ab 118 air quality improvement program proposed fy 2010 …10 5 0 2009-10 2010-11 2011-12 2012-13...

25
Air Resources Board Meeting Sacramento, California June 24, 2010 AB 118: Air Quality Improvement Program (AQIP) Proposed FY 2010-11 Funding Plan Air Resources Board Meeting Sacramento, California June 24, 2010 CALIFORNIA ENVIRONMENTAL PROTECTION AGENCY Air Resources Board

Upload: others

Post on 02-Feb-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • Air Resources Board MeetingSacramento, California

    June 24, 2010

    A B 118 : Air Qualit y Improvemen t Progra m (AQIP)

    Propose d FY 2010-1 1 Fundin g Plan

    Air Resources Board Meeting Sacramento, California

    June 24, 2010 CALIFORNIA ENVIRONMENTAL PROTECTION AGENCY

    Air Resources Board

  • Presentatio n Outline

    • Background on AQIP

    • Summary of FY 2009-10 projects

    • Proposed FY 2010-11 Funding Plan

    • Staff recommendation

  • Guidin g Principles • Support advanced technologies

    to meet post-2020 SIP goals and climate change goals

    • Focus on areas underserved through other incentive programs

  • Progra m Benefits • Provide immediate emission

    reductions

    • Accelerate large-scale deployment of cleaner technologies

    • Support SIP and Climate Change commitments

    • Enable future regulations

  • F Y 2009-10 AQI P Projects

  • Summary: FY09-1 0 Projects

    Project s

    Hybri d Truc k & Bus Voucher

    Clea n Vehicl e Rebate

    Award

    $20.4M

    $4.1M

    Law n & Garde n Equip . Replacement

    $1.6M

    Agricultura l UT V Rebate

    Advance d Demonstrations

    $1.1M

    $2.0M

    Fundin g Revenues ~$30M

  • Coordination with CEC’s AB 118 Program

    • Advanced technology workforce training

    • On- and off-road hybrid vehicle demonstration

    • Infrastructure for electric and hydrogen vehicles

  • Propose d F Y 2010-11 AQI P Fundin g Plan

  • Propose d FY10-1 1 AQIP Projects Allocation ($M)

    Hybrid Truck/Bus Voucher 25

    Clean Vehicle Rebate 5.0

    Lawn & Garden Equip. 1.0

    Agricultural UTV Rebate 0.5

    Off-Road Hybrid Pilot 3.0

    Advanced Techn Demos 5.5

    TOTAL $40M

    EO contingenc y authorit y fo r reduce d revenue s

  • Hybrid Truck & Bus Voucher Incentive

    Project (HVIP) F Y 09-1 0 Fund s Left : $1.6M F Y 10-1 1 Target : U p t o $25M

    • Consumer voucher for ~half the incremental cost of a new hybrid

    • Spur hybridization of fleets

    • Support Scoping Plan’s truck hybridization measure to reduce CO2 emissions

  • Cost vs. Production Volume

    Prototypes Incentives Spur 2006-08 Market 2009-13 -10 100-

    -8 Market Acceleration

    2014-20 80-

    -6 60- Robust 2020+ -4 40-

    -2 20-

    10/yr 100/yr 1,000/yr 2,500/yr 10,000/yr

    Individual Supplier Hybrid Driveline Volume

    Incr

    emen

    tal C

    ost (

    $000

    )

    Fue

    l Eco

    nom

    y P

    ayba

    ck (

    year

    s)

  • Regiona l Distribution o f HVI P Trucks

    600 + Vouche rs Issued

  • Regiona l Distribution o f HVI P Trucks

    South Coast

    274

    600 + Vouche rs Issued

  • Regional Distribution of HVIP Trucks

    South Coast

    274

    Bay Area

    224

    600+ Vouchers Issued

  • Regional Distribution of HVIP Trucks

    San Joaquin

    Valley

    39

    South Coast

    274

    Bay Area

    224

    600+ Vouchers Issued

  • Regional Distribution of HVIP Trucks

    San Joaquin

    Valley

    39

    South Coast

    274

    Sacramento

    30

    Bay Area

    224

    600+ Vouchers Issued

  • Regiona l Distribution o f HVI P Trucks

    Other Regions 10

    San Joaquin

    Valley

    39

    South Coast

    274 San Diego

    22

    Sacramento

    30

    Bay Area

    224

    600 + Vouche rs Issued

  • Update d Vouche r Amount s

    $15,000* $20,000

    $25,000 $30,000 *$20,000 for electric vehicles

  • Clea n Vehicl e Rebat e Proje ct

    (CVRP) F Y 09-1 0 Fund s Left : $3.6 M F Y 10-1 1 Target : U p t o $5M

    • Consumer rebat e fo r zero-emissio n an d plug-i n hybri d passenge r vehicles

    • Suppo rt transportatio n secto r emissio n reductions neede d i n th e post-202 0 timeframe

    • Accelerat e commercializatio n o f th e cleanes t vehicle s available

  • ZE V Dema nd Projections

    25

    Timing of next 20

    15

    10

    5

    0 2009-10 2010-11 2011-12 2012-13

    Current and Proposed Funding

    projected vehicle sales

    funding decision

    Cum

    ulat

    ive

    vehi

    cles

    (tho

    usan

    ds)

  • Law n & Garde n Equipmen t Replacemen t

    Proje ct (LGER) F Y 09-1 0 Fund s Left : $0.5 M F Y 10-1 1 Target : U p t o $1M

    • Replace gas-powered equipment with zero-emission equipment

    • Augment non-attainment air districts’ equipment replacement programs.

    • Spur development of commercial equipment

  • Agricultura l UT V Rebat e Project

    F Y 09-1 0 Fund s Left : $0.9 M F Y 10-1 1 Target : U p t o $0.5 M

    • Rebate to California growers for new zero emission utility terrain vehicles

    • Pays 15 percent of the MSRP (avg. $1,600 per vehicle)

    • Accelerate consumer acceptance of zero-emission work vehicles

  • Off-Roa d Hybri d Equipmen t Pilo t Project

    FY 10-11 Target: Up to $3M

    • Accelerate deployment and evaluateemission benefits of off-road hybridequipment

    • Accelerate transition of hybrid technology tothe off-road sector

    • Groundwork for future deployment funding

  • Demonstration Projects

    FY 09-10 Funds Left: $0 FY 10-11 Target: Up to $5.5M

    • Demonstrate the viability of advanced technology vehicles, equipment and emission controls

    • Accelerate commercialization and deployment of cleaner technologies in the California marketplace

  • Staf f Recommendation

    • Approv e th e AQI P F Y 2010-1 1 Fundin g Plan

    Structure BookmarksProposed FY 2010-11 Funding Plan CALIFORNIA ENVIRONMENTAL PROTECTION AGENCY Guiding Principles Program Benefits Summar y: FY09-1 0 Projects Coordination with CEC’s AB 118 Program Proposed FY10-11 AQIP Projects TOTAL Hybrid Truck & Bus Voucher Incentive Project (HVIP) Cost vs. Production Volume Regional Distribution of HVIP Trucks Regional Distribution of HVIP Trucks Regional Distribution of HVIP Trucks Clean Vehicle Rebate Project (CVRP) Equipment Replacement Project (LGER) Agricultural UTV Rebate Project Off-Road Hybrid Equipment Pilot Project Demonstration Projects