Totana PV Solar Plant
Customer need
Maximize the performance and reliability of the solar plant
ABB response
ABB delivers the complete solar plant in consortium with a mechanical partner
ABB applied an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Commissioning Supply: DC cabinets, AC cabinets, unit transformers, switchgears,
equipment housing, system optimization, control and SCADA.
Turn key installation, ground & civil works: Inverters, trackers, PV
mo u es, trans ormers an sw tc gears, ca nets, ous ng, system
optimization, control, SCADA, security system, cabling, etc
Partner scope: PV modules.
Totana PV Plant (Spain)
Size: 1.045 MWp, fix instalaltion
Reliable and efficient PV solar plant. Performance Ratio (PR) > 80%
(normally PR 75%)ABB Scope: EPC
Year of commissioning: p m ze opera on, con ro an ma n enance o so ar p an sun rac ng,
system optimization, control and protection, etc.)
Totana produces 2.2 GWh per year displaces 2200 tons of greenhouse gas
emissions annuall
EPC: 2008
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 2
Client kept the deadline and qualified for Spanish feed-in tariff for solar plant
-
8/22/2019 ABB PV References
3/48
La Robla PV Solar Plant
Customer need
Maximize the performance and reliability of the solar plant
ABB response
ABB delivers the complete solar plant in consortium with a solar manufacturer
ABB applied an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Commissioning
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters trackers PV
La Robla PV Plant (Spain)
Size: 20.2 MWp, 1-axis tracking
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
Partner scope: PV modules.
La Robla PV Plant (Spain)
Size: 13.3 MWp, 1 Axis tracker
Customer: GA Solar
ABB Scope: EPC
Customer benefit
Reliable and efficient PV solar plant. Performance Ratio (PR) > 80%
O timized o eration control and maintenance of PV solar lant sun trackin
ABB Scope: EPC
Year of commissioning:
EPC: 2010system optimization, control and protection, etc.)
La Robla produces 22.6 GWh per year displaces 11,500 tons of greenhouse
gas emissions annually
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 3
Client kept the deadline and qualified for Spanish feed-in tariff for solar plant
-
8/22/2019 ABB PV References
4/48
Golf PV Solar Plant
Customer need
Maximize the performance and reliability of the solar plant
ABB response
ABB delivers the complete solar plant in consortium with a solar manufacturer
ABB applied an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Commissioning
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters trackers PV
La Robla PV Plant (Spain)
Size: 20.2 MWp, 1-axis tracking
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
Partner scope: PV modules.
Golf PV Plant (Spain)
Size: 5.5 MWp, 1 Axis tracker
Customer: GA Solar
ABB Scope: EPC
Customer benefit
Reliable and efficient PV solar plant. Performance Ratio (PR) > 80%
O timized o eration control and maintenance of PV solar lant sun trackin
ABB Scope: BOS
Year of commissioning:
EPC: 2010system optimization, control and protection, etc.)
Client kept the deadline and qualified for Spanish feed-in tariff for solar plant EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 4
-
8/22/2019 ABB PV References
5/48
Aprilia 1 PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers a complete electrical solution to the EPC contractor
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: inverter centers, DC & AC cabinets, transformers, switchgears,
cabling, equipment housing, protection equipment, MV connection line.
Installation: inverter centers, DC & AC cabinets, transformers,switch ears cablin e ui ment housin rotection e ui ment MV
Aprilia 1 PV Plant (Italy)
Size: 9.7 MWp, fix installation
connection line, PV modules electrical connection
ABB Scope: eBoP
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 5
-
8/22/2019 ABB PV References
6/48
Sapeu PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete solar plant in consortium with a solar manufacturer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters structures PV
Sapeu PV Plant (Italy)
Size: 3.9 MWp, fix installation
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: BOS
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 6
-
8/22/2019 ABB PV References
7/48
Monreale PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete solar plant in consortium with a solar manufacturer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters structures PV
Monreale PV Plant (Italy)
Size: 3.27 MWp, fix installation
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: BOS
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 7
-
8/22/2019 ABB PV References
8/48
Francofonte PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete solar plant in consortium with a solar manufacturer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters structures PV
Francofonte PV Plant (Italy)
Size: 2.5 MWp, fix installation
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: BOS
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 8
-
8/22/2019 ABB PV References
9/48
Duccotto PV Solar Plant
Customer need
First class automation and electrical systems
Fix and 2 axis Plant
Polycrystalline, Monocrystalline & Thin Film panels.
