  • Data sheet 10/23-5.10 EN Rev. 10

    System components for sample gas sampling Probe tubes, filter units, sample gas lines, accessories

    Measurement made easy

    Modular sample gas probe system FE2 Filter unit Annular heating element Heating sleeve PFE2 Filter unit PFE3 Filter unit Type 40, Type 40 W Probe tubes Type 42 Probe tube (heated)

    Type 60 Probe tube (cement flue gas probe) Probe 2 Probe 11 Ceramic filter Process pressure reducers CGWB 13 Heated sample gas line TBL 01-S, TBL 01-C, TBL 01-E Heated sample gas lines Electronic temperature controller and switching relay

  • 2 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    Modular sample gas probe system

    Easily adaptable to different sampling conditions thanks to modular construction

    Components: FE2, PFE2, PFE3 filter units Probe tube types 40, 42, 60 Annular heating element Heating sleeve Probe tubes and filter unit heatable Connections for test gas and back purging Filter with high retention rate and long service life Easy filter replacement Usable in emission measuring systems conforming to

    European Directives 2000/76/EC and 2001/80/EC

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 3

    FE2 Filter unit

    Use The FE2 filter unit is a component of the modular gas sampling probe system. It is used for filtering gases containing dust. Process gas sampling conditions Pressure

    pabs = 50 to 600 kPa Temperature

    Max. 200 C (coated max. 180 C) Flow rate

    30 to 500 l/h, relative to 100 kPa and 0 C Pressure drop

    Approx. 0.6 hPa at 100 l/h Dust content

    Max. 3 g/m3 (application recommendation); max. 40 g/m3 with probe tube type 40 (see page 20) with purge-back device; max. 2000 g/m3 with probe tube type 60 (see page 22)

    Filter characteristics Filter element

    Surface filter Filter fineness

    0.3 m Retention rate

    99.98 % Seal integrity

    104 hPa l/s Dead volume

    280 ml Materials of gas-conducting parts Casing and connections

    Special steel 1.4571 (SAE 316Ti) Flange

    Special steel 1.4541 (SAE 321) Filter

    Aluminum oxide surface filter Coating

    Thermoset plastic, resistant up to 180 C Installation Flange

    DN 65, PN 6, form B to DIN 2573, flange gasket A; positioning of holes: 45, 90, 135, 180, 225, 270, 315, 360

    Mounting

    Flange connect or bolt to the probe tube Weight

    Approx. 8.0 kg

    Connection ports Sample gas , test gas

    G 1/4 in. internal thread Compressed air for back-purging (2 ports, optional)

    G 1/2 in. internal thread Probe tube

    G 3/4 in. internal thread Compressed air supply for back-purging (see PFE2 filter unit, page 7) Instrument air

    Free of dust, water and oil Pressure

    Max. 600 kPa Dimensional drawing (dimensions in mm)

    14

    13

    0

    16

    0

    65

    280 40...65

    10

    5

  • 4 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    FE2 Filter unit

    Ordering information

    Catalog No.Housing and flange SS, filter 0,3 m ceramic, gaskets standard, without purge connectors 23042-4-0730743Housing and flange SS, coated, filter 0,3 m ceramic, gaskets standard, without purge connectors 23042-5-0730744Housing and flange SS, filter 0,3 m ceramic, gaskets standard, with purge connectors 23042-4-0730745Housing and flange SS, coated, filter 0,3 m ceramic, gaskets standard, with purge connectors 23042-5-0730746Housing and flange SS, filter 0,3 m ceramic, gaskets for high corrosive gases, without purge connectors 23042-4-0730747Housing and flange SS, coated, filter 0,3 m ceramic, gaskets for high corrosive gases, w/o purge connectors 23042-5-0730748Housing and flange SS, filter 0,3 m ceramic, gaskets for high corrosive gases, with purge connectors 23042-4-0730749Housing and flange SS, coated, filter 0,3 m ceramic, gaskets for high corrosive gases, with purge connectors 23042-5-0730750

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 5

    Annular heating element

    Use The annular heating element is used for heating the FE2 filter unit, which is a component of the modular gas sampling probe system (see page 3). Heating is necessary if condensation is likely from moist gases and there is consequently risk of the filter becoming clogged and corroded. Data Power supply

    120 V AC or 230 V AC, 50 to 60 Hz Heater output

    200 W, 100 W or 50 W depending on setting (see below) The heating resistors are factory-set for heat output of 100 W

    Temperature of heater (unregulated)

    Approx. 120 C to 180 C (measured at ambient temperature of 20 C, still air)

    Ambient temperature

    0 to 55 C (still air) Degree of protection of housing

    IP50 Materials

    Housing: aluminum alloy, heating surface: brass Weight

    Approx. 1.7 kg Electrical connections

    Terminals via M20 cable gland. The electrical supply conductor must be heat resistant ( 200 C).

    Installation Two half shells are placed round the FE2 filter unit to be heated and closed with a wing screw. Option Regulated heating with 1 x Pt 100 Heating circuit

    Dimensional drawing (dimensions in mm)

    Ordering information

    Catalog No.Ring heater 230 V, 50/60 Hz 23029-5-7865312Ring heater 120 V, 50/60 Hz 23029-5-8008813Ring heater with Pt 100, 230 V, 50/60 Hz 23029-5-7865316Ring heater with Pt 100, 120 V, 50/60 Hz 23029-5-7865317

    230 / 115 V AC200 W 100 W 50 W

    230 / 115 V AC 230 / 115 V AC

  • 6 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    Heating sleeve

    Regulated heating sleeve for FE2 filter unit Heater

    Micanite Holding temperature

    Max. 350 C Temperature control

    Max. 200 C (Pt 100) Power supply

    120 V AC or 230 V AC Power consumption

    250 VA Connection

    Terminal box with M16 cable gland, degree of protection IP54

    Supply cable

    3 x 1 mm2 with silicone sheath, length 1 m Ambient temperature

    20 to +45 C Relative humidity

    75 % yearly mean; infrequent slight condensation permissible

    Weight

    Approx. 1 kg Essential accessories Insulating mat Temperature controller (see page 39)

    Ordering information

    Catalog No.Heated sleeve, 230 V, 50/60 Hz, 250 VA 23043-5-8018410Heated sleeve, 120 V, 50/60 Hz, 250 VA 23043-5-8018411Isolation for heated sleeve 23043-5-8018412

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 7

    PFE2 Filter unit

    Design The PFE2 filter unit consists of the FE2 filter unit with a regulat-ed heating sleeve, installed in a special-steel protective case. It is used to filter dust-containing gases and is a component of the modular gas sampling probe system. When used for gases with high dust content, the PFE2 can optionally be fitted with valves for automatic cleaning of the filter element in the FE2 filter unit. Depending on the dust load, in addition to 1-stage or 2-stage back-purging the type of back-purging can be selected. For this purpose, a pneumatically controlled valve circuitry with diaphragm back-purging valves and a direct acting version with coaxial sliding valves are available. The coaxial sliding valves are particularly suitable for frequent back-purging cycles. FE2 filter unit Technical data see page 3 Protective case Dimensions

    Standard version: 450 x 450 x 400 mm (H x W x D) Basic version: 270 x 203 x 330 mm (H x W x D)

    Material Special steel 1.4301 (SAE 304)

    Degree of protection of housing IP54

    Weight Standard version: approx. 25 kg incl. FE2 filter unit Basic version: approx. 17 kg incl. FE2 filter unit

    Ambient temperature 20 to +45 C

    Options Annular heating element, unregulated (see page 5) Heating sleeve, regulated (Pt 100), with insulating mat

    (see page 6) Back purging

    Pneumatic valves

    Type 2/2-way straight-way diaphragm valve

    Operating pressure/control pressure 600 kPa (6 bar)

    Nominal diameter DN 12

    Connections G 1/2 in. internal thread, control air: G 1/8 in. internal thread

    Material Brass

    Mode of operation Closed in normal position

    Ambient temperature 0 to +100 C

    Control valves

    Type 3/2-way solenoid valve

    Pressure range 600 kPa (6 bar)

    Nominal diameter DN 2.0

    Connections G 1/8 in. internal thread

    Material Brass

    Mode of operation Closed in normal position

    Ambient temperature 0 to +100 C

    Electrical connections Standard connector

    Power supply 120 V AC or 230 V AC, 50 to 60 Hz

    Power consumption 8 VA

    Coaxial valves

    Type 2/2-way direct acting valve

    Operating pressure 064 bar

    Nominal diameter DN 10

    Connections 10/12 x 1 mm

    Material Body: brass, valve seat: synthetic resin on metal, seal: NBR

    Mode of operation Closed in normal position

    Ambient temperature 10 to +80 C

    Power supply, current consumption 230 V AC, 50 to 60 Hz, 0.13 A

  • 8 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    PFE2 Filter unit

    Probe protective case, standard version: Dimensional drawing (dimensions in mm)

