Pl t

  • 8/22/2019 ABB PV References

    20/48

    Sugherotorto PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete EPC

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Panels, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters structures PV

    Sugherotorto PV Plant (Italy)

    Size: 3,2 MWp, fix installation

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: EPC

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 20

    B M t ll PV S l Pl t

  • 8/22/2019 ABB PV References

    21/48

    Borgo Montello PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers a complete BOS solution to the customer

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,

    cabling, equipment housing, protection equipment, MV connection line

    Installation: Inverter centers, DC & AC cabinets, transformers,

    Borgo Montello PV Plant (Italy)

    Size: 3,5 MWp, fix installation

    , , , ,

    connection line, PV modules electrical connection

    ABB Scope: eBoP

    Year of commissioning:

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 21

    Sirkovce PV Solar Plant

  • 8/22/2019 ABB PV References

    22/48

    Sirkovce PV Solar Plant

    Customer need

    First class electrical systems

    ABB response

    ABB Supplies all the electrical equipment and its engineering.

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    , , , , ,

    equipment housing.

    Installation: inverters, DC & AC cabinets, transformers, switchgears,

    cabling, equipment housing.

    Sirkovce PV Plant (Slovakia)

    Size: 1 MWp, fix installation

    ABB Scope: Supplier

    Year of commissioning

    EPC: 2010

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 22

    Canino PV Solar Plant

  • 8/22/2019 ABB PV References

    23/48

    Canino PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete solar plant in consortium with a solar manufacturer

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    Supply: Substation 150kV, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters structures PV

    Canino PV Plant (Italy)

    Size: 24,2 MWp, 1 axis tracker

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: EPC

    Year of commissioning:

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 23

    Cairo Montenotte PV Solar Plant

  • 8/22/2019 ABB PV References

    24/48

    Cairo Montenotte PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete solar plant in consortium with a solar manufacturer

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    Supply: Roof structure, DC cabinets, AC cabinets, inverters, unit

    transformers, switchgears, equipment housing, system optimization,

    control and SCADA.

    Turn ke installation round & civil works: Inverters structures PV

    Cairo Montenotte PV Plant (Italy)

    Size: 1 MWp, Roof top

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc.

    ABB Scope: EPC

    Year of commissioning:

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 24

    De Nittis 1 PV Solar Plant

  • 8/22/2019 ABB PV References

    25/48

    De Nittis 1 PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete Balance of system of the solar PV Plant ( panels

    ABB applied an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    De Nittis 1 PV Plant(Italy)

    Size: 12,7 MWp, fix installation

    Turn key installation, ground & civil works: Inverters, structures, PV

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: BOS

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 25

    De Nittis 2 PV Solar Plant

  • 8/22/2019 ABB PV References

    26/48

    De Nittis 2 PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete Balance of system of the solar PV Plant ( panels

    ABB applied an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    De Nittis 2 PV Plant (Italy)

    Size: 11,8 MWp, fix installation

    Turn key installation, ground & civil works: Inverters, structures, PV

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: BOS

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 26

    De Nittis 3 PV Solar Plant

  • 8/22/2019 ABB PV References

    27/48

    De Nittis 3 PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete Balance of system of the solar PV Plant ( panels

    ABB applied an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    De Nittis 3 PV Plant (Italy)

    Size: 14,47 MWp, fix installation

    Turn key installation, ground & civil works: Inverters, structures, PV

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: BOS

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 27

    Helios ITA 3 1 PV Solar Plant

  • 8/22/2019 ABB PV References

    28/48

    Helios ITA 3.1 PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete Balance of system of the solar PV Plant ( panels

    ABB applied an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Helios ITA 3.1 PV Plant (Italy)

    Size: 5,0 MWp, fix installation

    Turn key installation, ground & civil works: Inverters, structures, PV

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    .

    ABB Scope: BOS

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 28

    Helios ITA 3 2 PV Solar Plant

  • 8/22/2019 ABB PV References

    29/48

    Helios ITA 3.2 PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete Balance of system of the solar PV Plant ( panels

    ABB applied an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Helios ITA 3.2 PV Plant (Italy)

    Size: 5,0 MWp, fix installation

    Turn key installation, ground & civil works: Inverters, structures, PV

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    .

    ABB Scope: BOS

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 29

    Tetbury PV Solar Plant

  • 8/22/2019 ABB PV References

    30/48

    Tetbury PV Solar Plant

    Customer needs

    First class automation and electrical systems

    ABB response

    ABB applied an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    Supply: Substation, DC cabinets, AC cabinets, unit transformers,

    sw tc gears, equ pment ous ng,

    Tetbury PV Plant (UK)

    Size: 1 MWp, fix installation

    ABB Scope: eBoP

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 30

    Malmesbury PV Solar Plant

  • 8/22/2019 ABB PV References

    31/48

    Malmesbury PV Solar Plant

    Customer need

    First class electrical systems

    ABB response

    ABB Supplies all the electrical equipment and its engineering.