ABB response ABB delivers the complete solar plant in consortium with a solar manufacturer
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
Duccotto PV Plant (Italy)
Size: 7,7 MWp,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn key installation, ground & civil works: Inverters, structures, PV
modules transformers and switch ears cabinets housin s stem
Customer: GA Solar
ABB Scope: BOS
optimization, control, SCADA, security system, cabling, etc
Year of commissioning:
EPC: 2010
ABB GroupMay 10, 2012 | Slide 9
Status: Connected to grid
-
8/22/2019 ABB PV References
10/48
Macchia Rotonda 1 PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers a complete EBOP solution to the customer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Structure, inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line
Macchia Rotonda 1 PV Plant
(Italy)
Size: 3,3 MWp, fix installation
, , , ,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection
Customer: BYOMABB Scope: BOS
Year of commissioning:
EPC: 2010
ABB GroupMay 10, 2012 | Slide 10
-
8/22/2019 ABB PV References
11/48
Macchia Rotonda 2 PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers a complete EBOP solution to the customer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Structure, inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line
Macchia Rotonda 2 PV Plant
(Italy)
Size: 3,3 MWp, fix installation
, , , ,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection
Customer: BYOMABB Scope: BOS
Year of commissioning:
EPC: 2010
ABB GroupMay 10, 2012 | Slide 11
-
8/22/2019 ABB PV References
12/48
Schinosa PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers a complete EPC
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Panels, structure, inverter centers, DC & AC cabinets,
transformers, switchgears, cabling, equipment housing, protection
equipment, MV connection line
Schinosa PV Plant (Italy)
Size: 1 MWp, fix installation
, , , ,
transformers, switchgears, cabling, equipment housing, protection
equipment, MV connection line, PV modules electrical connection
ABB Scope: EPC
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 12
-
8/22/2019 ABB PV References
13/48
Armiento PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers a complete EBOP solution to the customer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Structure, inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line
Armiento PV Plant (Italy)
Size: 2 MWp, fix installation
, , , ,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection
ABB Scope: BOS
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 13
-
8/22/2019 ABB PV References
14/48
Inicorbaf PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers a complete EBOP solution to the customer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Structure, inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line
Inicorbaf PV Plant (Italy)
Size: 3 MWp, fix installation
, , , ,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection
ABB Scope: BOS
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 14
-
8/22/2019 ABB PV References
15/48
Iacovangelo PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers a complete EBOP solution to the customer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Structure, inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line
Iacovangelo PV Plant (Italy)
Size: 3,5 MWp, fix installation
, , , ,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection
ABB Scope: BOS
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 15
-
8/22/2019 ABB PV References
16/48
Furcas PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers a complete EBOP solution to the customer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Structure, inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line
Furcas PV Plant (Italy)
Size: 2,54 MWp
, , , ,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection
Customer: Amplio Group
ABB Scope: eBoP
Year of commissioning:
EPC: 2010
ABB GroupMay 10, 2012 | Slide 16
Status: Connected to grid
-
8/22/2019 ABB PV References
17/48
Pinna PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers a complete EBOP solution to the customer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Structure, inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line
Pinna PV Plant (Italy)
Size: 1,8 MWp
, , , ,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection
Customer: Amplio Group
ABB Scope: eBoP
Year of commissioning:
EPC: 2010
ABB GroupMay 10, 2012 | Slide 17
Status: Connected to grid
-
8/22/2019 ABB PV References
18/48
Cardonita PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete EPC
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Panels, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters structures PV
Cardonita PV Plant (Italy)
Size: 3,8 MWp, fix installation
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: EPC
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 18
S i PV S l Pl
-
8/22/2019 ABB PV References
19/48
Spinasanta PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete EPC
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Panels, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters structures PV
Spinasanta PV Plant (Italy)
Size: 6 MWp, fix installation
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: EPC
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 19
S h t t PV S l Pl t
-
8/22/2019 ABB PV References
20/48
Sugherotorto PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete EPC
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Panels, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters structures PV
Sugherotorto PV Plant (Italy)
Size: 3,2 MWp, fix installation
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: EPC
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 20
B M t ll PV S l Pl t
-
8/22/2019 ABB PV References
21/48
Borgo Montello PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers a complete BOS solution to the customer
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,
cabling, equipment housing, protection equipment, MV connection line
Installation: Inverter centers, DC & AC cabinets, transformers,
Borgo Montello PV Plant (Italy)
Size: 3,5 MWp, fix installation
, , , ,
connection line, PV modules electrical connection
ABB Scope: eBoP
Year of commissioning:
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 21
Sirkovce PV Solar Plant
-
8/22/2019 ABB PV References
22/48
Sirkovce PV Solar Plant
Customer need
First class electrical systems
ABB response
ABB Supplies all the electrical equipment and its engineering.