    40

    0

    450

    45

    0

    155

    440

    30

    016

    0

    17

    0

    170

    210

    75

    75

    11

    0

    65

    80

    90

    180

    80

    50

    15

    5

    M4

    M4

    165

    6

    ,5 11

    ,5

    1

    9,5

    M4

    M4

    45

    08

    0

    155

    550

    300

    Testgas

    connection

    Bulk

    head

    fittin

    g4/6

    x1

    mm

    Com

    pre

    ssed

    air

    Purg

    ing

    Bulk

    head

    fittin

    g10/1

    2x1

    mm

    Sam

    ple

    gas

    connection

    Contr

    olair

    Bulk

    head

    fittin

    g4/6

    x1

    mm

    Fla

    nge

    pla

    tew

    ith

    pip

    ecla

    mp

    21/2

    "R

    ST

    37-2

    hotgalv

    aniz

    ed

    DIN

    3568

    for

    mounting

    atpro

    be

    mounting

    adapte

    r

    Elo

    ngate

    dhole

    sfo

    rM

    8safe

    tycolla

    rbolts

    Ele

    ctr

    icalconnections

    Cover

    sw

    ivels

    upw

    ard

    s

    2x

    M32

    3x

    M25

    2x

    M20

    Take

    hole

    sfo

    rcable

    gla

    nds

    on

    the

    left

    into

    account

    Term

    inalbox

    with

    cable

    gla

    nds

    Use

    as

    required

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 9

    PFE2 Filter unit

    Probe protective case, standard version: Mounting

    Minimum distance xmin of the mounting flange from the wall depending on mounting angle : 10 15 20 25 30 35xmin /mm 229 248 268 287 307 324

    Probe protective case, basic version: Dimensional drawing and gas connections (dimensions in mm)

    1 Terminal box -X1 IP66 2 Sample gas line 3 Sample gas connection 6 mm 4 Test gas connection bulkhead fitting

    6 mm

    X

    3 xM20x1.5

    2 xM12x1.5

    2 xM20x1.5

    1234

    270

    330

    130

    58

    124

    80

    266

    200

  • 10 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    PFE2 Filter unit

    Pneumatic connections for 2-stage back-purging, standard version

    C

    D

    B

    A

    A:

    B:

    C:

    D:

    Back

    Pre

    ssure

    Purg

    ing

    Filt

    er

    Inle

    tG

    1/2

    "->

    12

    mm

    Tube

    Fitting

    Back

    Pre

    ssure

    Purg

    ing

    Filt

    er

    Surf

    ace

    and

    Pro

    be

    Tube

    Inle

    tG

    1/2

    "->

    12

    mm

    Tube

    Fitting

    Sam

    ple

    Outlet

    G1/4

    "->

    6m

    mor

    8m

    mT

    ube

    Fitting

    Calib

    ration

    Gas

    Inle

    tG

    1/4

    "->

    6m

    mT

    ube

    Fitting

    Instr

    um

    entA

    irIn

    let

    Bulk

    Head

    Unio

    n12

    mm

    Calib

    ration

    Gas

    Inle

    tB

    ulk

    Head

    Unio

    n6

    mm

    Contr

    olA

    irIn

    let

    Bulk

    Head

    Unio

    n6

    mm

    Pilo

    tO

    pera

    tion

    Valv

    eC

    leanin

    gF

    ilter

    -Y2.1

    Dia

    phra

    gm

    Valv

    eC

    leanin

    gF

    ilter

    -Y2.2

    Pilo

    tO

    pera

    tion

    Valv

    eP

    uls

    -Instr

    um

    entA

    ir-Y

    1.1

    Dia

    phra

    gm

    Valv

    eP

    uls

    -Instr

    um

    ente

    nlu

    ft-Y

    1.2

    Pilo

    tO

    pera

    tion

    Valv

    eC

    leanin

    gF

    ilter

    Surf

    ace

    and

    Pro

    be

    Tube

    -Y3.1

    Dia

    phra

    gm

    Valv

    eC

    leanin

    gF

    ilter

    Surf

    ace

    and

    Pro

    be

    Tube

    -Y3.2

    Sole

    noid

    Valv

    eA

    era

    tion

    -Y4

    Heate

    dS

    am

    ple

    Lin

    e-E

    2

    Junction

    Box

    Pro

    tection

    Box

    Ch

    eck

    Valv

    e

    Filt

    er

    Unit

    Heate

    dC

    heck

    Valv

    e-Y

    5

    Pt1

    00

    Connection

    Pow

    er

    Supply

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 11

    PFE2 Filter unit

    Pneumatic connections for 2-stage back-purging, standard version with coaxial valves

    0

    Junction b

    ox

    Pro

    tection b

    ox

    Check v

    alv

    e

    Filt

    er

    unit

    Pow

    er

    supply

    Connection for

    back-p

    urg

    ing filt

    er

    G 1

    /2 in. to

    12 m

    m p

    ipe c

    ouplin

    g

    Test gas c

    onnection G

    1/4

    in.

    to 6

    mm

    pip

    e c

    ouplin

    g

    Sam

    ple

    gas o

    utlet G

    1/4

    in.

    to 6

    mm

    pip

    e c

    ouplin

    g

    Sole

    noid

    valv

    e for

    cle

    anin

    g filt

    er

    -Y2

    Connection for

    instr

    um

    ent

    air (

    max. 6 b

    ar)

    bulk

    head fitting 1

    2 m

    m

    Connection for

    test gas

    bulk

    head fitting 6

    mm

    Connection for

    Pt1

    00

    Heate

    d s

    am

    ple

    gas lin

    e -

    E2

    Connection for

    instr

    um

    ent

    air (

    max. 6 b

    ar)

    bulk

    head fitting 1

    2 m

    m

    Heate

    d c

    uto

    ff v

    alv

    e -

    Y5 (

    option)

    Sole

    noid

    valv

    e for

    cle

    anin

    g filt

    er

    surf

    ace

    and p

    robe tube -

    Y1

    Connection for

    back-p

    urg

    ing

    filter

    surf

    ace a

    nd p

    robe tube

    G 1

    /2 in. to

    12 m

    m p

    ipe c

    ouplin

    g

  • 12 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    PFE2 Filter unit

    Probe protective case, standard version: Circuit and terminal diagram

    -E1

    -E2

    LN

    PE

    -X1

    12

    -X1

    56

    PE

    38

    -E3.2

    -X1

    LN

    PE

    -X1

    -E5.2

    -E5.1

    LN

    PE

    17

    -T01

    11

    5V

    ~

    24

    V=

    1,3

    A

    -X2

    12

    LN

    PE

    45

    LN

    PE

    78

    LN

    PE

    LN

    PE

    -Y3.1

    -Y1.1

    -Y2.1

    -Y4

    LN

    PE

    15

    36

    A1

    A2

    -Y5 -X

    2

    ......

    ...

    -X3

    12

    34

    56

    78

    91

    011

    12

    13

    14

    15

    16

    18

    17

    14

    -E4

    -B01

    set@

    30C

    3...1

    8x

    0,1

    4m

    m

    18

    19

    32

    1

    3x1

    ,5m

    m3x

    2,5

    mm

    3x1

    ,5m

    m

    3x1

    ,5m

    m

    3x1

    ,5m

    m

    4x1

    ,5m

    m

    20

    21

    15

    16

    13

    14

    12

    10

    11

    91

    37

    N

    4

    L

    3x1

    ,5m

    m

    2x0

    ,14

    mm

    2x0

    ,14

    mm

    2

    x0

    ,14

    mm

    2x0

    ,14

    mm

    2x

    0,1

    4m

    m

    2x

    0,1

    4m

    m

    -K013x

    1,5

    mm

    L

    11

    10

    9

    PE

    N

    12

    -E3

    .1

    External Protection Box Junction Box Analyzer Cabinet

    Power Supply Heating Sleave Filter Unit,230 or 115 VAC, 50...60 Hz, 250 W,required fusing 6 A,controller required !

    Heatin

    gS

    leeve

    Filte

    rU

    nit

    Power Supply Heater Probe Tube,230 VAC, 50...60 Hz, max. 800 W,required fusing 6 A,in case of 115 VAC power supply wire theheating elements -E3.1 and -E3.2 parallel.controller required !

    Power Supply Sample Line,230 VAC: < 35 m -> 1~, 35...60 m -> 3~,115 VAC: < 15 m -> 1~, 15...40 m -> 3~,50...60 Hz, 90 W/m,in case of a 3~ sample line connectL2 -> Termination 5, L3 -> Termination 6,required fusing 16 A,controller required !