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling,

    equipment housing.

    Installation: inverters, DC & AC cabinets, transformers, switchgears,

    cablin , e ui ment housin .

    Malmesbury PV Plant (UK)

    Size: 5,2 MWp, fix installation

    ABB Scope: Supplier

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 31

    Prunu PV Solar Plant

  • 8/22/2019 ABB PV References

    32/48

    Prunu PV Solar Plant

    Customer need

    First class automation and electrical systems

    ABB response

    ABB Supplies all the equipment and engineering.

    ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant

    ABB scope:

    Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling,

    equipment housing, system optimization, control, SCADA

    Installation: inverters, DC & AC cabinets, transformers, switchgears,

    cablin , e ui ment housin , s stem o timization, control, SCADA, etc

    Prunu PV (Corsica, France)

    Size: 4,4 MWp, fix installation

    ABB Scope: Supplier

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 32

    Mezos PV Solar Plant

  • 8/22/2019 ABB PV References

    33/48

    Customer need

    PV facility on a fish farm roof (Wood structure) -

    Optimal solution due to tight surface limitations

    ABB response

    ABB delivers the complete EBOP, panels and structures are supplied by thecustomer

    ABB applies an efficiency improvement system to maximize the overall

    per ormance o e so ar p an

    ABB scope:

    Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling,

    Mezos PV Plant (France)

    Size: 4.2 MWp, fix roof top

    , , ,

    Installation: inverters, DC & AC cabinets, transformers, switchgears,

    cabling, equipment housing, system optimization, control, SCADA, etc

    ABB Scope: eBoP

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 33

    Lethabo PV Solar Plant

  • 8/22/2019 ABB PV References

    34/48

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete EPC

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    Supply: Panels, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters structures PV

    Lethabo PV Plant (South Africa)

    Size: 578 kWp, 1 axis tracker

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: EPC

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 34

    Kendal PV Solar Plant

  • 8/22/2019 ABB PV References

    35/48

    Customer need

    First class automation and electrical systems

    ABB response

    ABB delivers the complete EPC

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    Supply: Panels, DC cabinets, AC cabinets, unit transformers,

    switchgears, equipment housing, system optimization, control and

    SCADA.

    Turn ke installation round & civil works: Inverters structures PV

    Kendal PV Plant (South Africa)

    Size: 620 kWp, fix installation

    modules, transformers and switchgears, cabinets, housing, system

    optimization, control, SCADA, security system, cabling, etc

    ABB Scope: EPC

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 35

    Solarmo PV Solar Plant

  • 8/22/2019 ABB PV References

    36/48

    Customer need

    First class electrical systems

    ABB response

    ABB Supplies all the MV electrical equipment and its engineering.

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling,

    equipment housing.

    Installation: inverters, DC & AC cabinets, transformers, switchgears,

    cablin , e ui ment housin .Solarmo PV Plant (Germany)

    Size: 1,2 MWp, fix installation

    ABB Scope: Supplier

    Year of commissioning

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 36

    Nangal PV Solar Plant

  • 8/22/2019 ABB PV References

    37/48

    Customer need

    Single point of responsibility for all the electrical works and equipment

    Reduced project lead time

    First class automation and electrical systems

    Maximize plant performance and reliability

    ABB response

    ABB delivers an eBoP solution to the customer

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:Nangal PV Plant (Punjab, India)

    Size: 1 MWp, fix installation

    Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,

    cabling, equipment housing, protection equipment, system optimization,

    control, SCADA

    ABB Scope: eBoP

    Year of commissioning

    Installation: Inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection, system optimization,

    control, SCADA

    EPC: 2011

    Status: Connected to grid

    ABB GroupMay 10, 2012 | Slide 37

    Tinwari PV Solar Plant

  • 8/22/2019 ABB PV References

    38/48

    Customer need

    Single point of responsibility for all the electrical works and equipment

    Reduced project lead time

    First class automation and electrical systems

    Maximize plant performance and reliability

    ABB response

    ABB delivers an eBoP solution to the customer

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    (Rajasthan, India)

    Size: 5 MWp, fix installation

    Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,

    cabling, equipment housing, protection equipment, system optimization,

    control, SCADA

    Customer:

    Moserbaer Photo Voltaic Ltd

    ABB Sco e: eBoP

    Installation: Inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection, system optimization,

    control, SCADA

    Year of commissioning

    EPC: 2011

    ABB GroupMay 10, 2012 | Slide 38

    Status: Connected to grid

    Bhilwara PV Solar Plant

  • 8/22/2019 ABB PV References

    39/48

    Customer need

    Single point of responsibility for all the electrical works and equipment

    Reduced project lead time

    First class automation and electrical systems

    Maximize plant performance and reliability

    ABB response

    ABB delivers an eBoP solution to the customer

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    (Rajasthan, India)

    Size: 5 MWp, fix installation

    Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,

    cabling, equipment housing, protection equipment, system optimization,

    control, SCADA

    Customer: Moserbaer

    Engineering and Constructions

    ABB Sco e: eBoP

    Installation: Inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection, system optimization,

    control, SCADA

    Year of commissioning

    EPC: 2012

    ABB GroupMay 10, 2012 | Slide 39

    Status: Under Construction

    Bolangir PV Solar Plant

  • 8/22/2019 ABB PV References

    40/48

    Customer need

    Single point of responsibility for all the electrical works and equipment

    Reduced project lead time

    First class automation and electrical systems

    Maximize plant performance and reliability

    ABB response

    ABB delivers an eBoP solution to the customer

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    (Rajasthan, India)

    Size: 5 MWp, fix installation

    Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,

    cabling, equipment housing, protection equipment, system optimization,

    control, SCADA

    Customer: Moserbaer

    Engineering and Constructions

    ABB Sco e: eBoP

    Installation: Inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection, system optimization,

    control, SCADA

    Year of commissioning

    EPC: 2012

    ABB GroupMay 10, 2012 | Slide 40

    Status: Under Construction

    Bap PV Solar Plant

  • 8/22/2019 ABB PV References

    41/48

    Customer need

    Single point of responsibility for all the electrical works and equipment

    Reduced project lead time

    First class automation and electrical systems

    Maximize plant performance and reliability

    ABB response

    ABB delivers an eBoP solution to the customer

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    (Rajasthan, India)

    Size: 5 MWp, fix installation

    Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,

    cabling, equipment housing, protection equipment, system optimization,

    control, SCADA

    Customer: Punj Lloyd Delta

    Renewables Private Limited

    ABB Sco e: eBoP

    Installation: Inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, PV modules electrical connection, system optimization,

    control, SCADA

    Year of commissioning

    EPC: 2012

    ABB GroupMay 10, 2012 | Slide 41

    Status: Under Construction

    Sliven PV Solar Plant

  • 8/22/2019 ABB PV References

    42/48

    Customer need

    Single point of responsibility for all the electrical works and equipment

    Reduced project lead time

    First class automation and electrical systems

    Maximize plant performance and reliability

    ABB response

    ABB delivers an eBoP solution to the customer

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:Sliven PV Plant (Bulgaria)

    Size: 9 MWp, fix installation

    Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,

    cabling, equipment housing, protection equipment

    Installation: Inverter centers, DC & AC cabinets, transformers,.

    ABB Scope: MV Turnkey

    Year of commissioning

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line

    EPC: 2012

    Status: Under Commissioning

    ABB GroupMay 10, 2012 | Slide 42

    SLP Parking PV Solar Plant

  • 8/22/2019 ABB PV References

    43/48

    Customer need

    First class automation and electrical systems from ABB

    Short construction schedule

    Expertise in electrical connection to CFE

    Local footprint

    ABB response

    ABB delivers a com lete solution

    ABB partners with reputable contractors and suppliers to ensure highest

    project quality

    ABB sco e:SLP PV Plant (San Luis Potos,

    Mexico)

    Size: 1,1 MWp,

    Supply: carports, inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, SCADA system, PV modules.

    Carport installation

    ABB Scope: EPC

    Turn key structures, inverter centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    connection line, SCADA, PV modules, grid connection

    Year of commissioning

    EPC: 2012

    ABB GroupMay 10, 2012 | Slide 43

    APEX PV Solar Plant

  • 8/22/2019 ABB PV References

    44/48

    Customer need

    First class automation and electrical systems from ABB

    Expertise in substation and HV grid connection to NV Energy

    ABB response

    ABB delivers the complete solution

    ABB applies an efficiency improvement system to maximize the overall

    performance of the PV solar plant

    ABB scope:

    Supply: transformation centers, DC & AC cabinets, transformers,

    switchgears, cabling, equipment housing, protection equipment, MV

    Apex PV Plant (Nevada, USA)