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
, , , , ,
equipment housing.
Installation: inverters, DC & AC cabinets, transformers, switchgears,
cabling, equipment housing.
Sirkovce PV Plant (Slovakia)
Size: 1 MWp, fix installation
ABB Scope: Supplier
Year of commissioning
EPC: 2010
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 22
Canino PV Solar Plant
-
8/22/2019 ABB PV References
23/48
Canino PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete solar plant in consortium with a solar manufacturer
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
Supply: Substation 150kV, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters structures PV
Canino PV Plant (Italy)
Size: 24,2 MWp, 1 axis tracker
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: EPC
Year of commissioning:
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 23
Cairo Montenotte PV Solar Plant
-
8/22/2019 ABB PV References
24/48
Cairo Montenotte PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete solar plant in consortium with a solar manufacturer
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
Supply: Roof structure, DC cabinets, AC cabinets, inverters, unit
transformers, switchgears, equipment housing, system optimization,
control and SCADA.
Turn ke installation round & civil works: Inverters structures PV
Cairo Montenotte PV Plant (Italy)
Size: 1 MWp, Roof top
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc.
ABB Scope: EPC
Year of commissioning:
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 24
De Nittis 1 PV Solar Plant
-
8/22/2019 ABB PV References
25/48
De Nittis 1 PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete Balance of system of the solar PV Plant ( panels
ABB applied an efficiency improvement system to maximize the overall
performance of the PV solar plant
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
De Nittis 1 PV Plant(Italy)
Size: 12,7 MWp, fix installation
Turn key installation, ground & civil works: Inverters, structures, PV
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: BOS
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 25
De Nittis 2 PV Solar Plant
-
8/22/2019 ABB PV References
26/48
De Nittis 2 PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete Balance of system of the solar PV Plant ( panels
ABB applied an efficiency improvement system to maximize the overall
performance of the PV solar plant
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
De Nittis 2 PV Plant (Italy)
Size: 11,8 MWp, fix installation
Turn key installation, ground & civil works: Inverters, structures, PV
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: BOS
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 26
De Nittis 3 PV Solar Plant
-
8/22/2019 ABB PV References
27/48
De Nittis 3 PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete Balance of system of the solar PV Plant ( panels
ABB applied an efficiency improvement system to maximize the overall
performance of the PV solar plant
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
De Nittis 3 PV Plant (Italy)
Size: 14,47 MWp, fix installation
Turn key installation, ground & civil works: Inverters, structures, PV
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: BOS
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 27
Helios ITA 3 1 PV Solar Plant
-
8/22/2019 ABB PV References
28/48
Helios ITA 3.1 PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete Balance of system of the solar PV Plant ( panels
ABB applied an efficiency improvement system to maximize the overall
performance of the PV solar plant
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Helios ITA 3.1 PV Plant (Italy)
Size: 5,0 MWp, fix installation
Turn key installation, ground & civil works: Inverters, structures, PV
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
.
ABB Scope: BOS
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 28
Helios ITA 3 2 PV Solar Plant
-
8/22/2019 ABB PV References
29/48
Helios ITA 3.2 PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete Balance of system of the solar PV Plant ( panels
ABB applied an efficiency improvement system to maximize the overall
performance of the PV solar plant
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Helios ITA 3.2 PV Plant (Italy)
Size: 5,0 MWp, fix installation
Turn key installation, ground & civil works: Inverters, structures, PV
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
.
ABB Scope: BOS
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 29
Tetbury PV Solar Plant
-
8/22/2019 ABB PV References
30/48
Tetbury PV Solar Plant
Customer needs
First class automation and electrical systems
ABB response
ABB applied an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
Supply: Substation, DC cabinets, AC cabinets, unit transformers,
sw tc gears, equ pment ous ng,
Tetbury PV Plant (UK)
Size: 1 MWp, fix installation
ABB Scope: eBoP
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 30
Malmesbury PV Solar Plant
-
8/22/2019 ABB PV References
31/48
Malmesbury PV Solar Plant
Customer need
First class electrical systems
ABB response
ABB Supplies all the electrical equipment and its engineering.