    >>

    He

    ate

    dP

    rob

    eT

    ub

    e

    Power Supply Frost Protection,230 or 115 VAC, 50...60 Hz, 300 W,required fusing 6 A

    Power Supply PTC-Elements andPowerpack -G02 / Heated Solenoid Valvein Sample Outlet,230 or 115 VAC, 50...60 Hz, 250 W,required fusing 6 A

    Power Supply Pilot Operation Valve -Y3.1,Cleaning Filter Surface and Probe Tube,230 or 115 VAC, 50...60 Hz, 8 Wrequired fusing 1 A

    Power Supply Pilot Operation Valve -Y1.1,Puls-Instrument Air,230 or 115 VAC, 50...60 Hz, 8 Wrequired fusing 1 A

    Power Supply Pilot Operation Valve -Y2.1,Cleaning Filter,230 or 115 VAC, 50...60 Hz, 8 Wrequired fusing 1 A

    Power Supply Pilot Operation Valve -Y4,Aeration,230 or 115 VAC, 50...60 Hz, 8 Wrequired fusing 1 A

    Power Supply Relais -K05/Check Valve -Y5,230 or 115 VAC, 50...60 Hz,required fusing 1 A

    Resistance Thermometer PT100,Filter Unit Sample Outlet,3-Wire-Connection

    Resistance Thermometer PT100,Sample Line,3-Wire-Connection

    Resistance Thermometer PT100,Probe Tube,3-Wire-Connection

    Resistance Thermometer PT100,Filter Unit Sample Outlet (Safety Wiring), 3-Wire-Connection

    Resistance Thermometer PT100,Sample Line (Safety Wiring),3-Wire-Connection

    Resistance Thermometer PT100,Probe Tube (Safety Wiring),3-Wire-Connection

    Fro

    stP

    rote

    ctio

    n

    He

    ate

    dC

    he

    ck

    Va

    lve

    21

    .10

    .20

    05

    Heate

    dS

    am

    ple

    Lin

    e

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 13

    PFE2 Filter unit

    Probe protective case, standard version with coaxial valves: Circuit and terminal diagram

    -E1

    -E2

    LN

    PE

    -X11

    2

    -X15

    6

    L2L3

    PE

    38

    -E3.1-E3.2

    -X1

    LN

    PE

    -X1

    -E5.2-E5.1

    LN

    PE

    17-X2

    12

    45

    LN

    PE

    LN

    PE

    -Y1-Y2

    LN

    PE9

    36

    A1A2

    -Y5 -X2

    ......

    ...

    -X31

    23

    45

    67

    89

    1011

    1213

    1415

    1618

    178

    -E4

    -B01

    set @ 30C

    1819

    32

    1

    3x1,5 mm

    5x2,5 mm

    3x1,5 m

    m

    3x1,5 mm

    4x1,5 m

    m

    2015

    1613

    147

    7

    N

    4

    L1

    3x1,5mm

    2x0,14mm

    2x0,14mm

    2x0,14m

    m

    2x0,14mm

    2x0,14m

    m

    2x0,14m

    m

    -K05

    3x1,5mm

    L

    1110

    9

    PE

    N

    12

    LN

    -T01 230 V~24 V

    =1,3 A

    +-

    External Protection Box Junction Box Analyzer Cabinet

    Power Supply Heating Sleave Filter Unit,230 VAC, 50...60 Hz, 250 W,required fusing 6 A,controller required!

    Heating

    Sleeve

    Filter Unit

    Power Supply Heater Probe Tube,230 VAC, 50...60 Hz, max. 800 W,required fusing 6 A,controller required!

    Power Supply Sample Line,230 VAC, 50...60 Hz,90 W/m, max. 11 kW / 17 kW, required fusing 16 A / 25 A,controller required!

    Heated

    Probe Tube

    Power Supply Frost Protection,230 VAC, 50...60 Hz, 300 W,required fusing 6 A

    Power Supply PTC Elements and Powerpack -G02 / Heated Solenoid Valve in Sample Outlet,230 VAC, 50...60 Hz, 250 W,required fusing 6 A

    Power Supply Solenoid Valve -Y1Cleaning Filter Surface and Probe Tube,230 VAC, 50...60 Hz, 30 VArequired fusing 1 A

    Power Supply Relay -K05 for Cutoff Valve -Y5,230 VAC, 50...60 Hz,required fusing 1 A

    Resistance Thermometer Pt100,Filter Unit Sample Gas Outlet,3-Wire ConnectionResistance Thermometer Pt100,Sample Gas Line,3-Wire ConnectionResistance Thermometer Pt100,Probe Tube,3-Wire ConnectionResistance Thermometer Pt100,Filter Unit Sample Gas Outlet (Safety Wiring),3-Wire ConnectionResistance Thermometer Pt100,Sample Gas Line (Safety Wiring),3-Wire ConnectionResistance Thermometer Pt100,Probe Tube (Safety Wiring),3-Wire Connection

    Frost Protection

    Heated C

    heck Valve

    Heated

    Sam

    ple Line

    Power Supply Solenoid Valve -Y2Cleaning Filter,230 VAC, 50...60 Hz, 30 VArequired fusing 1 A

  • 14 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    PFE2 Filter unit

    Ordering information

    Catalog No. 23028-0- 0 0 Design with protection box, Standard, IP 54 (450 x 450 x 400 mm) 2 with protection box, Standard, IP 54, anti-freeze heating 3 with protection box, Standard, IP 54, ambient temp. max. 65 C 4 with protection box, Basic, IP 54 (270 x 203 x 330 mm) 5 Filter housing and flange (equal FE2) Material SS, filter ceramic < 0.3 m, w/o connectors for back purging A Material SS, coated, filter ceramic < 0.3 m, w/o connectors for back purging B Heating with heating sleeve and insulation (max. 190 C, Pt 100 required) 2 with ring heater, unregulated 3 Controlling and monitoring without 1 with 1 x Pt 100 2 with 2 x Pt 100 3 Back purging unit with test/emergency purge valve (w/o compressed air unit) without 0 with back purging, 1-stage and SS connection adapter 1 with back purging, 2-stage and SS connection adapter 2 without back purging, with test/emerg. purge valve, unheated, without SS connection adapter 3 with back purging, 1-st., with test/emerg. purge valve, heated shut-off valve, SS connection adapter 5 with back purging, 2-st., with test/emerg. purge valve, heated shut-off valve, SS connection adapter 6 with back purging, 2-st., heated shut-of valve, SS connection adapter 7 with back purging, 1-stage via Coax valve, SS connection adapter A with back purging, 2-stage via Coax valves, SS connection adapter B w. back purging, 1-st. via Coax valve, with test/emerg. purge valve, heated shut-off-v., SS connection ad. D w. back purging, 2-st. via Coax valves, with test/emerg. purge valve, heated shut-off v., SS connection ad. E with back purging, 2-st. via Coax valves, heated shut-off valve, SS connection adapter F Power supply 230 V, 5060 Hz 1 120 V, 5060 Hz 2 120 V, 5060 Hz CSA, with AWG wiring 3 Approvals without 0 GOST 1 Gaskets Standard 1 for high corrosive gases 2 Connectors for back-purging at the filter housing (FE2) without 0with 1 Bulkhead unions (at the protection box) metric 1imperial (sample gas outlet in metric only) 2

    Catalog No. 23028-0- 0 0

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 15

    PFE3 Filter unit

    Design The PFE3 filter unit consists of a modified FE2 filter unit with a self-regulating heater. It is installed in a stainless steel protec-tive case. Process gas sampling conditions Pressure

    pabs = 50 to 600 kPa Temperature

    Max. 200 C Flow rate

    30 to 500 l/h, relative to 100 kPa and 0 C Pressure drop

    Approx. 0.6 hPa at 100 l/h Dust content

    Max. 3 g/m3 (application recommendation) Filter characteristics Filter element

    Surface filter Filter fineness

    0.3 m Seal integrity

    104 hPa l/s Dead volume

    280 ml Dimensions

    50/20 x 135 mm Heater Type

    Self-regulating heater (400 W) Temperature

    180 C (ambient temperature 20 C) Temperature alarm

    Approx. 150 C Power supply

    120 V AC or 230 V AC, 50 to 60 Hz Options Annular heating element (see page 5) Heating sleeve (see page 6)

    Materials of gas-conducting parts Casing, flange and connections

    Special steel 1.4571 (SAE 316Ti) Seals

    FPM

    Installation Flange

    DN 65, PN 6, form B to DIN 2527; positioning of holes: 45, 135, 225, 315

    Mounting

    Flange connect or bolt to the probe tube Connection ports Sample gas

    Pipe fitting 6 mm Test gas

    Bulkhead fitting 6 mm (option) Purge gas

    Bulkhead fittings 18 mm (option) Probe tube

    G 3/4 in. internal thread Protective case Dimensions

    270 x 203 x 330 mm (H x W x D) Material

    Special steel 1.4301 (SAE 304) Degree of protection of case

    IP54 Weight

    Approx. 17 kg incl. FE2 filter unit Ambient temperature

    20 to +45 C

  • 16 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    PFE3 Filter unit

    Dimensional drawing, gas connections (dimensions in mm)

    58

    270

    266

    130

    12

    4

    80

    33

    02

    00

    3x

    M2

    0x1

    ,52

    xM

    12

    x1

    ,5

    M20x1,5

    Junction

    Box

    -X1

    IP66

    Tube,S

    S316T

    i,6x1

    mm

    Calib

    ration

    Gas

    Bulk

    Head

    Unio

    n6

    mm

    Cle

    anin

    gF

    ilter

    Surf

    ace

    and

    Pro

    be

    Tube,

    Bulk

    Head

    Unio

    n18

    mm

    Cle

    anin

    gF

    ilter ,

    Bulk

    Head

    Unio

    n18

    mm

    Tube,C

    U15x1

    mm

    Tube,C

    U15x1

    mm

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 17

    PFE3 Filter unit

    Circuit and terminal diagram

    -E2

    LN

    PE

    -X1

    12

    -X1

    34

    LN

    PE

    PE

    PE

    -X1

    56

    78

    91

    0

    3x2,5

    mm

    2x0,1

    4m

    m

    -E1.1

    -E1.2

    -E1.3

    -E1.4

    set@

    140C

    11

    12

    13

    2x0,1

    4m

    m

    2x0,2

    mm

    3x1,5

    mm

    External Protection Box Junction Box Analyser Cabinet

    Power SupplyHeated Aluminium Form Filter Unit,230 or 115 VAC, 50...60 Hz, 250 W,required fusing 6 A

    Power Supply Sample Line,230 or 115 VAC, 50...60 Hz,90 W/m, max. 3600 W / 5700 W,required fusing 16 A / 25 A,controller required !

