    ABB GroupSeptember 24, 2009 | Slide 1

    ABB Solutions for the FPSO marketElectrical, Instrument, AutomationTelecom and EPC turnkey packages

  • 8/9/2019 ABB FPSO Solutions Ref

    2/22

    ABB GroupSeptember 24, 2009 | Slide 2

    ABB References

    ABB has deliveries to 35 FPSOs since1989

  • 8/9/2019 ABB FPSO Solutions Ref

    3/22

    ABB GroupSeptember 24, 2009 | Slide 4 ABBMonth DD, YYYY | Slide 4

    BP Angola MODEC

    The FPSO will have production capacity of157,000 barrels per day and first oil from thedevelopment is scheduled in 2011.

    Deliveries - FPSO

    MV Switchgear

    LV Switchgear

    Power Managemt System

    Transformers

    FPSO - Latest Project

  • 8/9/2019 ABB FPSO Solutions Ref

    4/22

    ABB GroupSeptember 24, 2009 | Slide 5 ABBMonth DD, YYYY | Slide 5

    Tupi FPSO MODEC/Petrobras

    Tupi pilot FPSO Cidade De Angara dos Reis MV22 MODEC convert the VLCC "M/V Sunrise IV

    The FPSO will be capable of processing:

    100,000 barrels of oil per day or150,000 barrels oftotal fluids per day, 150 million cubic feet per day ofgas. storage capacity of approximately 1,600,000

    barrels. The FPSO will also be able to inject 100,000barrels of water per day.

    The FPSO will initially gather production from 5subsea wells with the capability to handle 4additional production wells in the future.

    Deliveries - FPSODesign, Engineering fabrication and construction of completeE-House

    A-60 Fire Rated , ABS Certified

    Architectural design

    Redundant HVAC with pressurization

    Fire & Gas Detection system

    CO2 fire suppression system

    Complete E&I installation, termination &commisisoning

    Total weight of 700 tonn

    MV Switchgear

    LV Switchgear

    Integration of the above into the e-house

    FPSO - Latest Project

  • 8/9/2019 ABB FPSO Solutions Ref

    5/22

    ABB GroupSeptember 24, 2009 | Slide 6

    FPSO Project in development

    Deliveries - FPSO

    FEED Studies for Electro and Automation

    Engineering services marine conversion Hullside Process and Safety Systems

    Topside Process and Safety Systems

    Power Management System

    Ex Remote I/O cabinets for PCS, PSD, ESD and F&G

    3x24MVA Generators

    13.8kV Switchgear 6,6kV Switchgear

    440V / 220V Process Switchboard

    UPS w/batteries

    Transformers (dry immersed)

    VSD for LV

    IS LimitersDeliveries - Wellhead Platforms

    Integrated Process and Safety Systems

    Power Management System

    13.8kV Switchgar

    4.16kV Switchgear

    380V LV VSD MV

    Transformers (oil immersed)

    Peregrino FPSO & Wellhead Platforms

    The FPSO and the two wellhead platforms will be installed on the Peregrino Fieldlocated offshore 85 km south-east of Rio de Janeiro, Brazil. The recoverableresources are estimated at between 300 million and 600 million barrels of heavy oil(API 14). There will be 30 horizontal production wells and 7 water injection wells.Production will commence in the first quarter of 2010.

  • 8/9/2019 ABB FPSO Solutions Ref

    6/22

    ABB GroupSeptember 24, 2009 | Slide 7

    FPSO Project in development Pioneer FPSO Cascade & Chinook - BW

    Offshore (BWO) The FPSO will be installed on the Chinook

    Cascade fields, located in the Walker Ridgeblock, situated over 300 km south of theLouisiana coast in the beginning of 2010.Production will commence in the first quarter of

    2010. The FPSO will have a storage capacityof about 600,000 barrels of oil, a processcapacity of 80,000 bopd and gas exportfacilities of 16 mmscfd. The FPSO will beinstalled on the field with a water depth of2,600 meters, probably the deepest waterdepth an FPSO ever has been installed on.