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling,
equipment housing.
Installation: inverters, DC & AC cabinets, transformers, switchgears,
cablin , e ui ment housin .
Malmesbury PV Plant (UK)
Size: 5,2 MWp, fix installation
ABB Scope: Supplier
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 31
Prunu PV Solar Plant
-
8/22/2019 ABB PV References
32/48
Prunu PV Solar Plant
Customer need
First class automation and electrical systems
ABB response
ABB Supplies all the equipment and engineering.
ABB applies an efficiency improvement system to maximize the overallperformance of the PV solar plant
ABB scope:
Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling,
equipment housing, system optimization, control, SCADA
Installation: inverters, DC & AC cabinets, transformers, switchgears,
cablin , e ui ment housin , s stem o timization, control, SCADA, etc
Prunu PV (Corsica, France)
Size: 4,4 MWp, fix installation
ABB Scope: Supplier
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 32
Mezos PV Solar Plant
-
8/22/2019 ABB PV References
33/48
Customer need
PV facility on a fish farm roof (Wood structure) -
Optimal solution due to tight surface limitations
ABB response
ABB delivers the complete EBOP, panels and structures are supplied by thecustomer
ABB applies an efficiency improvement system to maximize the overall
per ormance o e so ar p an
ABB scope:
Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling,
Mezos PV Plant (France)
Size: 4.2 MWp, fix roof top
, , ,
Installation: inverters, DC & AC cabinets, transformers, switchgears,
cabling, equipment housing, system optimization, control, SCADA, etc
ABB Scope: eBoP
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 33
Lethabo PV Solar Plant
-
8/22/2019 ABB PV References
34/48
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete EPC
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
Supply: Panels, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters structures PV
Lethabo PV Plant (South Africa)
Size: 578 kWp, 1 axis tracker
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: EPC
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 34
Kendal PV Solar Plant
-
8/22/2019 ABB PV References
35/48
Customer need
First class automation and electrical systems
ABB response
ABB delivers the complete EPC
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
Supply: Panels, DC cabinets, AC cabinets, unit transformers,
switchgears, equipment housing, system optimization, control and
SCADA.
Turn ke installation round & civil works: Inverters structures PV
Kendal PV Plant (South Africa)
Size: 620 kWp, fix installation
modules, transformers and switchgears, cabinets, housing, system
optimization, control, SCADA, security system, cabling, etc
ABB Scope: EPC
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 35
Solarmo PV Solar Plant
-
8/22/2019 ABB PV References
36/48
Customer need
First class electrical systems
ABB response
ABB Supplies all the MV electrical equipment and its engineering.
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling,
equipment housing.
Installation: inverters, DC & AC cabinets, transformers, switchgears,
cablin , e ui ment housin .Solarmo PV Plant (Germany)
Size: 1,2 MWp, fix installation
ABB Scope: Supplier
Year of commissioning
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 36
Nangal PV Solar Plant
-
8/22/2019 ABB PV References
37/48
Customer need
Single point of responsibility for all the electrical works and equipment
Reduced project lead time
First class automation and electrical systems
Maximize plant performance and reliability
ABB response
ABB delivers an eBoP solution to the customer
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:Nangal PV Plant (Punjab, India)
Size: 1 MWp, fix installation
Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,
cabling, equipment housing, protection equipment, system optimization,
control, SCADA
ABB Scope: eBoP
Year of commissioning
Installation: Inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection, system optimization,
control, SCADA
EPC: 2011
Status: Connected to grid
ABB GroupMay 10, 2012 | Slide 37
Tinwari PV Solar Plant
-
8/22/2019 ABB PV References
38/48
Customer need
Single point of responsibility for all the electrical works and equipment
Reduced project lead time
First class automation and electrical systems
Maximize plant performance and reliability
ABB response