    Resistance Thermometer PT100,Filter Unit Sample Outlet,3-Wire-Connection

    Resistance Thermometer PT100,Sample Line,3-Wire-Connection

    Heate

    dS

    am

    ple

    Lin

    e

    Heate

    dA

    lum

    iniu

    mF

    orm

    sF

    ilter

    Unit

    Temperature Alarm,Surface heated Aluminium Forms

  • 18 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    PFE3 Filter unit

    Ordering information

    Catalog No. 23046-0- 0 0 0 0 0 Design with protection box IP54 (330 x 203 x 270 mm) 1 Filter housing and flange in stainless steel Filter unit < 0.3 m (filtration fineness), without purge connectors 4 Filter unit < 0.3 m, coated, without purge connectors 5 Filter unit FE2, < 0.3 m, with purge connectors, 2-stage 6 Filter unit FE2, coated, < 0.3 m, with purge connectors, 2-stage 7 Heating with self regulated heating and temperature alarm (120/230 V AC) 1 with ring heater, unregulated 2 with heated sleeve (max. 190 C, Pt 100 required) 3 Controlling and monitoring without 3 with 1 x Pt 100 (only for heated sleeve) 4 with 2 x Pt 100 (only for heated sleeve) 5 Connectors for back purging (without compressed air unit) without 1 with bulkhead unions for back purging, 1-stage 2 with bulkhead unions for back purging, 2-stage 3 Power supply 230 V AC, 5060 Hz 1 120 V AC, 5060 Hz 2 Test gas / emergency purging valve without 1 with, unheated, bulkhead union for connecting 2

    Catalog No. 23046-0- 0 0 0 0 0

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 19

    Selection table for probe tube types and probes

    Pro

    be

    tub

    e ty

    pe

    40

    SS

    1.4

    571

    (SA

    E 3

    16Ti

    )

    Pro

    be

    tub

    e ty

    pe

    40 W

    S

    S 1

    .457

    1 (S

    AE

    316

    Ti)

    Pro

    be

    tub

    e ty

    pe

    40

    SS

    1.4

    571

    (SA

    E 3

    16Ti

    ) co

    ated

    Pro

    be

    tub

    e ty

    pe

    40

    SS

    1.4

    893

    Pro

    be

    tub

    e ty

    pe

    40

    silic

    on c

    arb

    ide

    Pro

    be

    tub

    e ty

    pe

    42

    SS

    hea

    ted

    Pro

    be

    tub

    e ty

    pe

    60

    wat

    er c

    oole

    d 3

    )

    Pro

    be

    tub

    e ty

    pe

    60 R

    w

    ater

    coo

    led

    3)

    Pro

    be

    tub

    e ty

    pe

    60 S

    w

    ater

    coo

    led

    3)

    Pro

    be

    syst

    em H

    w

    ater

    coo

    led

    3)

    Pro

    be

    2

    par

    tly h

    eate

    d

    Pro

    be

    2

    heat

    ed

    Temperature < 130C < 180C 2) < 300C

    180450C 180900C

    < 1300C < 1400C

    Dust content < 50 mg/m3 < 1000 mg/m3

    < 3 g/m3 > 3 g/m3 1) 1) 1) 1) 1)

    40100 g/m3 1) 1) 1) 1) 1) 1)< 2000 g/m3 1) 1) 1) 1)

    Water vapor dew point

    < 65 C > 65 C

    Acidic aerosols (acid dew pt. 130 C) Pressure < 2 bar

    < 5 bar Technical data see p. 20 p. 20 p. 20 p. 20 p. 20 p. 21 p. 22 p. 22 p. 22 p. 22 p. 23 p. 23 1) Back purging required 2) With regulated heating sleeve (see page 6) 3) See SCK Sampling system for dry gas sampling data sheet (publication no. 10/23-8.81 EN)

    Lead-through tube installation

    Brickwork with metal sheeting Isolated sheet-metal channel Brickwork

    Flow direction of process gas

    1 Lead-through tube 2 Mounting flange DN 65, PN 6,

    form B to DIN 2573 3 Gasket 4 Welded-on rectangular block 5 Sampling probe flange

    Dimensions in mm

    Minimum distance xmin of the mounting flange from the wall depending on mounting angle :

    10 15 20 25 30 35xmin /mm 133 138 143 147 151 153

    1 2 5 3 1 2 5 3

    1 2 5 34

  • 20 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    Type 40, Type 40 W Probe tubes

    Use For sampling hot dust-containing gases in conjunction with the FE2/PFE2 filter unit (see page 3 or page 7) Process gas sampling conditions Pressure pabs = 50 to 500 kPa (0.5 to 5 bar) Temperature

    Probe tube version: Max. temperature:SS 1.4571 (SAE 316Ti) 450 C SS 1.4571 (SAE 316Ti) coated 180 C SS 1.4893 900 C SS 1.4571 (SAE 316Ti) Type 40 W 300 C Silicon carbide (max. length 1000 mm) 1300 C

    Flow rate Max. 300 l/h Pressure drop Approx. 10 hPa at 30 to 90 l/h Dust content

    Max. 3 g/m3 (application recommendation); max. 40 g/m3 with purge-back device in conjunction with FE2/PFE2 filter unit (not for coated probe tube)

    Installation G 3/4 in. external thread Mounting angle

    Any; 8 to 90 downwards from the horizontal is recom-mended. It is imperative to install the silicon carbide probe tube vertically.

    Dimensional drawing (dimensions in mm)

    Ordering information Catalog No. 23036-0- 0 0 0 0 0 0 0 0 0 0

    Version Stainless steel (1.4571), up to 500 C 1 Stainless steel (1.4571), coated, up to 180 C 2 Silicon carbide up to 1300 C, max. 1000 mm 4 Stainless steel (1.4893), up to 900C 5 Stainless steel (1.4571), up to 300 C, heated (Type 40 W for cement) 6 Nominal length 500 mm 1 1000 mm 2 1500 mm 3 2000 mm 4 2500 mm 5 3500 mm (only for heated version) 6 4000 mm (only for heated version) 7 4500 mm (only for heated version) 8

    Catalog No. 23036-0- 0 0 0 0 0 0 0 0 0 0

    G3/4

    G3/4

    G3/4

    L1

    L1

    L1

    16

    21,4

    12,6

    16

    ,8

    15

    23

    34

    16

    16105

    17,2

    Silicon-Carbide (max. 1300 C)

    Special Steel Material No. 1.4571 (max. 450 C)

    Special Steel Material No. 1.4893 (max. 900 C)

    SiC Protective Tube

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 21

    Type 42 Probe tube (heated)

    Use Low gas temperature High moisture content in gas Corrosive components in the process gas Typical places of use are: Sampling points in wet desulphurization plants

    (crude gas, clean gas, part-cleaned clean gas) Waste incineration plants Auxiliary boilers and stack emission measurements Process gas sampling conditions Pressure

    pabs = 200 kPa (2 bar) Temperature

    < 200 C Flow rate

    Max. 250 l/h Flow velocity

    Max. 12 m/s (> 1000 mm max. 7 m/s) Dust content

    Max. 3 g/m3 (application recommendation); max. 40 g/m3 with purge-back device in conjunction with FE2/PFE2 filter unit (see page 3 or page 7)

    T90 time

    Approx. 0.4 s at 250 l/h

    Probe tube heater Heat output

    Nominal length 1000 mm: 2 x 200 W Nominal length 1500 mm: 2 x 300 W Nominal length 2000 mm: 2 x 400 W

    Nominal voltage

    120 V AC or 230 V AC, 50 to 60 Hz Control

    Control temperature max. 200 C Temperature sensor

    Pt 100 Ordering information

    Catalog No.Length 1000 mm 23041-4-8018392Length 1500 mm 23041-4-8018393Length 2000 mm 23041-4-8018394

    Dimensional drawing (dimensions in mm) and terminal diagram

    12345

    160

    40

    Pt100

    1000/1500/2000 mm

    130

    17

    120 6 87 9

    M20

    21

    (mm)

    (W) 600400

    1000 1500

    800

    2000

    (kg) 128 10 90

    25

    x1,5

    40

    x2

    Line 115 V Terminals 2+3/4+5

    Heate

    r

    Temperature ControllerConnection

    Line Sensor

    Bridge:Line 230 V Terminals 3+4

    Length

    Wattage

    Weight

  • 22 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    Type 60 Probe tube (cement flue gas probe)

    Use For sampling hot cement flue gas with high dust content for CO, CO2, NO and SO2 analysis in dry cement production process (e.g. recuperator furnaces, furnaces with grate coolers), at rotary kiln inlet and/or after precalcination. Process gas sampling conditions Pressure

    pabs = max. 200 kPa (2 bar) Temperature

    Probe tube length: Max. temperature: 3500 mm 1200 C 3000 mm 1250 C 2500 mm 1300 C 2000 mm 1350 C 1500 mm 1400 C

    Flow rate

    Max. 250 l/h Dust content

    Max. 2000 g/m3 with periodical compressed air cleaning in conjunction with FE2 filter unit (see page 3)

    Dead time (Tt) for length = 3500 mm

    Approx. 40 s at 60 l/h, approx. 9 s at 250 l/h 90% time (T90) for length = 3500 mm

    Approx. 82 s at 60 l/h, approx. 17 s at 250 l/h Pressure drop

    Approx. 10 hPa Materials of gas-conducting parts Special steel 1.4541 (SAE 321) Mounting A flanged probe connector (internal diameter 200 mm) should be installed by the customer. The mounting flange is essential for installing the probe tube. The connections should be aligned according to the local situation.

