aashto/ntpep
DESCRIPTION
AASHTO/NTPEP. Polymer Concrete Overlays for Bridges and Pavements (PCO). Alphabet Soup. AASHTO – American Association of State Highway Transportation Officials NTPEP – National Transportation Product Evaluation Program e-PEF – Electronic Product Evaluation Form - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/1.jpg)
AASHTO/NTPEP
Polymer Concrete Overlaysfor Bridges and Pavements
(PCO)
![Page 2: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/2.jpg)
Alphabet Soup
AASHTO – American Association of State Highway Transportation Officials
NTPEP – National Transportation Product Evaluation Program
e-PEF – Electronic Product Evaluation Form
PCO – Polymer Concrete Overlays
![Page 3: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/3.jpg)
Purpose
Develop and Implement a Nationally Standardized Performance Based Evaluation Process for Polymer Concrete Overlay Systems
Reduce Redundancy of Testing Produce Valuable Unbiased Data
![Page 4: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/4.jpg)
![Page 5: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/5.jpg)
Polymer Concrete Overlays
Work Plan Draft Status Scheduled for Ballot in November 2011
Testing Facilities KYTC – Division of Materials Field Test Deck
Sample Submission and Data Reporting Data Mine
• http://data.ntpep.org
![Page 6: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/6.jpg)
PCO Work Plan
Manufacturers Participation Annual submission cycle Overlay submitted as a system
• Resin and Aggregate Five year resubmission cycle
Testing Laboratory Field test deck
![Page 7: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/7.jpg)
Laboratory Testing
Neat Resin Viscosity
ASTM D2196 Gel Time
ASTM C881 Flash Point
ASTM D 3278 Infrared Spectroscopy
AASHTO T237
Cured Resin Tensile Strength
ASTM D638 Tensile Elongation
ASTM D638 Modulus of Elasticity
ASTM D638 Absorption
ASTM D570
![Page 8: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/8.jpg)
Laboratory Testing
Cured Resin (Filled) Compressive strength
ASTM C579 Thermal compatibility
ASTM C884 Resistance to chloride ion
AASHTO T259/T260
Surface Aggregate Gradation AASHTO
T27 Soundness AASHTO T10 Absorption
AASHTO T84/T85 Shore D hardness
ASTM D2240 LA Wear test
AASHTO T96 Specific Gravity
AASHTO T84/T85
XRF Spectroscopy
![Page 9: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/9.jpg)
Field Test Deck
Installation Concrete Pavement,
Asphalt Pavement, and Bridge Deck
200 Foot Test Section Between June 1 and
June 30 I-64 Concrete and
Asphalt I-75 over Kentucky River
Evaluation Within 30 Days, 12
Months, and 24 Months Photographs Delaminated Area (%) Bond Strength
ASTM C 1583
Skid ResistanceAASHTO
T242
![Page 10: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/10.jpg)
![Page 11: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/11.jpg)
KYTC Skid Testing
Established Skid Testing Program Quality Control
3 Year Calibration cycle Maintain 3 control sections
![Page 12: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/12.jpg)
![Page 13: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/13.jpg)
What’s Left??
Finalize surface preparation requirements Develop e-PEF Develop DataMine module Develop Technical Committee Documents
Evaluation and Reporting time line Quality assurance program User’s Guide
![Page 14: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/14.jpg)
How Can YOU Help
General input on surface preparation requirements
General input on installation equipment/processes
General input on installation time requirements
![Page 15: AASHTO/NTPEP](https://reader035.vdocuments.site/reader035/viewer/2022070422/56816391550346895dd48755/html5/thumbnails/15.jpg)
Thank You
Derrick Castle, PCSChemical and Corrosion Laboratory SpecialistKentucky Transportation CabinetDivision of Materials