    Size: 24,8 MWp, 1 axis traxkers

    , , ,

    connection

    Installation: trackers, transformation centers, DC & AC cabinets,

    transformers, switchgears, cabling, equipment housing, protection

    ABB Scope: eBoP

    Year of commissioning

    equipment, MV connection line, SCADA, PV modules, substation,

    overhead line for grid connection

    EPC: 2012

    Status: Under Construction

    ABB GroupMay 10, 2012 | Slide 44

    Projects Photovoltaics

  • 8/22/2019 ABB PV References

    45/48

    Order year Country Location Customer Project Name Capacity (MW) Technology

    2008 Spain Murcia Bridge Investment Capital Totana 1,0 Tracker

    2010 Italy Sicily Gestamp Solar Sapeu 3,9 Fixed

    2010 Italy Sicilia Actelios Solar Schinosa 1,0 Fixed

    2010 Italy Sicilia Actelios Solar Cardonita 3,8 Fixed

    2010 Italy Sicilia Actelios Solar Spinasanta 6,0 Fixed

    2010 Italy Sicilia Actelios Solar Sugherotorto 3,3 Fixed

    2010 Italy Lazio Geosol Borgomontello 3,4 Fixed

    2010 Italy Sicily Gestamp Solar Ducotto 7,3 Fixed

    2010 Italy Lazio Volteo Energia (Kinexia) Aprilia 9,2 Fixed

    2010 Italy Puglia Macchia Rotonda s.r.l. Inicorbaf 3,0 Fixed

    2010 Italy Puglia Macchia Rotonda s.r.l. Macchia Rotonda 6,6 Fixed

    2010 Italy Puglia Macchia Rotonda s.r.l. Armiento 2,0 Fixed

    2010 Ital Pu lia Macchia Rotonda s.r.l. Iacovan elo 3,5 Fixed

    2010 Italy Puglia Emmessenne De Nittis 1,2,3 39,0 Fixed

    2010 Italy Sicily Gestamp Solar Monreale 3,2 Fixed

    2010 Italy Sicily Gestamp Solar Francofonte 2,7 Fixed

    ,

    2010 Spain Leon Gestamp Solar La Robla 13,3 Tracker

    2011 France Corsica Ralos Prunu 4,4 Fixed2011 France Atlantic Pyrinees Unite Solar Mezzos 4,2 Fishfarmer

    ,

    2011 Italy Lazio Phenix Renewables Canino 24,1 Tracker

    2011 Italy Sardinia Sardegna Agrienergia 4 SAE Furcas 2,5 Greenhouse

    2011 Italy Sardinia Sardegna Agrienergia 5 SAE Pinna 1,8 Greenhouse

    Projects Photovoltaics

  • 8/22/2019 ABB PV References

    46/48

    Order year Country Location Customer Project Name Capacity (MW) Technology

    2011 Italy Puglia Helios ITA3 (controllata Etrion) Brindisi 5,0 Tracker

    2011 Italy Puglia Helios ITA3 (controllata Etrion) Mesagne 5,0 Tracker

    2011 Italy Sicily Gestamp Solar Enerti 5 plants 21,0 Fixed

    2012 Mexico San Luis Potos ABB Mexico SLP 1,1 Parking Lot

    2011 Slovakia Sirkovce Enertec Sirkovce 1,0 Fixed

    2011 Southafrica Johanesbrug Eskom Lethabo 0,6 Tracker

    2011 Southafrica Johanesbrug Eskom Kendal 0,6 Fixed

    2011 United Kingdom Gloucestershire Soostoom Tentbury 1,0 Fixed

    2011 United Kingdom Wiltshire Sunstroom Malmesbury 5,2 Fixed

    2011 Germany Bavaria HaWi Project GMBH Solarmo 1,2 Fixed

    2011 India Punjab Soma Nangal 1,0 Fixed

    2011 India Rajasthan Moserbaer Photo Voltaic Ltd Tinwari 5,0 Fixed

    .

    2012 USA Nevada Sun Edison Apex 24,8 Tracker

    2012 India Rajasthan Moserbaer Engineering Bhilwara 5,0 Fixed

    2012 India Rajasthan Moserbaer Engineering Bolangir 5,0 Fixed

    n a a ast an un oy e ta enewa es ap , xe

    Total installed capacity (MW) 252,9

    Summar of Solar ABB references

  • 8/22/2019 ABB PV References

    47/48

    PV PLANTSPV PLANTSMore than 40 PV plants (EPC, BOS )

    More than 120 PV plants ( EBOP )

    More than 250 MW rid connected

    More than 81 Mwp under erectionMore than 3.100 Mwp under negotiation

    (Spain, Italy, UK, France, South Africa,

    USA, Mexico, India, Bulgaria, Germany)

    Starting activities in many others countries

    ( Australia, Israel, China, Chile. Peru, Namibia, Mauritania, Brazil,Japan, Indonesia, Malaysia, Korea, Vietnam Morocco, Algeria )