    Cooling water supply Quality

    Drinking water quality with approx. 30 % anti-freeze if required

    Outlet temperature

    Min. 50 C (or > dew point of the cement flue gas), max. 85 C

    Pressure

    pabs = max. 400 kPa (4 bar) Quantity circulated

    Approx. 3 m3/h (closed system) Type 60 S Probe tube Model with reinforced protection tube and flange DN 150, PN 16 Ordering information

    Catalog No.Length 1500 mm 23038-4-0856831Length 2000 mm 23038-4-0856832Length 2500 mm 23038-4-0856833Length 3000 mm 23038-4-0856834Length 3500 mm 23038-4-0856835Length 1500 mm, reinforced protection tube 23038-4-8018478Length 2000 mm, reinforced protection tube 23038-4-8018479Length 2500 mm, reinforced protection tube 23038-4-8018480Length 3000 mm, reinforced protection tube 23038-4-8018481Length 3500 mm, reinforced protection tube 23038-4-8018482Type 60 S, length 1500 mm 23038-4-0730642Type 60 S, length 2000 mm 23038-4-0730643Type 60 S, length 2500 mm 23038-4-0730644Type 60 S, length 3000 mm 23038-4-0730645Type 60 S, length 3500 mm 23038-4-0730646Type H, length 1500 mm 23020-4-0730656Type H, length 2000 mm 23020-4-0730647Type H, length 2500 mm 23020-4-0730648Type H, length 3000 mm 23020-4-0730649Type H, length 3500 mm 23020-4-0730650

    Dimensional drawing (dimensions in mm)

    1 Sample gas inlet ports

    2 Thickened shank of probe tube

    3 Cooling water connections

    L1 Probe tube length L2 Length of

    thickened shank: 800 mm for L1 2000 mm 1300 mm for L1 2500 mm

    L3 200 mm with reinforced protection tube L1

    L2

    90

    35

    A

    A

    ~60

    3

    3

    1 2

    ~70

    60,

    3

    89

    L3

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 23

    Probe 2

    Use Wherever large volumes of gas are sampled, gas pressure is raised and there is a high moisture or dust content in the gas. Process gas sampling conditions Pressure

    pabs = max. 400 kPa (4 bar) Temperature

    Max. 450 C (probe tube partly heated), max. 130 C (probe tube heated

    Flow rate

    Max. 2000 l/h Dust content

    Max. 20 g/m3 (application recommendation), max. 100 g/m3 with purging

    Purging pressure

    Max. 600 kPa (6 bar) Heating temperature of inlet filter

    200 C (at process gas temperature of 20 C) 90% time (T90)

    < 2 s at 250 l/h Filter fineness

    0.3 m Material of gas-conducting parts Support tube, heating rod, connecting pipe

    Special steel 1.4571 (SAE 316Ti) Inlet filter

    Aluminum oxide Seals

    Ceramic fiber Flange

    Special steel 1.4581 Mounting Flange

    DN 65, PN 6, form B, to DIN 2573 position of holes: 45, 135, 225, 315

    Mounting angle

    Any; 10 to 35 downwards from the horizontal recommend-ed (take direction of flow into account), see dim. drawing

    Sample gas outlet

    G 1/4 in. internal thread Test gas/purge air inlet

    G 3/8 in. internal thread

    Probe tube heating Heat output (unregulated)

    Nominal length 1200 mm: 650 W, partially heated (for heating of the wall bushing): 255 W

    Nominal voltage

    230 V AC, 50 to 60 Hz (120 V AC on inquiry) Electrical connection

    Silicone cable, 3 x 1.5 mm2, length 1000 mm Protective case (option) Dimensions

    270 x 203 x 330 mm (H x W x D) Material

    Special steel 1.4301 (SAE 304) Degree of protection of case

    IP54 Weight

    Approx. 7 kg Ambient temperature

    20 to +45 C Dimensional drawing (dimensions in mm)

    1 Mounting for the inlet filter 2 Inlet filter (inner filter) with internal heating rod 3 Gas sampling tube 4 Wall tube with inlet flange 5 Sample gas outlet or test gas/purge air inlet Ordering information

    Catalog No.1200 mm, 230 V, 50/60 Hz, 650 W 23022-4-07683011200 mm, 230 V, 50/60 Hz, 255 W, part. heat. 23022-4-0768305Prot. box, insulat., IP54, (330x203x270 mm) 23022-4-0730719

    180

    650

    12

  • 24 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    Probe 11

    Use Use in interior air, garage and tunnel monitoring, including corrosive atmospheres. The materials used ensure that with the gases normally occurring no adsorption occurs. Technical data Sampling pressure

    Atmospheric pressure Gas temperature

    25 to +50 C, dry Sample gas flow rate

    Max. 70 l/h Dust content

    Max. 1 mg/m3 Pressure drop with new filter

    10 hPa (mbar) at 70 l/h Service life of filter (estimated)

    d (days) = filter constant (2500) flow rate (l/h) x dust concentration (mg/m3)

    Sample gas connection port

    Bolted connection for flexible pipe with internal diameter 4 mm and external diameter 7 mm

    Materials

    Polycarbonate (probe head), aluminum oxide (filter) Transport and storage temperature

    25 to +70 C Mounting

    On wall or suspended from ceiling

    Dimensional drawing (dimensions in mm)

    Ordering information

    Catalog No.Room air probe 11 23021-4-0859585

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 25

    Ceramic filter

    Use For filtering dust from gases in the gas conditioning systems of analyzer systems when the gas sampling probe does not have a filter. The ceramic filter is positioned upstream the other devices in the sample gas conditioning chain. The ceramic filter can be heated with the annular heating element if condensation from the sample gas is likely. Technical data Flow rate (air)

    Max. 300 l/h Gas pressure

    pabs = 20 kPa to 1.7 MPa (0.2 to 17 bar) at 20 C filter temperature, max. 200 kPa (2 bar) at 180 C

    Pressure drop

    0.1 to 0.85 hPa at 30 to 250 l/h (air) Dynamic characteristics at

    Flow rate (air) 30 l/h 60 l/h 90 l/h Dead time Tt 3.7 s 2.3 s 1.7 s 90% time T90 11.5 s 5.5 s 3.9 s

    Filter fineness 0.3 m

    Construction, mounting Materials of gas-conducting parts

    Housing: steel, St 37 K or special steel 1.4571 (SAE 316Ti); filter: aluminum oxide; seals: FPM, Cu, Al2O3 fiber

    Gas connection ports G 1/4 in. internal thread or pipe connectors for pipe of internal diameter 4 mm

    Filter surface

    Approx. 212 cm2 Weight

    Approx. 2.1 kg Filter heating

    Annular heating element, see page 5 Mounting

    On wall with angle bracket

    Dimensional drawing (dimensions in mm)

    Ordering information

    Catalog No.Ceramic filter, steel version 23031-5-8018177Ceramic filter, stainless steel version 23031-5-8018178

    incl

    . T-h

    andl

    e (n

    ot s

    how

    n)

  • 26 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    Process pressure reducers

    Use If the pressure of the process gas is too high for the analyzer, a pressure reducer is required to lower the pressure. The type of pressure reducer used is determined by the properties of the process gas and the required sample gas pressure.

    Technical data

    Casing: brass Casing: brass Casing: special steel Casing: special steel

    Construction Single-stage with one manometer (outlet)

    Single-stage with two manometers (inlet /outlet)

    Single-stage without manometer

    Single-stage with two manometers (inlet /outlet)

    Inlet pressure Max. 1.5 MPa (15 bar) Max. 3.5 MPa (35 bar) Max. 3.5 MPa (35 bar) Max. 3.5 MPa (35 bar)

    Outlet pressure (adjustable)

    0.8 to 10 kPa (8 to 100 mbar)

    10 to 40 kPa (0.1 to 0.4 bar)

    10 to 70 kPa(0.1 to 0.7 bar)

    10 to 70 kPa (0.1 to 0.7 bar)

    Safety valve set to

    50 kPa (0.5 bar)

    80 kPa (0.8 bar)

    80 kPa (0.8 bar)

    Manometer display inlet pressure

    0 to 4 MPa (0 to 40 bar)

    0 to 4 MPa (0 to 40 bar)

    Manometer display outlet pressure

    0 to 250 hPa (0 to 250 mbar)

    0 to 60 kPa (0 to 0.6 bar)

    100 to +150 kPa (1 to +1.5 bar)