ABB delivers an eBoP solution to the customer
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
(Rajasthan, India)
Size: 5 MWp, fix installation
Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,
cabling, equipment housing, protection equipment, system optimization,
control, SCADA
Customer:
Moserbaer Photo Voltaic Ltd
ABB Sco e: eBoP
Installation: Inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection, system optimization,
control, SCADA
Year of commissioning
EPC: 2011
ABB GroupMay 10, 2012 | Slide 38
Status: Connected to grid
Bhilwara PV Solar Plant
-
8/22/2019 ABB PV References
39/48
Customer need
Single point of responsibility for all the electrical works and equipment
Reduced project lead time
First class automation and electrical systems
Maximize plant performance and reliability
ABB response
ABB delivers an eBoP solution to the customer
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
(Rajasthan, India)
Size: 5 MWp, fix installation
Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,
cabling, equipment housing, protection equipment, system optimization,
control, SCADA
Customer: Moserbaer
Engineering and Constructions
ABB Sco e: eBoP
Installation: Inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection, system optimization,
control, SCADA
Year of commissioning
EPC: 2012
ABB GroupMay 10, 2012 | Slide 39
Status: Under Construction
Bolangir PV Solar Plant
-
8/22/2019 ABB PV References
40/48
Customer need
Single point of responsibility for all the electrical works and equipment
Reduced project lead time
First class automation and electrical systems
Maximize plant performance and reliability
ABB response
ABB delivers an eBoP solution to the customer
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
(Rajasthan, India)
Size: 5 MWp, fix installation
Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,
cabling, equipment housing, protection equipment, system optimization,
control, SCADA
Customer: Moserbaer
Engineering and Constructions
ABB Sco e: eBoP
Installation: Inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection, system optimization,
control, SCADA
Year of commissioning
EPC: 2012
ABB GroupMay 10, 2012 | Slide 40
Status: Under Construction
Bap PV Solar Plant
-
8/22/2019 ABB PV References
41/48
Customer need
Single point of responsibility for all the electrical works and equipment
Reduced project lead time
First class automation and electrical systems
Maximize plant performance and reliability
ABB response
ABB delivers an eBoP solution to the customer
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
(Rajasthan, India)
Size: 5 MWp, fix installation
Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,
cabling, equipment housing, protection equipment, system optimization,
control, SCADA
Customer: Punj Lloyd Delta
Renewables Private Limited
ABB Sco e: eBoP
Installation: Inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, PV modules electrical connection, system optimization,
control, SCADA
Year of commissioning
EPC: 2012
ABB GroupMay 10, 2012 | Slide 41
Status: Under Construction
Sliven PV Solar Plant
-
8/22/2019 ABB PV References
42/48
Customer need
Single point of responsibility for all the electrical works and equipment
Reduced project lead time
First class automation and electrical systems
Maximize plant performance and reliability
ABB response
ABB delivers an eBoP solution to the customer
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:Sliven PV Plant (Bulgaria)
Size: 9 MWp, fix installation
Supply: Inverter centers, DC & AC cabinets, transformers, switchgears,
cabling, equipment housing, protection equipment
Installation: Inverter centers, DC & AC cabinets, transformers,.
ABB Scope: MV Turnkey
Year of commissioning
switchgears, cabling, equipment housing, protection equipment, MV
connection line
EPC: 2012
Status: Under Commissioning
ABB GroupMay 10, 2012 | Slide 42
SLP Parking PV Solar Plant
-
8/22/2019 ABB PV References
43/48
Customer need
First class automation and electrical systems from ABB
Short construction schedule
Expertise in electrical connection to CFE
Local footprint
ABB response
ABB delivers a com lete solution
ABB partners with reputable contractors and suppliers to ensure highest
project quality
ABB sco e:SLP PV Plant (San Luis Potos,
Mexico)
Size: 1,1 MWp,
Supply: carports, inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, SCADA system, PV modules.