    Deliveries:

    EPC services for Automation

    Topside Process Control

    Topside Process Shutdown

    Topside Emergency Shutdown Vessel Emergency Shutdown

    Power Management System

    MV/LV Switchgears

    VSD system for Cargo pump

    Compressor Soft Starters

  • 8/9/2019 ABB FPSO Solutions Ref

    7/22

    ABB GroupSeptember 24, 2009 | Slide 8

    Low Cost Fast track FPSO projects (sample) Olowi Fred Olsen Production

    The 145,000 dwt tanker Knock Allen to be convertedat Dubai Dry Dock to a FPSO for operation for CNRInternational (Olowi) Limited offshore Gabon, VestAfrica.

    When completed in October 2008, the FPSO will havea production capacity of 35,000 barrels of oil, 85 mmdcf

    gas per day and a power gen capacity of 2x27MW. Thestorage facilities of the vessel will hold 1.04 millionbarrels of oil equivalent.

    Deliveries:

    EPC services for Electro and Automation

    E-house module

    Topside Process Control

    Topside Process Shutdown

    Topside Emergency Shutdown

    Vessel Emergency Shutdown

    Power Management System

    6,6kV main Switchgear

    440V Process Switchboard

    20kVA UPS w/batteries

    Soft starters for 5MW compressors

    Transformers (dry and oil immersed)

  • 8/9/2019 ABB FPSO Solutions Ref

    8/22

    ABB GroupSeptember 24, 2009 | Slide 9

    FPSO Project in operation Maersk Woodside Vincent/Nganhurra

    The 380,000 dwt tanker Ellen Maersk to be converted to a

    FPSO at Keppel Shipyard in Singapore in 2007 andrenamed Vincent.

    When completed in 2008, the FPSO will have a productioncapacity of 120,000 barrels of oil and 100 million standardcubic feet of gas per day. The storage facilities of the vesselwill hold 1.9 million barrels of oil equivalent.

    Deliveries:

    Topside Process Control

    Topside Process Shutdown

    Topside Local Equipment room

    Emergency Shut Down Systems

    F&G systems

    Ex Remote I/O cabinets for PCS, PSD, ESD and F&G

    Power Management

    Topside LV distribution boards and motor control centre

    HV Switchgear

    Generators Interface

    MV Soft starter.

    UPS

    Trafo

    Ex. Distribution Boards

  • 8/9/2019 ABB FPSO Solutions Ref

    9/22

    ABB GroupSeptember 24, 2009 | Slide 10

    FPSO Project in operation

    Cidade de Vitoria (Golfinho II)

    Vitoria, is a FPSO vessel with a storage capacity of1,600,000 barrels and an oil production capacity of 100,000barrels of oil per day. The FPSO is used on the Petrobrasfield called Golfinho.

    ABB Scope of Supply:

    Topside Process Control

    Topside Process Shutdown

    Topside Instrumentation

    Topside Local Equipment room

    Ship Automation System (refurbishment)

    Emergency Shut Down Systems

    F&G systems

    Topside LV distribution boards and motor control centre HV Switchgear

    Power Management.

    Telecom

  • 8/9/2019 ABB FPSO Solutions Ref

    10/22

    ABB GroupSeptember 24, 2009 | Slide 11

    Low Cost Fast track FPSO projects (sample)

    Sendje Ceiba

    The 275,000 dwt tanker Berge Hus was converted into anFPSO at Jurong shipyard in Singapore and renamed SendjeCeiba.

    FPSO Sendje Ceiba was delivered with a productioncapacity of 160,000 barrels of liquids per day (bpd) andwater injection capacity of 135,000 bpd. The storagecapacity is two million barrels of oil. ABB (Vetco Aibel) hasprovided the process plant. The design life is 15 years withten years on the field without dry docking.

    Deliveries:

    Topside Process Control

    Topside Process Shutdown

    Topside Instrumentation

    Topside Local Equipment room

    Ship Automation System (refurbishment)

    Emergency Shut Down Systems F&G systems

    Topside LV distribution boards and motor control centre

    HV Switchgear

    New Generator

    Power Management.

    MV Soft starter.

  • 8/9/2019 ABB FPSO Solutions Ref

    11/22

    ABB GroupSeptember 24, 2009 | Slide 12

    Low Cost Fast track FPSO projects (sample)

    Sendje Berge Upgrade

    Sendje Berge was upgraded in 2004 at JurongShipyard in Singapore after been awarded a contractwith ADDAX.