    Flow rate 25 to 250 l/h 25 to 250 l/h 25 to 250 l/h 25 to 250 l/h

    Material diaphragm Buna rubber Buna rubber Special steel Special steel

    Material gasket Buna rubber Buna rubber EPDM EPDM

    Material housing Brass Special steel; gas-conducting parts: brass

    Special steel Special steel

    Weight Approx. 1.25 kg Approx. 2.65 kg Approx. 2.35 kg Approx. 2.35 kg

    Gas temperature and ambient temperature

    Max. 50 C Max. 50 C Max. 50 C Max. 50 C

    Catalog No. 23035-5-5864958 23035-5-5864951 23422-4-0730699 23422-4-0730700

    Supplied: Pressure reducer with angle bracket

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 27

    Process pressure reducers

    Dimensional drawings (dimensions in mm) Pressure reducer single-stage with one manometer (outlet)(Catalog No. 23035-5-5864958)

    Pressure reducer single-stage without manometer(Catalog No. 23422-4-0730699)

    Pressure reducer single-stage with two manometers (inlet/outlet) (Catalog No. 23035-5-5864951)

    Pressure reducer single-stage with two manometers (inlet/outlet) (Catalog No. 23422-4-0730700)

    79

    105

    4

    GasTech

    approx. 94(depending on handwheel position)

    approx. 30 (variable)

    118

    4

    GasTech148

    approx. 94(depending on handwheel position)

    approx. 30 (variable)

    N

    PTF

    N

    PTF

    N

    PTF

    N

    PTF

    NPTF

  • 28 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    Heated sample gas lines

    CGWB 13 Heated sample gas line

    Parallel strip heater (holding temperature max. 200 C) Pt 100 resistance thermometer for regulation Self-regulating anti-frost heater (max. 30 C) Self-regulating heater (option, holding temp. max. 100 C) TBL 01-S Heated sample gas line

    Fixed resistor heat. conductor (holding temp. max. 200 C) Pt 100 resistance thermometer for regulation Self-regulating heater (option, holding temp. max. 100 C) TBL 01-C Heated sample gas line

    Self-regulating heater (holding temp. max. 100/120 C) Integral pipe-end connectors for cement analysis systems TBL 01-E Heated sample gas line

    Competitive version Pipe ends with polyamide hard caps

    Selection table for heated sample gas lines

    CGWB 13 TBL 01-S TBL 01-C TBL 01-E

    Heater Self-regulating strip heater (30 C) x

    Self-regulating strip heater (100 C) x x x

    Self-regulating strip heater (120 C) x

    Fixed resistor heat. cond. (200 C) x x

    Parallel strip heater (200 C) x

    Outer covering Polyvinyl chloride (PVC) Polyamide (PA) Metal or PVC Polyamide (PA)Options Line can be shortened x x 1) / 2) x

    Small bending radius x x x

    Gas connections Various options Various options Various options PTFE

    Electrical connections Heater and Pt 100 fixed Heater and Pt 100 fixed Heater and Pt 100 fixed Heater and Pt 100 fixed

    Maximum line length 130 m 100 m 70 m 40 m

    Applications CO, O2, CO2 Anti-frost heater

    CO, O2, CO2 Holding temp. 100 C Holding temp. 100 C

    SO2, NOx, CnHm Holding temp. 200 C Holding temp. 200 C Holding temp. 200 C

    Cement analysis systems Holding temp. 120 C Technical data see page 30 see page 33 see page 33 see page 33

    1) Version with self-regulating strip heater 2) Version with fixed resistor heating conductor

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 29

    Heated sample gas lines

    Integral pipe-end connectors Flange Silicone cap

    Metal cap POM cap and shrunk-on hose

    Hard cap

  • 30 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    CGWB 13 Heated sample gas line

    Technical data

    Frost protected line Self-regulating strip heater Regulated parallel strip heater

    Outer covering PVC PVC PVC

    Medium-carrying pipe PTFE PTFE PTFE

    Integral pipe-end connectors Various options (see ordering information, page 32)

    Various options (see ordering information, page 32)

    Various options (see ordering information, page 32)

    Heater self-regulating strip heater self-regulating strip heater CPD heating element, regulated

    Power supply 230 V or 120 V, 50 to 60 Hz 230 V or 120 V, 50 to 60 Hz 230 V or 120 V, 50 to 60 Hz

    Heat output 16 W/m 30 W/m 60 W/m

    Current consumption Making/holding current = 65/25 mA

    0.15 A/m 0.3 A/m

    Holding temperature see diagram see diagram 200 C

    Ambient temperature 30 to +60 C 30 to +60 C 30 to +60 C

    Outer diameter 30 mm 43 mm 40 mm

    Flexible sample gas pipe 6 x 4 x 1 mm or 8 x 6 x 1 mm 6 x 4 x 1 mm or 8 x 6 x 1 mm 6 x 4 x 1 mm or 8 x 6 x 1 mm

    Maximum line length 130 m 90 m 60 m

    Line duct M42 M42 M42

    Minimum bending radius 300 mm 300 mm 300 mm

    Weight Approx. 1 kg/m Approx. 1 kg/m Approx. 1 kg/m

    Connect. lead for heater (fixed) 3 x 2.5 mm2; length 5 m 3 x 2.5 mm2; length 5 m 3 x 2.5 mm2; length 5 m

    Connect. lead for Pt 100 (fixed) LIYCI 2 x 0.14 mm2; length 5 m

    Holding temperature diagrams

    50

    40

    30

    20

    - 30 - 20 - 10 + 10 + 20 + 30 + 400

    Frost protected line, 6 x 4 x 1 mm PTFE, 16 W/m, self-regulating

    Me

    diu

    mp

    ipe

    tem

    pe

    ratu

    reC

    Ambient temperature C

    100

    90

    80

    70

    - 30 - 20 - 10 + 10 + 20 + 30 + 400

    Ambient temperature C

    Mediu

    mpip

    ete

    mpera

    ture

    C

    Self-regulating strip heater, 6 x 4 x 1 mm PTFE, 30 W/m

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 31

    CGWB 13 Heated sample gas line

    Dimensional drawings (dimensions in mm) CGWB 13 Self-regulating strip heater CGWB 13 Regulated parallel strip heater

    42

    300

    PO

    Mcap

    Shrinkin

    ghose

    Sam

    ple

    take-o

    ffsid

    eA

    naly

    zer

    sid

    e

    Pow

    er

    Supply

    Cable

    3x

    1.5

    ...2

    .5m

    m

    46

    46

    300

    Length

    by

    custo

    mer

    sre

    quest

    max.le

    ngth

    dependin

    gon

    MC

    B

    Pro

    cess

    tube

    overh

    ang,

    SS

    -nip

    ple

    6x1

    or

    8x1

    mm

    46

    42

    63

    49

    25

    54

    30

    0

    Le

    ng

    thb

    ycu

    sto

    me

    rs

    req

    ue

    st

    ma

    x.

    len

    gth

    de

    pe

    nd

    ing

    on

    MC

    Bo

    rsw

    itch

    ing

    loa

    do

    fth

    eco

    ntr

    olle

    rre

    sp

    ective

    ly

    PO

    Mca

    p

    Sh

    rin

    kin

    gh

    ose

    Sa

    mp

    leta

    ke

    -off

    sid

    eA

    na

    lyze

    rsid

    e

    Re

    pla

    ca

    ble

    tub

    en

    ipp

    le,

    31

    6ss,

    6x1

    or

    8x1

    mm

    Pt1

    00

    Ca

    ble

    2x

    0.1

    4m

    m

    Po

    we

    rS

    up

    ply

    Ca

    ble

    3x

    1.5

    ...2

    .5m

    m

  • 32 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    CGWB 13 Heated sample gas line

    Ordering information

    Catalog No. 23281-0- 0 0 0 0 0 0 0 Version Parallel strip heater 60 W/m, line can be shortened, regulated (Pt 100), 200 C 2 Self-regulating 16 W/m, 30 C (antifreeze) 3 Self-regulating 30 W/m, 100 C 7 Integral pipe-end connectors Probe: metal cap for PFE2/3 analysis: plastic cap with shrunk-on hose 2 Probe: metal cap for PFE2/3 analysis: flange 3 Both sides with POM plastic cap (for self-regulated versions only) 4 Probe: PTFE cap for PFE2/3 in conf. set analysis: POM plastic cap 5 Probe: metal cap for PFE2/3 in conf. set analysis: plastic cap with shrunk-on hose 6 Gas conducting line PTFE tube 6x4x1 mm 1 PTFE tube 8x6x1 mm 2 Power supply 230 V, 50 to 60 Hz 1 120 V, 50 to 60 Hz 2 Controlling and monitoring without Pt 100 (for self-regulated versions only) 0 with 1 x Pt 100 (fixed built-in) 1

    Catalog No. 23281-0- 0 0 0 0 0 0 0

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 33

    TBL 01-S, TBL 01-C, TBL 01-E Heated sample gas lines

    Technical data

    TBL 01-S Self-regulating strip heater TBL 01-S Fixed resistor heating conductor

    Outer covering Polyamide corrugated tubing Polyamide corrugated tubing

    Medium-carrying pipe PTFE pipe 6 x 4 x 1 mm or 8 x 6 x 1 mm PTFE pipe 6 x 4 x 1 mm or 8 x 6 x 1 mm

    Test gas pipe (unheated, option) PTFE pipe 6 x 4 x 1 mm (500 mm protruding) PTFE pipe 6 x 4 x 1 mm (500 mm protruding)