Carport installation
ABB Scope: EPC
Turn key structures, inverter centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
connection line, SCADA, PV modules, grid connection
Year of commissioning
EPC: 2012
ABB GroupMay 10, 2012 | Slide 43
APEX PV Solar Plant
-
8/22/2019 ABB PV References
44/48
Customer need
First class automation and electrical systems from ABB
Expertise in substation and HV grid connection to NV Energy
ABB response
ABB delivers the complete solution
ABB applies an efficiency improvement system to maximize the overall
performance of the PV solar plant
ABB scope:
Supply: transformation centers, DC & AC cabinets, transformers,
switchgears, cabling, equipment housing, protection equipment, MV
Apex PV Plant (Nevada, USA)
Size: 24,8 MWp, 1 axis traxkers
, , ,
connection
Installation: trackers, transformation centers, DC & AC cabinets,
transformers, switchgears, cabling, equipment housing, protection
ABB Scope: eBoP
Year of commissioning
equipment, MV connection line, SCADA, PV modules, substation,
overhead line for grid connection
EPC: 2012
Status: Under Construction
ABB GroupMay 10, 2012 | Slide 44
Projects Photovoltaics
-
8/22/2019 ABB PV References
45/48
Order year Country Location Customer Project Name Capacity (MW) Technology
2008 Spain Murcia Bridge Investment Capital Totana 1,0 Tracker
2010 Italy Sicily Gestamp Solar Sapeu 3,9 Fixed
2010 Italy Sicilia Actelios Solar Schinosa 1,0 Fixed
2010 Italy Sicilia Actelios Solar Cardonita 3,8 Fixed
2010 Italy Sicilia Actelios Solar Spinasanta 6,0 Fixed
2010 Italy Sicilia Actelios Solar Sugherotorto 3,3 Fixed
2010 Italy Lazio Geosol Borgomontello 3,4 Fixed
2010 Italy Sicily Gestamp Solar Ducotto 7,3 Fixed
2010 Italy Lazio Volteo Energia (Kinexia) Aprilia 9,2 Fixed
2010 Italy Puglia Macchia Rotonda s.r.l. Inicorbaf 3,0 Fixed
2010 Italy Puglia Macchia Rotonda s.r.l. Macchia Rotonda 6,6 Fixed
2010 Italy Puglia Macchia Rotonda s.r.l. Armiento 2,0 Fixed
2010 Ital Pu lia Macchia Rotonda s.r.l. Iacovan elo 3,5 Fixed
2010 Italy Puglia Emmessenne De Nittis 1,2,3 39,0 Fixed
2010 Italy Sicily Gestamp Solar Monreale 3,2 Fixed
2010 Italy Sicily Gestamp Solar Francofonte 2,7 Fixed
,
2010 Spain Leon Gestamp Solar La Robla 13,3 Tracker
2011 France Corsica Ralos Prunu 4,4 Fixed2011 France Atlantic Pyrinees Unite Solar Mezzos 4,2 Fishfarmer
,
2011 Italy Lazio Phenix Renewables Canino 24,1 Tracker
2011 Italy Sardinia Sardegna Agrienergia 4 SAE Furcas 2,5 Greenhouse
2011 Italy Sardinia Sardegna Agrienergia 5 SAE Pinna 1,8 Greenhouse
Projects Photovoltaics
-
8/22/2019 ABB PV References
46/48
Order year Country Location Customer Project Name Capacity (MW) Technology
2011 Italy Puglia Helios ITA3 (controllata Etrion) Brindisi 5,0 Tracker
2011 Italy Puglia Helios ITA3 (controllata Etrion) Mesagne 5,0 Tracker
2011 Italy Sicily Gestamp Solar Enerti 5 plants 21,0 Fixed
2012 Mexico San Luis Potos ABB Mexico SLP 1,1 Parking Lot
2011 Slovakia Sirkovce Enertec Sirkovce 1,0 Fixed
2011 Southafrica Johanesbrug Eskom Lethabo 0,6 Tracker
2011 Southafrica Johanesbrug Eskom Kendal 0,6 Fixed
2011 United Kingdom Gloucestershire Soostoom Tentbury 1,0 Fixed
2011 United Kingdom Wiltshire Sunstroom Malmesbury 5,2 Fixed
2011 Germany Bavaria HaWi Project GMBH Solarmo 1,2 Fixed
2011 India Punjab Soma Nangal 1,0 Fixed
2011 India Rajasthan Moserbaer Photo Voltaic Ltd Tinwari 5,0 Fixed
.
2012 USA Nevada Sun Edison Apex 24,8 Tracker
2012 India Rajasthan Moserbaer Engineering Bhilwara 5,0 Fixed
2012 India Rajasthan Moserbaer Engineering Bolangir 5,0 Fixed
n a a ast an un oy e ta enewa es ap , xe
Total installed capacity (MW) 252,9
Summar of Solar ABB references
-
8/22/2019 ABB PV References
47/48
PV PLANTSPV PLANTSMore than 40 PV plants (EPC, BOS )
More than 120 PV plants ( EBOP )
More than 250 MW rid connected
More than 81 Mwp under erectionMore than 3.100 Mwp under negotiation
(Spain, Italy, UK, France, South Africa,
USA, Mexico, India, Bulgaria, Germany)
Starting activities in many others countries