    Deliveries upgrade scope:

    Extension of topside Process Control

    Extension of topside Process Shutdown

    Extension of topside Instrumentation

    Extension of topside Local Equipment Room

    Extension of Ship Automation System (refurbishment)

    Extension of Emergency Shut Down Systems

    Extension of F&G systems

    Extension of Topside LV distribution boards and motorcontrol centre

    Extension of HV Switchgear. New panels in existingswitchboard.

    New Generator

    Extension of Power Management

    Delivery of Medium Voltage soft starters for GasInjection pumps. 4,7MW.

  • 8/9/2019 ABB FPSO Solutions Ref

    12/22

    ABB GroupSeptember 24, 2009 | Slide 13

    Low Cost Fast track FPSO projects (sample)

    Berge Helene Generic

    The conversion of the 275,000 dwt tanker BergeHelene was completed 2003 at Jurong shipyard in

    Singapore. Berge Helene is a generic FPSO with aproduction capacity of 60,000 barrels of liquids per day(bpd) and a storage capacity of two million barrels ofcrude oil. The vessel is designed for extended at-seaservice and to support incremental, on-locationexpansion of up to 240,000 bpd.

    Deliveries generic:

    Topside Process Control

    Topside Process Shutdown

    Topside Instrumentation

    Ship Automation System (refurbishment) Emergency Shut Down Systems

    Topside F&G systems

    HV Switchgear

    Power Management

  • 8/9/2019 ABB FPSO Solutions Ref

    13/22

    ABB GroupSeptember 24, 2009 | Slide 14

    Low Cost Fast track FPSO projects

    Berge Helene Upgrade

    The upgrade of Berge Helene in production at Chinguettifield outside Mauritania, West Africa.

    Deliveries for upgrade:

    Extension of Topside Process Control

    Extension of Topside Process Shutdown

    Extension of Topside Instrumentation

    Extension of Ship Automation System (refurbishment)

    Extension of Emergency Shut Down Systems

    Extension of Topside F&G systems Extension of existing HV Switchgear.

    Delivery of 2 pc. 30MVA turbine generators.

    Delivery of new 11kV switchboard.

    Delivery of 6,6 kV emergency switchboard.

    Extension of Power Management.

    Delivery of transformers with bus-duct connection.

    Delivery of 11 kV soft starters for Water Injection andGas Injection pumps.

    Delivery of 6,6kV Soft Starters for emergencyswitchboard.

  • 8/9/2019 ABB FPSO Solutions Ref

    14/22

    ABB GroupSeptember 24, 2009 | Slide 15

    Fire & Gas

    Emergency Shutdown

    Process Shutdown

    Process Control System

    PIMS

    Subsea Control

    Compressor / Turbine Control

    Training Simulator

    Varg (Pertra)

  • 8/9/2019 ABB FPSO Solutions Ref

    15/22

    ABB GroupSeptember 24, 2009 | Slide 16

    Balder - ExxonMobil

    Process Control System

    Subsea Control

    Well Control System

  • 8/9/2019 ABB FPSO Solutions Ref

    16/22

    ABB GroupSeptember 24, 2009 | Slide 17

    Terra Nova

    Fire & Gas

    Emergency Shut Down

    Process Shutdown

    Process Control

    Subsea Control

    PIMS

  • 8/9/2019 ABB FPSO Solutions Ref

    17/22

    ABB GroupSeptember 24, 2009 | Slide 18

    Island Wellserver

    ABB Supplies Well Services:

    Integrated Operation / Remote Services

    Data Acquisition

    Fire & Gas

    Emergency Shutdown System

  • 8/9/2019 ABB FPSO Solutions Ref

    18/22

    ABB GroupSeptember 24, 2009 | Slide 19

  • 8/9/2019 ABB FPSO Solutions Ref

    19/22

    ABB GroupSeptember 24, 2009 | Slide 20

    Tupi I

  • 8/9/2019 ABB FPSO Solutions Ref

    20/22

    ABB GroupSeptember 24, 2009 | Slide 21

    Tupi I

  • 8/9/2019 ABB FPSO Solutions Ref

    21/22

    ABB GroupSeptember 24, 2009 | Slide 22

    Tupi I

  • 8/9/2019 ABB FPSO Solutions Ref

    22/22

    ABB GroupSeptember 24, 2009 | Slide 24

    Fred Olsen Production Knock Allan FPSO