    Integral pipe end connectors Probe: metal cap, analyzer: flange or hard caps on both sides (pipe protruding 300 mm) or silicone caps on both sides (probe: 6/4 stainless steel connections, analyzer: pipe protruding 300 mm) or PTFE caps with 6/4 stainless steel connections on both sides, test gas pipe protruding 500 mm on both sides

    Power supply 230 V or 120 V, 50 to 60 Hz 230 V or 120 V, 50 to 60 Hz

    Heat output 38 W/m 90 W/m

    Holding temperature see diagram on page 30 200 C

    Ambient temperature 30 to +60 C 30 to +60 C

    Outer diameter 43 mm 43 mm

    Maximum line length 100 m 40 m

    Line duct M48 M48

    Minimum bending radius 200 mm 200 mm

    Weight Approx. 1 kg/m Approx. 1 kg/m

    Electrical connection for heater and Pt 100 (fixed)

    3 x 2.5 mm2, length 5 m 3 x 2.5 mm2 or 2 x 0.14 mm2, length 5 m

    TBL 01-C Self-regulating strip heater TBL 01-E Fixed resistor heating conductor

    Outer covering Metal corrugated tubing (for ACK) or PVC outer covering (for ACMP, ACX)

    Polyamide corrugated tubing

    Medium-carrying pipe PTFE pipe 6 x 4 x 1 mm PTFE pipe 6 x 4 x 1 mm or 8 x 6 x 1 mm

    Integral pipe end connectors Probe: metal cap analyzer: silicone cap (mandatory for ACK) or POM plastic caps on both sides (mandatory for ACMP, ACX) or probe: PTFE cap analyzer: POM plastic cap (mandatory for ACMP, ACX 120C)

    Polyamide hard caps

    Power supply 230 V or 120 V, 50 to 60 Hz 230 V or 120 V, 50 to 60 Hz

    Heat output 30 W/m or 47 W/m 90 W/m

    Holding temperature 100 C or 120 C 200 C

    Ambient temperature 30 to +60 C 30 to +60 C

    Outer diameter 43 mm 43 mm

    Maximum line length 70 m 40 m

    Line duct M48 M48

    Minimum bending radius 200 mm 200 mm

    Weight Approx. 1 kg/m Approx. 1 kg/m

    Electrical connection for heater and Pt 100 (fixed)

    3 x 2.5 mm2 or 2 x 0.14 mm2, length 5 m 3 x 2.5 mm2 or 2 x 0.14 mm2, length 5 m

  • 34 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    TBL 01-S, TBL 01-C, TBL 01-E Heated sample gas lines

    Dimensional drawings (dimensions in mm) TBL 01-S, pipe end connectors with hard caps TBL 01-S, pipe end connectors with flange and metal cap

    42

    35

    0

    30

    03

    00

    50

    Pro

    ce

    ss

    tub

    eo

    ve

    rha

    ng

    Sa

    mp

    leta

    ke

    -off

    sid

    eA

    na

    lyze

    rsid

    e

    PA

    co

    rru

    ga

    ted

    ho

    se

    Le

    ng

    thb

    ycu

    sto

    me

    rs

    req

    ue

    st

    ma

    x.

    len

    gth

    de

    pe

    nd

    ing

    on

    MC

    B

    Po

    we

    rsu

    pp

    lyC

    ab

    le3

    x1

    .5..

    .2.5

    mm

    Ha

    rdca

    pH

    ard

    ca

    p

    8

    49

    681

    42

    50

    60

    56

    25

    350

    42

    81

    24

    25

    49

    54

    63

    6

    mm

    Analy

    zer

    sid

    e

    PA

    corr

    ugate

    dhose

    Length

    by

    custo

    mer

    sre

    quest

    max.le

    ngth

    dependin

    gon

    MC

    Bor

    sw

    itchin

    glo

    ad

    ofth

    econtr

    olle

    rre

    spectively

    Pow

    er

    supply

    Cable

    3x

    1.5

    ...2

    .5m

    m

    Pt1

    00

    Cable

    2x

    0.1

    4m

    m

    Repla

    cable

    tube

    nip

    ple

    ,316ss,6x1

    or

    8x1

    mm

    Sam

    ple

    take-o

    ffsid

    e

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 35

    TBL 01-S, TBL 01-C, TBL 01-E Heated sample gas lines

    Dimensional drawings (dimensions in mm) TBL 01-S, pipe end connectors with metal caps for ACF TBL 01-E

    350

    42

    81

    24

    25

    49

    54

    63

    Analy

    zer

    sid

    e

    PA

    corr

    ugate

    dhose

    Length

    by

    custo

    mer

    sre

    quest

    max.le

    ngth

    dependin

    gon

    MC

    Bor

    sw

    itchin

    glo

    ad

    ofth

    econtr

    olle

    rre

    spectively

    Pow

    er

    supply

    Cable

    3x

    1.5

    ...2

    .5m

    m

    Pt1

    00

    Cable

    2x

    0.1

    4m

    m

    Repla

    ceable

    tube

    nip

    ple

    ,316ss,8x1

    mm

    Sam

    ple

    take-o

    ffsid

    e

    30

    03

    00

    50

    64

    2

    50

    60

    56

    6

    mm

    42

    Sa

    mp

    leta

    ke

    -off

    sid

    eA

    na

    lyze

    rsid

    e

    Le

    ng

    thb

    ycu

    sto

    me

    rs

    req

    ue

    st

    ma

    x.

    len

    gth

    de

    pe

    nd

    ing

    on

    MC

    Bo

    rsw

    itch

    ing

    loa

    do

    fth

    eco

    ntr

    olle

    rre

    sp

    ective

    ly

    Ha

    rdca

    p

    Po

    we

    rcu

    pp

    lyC

    ab

    le3

    x1

    .5..

    .2.5

    mm

    Pt1

    00

    Ca

    ble

    2x

    0.1

    4m

    m

    2x

    M1

    6C

    ab

    leG

    lan

    d

    Pro

    ce

    ss

    tub

    eo

    ve

    rha

    ng

    PA

    co

    rru

    ga

    ted

    ho

    se

    Ha

    rdca

    p

    Pro

    ce

    ss

    tub

    eo

    ve

    rha

    ng

  • 36 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    TBL 01-S, TBL 01-C, TBL 01-E Heated sample gas lines

    Dimensional drawings (dimensions in mm) TBL 01-C, pipe end connectors for ACK TBL 01-C, pipe end connectors for ACMP and ACX

    30

    0

    51

    45

    49

    81

    63

    54

    25

    Sa

    mp

    leta

    ke

    -off

    sid

    eA

    na

    lyze

    rsid

    e

    Me

    tall

    co

    rru

    ga

    ted

    ho

    se

    Le

    ng

    thb

    ycu

    sto

    me

    rs

    req

    ue

    st

    ma

    x.

    len

    gth

    de

    pe

    nd

    ing

    on

    MC

    Bo

    rsw

    itch

    ing

    loa

    do

    fth

    eco

    ntr

    olle

    rre

    sp

    ective

    ly

    Pro

    ce

    ss

    tub

    eo

    ve

    rha

    ng

    Sili

    co

    ne

    ca

    p

    Pt1

    00

    Ca

    ble

    2x

    0,1

    4m

    m

    Po

    we

    rsu

    pp

    lyC

    ab

    le3

    x1

    ,5..

    .2,5

    mm

    Re

    pla

    ca

    ble

    tub

    en

    ipp

    le,

    31

    6ss,

    6x1

    mm

    42

    300

    46

    46

    300

    PV

    CJacket

    PO

    Mcap

    Shrinkin

    ghose

    Sam

    ple

    take-o

    ffsid

    eA

    naly

    zer

    sid

    e

    Pow

    er

    Supply

    Cable

    3x

    1.5

    ...2

    .5m

    m

    Length

    by

    custo

    mer

    sre

    quest

    max.le

    ngth

    dependin

    gon

    MC

    B

    Pro

    cess

    tube

    overh

    ang

    Pt1

    00

    Cable

    2x

    0.1

    4m

    m

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 37

    TBL 01-S, TBL 01-C, TBL 01-E Heated sample gas lines

    TBL 01-S Ordering information

    Catalog No. 23283-0- 0 0 0 0 0 0 Version Fixed resistor heating strip, 90 W/m, holding temperature 200 C (for ACX) 1 Self-regulated heating strip, 38 W/m, holding temperature 100 C 2 Fixed resistor heating strip 90 W/m, holding temperature 200 C (for ACF) 4 Self-regulated heating strip, 38 W/m, holding temperature 100 C (for SCK) 6 Gas conducting line with PTFE tube 6x4x1 mm 1 with PTFE tube 8x6x1 mm (ACF) 3 with PTFE-tube 6x4x1 mm incl. an additional unheated PTFE tube for test gas 6x4x1 mm (500 mm protruding)

    4

    with PTFE-tube 8x6x1 mm incl. an additional unheated PTFE tube for test gas 6x4x1 mm (500 mm protruding, ACF)

    5

    Material of sheathing with plastic hose of PA (outside and indoors installation) 1 Connections Metal caps w. 6/4 SS connectors on both sides (ACF) A Probe: metal cap analyzer: flange, 6/4 SS connectors on both sides B Plastic hard caps on both sides (tube 300 mm protruding, self-regulated only) C Silicone caps both sidesprobe 6/4 SS conn.analyzer: tube 300 mm protruding (SCK) D PTFE caps with 6/4 SS connectors on both sides (ACF) E PTFE caps with 6/4 SS connectors on both sides for sample gas and PTFE tube for test gas 500 mm protruding on both sides (ACF)

    F

    Controlling and monitoring without Pt 100 (self-regulated version only) 0 with 1 x Pt 100 1 with 2 x Pt 100 2 Power supply 230 V, 50 to 60 Hz, for self-regulated heating strip (for SCK, not for ACF) 1 120 V, 50 to 60 Hz, for self-regulated heating strip (for SCK, not for ACF) 2 230 V, 50 to 60 Hz, for fixed resistor heating conductor 90 W/m 3 120 V, 50 to 60 Hz, for fixed resistor heating conductor 90 W/m 4 230 V, 50 to 60 Hz, for fixed resistor heating cond. 90 W/m (ACX, ACF, 35 m) 5 120 V, 50 to 60 Hz, for fixed resistor heating cond. 90 W/m (ACX, ACF, 15 m) 6 400 V/230 V, 50 to 60 Hz, for fixed res. heat. cond. 90 W/m (ACX, ACF, 3560 m) 7 208 V/120 V, 50 to 60 Hz, for fixed res. heat. cond. 90 W/m (ACX, ACF, 1540 m) 8 120 V, 50 to 60 Hz, self-regulated heating strip (for SCK with AWG wiring) 9

    Catalog No. 23283-0- 0 0 0 0 0 0

  • 38 System components for sample gas sampling 10/23-5.10 EN Rev. 10

    TBL 01-S, TBL 01-C, TBL 01-E Heated sample gas lines

    Additional ordering information TBL 01-S

    BA No.Fixed resistor heating strip 90 W/m, 6x4x1 mm, length m 301Fixed resistor heating strip 90 W/m, 8x6x1 mm, length m 303Self-regulated heating strip 38 W/m, 6x4x1 mm, length m 304Self-regulated heating strip 38 W/m, 6x4x1 mm, length m 307Self-regulated heating strip 38 W/m, 8x6x1 mm, length m 309Fixed res. heat. strip, PTFE tube 6x4x1 mm incl. add. unheated PFTE tube for test g. 6x4x1 mm (500 mm protruding), l. m 311Fixed res. heat. strip, PTFE tube 8x6x1 mm incl. add. unheated PFTE tube for test g. 6x4x1 mm (500 mm protruding), l. m 313Fixed res. heat. strip 90W/m, 400V/230V, 5060 Hz, (ACF, line length 3560m) with PTFE tube 8x6x1 mm, length m 315Fixed res. heat. strip 90W/m, 208V/120V, 5060 Hz, (ACF, line length 1540m) with PTFE tube 8x6x1 mm, length m 317 TBL 01-C Ordering information

    Catalog No. 23285-0- 0 0 0 0 0 0 Design Self-regulating strip heater, 30 W/m, 100 C (ACK) 2 Self-regulating strip heater, 30 W/m, 100 C (ACMP, ACX coal bin) 3 Self-regulating strip heater, 47 W/m, 120 C (ACMP, ACX pre-heater) 4 Gas conducting line with PTFE tube 6x4x1 mm 1 Material of sheathing with metal corrugated tubing for ACK (outdoor and indoor installation) 1 with PVC sheathing for ACMP, ACX (outdoor and indoor installation) 2 Connections Probe: metal cap, analyzer: silicone cap (mandatory for ACK) + shortening kit 1 POM plastic caps on both sides (mandatory for ACMP, ACX) + shortening kit 2 Probe: PTFE caps, analyzer: POM caps (mand. for ACMP, ACX 120C) + shorten. kit 3 Control /monitoring with 1 x Pt 100 1 Power supply 230 V, 50 to 60 Hz 1 120 V, 50 to 60 Hz 2

    Catalog No. 23285-0- 0 0 0 0 0 0 TBL 01-E Ordering information

    Catalog No. Fixed resistor heating conductor 90 W/m, PTFE 6x4x1, PA caps, 230 V 23284-4-0730695Fixed resistor heating conductor 90 W/m, PTFE 8x6x1, PA caps, 230 V 23284-4-0730696Fixed resistor heating conductor 90 W/m, PTFE 6x4x1, PA caps, 120 V 23284-4-0730697Fixed resistor heating conductor 90 W/m, PTFE 8x6x1, PA caps, 120 V 23284-4-0730698

  • 10/23-5.10 EN Rev. 10 System components for sample gas sampling 39

    Electronic temperature controller and switching relay

    Temperature controller Control range

    200 to +850 C

    Measurement input Pt 100

    Outputs 2 x relay 3 A, 250 V AC

    Power supply 110 to 240 V AC +10/15 %, 48 to 63 Hz

    Dimensions 48 x 48 mm, C-rail housing

    Weight 140 g

    Switching relay Load voltage

    Urms = 24 to 265 V

    Max. load current Irms = 30 A (ambient temperature = 25 C)

    Weight 200 g

    Ordering information

    Catalog No.Temperature controller

    parameters not set 23345-5-8328907parameters set for filter unit 23345-5-8328907Pparameters set for sample gas line 23345-5-8328907Lparameters set for self-regulating heater for ACMP, ACX

    23345-5-8328907C

    Switching relay 23345-5-8328731

    Connection diagram

    L1 N 342 343 341 142 143

    83242 243 11280 111 11381

    GN

    D

    ++

    0/12V230V/3A

    /3A230V

    110.

    ..240

    VA

    C-1

    5/+

    10%

    48...

    63 H

    z

    4+ 3-

    1 2

    M2A

    max.max.

    L

    L

    N

    Last

    Logi

    cO

    utp

    uts

    Bin

    ary

    Out

    put

    2

    Bin

    ary

    Out

    put

    1

    not

    used

    Alarm 1Temperature

    use coupling relayFor load current > 2 A

    Alarm 2Limiter

  • Contact us

    10/2

    35.

    10 E

    N R

    ev. 1

    0 08

    .201

    3

    ABB Limited Process Automation Oldends Lane GL10 3TA Stonehouse Gloucestershire, United Kingdom Phone: +44 1 453 826661 Fax: +44 1 453 829671 ABB Pte. Ltd. Process Automation 2 Ayer Rajah Crescent 139935 Singapore, Singapore Phone: +65 6773 5961 Fax: +65 6778 0222 ABB Engineering Ltd. Process Automation 10 Jiuxianqiao Lu 100015 Beijing, China Phone: +86 10 84566688 Ext. 6217 Fax: +86 10 84567650 ABB Inc. Process Automation 3700 W Sam Houston Parkway South, Suite 600, Houston, TX 77042, USA Phone: +1 713 587 8000 www.abb.com/analytical

    ABB Australia Pty Limited Process Automation Bapaume Road 2170 Moorebank New South Wales, Australia Phone: +61 2 9821 0968 Fax: +61 2 9400 7050 ABB Ltd. Process Automation 14 Mathura Road 121003 Faridabad, Haryana, India Phone: +91 129 2279627 Fax: +91 129 2279692 ABB Automation GmbH Process Automation Stierstaedter Strasse 5 60488 Frankfurt am Main, Germany Fax: +49 69 79304566 Email: [email protected]

    Note We reserve the right to make technical changes or modify the contents of this document without prior notice. With regard to purchase orders, the agreed particulars shall prevail. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this document. We reserve all rights in this document and in the subject matter and illustrations contained therein. Any reproduction, disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB. Copyright 2013 ABB All rights reserved

    Sales

    Service

    Modular sample gas probe systemFE2 Filter unitAnnular heating elementHeating sleevePFE2 Filter unitPFE3 Filter unitSelection table for probe tube types and probesType 40, Type 40 W Probe tubesType 42 Probe tube (heated)Type 60 Probe tube (cement flue gas probe)Probe 2Probe 11Ceramic filterProcess pressure reducersHeated sample gas linesCGWB 13 Heated sample gas lineTBL 01-S, TBL 01-C, TBL 01-E Heated sample gas linesElectronic temperature controller and switching relay

    /ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /CropGrayImages false /GrayImageMinResolution 300 /GrayImageMinResolutionPolicy /OK /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 240 /GrayImageDepth -1 /GrayImageMinDownsampleDepth 2 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /CropMonoImages false /MonoImageMinResolution 1200 /MonoImageMinResolutionPolicy /OK /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects true /CheckCompliance [ /None ] /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly true /PDFXNoTrimBoxError false /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile (None) /PDFXOutputConditionIdentifier (FOGRA27) /PDFXOutputCondition () /PDFXRegistryName (http://www.color.org) /PDFXTrapped /False

    /CreateJDFFile false /Description > /Namespace [ (Adobe) (Common) (1.0) ] /OtherNamespaces [ > /FormElements false /GenerateStructure false /IncludeBookmarks false /IncludeHyperlinks false /IncludeInteractive false /IncludeLayers false /IncludeProfiles true /MarksOffset 6 /MarksWeight 0.250000 /MultimediaHandling /UseObjectSettings /Namespace [ (Adobe) (CreativeSuite) (2.0) ] /PDFXOutputIntentProfileSelector /DocumentCMYK /PageMarksFile /RomanDefault /PreserveEditing true /UntaggedCMYKHandling /LeaveUntagged /UntaggedRGBHandling /UseDocumentProfile /UseDocumentBleed false >> > ]>> setdistillerparams> setpagedevice